Professional Documents
Culture Documents
NAME OF PROJECT : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along
Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE May 2, 2022
We hereby certify that we have conducted inspection on the work accomplished on the above mentioned
project for the period of April 24 - 30, 2022
We further certify that the quality of materials in the following items of work corresponding to the quality accoplished conform to standard Spefication and Special Provision of Contract, to viz,
however, the result of test shall prevail.
Accomplishments
ITEM NO. DESCRIPTION Program Quantities Unit
This Week To Date
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 L.S. - 1.00
A.1.1(15) Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer mos. - 36.77
40.50
A.1.1(6) Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis) mos. - 36.77
40.50
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 each - 1.00
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer 29.77 mos. - 29.77
A.1.4(1) Provision of Progress Photographs 29.77 mos. - 29.77
B.11 Provisional Sum - PS. - -
B.19 Geotechnical Exploration 288.50 Ln.m - 288.50
B.5 Project Billboard/Signboard 4.00 each - 4.00
B.7 Occupational Safety and Health Program 40.50 mos. - 36.77
B.8 Traffic Management 29.77 mos. - 29.77
B.9 Mobilization/Demobilization 1.00 L.S. - 0.50
101(6) Removal of Actual Structures / Obstruction - Concrete 824.00 cu.m. - 824.00
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 7,893.00 sq.m 350.00 5,031.00
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete
101(6)
Piles) 839.39 cu.m. - 270.39
101(7)a Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) 367,117.57 kgs - 367,117.57
101(7)b Removal of Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana 124,080.00 kgs - 124,080.00
104(1)a Embankment - from Roadway Excavation (Common Soil) 4,308.40 cu.m. - 2,042.40
104(2)a Embankment - from Borrow (Common Soil) 60,430.42 cu.m. - 55,200.00
104(2)d Embankment - from Borrow Granular Course Materials 1,435.00 cu.m. - 1,435.00
105(1)a Subgrade Preparation - Common Materials 6,508.00 sq.m - 1,908.00
200(1) Aggregate Sub-Base Course 5,253.00 cu.m. 280.00 4,171.00
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days 1,380.00 sq.m - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 10,094.00 sq.m 233.33 7,154.33
400(10) Steel H-Piles, Driven 1,320.00 ln.m. - 1,320.00
400(27)b Pile Integrity Test (PIT), Low Strain 18.00 ln.m. - 18.00
400(28) High Strain Dynamic Testing (PDA) 10.00 each - 10.00
400 (3) Steel H-Piles, Furnished 1,320.00 each - 1,320.00
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 ln.m. - 1,440.00
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 414.00 ln.m. - 414.00
401(2)a Concrete Railing - Standard 1,020.00 ln.m - 1,020.00
403(24)a1 Structural Steel, Furnished (Craneway & Platform) 405,560.57 kgs 1,868.76 368,986.32
403(3) Structural Steel, Erected (Craneway & Platform) 405,560.57 kgs 1,868.76 368,986.32
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 kgs - 2,514.77
404(1)a Reinforcing Steel (Grade 40) 78,215.31 kgs 233.33 52,862.33
404(1)b Reinforcing Steel (Grade 60) 667,088.40 kgs - 661,022.00
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 3,296.01 cu.m. - 2,927.00
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 each - 68.00
409(1) Welded Structural Steel 1.00 each - 1.00
411(1) Paint 3,326.11 sq.m. - 2,842.00
412(1) Elastomeric Bearing Pads 40.00 each - 40.00
413(4)a Expansion Joint 60.00 each - 60.00
413(1)a Premolded Expansion Joint Filler with sealant 1.79 ln.m. - 1.79
505(5) Grouted Riprap, Class "A" 2,234.14 cu.m. - 2,148.00
506(1) Stone Masonry 1,106.77 cu.m. - 1,040.00
511(1) Gabion 504.00 cu.m. - 378.00
511(3) Filter Cloth 504.00 sq.m - 504.00
517(1) Drain Pipe 136.00 ln.m - 136.00
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 ln.m - 1,062.50
603(4)b Metal Beam End Piece, Bull Nose 10.00 each - 10.00
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahead 2.00 each - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction 3.00 each - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs 2.00 each - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 each - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED 3.00 each - -
612(1) Reflectorized Pavement Markings (White) 502.00 sq.m. - 502.00
612(2) Reflectorized Pavement Markings (Yellow) 262.00 sq.m. - 262.00
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 sq.m. - 54.00
620(1)b Chevron Signs - 600mm x 800mm 8.00 each - -
NAME OF PROJECT : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along
Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE May 8, 2022
We hereby certify that we have conducted inspection on the work accomplished on the above mentioned
project for the period of May 1 - 7, 2022
We further certify that the quality of materials in the following items of work corresponding to the quality accoplished conform to standard Spefication and Special Provision of Contract, to viz,
however, the result of test shall prevail.
