VOLUME XXIV NUMBER 3ITHIRD QUARTER 1984

MODERN STEEL
CONSTRUCTION
Skin is More Than Beauty-Deep!
Steel's Flexibility Slides to Success
Function Creates Form of Symphony Pavilion
Modular Steel Construction Speeds Schedule
How Steel was Switched to American Suppliers
DECK DATA
_______ ML5 _________
ASIMPLE REVIEW PROCEDURE FOR DETERMINING THE NEGATIVE MOMENT
CAPACITY OF REINFORCED SLJlBS FORMED ON STEEL DECK.

;" · · ·
.
P

'.~ '>.:~
1< •
• 0 • .
0· • •

Q "' O
0" :
. .
0
. . .

~
. -

,
I dd
d

t=total slab thickness. from bottom of deck to top of slab. inches.


P=pitch of deck (center to center of ribs), inches.
dd=depth of deck. inches
d=distance to center of reinforcing steel from bottom of deck, inches.
As=area of reinforcing steel (not the deck), sq. inches/ft.
bp=average width of one rib, inches.
b= 12 {bp)/P. inches per ft. of width.
Convenfional reinforcement concrete design procedures apply-such as
the elastic method from ACI 318-63.
f'c=3000 psi } P=A./bd
fc=1350 psi k=V2 pn+(pn}'-pn
f.-30000
- PSI
. example values
j=l -k/ 3
n= 9
Mc= lt2fckjbd 2 (or) M.=A.f.jd (least value governs, inch pounds)
UNITED STEEL DECK, INC. PROFILE w/ h bp P b
1.5" Lok-Floor 3.85 6 12 6
2" Lok- Floor 3 6 12 6
3" Lok - Floor 2 6 12 6
N-Lok 0.75 2.25 8 3.375
B- Lok 1.5 2.25 6 4.5
Inverted B- Lok 2.5 3.75 6 7.5

Notes I .) If the deck LS unshored (dunng the pour) the design moment does not need
to mclude the weight of the slab
2.) ThlS design procedure IS applicable for ei ther composite or non-composite deck.
3.) The w/h values are used to determtne stud strength If composite beams
are being used Note that N-Lok IS not effiCient for composite beams

~ t­
~ I-

~L. \"~-'- 'I'}-J',--,=,H


~'ALJ~ N ICHOLAS J. BO URAS, INC.
PO BOX 662, 475 SPRINCr lEI D AV~
SUMMIT. N~W IERSEY 0790 1120 11 277 16 17

by PClngbom
~
En •neered descaIing Pangborn offers

anf surface prepamtion


systemS for Steel
a full line of stan-
dard designs. Or we
can custom engineer and
manufacture a complete
fabricators. system to your special
requirements ... any size,
Now you can descale any shape, any speed to
steel faster, cleaner and fit into your manufactur-
safer. And at the lowest pos- ing or fabricating pro-
sible operating and mainte- cess. And all of our de-


nance cost per ton of scaling systems are built
product cleaned . with traditional Pangborn
Today, Pangborn Roto- quality, and are com-
blast® descaling is the most petitively priced.
efficient way to clean steel For the most efficient,
products ... plates, sheets, cost cutting descaling
coils, rods, billets, slabs and surface
and rolled or fabricated preparation
structures of all types and systems . . . talk to
shapes from the very large Pangborn first. We put over
to the very small. 75 years of applications
A Pangborn Rotoblast engineering, manufacturing
system can clean, prepare know-how and full service
and provide the proper sur- back-up into everything we
face finish for the application build . Contact: Pangborn,
of modern coating systems. Box 380, Hagerstown , Mary-
Additionally, Pangborn land 21740. (301) 739-3500.
descaling can lengthen
tool and die life and im- Pangborn's horizontal roller conveyor descaler,
WIth Inverted ~r 0p60(n9, handles wid. ffange beams
prove burning. welding up 1036 " hIgh, sl961 plate up to 60" wK1e and 8
and machining vBrtety of rolled and fabricated .shapes.
operations. 'Ia1k to the leader
. .. fil'st.

PANGBI:JRN'
MODERN ':£1
CONSTRUCTION
Published by

American Institute
of Steel Construction
VOLUME XXIV NUMBER 3'THIRD OUARTER 1984

CONTENTS

One Melion Center: Skin is More Than Beauty-Deep! 5
The Wrigley BUilding Atlantis: Steel's Flexibility Slides to Success 13
400 North Michigan Avenue
Chicago , IllinoIs 60611 Cincinnati Symphony: Function Creates Its Form 17
Rohm and Haas: Modular Steel Speeds Schedule 20
OFFICERS
Throgs Neck Bridge: How Steel was Switched
John H. Buscl1, CI1alrman
to American Supplier 26
Womer H. Ouasebarth,
First Vtce Chairman
Dulany Condominiums: Mother Nature Takes
Norman G Ridenhour,
a Back Seat 28
Second VICe Chairman 1985 INTERNATIONAL SYMPOSIUM SET
Oscar W Stewart, Jr., Treasurer The program for the 1985 Intemational Engineenng Symposium on Struc-
Neil W Zundel. President tural Steel-whlch supplants this year's National Engineering Confer-
William W. Lamgan, enc&--will feature papers by an outstanding group of structural engineers,
Secretary & General Counsel educators, researchers, architects and consultants from eight countnes.
Geertlard Haaller, The agenda Includes experts in both theory and practice whose Innovative
VICe President, Research & Engineering concepts have often set the industry's standards in the design of buildings
LewiS Brunner. and bridges. Their contributions to the design and construction of steel
Vice President, Marl<ehng structures now leads the way to future technology. See the ad on pg. 30.

EIGHT SCHOLARSHIPS TO BE AWARDED


EDITORIAL STAFF Eight $5,000 graduate fellowships will be awarded by AISC in 1985 to
graduate or architectural engineering students who study towards an •
George E. Harper, Editor of Publica lions
advanced degree related to structural steel deSign. The Fellowship
Am y Kragnes. Ed rtona l ASSistant
Awards are granted on the basis of the candidate 's proposed course of
James Herman, BUSIness
study, scholastic achievement and faculty re :ommendation. Applications

-
are now available at college Civil or architectural engineering departments,
or from the AISC Education Foundation, 400 N. Michigan, Chicago, IL
60011.
REGIONAL OFFtCES
NOMINATIONS INVITED FOR T.R, HIGGINS LECTURESHIP AWARD
NORTHEAST REG ION
New York. NY (Hdq ) 212,69f>-4291
Applications are now being accepted for the 1985 Theodore R. Higgins
8oSIOO, MA 617 /329 74 I 7 Lectureship Award, which recogmzes the author of the most Significant
Phlladelph,a. PA 609/858- 9354 engineering paper related to steel in the five-year period from Jan. " 1979
P,lIsburgh PA 412,4438840 to Jan. " 1984.
SOUTHERN REGION The Winner, who receives a $3,000 cash award, presents his paper on
Allanla GA (Hdq ) 404·458· 7679 six occasions during 1985. A jury of six distinguished engineers from the
Charlolle. NC 704,54 Hl960 fields of design, education and the fabricated structural steel industry
Dallas. TX 214'6305236 selects the Winning author. Nominations, which should be directed to the
Houstoo. TX 713'270-6363 Cornmiltee on Education, AISC, 400 N. Michigan, Chicago, IL 60611 , must
CENTRAL REGION be received by Nov. 16, 1984.
ChtC8go IL (Hdq ) 312.670--2400
DelrOit. MI 3 13'352· 5558 FOURTH ANNUAL AWARDS BANQUET DECEMBER 4
Minneapolis, MN 6121888-3791
Sl LOUtS. MO 314'721 1332 The prestigious 4th Annual Awards Banquet to honor this year's Prize
WESTERN REGION Bridge Award winners will be held Dec. 4 In Chicago's Westin Hotel. A
Los Angeles , CA (Hdq ) 818'444 ·4519 well-known panel of six jurors chose 26 of the most outstanding bridges
Denver, CO =831-4622 from this year's 93 entries. The black-tie banquet, now an industry tradition,
San FranCISCO. CA 4 I 50932-0909 prOVides a forum for leading architects, structural engineers, bndge de-
AISC HEADOUARTERS Signers, contractors and fabricators.
Ch,cago. IL 312/670 ·2400 Highlight of the evening will be a multi-media presentation by the City •
GOVERNMENTAL of Baltimore on the planning, design and construction of the Ft. McHenry
AFFAIRS Tunnel. Dallas E. Wiegel, director of Baltimore 's Community Affairs Dept.
Washington. 0 C 202146& 5548 will present the show. Tickets are available from AISC Public Affairs,
Chicago. 3121670-2400.

