ASHOKA BUILDCON LTD.

LOCATION : CHENNAI OUTER RING ROAD PROJECT

Achieved
SR. Todays Up to
Activity Unit Total Qty During This Up To Last Balance Qty
No. Achievement Pervious day
Month Month
for Month

1 Tree Cutting Nos


2 Clearing & Grubbing Hct
3 Scarifying existing bituminous surface Sqm
4 Excavation in All type of soil Cum
a ABL Dept. Cum #REF! #REF! #REF! 144664.00
Embankment Dumping Cum 70966.00
5 Embankment filling Cum 1008032.00
5.1 ABL Dept. Cum
a RHS Service Road Cum #REF! #REF! #REF! #REF!
b RHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
c PTC Cum #REF! #REF! #REF! #REF!
d LHS Service Road Cum #REF! #REF! #REF! #REF!
e LHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
f Bus Bay Cum #REF! #REF! #REF! 0.00
g Junction Cum #REF! #REF! #REF! 0.00
5.2 EKR
a RHS Service Road Cum #REF! #REF! #REF! #REF!
b RHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
c PTC Cum #REF! #REF! #REF! #REF!
d LHS Service Road Cum #REF! #REF! #REF! #REF!
e LHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
f Bus Bay & Diverson,Junction Cum #REF! #REF! #REF! #REF!
5.3 EKR (GVR Stretch)
a RHS Service Road Cum #REF! #REF! #REF! #REF!
b RHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
d LHS Service Road Cum #REF! #REF! #REF! #REF!
e LHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
f Bus Bay & Diverson,Junction Cum #REF! #REF! #REF! #REF!
Emb.in RT Wall Portion Pondash Place of Soil #REF! #REF! #REF! #REF!
a RHS Service Road Cum #REF! #REF! #REF! #REF!
b RHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
c LHS Service Road Cum #REF! #REF! #REF! #REF!
d LHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
I Earth Filling With Pondash Cum #REF! #REF! #REF! #REF!
II Earth Filling with Soil Cum #REF! #REF! #REF! #REF!
5.3 GVR. Cum
5.4 Balaji.Ente
a Bus Bay & Toll Plaza Cum #REF! #REF! #REF! #REF!
b RHS Service Road Cum #REF! #REF! #REF! #REF!
c RHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
d PTC Cum #REF! #REF! #REF! #REF!
e LHS Service Road Cum #REF! #REF! #REF! #REF!
f LHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
Junction Cum 0 #REF! #REF! #REF! #REF!
iii. Ground improvement 0.00
RHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
LHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
RHS Service Road Cum #REF! #REF! #REF! #REF!
LHS Service Road Cum #REF! #REF! #REF! #REF!
Pondash Embankment Dumping Cum
6 Pondash Embankment Cum
6.1 ABL Dept. Cum -
a RHS Cum #REF! #REF! #REF! #REF!
b LHS Cum #REF! #REF! #REF! #REF!
6.2 ERK. Cum
1 EKR-12+200- (Dozzing/ Grading / Compaction)
a RHS Cum #REF! #REF! #REF! #REF!
b LHS Cum #REF! #REF! #REF! #REF!
ii EKR-15+200-( Dumping /Dozzing/ Grading / Compaction) 0.00
a RHS Cum #REF! #REF! #REF! #REF!
b LHS Cum #REF! #REF! #REF! #REF!
iii. EKR-12+800-( Dumping /Dozzing/ Grading / Compaction)
a RHS Cum #REF! #REF! #REF! #REF!
b LHS Cum #REF! #REF! #REF! #REF!
iv Embankment With Sub-Grade Material (Passed Qty.) #REF! #REF! #REF! #REF!
EKR-12+800-( Dumping /Dozzing/ Grading / Compaction) #REF! #REF! #REF! #REF!
a RHS Cum #REF! #REF! #REF! #REF!
b LHS Cum #REF! #REF! #REF! #REF!
v Embankment With Sub-Grade Material (Passed Qty.)
EKR-13+967-( Dumping /Dozzing/ Grading / Compaction)
a RHS Cum #REF! #REF! #REF! #REF!
b LHS Cum #REF! #REF! #REF! #REF!
vi Embankment With Pondash Material (Passed Qty.)
EKR-13+967-( Dumping /Dozzing/ Grading / Compaction)
a RHS Cum #REF! #REF! #REF! #REF!
b LHS Cum #REF! #REF! #REF! #REF!
#REF! #REF!
a RHS Cum #REF! #REF! #REF! #REF!
b LHS Cum #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! Cum #REF! #REF! #REF! #REF!
c Sub Grade (GVR STRETCH)
i LHS Cum #REF! #REF! #REF! #REF!
Subgrade Dumping Cum
6 Subgrade Cum
6.1 ABL Dept. Cum -
a RHS Service Road Cum #REF! #REF! #REF! #REF!
RHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
PTC Cum #REF! #REF! #REF! #REF!
b LHS Service Road Cum #REF! #REF! #REF! #REF!
LHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
c Bus Bay Cum #REF! #REF! #REF! #REF!
Junction Cum #REF! #REF! #REF! #REF!
Toll Plaza Cum #REF! #REF! #REF! #REF!
Backfilling / Other Infra Cum #REF! #REF! #REF! #REF!
7 GSB Cum
7.1 ABL Dept.
a RHS Service Road Cum #REF! #REF! #REF! #REF!
RHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
b LHS Service Road Cum #REF! #REF! #REF! #REF!
LHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
d Bus Bay Cum #REF! #REF! #REF! #REF!
PTC Cum #REF! #REF! #REF! #REF!
Junction Cum #REF! #REF! #REF! #REF!
Cross Road Cum #REF! #REF! #REF! #REF!
e GSB (GVR STRETCH)
LHS Cum #REF! #REF! #REF! #REF!
9 WMM MT #REF!
9.1 ABL Dept. MT -
a RHS Service Road Cum #REF! #REF! #REF! #REF!
b RHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
c LHS Service Road Cum #REF! #REF! #REF! #REF!
d LHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
e Bus Bay Cum #REF! #REF! #REF! #REF!
f Junctiom Cum #REF! #REF! #REF! #REF!
g PTC Cum #REF! #REF! #REF! #REF!
h Toll Plaza Cum #REF! #REF! #REF! #REF!
i Infra works/ Cross Road Cum #REF! #REF! #REF! #REF!
10 BM MT
a ABL Dept. MT
d Section-IV (Ch:465.0 to 475.0): Balance MT -
11 DBM MT
a ABL Dept. MT -
a RHS Service Road Cum #REF! #REF! #REF! #REF!
b RHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
c LHS Service Road Cum #REF! #REF! #REF! #REF!
d LHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
e Bus Bay Cum #REF! #REF! #REF! #REF!
f Median Cum #REF! #REF! #REF! #REF!
g Junction Cum #REF! #REF! #REF! #REF!
Diverson Cum #REF! #REF! #REF! #REF!
11 BC MT
a ABL Dept. MT
a RHS Service Road Cum #REF! #REF! #REF! #REF!
b RHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
c LHS Service Road Cum #REF! #REF! #REF! #REF!
d LHS Main Carraige Way Cum #REF! #REF! #REF! #REF!
e Parking Area Cum #REF! #REF! #REF! #REF!
f #REF! Cum #REF! #REF! #REF! #REF!
#REF! Cum #REF! #REF! #REF! #REF!
11a #REF! Cum #REF! #REF! #REF! #REF!
#REF! Cum #REF! #REF! #REF! #REF!
#REF! Cum #REF! #REF! #REF! #REF!
12 SDBC MT
a ABL Dept. MT - -
13 BC MT - -
a ABL Dept. MT - -
14 Prime coat Sqm
a RHS - SR Sqm #REF! #REF! #REF! #REF!
b RHS - MCW Sqm #REF! #REF! #REF! #REF!
c LHS - SR Sqm #REF! #REF! #REF! #REF!
d LHS - MCW Sqm #REF! #REF! #REF! #REF!
e Bus Bay Sqm #REF! #REF! #REF! 0.00
f Junctiom Sqm #REF! #REF! #REF! 0.00
15 Tack coat Sqm
16 Toll Plaza DLC Cum
a Excvation Cum #REF! #REF! #REF! #REF!