Accomplishments
ITEM NO. DESCRIPTION Program Quantities Unit
This Week To Date
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 L.S. - 1.00
A.1.1(15) Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer
40.50 mos. - 36.77
A.1.1(6) Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis)
40.50 mos. - 36.77
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 each - 1.00
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer 29.77 mos. - 29.77
A.1.4(1) Provision of Progress Photographs 29.77 mos. - 29.77
B.11 Provisional Sum - PS. - -
B.19 Geotechnical Exploration 288.50 Ln.m - 288.50
B.5 Project Billboard/Signboard 4.00 each - 4.00
B.7 Occupational Safety and Health Program 40.50 mos. - 36.77
B.8 Traffic Management 29.77 mos. - 29.77
B.9 Mobilization/Demobilization 1.00 L.S. - 0.50
101(6) Removal of Actual Structures / Obstruction - Concrete 824.00 cu.m. - 824.00
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 7,893.00 sq.m 350.00 5,381.00
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete
101(6)
Piles) 839.39 cu.m. - 270.39
101(7)a Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) 367,117.57 kgs - 367,117.57
101(7)b Removal of Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana 124,080.00 kgs - 124,080.00
104(1)a Embankment - from Roadway Excavation (Common Soil) 4,308.40 cu.m. - 2,042.40
104(2)a Embankment - from Borrow (Common Soil) 60,430.42 cu.m. - 55,200.00
104(2)d Embankment - from Borrow Granular Course Materials 1,435.00 cu.m. - 1,435.00
105(1)a Subgrade Preparation - Common Materials 6,508.00 sq.m - 1,908.00
200(1) Aggregate Sub-Base Course 5,253.00 cu.m. 280.00 4,451.00
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days 1,380.00 sq.m - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 10,094.00 sq.m 233.33 7,387.67
400(10) Steel H-Piles, Driven 1,320.00 ln.m. - 1,320.00
400(27)b Pile Integrity Test (PIT), Low Strain 18.00 ln.m. - 18.00
400(28) High Strain Dynamic Testing (PDA) 10.00 each - 10.00
400 (3) Steel H-Piles, Furnished 1,320.00 each - 1,320.00
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 ln.m. - 1,440.00
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 414.00 ln.m. - 414.00
401(2)a Concrete Railing - Standard 1,020.00 ln.m - 1,020.00
403(24)a1 Structural Steel, Furnished (Craneway & Platform) 405,560.57 kgs 1,868.76 370,855.08
403(3) Structural Steel, Erected (Craneway & Platform) 405,560.57 kgs 1,868.76 370,855.08
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 kgs - 2,514.77
404(1)a Reinforcing Steel (Grade 40) 78,215.31 kgs 233.33 53,095.67
404(1)b Reinforcing Steel (Grade 60) 667,088.40 kgs - 661,022.00
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 3,296.01 cu.m. - 2,927.00
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 each - 68.00
409(1) Welded Structural Steel 1.00 each - 1.00
411(1) Paint 3,326.11 sq.m. - 2,842.00
412(1) Elastomeric Bearing Pads 40.00 each - 40.00
413(4)a Expansion Joint 60.00 each - 60.00
413(1)a Premolded Expansion Joint Filler with sealant 1.79 ln.m. - 1.79
505(5) Grouted Riprap, Class "A" 2,234.14 cu.m. - 2,148.00
506(1) Stone Masonry 1,106.77 cu.m. - 1,040.00
511(1) Gabion 504.00 cu.m. - 378.00
511(3) Filter Cloth 504.00 sq.m - 504.00
517(1) Drain Pipe 136.00 ln.m - 136.00
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 ln.m - 1,062.50
603(4)b Metal Beam End Piece, Bull Nose 10.00 each - 10.00
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahead 2.00 each - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction 3.00 each - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs 2.00 each - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 each - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED 3.00 each - -
612(1) Reflectorized Pavement Markings (White) 502.00 sq.m. - 502.00
612(2) Reflectorized Pavement Markings (Yellow) 262.00 sq.m. - 262.00
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 sq.m. - 54.00
620(1)b Chevron Signs - 600mm x 800mm 8.00 each - -
NAME OF PROJECT : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along
Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE May 16, 2022
We hereby certify that we have conducted inspection on the work accomplished on the above mentioned
project for the period of May 8 - 15, 2022
We further certify that the quality of materials in the following items of work corresponding to the quality accoplished conform to standard Spefication and Special Provision of Contract, to viz,
however, the result of test shall prevail.