4 MODERN STEEL CONSTRUCTION


numerous special features were devel- house tower The finish colors, two shades from the deSired 12 ft, and would cause
oped of warm gray-to-beige, harmonize with the the core to grow to accommodate Wider
Massing consists of a 54-story tower gray granite courthouse and Union Trust beams And braced tube schemes, uSing
and a 17-story "bustle" (attached low-rise bUildings, the rich brown Cor-ten U.S. multistory X or V braces, were Incompat-
portion) of Similar appearance, to echo Steel Building and the red brick Wilham Ible With the architectural deSign •
H H Richardson 's landmark Allegheny Penn Hotel The framed -tube scheme flnalty se-
County Courthouse and tower The use of lected proved structurally efhClent and
solid plate panels with only approximately Structural Concepts gave the architect freedom to deSign an
25% glazing gives a visual weight similar Because of the bUilding height, deSired extremely compact, effiCient core Framed
to the surrounding traditional bUildings, clear spans, local conStruCtion market and tubes conventionally use Wide, closely
while aiding energy conservation . developer preference, steel framing was spaced columns and deep, sllff spandrels
The tower and bustle have sloping up- chosen for thiS prolect. Several Wind-re- to form a nearly solid tube or cylinder
per walls Similar to the mansard roof of the sisting systems were conSidered . Core which resists lateral forces by cantilever-
Union Trust BUilding Start of the bustle braCing proved uneconomical because Ing up from Ihe foundation The spandrels
slope coincides With start of the Union the core IS qUite narrow, giving the braCing are usually upset, prolectlng above Ihe
Trust roof Setbacks also occur at bUilding system a very slender 20: 1 aspect ratio It floor to prOVide adequate stiffness 10 limit
tops to further define their special nature would reqUIre excessive additional steel In bUilding drltt But here, With cooperallOn
Tall, narrow Windows and protruding col - core columns to control dritt, and large between the architect and engineer, and
umn covers create a strong sense of ver- uplift forces reqUiring expensive founda- Ihe developer, the facade was deSigned
ticality Similar to the courthouse tower, and lIOns Core braCing , plus outriggers, would to add liS sllffness 10 Ihat of Ihe framed
serve to distinguish It from the broader take useable space from outrigger floors , tube Thus the lube could be SiZed lust for
U S Steel BUilding An elongated octag- and reqUire that core columns and perim- strength When deSigning for strength
onal floor plan creates eight relatively nar- eter columns align, compromising core ef- alone, the columns became narrow W14 S
row faces, further diminishing ItS apparent fiCiency FUll-Width moment frames also re- on a 10-tt spacing (A572 Gr 50 steel), and
width qUire alignment and would need deep spandrels are W24 to W30's (A36 steel),
Corner proJections, which create eight beams to develop adequate sllffness which ht beneath the floor ThiS freed up
desirable bay-window corners per floor, across the long beam spans. ThiS would useable floor space all along the perime-
reflect the thickened corners of the court- force an Increase In floor-to-floor height ter, but Wind drift or sway at Ihe top floor

~ Nonstruelural •
_~,.. T R"~ b<oP wa..o.o / (Free-floating)
'" 'l'VIIO _ TOR., .'!"'. Facade Panels
~::.,~ ~ "' 1l\..CIEt. Unshaded
r Siructural Facede
Pansls Shown
~r:.::l'N T4.L.
"'.CT Jll",AT& Shaded (Exposed
'~.oIIC.#ICf.....,..e.., Faces only-Hidden
Faces nol Sheded
IOf Clanly)
r Thlct< Infoll
Panels al
Beh Trusses

Sliff Spandrels,
No Panels, on
Three Faces
Where ·Bustle~
Connects _ _-...,=!---_
)

Basement
Bracing _


~ MII~.m
, ""'eo...~
1~'T1:~1Q,; Foundation
!')to(" ..e"'!IIWCJIIL to...~ Walls ___-
p
"T
~. 'IO"""'"
TJt&Ii...c IIIO..~
lIQ.."
I:IIJ:f.. To-e~~~~

Stressed skm-tube mterface (I ). and tower


model With facade panels (above)

6 MODERN STEEL CONSTRUCTION


numerous special features were devel- house tower. The finish colors, two shades from the desired 12 ft, and would cause
oped . of warm gray-Io-beige, harmonize with the the core to grow to accommodate wider
Massing consists of a 54-story tower gray granite courthouse and Union Trust beams. And braced tube schemes, using
and a 17-story "bustle" (attached low-rise buildings, the rich brown Cor-ten U.S. multistory X or V braces, were incompat-
portion) of similar appearance, to echo Steel Building and the red brick William ible with the architectural design. •
H.H. Richardson 's landmark Allegheny Penn Hotel. The framed-tube scheme finally se-
County Courthouse and tower. The use of lected proved structurally efficient and
solid plate panels with only approximatety Structuraf Concepts gave the architect freedom to design an
25% glazing gives a visual weight similar Because of the building height, desired extremely compact, efficient core. Framed
to the surrounding traditional buildings, clear spans, local construction market and tubes conventionally use wide, closely
while aiding energy conservation. developer preference, steel framing was spaced columns and deep, stiff spandrels
The tower and bustle have sloping up- chosen for this project. Several wind-re- to form a nearly solid tube or cylinder
per walls similar !o the mansard roof of the sisting systems were considered. Core which resists lateral forces by cantilever-
Union Trust Building . Start of the bustle bracing proved uneconomical because ing up from the foundation . The spandrels
slope coincides with start of the Union the core is quite narrow, giving the bracing are usually upset, projecting above the
Trust roof. Setbacks also occur at building system a very slender 20:1 aspect ratio. It floor to provide adequate stiffness to limit
tops to further define their special nature. would require excessive additional steel in building drift. But here, with cooperation
Tall, narrow windows and protruding col- core columns to control drift, and large between the architect and engineer, and
umn covers create a strong sense of ver- uplift forces requiring expensive founda- the developer, the facade was designed
ticality similar to the courthouse tower, and tions. Core bracing , plus outriggers, would to add its stiffness to that of the framed
serve to distinguish it from the broader take useable space from outrigger floors , tube. Thus the tube could be sized just for
U.S. Steel Building . An elongated octag- and require that core columns and perim- st rength . When designing for strength
onal floor plan creates eight relatively nar- eter columns align, compromising core ef- alone, the columns became narrow W14 's
row faces , further diminishing its apparent ficiency. Full-width moment frames also re- on a 1O-ft spacing (A572 Gr. 50 steel), and
width. quire alignment and would need deep spandrels are W24 to W30's (A36 steel),
Corner projections, which create eight beams to develop adequate stiffness which fit beneath the floor. This freed up
desirable bay-window corners per floor, across the long beam spans. This would useable floor space all along the perime-
reflect the thickened corners of the court- force an increase in floor-to-floor height ter, but wind drift or sway at the top floor

Nonstructural •
CQu,..MN TREl!!! 5MoP·wEl..DEO (Free-floating)
.,.. TvoO STORY · '!RS-
Facade Panels
co......MI'i ".,.. ~ ... oP ..... E\...OEO
-0 c.::\".u,... ... Unshaded
~'~ / Structural Facade
/ Panels Shown
Shaded (Exposed
~~-~ FJCADE ~a Faces only-Hidden
Faces nol Shaded
""" ""'"
VJ~C'
~T1~_I"1EA ...",,0
for Clarify).
inti!!
Panels at
Belt Trusses
C'LIrH Covtp.
~.TE.~,;ff)~.,-

Stiff Spandrels,
No Panels, on
Three Faces
Where ~ Bustle"
Connects --~",:::::~ij3R~

Basement

... -""'ect..~
I ...~~~~IO.~
: :J...... ...E~
p.PN'Ei,. ~~!O..~
,. -JE&Ii"J( !IO..~
"""-'016..

~ Ao..:. ~;:.-o:r-e ..,110£ Ir..o.J


!o.)_~

~
Foundation

Stressed skm-tube Interface (I.) ; and tower


model With facade panels (above) .

6 MODERN STEEL CONSTRUCTION
of this retatlvely flexible tube would have wall section). Stiffener and subpanel buck- ness, and ending at o/,.-In plate With all
been an unacceptable 3O-In or t/29O!h of ling was also checked by a NASTRAN spandrel and mullion subpanels diVided
height By uSing the steel plate facade as buckling program by additional stiffeners ThiS hierarchy was
,nflll, the frame was s!lffened and Wind drift Second, a fine-mesh finite element used to develop a panel schedule Similar
ecame an acceptabte 15 In or 1/500th model 01 the entire panel With appropriate to a column schedule, since the overall
• of height Because the facade IS used only edge restraints was used to find the pat- bUilding computer runs showed shears
for deflection control, not for strength, it tern of working stresses expected at var- varying from face -to-face and floor-to-
does not need fireproofing or flame IOUS levels of panel shear, and to deter- floor
shields mine Ihe lateral spring constant of the
panel Facade Detailing
Facade Anatysfs Third , the elastiC buckling stresses TYPical panels are three stories high by 10-
Although reqUIred only for stiffness, the fa- lound In Step 1 were converted to allow- ft Wide to minimize JOlnlS, yet perm 11 easy
cade panels need suffiCient strength to re- able stresses, With due consideration for shiPPing. They consist 01 V. -In. to o/,.-In
slstthe forces imposed It was necessary inelastic behavior. The slenderness ratio A36 face plates, a grid of 4-ln., 5-in and
to keep working stress below buckling lev- Llr, which corresponds to the elastic buck- 6-In. A36 slllfeners aligned With Window
els to prOVide good stiffness, aVOid a rip- ling stress, was found , and that Llr was edges, and bent plales or angles at panel
pling appearance and poSSible glazing used ,n the usual AISC compression for- edges Because panel Installation closely
problems To accomplish thiS, panels were mulas for allowable stress. followed frame erection, the panels re-
analyzed In several ways Fourth, a full-Size, three-story steel pro- qUired Isolation from the column shorten-
First, the small rectangular subpanels totype panel was fabricated by USS Fab- Ing which would occur as erection pro-
defined by the stiffener grid were analyzed rication and tested at Fritz Laboratory of ceeded Thermal expanslOl1 also had to
uSing claSSical plate buckling theory to es- Lehigh University Overall panel stiffness be relieved These goals are met by a
tablish Critical buckling stresses, assum- and buckling strength was In good agree- unique auachment system which limits
ing Ihat the stiffeners are fully effective. ment With the analYSIS panel-to-frame connections to vertical fins
Stiffener effectiveness was checked by us- At thiS point, a hierarchy of panel types at panel mid-height, fleXible honzontal
Ing the AISI specification for design of versus shear force was established, start- plates at panel top and boUom. and flex-
cold -formed laterally unbraced beams Ing at V. -In . plate With the baSIC stiffener Ible tiebacks at Window heads and Sills
(since panel proportions made It a thln- grid , adding sllffeners andlor plate thick- Panel-to-panel connections are used to

,ectlon 01 column trees at slopmg lOP Column cover butts coyer below and studs
• ote finS for panel connections Web holes protrude through S/OIS In panel Note bolts
gIve boltmg access at panel hOfllontal JOints ., panel edges

