COURSE SUMMARY:
 This course cover the basic principles of protection in explosive atmospheres of plant and machinery outlined in IECEx 60079
series and OD 504.
 The explosion-protection aspects of conducting initial, periodic and sample audit inspections of explosion-protected
equipment and installations.
 Explosion-protection aspects for installing explosion-protected and associated equipment and wiring systems.
 The explosion-protection aspects for maintaining explosion-protected and associated equipment and wiring systems including
plant maintenance schemes.
 Testing electrical installations for explosive atmospheres.
 This Unit of Competence covers evaluating the completeness of a hazardous area verification dossier and compliance of the
explosion-protected aspects of the electrical installations within the constraints of a visual or close inspection.
PREREQUISITES:
 Competence in this unit requires a degree, diploma or equivalent in a technical subject such as College Certificates and Trade
Credentials.
 For an operative a minimum 3 years’ experience in general electrical installation practice.
 For a responsible person a minimum 3 years’ experience in Hazardous Area installation practice.
ELIGIBLE CANDIDATES:
 Electrical technicians/tradesman working in or associated with Explosive Atmospheres (Hazardous Areas)

COURSE CONTENT
DAY 1  Insulation resistance testing
 Examples of Hazardous Areas  Fault loop impedance testing
 Properties of Flammable Materials  Motor testing
 Acts and Regulations & Standards  Transformer testing
 Hazardous Areas Legislative Requirements  Perform visual, close & detailed inspections
 Hazardous Area Working Methods
 Working in a Hazardous Area DAY 4
 Hazardous Area Dossiers (HAD)  Types of inspections
 Ex markings & Certification  Grades of inspections
 Equipment for inspections
DAY 2  Information for inspections
 Selection of Equipment  Inspections sheets (How to complete)
 Selection of Wiring System  Reviewing calculations
 Protection Techniques  Practical examples
 Ex 001 - Selected Response Assessment
 Ex 001 - Constructed Response Assessment DAY 5
 Safe working in hazardous area requirements  Ex 003 & 006 – Selected response Assessment
 Hot work permits  Ex 003 & 006 – Practical Assessment
 Lock out procedures  Ex 004 007 & 008 – Selected response Assessment
 IEC Standard for Earthing
DAY 6
DAY 3  Ex 004 007 & 008 – Constructed response Assessment
 Installation testing  Ex 004 007 & 008 – Practical Assessment
 Earth testing

ASSESSMENT:
TRAINING VENUE:
Combination of written & practical
ATTS, SINGAPORE, No. 3 Buroh Street
JTC Space One @ Buroh, Singapore 627566
CERTIFICATION:
IECEx CoPC – Certification of Competency issued by CONTACT DETAILS:
SEEG, AUSTRALIA Email : enquiry@atts-asia.com
*Each certification will be charged separately Tel : (65) 6265 2838

Assets Training & Technical Services Pte Ltd www.atts-asia.com

You might also like