b Embankment (shree Balaji) Cum #REF! #REF! #REF! #REF!
c Sub Grade Cum #REF! #REF! #REF! #REF!
d GSB Cum #REF! #REF! #REF! #REF!
e WMM Cum #REF! #REF! #REF! #REF!
f DLC M15 Cum #REF! #REF! #REF! #REF!
g PQC M40 Cum #REF! #REF! #REF! #REF!
17 Bus Bay 0.00
a Excvation Nos. #REF! #REF! #REF! #REF!
b Embankment Nos. #REF! #REF! #REF! #REF!
c Sub Grade Nos. #REF! #REF! #REF! #REF!
d GSB Nos. #REF! #REF! #REF! #REF!
e WMM Nos. #REF! #REF! #REF! #REF!
f DBM Nos. #REF! #REF! #REF! #REF!
g BC Nos. #REF! #REF! #REF! #REF!
18 Shoulder Filling Cum #REF! #REF! #REF! #REF!
19 Median filling Cum #REF! #REF! #REF! #REF!
20 Median filling (GVR Stretch) Cum #REF! #REF! #REF! #REF!
21 Filter Media Cum #REF! #REF! #REF! #REF!
22 STRUCTURE
1 Structural Excvation - 0.00
a RHS Cum #REF! #REF! #REF! #REF!
b LHS Cum #REF! #REF! #REF! #REF!
2 Box Culvert - RHS & LHS - #REF!
a Excavation No #REF! #REF! #REF! #REF!
b PCC No #REF! #REF! #REF! #REF!
c Raft No #REF! #REF! #REF! #REF!
d Walls No #REF! #REF! #REF! #REF!
e Slab No #REF! #REF! #REF! #REF!
f RT Wall RHS & LHS(BC) #REF! #REF! #REF! #REF!
(i) PCC No #REF! #REF! #REF! #REF!
(ii) Raft No #REF! #REF! #REF! #REF!
(iii) Walls No #REF! #REF! #REF! #REF!
(iv) Curtain Wall No #REF! #REF! #REF! #REF!
(v) Floor Apron No #REF! #REF! #REF! #REF!
3 PUP - RHS & LHS #REF! #REF! #REF! #REF!
a Excavation No #REF! #REF! #REF! #REF!
b PCC No #REF! #REF! #REF! #REF!
c Raft No #REF! #REF! #REF! #REF!
d Walls No #REF! #REF! #REF! #REF!
e Slab No #REF! #REF! #REF! #REF!
f Approach Slab - PCC No #REF! #REF! #REF! #REF!
g Approach Slab No #REF! #REF! #REF! #REF!
4 VUP - RHS & LHS #REF! #REF! #REF! #REF!
a Excavation No #REF! #REF! #REF! #REF!
b PCC No #REF! #REF! #REF! #REF!
c Raft No #REF! #REF! #REF! #REF!
d Walls No #REF! #REF! #REF! #REF!
e Slab No #REF! #REF! #REF! #REF!
f Approach Slab - PCC No #REF! #REF! #REF! #REF!
g Approach Slab No #REF! #REF! #REF! #REF!
5 Minor Bridge - RHS & LHS #REF! #REF! #REF! #REF!
a Piling No #REF! #REF! #REF! #REF!
b Excavation No #REF! #REF! #REF! #REF!
c PCC No #REF! #REF! #REF! #REF!
d Raft/Pile Cap No #REF! #REF! #REF! #REF!
e Abutment Walls No #REF! #REF! #REF! #REF!
g Steel Girder No #REF! #REF! #REF! #REF!
h Slab No #REF! #REF! #REF! #REF!
i Approach Slab No #REF! #REF! #REF! #REF!
6 Fly Over Bridge - RHS & LHS #REF! #REF! #REF! #REF!
a Excavation No #REF! #REF! #REF! #REF!
b PCC No #REF! #REF! #REF! #REF!
c Raft No #REF! #REF! #REF! #REF!
d Abutment /Pier Walls No #REF! #REF! #REF! #REF!
e Abutment /Pier Cap No #REF! #REF! #REF! #REF!
f PSC Girder No #REF! #REF! #REF! #REF!
g RCC Grider No #REF! #REF! #REF! #REF!
h Slab No #REF! #REF! #REF! #REF!
i Approach Slab No #REF! #REF! #REF! #REF!
7 Cloverleaf @ Km. 18+350 - Half Portion #REF! #REF! #REF! #REF!
a Pile Concreting No #REF! #REF! #REF! #REF!
b Pile Cap No #REF! #REF! #REF! #REF!
c Pier / Abutment No #REF! #REF! #REF! #REF!
d Pier / Abutment Cap No #REF! #REF! #REF! #REF!
e Girder Casting No #REF! #REF! #REF! #REF!
f Girder Erection No #REF! #REF! #REF! #REF!
g Deck Slab No #REF! #REF! #REF! #REF!
8 RT Wall RHS & LHS ( MCW Portion) #REF! #REF! #REF! #REF!
a PCC Rmt #REF! #REF! #REF! #REF!
b Raft Rmt #REF! #REF! #REF! #REF!
c Walls Rmt #REF! #REF! #REF! #REF!
8 Construction of RE structures #REF! #REF! #REF! #REF!
a Levelling course Rmt #REF! #REF! #REF! #REF!
b With Vertical cum Sloped Surcharge #REF! #REF! #REF! #REF!
i Strata Sqm #REF! #REF! #REF! #REF!
ii Maccaferri Sqm #REF! #REF! #REF! #REF!
iii. RE Panel Erection Sqm #REF! #REF! #REF! #REF!
iv. Total Sqm #REF! #REF! #REF! #REF!
c Coping Beam Rmt #REF! #REF! #REF! #REF!
d Crash Barrier/Friction Slab #REF! #REF! #REF! #REF!
(i) Casting Rmt #REF! #REF! #REF! #REF!
(ii) PCC Rmt #REF! #REF! #REF! #REF!
(iii) Erection Rmt #REF! #REF! #REF! #REF!
Cast in-situ Rmt #REF! #REF! #REF! #REF!
e Earthern Berm Filling Cum #REF! #REF! #REF! #REF!
f Stone Pitching Cum #REF! #REF! #REF! #REF!
g Tenax Drainage (PVC Pipe) Sqm #REF! #REF! #REF! #REF!
8 Construction of RE structures (GVR Stretch) #REF! #REF! #REF! #REF!
a Levelling course Rmt #REF! #REF! #REF! #REF!
b With Vertical cum Sloped Surcharge #REF! #REF! #REF! #REF!
c Strata Sqm #REF! #REF! #REF! #REF!
d Coping Beam Rmt #REF! #REF! #REF! #REF!
e Friction Slab PCC Rmt #REF! #REF! #REF! #REF!
f Friction Slab Erection Rmt #REF! #REF! #REF! #REF!
9 Precast Drain #REF! #REF! #REF! #REF!
a Drain - Steel Fixing & Concreting Rmt #REF! #REF! #REF! #REF!
b Cover Slab - Steel Fixing & Concreting Rmt #REF! #REF! #REF! #REF!
c GSB layer Rmt #REF! #REF! #REF! #REF!
d PCC M15 Rmt #REF! #REF! #REF! #REF!
e Erection of Drains Rmt #REF! #REF! #REF! #REF!
Cast in situ Drains #REF! #REF! #REF! #REF!
a PCC M15 Rmt #REF! #REF! #REF! #REF!
b Drain - Steel Fixing & Concreting Rmt #REF! #REF! #REF! #REF!
c Cover Slab - Steel Fixing & Concreting Rmt #REF! #REF! #REF! #REF!
a Chute Drains Rmt #REF! #REF! #REF! #REF!
Metal Beam Crash Barrier Rmt #REF! #REF! #REF! #REF!
Turfing Sqm #REF! #REF! #REF! #REF!
Geomat Sqm #REF! #REF! #REF! #REF!
Sign Board No #REF! #REF! #REF! #REF!
Cable Laying Rmt #REF! #REF! #REF! #REF!
#REF! No #REF! #REF! #REF! #REF!
Boundry Stone No #REF! #REF! #REF! #REF!
#REF! No #REF! #REF! #REF! #REF!
Light Fixing No #REF! #REF! #REF! #REF!
#REF! No #REF! #REF! #REF! #REF!
#REF! No #REF! #REF! #REF! #REF!
Delinators No #REF! #REF! #REF! #REF!
#REF! No #REF! #REF! #REF! #REF!
#REF! No #REF! #REF! #REF! #REF!
#REF! Sqm #REF! #REF! #REF! #REF!
#REF! No #REF! #REF! #REF! #REF!
#REF! No #REF! #REF! #REF! #REF!
#REF! No #REF! #REF! #REF! #REF!
10 a) RE Wall blocks Casting (Strata) No #REF! #REF! #REF! #REF!
b) RE Wall blocks Casting (Maccaferri) No #REF! #REF! #REF! #REF!
c) RE Wall Panel Casting (Maccaferri) Sqm. #REF! #REF! #REF! #REF!
23 Kerb Laying Rmt - 0.00
a RHS - SR Rmt #REF! #REF! #REF! #REF!
b RHS - MCW Rmt #REF! #REF! #REF! #REF!
c LHS - SR Rmt #REF! #REF! #REF! #REF!
d LHS - MCW Rmt #REF! #REF! #REF! #REF!
e Bus Bay Rmt #REF! #REF! #REF! #REF!
f Cross Road Rmt #REF! #REF! #REF! #REF!
24 Providing, laying NP-4 Hume Pipe Rmt
a Dia 1000 mm Rmt
b Dia 1200 mm Rmt
c Dia 1500 mm Rmt
25 Reinforcement MT 9111.00
4/2 Laning of Govindpur(R
Highway Linear KM
Sr.
Activity Unit
No.
Embankment LHS
1 KM
Embankment RHS
Subgrade LHS
2 KM
Subgrade RHS
G.S.B LHS
3 KM
G.S.B RHS
DLC LHS
4 KM
DLC RHS
PQC LHS
5 KM
PQC RHS