3rd Ouarter 1984 1


ensure that each buitding face acts as a cial, large vertical fin on the building frame. ethylene slip pads under plate washers.
true stressed skin. Bolted connections at Tiebacks provide resistance against wind
top and bottom transfer·the horizontat wind normal pressures and hold the grid Panel Fabrication
shear from upper to tower panels. These against buckling . Because 6,300 tons of steel are in the skin,
connections attach to the spandrel beam While panet horizontat loints are easily lacade fabrication used as much stano.
to bring in additional shear from wind on sealed , the numerous bolts and shims at dardization as possible. Face plates were
that floor, and compress two lines of vertical edges require a different ap- ordered oversized to ensure unmarred fi-
closed-cell neoprene which seal the hor- proach. The column covers, brake-bent nal edges and true final shapes. Window
izontal shiplap joint against weather. from 12-ft lengths of Va-in. steel plate, openings were cut and edges trimmed to
Panel-to-panel stitch bolts along vertical cover Ihis joint and are sealed against the true size on a numeric-controlled plasma
edge angles transfer wind shear between panels with closed-cell neoprene strips. torch table. Window openings have corner
adjacent panels. By concentrating bolts In These are compressed by V... in. threaded bulges to provide a stress-reducing radiUS
the areas adjacent to window openings, studs which poke inward through the without interfering with the glazing, and the
the two narrow "mullion" strips on adjacent panels. Butting ends are sealed by neo- n-c torch easily provided this potentially
panels are forced to act as one wider mUl- prene held between end diaphragms of tricky detail. Jigs were used to fabricate
lion with much greater stiffness and the stacked covers. To avoid a chimney stlflener grids square and to a true plane.
strength. effect in the covers, one end diaphragm Double fillet welds provide continuity
At vertical fins , fin-to-column connec- every few floors is extended to block vir- through stiffener intersections. Then the
tions need to transfer only the change in tually the full cross section of the cover. To face and the grid were connected, using
shear between adjacent panels. Interest- permit weeping of any water which may Ve-in. intermittent staggered welds. This
ingly, while the largest shear in panels oc- enter, the bottom seal at the base flashing weld size was found to limit oil-canning on
curs when panels act as part of the tube IS an open-cell sponge. V. -In. plates to acceptable limits, and to
web, the largest change in shear between Where column covers bridge across show virtually no oil-canning on o/,e-In.
panels occurs on the tube flanges. Where panel joints , and where non-structural plates. Edge angles and bent plates were
building faces end , the stressed skin is panels occur, such as at the flexible bay- fillet-welded last.
interrupted by bay-window corners, and a window corner panels, motion IS permitted The panels received a shop-applied
heavy vertical edge angle serves to collect by the use of slotted holes for studs and four-part treatment con sisting of sand-
all the panel shear and deliver it to a spe- pairs of ultrahigh molecular weight poly- blasting , zinc-rich primer, epoxy interme-

.- -

:... -;.,........
;.,_......
;:.£::.:,;:.....
~. -
-

--.
--....... -
--"""---'"-
(- -..--....,

'-"-------"- -------!
, -- " - l>
(, ,'

DDOLu~ o --_
_--- - .....
.......
...
.- ~~ ------1
00_0 S_D JH - ._ _.
Plan Section at panef-(o-coJumn connection 1m (above) Forces
actmg on panels (r). Section at panel-lo-panel vertical JOInts (r.j
-" J
.....
=--:::::.._o.t
[1 ULLJ UGO
.... .....,. " ....


~

Ii it I

B MODERN STEEL CONSTRUCTION


diate and two coats of urethane finish. In- winds. Panel shear forces were derived
sulation was also shop-applied using directly from the second model.
impaling pins, to permit quick erection di- • Explicit recognition of the P-delta effect.
rectly from the delivery truck. Transpor- When a building drifts, the total of col-
_ tion costs were minimized by using jigs,
hich permitted stacking of several panels
umn loads at a story P times the inter-
story drift, delta, adds to wind moment.
STRUCTURAL
on a trailer, yet protecting their finish from
damage. After adjustment and bolting up,
P times delta divided by story height is
the additional story shear generated. For
PRODUCTS
insulating glazing was field-installed from
inside using neoprene zipper gaskets in a
the rather flexible frame-only case, P-
What % of your needs
delta typically added 17% to wind
bed of uncured butyl sealant. The inner shears and moments. require ST. LOUIS
light of glazing is supported by a PVC • Eight bay-window corners on each tower SCREW & BOLT HIGH
weep evaporation channel on the sill stif- floor, which interrupt the line of structural STRENGTH Bolts?
fener. facade panels and standard tube bays.
Even with very heavy W33 or built-up
Specfal Features of Structural Desfgn
Consider this -
beams, these weak links caused the
In addition to the use of a stressed-skin framed tube to act too much like a col-
facade , the 21,OOO-ton steel frame incor-
.American Made
lection of individual walls. To reconstitute
porated numerous other special features: proper tube action, infill plates 1y.. in. • Tested & Certified
• A two-step tower analysis. One tower thick and belt trusses were required at • Full Range of
model considered the frame 0rly, and the 17th and 35th levels, which are me- Type I & lIT Products
included 3,000 nodes, 6,000 members chanical floors .
and 9,200 degrees of freedom . A sec- • Box columns at 45· corners. Because of
• Fast Delivery
ond tower model had facade panels the nature and orientation of wind mo- .95 Years of
added, simulated by Y,..in. thick steel ments acting on these columns, internal Dependable Service
membranes . Each member was stiffeners required welding on all four
checked against forces in both models edges. Three edges were welded before
resulting from 70 mph fa stest-mile closing the box, and the fourth edge was
welded by the electroslag process
through a keyhole in the box.
• Free circulation between the lOW-rise
bustle and the tower. Built-up spandrels
compensate for the loss of facade panel
stiffness in these areas, to avoid tower
twist.
• Tuned bustle stiffness. An expansion
joint between tower and bustle would
create more problems than it would
solve. To help the bustle move together
with the tower, a line of internal chevron
bracing was provided and sized to give
stiffness compatible with the tower.
• Vierendeel column pickups: 23 of the 28
perimeter bristle columns are inter-
rupted for lobbies. driveways, loading
docks etc. The spandrel-and-column
grid on upper floors acts to carry most
of the load by Vierendeel action, per-
mitting relatively light pickup girders.
• Shallow floor-to-floor height (12-ft) With
an 8 11-6 in. ceiling and a 45-11 span.
We wantto be involved _
Unshored compOSite W24 beams sup- CALL US COLLECT!
port an electrified 4Y,-in. slab on a 2-in.
composite metal deck. Shop-cut open- Todayat314-389-7500
ings pass mechanical services. An in-
house computer program determined ST. LOUIS SCREW & BOLT CO.
reinforcement requirements. so only 6902 NORTH BROADWAY
40% of the 4,000 beam cuts requ ired ST. LOUIS. MISSOURI 63147-9990
reinforcement. Such reinforcement IS PHONE (314) 389-7500
generally limited to a pair of bars at the
011 trusses on laces and mflll plates at bottom edge of the hole.
• orne,s occur at '7th (shown) and
35th·floor mechanical fooms to Improve
tube actIon

3,d Quarter/ ,984 9


• Offset core cotumns which project into • Minimum-sized core columns. At lower • Foundation bracing. Half of the tower pe-
elevator lobbies, rather than into the cir- levels, columns are virtually solid A572 rimeter is incorporated Within the foun-
culation corridor around the core. For a Gr. 42 steel consisting of side-by-side dation wall, which is designed to resist
given corridor clear width, this gives an plates welded together. the wind shear, and to act as a hold-
additional band of useable space all • Grillage footings at core columns. To down beam for those corner column •
around the core. avoid overloading weak claystone un- which may experience uplift. To avolclW'
• Standardized slotted beam seats for derlying the sandstone bearing stratum, tower twisting and limit drift at street
skewed beams. By skewing, framing is the bearing level had to be kept high. level, the other perimeter faces have
direct and easy to erect while still per- Conventional reinforced concrete foot- heavy steel wind shear bracing from
mitting freedom of core column place- Ings would be too thin and fail in punch- foundation to street level.
ment. ing shear. Each steel grillage consists of • Easy retrofit for the bank vaults, mez-
• Cambered core columns. Because ver- a bottom tier of 15 to 16 S24 sections zanines, stone finishes and grand stairs
tical load plus wind moment governs pe- and a top tier of three W14 jumbo sec- requested by tenants, because of the
rimeter columns, they act at a lower tions, all with pipe and strap separators. adaptable nature of steel framing .
stress than the vertical-load-only core Bottom tier beams were set shimmed on At One Mellon Bank Center, the mar-
columns. Core columns were fabricated a mudslab to give a level top plane. Top nage of a stressed-skin facade to a framed
about V2<rin. longer per story (V.-in. in tier beams were shop milled to have a tube creates a distinctive new structural
three out of four two-story tiers) to pro- level top bearing plane to receive the system which is practical, efficient and
vide level, not dished, floors when all base plate when they rest on a level sur- economical. It should prove to be a useful
dead loads Including permanent walls face . The assembly was then encased addition to the family of hlgh-nse wind re-
are in place. in concrete. sisting schemes. 0

Architect
Welton Becket Associates
New York, New York

Structural Engineer
Lev Zetlin Associates, Inc
New York, New York


General Contractor
Turner Construction Company
Pittsburgh, Pennsylvania

Steel Fabricators
Amencan Bridge D,VISion, U S Steel Corp
Montague·Betts
Pittsburgh Bridge & Iron

Panel Fabricator
Calumet Industries 'Narks Incorporated
Gary, Indiana

Steel and Panel Erector


American Bridge D,VISIon, US Steel Corp
PIttsburgh, Pennsylvania

Owner
500 Grant Street Associates
Top of wbustle~ shows CflSp detaIls and numerous planes of stressed-skin facade Pittsburgh, Pennsylvania

Developer
U S Sleel Realty Development
A paper on One Mellon Center won the $5,000 Gold Award in the James F. Uncoln Arc Pittsburgh, Pennsylvania
Welding Foundation's 1983 Welded Destgn and Engineering Award Program.


