You are on page 1of 17

SUMMARY REPORT OF LABORATORY TEST

NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao
- Dalin - Sta. Margarita Road
LOCATION Baggao, Cagayan
CONTRACTOR FREY-FIL
UPDATED CORPORATION
Mar 23 2021

Quantity Specification Sampled Tested Specifications Remarks


Lab. No Kind of Materials At Location
Represented Item No. By Date By Date

1 LRISA-181106 - 0011 RSB (20 mm) Not Stated 400(23)a13 Jay Mar Isorena ### Jason Porras ### E.B Testing TR no. 1
2 LRISA-181106 - 0011 RSB (25 mm) Not Stated 400(23)a13 Jay Mar Isorena ### Jason Porras ### E.B Testing 4 pcs TR no. 1
3 LRISA-181106 - 0011 RSB (36 mm) Not Stated 400(23)a13 Jay Mar Isorena ### Jason Porras ### E.B Testing 20 pcs TR no. 1
6 LRISA-181106-0015 RSB (10 mm) Not Stated 406(1)f8 Jay Mar Isorena ### Jason Porras ### E.B Testing TR no. 3
7 LRISA-181106-0015 RSB (10 mm) Jay Mar Isorena ### Jason Porras ### E.B Testing ASTM C-150 TR no. 5
12 LRPSG-190327-0037 RSB (12 mm) Not Stated R. Abalos March 27, 2019 Elmer Montero April 03, 2019 E.B Testing 3 pcs TR no. 3
13 LRHO-190327-0041 RSB (12 mm) 10000 kgs Jay Mar Isorena March 27, 2019 Elmer Montero April 03, 2019 E.B Testing 3 pcs TR no. 3
14 LRPSG-190327-0037 RSB (20 mm) Not Stated R. Abalos March 27, 2019 Elmer Montero April 03, 2019 E.B Testing 3 pcs TR no. 3
15 LRHO-190327-0042 RSB (25 mm) 10000 kgs Jay Mar Isorena March 27, 2019 Elmer Montero April 03, 2019 E.B Testing 3 pcs TR no. 3
16 LRPSG-190327-0037 RSB (28 mm) Not Stated R. Abalos March 27, 2019 Elmer Montero April 03, 2019 E.B Testing 3 pcs TR no. 3
17 LRHO-190327-0041 RSB (12 mm) Jay Mar Isorena March 27, 2019 Elmer Montero April 03, 2019 E.B Testing PNS 49 TR no. 5
18 LRHO-190327-0041 RSB (12 mm) Jay Mar Isorena March 27, 2019 Elmer Montero April 03, 2019 E.B Testing PNS 49 TR no. 5
19 LRHO-190327-0041 RSB (12 mm) Jay Mar Isorena March 27, 2019 Elmer Montero April 03, 2019 E.B Testing PNS 49 TR no. 5
20 LRPSG-190327-0037 RSB (12 mm) R. Abalos March 27, 2019 Elmer Montero April 03, 2019 E.B Testing PNS 49 TR no. 5
21 LRPSG-190327-0037 RSB (12 mm) R. Abalos March 27, 2019 Elmer Montero April 03, 2019 E.B Testing PNS 49 TR no. 5
22 LRPSG-190327-0037 RSB (12 mm) R. Abalos March 27, 2019 Elmer Montero April 03, 2019 E.B Testing PNS 49 TR no. 5
23 LRPSG-190327-0037 RSB (20 mm) R. Abalos March 27, 2019 Elmer Montero April 03, 2019 E.B Testing PNS 49 TR no. 5
24 LRPSG-190327-0037 RSB (20 mm) R. Abalos March 27, 2019 Elmer Montero April 03, 2019 E.B Testing PNS 49 TR no. 5
25 LRPSG-190327-0037 RSB (20 mm) R. Abalos March 27, 2019 Elmer Montero April 03, 2019 E.B Testing PNS 49 TR no. 5
26 LRHO-190327-0042 RSB (25 mm) Jay Mar Isorena March 27, 2019 Elmer Montero April 03, 2019 E.B Testing PNS 49 TR no. 5
27 LRHO-190327-0042 RSB (25 mm) Jay Mar Isorena March 27, 2019 Elmer Montero April 03, 2019 E.B Testing PNS 49 TR no. 5
28 LRHO-190327-0042 RSB (25 mm) Jay Mar Isorena March 27, 2019 Elmer Montero April 03, 2019 E.B Testing PNS 49 TR no. 5
29 LRPSG-190327-0037 RSB (28 mm) R. Abalos March 27, 2019 Elmer Montero April 03, 2019 E.B Testing PNS 49 TR no. 5
30 LRPSG-190327-0037 RSB (28 mm) R. Abalos March 27, 2019 Elmer Montero April 03, 2019 E.B Testing PNS 49 TR no. 5
31 LRPSG-190327-0037 RSB (28 mm) R. Abalos March 27, 2019 Elmer Montero April 03, 2019 E.B Testing PNS 49 TR no. 5
46 LRISA-190423 - 0003 ARSB (20 mm) 110000 kgs 400(23)a13 Adamin Amarrador April 23, 2019 Jason Porras April 30, 2019 E.B Testing 5 pcs TR no. 1
47 LRISA-190423 - 0005 ARSB (36 mm) 500000 kgs 400(23)a13 Adamin Amarrador April 23, 2019 Jason Porras April 30, 2019 E.B Testing 43 pcs TR no. 1
48 LRPSG-190425-0019 RSB (12 mm) R. Abalos April 25, 2019 Elmer Montero May 02, 2019 E.B Testing PNS 49 TR no. 5
53 LRPSG-190504-0006 RSB (28 mm) R. Abalos May 04, 2019 Elmer Montero May 11, 2019 E.B Testing PNS 49 TR no. 5