Structure Work Progress


Sr.
Type of Structure Unit
No.
1 Box Culvert Nos.

2 Hume Pipe Culvert Nos.

3 Slab Culver Nos.

4 Grade Separator Nos.

5 Minor Bridge Nos.

6 Major Bridge Nos.

7 RUB Nos.

8 ROB Nos.
4/2 Laning of Govindpur(Rajganj) Chas WB Border section of NH:32

Total Scope Completed WIP Balance % of Achivement


56.889 1.96 113.778 0
113.778 2.9 113.778 0
113.778 113.778 0
113.778 113.778 0
113.778 113.778 0
113.778 113.778 0
113.778 113.778 0
113.778 113.778 0
113.778 113.778 0
113.778 113.778 0

Total Scope Completed WIP Balance % of Achivement


50 2 48 0
3 1 0
3 1 0
1 1 0
5 5 0
2 2 0
1 1 0
4 4 0
of NH:32

Remarks if any

Remarks
ASHOKA BUILDCON LIMITED
Rajganj Chas Bengal Border NH-32 Road Project
DPR SUMMARY

PROGRESS UP TO DATE 19.12.2017


This Month Quantity
Sl. Up To Last
Activity Unit Todays Upto During This Up To Date Remarks for non achievement
No. Month
Achievement Yesterday Month
1 Highway (Work Done)
a Tree counting for transplantation(BHS) KM - - 18.900 18.900
b Clearing & Grubbing (C&G) Sqm - 40,825 40,825 79,139 119,964
c OGL Bed Prepare KM 0.580 7.210 7.790 - 7.790
d RCC ROW Pillar Casting Nos. - - - 399 399
e Tree Removing Nos. - 140 140 251 391
f Tree Cutting Nos. 47.00 549 596 - 596
g Tree Number repainting KM - 8 8 6 14
h Embankment Cum 846.00 11,824 12,670 - 12,670
i Excavation Cum - 180 180 - 180
j Fly Ash MT 283.01 476 759 - 759
2 Structure
a Invert Level Checking Nos. - 1 1 16.00 17
b
3 Camp Mobilisation .
e Dressing for foundation Sqm - 66.220 66.220 1,360.730 1,426.950
f PCC M15 Cum - 4.089 4.089 694.920 699.009
g RCC M20 Cum 0.390 0.390 108.940 109.330
h Brickwork in foundation & substructure Cum - - - 552.330 552.330
i RR masonary in foundation & Substructure Cum - - - 12.890 12.890
j Plastering Sqm - 12.600 12.600 1,284.460 1,297.060
k IPS Flooring Sqm - 277.170 277.170 2,015.864 2,293.034
l Tile work Sqft - - - 6,926.300 6,926.300
m Plumbing Work Rft - 593.000 593.000 3,863.040 4,456.040
n Sand Filling Cum - - - 343.580 343.580
o Barbed Wire RMT - - - 1,632.500 1,632.500
p Coping Work RMT - - - 701.900 701.900
q Broken Bricks transportation and unloading(Approx) Cum - - - 759 759
r Soil filling From Borrow area Cum - 1,540 1,540 - 1,540
4 Crusher
Crusher at KM 26+000 (Agency SSEPL)(Approx. Quantity)40 MM, 20
a Only GSB Crushing
MM , Dust MT 301 6,275 6,576 5,474 12,050
Crusher at Galagi ( 22 KM from KM 0+000) (Agency EIPL)(Approx.
b MT - - - 58,934 58,934 Mining contractor has ran away
Quantity)40 MM, 20 MM , Dust
5 Eviction work
a Dhanbad Disst. Nos. - - - 483 483
b Bokaro Disst. Nos. - - - 743 743
ASHOKA BUILDCON LIMITED
Rajganj Chas Bengal Border NH-32 Road Project Date: -19.12.2017
Daily Progress Report (Highway)

Chainages
Sr.no Date Name of contractor Items RFI NO. Layer Side No Length  Width Depth   Quantity Unit Remarks
From To

Tree Removing Or Cutting

1 10/11/2017 Dharmshila Const. Tree Removing 40+540 40+600 LHS 8 Nos. Khajoor

2 11/11/2017 Dharmshila Const. Tree Removing 40+600 40+850 LHS 20 Nos. Khajoor

3 22/11/2017 Dharmshila Const. Tree Removing 37+850 38+830 LHS 41 Nos. Khajoor

4 22/11/2017 Dharmshila Const. Tree Removing 37+850 38+500 RHS 9 Nos. Khajoor

5 22/11/2017 Departmental Tree Removing 46+460 46+840 LHS 14 Nos. Khajoor

6 22/11/2017 Departmental Tree Removing 46+498 46+620 RHS 21 Nos. Khajoor

7 23/11/2017 Devesh Const. Tree Removing 46+660 46+810 RHS 29 Nos. Khajoor

8 23/11/2017 Dharmshila Const. Tree Removing 38+500 39+220 RHS 42 Nos. Khajoor

9 24/11/2017 Dharmshila Const. Tree Removing 40+380 40+900 RHS 47 Nos. Khajoor

10 25/11/2017 Dharmshila Const. Tree Removing 40+150 40+380 RHS Khajoor


12 Nos.
11 25/11/2017 Dharmshila Const. Tree Removing 40+150 40+360 LHS Khajoor

12 25/11/2017 Devesh Const. Tree Removing 47+400 47+750 RHS 8 Nos. Khajoor

13 50+740 50+860 RHS


11/12/2017 Departmental Tree Removing 40 Khajoor
14 50+740 50+820 LHS

15 12/12/2017 Dharmshila Const. Tree Removing 50+820 51+040 RHS 50 Nos. Khajoor

16 13/12/2017 Dharmshila Const. Tree Removing 51+040 51+120 LHS 50 Nos. Khajoor

1 02/12/2017 Dattakrupa Enterprises Tree Cutting 44+000 44+700 RHS 46 Nos. Difference species

2 03/12/2017 Dattakrupa Enterprises Tree Cutting 43+000 44+000 RHS 31 Nos. Difference species

3 05/12/2017 Dattakrupa Enterprises Tree Cutting 38+955 40+850 LHS 22 Nos. Difference species

4 05/12/2017 Dattakrupa Enterprises Tree Cutting 38+955 40+850 RHS 25 Nos. Difference species

5 09/12/2017 Dattakrupa Enterprises Tree Cutting 38+200 38+955 BHS 23 Nos. Difference species

6 10/12/2017 Dattakrupa Enterprises Tree Cutting 37+840 38+200 BHS 23 Nos. Difference species

7 12/12/2017 Dattakrupa Enterprises Tree Cutting 44+000 42+802 BHS 27 Nos. Difference species

8 12/13/2017 Dattakrupa Enterprises Tree Cutting 41+500 41+100 BHS 92 Nos. Difference species

9 14/12/2017 Dattakrupa Enterprises Tree Cutting 54+700 55+350 LHS Difference species

10 14/12/2017 Dattakrupa Enterprises Tree Cutting 54+150 54+440 LHS 39 Difference species

11 14/12/2017 Dattakrupa Enterprises Tree Cutting 50+850 51+040 LHS Difference species

12 14/12/2017 Dattakrupa Enterprises Tree Cutting 54+700 55+350 RHS Difference species

13 14/12/2017 Dattakrupa Enterprises Tree Cutting 54+150 54+440 RHS 27 Difference species

14 14/12/2017 Dattakrupa Enterprises Tree Cutting 50+850 51+040 RHS Difference species

15 15/12/2017 Dattakrupa Enterprises Tree Cutting 45+100 45+500 LHS 47 Difference species

16 15/12/2017 Dattakrupa Enterprises Tree Cutting 45+100 45+500 RHS 24 Difference species

17 16/12/2017 Dattakrupa Enterprises Tree Cutting 47+100 47+500 BHS 67 Difference species

18 18/12/2017 Dattakrupa Enterprises Tree Cutting 50+900 52+050 LHS 14 Difference species

19 18/12/2017 Dattakrupa Enterprises Tree Cutting 50+900 52+050 RHs 42 Difference species

20 19/12/2017 Dattakrupa Enterprises Tree Cutting 51+900 52+500 LHS 33 Difference species

21 19/12/2017 Dattakrupa Enterprises Tree Cutting 51+900 52+500 RHS 14 Difference species

596

C&G

1 05/11/2017 Departmental Clearing & Grubbing 40+700 40+880 RHS 1 180 8.5 1530 Sqm OGL Bed Done
29/11/2017 Dharmshila Const. Clearing & Grubbing 40+700 40+880 RHS 1 1.5 270 Sqm OGL Bed Done
2 06/11/2017 Departmental Clearing & Grubbing 40+500 40+700 RHS 1 200 8.5 1700 Sqm OGL Bed Done
04/12/2017 Dharmshila Const. Clearing & Grubbing 40+500 40+700 RHS 1 1.5 300 Sqm OGL Bed Done
3 08/11/2017 Departmental Clearing & Grubbing 40+460 40+500 RHS 1 40 8.5 340 Sqm OGL Bed Done
29/11/2017 Dharmshila Const. Clearing & Grubbing 40+460 40+500 RHS 1 1.5 60 Sqm OGL Bed Done
4 09/11/2017 Departmental Clearing & Grubbing 40+400 40+460 RHS 1 60 8.5 510 Sqm OGL Bed Done
29/11/2017 Dharmshila Const. Clearing & Grubbing 40+400 40+460 RHS 1 1.5 90 Sqm OGL Bed Done
5 09/11/2017 Departmental Clearing & Grubbing 40+400 40+550 LHS 1 150 8.5 1275 Sqm OGL Bed Done
29/11/2017 Dharmshila Const. Clearing & Grubbing 40+400 40+550 LHS 1 1.5 225 Sqm OGL Bed Done
6 10/11/2017 Dharmshila Const. Clearing & Grubbing 38+900 39+050 LHS 1 150 7.5 1125 Sqm OGL Bed Done
30/11/2017 Dharmshila Const. Clearing & Grubbing 38+900 39+050 LHS 1 1.5 225 Sqm OGL Bed Done
7 10/11/2017 Dharmshila Const. Clearing & Grubbing 39+200 39+540 LHS 1 340 7.5 2550 Sqm OGL Bed Done
04/12/2017 Dharmshila Const. Clearing & Grubbing 39+200 39+540 LHS 1 1.5 510 Sqm OGL Bed Done
8 10/11/2017 Dharmshila Const. Clearing & Grubbing 40+550 40+600 LHS 1 50 8.5 425 Sqm OGL Bed Done
05/12/2017 Dharmshila Const. Clearing & Grubbing 40+550 40+600 LHS 1 1.5 75 Sqm OGL Bed Done
9 10/11/2017 Dharmshila Const. Clearing & Grubbing 40+150 40+400 LHS 1 250 8.5 2125 Sqm OGL Bed Done
ASHOKA BUILDCON LIMITED
Rajganj Chas Bengal Border NH-32 Road Project Date: -19.12.2017
Daily Progress Report (Highway)

Chainages
Sr.no Date Name of contractor Items RFI NO. Layer Side No Length  Width Depth   Quantity Unit Remarks
From To

10 11/11/2017 Dharmshila Const. Clearing & Grubbing 40+600 40+830 LHS 1 230 8.5 1955 Sqm OGL Bed Done
29/11/2017 Dharmshila Const. Clearing & Grubbing 40+600 40+830 LHS 1 1.5 345 Sqm OGL Bed Done
11 11/11/2017 Dharmshila Const. Clearing & Grubbing 39+540 39+760 LHS 1 220 7 1540 Sqm OGL Bed Done
13/11/2017 Dharmshila Const. Clearing & Grubbing 39+540 39+760 LHS 1 1 220 Sqm OGL Bed Done
12 12/11/2017 Dharmshila Const. Clearing & Grubbing 39+760 39+950 LHS 1 190 7 1330 Sqm OGL Bed Done
04/12/2017 Dharmshila Const. Clearing & Grubbing 39+760 39+950 LHS 1 1.5 285 Sqm OGL Bed Done
13 13/11/2017 Dharmshila Const. Clearing & Grubbing 40+830 40+850 LHS 1 20 6.5 130 Sqm OGL Bed Done
14 13/11/2017 Dharmshila Const. Clearing & Grubbing 41+260 41+430 LHS 1 170 7 1190 Sqm OGL Bed Done
06/12/2017 Dharmshila Const. Clearing & Grubbing 41+260 41+430 LHS 1 1.5 255 Sqm OGL Bed Done
15 13/11/2017 Dharmshila Const. Clearing & Grubbing 39+950 40+060 LHS 1 110 7 770 Sqm OGL Bed Done
05/12/2017 Dharmshila Const. Clearing & Grubbing 39+950 40+060 LHS 1 1.5 165 Sqm OGL Bed Done
16 13/11/2017 Dharmshila Const. Clearing & Grubbing 39+900 39+970 RHS 1 70 7 490 Sqm OGL Bed Done
04/12/2017 Dharmshila Const. Clearing & Grubbing 39+900 39+970 RHS 1 1.5 105 OGL Bed Done
17 14/11/2017 Dharmshila Const. Clearing & Grubbing 39+300 39+360 RHS 1 60 7 420 Sqm OGL Bed Done
13/12/2017 Dharmshila Const. Clearing & Grubbing 39+300 39+360 RHS 1 1.5 90 Sqm OGL Bed Done
18 14/11/2017 Dharmshila Const. Clearing & Grubbing 39370 39850 RHS 1 480 7 3360 Sqm Measurement from PCL deduction 5m

19 14/11/2017 Dharmshila Const. Clearing & Grubbing 41320 41450 RHS 1 130 6 780 Sqm OGL Bed Done
06/12/2017 Dharmshila Const. Clearing & Grubbing 41+320 41+450 RHS 1 1.5 195 Sqm OGL Bed Done
20 14/11/2017 Dharmshila Const. Clearing & Grubbing 41+480 41+660 LHS 1 180 7 1260 Sqm OGL Bed Done
06/12/2017 Dharmshila Const. Clearing & Grubbing 41+480 41+660 LHS 1 1.5 270 OGL Bed Done
21 14/11/2017 Dharmshila Const. Clearing & Grubbing 41+540 41+660 RHS 1 120 7 840 Sqm OGL Bed Done
06/12/2017 Dharmshila Const. Clearing & Grubbing 41+540 41+660 RHS 1 1.5 180 Sqm OGL Bed Done
22 15/11/2017 Dharmshila Const. Clearing & Grubbing 39+140 39+300 RHS 1 160 5 800 Sqm OGL Bed Done
29/11/2017 Dharmshila Const. Clearing & Grubbing 39+140 39+300 RHS 1 1.5 240 Sqm OGL Bed Done
23 15/11/2017 Dharmshila Const. Clearing & Grubbing 38+800 38+900 RHS 1 100 7 700 Sqm OGL Bed Done
07/11/2017 Dharmshila Const. Clearing & Grubbing 38+800 38+900 RHS 1 1.5 150 Sqm OGL Bed Done
24 15/11/2017 Dharmshila Const. Clearing & Grubbing 42+050 42+220 LHS 1 170 7 1190 Sqm Measurement from PCL deduction 5m

25 15/11/2017 Dharmshila Const. Clearing & Grubbing 42+180 42+240 RHS 1 60 5 300 Sqm Measurement from PCL deduction 5m

26 16/11/2017 Dharmshila Const. Clearing & Grubbing 38+400 38+800 RHS 1 400 7 2800 Sqm OGL Bed Done
01/12/2017 Dharmshila Const. Clearing & Grubbing 38+400 38+800 RHS 1 1.5 600 Sqm OGL Bed Done
27 16/11/2017 Departmental Clearing & Grubbing 45+200 45+480 RHS 1 280 6 1680 Sqm Measurement from PCL deduction 5m

28 17/11/2017 Dharmshila Const. Clearing & Grubbing 38+000 38+400 RHS 1 400 7 2800 Sqm OGL Bed Done
01/12/2017 Dharmshila Const. Clearing & Grubbing 38+000 38+400 RHS 1 1.5 600 Sqm OGL Bed Done
29 17/11/2017 Departmental Clearing & Grubbing 45+200 45+500 LHS 1 300 6.7 2010 Sqm OGL Bed Done
16/12/2017 Departmental Clearing & Grubbing 45+200 45+500 LHS 1 1.5 450 Sqm OGL Bed Done
30 18/11/2017 Dharmshila Const. Clearing & Grubbing 37+840 38+000 RHS 1 160 7 1120 Sqm OGL Bed Done
18/11/2017 Dharmshila Const. Clearing & Grubbing 37+840 38+000 RHS 1 1.5 240 OGL Bed Done
31 18/11/2017 Dharmshila Const. Clearing & Grubbing 37+840 38+100 LHS 1 260 7 1820 Sqm OGL Bed Done
18/11/2017 Dharmshila Const. Clearing & Grubbing 37+840 38+100 LHS 1 1.5 390 Sqm OGL Bed Done
32 18/11/2017 Devesh Const. Clearing & Grubbing 44+000 44+260 RHS 1 260 7 1820 Sqm OGL Bed Done
07/12/2017 Devesh Const. Clearing & Grubbing 44+000 44+260 RHS 1 1.5 390 Sqm OGL Bed Done
33 19/11/2017 Devesh Const. Clearing & Grubbing 44+260 44+460 RHS 1 200 7 1400 Sqm OGL Bed Done
07/12/2017 Devesh Const. Clearing & Grubbing 44+260 44+460 RHS 1 1.5 300 Sqm OGL Bed Done
34 20/11/2017 Devesh Const. Clearing & Grubbing 44+460 44+570 RHS 1 110 7 770 Sqm OGL Bed Done
07/12/2017 Devesh Const. Clearing & Grubbing 44+460 44+570 RHS 1 1.5 165 Sqm OGL Bed Done
35 20/11/2017 Devesh Const. Clearing & Grubbing 44+770 44+960 RHS 1 190 7 1330 Sqm Measurement from PCL deduction 5m

36 20/11/2017 Departmental Clearing & Grubbing 45+480 46+030 RHS 1 550 6 3300 Sqm Measurement from PCL deduction 5m

37 20/11/2017 Dharmshila Const. Clearing & Grubbing 38+300 38+360 LHS 1 60 7 420 Sqm Measurement from PCL deduction 5m

38 20/11/2017 Dharmshila Const. Clearing & Grubbing 38+400 38+420 LHS 1 20 7 140 Sqm Measurement from PCL deduction 5m

39 20/11/2017 Dharmshila Const. Clearing & Grubbing 38+460 38+500 LHS 1 40 7 280 Sqm OGL Bed Done
01/12/2017 Dharmshila Const. Clearing & Grubbing 38+460 38+500 LHS 1 1.5 60 OGL Bed Done
40 21/11/2017 Dharmshila Const. Clearing & Grubbing 38+500 38+830 LHS 1 330 7 2310 Sqm OGL Bed Done
30/11/2017 Dharmshila Const. Clearing & Grubbing 38+500 38+830 LHS 1 1.5 495 Sqm OGL Bed Done
41 21/11/2017 Dharmshila Const. Clearing & Grubbing 39+050 39+200 LHS 1 150 7 1050 Sqm OGL Bed Done
30/11/2017 Dharmshila Const. Clearing & Grubbing 39+050 39+200 LHS 1 1.5 225 Sqm OGL Bed Done
42 21/11/2017 Devesh Const. Clearing & Grubbing 44+960 45+070 RHS 1 110 7 770 Sqm Measurement from PCL deduction 5m

43 21/11/2017 Devesh Const. Clearing & Grubbing 46+280 46+460 LHS 1 180 4.3 774 Sqm Measurement from PCL deduction 5m

44 21/11/2017 Departmental Clearing & Grubbing 45+500 45+920 LHS 1 420 6 2520 Sqm OGL Bed Done
16/12/2017 Departmental Clearing & Grubbing 45+500 45+920 LHS 1 1.5 630 Sqm OGL Bed Done
45 21/11/2017 Departmental Clearing & Grubbing 45+920 46+140 LHS 1 220 3 660 Sqm OGL Bed Done
16/12/2017 Departmental Clearing & Grubbing 45+920 46+140 LHS 1 2.5 550 Sqm OGL Bed Done
46 22/11/2017 Devesh Const. Clearing & Grubbing 46+270 46+460 RHS 1 190 4 760 Sqm Measurement from PCL deduction 5m

47 22/11/2017 Devesh Const. Clearing & Grubbing 46+460 46+660 RHS 1 200 6 1200 Sqm Measurement from PCL deduction 5m

48 22/11/2017 Departmental Clearing & Grubbing 46+030 46+200 RHS 1 170 3.5 595 Sqm Measurement from PCL deduction 5m

49 22/11/2017 Departmental Clearing & Grubbing 46+460 46+860 LHS 1 400 5.5 2200 Sqm Measurement from PCL deduction 5m

50 23/11/2017 Devesh Const. Clearing & Grubbing 46+660 46+810 RHS 1 150 5.5 825 Sqm Measurement from PCL deduction 5m

51 23/11/2017 Dharmshila Const. Clearing & Grubbing 39+000 39+140 RHS 1 140 6 840 Sqm OGL Bed Done
29/11/2017 Dharmshila Const. Clearing & Grubbing 39+000 39+140 RHS 1 1.5 210 Sqm OGL Bed Done
52 23/11/2017 Departmental Clearing & Grubbing 46+860 47+530 LHS 1 670 5 3350 Sqm Measurement from PCL deduction 5m

53 24/11/2017 Devesh Const. Clearing & Grubbing 46+810 46+880 RHS 1 70 5 350 Sqm Measurement from PCL deduction 5m

54 24/11/2017 Devesh Const. Clearing & Grubbing 46+940 47+400 RHS 1 460 5 2300 Sqm Measurement from PCL deduction 5m

55 24/11/2017 Departmental Clearing & Grubbing 47+530 47+840 LHS 1 310 5 1550 Sqm Measurement from PCL deduction 5m

56 24/11/2017 Departmental Clearing & Grubbing 47+750 47+840 RHS 1 90 4 360 Sqm Measurement from PCL deduction 5m

57 25/11/2017 Departmental Clearing & Grubbing 48+000 48+420 LHS 1 420 5 2100 Sqm OGL Bed Done
08/12/2017 Departmental Clearing & Grubbing 48+000 48+420 LHS 1 1.5 630 Sqm OGL Bed Done
58 25/11/2017 Devesh Const. Clearing & Grubbing 47+400 47+750 RHS 1 350 5 1750 Sqm OGL Bed Done
ASHOKA BUILDCON LIMITED
Rajganj Chas Bengal Border NH-32 Road Project Date: -19.12.2017
Daily Progress Report (Highway)

Chainages
Sr.no Date Name of contractor Items RFI NO. Layer Side No Length  Width Depth   Quantity Unit Remarks
From To

08/12/2017 Devesh Const. Clearing & Grubbing 47+400 47+750 RHS 1 1.5 525 Sqm OGL Bed Done
59 25/11/2017 Devesh Const. Clearing & Grubbing 44+940 45+200 LHS 1 260 5 1300 Sqm Measurement from PCL deduction 5m

60 25/11/2017 Dharmshila Const. Clearing & Grubbing 40+150 40+400 RHS 1 250 5 1250 Sqm
13/12/2017 Dharmshila Const. Clearing & Grubbing 40+150 40+400 RHS 1 1.5 375 Sqm
61 26/11/2017 Devesh Const. Clearing & Grubbing 44+580 44+620 LHS 1 40 5 200 Sqm
62 26/11/2017 Devesh Const. Clearing & Grubbing 44+680 44+940 LHS 1 260 5 1300 Sqm Measurement from PCL deduction 5m

63 27/11/2017 Departmental Clearing & Grubbing 48+700 49+000 RHS 1 300 5 1500 Sqm Measurement from PCL deduction 5m

64 28/11/2017 Devesh Const. Clearing & Grubbing 44+200 44+580 LHS 1 380 6 2280 Sqm Measurement from PCL deduction 5m

65 30/11/2017 Dharmshila Const. Clearing & Grubbing 38+830 38+900 LHS 1 70 7.5 525 Sqm OGL Bed Done
04/12/2017 Dharmshila Const. Clearing & Grubbing 38+830 38+900 LHS 1 1.5 105 Sqm OGL Bed Done
66 04/12/2017 Dharmshila Const. Clearing & Grubbing 39+850 39+900 RHS 1 50 8.5 425 Sqm OGL Bed Done
67 06/12/2017 Devesh Const. Clearing & Grubbing 43+320 43+720 LHS 1 400 6.5 2600 Sqm OGL Bed Done
68 06/12/2017 Devesh Const. Clearing & Grubbing 43+320 43+480 RHS 1 160 6.5 1040 Sqm OGL Bed Done
69 06/12/2017 Devesh Const. Clearing & Grubbing 44+000 44+200 LHS 1 200 7.8 1560 Sqm OGL Bed Done
66 06/12/2017 Dharmshila Const. Clearing & Grubbing 41+660 41+720 RHS 1 60 8.5 510 Sqm OGL Bed Done
67 09/12/2017 Departmental Clearing & Grubbing 50+920 51+110 RHS 1 190 11 2090 Sqm OGL Bed Done
68 09/12/2017 Departmental Clearing & Grubbing 50+860 50+920 RHS 1 60 7.5 450 Sqm OGL Bed Done
69 11/12/2017 Departmental Clearing & Grubbing 50+740 50+860 RHS 1 120 8.5 1020 Sqm OGL Bed Done
70 11/12/2017 Departmental Clearing & Grubbing 50+740 50+820 LHS 1 80 8 640 Sqm OGL Bed Done
71 12/12/2017 Dharmshila Const. Clearing & Grubbing 40+060 40+140 LHS 1 80 8 640 Sqm OGL Bed Done
72 12/12/2017 Dharmshila Const. Clearing & Grubbing 39+970 40+140 RHS 1 170 8 1360 Sqm OGL Bed Done
73 12/12/2017 Departmental Clearing & Grubbing 50+820 50+900 LHS 1 80 9 720 Sqm OGL Bed Done
74 12/12/2017 Departmental Clearing & Grubbing 50+930 51+040 LHS 1 110 9 990 Sqm OGL Bed Done
75 13/12/2017 Departmental Clearing & Grubbing 51+040 51+120 LHS 1 80 10 800 Sqm OGL Bed Done
76 14/12/2017 Dharmshila Const. Clearing & Grubbing 306/ 16-12-2017 38+100 38+300 LHS 1 200 8 1600 Sqm OGL Bed Done
77 14/12/2017 Dharmshila Const. Clearing & Grubbing 307/ 16-12-2017 38+360 38+400 LHS 1 40 8 320 Sqm OGL Bed Done
78 14/12/2017 Dharmshila Const. Clearing & Grubbing 308/ 16-12-2017 38+420 38+460 LHS 1 40 8 320 Sqm OGL Bed Done
79 14/12/2017 Departmental Clearing & Grubbing 50+670 50+740 LHS 1 70 8 560 Sqm OGL Bed Done
80 14/12/2017 Departmental Clearing & Grubbing 50+670 50+740 RHS 1 70 7 490 Sqm OGL Bed Done
81 14/12/2017 Isha Enterprises Clearing & Grubbing 55+850 56+000 RHS 1 150 8.5 1275 Sqm OGL Bed Done
81 15/12/2017 Isha Enterprises Clearing & Grubbing 55+850 56+000 LHS 1 150 8.5 1275 Sqm OGL Bed Done
82 16/12/2017 Dharmshila Const. Clearing & Grubbing 343/ 19-12-2017 38+900 39+000 RHS 1 100 7 700 Sqm OGL Bed Done
83 16/12/2017 Devesh Const. Clearing & Grubbing 45+150 45+200 RHS 1 50 8 400 Sqm OGL Bed Done
84 18/12/2017 Devesh Const. Clearing & Grubbing 45+070 45+150 RHS 1 80 8 640 Sqm OGL Bed Done
85 18/12/2017 Departmental Clearing & Grubbing 50+470 50+670 RHS 1 200 7 1400 Sqm

16700 119964
OGL BED PREPARE
1 28/11/2017 Dharmshila Const. OGL Bed Prepare 40+420 40+580 LHS 160
2 28/11/2017 Dharmshila Const. OGL Bed Prepare 40+630 40+800 LHS 170
3 28/11/2017 Dharmshila Const. OGL Bed Prepare 40+630 40+880 RHS 250
4 29/11/2017 Dharmshila Const. OGL Bed Prepare 40+400 40+580 RHS 180
5 29/11/2017 Dharmshila Const. OGL Bed Prepare 39+000 39+360 RHS 360
6 29/11/2017 Dharmshila Const. OGL Bed Prepare 40+800 40+830 LHS 30
7 30/11/2017 Dharmshila Const. OGL Bed Prepare 38+740 39+280 LHS 540
8 30/11/2017 Dharmshila Const. OGL Bed Prepare 38+740 38+900 RHS 160
9 01/12/2017 Dharmshila Const. OGL Bed Prepare 38+440 38+640 RHS 200
10 01/12/2017 Dharmshila Const. OGL Bed Prepare 38+000 38+100 RHS 100
11 01/12/2017 Dharmshila Const. OGL Bed Prepare 38+460 38+640 LHS 180
12 02/12/2017 Dharmshila Const. OGL Bed Prepare 37+840 38+100 LHS 260
13 02/12/2017 Dharmshila Const. OGL Bed Prepare 37+840 38+000 RHS 160
14 04/12/2017 Dharmshila Const. OGL Bed Prepare 39+760 40+000 LHS 240
15 04/12/2017 Dharmshila Const. OGL Bed Prepare 39+760 39+940 RHS 180
16 06/12/2017 Devesh Const. OGL Bed Prepare 44+000 44+570 RHS 570
17 06/12/2017 Devesh Const. OGL Bed Prepare 44+000 44+240 LHS 240
18 06/12/2017 Dharmshila Const. OGL Bed Prepare 41+320 41+400 RHS 80
19 06/12/2017 Dharmshila Const. OGL Bed Prepare 41+320 41+400 LHS 80
20 06/12/2017 Dharmshila Const. OGL Bed Prepare 41+520 41+720 RHS 200
21 06/12/2017 Dharmshila Const. OGL Bed Prepare 41+520 41+600 LHS 80
22 07/12/2017 Devesh Const. OGL Bed Prepare 47+460 47+560 RHS 100
23 07/12/2017 Departmental OGL Bed Prepare 48+180 48+280 LHS 100
24 07/12/2017 Dharmshila Const. OGL Bed Prepare 41+300 41+320 LHS 20
25 11/12/2017 Dharmshila Const. OGL Bed Prepare 39+920 39+980 RHS 60
26 11/12/2017 Dharmshila Const. OGL Bed Prepare 40+000 40+060 LHS 60
27 12/12/2017 Dharmshila Const. OGL Bed Prepare 40+060 40+420 LHS 360
28 12/12/2017 Dharmshila Const. OGL Bed Prepare 38+100 38+440 RHS 340
29 12/12/2017 Devesh Const. OGL Bed Prepare 45+200 45+300 RHS 100
30 12/12/2017 Devesh Const. OGL Bed Prepare 45+600 45+740 RHS 140
31 14/12/2017 Dharmshila Const. OGL Bed Prepare 308/ 16-12-2017 38+100 38+460 LHS 360
31 14/12/2017 Dharmshila Const. OGL Bed Prepare 304/ 16-12-2017 46+470 46+530 LHS 60
32 15/12/2017 Departmental OGL Bed Prepare 300/ 16-12-2017 50+820 51+120 LHS 300
33 15/12/2017 Departmental OGL Bed Prepare 319/ 18-12-2017 50+650 50+860 RHS 210
34 16/12/2017 Dharmshila Const. OGL Bed Prepare 346/ 19-12-2017 38+900 39+000 RHS 100
35 16/12/2017 Dharmshila Const. OGL Bed Prepare 38+640 38+740 LHS 100
36 16/12/2017 Dharmshila Const. OGL Bed Prepare 345/ 19-12-2017 38+640 38+740 LHS 100
ASHOKA BUILDCON LIMITED
Rajganj Chas Bengal Border NH-32 Road Project Date: -19.12.2017
Daily Progress Report (Highway)

Chainages
Sr.no Date Name of contractor Items RFI NO. Layer Side No Length  Width Depth   Quantity Unit Remarks
From To

37 16/12/2017 Devesh Const. OGL Bed Prepare 318/ 18.12.2017 45+150 45+300 LHS 150
38 16/12/2017 Devesh Const. OGL Bed Prepare 45+150 45+200 RHS 50
39 18/12/2017 Devesh Const. OGL Bed Prepare 45+070 45+150 RHS 80
40 19/12/2017 Devesh Const. OGL Bed Prepare 347/ 19-12-2017 47+300 47+420 LHS 120
41 19/12/2017 Devesh Const. OGL Bed Prepare 348/ 19-12-2017 47+240 47+400 RHS 160
42 19/12/2017 Devesh Const. OGL Bed Prepare 350/ 19-12-2017 45+300 45+600 RHS 300

7790
Embankment
1 30/11/2017 Dharmshila Const. Emb-1st 40+400 40+580 RHS 18 180 6.2 0.2 223 Cum
2 30/11/2017 Dharmshila Const. Emb-1st 40+620 40+880 RHS 40 260 7.2 0.2 374 Cum
3 30/11/2017 Dharmshila Const. Emb-1st 40+620 40+800 LHS 27 180 7.2 0.2 259 Cum
4 01/12/2017 Dharmshila Const. Emb-1st 40+440 40+580 LHS 18 140 6 0.2 168 Cum
5 01/12/2017 Dharmshila Const. Emb-1st 38+740 38+900 RHS 18 160 6 0.2 192 Cum
6 02/12/2017 Dharmshila Const. Emb-2nd 40+620 40+800 LHS 25 180 6.8 0.2 245 Cum
7 02/12/2017 Dharmshila Const. Emb-1st 39+150 39+250 RHS 8 100 5 0.2 100 Cum
8 02/12/2017 Dharmshila Const. Emb-1st 39+000 39+100 LHS 13 100 6.5 0.2 130 Cum
9 02/12/2017 Dharmshila Const. Emb-1st 38+760 38+800 LHS 8 40 6.5 0.2 52 Cum
10 03/12/2017 Dharmshila Const. Emb-1st 39+100 39+200 LHS 10 100 6 0.2 120 Cum
11 03/12/2017 Dharmshila Const. Emb-2nd 38+760 38+820 LHS 10 60 6 0.2 72 Cum
13 04/12/2017 Dharmshila Const. Emb-1st 38+440 38+500 RHS 8 60 5 0.2 60 Cum
14 04/12/2017 Dharmshila Const. Emb-1st 37+840 38+100 RHS 35 260 7.3 0.2 380 Cum 11641

15 04/12/2017 Dharmshila Const. Emb-1st 37+990 38+100 LHS 15 110 6.5 0.2 143 Cum 11837

16 05/12/2017 Dharmshila Const. Emb-1st 39+800 39+990 LHS 22 190 5.5 0.2 209 Cum
17 05/12/2017 Dharmshila Const. Emb-1st 37+840 37+990 LHS 18 150 8 0.2 240 Cum
18 05/12/2017 Dharmshila Const. Emb-1st 37+980 38+060 RHS 6 80 6.5 0.2 104 Cum
19 06/12/2017 Dharmshila Const. Emb-1st 39+800 39+920 RHS 16 120 6.5 0.2 156 Cum
20 06/12/2017 Dharmshila Const. Emb-1st 38+500 38+600 LHS 9 100 4 0.2 80 Cum
21 06/12/2017 Dharmshila Const. Emb-2nd 40+420 40+620 LHS 10 200 5.5 0.12 132 Cum
22 07/12/2017 Dharmshila Const. Emb-2nd 37+900 38+100 LHS 20 200 6.9 0.2 276 Cum
22 07/12/2017 Dharmshila Const. Emb-2nd 37+900 38+100 RHS 20 200 6.9 0.15 207 Cum
24 07/12/2017 Devesh Const. Emb-1st 44+200 44+380 RHS 22 180 6 0.2 216 Cum
25 08/12/2017 Devesh Const. Emb-2nd 44+200 44+380 RHS 17 180 5.6 0.2 202 Cum
26 08/12/2017 Devesh Const. Emb-1st 44+380 44+500 RHS 22 120 6 0.2 144 Cum
27 08/12/2017 Navamukta Const. Emb-1st 48+180 48+280 LHS 13 100 6.3 0.2 126 Cum
28 08/12/2017 Navamukta Const. Emb-1st 47+430 47+550 RHS 16 120 6 0.2 144 Cum
29 08/12/2017 Dharmshila Const. Emb-3rd 40+620 40+800 LHS 20 180 6.4 0.2 230 Cum
30 08/12/2017 Dharmshila Const. Emb-2nd 40+620 40+800 RHS 18 180 6.8 0.2 245 Cum
Sr.no Date Name of contractor Items No

1 30/11/2017 Dhanlaxmi Enterprises Dismantling & area Dressing 1


2 30/11/2017 Dhanlaxmi Enterprises M-15 1
3 30/11/2017 Dhanlaxmi Enterprises IPS Flooring(Varandah) 1
4 01/12/2017 Dhanlaxmi Enterprises IPS Flooring(Varandah) 1
5 02/12/2017 Dhanlaxmi Enterprises IPS Flooring(Varandah) 1
5 03/12/2017 Dhanlaxmi Enterprises Water pipe Line 1
6 04/12/2017 Dhanlaxmi Enterprises Sewage pipe line(4") 1
7 04/12/2017 Dhanlaxmi Enterprises Drainage Chamber (PCC) 5
8 04/12/2017 Dhanlaxmi Enterprises Drainage Chamber (Dressing) 5
9 05/12/2017 Dhanlaxmi Enterprises Drainage Chamber (PCC) 2
10 05/12/2017 Dhanlaxmi Enterprises Drainage Chamber (Dressing) 2
11 05/12/2017 Dhanlaxmi Enterprises Sewage pipe line(3") 1
12 07/12/2017 Dhanlaxmi Enterprises IPS Flooring(Labour Bathroom) 3
13 08/12/2017 Dhanlaxmi Enterprises IPS Flooring(Labour Bathroom) 15
09-12-2017/
14 Dhanlaxmi Enterprises IPS Flooring( Bathroom area) 1
11-12-2017
15 11/12/2017 Dhanlaxmi Enterprises IPS Flooring( Bathroom area) 1
16 11/12/2017 Dhanlaxmi Enterprises IPS Flooring( Bathroom area) 1
17 12/12/2017 Dhanlaxmi Enterprises IPS Flooring( Bathroom area) 1
18 13/12/2017 Dhanlaxmi Enterprises Dressing 1
19 13/12/2017 Dhanlaxmi Enterprises PCC M-15 1
20 13/12/2017 Dhanlaxmi Enterprises Dressing 1
21 13/12/2017 Dhanlaxmi Enterprises PCC M-15 1
22 13/12/2017 Dhanlaxmi Enterprises Drainage Chamber (Plaster Inner)-5Nos 10
23 13/12/2017 Dhanlaxmi Enterprises Drainage Chamber (Plaster Inner)-5Nos 10
24 13/12/2017 Dhanlaxmi Enterprises Drainage Chamber ( Inner Plaster)-2Nos 4
25 13/12/2017 Dhanlaxmi Enterprises Drainage Chamber ( Inner Plaster)-2Nos 4
25 15/12/2017 Dhanlaxmi Enterprises IPS Flooring( Bathroom area) 1
26 15/12/2017 Dhanlaxmi Enterprises IPS Flooring( Bathroom area) 1
27 15/12/2017 Dhanlaxmi Enterprises IPS Flooring( Bathroom area) 1
28
15/12/2017 Dhanlaxmi Enterprises RCC-M 20 for soak pit precast 2
29
30 16/12/2017 Dhanlaxmi Enterprises IPS Flooring( Work Shop P&M) 2
Length  Width Depth   Quantity Unit Remarks

8 4.5 36 Sqm Engineer's qtr. Camp-44


8 4.5 0.05 1.8 Cum Engineer's qtr. Camp-44
8 1.5 12 Sqm Engineer's qtr. Camp-44
8 1.5 12 Sqm Engineer's qtr. Camp-44
8 1.5 12 Sqm Engineer's qtr. Camp-44
196.8 Rft Engineer's qtr. Camp-24
196.8 Rft Engineer's qtr. Camp-24
1.2 1 0.075 0.45 Cum Camp-24
1.2 1 6 Sqm Camp-24
4.2 0.8 0.075 0.504 Cum Camp-24
4.2 0.8 6.72 Sqm Camp-24
198.44 Rft Engineer's qtr. Camp-24
1.75 0.96 5.04 Sqm Camp-44
1.75 0.96 25.2 Sqm Camp-44

10 5.5 55 Sqm
Arround of Labour bath water tank area
3.4 3.5 11.9 Sqm Camp-44
3.5 3.15 11.025 Sqm
10 5.45 54.5 Sqm
4 2.05 8.2 Sqm For DG-40KVA foundation
4 2.05 0.075 0.615 Cum For DG-40KVA foundation
3.1 3 9.3 Sqm For Petrolpump Cabin
3.1 3.1 0.075 0.721 Cum For Petrolpump Cabin
1.2 0.3 3.6 Sqm Camp-24
1 0.3 3 Sqm Camp-24
4.2 0.3 5.04 Sqm Camp-24
0.8 0.3 0.96 Sqm Camp-24
3.55 3.25 11.5375 Sqm Camp-24
3.2 3.25 10.4 Sqm Camp-44
10 2.5 25 Sqm Camp-44
0.065 0.39 Cum Camp-44
2 1.5
39 Kg Camp-44
5 3.15 31.5 Sqm Camp-44
RCB NH-32 Project
Wing wall Wall Raft PCC Excavation Diversion
Sr. No. Type of Structure
LHS
1 Box Culvert 2x2
2 Box Culvert 2x2
3 Box Culvert 2x2
4 Box Culvert 2x2
5 Box Culvert 2x2
6 Box Culvert 2x1.2
7 Box Culvert 2x2
8 Box Culvert 2x2
9 Box Culvert 2x2
10 Box Culvert 2x2
11 Box Culvert 2x2
12 Box Culvert 2x2
13 Box Culvert 2x2
14 Box Culvert 2x2
15 Box Culvert 2x2
16 Box Culvert 2x2
17 Box Culvert 2x2
18 Box Culvert 2x2
19 Box Culvert 2x2
20 Box Culvert 2x2
21 Box Culvert 2x2
22 Box Culvert 2x2
23 Box Culvert 2x2
24 Box Culvert 2x2
25 Box Culvert 2x2
26 Box Culvert 2x2
27 Box Culvert 2x2
28 Box Culvert 2x2
29 Box Culvert 2x2
30 Box Culvert 3x3
31 Box Culvert 2x2
32 Box Culvert 2x2
33 Box Culvert 3x3
34 Box Culvert 2x2
35 Box Culvert 2x2
36 Box Culvert 3x3
37 Box Culvert 2x2
38 Box Culvert 2x2
39 Box Culvert 2x2
40 Box Culvert 2x2
41 Box Culvert 2x2
42 Box Culvert 2x2
43 12/19/2017 Box Culvert 2x2
44 12/19/2017 12/18/2017 Box Culvert 2x2
32 Project
Project Diversion Excavation PCC Raft Wall Wing wall
Chainage RHS
0+850
5+546
6+662
6+845
7+665
11+803
12+090
13+810
19+738
21+246
22+753
24+056
24+241
27+427
29+281
30+453
30+794
31+189
31+253
31+412
31+669
34+049
34+424
35+300
35+752
36+345
37+520
38+392
38+728
39+989
42+736
43+653
45+138
45+635
46+758
47+424
48+330
48+836
49+862
51+951
52+365
53+453
54+782 12/19/2017
55+364 12/18/2017 12/19/2017
ASHOKA BU
Dept. Laubour U
Nos of labour
Sr.No DDS Nos. Date Utilization for work Name of contractor
Skill

1 103 19-12-2017 Safety Manoj kumar Constructions


2 38 19-12-2017 QA/QC Manoj kumar Constructions
3 305 19-12-2017 Survey Manoj kumar Constructions
4 1973 19-12-2017 Highway Manoj kumar Constructions
5 202 19-12-2017 Store Manoj kumar Constructions
Todays
During this month
Up to Last Month
Total Till date
ASHOKA BUILDCON LTD.
Dept. Laubour Utilization Details
Nos of labour Chainage Side
Unskill From To
292
3 Camp-44
2 Camp-44
6
5
2
18
310
2473
2783
s
Activity details Remarks

Used for Reparing of Safety Board.


Used for Borrow area CBR casting & FDD testing
Box culvert layout ch 54+782, 55+354 & NGL taken
Used for OGL Work
Used for shuttering material stacking
Sr.No. Date Climate Rainfall(mm) Remarks

1 11/26/2017 Sunny 0.00mm


2 11/27/2017 Sunny 0.00mm
3 11/28/2017 Sunny 0.00mm
4 11/29/2017 Sunny 0.00mm
5 11/30/2017 Sunny 0.00mm
6 12/1/2017 Sunny 0.00mm
7 12/2/2017 Sunny 0.00mm
8 12/3/2017 Sunny 0.00mm
9 12/4/2017 Sunny 0.00mm
10 12/5/2017 Sunny 0.00mm
11 12/6/2017 Sunny 0.00mm
12 12/7/2017 Sunny 0.00mm
13 12/8/2017 Sunny 0.00mm
14 12/9/2017 Sunny 0.00mm
15 12/10/2017 Sunny 0.00mm
16 12/11/2017 Sunny 0.00mm
17 12/12/2017 Sunny 0.00mm
18 12/13/2017 Sunny 0.00mm
19 12/14/2017 Sunny 0.00mm
20 12/15/2017 Sunny 0.00mm
21 12/16/2017 Sunny 0.00mm
22 12/17/2017 Sunny 0.00mm
23 12/18/2017 Sunny 0.00mm
24 12/19/2017 Sunny 0.00mm
Hire Machinery use by ABL
Date Contractor Name S. Reading C. Reading Hours
12/8/2017 Dharamshila Const. 12120.1 12122.3 2.2
12/8/2017 Dharamshila Const. 12125.8 12128 2.2
achinery use by ABL
Remarks
Water log area slush cutting(From CH-38+600 to 38+740(LHS)
Water log area slush cutting(From CH-38+240 to 38+340(RHS)