Implementing Agency
Contractor
CMS
GENERAL REQUIREMENTS
A FACILITIES FOR THE ENGINEER
A.1.1 Field Office for the Engineer / BCDA Staff l.s. 1.00 1.00
Construction of Field Offices for the Engineer (1 Unit
A.1.1(3) l.s. 1.00 - 1.00
CMS Office @ 240 sqm of Floor Area)
Construction of Living Quarters for the Engineer (4
A.1.1(5) l.s. 1.00 - 1.00
units Staff House @ 128 sqm Floor Area per Unit)
Provision of Furniture, Fictures, Office Equipment
A.1.1(11) and Appliances for the Field Offices (Schedule B, a l.s. 1.00 - 1.00
& b), Rental Basis
Provision of Furniture, Fictures, Office Equipment
A.1.1(13) and Appliances for the Living Quarters (Schedule B, mo. 1.00 - 1.00
c), Rental Basis
Operation and Maintenance of Field Office for the
A.1.1(16) mo. 21.00 - 21.00
Engineer
Provision of Office Supplies and Consumables
A.1.1(19) mo. 21.00 - 21.00
(Schedule C)
Service Vehicles for the Engineer/ BCDA Staff-Rental
A.1.2 0.00
Basis
Provide Four (4) units Brand New Servie Vehicles
A.1.2 (2) 21.00 - 21.00
(Schedule D)
Operation and Maintenance of Four (4) Units
A.1.2 (5) mo. 21.00 - 21.00
Service Vehicles
A.1.3 Assistance to the Engineer/ BCDA Staff 0.00
Page 1 of 6
Qty. Incorporated into the Work
Item No DESCRIPTION UNIT QUANTITY
Previous This Period To Date Balance
103(7) Hauling Out of Unsuitable Materials (1km Radius) cum 21,678.44 - 21,678.44
103(7) Hauling Out of Stripped Materials (1km Radius) cum 7,404.79 - 7,404.79
Page 2 of 6
Qty. Incorporated into the Work
Item No DESCRIPTION UNIT QUANTITY
Previous This Period To Date Balance
Page 3 of 6
Qty. Incorporated into the Work
Item No DESCRIPTION UNIT QUANTITY
Previous This Period To Date Balance
Page 4 of 6
Qty. Incorporated into the Work
Item No DESCRIPTION UNIT QUANTITY
Previous This Period To Date Balance
400(27)a High Strain Dynamic Testing (PDA) (0.80m dia.) ea 3.00 - 3.00
400(27)b High Strain Dynamic Testing (PDA) (1.20m dia.) ea 6.00 - 6.00
902(1)b-37 Reinforcing Steel, Pile Cap (Grade 60) kgs 514,541.86 - 514,541.86
PREPARED BY:
Page 6 of 6
PROJECT: CONSTRUCTION OF VARIOUS STRUCTURES AND FACILITIES WITHIN THE 100 HECTARE AREA AT BATAAN TECHNOLOGY PARK
LOCATION: MORONG, BATAAN
STATUS OF TEST
From February 22 to October 10, 2022
Page 1 of 13
Qty. Incorporated into the Work No. of Test Performed
MINIMUM
Item No DESCRIPTION UNIT QUANTITY KIND OF TEST This Remarks
Previous This Period To Date Balance NO. OF TEST On-file To Date
Period
Project Billboards/ Signboards (2 Project Signboards
B.5 ea. 3.00 2.00 2.00 1.00 PE Certificate 3 2 2 PB 1
and 1 COA Signboard)
B.7 (1) Occupational Safety and Health Program mo. 21.00 7.56 7.56 13.44 PE Certificate 21 8 8 PB 1
B.9 Mobilization / Demobilization l.s. 1.00 0.36 0.36 0.64 PE Certificate 1 1 1 PB 1
B.4 (10) Miscellaneous Survey and Staking l.s. 1.00 0.38 0.38 0.62 PE Certificate 1 1 1 PB 1
B.14 Environmental Management and Monitoring mo. 21.00 7.50 7.50 13.50 PE Certificate 21 8 8 PB 1
SITE DEVELOPMENT WORKS
C EARTHWORKS
100(1) Clearing and Grubbing has. 7.40 7.25 7.25 0.15 PE Certificate 1 1 1 PB 1
Individual Removal of Trees (Small, 150 - 300 mm
100(3)a1 ea 180.00 180.00 180.00 0.00 PE Certificate 1 1 1 PB 1
dia.)
Individual Removal of Trees (Small, 301 - 500 mm
100(3)a2 ea 252.00 121.00 121.00 131.00 PE Certificate 1 1 1 PB 1
dia.)
Individual Removal of Trees (Small, 501 - 750 mm
100(3)a3 ea 191.00 35.00 35.00 156.00 PE Certificate 1 1 1 PB 1
dia.)
Individual Removal of Trees (Small, 751 - 900 mm
100(3)a4 ea 59.00 5.00 5.00 54.00 PE Certificate 1 1 1 PB 1
dia.)
Individual Removal of Trees (Large, above 900 mm
100(4) ea 69.00 3.00 3.00 66.00 PE Certificate 1 1 1 PB 1
dia.)