54 LRPSG-190518-0005 RSB (20 mm) Not Stated R. Abalos May 18, 2019 Elmer Montero May 25, 2019 E.B Testing TR no. 3
55 LRPSG-190518-0005 RSB (20 mm) R. Abalos May 18, 2019 Elmer Montero May 25, 2019 E.B Testing PNS 49 TR no. 5
56 LRPSG-190520-0028 RSB (12 mm) R. Abalos May 20, 2019 Elmer Montero May 27, 2019 E.B Testing PNS 49 TR no. 5
57 LRPSG-190520-0011 RSB (12 mm) R. Abalos May 20, 2019 Elmer Montero May 27, 2019 E.B Testing PNS 49 TR no. 5
58 LRPSG-190520-0011 RSB (20 mm) R. Abalos May 20, 2019 Elmer Montero May 27, 2019 E.B Testing PNS 49 TR no. 5
59 LRPSG-190520-0028 RSB (20 mm) R. Abalos May 20, 2019 Elmer Montero May 27, 2019 E.B Testing PNS 49 TR no. 5
60 LRPSG-190520-0028 RSB (28 mm) R. Abalos May 20, 2019 Elmer Montero May 27, 2019 E.B Testing PNS 49 TR no. 5
73 LRQC-190806-0004 RSB (25 mm) 10000 kgs Not Stated August 06, 2019 Christoper Lampa August 10, 2019 E.B Testing 2 pcs TR no. 3
74 LRQC-190806-0004 RSB (28 mm) 10000 kgs Not Stated August 06, 2019 Christoper Lampa August 10, 2019 E.B Testing 3 pcs TR no. 3
75 LRQC-190806-0004 RSB (20 mm) 10000 kgs Not Stated August 06, 2019 Christoper Lampa August 10, 2019 E.B Testing 3 pcs TR no. 3
76 LRQC-190806-0004 RSB (12 mm) 10000 kgs Not Stated August 06, 2019 Christoper Lampa August 10, 2019 E.B Testing 3 pcs TR no. 3
77 LRQC-190806-0004 RSB (28 mm) R. Abalos August 06, 2019 Christoper Lampa August 10, 2019 E.B Testing PNS 49 Grade 60 TR no. 5
78 LRQC-190806-0004 RSB (28 mm) R. Abalos August 06, 2019 Christoper Lampa August 10, 2019 E.B Testing PNS 49 Grade 60 TR no. 5
91 LRISA-190925-0021 RSB (28 mm) 70000 kgs 404(1)b Sherry Hann Adduru ### Jason Porras October 01, 2019 E.B Testing 6 pcs TR no. 4
102 LRISA-191028-0032-T RSB (36 mm) 200000 kgs 400(23)a13 Sherry Hann Adduru October 28, 2019 Jason Porras ### E.B Testing 1 pc TR no. 1
SUMMARY REPORT OF LABORATORY TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao
- Dalin - Sta. Margarita Road
LOCATION Baggao, Cagayan
CONTRACTOR FREY-FIL
UPDATED CORPORATION
Mar 23 2021
109 LRPSG-191125-0009 RSB (10 mm) R. Abalos ### Elmer Montero ### E.B Testing PNS 49 TR no. 5
110 LRPSG-191125-0009 RSB (12 mm) R. Abalos ### Elmer Montero ### E.B Testing PNS 49 TR no. 5
111 LRPSG-191125-0009 RSB (12 mm) R. Abalos ### Elmer Montero ### E.B Testing PNS 49 TR no. 5
112 LRPSG-191125-0009 RSB (25 mm) R. Abalos ### Elmer Montero ### E.B Testing PNS 49 TR no. 5
113 LRPSG-191125-0009 RSB (20 mm) R. Abalos ### Elmer Montero ### E.B Testing PNS 49 TR no. 5
114 LRPSG-191125-0009 RSB (20 mm) R. Abalos ### Elmer Montero ### E.B Testing PNS 49 TR no. 5
115 LRPSG-191125-0009 RSB (20 mm) R. Abalos ### Elmer Montero ### E.B Testing PNS 49 TR no. 5
116 LRPSG-191125-0009 RSB (28 mm) R. Abalos ### Elmer Montero ### E.B Testing PNS 49 TR no. 5
117 LRPSG-191125-0009 RSB (28 mm) R. Abalos ### Elmer Montero ### E.B Testing PNS 49 TR no. 5
118 LRPSG-191125-0009 RSB (28 mm) R. Abalos ### Elmer Montero ### E.B Testing PNS 49 TR no. 5
119 LRPSG-191125-0009 RSB (12 mm) R. Abalos ### Elmer Montero ### E.B Testing PNS 49 TR no.5
138 LRISA-200611-0020-B RSB (25 mm) 20000 kgs Analyn Buscas June 11, 2020 Norman Valencia June 18, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
139 LRISA-200611-0020-A RSB (25 mm) 20000 kgs Analyn Buscas June 11, 2020 Norman Valencia June 18, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
140 LRISA-200611-0020-B RSB (20 mm) 20000 kgs Analyn Buscas June 11, 2020 Norman Valencia June 18, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
141 LRISA-200611-0020-A RSB (20 mm) 20000 kgs Analyn Buscas June 11, 2020 Norman Valencia June 18, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
142 LRISA-200611-0020-B RSB (36 mm) 20000 kgs 400(23)a13 Analyn Buscas June 11, 2020 Norman Valencia June 18, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
143 LRISA-200611-0020-A RSB (36 mm) 20000 kgs 400(23)a13 Analyn Buscas June 11, 2020 Norman Valencia June 18, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
145 LRISA-200624-0019 RSB (25 mm) 10000 kgs Analyn Buscas June 24, 2020 Norman Valencia July 01, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
146 LRISA-200624-0019 RSB (20 mm) 10000 kgs 404(1)b Analyn Buscas June 24, 2020 Norman Valencia July 01, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
147 LRISA-200624-0019-C RSB (36 mm) 120000 kgs 400(23)a13 Analyn Buscas June 24, 2020 Norman Valencia July 01, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
148 LRISA-200624-0019-B RSB (36 mm) 120000 kgs 400(23)a13 Analyn Buscas June 24, 2020 Norman Valencia July 01, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
149 LRISA-200624-0019-A RSB (36 mm) 120000 kgs 400(23)a13 Analyn Buscas June 24, 2020 Norman Valencia July 01, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
150 LRISA-200624-0019 RSB (36 mm) 10000 kgs 404(1)b Analyn Buscas June 24, 2020 Norman Valencia July 01, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
151 LRISA-200624-0019-G RSB (36 mm) 120000 kgs 400(23)a13 Analyn Buscas June 24, 2020 Norman Valencia July 01, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
152 LRISA-200624-0019-F RSB (36 mm) 120000 kgs 400(23)a13 Analyn Buscas June 24, 2020 Norman Valencia July 01, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
153 LRISA-200624-0019-E RSB (36 mm) 120000 kgs 400(23)a13 Analyn Buscas June 24, 2020 Norman Valencia July 01, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
154 LRISA-200624-0019-D RSB (36 mm) 120000 kgs 400(23)a13 Analyn Buscas June 24, 2020 Norman Valencia July 01, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
155 LRISA-200624-0019-K RSB (36 mm) 120000 kgs 400(23)a13 Analyn Buscas June 24, 2020 Norman Valencia July 01, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
156 LRISA-200624-0019-J RSB (36 mm) 120000 kgs 400(23)a13 Analyn Buscas June 24, 2020 Norman Valencia July 01, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
157 LRISA-200624-0019-I RSB (36 mm) 120000 kgs 400(23)a13 Analyn Buscas June 24, 2020 Norman Valencia July 01, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
158 LRISA-200624-0019-H RSB (36 mm) 120000 kgs 400(23)a13 Analyn Buscas June 24, 2020 Norman Valencia July 01, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
159 LRISA-200624-0019-L RSB (36 mm) 120000 kgs 400(23)a13 Analyn Buscas June 24, 2020 Norman Valencia July 01, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
161 LRISA-200805-0008 RSB (36 mm) 10000 kgs 404(1)b Analyn Buscas August 05, 2020 Norman Valencia August 12, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
162 LRISA-200805-0008 RSB (20 mm) 10000 kgs 404(1)b Analyn Buscas August 05, 2020 Norman Valencia August 12, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
163 LRISA-200805-0008 RSB (25 mm) 10000 kgs 404(1)b Analyn Buscas August 05, 2020 Norman Valencia August 12, 2020 E.B Testing PNS 49 Grade 60 TR no. 6
164 LRQC-190806-0004 RSB (12 mm) - Christoper Lampa August 10, 2019 E.B Testing PNS 49 Grade 40 TR no. 5
165 LRQC-190806-0004 RSB (12 mm) - Christoper Lampa August 10, 2019 E.B Testing PNS 49 Grade 40 TR no. 5
166 LRQC-190806-0004 RSB (12 mm) - Christoper Lampa August 10, 2019 E.B Testing PNS 49 Grade 40 TR no. 5
167 LRQC-190806-0004 RSB (20 mm) - Christoper Lampa August 10, 2019 E.B Testing PNS 49 Grade 40 TR no. 5
168 LRQC-190806-0004 RSB (20 mm) - Christoper Lampa August 10, 2019 E.B Testing PNS 49 Grade 40 TR no. 5
169 LRQC-190806-0004 RSB (20 mm) - Christoper Lampa August 10, 2019 E.B Testing PNS 49 Grade 40 TR no. 5
170 LRQC-190806-0004 RSB (25 mm) - Christoper Lampa August 10, 2019 E.B Testing PNS 49 Grade 40 TR no. 5
171 LRQC-190806-0004 RSB (25 mm) - Christoper Lampa August 10, 2019 E.B Testing PNS 49 Grade 40 TR no. 5
172 LRQC-190806-0004 RSB (28 mm) - Christoper Lampa August 10, 2019 E.B Testing PNS 49 Grade 60 TR no. 5