Accomplishments
ITEM NO. DESCRIPTION Program Quantities Unit
This Week To Date
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 L.S. - 1.00
A.1.1(15)
Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer 40.50 mos. - 36.77
A.1.1(6)
Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis) 40.50 mos. - 36.77
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 each - 1.00
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer 29.77 mos. - 29.77
A.1.4(1) Provision of Progress Photographs 29.77 mos. - 29.77
B.11 Provisional Sum - PS. - -
B.19 Geotechnical Exploration 288.50 Ln.m - 288.50
B.5 Project Billboard/Signboard 4.00 each - 4.00
B.7 Occupational Safety and Health Program 40.50 mos. - 36.77
B.8 Traffic Management 29.77 mos. - 29.77
B.9 Mobilization/Demobilization 1.00 L.S. - 0.50
101(6) Removal of Actual Structures / Obstruction - Concrete 824.00 cu.m. - 824.00
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 7,893.00 sq.m 400.00 5,781.00
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete
101(6)
Piles) 839.39 cu.m. - 270.39
101(7)a Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) 367,117.57 kgs - 367,117.57
101(7)b Removal of Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana 124,080.00 kgs - 124,080.00
104(1)a Embankment - from Roadway Excavation (Common Soil) 4,308.40 cu.m. - 2,042.40
104(2)a Embankment - from Borrow (Common Soil) 60,430.42 cu.m. - 55,200.00
104(2)d Embankment - from Borrow Granular Course Materials 1,435.00 cu.m. - 1,435.00
105(1)a Subgrade Preparation - Common Materials 6,508.00 sq.m - 1,908.00
200(1) Aggregate Sub-Base Course 5,253.00 cu.m. 320.00 4,771.00
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days 1,380.00 sq.m - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 10,094.00 sq.m 266.67 7,654.33
400(10) Steel H-Piles, Driven 1,320.00 ln.m. - 1,320.00
400(27)b Pile Integrity Test (PIT), Low Strain 18.00 ln.m. - 18.00
400(28) High Strain Dynamic Testing (PDA) 10.00 each - 10.00
400 (3) Steel H-Piles, Furnished 1,320.00 each - 1,320.00
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 ln.m. - 1,440.00
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 414.00 ln.m. - 414.00
401(2)a Concrete Railing - Standard 1,020.00 ln.m - 1,020.00
403(24)a1 Structural Steel, Furnished (Craneway & Platform) 405,560.57 kgs 2,135.72 372,990.80
403(3) Structural Steel, Erected (Craneway & Platform) 405,560.57 kgs 2,135.72 372,990.80
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 kgs - 2,514.77
404(1)a Reinforcing Steel (Grade 40) 78,215.31 kgs 266.67 53,362.33
404(1)b Reinforcing Steel (Grade 60) 667,088.40 kgs - 661,022.00
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 3,296.01 cu.m. - 2,927.00
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 each - 68.00
409(1) Welded Structural Steel 1.00 each - 1.00
411(1) Paint 3,326.11 sq.m. - 2,842.00
412(1) Elastomeric Bearing Pads 40.00 each - 40.00
413(4)a Expansion Joint 60.00 each - 60.00
413(1)a Premolded Expansion Joint Filler with sealant 1.79 ln.m. - 1.79
505(5) Grouted Riprap, Class "A" 2,234.14 cu.m. - 2,148.00
506(1) Stone Masonry 1,106.77 cu.m. - 1,040.00
511(1) Gabion 504.00 cu.m. - 378.00
511(3) Filter Cloth 504.00 sq.m - 504.00
517(1) Drain Pipe 136.00 ln.m - 136.00
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 ln.m - 1,062.50
603(4)b Metal Beam End Piece, Bull Nose 10.00 each - 10.00
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahead 2.00 each - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction 3.00 each - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs 2.00 each - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 each - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED 3.00 each - -
612(1) Reflectorized Pavement Markings (White) 502.00 sq.m. - 502.00
612(2) Reflectorized Pavement Markings (Yellow) 262.00 sq.m. - 262.00
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 sq.m. - 54.00
620(1)b Chevron Signs - 600mm x 800mm 8.00 each - -
NAME OF PROJECT : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along
Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE May 23, 2022
We hereby certify that we have conducted inspection on the work accomplished on the above mentioned
project for the period of May 16 - 22, 2022
We further certify that the quality of materials in the following items of work corresponding to the quality accoplished conform to standard Spefication and Special Provision of Contract, to viz,
however, the result of test shall prevail.