102(1) Unsuitable Excavation cum 21,678.44 15,716.87 15,716.87 5,961.57 Grading 15 11 11 PB 1
Atterberg Limit 15 11 11
Lab. Compaction 15 11 11
102(5) Stripping of Soil cum 7,404.79 5,087.17 5,087.17 2,317.62 PE Certificate 1 1 1 PB 1
103(7) Hauling Out of Unsuitable Materials (1km Radius) cum 21,678.44 14,666.51 14,666.51 7,011.93 PE Certificate 1 1 1 PB 1
103(7) Hauling Out of Stripped Materials (1km Radius) cum 7,404.79 4,959.07 4,959.07 2,445.72 PE Certificate 1 1 1 PB 1
104(1)a1 Embankment from Roadway Excavation (Common cum 75,440.96 41,429.40 41,429.40 34,011.56 Grading 51 28 28 PB 1
Soil)
Atterberg Limit 51 28 28
Lab. Compaction 51 28 28
FDT 2265 1245 1245
104(2)a Embankment from Borrow (Common Soil) cum 46,867.46 46,867.46 Grading 32
Atterberg Limit 32
Lab. Compaction 32
FDT 1407
105(1)a Subgrade Preparation (Common Materials) sqm 16,114.83 6,034.45 6,034.45 10,080.38 Grading 3 1 1 PB 1
Atterberg Limit 3 1 1
Lab. Compaction 3 1 1
FDT 99 39 39
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
Structure Excavation , Common Soil, includes
103(1)a1.2 Hauling Cost (Curb Inlet Manhole, Surface Inlet cu.m 1,043.00 1,043.00 PE Certificate 1
Manhole, Dual Inlet Manhole & Curb Inlet)
Structure Excavation, Common Soil, includes
103(1)a2.2 cu.m 644.35 644.35 PE Certificate 1
Hauling Cost (Concrete Drop Inlet)
Structure Excavation, Common Soil, includes
103(1)a2.3 cu.m 66.24 66.24 PE Certificate 1
Hauling Cost (Area Drain)
Page 2 of 13
Qty. Incorporated into the Work No. of Test Performed
MINIMUM
Item No DESCRIPTION UNIT QUANTITY KIND OF TEST This Remarks
Previous This Period To Date Balance NO. OF TEST On-file To Date
Period
Structure Excavation, Common Soil, includes
103(1)a5 cu.m 119.74 59.87 59.87 59.87 PE Certificate 1 1 1 PB 1
Hauling Cost (Trapezoidal Earth Ditch)
Page 3 of 13
Qty. Incorporated into the Work No. of Test Performed
MINIMUM
Item No DESCRIPTION UNIT QUANTITY KIND OF TEST This Remarks
Previous This Period To Date Balance NO. OF TEST On-file To Date
Period
Abrasion 1
Unit Weight 1
d. Water li - Quality Test 1
e. Concrete cum 10.66 - - - 10.66 Compressive Strength 14
Lean Concrete, Class B, 16.5 Mpa (Concrete Drop
407(8) cu.m 9.80 9.80 DM & TM 1
Inlet)
a. Cement bag. 89.18 - - - 89.18 Quality Test 6
b. Fine Aggregates cum 4.90 - - - 4.90 Grading 1
Sp. Gravity & Abs. 1
Soundness 1
Organic Impurities 1
Unit Weight 1
Clay Lumps 1
c. Coarse Aggregates cum 6.66 - - - 6.66 Grading 1
Sp. Gravity & Abs. 1
Soundness 1
Abrasion 1
Unit Weight 1
d. Water li - Quality Test 1
e. Concrete cum 9.80 - - - 9.80 Compressive Strength 14
407(8) Lean Concrete, Class B, 16.5 Mpa (Area Drain) cu.m 1.08 1.08 DM & TM 1
a. Cement bag. 9.83 - - - 9.83 Quality Test 6
b. Fine Aggregates cum 0.54 - - - 0.54 Grading 1
Sp. Gravity & Abs. 1
Soundness 1
Organic Impurities 1
Unit Weight 1
Clay Lumps 1
c. Coarse Aggregates cum 0.73 - - - 0.73 Grading 1
Sp. Gravity & Abs. 1
Soundness 1
Abrasion 1
Unit Weight 1
d. Water li - Quality Test 1
e. Concrete cum 1.08 - - - 1.08 Compressive Strength 14
Lean Concrete, Class B, 16.5 Mpa (RCBC, 1 Barrel -
2.1 m x 1.5 m, 1 Barrel - 2.4 m x 2.4 m, 1 Barrel - 3.0 m
407(8) cu.m 38.05 38.05 DM & TM 1
x 2.1 m, includes Wingwall, Apron Slab, and Cut-off
Wall)
a. Cement bag. 346.26 - - - 346.26 Quality Test 6
b. Fine Aggregates cum 19.03 - - - 19.03 Grading 1
Sp. Gravity & Abs. 1
Soundness 1
Page 4 of 13
Qty. Incorporated into the Work No. of Test Performed
MINIMUM
Item No DESCRIPTION UNIT QUANTITY KIND OF TEST This Remarks
Previous This Period To Date Balance NO. OF TEST On-file To Date
Period
Organic Impurities 1
Unit Weight 1
Clay Lumps 1
c. Coarse Aggregates cum 25.87 - - - 25.87 Grading 1
Sp. Gravity & Abs. 1
Soundness 1
Abrasion 1
Unit Weight 1
d. Water li - Quality Test 1
e. Concrete cum 38.05 - - - 38.05 Compressive Strength 14
Page 5 of 13
Qty. Incorporated into the Work No. of Test Performed
MINIMUM
Item No DESCRIPTION UNIT QUANTITY KIND OF TEST This Remarks
Previous This Period To Date Balance NO. OF TEST On-file To Date
Period
Trees Furnishing and Transplanting - Tree Saplings for
611(1)a5 Replacement for Cut Trees affected during ea. 1,600.00 1,000.00 1,000.00 600.00 PE Certificate 1 1 1 PB 1
construction (Aratiles Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)a6 Replacement for Cut Trees affected during ea. 200.00 100.00 100.00 100.00 PE Certificate 1 1 1 PB 1
construction (Antipolo Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)b1 Replacement for Cut Trees affected during ea. 3,200.00 - 3,200.00 PE Certificate 1
construction (Babayan Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)b2 Replacement for Cut Trees affected during ea. 200.00 - 200.00 PE Certificate 1
construction (Bamboo Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)b3 Replacement for Cut Trees affected during ea. 7,400.00 7,400.00 7,400.00 0.00 PE Certificate 1 1 1 PB 1
construction (Banaba Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)b4 Replacement for Cut Trees affected during ea. 200.00 - 200.00 PE Certificate 1
construction (Bangkal Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)b5 Replacement for Cut Trees affected during ea. 400.00 400.00 400.00 0.00 PE Certificate 1 1 1 PB 1
construction (Bignay Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)b6 Replacement for Cut Trees affected during ea. 600.00 100.00 100.00 500.00 PE Certificate 1 1 1 PB 1
construction (Binayoyo Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)c1 Replacement for Cut Trees affected during ea. 200.00 31.00 31.00 169.00 PE Certificate 1 1 1 PB 1
construction (Coconut Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)d1 Replacement for Cut Trees affected during ea. 200.00 200.00 200.00 0.00 PE Certificate 1 1 1 PB 1
construction (Duhat Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)d2 Replacement for Cut Trees affected during ea. 2,200.00 2,200.00 2,200.00 0.00 PE Certificate 1 1 1 PB 1
construction (Dulit Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)d3 Replacement for Cut Trees affected during ea. 600.00 300.00 300.00 300.00 PE Certificate 1 1 1 PB 1
construction (Dirita Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)e1 Replacement for Cut Trees affected during ea. 700.00 100.00 100.00 600.00 PE Certificate 1 1 1 PB 1
construction (Fire Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)f1 Replacement for Cut Trees affected during ea. 11,900.00 8,800.00 8,800.00 3,100.00 PE Certificate 1 1 1 PB 1
construction (Gmelina Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)f2 Replacement for Cut Trees affected during ea. 100.00 46.00 46.00 54.00 PE Certificate 1 1 1 PB 1
construction (Guava Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)g1 Replacement for Cut Trees affected during ea. 1,700.00 1,700.00 1,700.00 0.00 PE Certificate 1 1 1 PB 1
construction (Ipil-ipil Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)h1 Replacement for Cut Trees affected during ea. 100.00 100.00 100.00 0.00 PE Certificate 1 1 1 PB 1
construction (Jackfruit Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)i2 Replacement for Cut Trees affected during ea. 100.00 44.00 44.00 56.00 PE Certificate 1 1 1 PB 1
construction (Kasoy Tree)
Page 6 of 13
Qty. Incorporated into the Work No. of Test Performed
MINIMUM
Item No DESCRIPTION UNIT QUANTITY KIND OF TEST This Remarks
Previous This Period To Date Balance NO. OF TEST On-file To Date
Period
Trees Furnishing and Transplanting - Tree Saplings for
611(1)j1 Replacement for Cut Trees affected during ea. 2,600.00 200.00 200.00 2,400.00 PE Certificate 1 1 1 PB 1
construction (Lanete Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)j2 Replacement for Cut Trees affected during ea. 1,800.00 500.00 500.00 1,300.00 PE Certificate 1 1 1 PB 1
construction (Ligas Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)k1 Replacement for Cut Trees affected during ea. 2,300.00 200.00 200.00 2,100.00 PE Certificate 1 1 1 PB 1
construction (Mahogany Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)k2 Replacement for Cut Trees affected during ea. 1,300.00 600.00 600.00 700.00 PE Certificate 1 1 1 PB 1
construction (Mangium Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)k3 Replacement for Cut Trees affected during ea. 900.00 100.00 100.00 800.00 PE Certificate 1 1 1 PB 1
construction (Mango Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)k5 Replacement for Cut Trees affected during ea. 500.00 200.00 200.00 300.00 PE Certificate 1 1 1 PB 1
construction (Madre de Cacao Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)l1 Replacement for Cut Trees affected during ea. 6,400.00 500.00 500.00 5,900.00 PE Certificate 1 1 1 PB 1
construction (Narra Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)m1 Replacement for Cut Trees affected during ea. 200.00 70.00 70.00 130.00 PE Certificate 1 1 1 PB 1
construction (Pakiling Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)m2 Replacement for Cut Trees affected during ea. 1,200.00 600.00 600.00 600.00 PE Certificate 1 1 1 PB 1
construction (Puso-puso Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)m3 Replacement for Cut Trees affected during ea. 200.00 70.00 70.00 130.00 PE Certificate 1 1 1 PB 1
construction (Palm Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)n1 Replacement for Cut Trees affected during ea. 700.00 700.00 700.00 0.00 PE Certificate 1 1 1 PB 1
construction (Santol Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)n2 Replacement for Cut Trees affected during ea. 300.00 75.00 75.00 225.00 PE Certificate 1 1 1 PB 1
construction (Star Apple Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(2)a1 Replacement for Cut Trees affected during ea. 5,300.00 500.00 500.00 4,800.00 PE Certificate 1 1 1 PB 1
construction (Takip Asin Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(2)a2 Replacement for Cut Trees affected during ea. 600.00 200.00 200.00 400.00 PE Certificate 1 1 1 PB 1
construction (Talisay Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(2)a3 Replacement for Cut Trees affected during ea. 100.00 45.00 45.00 55.00 PE Certificate 1 1 1 PB 1
construction (Tamarind Tree)
Trees Furnishing and Transplanting - Tree Saplings for
611(1)a5 Replacement for Cut Trees affected during ea. 1,400.00 600.00 600.00 800.00 PE Certificate 1 1 1 PB 1
construction (Tibig Tree)
REMOVAL WORKS
101(1)a Demolition of Existing Buildings 0.00 PE Certificate 1
Page 7 of 13
Qty. Incorporated into the Work No. of Test Performed
MINIMUM
Item No DESCRIPTION UNIT QUANTITY KIND OF TEST This Remarks
Previous This Period To Date Balance NO. OF TEST On-file To Date
Period
101(1)b.1 Demolition of Existing Structure No. 16 Burned ls.
Market, One Storey (Partially
Demolished/Damaged ) - Concrete with CHB Wall 1.00 1.00 1.00 0.00 PE Certificate 1 1 1 PB 1
(No Roof) and Includes Hauling out of materials,
(Estimated Floor Area = 232.50 m 2)
ALL BUILDINGS
STRUCTURAL EARTHWORK
Structure Excavation (Common Soil) cum 25,461.88 24,643.48 24,643.48 818.40 PE Certificate 1 1 1 PB 1
Hauling and Disposal (Assumed 1km Radius) cum 4,097.75 3,687.98 3,687.98 409.77 PE Certificate 1 1 1 PB 1
Structural Backfilling (using Excavated Materials) cum 23,734.06 20,461.18 20,461.18 3,272.88 PE Certificate 1 1 1 PB 1
Structural Backfilling (using Excavated Materials
cum 2,369.93 473.99 473.99 1,895.94 PE Certificate 1 1 1 PB 1
Taken from other Structures)
Page 8 of 13
Qty. Incorporated into the Work No. of Test Performed
MINIMUM
Item No DESCRIPTION UNIT QUANTITY KIND OF TEST This Remarks
Previous This Period To Date Balance NO. OF TEST On-file To Date
Period
Soundness 1 1 1
Abrasion 1 1 1
Unit Weight 1 1 1
d. Water li - Quality Test 1 1 1 PB 1
e. Concrete cum 1,599.65 - 1,599.65 1,599.65 0.00 Compressive Strength 22 22 22 PB 1
Concrete Piles Cast in Drilled Holes, BP16 (1.20m
400(17)e.5 lm 1,234.00 670.00 670.00 564.00 DM & TM 1 1 1 PB 1
dia.)
a. Cement bag. 14,654.06 - 7,956.42 7,956.42 6,697.64 Quality Test 6 4 4 PB 1
b. Fine Aggregates cum 697.81 - 378.88 378.88 318.94 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Organic Impurities 1 1 1
Unit Weight 1 1 1
Clay Lumps 1 1 1
c. Coarse Aggregates cum 949.02 - 515.27 515.27 433.75 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Abrasion 1 1 1
Unit Weight 1 1 1
d. Water li - Quality Test 1 1 1 PB 1
e. Concrete cum 1,395.62 - 757.75 757.75 637.87 Compressive Strength 19 11 11 PB 1
Concrete Piles Cast in Drilled Holes, BP17 (1.20m
400(17)e.6 lm 495.00 495.00 495.00 0.00 DM & TM 1 1 1 PB 1
dia.)
a. Cement bag. 5,878.25 - 5,878.25 5,878.25 0.00 Quality Test 6 3 3 PB 1
b. Fine Aggregates cum 279.92 - 279.92 279.92 0.00 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Organic Impurities 1 1 1
Unit Weight 1 1 1
Clay Lumps 1 1 1
c. Coarse Aggregates cum 380.69 - 380.69 380.69 0.00 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Abrasion 1 1 1
Unit Weight 1 1 1
d. Water li - Quality Test 1 1 1 PB 1
e. Concrete cum 559.83 - 559.83 559.83 0.00 Compressive Strength 8 8 8 PB 1
400(26)b Pile Integrity Testing ea 9.00 7.00 7.00 2.00 Test Result 1 7 7 PB 1
400(27)a High Strain Dynamic Testing (PDA) (0.80m dia.) ea 3.00 3.00 3.00 0.00 Test Result 1 3 3 PB 1
400(27)b High Strain Dynamic Testing (PDA) (1.20m dia.) ea 6.00 4.00 4.00 2.00 Test Result 1 4 4 PB 1
Page 9 of 13
Qty. Incorporated into the Work No. of Test Performed
MINIMUM
Item No DESCRIPTION UNIT QUANTITY KIND OF TEST This Remarks
Previous This Period To Date Balance NO. OF TEST On-file To Date
Period
Structural Concrete, Column Footings, Class A
900(1)c1-a cum 510.94 167.08 167.08 343.86 PE Certificate 1 1 1 PB 1
(fc=21 Mpa) @ 28 days
a. Cement bag. 4,087.52 - 1,336.63 1,336.63 2,750.89 Quality Test 1 1 1 PB 1
b. Fine Aggregates cum 255.47 - 83.54 83.54 171.93 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Organic Impurities 1 1 1
Unit Weight 1 1 1
Clay Lumps 1 1 1
c. Coarse Aggregates cum 347.44 - 113.61 113.61 233.83 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Abrasion 1 1 1
Unit Weight 1 1 1
d. Water li - Quality Test 1 1 1 PB 1
e. Concrete cum 510.94 - 167.08 167.08 343.86 Compressive Strength 1 3 3 PB 1
Structural Concrete, Mat Foundations, Class A
900(1)c1-m cum 514.00 436.90 436.90 77.10 PE Certificate 1 1 1 PB 1
(fc=21 Mpa) @ 28 days
a. Cement bag. 4,112.00 - 3,495.20 3,495.20 616.80 Quality Test 1 2 2 PB 1
b. Fine Aggregates cum 257.00 - 218.45 218.45 38.55 Grading 1 1 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Organic Impurities 1 1 1
Unit Weight 1 1 1
Clay Lumps 1 1 1
c. Coarse Aggregates cum 349.52 - 297.09 297.09 52.43 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Abrasion 1 1 1
Unit Weight 1 1 1
d. Water li - Quality Test 1 1 1 PB 1
e. Concrete cum 514.00 - 436.90 436.90 77.10 Compressive Strength 1 6 6 PB 1
Structural Concrete, Pile Cap, Class A (fc=21 Mpa)
900(1)c1-ae cum 2,158.17 955.73 955.73 1,202.44 PE Certificate 1 1 1 PB 1
@ 28 days
a. Cement bag. 17,265.36 - 7,645.81 7,645.81 9,619.55 Quality Test 1 4 4 PB 1
b. Fine Aggregates cum 1,079.09 - 477.86 477.86 601.22 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Organic Impurities 1 1 1
Unit Weight 1 1 1
Clay Lumps 1 1 1
c. Coarse Aggregates cum 1,467.56 - 649.89 649.89 817.66 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Page 10 of 13
Qty. Incorporated into the Work No. of Test Performed
MINIMUM
Item No DESCRIPTION UNIT QUANTITY KIND OF TEST This Remarks
Previous This Period To Date Balance NO. OF TEST On-file To Date
Period
Soundness 1 1 1
Abrasion 1 1 1
Unit Weight 1 1 1
d. Water li - Quality Test 1 1 1 PB 1
e. Concrete cum 2,158.17 - 955.73 955.73 1,202.44 Compressive Strength 1 13 13 PB 1
CAST-IN PLACE CONCRETE (28 Mpa)
Structural Concrete, Column Footings, 28 Mpa @ 28
900(8)a cum 94.09 46.82 46.82 47.27 PE Certificate 1 1 1 PB 1
days
a. Cement bag. 752.72 - 374.58 374.58 378.14 Quality Test 1 1 1 PB 1
b. Fine Aggregates cum 47.05 - 23.41 23.41 23.63 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Organic Impurities 1 1 1
Unit Weight 1 1 1
Clay Lumps 1 1 1
c. Coarse Aggregates cum 63.98 - 31.84 31.84 32.14 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Abrasion 1 1 1
Unit Weight 1 1 1
d. Water li - Quality Test 1 1 1 PB 1
e. Concrete cum 94.09 - 46.82 46.82 47.27 Compressive Strength 1 1 1 PB 1
Structural Concrete, Footing-Tie-Beams, 28 Mpa @
900(8)n cum 463.57 115.89 115.89 347.68 PE Certificate 1 1 1 PB 1
28 days
a. Cement bag. 3,708.56 - 927.14 927.14 2,781.42 Quality Test 1 1 1 PB 1
b. Fine Aggregates cum 231.79 - 57.95 57.95 173.84 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Organic Impurities 1 1 1
Unit Weight 1 1 1
Clay Lumps 1 1 1
c. Coarse Aggregates cum 315.23 - 78.81 78.81 236.42 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Abrasion 1 1 1
Unit Weight 1 1 1
d. Water li - Quality Test 1 1 1 PB 1
e. Concrete cum 463.57 - 115.89 115.89 347.68 Compressive Strength 1 2 2 PB 1
CAST-IN PLACE CONCRETE (10.34 Mpa)
Structural Concrete, Columns/Planted Columns,
900(11)a cum 101.27 50.08 50.08 51.19 PE Certificate 1 1 1 PB 1
10.34 Mpa @ 28 days
a. Cement bag. 810.16 - 400.61 400.61 409.55 Quality Test 1 1 1 PB 1
Page 11 of 13
Qty. Incorporated into the Work No. of Test Performed
MINIMUM
Item No DESCRIPTION UNIT QUANTITY KIND OF TEST This Remarks
Previous This Period To Date Balance NO. OF TEST On-file To Date
Period
b. Fine Aggregates cum 50.64 - 25.04 25.04 25.60 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Organic Impurities 1 1 1
Unit Weight 1 1 1
Clay Lumps 1 1 1
c. Coarse Aggregates cum 68.86 - 34.05 34.05 34.81 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Abrasion 1 1 1
Unit Weight 1 1 1
d. Water li - Quality Test 1 1 1 PB 1
e. Concrete cum 101.27 - 50.08 50.08 51.19 Compressive Strength 1 1 1 PB 1
CAST-IN PLACE CONCRETE (10 Mpa)
901(1) Structural Concrete (Lean Concrete, 10Mpa) cum 62.01 43.54 43.54 18.47 PE Certificate 1 1 1 PB 1
a. Cement bag. 496.08 - 348.34 348.34 147.74 Quality Test 1 1 1 PB 1
b. Fine Aggregates cum 31.01 - 21.77 21.77 9.23 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Organic Impurities 1 1 1
Unit Weight 1 1 1
Clay Lumps 1 1 1
c. Coarse Aggregates cum 42.17 - 29.61 29.61 12.56 Grading 1 1 1 PB 1
Sp. Gravity & Abs. 1 1 1
Soundness 1 1 1
Abrasion 1 1 1
Unit Weight 1 1 1
d. Water li - Quality Test 1 1 1 PB 1
e. Concrete cum 62.01 - 43.54 43.54 18.47 Compressive Strength 1 1 1 PB 1
REINFORCING STEEL (GRADE 40)
902(1)a1 Reinforcing Steel, Column Footings (Grade 40) kgs 132.24 92.57 92.57 39.67 Quality Test 5 1 1 PB 1
902(1)a6 Reinforcing Steel, Footing-Tie-Beams (Grade 40) kgs 3,592.73 1,676.73 1,676.73 1,916.00 Quality Test 5 1 1 PB 1
Reinforcing Steel, Columns/Planted Columns
902(1)a11 kgs 2,374.40 1,566.06 1,566.06 808.34 Quality Test 115 1 1 PB 1
(Grade 40)
REINFORCING STEEL (GRADE 60)
902(1)b-1 Reinforcing Steel, Column Footings (Grade 60) kgs 47,983.90 34,067.39 34,067.39 13,916.51 Quality Test 5 3 3 PB 1
902(1)b-2 Reinforcing Steel, Matt Foundations (Grade 60) kgs 38,063.79 38,063.80 38,063.80 0.00 Quality Test 4 4 4 PB 1
902(1)b-8 Reinforcing Steel, Footing-Tie-Beam (Grade 60) kgs 113,910.44 54,559.70 54,559.70 59,350.74 Quality Test 4 6 6 PB 1
Reinforcing Steel, Columns/Planted Columns
902(1)b-14 kgs 1,145,443.14 751,068.35 751,068.35 394,374.79 Quality Test 115 75 75 PB 1
(Grade 60)
902(1)b-37 Reinforcing Steel, Pile Cap (Grade 60) kgs 514,541.86 396,106.40 396,106.40 118,435.46 Quality Test 52 40 40 PB 1
Page 12 of 13
Qty. Incorporated into the Work No. of Test Performed
MINIMUM
Item No DESCRIPTION UNIT QUANTITY KIND OF TEST This Remarks
Previous This Period To Date Balance NO. OF TEST On-file To Date
Period
FORWORKS AND FALSEWORK
903(2)a Formworks and Falseworks (Lean Concrete) sqm. 28.88 20.35 20.35 8.53 PE Certificate 1 1 1 PB 1
903(2)b Formworks and Falseworks (Column Footings) sqm. 1,145.32 787.29 787.29 358.03 PE Certificate 1 1 1 PB 1
903(2)c Formworks and Falseworks (Mat Foundations) sqm. 149.00 149.00 149.00 0.00 PE Certificate 1 1 1 PB 1
903(2)i Formworks and Falseworks (Footing Tie Beam) sqm. 5,308.54 2,528.84 2,528.84 2,779.70 PE Certificate 1
Formworks and Falseworks (Columns/Planted
903(2)o sqm. 18,789.13 12,200.83 12,200.83 6,588.30 PE Certificate 1 2 2 PB 1
Columns)
903(2)an Formworks and Falseworks (Pile Cap) sqm. 4,227.79 3,233.12 3,233.12 994.67 PE Certificate 1 1 1 PB 1
Page 13 of 13
SUMMARY OF TEST
From February 22 to October 10, 2022
Name of Project and Location : CONSTRUCTION OF VARIOUS STRUCTURES AND FACILITIES WITHIN THE 100 HECTARE AREA AT BATAAN TECH. PARKProject Accomplishment :
Implementing Office : Bases Conversion Development Authority Project Cost :
Implementation Period :
Page 2
SLMTC-PB-PLLL-005 16 Roadway Excavation 1500m3 Jobsite Atterberg 104(1)a Cavdeal 08/09/2022 SLMTC 08/10/2022 SLMTC A-2-4
SLMTC-PB-MDR-005 16 Roadway Excavation 1500m3 Jobsite Compaction 104(1)a Cavdeal 08/09/2022 SLMTC 08/10/2022 SLMTC
SLMTC-PB-SA-001 17 Roadway Excavation 1500m3 Jobsite Grading 104(1)a Cavdeal 08/23/2022 SLMTC 08/24/2022 SLMTC Passed
SLMTC-PB-PLLL-001 17 Roadway Excavation 1500m3 Jobsite Atterberg 104(1)a Cavdeal 08/23/2022 SLMTC 08/24/2022 SLMTC A-2-4
SLMTC-PB-MDR-001 17 Roadway Excavation 1500m3 Jobsite Compaction 104(1)a Cavdeal 08/23/2022 SLMTC 08/24/2022 SLMTC
SLMTC-PB-SA-002 18 Roadway Excavation 1500m3 Jobsite Grading 104(1)a Cavdeal 09/02/2022 SLMTC 09/03/2022 SLMTC Passed
SLMTC-PB-PLLL-002 18 Roadway Excavation 1500m3 Jobsite Atterberg 104(1)a Cavdeal 09/02/2022 SLMTC 09/03/2022 SLMTC A-2-4
SLMTC-PB-MDR-002 18 Roadway Excavation 1500m3 Jobsite Compaction 104(1)a Cavdeal 09/02/2022 SLMTC 09/03/2022 SLMTC
SLMTC-PB-SA-003 19 Roadway Excavation 1500m3 Jobsite Grading 104(1)a Cavdeal 09/20/2022 SLMTC 09/21/2022 SLMTC Passed
SLMTC-PB-PLLL-003 19 Roadway Excavation 1500m3 Jobsite Atterberg 104(1)a Cavdeal 09/20/2022 SLMTC 09/21/2022 SLMTC A-2-4
SLMTC-PB-MDR-003 19 Roadway Excavation 1500m3 Jobsite Compaction 104(1)a Cavdeal 09/20/2022 SLMTC 09/21/2022 SLMTC
3
SLMTC-PB-SA-004 20 Roadway Excavation 1500m Jobsite Grading 104(1)a Cavdeal 09/20/2022 SLMTC 09/21/2022 SLMTC Passed
SLMTC-PB-PLLL-004 20 Roadway Excavation 1500m3 Jobsite Atterberg 104(1)a Cavdeal 09/20/2022 SLMTC 09/21/2022 SLMTC A-2-4
SLMTC-PB-MDR-004 20 Roadway Excavation 1500m3 Jobsite Compaction 104(1)a Cavdeal 09/20/2022 SLMTC 09/21/2022 SLMTC
SLMTC-PB-SA-005 21 Roadway Excavation 1500m3 Jobsite Grading 104(1)a Cavdeal 09/20/2022 SLMTC 09/21/2022 SLMTC Passed
SLMTC-PB-PLLL-005 21 Roadway Excavation 1500m3 Jobsite Atterberg 104(1)a Cavdeal 09/20/2022 SLMTC 09/21/2022 SLMTC A-2-4
SLMTC-PB-MDR-005 21 Roadway Excavation 1500m3 Jobsite Compaction 104(1)a Cavdeal 09/20/2022 SLMTC 09/21/2022 SLMTC
SLMTC-PB-SA-001 22 Roadway Excavation 1500m3 Jobsite Grading 104(1)a Cavdeal 09/27/2022 SLMTC 09/28/2022 SLMTC Passed
SLMTC-PB-PLLL-001 22 Roadway Excavation 1500m3 Jobsite Atterberg 104(1)a Cavdeal 09/27/2022 SLMTC 09/28/2022 SLMTC A-2-4
SLMTC-PB-MDR-001 22 Roadway Excavation 1500m3 Jobsite Compaction 104(1)a Cavdeal 09/27/2022 SLMTC 09/28/2022 SLMTC
SLMTC-PB-SA-002 23 Roadway Excavation 1500m3 Jobsite Grading 104(1)a Cavdeal 09/27/2022 SLMTC 09/28/2022 SLMTC Passed
SLMTC-PB-PLLL-002 23 Roadway Excavation 1500m3 Jobsite Atterberg 104(1)a Cavdeal 09/27/2022 SLMTC 09/28/2022 SLMTC A-2-4
SLMTC-PB-MDR-002 23 Roadway Excavation 1500m3 Jobsite Compaction 104(1)a Cavdeal 09/27/2022 SLMTC 09/28/2022 SLMTC
SLMTC-PB-SA-003 24 Roadway Excavation 1500m3 Jobsite Grading 104(1)a Cavdeal 09/27/2022 SLMTC 09/28/2022 SLMTC Passed
SLMTC-PB-PLLL-003 24 Roadway Excavation 1500m3 Jobsite Atterberg 104(1)a Cavdeal 09/27/2022 SLMTC 09/28/2022 SLMTC A-2-4
SLMTC-PB-MDR-003 24 Roadway Excavation 1500m3 Jobsite Compaction 104(1)a Cavdeal 09/27/2022 SLMTC 09/28/2022 SLMTC
SLMTC-PB-SA-004 25 Roadway Excavation 1500m3 Jobsite Grading 104(1)a Cavdeal 09/27/2022 SLMTC 09/28/2022 SLMTC Passed
SLMTC-PB-PLLL-004 25 Roadway Excavation 1500m3 Jobsite Atterberg 104(1)a Cavdeal 09/27/2022 SLMTC 09/28/2022 SLMTC A-2-4
SLMTC-PB-MDR-004 25 Roadway Excavation 1500m3 Jobsite Compaction 104(1)a Cavdeal 09/27/2022 SLMTC 09/28/2022 SLMTC
SLMTC-PB-SA-005 26 Roadway Excavation 1500m3 Jobsite Grading 104(1)a Cavdeal 10/04/2022 SLMTC 10/05/2022 SLMTC Passed
SLMTC-PB-PLLL-005 26 Roadway Excavation 1500m3 Jobsite Atterberg 104(1)a Cavdeal 10/04/2022 SLMTC 10/05/2022 SLMTC A-2-4
SLMTC-PB-MDR-005 26 Roadway Excavation 1500m3 Jobsite Compaction 104(1)a Cavdeal 10/04/2022 SLMTC 10/05/2022 SLMTC
SLMTC-PB-SA-006 27 Roadway Excavation 1500m3 Jobsite Grading 104(1)a Cavdeal 10/04/2022 SLMTC 10/05/2022 SLMTC Passed
SLMTC-PB-PLLL-006 27 Roadway Excavation 1500m3 Jobsite Atterberg 104(1)a Cavdeal 10/04/2022 SLMTC 10/05/2022 SLMTC A-2-4
SLMTC-PB-MDR-006 27 Roadway Excavation 1500m3 Jobsite Compaction 104(1)a Cavdeal 10/04/2022 SLMTC 10/05/2022 SLMTC
SLMTC-PB-SA-007 28 Roadway Excavation 1500m3 Jobsite Grading 104(1)a Cavdeal 10/04/2022 SLMTC 10/05/2022 SLMTC Passed
SLMTC-PB-PLLL-007 28 Roadway Excavation 1500m3 Jobsite Atterberg 104(1)a Cavdeal 10/04/2022 SLMTC 10/05/2022 SLMTC A-2-4
SLMTC-PB-MDR-007 28 Roadway Excavation 1500m3 Jobsite Compaction 104(1)a Cavdeal 10/04/2022 SLMTC 10/05/2022 SLMTC
ITEM 105(1) - SUBGRADE
SLMTC-PB-SA-001 1 Subgrade 1500m3 Jobsite Grading 105(1) Cavdeal 05/27/2022 SLMTC 05/28/2022 SLMTC Passed
SLMTC-PB-PLLL-001 1 Subgrade 1500m3 Jobsite Atterberg 105(1) Cavdeal 05/27/2022 SLMTC 05/28/2022 SLMTC A-2-4
SLMTC-PB-MDR-001 1 Subgrade 1500m3 Jobsite Compaction 105(1) Cavdeal 05/27/2022 SLMTC 05/28/2022 SLMTC
ITEM 400(17) - CONCRETE PILES CAST IN DRILLED HOLES
SLMTC-PB-FA-SA-001 1 Fine Aggregates 1500m3 BGC Grading 400(17)a.8, e.4, e.5 Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-FA-SG-001 1 Fine Aggregates 1500m3 BGC Sp. Gravity & Abs. 400(17)a.8, e.4, e.5 Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-FA-ST-001 1 Fine Aggregates 1500m3 BGC Soundness 400(17)a.8, e.4, e.5 Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-FA-OI-001 1 Fine Aggregates 1500m3 BGC Org. Impurities 400(17)a.8, e.4, e.5 Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-FA-UW-001 1 Fine Aggregates 1500m3 BGC Unit Weight 400(17)a.8, e.4, e.5 Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
3
SLMTC-PB-FA-CL-001 1 Fine Aggregates 1500m BGC Clay Lumps 400(17)a.8, e.4, e.5 Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
Page 3
SLMTC-PB-CA-SA-001 1 Coarse Aggregates 1500m3 BGC Grading 400(17)a.8, e.4, e.5 Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-CA-SG-001 1 Coarse Aggregates 1500m3 BGC Sp. Gravity & Abs. 400(17)a.8, e.4, e.5 Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-CA-ST-001 1 Coarse Aggregates 1500m3 BGC Soundness 400(17)a.8, e.4, e.5 Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-CA-LA-001 1 Coarse Aggregates 1500m3 BGC Abrasion 400(17)a.8, e.4, e.5 Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-CA-UW-001 1 Coarse Aggregates 1500m3 BGC Unit Weight 400(17)a.8, e.4, e.5 Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-CA-SA-002 1 Coarse Aggregates 1500m3 BGC Grading 400(17)a.8, e.4, e.5 Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
ITEM 900(1), 900(8), 901(1) - STRUCTURAL CONCRETE
SLMTC-PB-FA-SA-001 1 Fine Aggregates 1500m3 BGC Grading 900(1), 900(8), 901(1) Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-FA-SG-001 1 Fine Aggregates 1500m3 BGC Sp. Gravity & Abs. 900(1), 900(8), 901(1) Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-FA-ST-001 1 Fine Aggregates 1500m3 BGC Soundness 900(1), 900(8), 901(1) Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-FA-OI-001 1 Fine Aggregates 1500m3 BGC Org. Impurities 900(1), 900(8), 901(1) Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
3
SLMTC-PB-FA-UW-001 1 Fine Aggregates 1500m BGC Unit Weight 900(1), 900(8), 901(1) Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-FA-CL-001 1 Fine Aggregates 1500m3 BGC Clay Lumps 900(1), 900(8), 901(1) Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-CA-SA-001 1 Coarse Aggregates 1500m3 BGC Grading 900(1), 900(8), 901(1) Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-CA-SG-001 1 Coarse Aggregates 1500m3 BGC Sp. Gravity & Abs. 900(1), 900(8), 901(1) Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-CA-ST-001 1 Coarse Aggregates 1500m3 BGC Soundness 900(1), 900(8), 901(1) Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-CA-LA-001 1 Coarse Aggregates 1500m3 BGC Abrasion 900(1), 900(8), 901(1) Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-CA-UW-001 1 Coarse Aggregates 1500m3 BGC Unit Weight 900(1), 900(8), 901(1) Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed
SLMTC-PB-CA-SA-002 1 Coarse Aggregates 1500m3 BGC Grading 900(1), 900(8), 901(1) Cavdeal 06/10/2022 SLMTC 06/11/2022 SLMTC Passed