10 MODERN STEEL CONSTRUCTION
INDEPENDENT
• TESTS PROVE IT:
Th is fastener
will attach steel decking
with greater consistency.
And anybody
can do it- faster.
Ramset's T·26 System is your assur-
ance of a Quality fastening every time.
The system includes a rapid-loading, AC TUAL SIZE

powder-actuated 1 Gradually Increasing diameter of


• tool thaI's com- shank causes washer to make com-
pletely portable, easy-to- plete contact with steel deck . Also
use and meets OSHA safety prevents over-penetration of fastener
regulations. But the key ele- 2. Length of shank allows multiple
ment is the unique fastener. The pin/ sheets to be fastened , up to a com-
bined thickness of 200 mch
washer design assures consistent
holding power, and installation is two 3 Shank IS knurled to give the fas-
tener bile" and mcrease holding
to four times faster, too. II's been pro- value
ven on major projects and by indepen-
4 Pre-stressed washer prOVides
@Ramsel. dent testing laboratories. You don't
have to take our word for it. We'lI send
clamping action . absorbs sheet
stresses, rides up shank when pm IS
Ramset Fastenmg Systems
A DIVIsIOn olOIm CorporatIOn proof. Write Don Van Allman. head of driven assuring POSitive. firm holding
• InlerNlhO''''' HucIQ~l1ert
our product engineering team at 5. Pomt deSign and hardened steel
Shllmrock $freet .. _. Ramset Fastening Systems, Shamrock
e.te Alton. IIht'lOlll52024 ~ composition of pm Insure proper
(818)25&2000 ~ St" East Alton, IL 62024. penetration

3rd Duarter 1984 11


When's the last tiIne
you asked for
a custOIn hot-rolled section?

]
T
H
1
1
I
I
WBC Custom-Welded Sections Beat Hot-Rolled Beams Six Ways.

1. Custom Sections 3. S t ronger 5. Consistent Qu ality
It's no longer necessary to restrict High Frequency welding produces a Our beams are produced continu-
your beam designs to standard hand- true forge weld as strong as the par- ously at speeds up to 200 feet per
book WF sections. Special offset or ent metal with no filler metal or cast minute on our modern high frequency
"Z" sections like these are easily pro- structure. And , you can specify HSLA weld mill Low waste , high speed , and
duced by Welded Beam Company to steels up to 80,000 pSI yield for all or specification-matching controls com-
SUIt your exact geometry, loadmg. part of the beam providing greater bine to assure a conSistent high-
and length requirements . You can load-carrying capabi lity in a ~maller, quality product
even use dissimilar steels for web lighter beam .
and flanges .
6. Deli v ery Flexib ility
4. Easi er Assem b ly Our mill is a more flexible manufac-
2. Reduced Fabricating Draft angles are nonexistent for WBC tUring system than the traditional hot
Cost HF-welded beams, So flanges are fial mill As a result, shorter runs are eas-
Since wee " Custom Beams" are fab- and edges are square, simplifYing Ilt- ily achieved that shorten your lead
ricated exactly to your requirements , up at assembly Also , beams can be time and let you match delivery to
labor and scrap from cutting up delivered to exact customer lengths constructIOn dates
standard WF beams to suit the Job IS saving on splicing or cutting on-site.
eliminated

Welded Beam Compan y "CuslomBeams" can make a dramatic difference In the


InteQnty. scheduling and fabncatlng costs of your fabncated metal product


Contact WBC now 10 get the full particulars.
Post Office Box 280 , Perry , OhiO 44081 , Telephone: (216) 259-4500

WELDED I3EAM COMI::IANV


t2 MODERN STEEL CONSTRUCTION
Atlantis, The Water Kingdom :
. Steel's Flexibility Slides to Success

ixty-five acres of water slides! The Will rush down the slides, enough water to
S magnitude of AtlantiS, the Water King-
dom In Hollywood, Fla makes Its overall
support a small City. Twelve slides were
bUilt In Phase 1- mne standard 4-ft slides,
water slides at different heights Figure 2
shows the problem was complicated by
the unusual weaving and looping patterns
deSign concept unique According to the one tube and two speed slides-the larg- of the water slides A flume run ConSiStS
park's deSigner, the water-o"ented theme est slide system ever bUilt of many fiberglass pieces bolted to one
park IS the largest of ItS kind In the world Design of the flume support systems de- another Every flume (OInt has an x-y-z c0-
The $1B.5-mlllion park offers a Wide array manded high-strength steel. The connec- ordinate. These unusual patlerns de-
of water-related "des, attractions, leisure tions had to be Simple because of the com- manded a very fleXible system to support
activities and family entertainment lust off plexity Involved when the structural all the flume (OInts As a result, the flume
Route 1-95 In east-central Flo"da Figure members were Interacting Welding was Iree support and the tresile support were
1 details the overall concept of the huge chosen to give SimpliCity and a clean ap- deSigned With the Idea to carry as many
prolect pearance to all the connecllons The sup- flume JOints as posSible With the least
The Int"cate deSign of the steel struc- port system was also deSigned so the ma- amount of ground supports
tural system that supports an array of jo"ty of the welded connections could be To keep Ihe overall support system look-
water slides (flumes) from a steel tower is fabricated In the shop for economy and Ing clean, a Single PIPe support carnes a
shown In the area Circled on Fig. 1 When quality control number of JOints ThiS ffume tree system
finally completed, the project Will have 1B proved to be more effiCient than a tresile
slides projecting from the tower at 34 -ft , Flume Structural Support System

44 -ft , 54 -ft, 64 -ft and 74 -ft levels At full The archltecl was challenged to design a Figure 1 Rend~"ng 01 total AllanlJs protect
capaCity, 49 million gallons of water dally syslem that could support a number of site. With water slide IocatlOfl Circled

LOCATI ON O~ WA TE R UI DU


3rd Quarter 1984 13
support (a framework of tubular steel berglass flume to the secondary arm sup- more complicated when two or more arm
members) at every jOint. There was ap- port (Fig. 3). The secondary arm provides systems combined on the same plate stif-
proximately a 30% savings in cost of steel enough play in the system so a proper feners. A pipe jig and hydrauliC jack were
pipe using the free design vs. an equiv- flume fitting can be achieved before field- used for the shop fabrication of this set up . •
alent height trestle. The support systems welding the arm. A tubular structure was In many cases, the arm systems were In-
(as high as 74 tt) had to be designed for chosen for the arm systems primarily for terfering with each other. The problem was
hurricane winds up to 120 mph (required its rigidity in bending and torsion. complicated as the number of arms inter-
by the South Florida Building Code). Steel , The applied loads considered on these fering increased. Such Interferences not
chosen for its high strength and practical members were: only reduced the cross sectional areas of
application, made the overall system very • Dead load of the flume system and live the tubes, but also Introduced additional
flexible in adapting to the unusual shape loads due to people and water torsional stresses . Welding the entire
and height patterns of the slides. The splice was the only practical solution ,
• Centrifugal forces developed when a
same strength and flexibility were main- mass of people and water travels through which developed the full load on the con-
tained by uSing only welded connections. nection Without any additional plates. A
a flume loop or radiUS
Connections were simplified , thus produc- clean connecllon (Fig 5) was stili main-
• Turbulence induced by high winds tained after being primed in the shop.
ing a clean transition between structural
flowing through the spaghetti-like flume
members Each arm system had to be precisely
structure
welded to match an x-y-z coordinate of a
Ffume Tree Support The tubes also provided simple con - flume joint. tt was necessary to position
The concept In designing the tree struc- nections. The short and long arm system the arm systems correctly, and quality
ture was to support as many flume joints reduced material cost . The main arm has welding was required. Fabricating the arm
as possible. The various structural com- a maximum length of 18 ft, but in special systems in the shop made this possible,
ponents of this system are labeled in Flg.3 cases It reaches out as far as 21 ft (see and the arms could then be attached and
It was advantageous to place a pipe sup- Fig . 4). This arm system reqUired plate stif- held-welded to the pipes Erection bolts
port at the center of the flume loop or ra- feners to strengthen the pipe walls. Weld- were welded to the pipes to accurately
diUS where possible. This gave the system Ing made it possible to have clean con- position the arm systems
the flexibility to support a greater number nections between the tubes and pipe while The pipe support was the largest struc-
of flume jOints, and thus eliminated many maintaining the structural integnty of the tural member of the tree system. A pipe
trestles. Where there are a number of tree system. Since they have the same outline was chosen because of ItS effiCiency In
supports, It was most cost-effective to fab- as the connections, the welds were more resisting a lateral force , wllh five different
ncate sets of arm systems (main arm and efhclent In resisting a torsional load- the SIZe pipe columns shown In the columns
kick arm) of one length. The flume tree same efficiency for using tube members schedule. In some cases, the resisting
employs all-welded connections. for torsion. Wind moment near the base was so great •
The mounting bracket connects the h- The tube-to-plpe connection became that the largest available sIZe pipe had to

FIgure 2. Unusual weavmg and mter·


loopmg of slides complIcated deSIgn
problems


14 MODERN STEEL CONSTRUCTION
be reinforced with a pipe liner. Rgure 6
shows a Pipe "24" STD. (V2 in. thick) lined
with a Pipe "24" XS WO in. thick). The bot-
tom was cut at an angle for ease of welding
_ the pipets) to the base plate. The liner,
~hlch only extends as far as structurally
required (up to 15 tt), is a pipe with a single
cut along Its length. Plates with pre-drilied
holes were temporarily welded to the pipe
on each side of the cut to provide an-
chorage for a threaded stud with double
nuts at each end. The sleeve pipe was
gradually pried open by screwing the ap-
propriate nuts. A come-a-Iong was then
used to slip the sleeve over the pipe sup-
port. After poSitioning, the nuts were un-
screwed, causing the sleeve to rebound
to ItS Original shape. This rebound caused
the sleeve pipe to physically grip around
the pipe support, giVing a very tight con-
nection to weld. Welding made it possible
for the liner and pipe to perform as a Single NATIONAL
structural member. The final product re-
veals a liner which is unnoticeable from a INSTITUTE OF
distance.
It was also economical to section a long STEEL DETAILING
p ipe Into different thicknesses . The
lengths of pipes to be spliced had to be
determined by balancing the savings of representin g:
material of a thinner member vs. the labor the independent steel detailer
cost of the splice weld itself. If the V.-in.
pipe was more than 13 tt above the point
_ here a :Vo-in pipe was structurally ade-
uate, It was more economical to weld dedicated 10:
increasing professionalism in the
sfeel detailing industry and
improving re lations among
colleagues in the steel
construction industry
PlP.