Accomplishments
ITEM NO. DESCRIPTION Program Quantities Unit
This Week To Date
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 L.S. - 1.00
A.1.1(15)
Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer 40.50 mos. - 36.77
A.1.1(6)
Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis) 40.50 mos. - 36.77
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 each - 1.00
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer 29.77 mos. - 29.77
A.1.4(1) Provision of Progress Photographs 29.77 mos. - 29.77
B.11 Provisional Sum - PS. - -
B.19 Geotechnical Exploration 288.50 Ln.m - 288.50
B.5 Project Billboard/Signboard 4.00 each - 4.00
B.7 Occupational Safety and Health Program 40.50 mos. - 36.77
B.8 Traffic Management 29.77 mos. - 29.77
B.9 Mobilization/Demobilization 1.00 L.S. - 0.50
101(6) Removal of Actual Structures / Obstruction - Concrete 824.00 cu.m. - 824.00
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 7,893.00 sq.m 350.00 6,131.00
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete
101(6)
Piles) 839.39 cu.m. - 270.39
101(7)a Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) 367,117.57 kgs - 367,117.57
101(7)b Removal of Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana 124,080.00 kgs - 124,080.00
104(1)a Embankment - from Roadway Excavation (Common Soil) 4,308.40 cu.m. - 2,042.40
104(2)a Embankment - from Borrow (Common Soil) 60,430.42 cu.m. - 55,200.00
104(2)d Embankment - from Borrow Granular Course Materials 1,435.00 cu.m. - 1,435.00
105(1)a Subgrade Preparation - Common Materials 6,508.00 sq.m - 1,908.00
200(1) Aggregate Sub-Base Course 5,253.00 cu.m. 280.00 5,051.00
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days 1,380.00 sq.m - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 10,094.00 sq.m 233.33 7,887.67
400(10) Steel H-Piles, Driven 1,320.00 ln.m. - 1,320.00
400(27)b Pile Integrity Test (PIT), Low Strain 18.00 ln.m. - 18.00
400(28) High Strain Dynamic Testing (PDA) 10.00 each - 10.00
400 (3) Steel H-Piles, Furnished 1,320.00 each - 1,320.00
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 ln.m. - 1,440.00
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 414.00 ln.m. - 414.00
401(2)a Concrete Railing - Standard 1,020.00 ln.m - 1,020.00
403(24)a1 Structural Steel, Furnished (Craneway & Platform) 405,560.57 kgs 1,868.76 374,859.56
403(3) Structural Steel, Erected (Craneway & Platform) 405,560.57 kgs 1,868.76 374,859.56
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 kgs - 2,514.77
404(1)a Reinforcing Steel (Grade 40) 78,215.31 kgs 233.33 53,595.67
404(1)b Reinforcing Steel (Grade 60) 667,088.40 kgs - 661,022.00
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 3,296.01 cu.m. - 2,927.00
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 each - 68.00
409(1) Welded Structural Steel 1.00 each - 1.00
411(1) Paint 3,326.11 sq.m. - 2,842.00
412(1) Elastomeric Bearing Pads 40.00 each - 40.00
413(4)a Expansion Joint 60.00 each - 60.00
413(1)a Premolded Expansion Joint Filler with sealant 1.79 ln.m. - 1.79
505(5) Grouted Riprap, Class "A" 2,234.14 cu.m. - 2,148.00
506(1) Stone Masonry 1,106.77 cu.m. - 1,040.00
511(1) Gabion 504.00 cu.m. - 378.00
511(3) Filter Cloth 504.00 sq.m - 504.00
517(1) Drain Pipe 136.00 ln.m - 136.00
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 ln.m - 1,062.50
603(4)b Metal Beam End Piece, Bull Nose 10.00 each - 10.00
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahead 2.00 each - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction 3.00 each - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs 2.00 each - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 each - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED 3.00 each - -
612(1) Reflectorized Pavement Markings (White) 502.00 sq.m. - 502.00
612(2) Reflectorized Pavement Markings (Yellow) 262.00 sq.m. - 262.00
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 sq.m. - 54.00
620(1)b Chevron Signs - 600mm x 800mm 8.00 each - -
NAME OF PROJECT : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along
Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE May 24, 2022
We hereby certify that we have conducted inspection on the work accomplished on the above mentioned
project for the period of May 23, 2022
We further certify that the quality of materials in the following items of work corresponding to the quality accoplished conform to standard Spefication and Special Provision of Contract, to viz,
however, the result of test shall prevail.