Prepared By: ` Checked by:


SUMMARY REPORT OF LABORATORY TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao
- Dalin - Sta. Margarita Road
LOCATION Baggao, Cagayan
CONTRACTOR FREY-FIL
UPDATED CORPORATION
Mar 23 2021

GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Materials Engineer - DPWH Project Engineer - DPWH
No. Product ID Date Location Recorded by

1 01G1 December 04, 2019 Norzagaray DSI


2 01G2 December 04, 2019 Norzagaray DSI
3 01G3 December 18, 2019 Norzagaray DSI
4 01G4 December 18, 2019 Norzagaray DSI
5 04G1 October 26, 2019 Norzagaray DSI
6 04G2 October 26, 2019 Norzagaray DSI
7 04G3 November 08, 2019 Norzagaray DSI
8 04G4 November 08, 2019 Norzagaray DSI
9 05G1 November 08, 2019 Norzagaray DSI
10 05G2 November 16, 2019 Norzagaray DSI
11 05G3 November 16, 2019 Norzagaray DSI
12 05G4 November 08, 2019 Norzagaray DSI
13 07G1 November 16, 2019 Norzagaray DSI
14 07G2 November 08, 2019 Norzagaray DSI 65.847
15 07G3 November 16, 2019 Norzagaray DSI
16 07G4 November 16, 2019 Norzagaray DSI
17 08G1 November 16, 2019 Norzagaray DSI
18 08G2 December 20, 2019 Norzagaray DSI
19 08G3 December 18, 2019 Norzagaray DSI
20 08G4 December 18, 2019 Norzagaray DSI
21 10G1 December 19, 2019 Norzagaray DSI
22 10G2 December 20, 2019 Norzagaray DSI
23 10G3 December 18, 2019 Norzagaray DSI
24 10G4 December 20, 2019 Norzagaray DSI
25 11G1 December 19, 2019 Norzagaray DSI
26 11G2 December 20, 2019 Norzagaray DSI
27 11G3 December 19, 2019 Norzagaray DSI
28 11G4 December 20, 2019 Norzagaray DSI
29 13G1 December 19, 2019 Norzagaray DSI
30 13G2 December 20, 2019 Norzagaray DSI
31 13G3 December 19, 2019 Norzagaray DSI
32 13G4 December 20, 2019 Norzagaray DSI
33 14G1 December 20, 2019 Norzagaray DSI 3500
34 14G2 January 06, 2020 Norzagaray DSI 4450
35 14G4 January 06, 2020 Norzagaray DSI 7950
36 16G1 January 07, 2020 Norzagaray DSI
37 16G3 January 07, 2020 Norzagaray DSI
38 16G4 January 07, 2020 Norzagaray DSI
39 Girder 20 October 25, 2019 DSI PDF
40 Girder 21 October 30, 2019 DSI PDF
41 Girder 22 October 25, 2019 DSI PDF
42 Girder 23 October 30, 2019 DSI PDF
43 Girder 24 October 20, 2019 DSI PDF
44 Girder 25 November 18, 2019 DSI PDF
45 Girder 01 April 23, 2019 Calumpit DSI PDF
46 Girder 02 April 29, 2019 Calumpit DSI PDF
47 Girder 03 May 02, 2019 Calumpit DSI PDF
48 Girder 04 May 02, 2019 Calumpit DSI PDF
49 Girder 05 May 03, 2019 Calumpit DSI PDF
50 Girder 06 May 04, 2019 Calumpit DSI PDF
51 Girder 07 June 06, 2019 Calumpit DSI PDF
52 Girder 08 June 08, 2019 Calumpit DSI PDF
53 Girder 09 June 10, 2019 Calumpit DSI PDF
54 Girder 10 June 10, 2019 Calumpit DSI PDF
55 Girder 11 July 08, 2019 Calumpit DSI PDF
56 Girder 12 July 09, 2019 Calumpit DSI PDF
57 Girder 13 July 10, 2019 Calumpit DSI PDF
58 Girder 14 September 04, 2019 Calumpit DSI PDF
59 Girder 15 September 04, 2019 Calumpit DSI PDF
60 Girder 16 September 04, 2019 Calumpit DSI PDF
61 Girder 17 September 12, 2019 Calumpit DSI PDF
62 Girder 18 September 12, 2019 Calumpit DSI PDF
63 Girder 19 September 12, 2019 Calumpit DSI PDF
64 17G1 July 20, 2019 Baras DSI
65 17G2 July 20, 2019 Baras DSI
66 17G3 July 28, 2019 Baras DSI
67 17G4 July 28, 2019 Baras DSI
68 14G3 January 06, 2020 Norzagaray DSI
Date of Stressing
No. ID From Tested by: FFC Witness Location
Cable 1 Cable 2 Cable 3 Cable 4

26 01G1 Norzagaray Plant Leandro Marquez Roland Abcede November 15, 2019 November 15, 2019 November 19, 2019 November 19, 2019
27 01G2 Norzagaray Plant Leandro Marquez Roland Abcede November 15, 2019 November 18, 2019 November 19, 2019 November 19, 2019
28 01G3 Norzagaray Plant Leandro Marquez Roland Abcede November 18, 2019 November 18, 2019 November 19, 2019 November 19, 2019
29 01G4 Norzagaray Plant Leandro Marquez Roland Abcede November 16, 2019 November 16, 2019 November 19, 2019 November 19, 2019
30 04G1 Norzagaray Plant Leandro Marquez Roland Abcede October 19, 2019 October 19, 2019 October 21, 2019 October 21, 2019
31 04G2 Norzagaray Plant Leandro Marquez Roland Abcede October 21, 2019 October 21, 2019 October 22, 2019 October 22, 2019
32 04G3 Norzagaray Plant Leandro Marquez Roland Abcede October 24, 2019 October 24, 2019 October 26, 2019 October 26, 2019
33 04G4 Norzagaray Plant Leandro Marquez Roland Abcede October 25, 2019 October 25, 2019 October 29, 2019 October 26, 2019
34 05G1 Norzagaray Plant Leandro Marquez Roland Abcede October 28, 2019 October 28, 2019 November 04, 2019 November 04, 2019
35 05G2 Norzagaray Plant Leandro Marquez Roland Abcede November 04, 2019 November 04, 2019 November 07, 2019 November 07, 2019
36 05G3 Norzagaray Plant Leandro Marquez Roland Abcede November 06, 2019 November 06, 2019 November 09, 2019 November 09, 2019
37 05G4 Norzagaray Plant Leandro Marquez Roland Abcede October 28, 2019 October 28, 2019 October 30, 2019 October 30, 2019
38 07G1 Norzagaray Plant Leandro Marquez Roland Abcede November 09, 2019 November 09, 2019 November 11, 2019 November 11, 2019
39 07G2 Norzagaray Plant Leandro Marquez Roland Abcede November 04, 2019 November 04, 2019 November 05, 2019 November 05, 2019
40 07G3 Norzagaray Plant Leandro Marquez Roland Abcede November 07, 2019 November 07, 2019 November 11, 2019 November 11, 2019
41 07G4 Norzagaray Plant Leandro Marquez Roland Abcede November 11, 2019 November 11, 2019 November 12, 2019 November 12, 2019
42 08G1 Norzagaray Plant Leandro Marquez Roland Abcede November 12, 2019 November 13, 2019 November 13, 2019 November 13, 2019
43 08G2 Norzagaray Plant Leandro Marquez Roland Abcede November 20, 2019 November 20, 2019 November 21, 2019 November 21, 2019
44 08G3 Norzagaray Plant Leandro Marquez Roland Abcede November 21, 2019 November 21, 2019 November 23, 2019 November 23, 2019
45 08G4 Norzagaray Plant Leandro Marquez Roland Abcede November 14, 2019 November 14, 2019 November 16, 2019 November 16, 2019
46 10G1 Norzagaray Plant Leandro Marquez Roland Abcede November 25, 2019 November 25, 2019 November 26, 2019 November 26, 2019
47 10G2 Norzagaray Plant Leandro Marquez Roland Abcede November 22, 2019 November 22, 2019 November 25, 2019 November 25, 2019
48 10G3 Norzagaray Plant Leandro Marquez Roland Abcede November 23, 2019 November 23, 2019 November 25, 2019 November 25, 2019
49 10G4 Norzagaray Plant Leandro Marquez Roland Abcede November 25, 2019 November 25, 2019 November 25, 2019 November 26, 2019
50 11G1 Norzagaray Plant Leandro Marquez Roland Abcede November 28, 2019 November 28, 2019 December 05, 2019 December 05, 2019
51 11G2 Norzagaray Plant Leandro Marquez Roland Abcede November 29, 2019 November 29, 2019 December 07, 2019 December 07, 2019
52 11G3 Norzagaray Plant Leandro Marquez Roland Abcede December 02, 2019 December 02, 2019 December 05, 2019 December 05, 2019
53 11G4 Norzagaray Plant Leandro Marquez Roland Abcede November 27, 2019 November 28, 2019 November 28, 2019
57 13G1 Norzagaray Plant December 06, 2019 December 06, 2019 December 09, 2019 December 09, 2019 PDF
54 13G2 Norzagaray Plant Leandro Marquez Roland Abcede December 02, 2019 December 02, 2019 December 07, 2019 December 07, 2019
55 13G3 Norzagaray Plant Leandro Marquez Jeric Milio December 04, 2019 December 04, 2019 December 09, 2019 December 09, 2019
58 13G4 Norzagaray Plant December 07, 2019 December 07, 2019 PDF
67 14G1 Norzagaray Plant Caraig December 17, 2019 December 20, 2019
59 14G2 Norzagaray Plant December 10, 2019 December 13, 2019 December 16, 2019 December 16, 2019 PDF
68 14G3 Norzagaray Plant Caraig December 12, 2019 December 16, 2019
60 14G4 Norzagaray Plant December 11, 2019 December 11, 2019 December 14, 2019 December 14, 2019 PDF
56 16G1 Norzagaray Plant Leandro Marquez Roland Abcede December 04, 2019 December 04, 2019 December 06, 2019 December 06, 2019
61 16G3 Norzagaray Plant December 12, 2019 December 12, 2019 December 12, 2019 December 12, 2019 PDF
62 16G4 Norzagaray Plant December 06, 2019 December 06, 2019 December 12, 2019 December 12, 2019 PDF
63 17G1 Baras Leandro Marquez July 11, 2019 July 11, 2019 July 18, 2019 July 18, 2019
64 17G2 Baras Leandro Marquez July 15, 2019 July 18, 2019
65 17G3 Baras Leandro Marquez July 18, 2019 July 20, 2019
66 17G4 Baras Leandro Marquez July 21, 2019 July 24, 2019
8 Girder 01 Calumpit Leandro Marquez C. Bautista April 01, 2019 April 01, 2019 April 10, 2019 April 10, 2019 TR no. 5
9 Girder 02 Calumpit Leandro Marquez C. Bautista April 10, 2019 April 10, 2019 April 15, 2019 April 15, 2019 TR no. 5
10 Girder 03 Calumpit Leandro Marquez C. Bautista April 12, 2019 April 12, 2019 April 24, 2019 April 24, 2019 TR no. 5
11 Girder 04 Calumpit Leandro Marquez Jerome Carpio April 16, 2019 April 16, 2019 April 25, 2019 April 25, 2019 TR no. 5
12 Girder 05 Calumpit Leandro Marquez Jerome Carpio April 23, 2019 April 23, 2019 April 26, 2019 April 26, 2019 TR no. 5
13 Girder 06 Calumpit Leandro Marquez Jerome Carpio April 27, 2019 April 27, 2019 April 30, 2019 April 30, 2019 TR no. 5
14 Girder 07 Calumpit Leandro Marquez Jerome Carpio May 07, 2019 May 07, 2019 May 21, 2019 May 21, 2019 TR no. 5
15 Girder 08 Calumpit Leandro Marquez Jerome Carpio May 07, 2019 May 07, 2019 May 22, 2019 May 22, 2019 TR no. 5
16 Girder 09 Calumpit Leandro Marquez Jerome Carpio May 20, 2019 May 20, 2019 June 06, 2019 June 06, 2019 TR no. 5
17 Girder 10 Calumpit Leandro Marquez Jerome Carpio May 20, 2019 May 20, 2019 June 04, 2019 June 04, 2019 TR no. 5
18 Girder 11 Calumpit Leandro Marquez C. Bautista June 07, 2019 June 07, 2019 June 15, 2019 June 15, 2019 TR no. 5
19 Girder 12 Calumpit Leandro Marquez C. Bautista June 07, 2019 June 07, 2019 July 15, 2019 July 15, 2019
1 Girder 13 Calumpit Leandro Marquez C. Bautista June 19, 2019 June 19, 2019 June 25, 2019 June 25, 2019 TR no. 5
2 Girder 14 Calumpit Leandro Marquez C. Bautista June 22, 2019 June 22, 2019 July 20, 2019 July 20, 2019 TR no. 5
3 Girder 15 Calumpit Leandro Marquez July 25, 2019 July 25, 2019 August 24, 2019 August 25, 2019 TR no. 5
4 Girder 16 Calumpit Leandro Marquez July 30, 2019 July 30, 2019 August 23, 2019 August 23, 2019 TR no. 5
5 Girder 17 Calumpit Leandro Marquez August 27, 2019 August 27, 2019 September 02, 2019 September 02, 2019 TR no. 5
6 Girder 18 Calumpit Leandro Marquez August 27, 2019 August 27, 2019 September 03, 2019 September 03, 2019 TR no. 5
7 Girder 19 Calumpit Leandro Marquez September 06, 2019 September 06, 2019 September 09, 2019 September 09, 2019 TR no. 5
20 Girder 20 Calumpit Leandro Marquez Ventura Cervantes September 06, 2019 September 06, 2019 October 05, 2019 October 05, 2019
21 Girder 21 Calumpit Leandro Marquez Ventura Cervantes September 11, 2019 September 11, 2019 September 17, 2019 September 17, 2019
22 Girder 22 Calumpit Leandro Marquez Ventura Cervantes September 20, 2019 September 20, 2019 October 07, 2019 October 07, 2019
23 Girder 23 Calumpit Leandro Marquez Ventura Cervantes October 08, 2019 October 08, 2019 October 26, 2019 October 26, 2019
24 Girder 24 Calumpit Leandro Marquez Ventura Cervantes October 09, 2019 October 09, 2019 October 26, 2019 October 26, 2019
25 Girder 25 Calumpit Leandro Marquez Ventura Cervantes October 27, 2019 October 27, 2019 November 13, 2019 November 13, 2019
'
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge
(B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION Baggao, Cagayan
CONTRACTOR FREY-FIL CORPORATION
UPDATED Mar 23 2021

Sampled Tested
Age Average
No. Lab. No Kind of Materials Part of Structure Location
By Date By Date At (Days) (psi)

PART F- BRIDGE CONSTRUCTION


ABUSAG BRIDGE

430 Grout Cube 24-Nov-19 22-Dec-19 28 Girder 25 PDF


186 Grout Cube Godel 8-Nov-19 M. Enciso 6-Dec-19 FFC 28 4G3 TR no. 5
187 Grout Cube Godel 8-Nov-19 M. Enciso 6-Dec-19 FFC 28 5G1 TR no. 5
188 Grout Cube Godel 8-Nov-19 M. Enciso 6-Dec-19 FFC 28 5G4 TR no. 5
189 Grout Cube Godel 8-Nov-19 M. Enciso 6-Dec-19 FFC 28 7G2 TR no. 5
426 Grout Cube 30-Oct-19 27-Nov-19 28 Girder 21 PDF
428 Grout Cube 30-Oct-19 27-Nov-19 28 Girder 23 PDF
429 Grout Cube 30-Oct-19 27-Nov-19 28 Girder 24 PDF
425 Grout Cube 25-Oct-19 22-Nov-19 28 Girder 20 PDF
427 Grout Cube 25-Oct-19 22-Nov-19 28 Girder 22 PDF
183 Grout Cube Godel 12-Sep-19 J. Armado 10-Oct-19 FFC 28 Girder 17 TR no. 5
184 Grout Cube Godel 12-Sep-19 J. Armado 10-Oct-19 FFC 28 Girder 18 TR no. 5
185 Grout Cube Godel 12-Sep-19 J. Armado 10-Oct-19 FFC 28 Girder 19 TR no. 5
180 Grout Cube Godel 4-Sep-19 J. Armado 2-Oct-19 FFC 28 Girder 14 TR no. 5
181 Grout Cube Godel 4-Sep-19 J. Armado 2-Oct-19 FFC 28 Girder 15 TR no. 5
182 Grout Cube Godel 4-Sep-19 J. Armado 2-Oct-19 FFC 28 Girder 16 TR no. 5
178 Grout Cube Godel 10-Jul-19 J. Armado 7-Aug-19 FFC 28 Girder 12 TR no. 5
177 Grout Cube Godel 9-Jul-19 J. Armado 6-Aug-19 FFC 28 Girder 11 TR no. 5
179 Grout Cube Godel 8-Jul-19 J. Armado 5-Aug-19 FFC 28 Girder 13 TR no. 5
176 Grout Cube Godel 10-Jun-19 J. Armado 8-Jul-19 FFC 28 Girder 10 TR no. 5
175 Grout Cube Godel 10-Jun-19 J. Armado 8-Jul-19 FFC 28 Girder 9 TR no. 5
174 Grout Cube Godel 8-Jun-19 J. Armado 6-Jul-19 FFC 28 Girder 8 TR no. 5
173 Grout Cube Godel 6-Jun-19 J. Armado 4-Jul-19 FFC 28 Girder 7 TR no. 5
172 Grout Cube Godel 4-May-19 Jomar Quitlong 1-Jun-19 RGE 28 Girder 6 TR no. 5
171 Grout Cube Godel 3-May-19 Jomar Quitlong 31-May-19 RGE 28 Girder 5 TR no. 5
169 Grout Cube Godel 2-May-19 Jomar Quitlong 30-May-19 RGE 28 Girder 3 TR no. 5
170 Grout Cube Godel 2-May-19 Jomar Quitlong 30-May-19 RGE 28 Girder 4 TR no. 5
168 Grout Cube Godel 29-Apr-19 Jomar Quitlong 27-May-19 RGE 28 Girder 2 TR no. 5
167 Grout Cube Godel 23-Apr-19 Jomar Quitlong 21-May-19 RGE 28 Girder 1 TR no. 5
197 Grout Cube Godel 16-Jan-20 DSI 28 10G1 TR no. 5
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge
(B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION Baggao, Cagayan
CONTRACTOR FREY-FIL CORPORATION
UPDATED Mar 23 2021
200 Grout Cube Godel 17-Jan-20 DSI 28 10G2 TR no. 5
203 Grout Cube Godel 15-Jan-20 DSI 28 10G3 TR no. 5
206 Grout Cube Godel 17-Jan-20 DSI 28 10G4 TR no. 5
209 Grout Cube Godel 16-Jan-20 DSI 28 11G1 TR no. 5
212 Grout Cube Godel 17-Jan-20 DSI 28 11G2 TR no. 5
215 Grout Cube Godel 16-Jan-20 DSI 28 11G3 TR no. 5
218 Grout Cube Godel 17-Jan-20 DSI 28 11G4 TR no. 5
221 Grout Cube Godel 16-Jan-20 DSI 28 13G1 TR no. 5
224 Grout Cube Godel 17-Jan-20 DSI 28 13G2 TR no. 5
227 Grout Cube Godel 16-Jan-20 DSI 28 13G3 TR no. 5
231 Grout Cube Godel 17-Jan-20 DSI 28 13G4 TR no. 5
233 Grout Cube Godel 17-Jan-20 DSI 28 14G1 TR no. 5
246 Grout Cube Godel 2-Jan-20 DSI 28 1G1 TR no. 5
Quantity Desired Sampled
No. Sample ID Kind of Material
Represented Test by date
1 Eagle Cement 2000 bags QT Jay Mar Isorena 3/28/2019
2 Fine Aggregate(Vib1500 cu.m Jay Mar Isorena 3/28/2019
3 Coarse Aggregates1500 cu.m Jay Mar Isorena 3/28/2019
4 RSB (12mm) 10000 kgs Sherry Hann Addur 7/24/2019
5 RSB (12mm) 10000 kgs Jay Mar Isorena 3/27/2019
6 RSB (20 mm) 10000 kgs Sherry Hann Addur 7/24/2019
7 RSB (20 mm) 10000 kgs Jay Mar Isorena 3/27/2019
8 RSB (25 mm) 10000 kgs Jay Mar Isorena 3/27/2019
9 RSB (25 mm) 10000 kgs Sherry Hann Addur 7/24/2019
10 RSB (28 mm) 10000 kgs Sherry Hann Addur 7/24/2019
11 RSB (28 mm) 10000 kgs Jay Mar Isorena 3/27/2019
12 Admixture QT Jay Mar Isorena 3/28/2019
13
Testing Date
Location
Center Submitted
DPWH 3/28/2019 TR no. 5
DPWH 3/28/2019 TR no. 5
DPWH 3/28/2019 TR no. 5
DPWH 8/6/2019 TR no. 5
DPWH 3/27/2019 TR no. 5
DPWH 8/6/2019 TR no. 5
DPWH 3/27/2019 TR no. 5
DPWH 3/27/2019 TR no. 5
DPWH 8/6/2019 TR no. 5
DPWH 8/6/2019 TR no. 5
DPWH 3/27/2019 TR no. 5
DPWH 3/28/2019 TR no. 5
Girder Test Report Availability Summary
Compressive Test Report Stressing Grouting
Concrete Grout Record Record
No. Product ID Billing no.
From From
From From
Record (28- Record (28-
Record Record
days) days)

1 01G1 3rd R R R R
2 01G2 3rd R R R R
3 01G3 3rd R R R R
4 01G4 3rd R R R R
5 04G1 3rd R R R R
6 04G2 3rd R R R R
7 04G3 3rd R R R R
8 04G4 3rd R R R R
9 05G1 3rd R R R R
10 05G2 3rd R R R R
11 05G3 3rd R R R R
12 05G4 3rd R R R R
13 07G1 3rd R R R R
14 07G2 3rd R R R R
15 07G3 3rd R R R R
16 07G4 3rd R R R R
17 08G1 3rd R R R R
18 08G2 3rd R R R R
19 08G3 4th R R R R
20 08G4 3rd R R R R
21 10G1 4th R R R R
22 10G2 4th R R R R
23 10G3 4th R R R R
24 10G4 4th R R R R
25 11G1 4th R R R R
26 11G2 4th R R R R
27 11G3 4th R R R R
28 11G4 4th R R R R
29 13G1 R R R R
30 13G2 4th R R R R
31 13G3 4th R R R R
32 13G4 R R R R
33 14G1 R R R R
34 14G2 R R R R
35 14G3 Q R R R
36 14G4 R R R R
37 16G1 4th R R R R
38 16G2 Q Q Q Q
39 16G3 R R R R
16G4 R R R R 510
1 17G1 R R R R
2 17G2 R R R R
3 17G3 R R R R
4 17G4 R R R R
1 Girder 01 1st R R R R
2 Girder 02 1st R R R R
3 Girder 03 1st R R R R
4 Girder 04 1st R R R R
5 Girder 05 1st R R R R
6 Girder 06 1st R R R R
7 Girder 07 1st R R R R
8 Girder 08 1st R R R R
9 Girder 09 2nd R R R R
10 Girder 10 2nd R R R R
11 Girder 11 2nd R R R R
12 Girder 12 2nd R R R R
13 Girder 13 3rd R R R R
14 Girder 14 3rd R R R R
15 Girder 15 3rd R R R R
16 Girder 16 3rd R R R R
17 Girder 17 3rd R R R R
18 Girder 18 3rd R R R R
19 Girder 19 3rd R R R R
20 Girder 20 3rd R R R R
21 Girder 21 3rd R R R R
22 Girder 22 3rd R R R R
23 Girder 23 3rd R R R R
24 Girder 24 3rd R R R R
25 Girder 25 3rd R R R R
Available 67 68 68 68
Total
Balance 1 0 0 0
Road System: Bridge Program: Replacement of Permanent Weak Bridges
NAME OF PROJECT - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta.
Margarita Road
LOCATION Baggao, Cagayan
CONTRACTOR FREY-FIL CORPORATION
UPDATED Oct 23 2020

Class 1 Both ends continuous, One sides with dowels


Class 2 Both ends continuous, Both sides with dowels
Class 3 One end expansion and other is continuous, right side with dowels
Class 4 One end expansion and other is continuous, left side with dowels
Class 5 One end expansion and other is continuous, both sides with dowels
Classification of Girders Girder ID's not listed
No. Class 1 Class 2 Class 3 Class 4 Class 5
1 16G1 16G3 01G4 01G1 01G2 G25
2 16G4 G02 04G1 04G4 01G3 14G1
3 G01 G03 05G4 05G1 04G2 14G3
4 G04 G06 07G4 07G1 04G3 17G1
5 G05 G07 08G4 08G1 05G2 17G2
6 G08 G10 10G1 10G4 05G3 17G3
7 G09 G11 11G4 11G1 07G2 17G4
8 G12 G14 13G1 13G1 07G3
9 G13 G15 14G4 13G4 08G2
10 G16 G18 No ID1 No ID2 08G3
11 G17 G19 No ID3 10G2
12 G20 G22 10G3
13 G21 G23 11G2
14 G24 11G3
15 No ID6 13G2
16 13G3
17 14G2
18 No ID4
19 No ID5
20

Total Known 15 13 10 11 19 68
Required 14 14 10 10 20 68
Balance 1 -1 0 1 -1 0

Remarks
- There are two girder with same ID (13G1) in different class.
- There are 6 girder with no ID's stock in Baras plant.
- One girder with no tag in calumpit (Possibly G25)
28 days
Date Compress Stressing Grouting
Girder Casted ive Result Record Record Remarks
1 13G1
2 13G4
3 14G1
4 14G2
5 14G3
6 14G4
7 16G3
8 16G4
9 17G1
10 17G2
11 17G3
12 17G4