SECONDARY ARM
TW • • • • _ _
contact us for furth er information on:
MA'NARM-- ,
• associate member.;hip
1 • members hip roster
~ ........
• publications available
AT E STIFFE NERS --~' . ...•. ,1
• quality procedures program
• association goals and activities
.... ,,,'
- ........
WELD SPLICE EXECUTIVE OFFICE
KICK ARM MOUNTING BRA CKETS 2506 GROSS POINT ROAD
EVANSTON, ILLINOIS 60201
PIPE LINER (312) 475"7530
SASE PlATE -';;::::::::::::::::::1


Figure 3 Flume suppo" Isometnc Figure 4 (top) Steel arm reaches out to
21·11 maX/mum Figure 5 (e) Clean
connection was mamtalned after shop
p"mlng Figure 6 (bon ) Fmal produel 01
welded connection

3rd Ouarter 1984 f5


splice the ¥.-in. pipe to complete the tree.
Keeping this in mind, the weld splices
were located where they were cost effec-
tive. A clean transition was once agai.
maintained throughout the pipe with th
welded splice connections.
For erection purposes, it was decided
to fi rst anchor the base plate into the foot-
ing and then field-weld (a groove weld with
an inner shield) the pipe(s) to the plate.
This procedure provides a faster and more
efficient weld, and produces a very clean
connection without sacrificing the struc-
tural integrity of Ihe system.

Trestles
The other alternative for transmitting loads
was the steel trestle support. The trestles
were placed on a straight flume run where
the tree support was not practical, or at
places beyond the arm systems' reach.
This support system consists of tubular
members welded to each other, with the
trestles ranging In height from one to 69
ft. Some trestles were a combination of a
truss and frame system, necessary be-
cause more than one liume had to be sup-
ported at different levels by the same tres-
tle. The trestles also could be fabricated
in one piece in the shop.
This project is an excellent example of
the versatility possible in welding steele
Some of the attractive structural and ar
chitectural characteristiCs of welding are:
• tt is rigid, yet ductile In strength.
First is Arbed's new rolled 40" beam . .. available in 16 • It produces a variety of connections
sections from 149 to 328 Ibs. It gives high section moduli, because It can form around any shaped
great lateral buckling resistance, and competes economically member.
with both fabricated sections, as well as reinforced precast • It produces a very clean connection,
and prestressed concrete. making the overall project pleasant to the
Then there's Arbed's rolled " tailor-made " series (up to eye.
42.45 " x 18.13 " x 848Ibs.)... that lets you specify the beam Welding also permits the option of mak-
weight you need, other than what is normally available. Ing cost-effective decisions. Substantial
Result? Big savings: in fabrication costs and weight. savings can be made if the designer re-
Why not get all the facts? Send the coupon now for alizes the potentials welding has to offer.
The quality in welding has reached such
information including complete specifications.
a point that Ihe structural engineer should
'fu~ME~~rn~~~~~~~~~~n feel quite comfortable In using It as one of
I (212) 486-9890. Domestic Telex: (W.U.) 125159, Int' l Telex (ITT) 421180. his many design tools. 0

II In Canada: TradeARBED Canada, Inc., 1176 Blair Road, Burlington,


Ontario, Canada L7M lK9. (416) 335-5710, Telex 0618258 II DesigniStructural Engineer
Please send complete Information on TradeARBED's 40 · beams and I D. E. Bntt ASSOCiates, Inc.
I " TAILOR-MADE" beams. Fort Lauderdale, Fionda
I Name Titl e I Steel Fabricator

I Firm
Address, ___________________________________________
I Steel Fabricators, Inc

________S.!!!!'__ _=.I!!.... __ J Fort Lauderdale, Flonda


l..£~ Contractor (water slide)
Water Parks of Amenca
Myrtle Beach, South Carolina

11&-~E Ali!lBED lnc. Owner


Six Flags AtlantiS. The Water Kingdom
INNOVATORS OF STEEL CONSTRUCTION PRODUCTS Hollywood. Flonda

16 MODERN STEEL CONSTRUCTION


Cincinnati Symphony Pavilion:
. Function Creates its Form
by James E. Chaplin

new summer home for the Cincinnati spanned by a box truss which supports
A Symphony has risen on the banks of
the Ohio River In Hamilton Co, a .-just in
strument storage.
Long·span roof trusses 10-ft deep that
span 176 It provide a one-acre covered,
the roof trusses spaced 11 ft o.c.
Although the paVIlion's location on the
time for a July 4 opening performance. open-sided seating area for musIc lovers. OhiO River IS qUite sceniC, It poses prob·
Unlike pavilions in other areas of the More than 4,000 can be seated in the cOV· lems. Spring flOOCs frequently cause the
country, Cincinnati Symphony's new ered area, and space on the outdoor river to rise to 10 It above the stage level
abode incorporates an enclosed stage slopes provides for another 10,000 to view EqUipment, and the dreSSing room and
house t tOft wide by 55 ft deep. The stage the performances through the open sides stage areas, are set up to be removed and
house, poured concrete with foot·thlck and rear of the covered seating area stored dUring the winter The structure IS
walls, IS covered by a watertight roof, The Since the 264·ft width of the sealing area permanent, but had to be bUilt sufllclently
proscenium opening is 70 ft wide by 30 ft IS greater than the stage house, the roof rugged to resist damage from the water,
high. At the rear of the stage house IS a Irusses are supported at either side on 33· floallng objects, Ice and the assaults of
two-level structure that houses a green ft square steel towers. The space between nature EqUipment Items which cannot be
room, dreSSing rooms and space for In· these towers and the stage house IS readily removed and replaced (cooling

New summer home fOf Cmcmnatl


Symphony at former play/and site on OhiO


River Pavlhon theme was orchestrated
around the durabtlity and symmetry of
structural steel 'rammg

James E. Chaplin IS vICe preSident of lhe con·


suiting englneenng firm of OeSIrTlone. Chap-
hn and ASSOCiates pc, New York. New York


3rd Duarter 1984 17
towers, transformers, etc.) are tocated on tem. The tower vertical members are 6-in. a cast-in-place curved pergola, 7SO ft
the roof, above the reach of ftood waters. wide-flange columns at each corner long, which provides space for restrooms,
tn devetoping the pavition-tike theme, braced on a 5 fI-6 in. grid. The box trusses, concessions and ticket offices.
the architect took advantage of the dura- the faces of the large towers and the small Foundalions for the stage house and
bitity and symmetrical beauty of structural towers were fabricated in the shop to the covered seating area are supported on .
steel framing . The superstructure is largest shippable elements (11 ft by 11 ft SO-ton auger-cast piles, extending 40 ft
formed from lightweight structural steel by 44 ft) to save construction time In erec- Into dense sand since the site has been
framing . The two towers on either side of tion and assembly. covered with river silt and miscellaneous
the stage house and a peaked structure Design of the structural steel involved fill. The pergola is further back from the
over the stage house extend 126 ft higher the use of computer techniques to analyze river, and effectively only one story high.
than the stage ftoor level. These are con- the framing for stresses and to minimize It was decided to preload the bearing area
structed from a light, open steel frame- lateral deflections which result when very with 4 ft of soil for three months before
work, to create a transparent, web-like ap- light sections are used . This approach also starting the construction of this structure.
pearance. The towers on each side of the permitted control of secondary stresses Taking advantage of pre-consolidation of
stage house are 33 ft square. The faces that result from wind and thermal eHects. the soil , together with keeping the soil
are framed using 8-in. wide-flange verti- The computer also permitted the designer pressure less than one and a half tons per
cals and horizontals, spaced 11 ft each to optimize the distribution of structural square foot, minimized settlement to tol-
way. Each panel was X-braced with 4-in. members, which minimized deftections erable levels.
WT's. while satisfying the stress conditions . According to Architect Michael Graves,
A box truss, ll-ft high by ll -ft Wide, Computer design of the structural and ar- "The design attempts a fresh approach to
spans the 44 -ft space between the tower chitectural steel resulted in a savings of the assembly of many people under one
and the stage house. Constructed entirely almost $300,000. roof. In its simpliCity, the scheme summons
of eight wide-ftange members, it serves to Extending toward the rear behind the thoughts of a congregation under a tent,
support the roof trusses covering the seat- covered seats, the grade slopes gently a building by the river and the relaxed at-
ing area. The rear of the seating area roof upward to afford a good view of the per- mosphere of a pavilion in the park." D
is supported on eight towers, ll-ft square formance for patrons seated on the grassy
by 22-ft tall, bridged by a box truss sys- areas. The rear of this area is defined by

Ml-JACK buys
DROll lravelift

~2t::~s=i~il~~f~rom J l CASE~~'~~J:9
1 PRODUCTS o..f
MI .. J"'~ ~th< DROTT
1M J . \. Cas< COlnp'~~

. _.......
acQ,uisition i.s
MI. J",CK haS


18 MODERN STEEL CONSTRUCTION
ATIP
FOR
COST

The Bolt is cali-


brated to assure
proper tension
when the tip is
twisted off during
installation.

• One man, one


side installation
• Non impacting,
electric wrenches
• Visual inspection
• Engineeringlfield
assistance

Open Sleel framework created web-lIke


LeJeune
Architects
Michael Graves
appearance for outdoor concert arena
Box truss between tower and playhouse
Tension
Princeton, New Jersey
Cart A Strauss & Associates (assoc. architect)
supports trusses that cover sealing area
Control
CinCinnati, Ohio
Bolts
Structural Engineer Offer the
DeSimone, Chaplin and Associates
New York , New York lowest cost
for properly
General Contractor installed /
F Messer & Sons Construction Co
CinCinnati, OhiO inspected
A-325 & A-490
Steel Fabricator
Holston Steel Structures fasteners.
Bnstol. Tennessee

~wner
~ lnclnnatl Symphony LeJeune Bolt Company
Clncmnall, OhiO 8330 West 220th St .
Lakeville, M innesota 55044
Phone 6 12-469-5521

3rd Quarter 1984 19


Rohm and Haas Modifiers Plant:
Modular Steel Construction
Speeds Schedule •
by Keith Flemingloss

Kel/h Flemlng/oss. PE ., 15 the Civil Engineering Ohm and Haas Company confronted malor concern , the schedule also de-
Specialist lor Rohm and Haas Company's
Central Engineering DIVISion . Bristol, Penn-
R a major scheduJlng challenge head-
on when, In August 1983, approval was
manded the process bUilding be erected
dUring January, February and March
sylvania given to begin detailed engineering on a While LOUisville IS not In an area noted for
major PVC Modifiers plant expansion for heavy snowfall, the winter weather In the
their LouISVille, Kentucky faCIlity Market- area IS noted for Its variability, freeZing
Ing projections reqUIred the project be op- rains and gusty Winds. National Weather
erational by the end of June 1984 ' Service statistics showed an average of
The chemical process faCility consisted one In three days per week were likely to
of a process bUilding enclOSing 34 ,150 sq be lost for steel erection dUring thiS period
tt, diVided Into many areas With uneven Atter considering the hazards of winter
floor heights and supporting process erection, plus the anticipated downtime
equipment of every description throughout due to weather, a scheme of modular steel
the structure. An enclosed tank farm bUild- construction was deVised The complex
Ing was required, With 3,240 sq It weath- main process bUilding would be assem-
erproofed for raw material storage. The bled at grade, one floor at a time, and


product packaging building , With 6,800 stacked like bUilding blocks to form the
square feet of floor space, completed the completed 108-1t tall building
accelerated construction schedule. To-
gether, these bUildings reqUired nearly Design Phase
500 tons of galvanIZed structural steel Since equipment layouts had been well
framing developed , an Immediate start on the ac-
Although time alone would have been a tual analYSIS and deSign was possible In

20 MODERN STEEL CONSTRUCTtON


early September. The basIc lloor framing bay sizes and unsymmetrical framing due ment dUring erection. a column splice de-
design was performed with Rohm and to equipment openings complicated the tail was developed which combined erec-
Haas' FLBEAM program FLBEAM IS given reqUIrement that each module be capable tion clips Similar to the type used In welded
the basic floor layout, desired loadings, of maintaining ItS shape while being lilted splice details. With bolted cover plates at-
floor openings and any other pertinent Into place To handte thiS requirement, tached alter the nine-column module was
data. and returns a plot of the floor fram- semi-rigid connections were used on the landed
Ing, with all beams sized as simple beams Interior girder-column connections. The The fabricator's engineering group sug-
of minimum secllon weight The speed of actual modules were two bays square. gested another area which they felt could
thiS floor analysIs allowed experimentation with dimensions of 45 It x 40 It and 40 It result In further savings uSing shear plate
With various framing arrangements to op- x 40 It. and weighed between t6 and 21 connections In place of the traditional clip
timIZe the steel framing requirements. An tons each. The second module of each angles Alter reviewing the AISC Engl-
estimated 10-15% weight savings was re- floor level framed into columns, which neeflng Journal article on the current state
alized in thiS case Column loads are tab- were erected as part 01 the preceding of the art In Single-plate framing connec-
ulated automallcally as well. which eased modute. ThiS was accomptished by pro- tions. thiS approach was accepted
the deSign of the columns and eliminated viding erection seats to land the girders From the first transmittal of deSign draw-
the waste of "worst case" deSign for alignment and bolt-up. The original de- Ings on Nov tst, 1983 It was apparent the
The modular erection scheme placed sign called for two splices each for the t 5 schedule was gOing to be difficult to main-
ery few restrictions upon deSign of the cotumns Involved in the modular part of tain So. a deCISion was made to detail and
• amlng The equipment arrangement diC- the bUilding. To allow each module to be fabricate the bUilding as a sequence of
tated a bay size layout that varied In both assembled at a safe, convenient height modules, breaking the prolect Into man-
directions. With bay Widths varying be- from grade. extra column splices were re- ageable units for expediting and monitor-
tween 17 It and 23 It, and bay lengths qUired, and were deSigned five feet below Ing progress An added benefit resulted
between 20 It and 25 It. Unsymmetrical top of steel for each level. To ease allgn- from incorporating deSign modifications to

Mam scheduling challenge on Room and


Haas Mod/hers Plant (I) was met With
structural steel Plant IS shown before and
afler cladding


3rd Quarter, 1984 21
upper floors dunng the onglnal detailing, This was accomplished dunng a period of apparent as the erection productivity was
rather than as correctIons or reVISIons In freezing temperatures and high winds. analyzed: the Single-plate framing con-
the field With a break In the weather, each module necltons eliminated the need for ereclton
was hfted Into place by a single crane. The bolting and allowed each bay to be com-
"Building Blocks" Go Up lift and alignment of the nine column pletely assem. bled and bolted-up, Ind.
The modular erection scheme reqUired lit- splices took less than three hours per pendently of any surrounding bay Th
tle In Ihe way of extra construction facili- module . This procedure was repeated meant that Virtually all bolting could be
ties The site had barely enough room for through the next SIX modules, until the done at grade, conveniently and safely
a module assembly area to the side of the bUilding had reached the 90 ft level (see
bUilding . Smal" temporary foollngs were sequence In Fig . 1). The roof framing was Time and Cost Savings
Installed, and the modules assembled 58 left off to permit eqUipment placement, On thiS prolect, It was always kept In mind
ft south of their Iinal destlnahon. and erected later In conventional fashion . that whatever construction method was
The detailing and fabncatlon of one As the prolect progressed, other ben- used , whatever details were chosen, must
module at a time resulted in a sequenced efits became apparent. Due to the sched- help the project schedule, and still guar-
delivery of matenals which eliminated the ule pressure, It was Important to enable as antee a safe, pracltcal structure. For thiS
reqUirement for a large ·shake-out" or stor- much productive work as pOSSible, as project. the modular erection scheme re-
age area, and permtlted the complehon of qUickly as pOSSible The modular scheme sulted In a tangible savings In the sched-
each module once It was begun. permitted an erection crew to assemble ule EqUipment which was onglnally
Module # 1. the entire first floor of the modules, while a detail crew Installed planned to be stored at the site was
main bUilding , was erected In conventional braCing , handrails and floonng . ThiS alone erected directly Into the structure by
fashion The second and third modules resulted In an apparent schedule savings March- while the onglnal construction
were each half of the second floor, and of almost half the erection schedule for the schedule had shown steel erection begm-
were assembled side by side at grade. main bUilding A subtle savings became nmg In mid-Marchi In fact , steel ereclton

Detail of steel module layout Numbers mdlcate erection sequence

r"f'i'

i::t
<il

"
(j) (j)

10
'il


8

SOUTH £(.£ ....-"TIOI<I - COLli,..,'" LIN£ (f) •


22 MOOERN STEEL CONSTRUCTION
began In mid-December and progressed Engineer/Architect/General Contractor
continuously through the winter. Rohm and Haas Co., Central Engineering Dlv
While the modular scheme saved the Bnstol. Pennsylvania
schedule, that was not Its only Influence
There were actually cost savings due to Steel Fabricator
• Increased productivity, as well. Estimates Southern Ohio Fabricators, Inc
CinCinnatI. Ohio
near completion of the modular assembly
and ereclion phase of the project Indi- General Contractor/Owner
cated a savings of almost 30% of the orig- Rohm & Haas. Kentucky
Inal labor estimate. In addition to the fact Louisville, Kentucky
that much of the assembly was done at
grade, some of the Increased produClivlty
was due 10 the fact the ironworkers were
enthusiastic about showing their ability to
adapt to the new erection scheme They
offered many suggestions which simpli-
fied the erection of the modules.
Credit needs to be given, as well , to the
fact there were virtually no detailing errors
on the steel for the main building, and very
few minor fabrlcalion errors. 0 SUPERWELD FOR THE IBM pc
Weld analysis and design program. Fully menu drIVen,
with graphics and hard copy report. AISC code check.
Oes'9ned to answer "whal lr questions PrICe $199 00
Demo disk $1500
MlCrOlech International
1630 (Old) Oakland Rd. Suite A2 15
San Jose, CA 9513 1
(408) 947-1515

• Three Major
Projects
Specify
Coronet Load
Indicators
Coronel Load Indicators are being used
on these three major projects to eliminate
the guesswork of the conventional "turn-
of-nUl" method of installing high-strength
bolts to assure that structural joints
are properly assembled.
Using Coronet load Indicators provides
immediate visual proof that 100% of the
bolts have been properly tensioned.
Inspection is considerably fasler and The new COlumbia Ceater in Suttle. Wasllingtoa will lie 76stories Tile VandenllefJ AIr Forte Base SlIunle AuellllllY BIIIIdIIlll ISAB),
more precise than with a calibrated when ~ted makll'lQ II the tallest bulldli'lO west 01ClMCago. a moveable hl\lh bay steel strucltile COITIpalabie fo a 23 slOly
Owner & DM\ooeI Martin Selllli St'lIClUraJ EtiOIneer Sklthl'lV. oolkllng SUUClUral EI'IgU'Ie8r Bedltei NallOl'lai. inc General
torque wrench . Ward ~s Barkshue. Geneta ConuaclO' Hatntd S Wr(tlt" Contractot_Steel FallflCa~l!\ and SteeJ Erector RaymQ'ld KaISef
Company: Steel Fal...:ator Saf!.lSQll!l Ccrpwll00; Steel EreclQ" Engll'lea-s 1nc/Ka15er Stet:'! CorDcnIJOtl a jOIIlllIeI'IIlJltl
To be sure that structural bolts are properly Amencan Bridge OmSlOll oj US Steel
tensioned in your building connections,
specify Coronet load Indicators. Write
or call today tor an up-to-date fact file.

q,
• CooDer &Tumer Inc
eo.-t'Io.cIladlcalon
Keystone Industnal Park
200 Aillenhouse Circle-No.8 · Bristol. PA 19007

RockwelllnterullOll.f s B· 1B 80liliiii, IInal mate. assembly. and check-out prOOuctlOfl


RockweIllnternatlOllill CorporatIOn. Structural EflIIIneef & General Cootractor The H K
Maoolactunng Como-anrr. Steel EJector Ca~brMa ElectofS
23
Now ou can run
S -mon ourPC •
for as little as $ 00.
1''7Il1\


TAAD- III is the mo,t compre hensive The design phase or STAAD- II1 uses the
package ror struct ura l ana lysis and design. latest codes. which are cont inua ll y updated.
Developed by Research Engineers. Inc .. it usc And an optiona l graphics package is ava ilable
STRUDL-type simple Engli,h comma nd in- to su pport the system ror plotting structural
put. But it's easier and up to ten times raster geometry and denected shape.
than STRUDL. STAAD- II1 is a lso avai lable world-wide
And now yo u can run this major structural through most majo r time-sharing networks.
analysis software program on your IBM Pc. And licensing can be arranged under a dir-
XT or compatible compu ter. STAAD-III IS rerent price schedule for VAX. PRIM E. IBM
available in three modules: 43XX. CDC. HP. NCR TOWER. M 68000
1. Frame Analysis with Steel Design and others.
2. Frame Analysis with Concrete Design For detailed inrormation on TAAD-III.
3. Frame Finite Element Analysis call (609) 983-5050. Or write to Research
ach module costs only $ 1100. Or you can Engineers. Inc .. 9003-D Greentree Commons.
purchasc a ll three ror j ust $2500. Marlto n. NJ 08053.

RE Research Engineers, Inc.


A reputation you can build on .

24 MODERN STEEL CONSTRUCTION

• When it comes to constructional plate steels, widths 12" to 48" and thicknesses V," to 12."
we wrote the book. This current edition features Lukens-Conshohocken. A rolling mill and ship-
Lukens' capabilities with regard to : ping complex deSigned to meet your needs for
Sizes. Standard specification plates available in light-to-medium thickness carbon plate and our
widths to 195," lengths to 1250" and thicknesses Sure-Foot safety floor plate.
to 25." A size card shows details. Lukens Flnellne. A family of low-sulfur con-
Specifications. Mechanical properties and structional steels particularly effective when
chemistry of the various grades of steel most used in fracture critical applications.
frequently found in bridges and buildings. Dis- For your copy of this brochure. illustrated
played in chart form . with photos of our facilities and our products in
Heat Treating. Offered on plates up to 890" long. use. just fill out the coupon below.
Stripped Plate. An alternative to universal mill
plate in applications such as fabricated bridge
girders. Produced in lengths from 120" to 1250," ~UKEN.s.sTEE~

Write r------------------,

LUKENS STEEL COMPANY
586 Services BUilding

right
• CoatesVltle. PA 19320 •
I Please send me a copy of your brochure. LUKENS CONSTRUCTIONAL I


• PLATE STEELS •

• N.... •
now. •

L
TlTl.
COMPANY _ _ _ _ _ __

I __________________
• ADDAESS
CITY __ _ __ STATE -- ZIP
_ .


I
_~

3rd Ouarter t 984


25
Throgs Neck Bridge:
How Steel was Switched
to American Suppliers •
ny state, locality or company which of the approaches was necessary. American steel and fabrication resulted In
A produces construction materials or
products lor purchase by government
The project reqUires 16,000 tons of one
In -thick , A36 grade steel plate , with
a bid $3.4 million higher.
What Initiated Intense opposition to the
agencies In competition with overseas welded orthotroplc ribs, fabricated In sec- foreign porllon of the bid was the fact that
suppliers would do well to study, and tions New steel decking and an asphalt at the same time, a "Buy-American Steel"
emulate, thiS example of sWitching an ac- surface are to be fabricated In the shop, Act became law In New York State. Under
cepted, lower, foreign-supplier bid to that and then Installed on-site by fastening and ItS provisions, state agency purchases
of American companies. welding Three lanes are being redecked must be of domesllcally produced steel.
What could become the claSSIC case of In Summer/Fall of 1984. the other three In unless the public contracting authOrity
a program to successfully accomplish 1985 Sections of the bridge Will be closed could prove that uSing American steel re-
such a converSion Involves a New York at night so that removal of the old deck sults In "unreasonable cost. " not further
City bridge, a domestic steelmaker. fab- and Installation of the new minimizes In- defined In terms of figures or percentages
ricators and an erector terference with traffic . A major American steel producer. who
The Throgs Neck Bridge. opened In S'x bids were received In June, 1983 for fabricated and erected 10,000 tons of
1961 , IS a 13,410-ft , six-lane suspension the redecklng project, Including steel, fab- steel when the Throgs Neck Bridge was
bridge linking the Bronx and Queens, two rlcallon and Installation . The low bid , $32.9 first bUilt, did not believe that $3.4 million
New York City boroughs Because of de- million, accepted In July from Karl Koch conslltuted " unreasonable cost. " and
terioration in canlilevered deck ap - Erectors, of Carteret, N J , was based on helped orchestrate a full program to have

ac-.
proaches , ItS operator the Trlborough steel to be produced In Japan and fabri- the foreign portion of the contract re-
Bridge and Tunnel Authority, a diVision of cated In South Korea About $13 million of SCinded
the Metropolitan Transportation Authority the total bid was for steel and ItS fabrica- The sole argument In lavor of the
(MTA)-determlned that redecklng parts tion . It had been determined that uSing cepted bid was the $3 4 -million differential
between foreign and American steel It
could help subSidize lares on New York
City's bus and subway system as well as
suburban commuter rail systems, or It
could be used to help fund additional cap-
Ital prolects
Marshalled against that argument were
economiC and other Justifications for steel-
making and shop construction In the U S
With regard 10 the crucial issue of lobs,
steel plate for redecklng would be pro-
duced In Maryland at an approximate rate
of one ton per steelworker per day (8-hr
shift) . Thus , the total tonnage would pro-
Vide 16,000 man-days of employment at a
wage-and -beneflts pay scale of $168 per
day, for a totat of $2,688,000 In pay and
$806,400 In taxes (at a 30% rate)
The 4,028 tons of orthotroplc rib sec-
lions to stiffen the bridge's steel plate deck
would be manufactured In a New York
steel speCialty shop and reqUire 1.560
man-days Estimates are that thiS WOUld,
In turn, support an additional 3,120 man-
days of Indirect work In the Niagara area
Fabrication of the bridge deck panels IS a.

Throgs Neck a fldge. New York City.


undergoes huge redeckmg program
dUflng 1984 ·85

26 MODERN STEEL CONSTRUCTION


jOint venture of two specialty shops. The Backing up all this economic justifica- the United Steelworkers of America be-
final result of their work IS fully completed tion was Intense lobbYing and publicity at came actively Involved .
panels, about 19-ft wide by 50-ft long , in- both state and local levels. LobbYists VIS- Governor Cuomo was Ihe key to MTA's
cluding all of the steel components and a Ited , called and wrote key New York State reversal of its decIsion. Late In Septem-
sub-base asphalt surface :y. -In. thick. Work legislators, senators and assemblymen, ber- after the Governor asked II to recon-
• at the two companies, Involving 80 men pOinting out the Inconsistency between the Sider the Throgs Neck contract- the MTA
each , totals 40,000 to 50,000 man-days MTA's action and the newly enacted Buy- board changed ItS mind and voted to re-
per year American Steel law. New York State's qUire the use of domestic steel plate fab-
Although tax calculations are not yet Commerce Commissioner, William Dona· ricated In New York
available for the Throgs Neck Bridge con- hue, was contacted and he promised his Thus, a bid encompassing foreign steel
tract, this analogy may suffice. Studies full cooperation and fabricated parts was SWitched to
have shown that. when the US Govern- The American Iron and Steel Institute, American steel and parts In addlllon, at
ment purchases $l-mllhon worth of de- which has a Buy-American task lorce, least 66,000 man-days of employment Will
fense materials from a domesllc supplier, communicated with Governor Mario be achieved for U S workers, and more
the money moves about the economy with Cuomo, and made Widely known New than Ihe $34 -mllhon d,fferenl,al Will be re-
a feedback effect. Through company York's stake In the steel Industry's eco- turned In laxes How thiS changeover was
taxes, payrolls , dividends and other pur- nomic recovery For example, two major accomplished should be espeCially Im-
chases, $524 ,000 returns In taxes. Instead American steel companies alone pur- portant to those In the majority of stales
of a domestic purchase costing the gov- chase annually more than $1 billion In New which already have Buy-American laws It
ernment $1 million, it actually costs only York goods and services. was Ihe presence of such a law In New
$476,000 or 47% of the 100tiai expenditure A Bronx assemblyman set up a news York State which proVided a statutory base
Other benefits Include a heightened conference on the steps of MTA's office In for all arguments and helped Immeasur-
safety factor, for In the event a faulty sec- New York City EditOrial support for re- ably In overturning Ihe foreign bids LJ
tion IS produced by the New York fabri - versing the decIsion and bUying American
cators, It IS almost Immediately replacea- steel was received from newspapers
ble Contrast that with an 11 ,OOO-mile throughout the state . although some We are mdebted to the Steel Products News
supply hne from foreign sources I In prac- downstate papers were In opposillon. Key Bureau of A/SI for thiS ",formatlon and photo
IIcal terms , how does an Inspector reject newspapers in Bulfalo and Albany were
a section not up to specifications If he contacted , and It was called to their atten-
knows ItS closest replacement IS In South lion the decIsion to buy foreign . Top offi-
Korea? cials of the New York State AFL-CIO and

• .....&--

QUALITY PROCEDURES

OUALITY PROCEDURES
CERTIPICATION
• .S.U • • • detailing firm follows prescribed drafting room procedure\ designed to reduce the po~slbliity of error
• .ssu • • • compliance with specification
• • • • UR • • impartial evaluation of operations
FABRICATOR • . .. your Job demands the best. You can increase the quality of your shop drawmgs and guarantee
professionalism by using a firm certified under the National Institute of Steel Det.1iling QUALITY PROCEDURES PROGRAM.
Conrad:
Baresel Corr,' Central Detailing Service Corp. Dallas Detailing Co.
13320 Map edale 140 S. Flower I. , #20 1 2636 Walnut Hdllane, #30t
Norwalk, CA 90650 Ora nge, CA 92668 Dallas, TX 75229
213/921-6758 714/937- t 573 214/350-7986
Gunther Baresel Jamie Gardner Robert Sieger
Fritz Baresel Ron Germaine

I.A. Free, Jr. & Co., Inc. Schreiber & McGhee, loc.
P.O. 80x 21007 P.O. 80x 270580
Columbia,SC 29221 Dallas, TX 75227
803/772-4 150 2 14/388-0674
Joe A. Free, Jr. Tom McGhee
-The NatIonal InstItute of Steel Detailing QualifY Proc.edures Progr.lm I') ddmtnl')tered by Abstech.

3rd Quarter 1984 27


The Dulany Condominiums:
Mother Nature Takes a Backseat!

he Dulany Condominiums, at the base ported on precast concrete walls and ... and architectural and structural aller-
T of Mt. Werner, Steamboat Springs,
Colo., boasts 'an intncate five-level struc-
beams; and a structural steel frame with a
composite lloor system.
ations could be made simpler once the job
was in prog ress."
ture that rellects the image ot the bustling Experience with several similar projects Campbell also pointed out, "Since we
Colorado ski resort. And yet it blends with led the struc tural engineer and the con- were forced by Mother Nature into a fast-
the surrounding rustic atmosphere of the tractor to conclude a structural steel frame track approach to the project, using struc-
Colorado community. with a composite lloor system and a beam tural steel allowed us to reduce construc-
Flexibility of architectural design and and steel joist root would provide optimum tion time considerably. The structural steel
speed of erection are the focal reasons lIexibility and economy while achieving mill order was placed before the drawings
why structural steel framing was selected SWift erection. were completed. Foundation construction
for the 25-unit project. According to Ste- then began as early as possible and was
phen J. Campbell, president of the struc- Fast"Track Beats Mother Nature In place when the fabricated steel arrived."
tural engineering firm , "The client wanted The project engineer, A. J . Baysek, ex-
a lIexlble structural system which would plained, "Structural steel was selected lor Ftoor Construction Easler
permit the desired aesthetics and form re- several reasons , the most obvious being The lloor system (Fig . 1), spanning ap-
quired for the prolect, while maintaining versatility. Structural steel IS Ideally sUi ted proximately 14 It between beams, consists
the desired economy. In addition, the fast- lor fast-track construction. In addition, it of 3-in. composite steel 1I00r deck topped
track construction approach to the project, provided the architect with a versatile and with 3'/,-ln. lightweight concrete with com-
necessitated by the short construction lIexible structural system to assist in the pOSite steel beams (composite action
season in the high country of Colorado, adaptation of the building torm to the proj- achieved by welding 3/4-ln . dla. studs
played an inlluential role in the selection ect's physical demands, and it helped re- through the deck to the beams). Thi s sys-
of the final framing system. The selection duce the overall height of the building . tem enabled the structural engineer to pro.
of structural steel framing solved inherent "It also provided the lightest framing Vide a light. economical framing system
design and construction problems as well system, which minimized the vertical loads which minimized overall structural depth.
as lending considerable aesthetic lIexlbll- to the foundation and contnbuted to overall Each condominium unit was deSigned
Ity. " cost savings We were able to use spread With indiVidual cantilevered balconies. The
footings instead 01 a more costly tounda- balconies were designed for unusually
Preliminary Framing Analysis tlon system, such as piles. Even then, the high live-load requirements , because of
Once the basIc condominium unit plan lighter dead load minimized spread loot- snow accumulation and the storage of fire-
(Fig . 1) was established in relation to the ing sizes, Important because of the site's wood for the long winter months. The
overall layout, several structural systems low sOII-beanng capacity. Structural steel adaptability 01 structu ra l steel framing to
were considered: precast concrete hol- framing ollered many advantages tor the the detailing of such cantilevered con-
low-core slabs supported on steel frame ; cnteria established tor the project; speedy struction enabled the deSigners to achieve
precast concrete hollow-core slabs sup- erection . . design lIexlbility . economy the deSired lunctlon and aesthetics of the
balconies Within the construction depth
limitation (Fig. 2).
The structure was deSigned to resist not
only the 25 psf lateral loads Induced by
Wind , but also the Zone t seismiC loads
required by the Uniform Building Code.
Lateral resistance IS provided by K-braced
bents which transfer the honzontal lorces
to the loundatlon . The K-braced bents
were strategically placed In the demiSing
walls between unlls.

tntricate Framing Made Simple


The roof profile was a comb,nallon of
sloped , gabled and shed -type rOOfS .

Dulany Condominiums. Steamboat Sprmgs. Colo

28 MODERN STEEL CONSTRUCTION


~ - _...
• .II
--. I

/- - - - - - - - - - - - -- - - -- - - - - - - - , ..
'1
I
1I

I
_

~
•. -
{"...... . :i
n~'c.~
'
I

r-t~=9
--- - j
I

I
=-.' ::

-F- I
." I
i
I

L~____~~t~~~---4r.-,~~,~ : ~', .i I
. '* ~ i ..... u.
~ I
:
:' 1-
I

~~::cu I !.t
• I
• I iLl
I

I

!
I •
I •
:
I _. cou/ .... '
- fY . tCH
II

• I
I
I
I

I,
'- -- ........ c. ''' W''
nl>tCAL CONOOMINIUM
'LOOR '.".INO
.,

Figure 1 ParMI frammg plan (5th level)

which allowed Ihe archltecl to achieve Ihe Architect


deSired Intenor ceiling elevations and Dallas TaylorfThomas E Woodward
slopes for Ihe individual condominium & ASSOCiates. Inc
units and yet provide an aes'hetlcal'y Dallas, Texas
pleaSing overall roof profile. The use of
Structural Engineer
steel beams and open·web sleel JOiStS Gunnln-Campbell Consuillng Engineers. Inc
permitted Ihe versatility needed to accom- OaUas. Texas
modate the intricate variations of the de-
sign (Fig 2) Contractor
Campbell In summing up the proJect. Hensel-Phelps Construction Co
commented ' The selection of structural Greeley, Colorado
steel allowed us to maintain an economical
Owner
unit without haVing to compromise the ar· Dulany Corporation
. hltectural expression ' 0 Steamboat Springs. Coforado
Structural steel framework shows
flerlng effect of gable fools (top)
Kbr8ced bents are used lor 181eral
resIstance (c.) Gantl/evered balCOnies ,
wIth Iyplc811100r framing (bolt )

3rd Quarteri 1984 29


World Class. •


Providing State·of·the·Art on Designing
-TO ;~~~Ple-;;~;m~iOn:n-;rOg;;m~peake~.-;ansporta.1
and Building with Steel featuring . . . I
tlon . !'lotel accommodations, and the official registration form.
return this coupon today! Di rect your Inqu iry to: I
• Space Frame Structures . Departmen t of Public Allairs I
American Ins titute of Steel Construction , Inc.
• Improved Economy of Short·Span Bridges 400 North Michigan Avenue, Chicago , Illinois 60611 I
I
• limit States Design of Structures I
Name
• Cable Supported Stru ct ures-Research , I
Design , and Const ru ction I
• Steel Buildi ng in the Far East
I
I
• Practical Qual ity Control and Ass urance I
Plus a spec ia l presentation on the material
(CIty) (State, Country) (Z~ Postal Code) I
selection process for a high·rise building . In addItion to program details, I would like information on the '.
lollo.,ing: I
[J Major Chicago Attractions
I o
0 Pre and Post-ConventIon Tours I
Chicago School of Architecture TOUf
-~-~-----~~-- L _______________________ J
30 MODERN STEEL CONSTRUCTiON
Pick the Profile that's right for you I
Need Some Help?
Manufacturing Plants:
Epic Metals Corporation is involved daily • PiHsburgh. Pa • Chicago. 111.
in engineering and manufacturing • Toledo. Ohio • Lakeland. Fla
Composite Decks, EPC Cellular Raceway Contact us toaay (or Prompt Domestic
and International Shipments
System, Cellular Decks, Roof Decks, Form
Decks, Roofing and Siding.
Our staff IS ready to serve your needs. EPIC
~ A f N
~rchitects, Engineers, Contractors .. . Eleven Talbot Avenue. Rankin PA 15104
give us a call ... write ... telex ... or PHONE: 412/351-3913
TWX: 71Q-664-4424
come and visit. EPICMETAL BOOK
We olso manufacture some of the aboVe profiles In aluminum
31
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
The Wrigley Building. 400 North Michigan Avenue BULK RATE
U.S. POSTAGE
Chicago. IL 60611 PA I D
WHEATON, ILL.
Address Corre ctIon Requested


Permit No. 1786

AMERICAN
COMPUTERS
& ENGINEERS

You might also like