Accomplishments
ITEM NO. DESCRIPTION Program Quantities Unit
This Week To Date
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 L.S. - 1.00
A.1.1(15)
Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer 40.50 mos. - 36.77
A.1.1(6)
Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis) 40.50 mos. - 36.77
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 each - 1.00
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer 29.77 mos. - 29.77
A.1.4(1) Provision of Progress Photographs 29.77 mos. - 29.77
B.11 Provisional Sum - PS. - -
B.19 Geotechnical Exploration 288.50 Ln.m - 288.50
B.5 Project Billboard/Signboard 4.00 each - 4.00
B.7 Occupational Safety and Health Program 40.50 mos. - 36.77
B.8 Traffic Management 29.77 mos. - 29.77
B.9 Mobilization/Demobilization 1.00 L.S. - 0.50
101(6) Removal of Actual Structures / Obstruction - Concrete 824.00 cu.m. - 824.00
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 7,893.00 sq.m 50.00 6,181.00
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete
101(6)
Piles) 839.39 cu.m. - 270.39
101(7)a Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) 367,117.57 kgs - 367,117.57
101(7)b Removal of Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana 124,080.00 kgs - 124,080.00
104(1)a Embankment - from Roadway Excavation (Common Soil) 4,308.40 cu.m. - 2,042.40
104(2)a Embankment - from Borrow (Common Soil) 60,430.42 cu.m. - 55,200.00
104(2)d Embankment - from Borrow Granular Course Materials 1,435.00 cu.m. - 1,435.00
105(1)a Subgrade Preparation - Common Materials 6,508.00 sq.m - 1,908.00
200(1) Aggregate Sub-Base Course 5,253.00 cu.m. 40.00 5,091.00
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days 1,380.00 sq.m - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 10,094.00 sq.m 33.33 7,921.00
400(10) Steel H-Piles, Driven 1,320.00 ln.m. - 1,320.00
400(27)b Pile Integrity Test (PIT), Low Strain 18.00 ln.m. - 18.00
400(28) High Strain Dynamic Testing (PDA) 10.00 each - 10.00
400 (3) Steel H-Piles, Furnished 1,320.00 each - 1,320.00
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 ln.m. - 1,440.00
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 414.00 ln.m. - 414.00
401(2)a Concrete Railing - Standard 1,020.00 ln.m - 1,020.00
403(24)a1 Structural Steel, Furnished (Craneway & Platform) 405,560.57 kgs 266.97 375,126.52
403(3) Structural Steel, Erected (Craneway & Platform) 405,560.57 kgs 266.97 375,126.52
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 kgs - 2,514.77
404(1)a Reinforcing Steel (Grade 40) 78,215.31 kgs 33.33 53,629.00
404(1)b Reinforcing Steel (Grade 60) 667,088.40 kgs - 661,022.00
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 3,296.01 cu.m. - 2,927.00
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 each - 68.00
409(1) Welded Structural Steel 1.00 each - 1.00
411(1) Paint 3,326.11 sq.m. - 2,842.00
412(1) Elastomeric Bearing Pads 40.00 each - 40.00
413(4)a Expansion Joint 60.00 each - 60.00
413(1)a Premolded Expansion Joint Filler with sealant 1.79 ln.m. - 1.79
505(5) Grouted Riprap, Class "A" 2,234.14 cu.m. - 2,148.00
506(1) Stone Masonry 1,106.77 cu.m. - 1,040.00
511(1) Gabion 504.00 cu.m. - 378.00
511(3) Filter Cloth 504.00 sq.m - 504.00
517(1) Drain Pipe 136.00 ln.m - 136.00
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 ln.m - 1,062.50
603(4)b Metal Beam End Piece, Bull Nose 10.00 each - 10.00
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahead 2.00 each - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction 3.00 each - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs 2.00 each - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 each - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED 3.00 each - -
612(1) Reflectorized Pavement Markings (White) 502.00 sq.m. - 502.00
612(2) Reflectorized Pavement Markings (Yellow) 262.00 sq.m. - 262.00
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 sq.m. - 54.00
620(1)b Chevron Signs - 600mm x 800mm 8.00 each - -
NAME OF PROJECT : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges -
Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE May 24, 2022
We hereby certify that we have conducted an inspection and verification on work accomplishment on the above - mentioned project
April 24 - May 23, 2022
We further certify that we have found that the quality of materials in the following items of work corresponding to the
quantity accomplished conforms with the Standard Specifications and Special Provisions of the Contract: