You are on page 1of 51

MONTHLY STATUS ON TEST REPORTS

NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR
PERIOD March 24 - April 23, 2022
Variation no. 5 MIN. TEST REQUIRED ACCOMPLISHMENT TEST PERFORMED
ITEM NO. DESCRIPTION QTY UNIT REMARKS
QTY Kind of Test No. / Test PREVIOUS THIS TOTAL PREV THIS TOTAL BAL

Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers
A.1.1(11) 1.00 1.00 L.S. PEC 1.00 - 1.00 1.00 1.00 -

Operation & Maintenance of Temporary Field Office, Laboratory and Living


A.1.1(15) 25.00 39.83 mos. PEC 35.77 1.00 36.77 36.00 1 37.00 -
Quarters Building for the Engineer
Provision of Combined Field Office, Laboratory and Living Quarters Building for
A.1.1(6) 25.00 39.83 mos. PEC 35.77 1.00 36.77 36.00 1 37.00 -
the Engineer (Rental Basis)
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 1.00 each PEC 1.00 - 1.00 1.00 1.00 -
A.1.2(6) Operation & Maintenance of Pick up Type Service Vehicle for the Engineer 25.00 29.77 mos. PEC 29.77 - 29.77 30.00 30.00 -
A.1.4(1) Provision of Progress Photographs 25.00 29.77 mos. PEC 29.77 - 29.77 30.00 30.00 -
B.11 Provisional Sum 1.00 - PS. PEC - - - - - -
B.19 Geotechnical Exploration 240.00 288.50 Ln.m PEC 288.50 - 288.50 1.00 1.00 -
B.5 Project Billboard/Signboard 4.00 4.00 each PEC 4.00 - 4.00 4.00 4.00 -
B.7 Occupational Safety and Health Program 25.00 39.83 mos. PEC 35.77 1.00 36.77 36.00 1 37.00 -
B.8 Traffic Management 25.00 29.77 mos. PEC 29.77 - 29.77 30.00 30.00 -
B.9 Mobilization/Demobilization 1.00 1.00 L.S. PEC 0.50 - 0.50 1.00 1.00 -
101(6) Removal of Actual Structures / Obstruction - Concrete 721.77 824.00 cu.m. PEC 824.00 - 824.00 4.00 4.00 -
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 2,635.00 4,811.00 sq.m PEC 4,681.00 - 4,681.00 3.00 3.00 -
Removal of Actual Structures / Obstruction (Demolition of Superstructure,
101(6) 535.00 624.00 cu.m. - - - - - -
Coping and Exposed Reinforced Concrete Piles) PEC

Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from


101(7)a 521,835.00 367,117.57 kgs 367,117.57 - 367,117.57 2.00 2.00 -
Project Site to Lingu, Solana Stockyard) for Detour / Craneway & Platform
PEC

Removal of Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling


101(7)b 225,600.00 124,080.00 kgs 124,080.00 - 124,080.00 2.00 2.00 -
from Project Site to Lingu, Solana Stockyard for Detour / Craneway & Platform)
PEC
104(1)a Embankment - from Roadway Excavation (Common Soil) 579.00 2,418.40 cu.m. PEC 2,042.40 - 2,042.40 2.00 2.00 -
104(2)a Embankment - from Borrow (Common Soil) 33,887.37 60,430.42 cu.m. 55,200.00 - 55,200.00
GPC 23.00 - - 27.00 27.00 -
QT 23.00 - - 27.00 27.00 -
FDT 452.00 - - 418.00 418.00 34.00
104(2)d Embankment - from Borrow Granular Course Materials (Craneway) 1,435.00 1,435.00 cu.m. 1,435.00 - 1,435.00
105(1)a Subgrade Preparation - Common Materials 1,313.00 10,382.00 sq.m 1,908.00 - 1,908.00
GPC 1.00 - - 6.00 6.00 -
FDT 4.00 - - 11.00 11.00 -
QT 1.00 - - 1.00 1.00 -
200(1) Aggregate Sub-Base Course 3,497.00 7,855.00 cu.m. 3,891.00 - 3,891.00
QT 3.00 - - 4.00 4.00 -
G/P 13.00 - - 15.00 15.00 -
C 3.00 - - 9.00 9.00 -
CBR 2.00 - - 2.00 2.00 -
FDT 51.00 - - 52.00 52.00 -
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days 2,091.00 - sq.m - - - - - -
MONTHLY STATUS ON TEST REPORTS
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR
PERIOD March 24 - April 23, 2022
Variation no. 5 MIN. TEST REQUIRED ACCOMPLISHMENT TEST PERFORMED
ITEM NO. DESCRIPTION QTY UNIT REMARKS
QTY Kind of Test No. / Test PREVIOUS THIS TOTAL PREV THIS TOTAL BAL

a. Cement 125,876.33 bags included in ITEM 400(23)a13 - - - - -


b. Fine Aggregate 3,230.60 cu.m. included in ITEM 400(23)a13 - - - - -
c. Coarse Aggregate 226.14 cu.m QT 1.00 - - - - 1.00
G 16.00 - - - - 16.00
d. Reinforcing bar 697.00 kgs QT 1.00 - - - - 1.00
MTC - - - - -
e. Water 96.92 liters PEC - - - - -
f. Asphalt Sealant 232.33 liters QT 1.00 - - - - 1.00
g. Pipe Sleeve 32.17 pcs. MTC - - - - -
313.65 cu.m. FT 5.00 - - - - 5.00
1,394.00 ln.m. TD 7.00 - - - - 7.00
h. Thickness Determination on (by concrete core) drilling
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 5,250.00 12,779.00 sq.m 6,608.71 312.29 6,921.00
a. Cement 14,700.00 bags included in ITEM 400(23)a13 - - - - -
b. Fine Aggregate 441.00 cu.m. included in ITEM 400(23)a13 - - - - -
c. Coarse Aggregate 1,029.00 cu.m included in ITEM 311(1)a - - - - -
d. Reinforcing bar 2,600.00 kgs included in ITEM 311(1)a - - - - -
e. Water 449.82 liters PEC - - 6.00 1 7.00 -
f. Asphalt Sealant 890.00 liters included in ITEM 311(1)a - - - - -
g. Pipe Sleeve 80.00 pcs. MTC - - - - -
h. Concrete Beam Sample 1,470.00 cu.m. FT 19.00 - - 36.00 2 38.00 -
i. Concrete Pavement 1,567.16 ln.m. TD 8.00 - - - - 8.00
j. Thickness Determination on (by concrete core) drilling - - - - -
400(10) Steel H-Piles, Driven 2,400.00 1,320.00 ln.m. PEC 1,320.00 - 1,320.00 1.00 1.00 -
400(3) Steel H-Piles, Furnished 2,400.00 1,320.00 ln.m. 1,320.00 - 1,320.00 - - -
Steel H-Pile (HP 12 x 63) 225,600.00 kgs QT 1.00 - - - - 1.00
MTC - - - - -
IR - - - - -
400(27)b Pile Integriity Testing - Low Strain 18.00 18.00 ln.m. 18.00 - 18.00 18.00 18.00 -
400(28) High Strain Dynamic Testing (PDA) 10.00 10.00 ln.m. 10.00 - 10.00 10.00 10.00 -
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 1,440.00 ln.m. 1,440.00 - 1,440.00 - - -
a. Cement 64,428.00 bags QT 33.00 - - 33.00 33.00 -
b. Fine Aggregate 3,010.65 cu.m. QT 3.00 - - 3.00 3.00 -
G 85.00 - - 85.00 85.00 -
c. Coarse Aggregate 4,636.40 cu.m - - - - -
QT 4.00 - - 4.00 4.00 -
G 62.00 - - 62.00 62.00 -
d. Water 1,806.40 liters QT 1.00 - - 1.00 1.00 -
PEC - - - - -
e. Reinforcing bar - kgs - - - - -
36 mm diameter 1,147,392.00 kgs QT 115.00 - - 115.00 115.00 -
MONTHLY STATUS ON TEST REPORTS
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR
PERIOD March 24 - April 23, 2022
Variation no. 5 MIN. TEST REQUIRED ACCOMPLISHMENT TEST PERFORMED
ITEM NO. DESCRIPTION QTY UNIT REMARKS
QTY Kind of Test No. / Test PREVIOUS THIS TOTAL PREV THIS TOTAL BAL

25 mm diameter 77,355.15 kgs QT 8.00 - - 8.00 8.00 -


20 mm diameter 90,533.38 kgs QT 10.00 - - 10.00 10.00 -
f. Concrete Cylinder CT 108.00 - - 108.00 108.00 -
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 324.00 414.00 ln.m. QT 1.00 414.00 - 414.00 - - 1.00
401(2)a Concrete Railing - Standard 1,020.00 1,020.00 ln.m 1,020.00 - 1,020.00 - - -
a. Cement 6,018.00 bags included in ITEM 400(23)a13 - - - - -
b. Fine Aggregate 61.20 cu.m. included in ITEM 400(23)a13 - - - - -
c. Coarse Aggregate 142.80 cu.m QT 1.00 - - 1.00 1.00 -
G 6.00 - - 6.00 6.00 -
d. Water liters PEC - - - - -
e. Reinforcing bar 40,800.00 kgs QT 6.00 - - - - 6.00
403(1)a1 Structural Steel, Furnished (Craneway & Platform) 558,885.29 402,056.57 kgs IR 367,117.57 - 367,117.57 1.00 1.00 -
a. Structural Steel 547,926.75 kgs - - - - -
MTC - - 1.00 1.00 -
IR - - 1.00 1.00 -
b. Miscelaneous Item 10,958.54 kgs MTC - - 1.00 1.00 -
PEC - - 1.00 1.00 -
403(3) Structural Steel, Erected (Craneway & Platform) 521,835.00 402,056.57 kgs 367,117.57 - 367,117.57 - - -
a. Welding Rod 10,436.00 kgs NTR - - - - -
b. Oxy / Acetylyn 200.00 cyl NTR - - - - -
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 2,514.77 kgs 2,514.77 - 2,514.77 - - -
a. Structural Steel 2,640.00 kgs QT 1.00 - - - - 1.00
MTC - - - - -
IR - - - - -
b. Reinforcing bar 264.05 kgs included in ITEM 401(2)a - - - - -
c. Welding rod 26.41 kgs NTR - - - - -
d. Oxy / Acytylyn 10.00 Cyl NTR - - - - -
404(1)a Reinforcing Steel (Grade 40) 121,874.96 56,631.11 kgs 52,629.11 - 52,629.11 - - -
a. 12 mm diameter 120,543.48 kgs 13.00 4,729.11 - 4,729.11 13.00 13.00 -
b. 10 mm diameter 923.62 kgs QT 1.00 - - 2.00 2.00 -
c. 8 mm diameter 407.86 kgs 1.00 - - 2.00 2.00 -
404(1)b Reinforcing Steel (Grade 60) 645,041.00 673,154.40 kgs - 661,022.40 - 661,022.40 - - -
a. 36 mm diameter 659,862.46 kgs QT 66.00 304,941.61 304,941.61 66.00 66.00 -
b. 32 mm diameter 4,242.60 kgs QT 1.00 601.11 601.11 1.00 1.00 -
c. 28 mm diameter 99,005.76 kgs QT 10.00 13,830.30 13,830.30 1.00 1.00 9.00
d. 25 mm diameter 88,168.89 kgs QT 9.00 109,049.72 109,049.72 10.00 10.00 -
e. 20 mm diameter 485,203.97 kgs QT 49.00 236,782.18 236,782.18 19.00 19.00 30.00
f. 16 mm diameter 153,843.21 kgs QT 16.00 60,757.39 60,757.39 8.00 8.00 8.00
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 1,710.41 3,025.41 cu.m. - 2,927.41 - 2,927.41 - - -
a. Cement 36,893.74 bags included in ITEM 400(23)a13
b. Fine Aggregate 1,418.99 cu.m. included in ITEM 400(23)a13
MONTHLY STATUS ON TEST REPORTS
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR
PERIOD March 24 - April 23, 2022
Variation no. 5 MIN. TEST REQUIRED ACCOMPLISHMENT TEST PERFORMED
ITEM NO. DESCRIPTION QTY UNIT REMARKS
QTY Kind of Test No. / Test PREVIOUS THIS TOTAL PREV THIS TOTAL BAL

c. Coarse Aggregate 2,837.98 cu.m QT 2.00 - - 4.00 4.00 -


G 38.00 - - 36.00 36.00 2.00
d. Water liters PEC - - - - - -
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 68.00 each - 68.00 - 68.00 - - -
a. Cement 19,081.14 bags QT 10.00 - - 10.00 10.00 -
b. Fine Aggregate 733.89 cu.m. - - - - - -
QT 1.00 - - 1.00 1.00 -
G 10.00 - - 10.00 10.00 -
c. Coarse Aggregate 1,467.78 cu.m - - - - - -
QT 1.00 - - 1.00 1.00 -
G 20.00 - - 20.00 20.00 -
d. Water liters PEC - - - - - -
e. Steel Bars 229,343.60 kgs - - - - - -
a. 28 mm diameter 68,306.68 kgs QT 7.00 - - 7.00 7.00 -
b. 25 mm diameter 1,262.08 kgs QT 1.00 - - 1.00 1.00 -
c. 20 mm diameter 55,879.00 kgs QT 6.00 - - 6.00 6.00 -
d. 12 mm diameter 103,326.00 kgs QT 11.00 - - 11.00 11.00 -
e. 10 mm diameter 569.84 kgs QT 1.00 - - 1.00 1.00 -
f. Wire Strands ton QT 1.00 - - 1.00 1.00 -
g. Concrete Cylinder 68.00 cu.m. CT 68.00 - - 68.00 68.00 -
409(1) Welded Structural Steel 1.00 1.00 l.s. 1.00 1.00 - 1.00 1.00 1.00 -
411(1) Paint 2,543.11 3,326.11 sq.m QT 1.00 - 2,842.11 2,842.11 - 1 1.00 -
412(1) Elastomeric Bearing Pads 40.00 40.00 each QT 1.00 40.00 - 40.00 2.00 2.00 -
413(4)a Expansion Joint 60.00 60.00 each QT 1.00 60.00 - 60.00 2.00 2.00 -
413(1)a Premolded Expansion Joint Filler with sealant 1.79 1.79 ln.m. QT 1.00 1.79 - 1.79 2.00 2.00 -
505(2)a Grouted Riprap, Class "A" 2,345.02 2,234.14 cu.m. - 2,065.43 82.71 2,148.14 - - -
a. Cement 262.33 bags included in ITEM 400(23)a13 - - - - -
b. Fine Aggregate 586.25 cu.m. included in ITEM 400(23)a13 - - - - -
c. Boulder 2,931.25 cu.m QT 1.00 - - 3.00 1 4.00 -
d. Water liters PEC - - - 5.00 1 6.00 -
506(1) Stone Masonry 3,072.00 1,106.77 cu.m. - 1,030.00 10.77 1,040.77 - - -
a. Cement 343.66 bags included in ITEM 400(23)a13 - - - - -
b. Fine Aggregate 768.00 cu.m. included in ITEM 400(23)a13 - - - - -
c. Boulder 3,840.00 cu.m QT 1.00 - - 1.00 1 2.00 -
d. Water liters PEC - - - 4.00 1 5.00 -
511(1) Gabion 504.00 504.00 cu.m. - 283.50 94.50 378.00 - - -
a. Boulder 630.00 cu.m. QT 1.00 - - 3.00 1 4.00 -
b. Wire and Wire Mesh 252.00 bag QT 1.00 - - 3.00 1 4.00 -
511(2) Filter Cloth 504.00 504.00 sq.m QT 1.00 419.33 84.67 504.00 - - -
IR - - - 4.00 1 5.00 -
517(1) Drain Pipe 136.00 136.00 ln.m IR - 136.00 - 136.00 4.00 4.00 -
MONTHLY STATUS ON TEST REPORTS
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR
PERIOD March 24 - April 23, 2022
Variation no. 5 MIN. TEST REQUIRED ACCOMPLISHMENT TEST PERFORMED
ITEM NO. DESCRIPTION QTY UNIT REMARKS
QTY Kind of Test No. / Test PREVIOUS THIS TOTAL PREV THIS TOTAL BAL

MTC - - - - - -
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 1,062.50 ln.m - - 1,062.50 1,062.50 - - -
a. Metal Guardrail 1,062.50 ln.m QT 1.00 - - - - 1.00
IR - - - - 1 1.00 - 1.00
b. Post 390.00 each IR - - - - 1 1.00 - 1.00
603(4)b Metal Beam End Piece, Bull Nose 10.00 10.00 each QT 1.00 - 10.00 10.00 - 1 1.00 -
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs 2.00 2.00 each QT 1.00 - - - - - 1.00
605(1)aj2 Pedestrian
Warning Crossing
Signs, 600mmAhead
x 600mm, W2-4B, Intersection and Junction Signs T- 3.00 3.00 each QT 1.00 - - - - - 1.00
605(2)ag3 Junction
Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension 2.00 2.00 each QT 1.00 - - - - - 1.00
605(2)ai2 Restriction
Regulatory Signs
Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 4.00 each QT 1.00 - - - - - 1.00
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs 3.00 3.00 each QT 1.00 - - - - - 1.00
612(1) REDUCE SPEED
Reflectorized Thermoplastic Pavement Markings (White) 498.00 502.00 sq.m - - 502.00 502.00 - - -
a. Thermoplastic Paint White 161.85 161.85 bags QT 3.00 - 502.00 502.00 - 3 3.00 -
b. Glass Beads 16.43 16.43 bags QT 1.00 - - - 1 1.00 -
c. Primer White 59.76 59.76 liters QT 1.00 - - - 1 1.00 -
612(2) Reflectorized Thermoplastic Pavement Markings (Yellow) 262.00 262.00 sq.m - - 262.00 262.00 - - -
a. Thermoplastic Paint White 85.15 85.15 bags QT 1.00 - - - 1 1.00 -
b. Glass Beads 8.65 8.65 bags included in ITEM 612(1) - - - - -
c. Primer Yellow 31.44 31.44 liters QT 1.00 - - - 1 1.00 -
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 54.00 sq.m QT 1.00 - 54.00 54.00 - 1 1.00 -
a. Thermoplastic Paint White 49.00 49.00 bags included in ITEM 612(1) - - - - -
b. Glass Beads 4.98 4.98 bags included in ITEM 612(1) - - - - -
c. Primer Yellow 18.12 18.12 liters included in ITEM 612(2) - - - - -
620(1)b Chevron Signs - 600mm x 800mm 8.00 8.00 each QT 1.00 - - - - - 1.00

Prepared By: ` Checked by: Submitted by:

JAY MAR T. ISORENA GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Materials Engineer - Contractor Materials Engineer - DPWH Project Engineer - DPWH
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
Baggao, Cagayan

CERTIFICATE OF QUALITY CONTROL ASSURANCE

NAME OF PROJECT :18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along
Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE April 2, 2022

We hereby certify that we have conducted inspection on the work accomplished on the above mentioned
project for the period of March 24 - 30, 2022

We further certify that the quality of materials in the following items of work corresponding to the quality accoplished conform to standard Spefication and Special Provision of Contract, to viz,
however, the result of test shall prevail.

Accomplishments
ITEM NO. DESCRIPTION Program Quantities Unit
This Week To Date
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 L.S. - 1.00
A.1.1(15) Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer 39.83 mos. 0.23 36.00

A.1.1(6) Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis) 39.83 mos. 0.23 35.00

A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 each - 29.77
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer 29.77 mos. - 29.77
A.1.4(1) Provision of Progress Photographs 29.77 mos. - -
B.11 Provisional Sum - PS. - 288.50
B.19 Geotechnical Exploration 288.50 Ln.m - -
B.5 Project Billboard/Signboard 4.00 each - 33.77
B.7 Occupational Safety and Health Program 39.83 mos. 0.23 32.00
B.8 Traffic Management 29.77 mos. - 0.50
B.9 Mobilization/Demobilization 1.00 L.S. - 824.00
101(6) Removal of Actual Structures / Obstruction - Concrete 824.00 cu.m. - 4,681.00
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 4,811.00 sq.m - -
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete
101(6)
Piles)
Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) 624.00 cu.m. - 367,117.57
101(7)a for Detourof/ Craneway
Removal & Platform
Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana 367,117.57 kgs - 124,080.00
101(7)b Stockyard for Detour / Craneway & Platform) 124,080.00 kgs - -
104(1)a Embankment - from Roadway Excavation (Common Soil) 2,418.40 cu.m. - -
104(2)a Embankment - from Borrow (Common Soil) 31,470.56 cu.m. - -
104(2)d Embankment - from Borrow Granular Course Materials 1,435.00 cu.m. - -
105(1)a Subgrade Preparation - Common Materials 10,382.00 sq.m - 42.80
200(1) Aggregate Sub-Base Course 7,855.00 cu.m. - 257.75
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days - sq.m - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 12,779.00 sq.m 72.87 1,322.01
400(10) Steel H-Piles, Driven 1,320.00 ln.m. - 18.00
400(27)b Pile Integrity Test (PIT), Low Strain 18.00 ln.m. - 10.00
400(28) High Strain Dynamic Testing (PDA) 10.00 each - 1,320.00
400 (3) Steel H-Piles, Furnished 1,320.00 each - -
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 ln.m. - 414.00
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 414.00 ln.m. - 1,020.00
401(2)a Concrete Railing - Standard 1,020.00 ln.m - -
403(24)a1 Structural Steel, Furnished (Craneway & Platform) 402,056.57 kgs - -
403(3) Structural Steel, Erected (Craneway & Platform) 402,056.57 kgs - -
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 kgs - -
404(1)a Reinforcing Steel (Grade 40) 56,631.11 kgs - 3,152.74
404(1)b Reinforcing Steel (Grade 60) 673,154.40 kgs - 2,927.41
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 3,025.41 cu.m. - 68.00
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 each - 1.00
409(1) Welded Structural Steel 1.00 each - -
411(1) Paint 3,326.11 sq.m. 663.16 703.16
412(1) Elastomeric Bearing Pads 40.00 each - -
413(4)a Expansion Joint 60.00 each - -
413(1)a Premolded Expansion Joint Filler with sealant 1.79 ln.m. - 1,900.00
505(5) Grouted Riprap, Class "A" 2,234.14 cu.m. 19.30 184.73
506(1) Stone Masonry 1,106.77 cu.m. 2.51 97.01
511(1) Gabion 504.00 cu.m. 22.05 211.05
511(3) Filter Cloth 504.00 sq.m 19.76 189.09
517(1) Drain Pipe 136.00 ln.m - -
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 ln.m 247.92 247.92
603(4)b Metal Beam End Piece, Bull Nose 10.00 each 2.33 2.33
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahead 2.00 each - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction 3.00 each - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs 2.00 each - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 each - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED 3.00 each - -
612(1) Reflectorized Pavement Markings (White) 502.00 sq.m. 117.13 117.13
612(2) Reflectorized Pavement Markings (Yellow) 262.00 sq.m. 61.13 61.13
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 sq.m. 12.60 12.60
620(1)b Chevron Signs - 600mm x 800mm 8.00 each - -

PREPARED BY : SUBMITTED BY:

GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Project Quality Assurance Engineer Project Engineer

Note : To be Submitted every quarter of the month


1st report x
2nd report
3rd report
4th report
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
Baggao, Cagayan

CERTIFICATE OF QUALITY CONTROL ASSURANCE

NAME OF PROJECT :18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along
Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE April 8, 2022

We hereby certify that we have conducted inspection on the work accomplished on the above mentioned
project for the period of April 1 - 7, 2022

We further certify that the quality of materials in the following items of work corresponding to the quality accoplished conform to standard Spefication and Special Provision of Contract, to viz,
however, the result of test shall prevail.

Accomplishments
ITEM NO. DESCRIPTION Program Quantities Unit
This Week To Date
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 L.S. - 1.00
A.1.1(15) Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer 39.83 mos. 0.23 36.24

A.1.1(6) Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis)
39.83 mos. 0.23 35.24
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 each - 29.77
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer 29.77 mos. - 29.77
A.1.4(1) Provision of Progress Photographs 29.77 mos. - -
B.11 Provisional Sum - PS. - 288.50
B.19 Geotechnical Exploration 288.50 Ln.m - -
B.5 Project Billboard/Signboard 4.00 each - 33.77
B.7 Occupational Safety and Health Program 39.83 mos. 0.23 32.24
B.8 Traffic Management 29.77 mos. - 0.50
B.9 Mobilization/Demobilization 1.00 L.S. - 824.00
101(6) Removal of Actual Structures / Obstruction - Concrete 824.00 cu.m. - 4,681.00
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 4,811.00 sq.m - -
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete
101(6)
Piles)
Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) 624.00 cu.m. - 367,117.57
101(7)a for Detourof/ Craneway
Removal & Platform
Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana 367,117.57 kgs - 124,080.00
101(7)b Stockyard for Detour / Craneway & Platform) 124,080.00 kgs - -
104(1)a Embankment - from Roadway Excavation (Common Soil) 2,418.40 cu.m. - -
104(2)a Embankment - from Borrow (Common Soil) 31,470.56 cu.m. - -
104(2)d Embankment - from Borrow Granular Course Materials 1,435.00 cu.m. - -
105(1)a Subgrade Preparation - Common Materials 10,382.00 sq.m - 42.80
200(1) Aggregate Sub-Base Course 7,855.00 cu.m. - 257.75
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days - sq.m - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 12,779.00 sq.m 72.87 1,394.88
400(10) Steel H-Piles, Driven 1,320.00 ln.m. - 18.00
400(27)b Pile Integrity Test (PIT), Low Strain 18.00 ln.m. - 10.00
400(28) High Strain Dynamic Testing (PDA) 10.00 each - 1,320.00
400 (3) Steel H-Piles, Furnished 1,320.00 each - -
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 ln.m. - 414.00
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 414.00 ln.m. - 1,020.00
401(2)a Concrete Railing - Standard 1,020.00 ln.m - -
403(24)a1 Structural Steel, Furnished (Craneway & Platform) 402,056.57 kgs - -
403(3) Structural Steel, Erected (Craneway & Platform) 402,056.57 kgs - -
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 kgs - -
404(1)a Reinforcing Steel (Grade 40) 56,631.11 kgs - 3,152.74
404(1)b Reinforcing Steel (Grade 60) 673,154.40 kgs - 2,927.41
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 3,025.41 cu.m. - 68.00
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 each - 1.00
409(1) Welded Structural Steel 1.00 each - -
411(1) Paint 3,326.11 sq.m. 663.16 1,366.32
412(1) Elastomeric Bearing Pads 40.00 each - -
413(4)a Expansion Joint 60.00 each - -
413(1)a Premolded Expansion Joint Filler with sealant 1.79 ln.m. - 1,900.00
505(5) Grouted Riprap, Class "A" 2,234.14 cu.m. 19.30 204.03
506(1) Stone Masonry 1,106.77 cu.m. 2.51 99.53
511(1) Gabion 504.00 cu.m. 22.05 233.10
511(3) Filter Cloth 504.00 sq.m 19.76 208.84
517(1) Drain Pipe 136.00 ln.m - -
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 ln.m 247.92 495.83
603(4)b Metal Beam End Piece, Bull Nose 10.00 each 2.33 4.67
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahead 2.00 each - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction 3.00 each - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs 2.00 each - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 each - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED 3.00 each - -
612(1) Reflectorized Pavement Markings (White) 502.00 sq.m. 117.13 234.27
612(2) Reflectorized Pavement Markings (Yellow) 262.00 sq.m. 61.13 122.27
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 sq.m. 12.60 25.20
620(1)b Chevron Signs - 600mm x 800mm 8.00 each - -

PREPARED BY : SUBMITTED BY:

GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Project Quality Assurance Engineer Project Engineer

Note : To be Submitted every quarter of the month


1st report
2nd report x
3rd report
4th report
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
Baggao, Cagayan

CERTIFICATE OF QUALITY CONTROL ASSURANCE

NAME OF PROJECT :18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along
Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE April 16, 2022

We hereby certify that we have conducted inspection on the work accomplished on the above mentioned
project for the period of April 8 - 15, 2022

We further certify that the quality of materials in the following items of work corresponding to the quality accoplished conform to standard Spefication and Special Provision of Contract, to viz,
however, the result of test shall prevail.

Accomplishments
ITEM NO. DESCRIPTION Program Quantities Unit
This Week To Date
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 L.S. - 1.00
A.1.1(15) Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer 39.83 mos. 0.27 36.50

A.1.1(6)
Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis) 39.83 mos. 0.27 35.50
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 each - 29.77
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer 29.77 mos. - 29.77
A.1.4(1) Provision of Progress Photographs 29.77 mos. - -
B.11 Provisional Sum - PS. - 288.50
B.19 Geotechnical Exploration 288.50 Ln.m - -
B.5 Project Billboard/Signboard 4.00 each - 33.77
B.7 Occupational Safety and Health Program 39.83 mos. 0.27 32.50
B.8 Traffic Management 29.77 mos. - 0.50
B.9 Mobilization/Demobilization 1.00 L.S. - 824.00
101(6) Removal of Actual Structures / Obstruction - Concrete 824.00 cu.m. - 4,681.00
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 4,811.00 sq.m - -
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete
101(6)
Piles)
Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) 624.00 cu.m. - 367,117.57
101(7)a for Detourof/ Craneway
Removal & Platform
Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana 367,117.57 kgs - 124,080.00
101(7)b Stockyard for Detour / Craneway & Platform) 124,080.00 kgs - -
104(1)a Embankment - from Roadway Excavation (Common Soil) 2,418.40 cu.m. - -
104(2)a Embankment - from Borrow (Common Soil) 31,470.56 cu.m. - -
104(2)d Embankment - from Borrow Granular Course Materials 1,435.00 cu.m. - -
105(1)a Subgrade Preparation - Common Materials 10,382.00 sq.m - 42.80
200(1) Aggregate Sub-Base Course 7,855.00 cu.m. - 257.75
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days - sq.m - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 12,779.00 sq.m 83.28 1,478.15
400(10) Steel H-Piles, Driven 1,320.00 ln.m. - 18.00
400(27)b Pile Integrity Test (PIT), Low Strain 18.00 ln.m. - 10.00
400(28) High Strain Dynamic Testing (PDA) 10.00 each - 1,320.00
400 (3) Steel H-Piles, Furnished 1,320.00 each - -
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 ln.m. - 414.00
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 414.00 ln.m. - 1,020.00
401(2)a Concrete Railing - Standard 1,020.00 ln.m - -
403(24)a1 Structural Steel, Furnished (Craneway & Platform) 402,056.57 kgs - -
403(3) Structural Steel, Erected (Craneway & Platform) 402,056.57 kgs - -
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 kgs - -
404(1)a Reinforcing Steel (Grade 40) 56,631.11 kgs - 3,152.74
404(1)b Reinforcing Steel (Grade 60) 673,154.40 kgs - 2,927.41
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 3,025.41 cu.m. - 68.00
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 each - 1.00
409(1) Welded Structural Steel 1.00 each - -
411(1) Paint 3,326.11 sq.m. 757.90 2,124.21
412(1) Elastomeric Bearing Pads 40.00 each - -
413(4)a Expansion Joint 60.00 each - -
413(1)a Premolded Expansion Joint Filler with sealant 1.79 ln.m. - 1,900.00
505(5) Grouted Riprap, Class "A" 2,234.14 cu.m. 22.06 226.08
506(1) Stone Masonry 1,106.77 cu.m. 2.87 102.40
511(1) Gabion 504.00 cu.m. 25.20 258.30
511(3) Filter Cloth 504.00 sq.m 22.58 231.42
517(1) Drain Pipe 136.00 ln.m - -
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 ln.m 283.33 779.17
603(4)b Metal Beam End Piece, Bull Nose 10.00 each 2.67 7.33
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahead 2.00 each - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction 3.00 each - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs 2.00 each - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 each - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED 3.00 each - -
612(1) Reflectorized Pavement Markings (White) 502.00 sq.m. 133.87 368.13
612(2) Reflectorized Pavement Markings (Yellow) 262.00 sq.m. 69.87 192.13
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 sq.m. 14.40 39.60
620(1)b Chevron Signs - 600mm x 800mm 8.00 each - -

PREPARED BY : SUBMITTED BY:

GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Project Quality Assurance Engineer Project Engineer

Note : To be Submitted every quarter of the month


1st report
2nd report
3rd report x
4th report
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
Baggao, Cagayan

CERTIFICATE OF QUALITY CONTROL ASSURANCE

NAME OF PROJECT :18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along
Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE April 23, 2022

We hereby certify that we have conducted inspection on the work accomplished on the above mentioned
project for the period of April 16 - 22, 2022

We further certify that the quality of materials in the following items of work corresponding to the quality accoplished conform to standard Spefication and Special Provision of Contract, to viz,
however, the result of test shall prevail.

Accomplishments
ITEM NO. DESCRIPTION Program Quantities Unit
This Week To Date
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 L.S. - 1.00
A.1.1(15) Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer 39.83 mos. 0.23 36.74

A.1.1(6)
Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis) 39.83 mos. 0.23 35.74
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 each - 29.77
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer 29.77 mos. - 29.77
A.1.4(1) Provision of Progress Photographs 29.77 mos. - -
B.11 Provisional Sum - PS. - 288.50
B.19 Geotechnical Exploration 288.50 Ln.m - -
B.5 Project Billboard/Signboard 4.00 each - 33.77
B.7 Occupational Safety and Health Program 39.83 mos. 0.23 32.74
B.8 Traffic Management 29.77 mos. - 0.50
B.9 Mobilization/Demobilization 1.00 L.S. - 824.00
101(6) Removal of Actual Structures / Obstruction - Concrete 824.00 cu.m. - 4,681.00
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 4,811.00 sq.m - -
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete
101(6)
Piles)
Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) 624.00 cu.m. - 367,117.57
101(7)a for Detourof/ Craneway
Removal & Platform
Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana 367,117.57 kgs - 124,080.00
101(7)b Stockyard for Detour / Craneway & Platform) 124,080.00 kgs - -
104(1)a Embankment - from Roadway Excavation (Common Soil) 2,418.40 cu.m. - -
104(2)a Embankment - from Borrow (Common Soil) 31,470.56 cu.m. - -
104(2)d Embankment - from Borrow Granular Course Materials 1,435.00 cu.m. - -
105(1)a Subgrade Preparation - Common Materials 10,382.00 sq.m - 42.80
200(1) Aggregate Sub-Base Course 7,855.00 cu.m. - 257.75
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days - sq.m - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 12,779.00 sq.m 72.87 1,551.02
400(10) Steel H-Piles, Driven 1,320.00 ln.m. - 18.00
400(27)b Pile Integrity Test (PIT), Low Strain 18.00 ln.m. - 10.00
400(28) High Strain Dynamic Testing (PDA) 10.00 each - 1,320.00
400 (3) Steel H-Piles, Furnished 1,320.00 each - -
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 ln.m. - 414.00
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 414.00 ln.m. - 1,020.00
401(2)a Concrete Railing - Standard 1,020.00 ln.m - -
403(24)a1 Structural Steel, Furnished (Craneway & Platform) 402,056.57 kgs - -
403(3) Structural Steel, Erected (Craneway & Platform) 402,056.57 kgs - -
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 kgs - -
404(1)a Reinforcing Steel (Grade 40) 56,631.11 kgs - 3,152.74
404(1)b Reinforcing Steel (Grade 60) 673,154.40 kgs - 2,927.41
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 3,025.41 cu.m. - 68.00
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 each - 1.00
409(1) Welded Structural Steel 1.00 each - -
411(1) Paint 3,326.11 sq.m. 663.16 2,787.37
412(1) Elastomeric Bearing Pads 40.00 each - -
413(4)a Expansion Joint 60.00 each - -
413(1)a Premolded Expansion Joint Filler with sealant 1.79 ln.m. - 1,900.00
505(5) Grouted Riprap, Class "A" 2,234.14 cu.m. 19.30 245.38
506(1) Stone Masonry 1,106.77 cu.m. 2.51 104.91
511(1) Gabion 504.00 cu.m. 22.05 280.35
511(3) Filter Cloth 504.00 sq.m 19.76 251.18
517(1) Drain Pipe 136.00 ln.m - -
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 ln.m 247.92 1,027.08
603(4)b Metal Beam End Piece, Bull Nose 10.00 each 2.33 9.67
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahead 2.00 each - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction 3.00 each - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs 2.00 each - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 each - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED 3.00 each - -
612(1) Reflectorized Pavement Markings (White) 502.00 sq.m. 117.13 485.27
612(2) Reflectorized Pavement Markings (Yellow) 262.00 sq.m. 61.13 253.27
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 sq.m. 12.60 52.20
620(1)b Chevron Signs - 600mm x 800mm 8.00 each - -

PREPARED BY : SUBMITTED BY:

GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Project Quality Assurance Engineer Project Engineer

Note : To be Submitted every quarter of the month


1st report
2nd report
3rd report
4th report x
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
Baggao, Cagayan

CERTIFICATE OF QUALITY CONTROL ASSURANCE

NAME OF PROJECT :18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along
Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE April 24, 2022

We hereby certify that we have conducted inspection on the work accomplished on the above mentioned
project for the period of April 23, 2022

We further certify that the quality of materials in the following items of work corresponding to the quality accoplished conform to standard Spefication and Special Provision of Contract, to viz,
however, the result of test shall prevail.

Accomplishments
ITEM NO. DESCRIPTION Program Quantities Unit
This Week To Date
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 L.S. - 1.00
A.1.1(15) Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer 39.83 mos. 0.03 36.77

A.1.1(6)
Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis) 39.83 mos. 0.03 35.77
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 each - 29.77
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer 29.77 mos. - 29.77
A.1.4(1) Provision of Progress Photographs 29.77 mos. - -
B.11 Provisional Sum - PS. - 288.50
B.19 Geotechnical Exploration 288.50 Ln.m - -
B.5 Project Billboard/Signboard 4.00 each - 33.77
B.7 Occupational Safety and Health Program 39.83 mos. 0.03 32.77
B.8 Traffic Management 29.77 mos. - 0.50
B.9 Mobilization/Demobilization 1.00 L.S. - 824.00
101(6) Removal of Actual Structures / Obstruction - Concrete 824.00 cu.m. - 4,681.00
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 4,811.00 sq.m - -
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete
101(6)
Piles)
Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) 624.00 cu.m. - 367,117.57
101(7)a for Detourof/ Craneway
Removal & Platform
Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana 367,117.57 kgs - 124,080.00
101(7)b Stockyard for Detour / Craneway & Platform) 124,080.00 kgs - -
104(1)a Embankment - from Roadway Excavation (Common Soil) 2,418.40 cu.m. - -
104(2)a Embankment - from Borrow (Common Soil) 31,470.56 cu.m. - -
104(2)d Embankment - from Borrow Granular Course Materials 1,435.00 cu.m. - -
105(1)a Subgrade Preparation - Common Materials 10,382.00 sq.m - 42.80
200(1) Aggregate Sub-Base Course 7,855.00 cu.m. - 257.75
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days - sq.m - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 12,779.00 sq.m 10.41 1,561.43
400(10) Steel H-Piles, Driven 1,320.00 ln.m. - 18.00
400(27)b Pile Integrity Test (PIT), Low Strain 18.00 ln.m. - 10.00
400(28) High Strain Dynamic Testing (PDA) 10.00 each - 1,320.00
400 (3) Steel H-Piles, Furnished 1,320.00 each - -
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 ln.m. - 414.00
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 414.00 ln.m. - 1,020.00
401(2)a Concrete Railing - Standard 1,020.00 ln.m - -
403(24)a1 Structural Steel, Furnished (Craneway & Platform) 402,056.57 kgs - -
403(3) Structural Steel, Erected (Craneway & Platform) 402,056.57 kgs - -
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 kgs - -
404(1)a Reinforcing Steel (Grade 40) 56,631.11 kgs - 3,152.74
404(1)b Reinforcing Steel (Grade 60) 673,154.40 kgs - 2,927.41
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 3,025.41 cu.m. - 68.00
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 each - 1.00
409(1) Welded Structural Steel 1.00 each - -
411(1) Paint 3,326.11 sq.m. 94.74 2,882.11
412(1) Elastomeric Bearing Pads 40.00 each - -
413(4)a Expansion Joint 60.00 each - -
413(1)a Premolded Expansion Joint Filler with sealant 1.79 ln.m. - 1,900.00
505(5) Grouted Riprap, Class "A" 2,234.14 cu.m. 2.76 248.14
506(1) Stone Masonry 1,106.77 cu.m. 0.36 105.27
511(1) Gabion 504.00 cu.m. 3.15 283.50
511(3) Filter Cloth 504.00 sq.m 2.82 254.00
517(1) Drain Pipe 136.00 ln.m - -
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 ln.m 35.42 1,062.50
603(4)b Metal Beam End Piece, Bull Nose 10.00 each 0.33 10.00
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahead 2.00 each - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction 3.00 each - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs 2.00 each - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 each - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED 3.00 each - -
612(1) Reflectorized Pavement Markings (White) 502.00 sq.m. 16.73 502.00
612(2) Reflectorized Pavement Markings (Yellow) 262.00 sq.m. 8.73 262.00
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 sq.m. 1.80 54.00
620(1)b Chevron Signs - 600mm x 800mm 8.00 each - -

PREPARED BY : SUBMITTED BY:

GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Project Quality Assurance Engineer Project Engineer

Note : To be Submitted every quarter of the month


1st report
2nd report
3rd report
4th report x
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
Baggao, Cagayan

SUMMARY OF WEEKLY CERTIFICATE OF QUALITY CONTROL ASSURANCE

NAME OF PROJECT :18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges
- Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE April 24, 2022
We hereby certify that we have conducted an inspection and verification on work accomplishment on the above - mentioned project
for the period
March 24 - April 23, 2022

We further certify that we have found that the quality of materials in the following items of work corresponding to the
quantity accomplished conforms with the Standard Specifications and Special Provisions of the Contract:

WEEKLY QUANTITY ACCOMPLISHED


ITEM NO. DESCRIPTION
24 - 30 1-7 8 - 15 16 - 22 23 TOTAL
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers - - - - - -
Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for
A.1.1(15) the Engineer 0.23 0.23 0.27 0.23 0.03 1.00
Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer
A.1.1(6) (Rental Basis) 0.23 0.23 0.27 0.23 0.03 1.00
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer - - - - - -
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer - - - - - -
A.1.4(1) Provision of Progress Photographs - - - - - -
B.11 Provisional Sum - - - - - -
B.19 Geotechnical Exploration - - - - - -
B.5 Project Billboard/Signboard - - - - - -
B.7 Occupational Safety and Health Program 0.23 0.23 0.27 0.23 0.03 1.00
B.8 Traffic Management - - - - - -
B.9 Mobilization/Demobilization - - - - - -
101(6) Removal of Actual Structures / Obstruction - Concrete - - - - - -
101(3)b3 Removal of Actual Structures / Obstruction - PCCP - - - - - -
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed
101(6)
Reinforced
Removal of Concrete Piles) / Obstruction - Steel (Dismantling & Hauling from Project Site to
Actual Structures - - - - - -
101(7)a Lingu, Solana
Removal Stockyard)
of Actual for Detour
Structures / Craneway
/ Obstruction - Steel& H-Piles
Platform(Retrieve & Hauling from Project Site to - - - - - -
101(7)b Lingu, Solana Stockyard for Detour / Craneway & Platform) - - - - - -
104(1)a Embankment - from Roadway Excavation (Common Soil) - - - - - -
104(2)a Embankment - from Borrow (Common Soil) - - - - - -
104(2)d Embankment - from Borrow Granular Course Materials - - - - - -
105(1)a Subgrade Preparation - Common Materials - - - - - -
200(1) Aggregate Sub-Base Course - - - - - -
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days - - - - - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 72.87 72.87 83.28 72.87 10.41 312.29
400(10) Steel H-Piles, Driven - - - - - -
400(27)b Pile Integrity Test (PIT), Low Strain - - - - - -
400(28) High Strain Dynamic Testing (PDA) - - - - - -
400 (3) Steel H-Piles, Furnished - - - - - -
400(23)a13 Bored Piles (2200mm diameter) - - - - - -
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) - - - - - -
401(2)a Concrete Railing - Standard - - - - - -
403(24)a1 Structural Steel, Furnished (Craneway & Platform) - - - - - -
403(3) Structural Steel, Erected (Craneway & Platform) - - - - - -
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) - - - - - -
404(1)a Reinforcing Steel (Grade 40) - - - - - -
404(1)b Reinforcing Steel (Grade 60) - - - - - -
405(1)b3 Structural Concrete Class "A", Fc'=28MPa - - - - - -
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) - - - - - -
409(1) Welded Structural Steel - - - - - -
411(1) Paint 663.16 663.16 757.90 663.16 94.74 2,842.11
412(1) Elastomeric Bearing Pads - - - - - -
413(4)a Expansion Joint - - - - - -
413(1)a Premolded Expansion Joint Filler with sealant - - - - - -
505(5) Grouted Riprap, Class "A" 19.30 19.30 22.06 19.30 2.76 82.71
506(1) Stone Masonry 2.51 2.51 2.87 2.51 0.36 10.77
511(1) Gabion 22.05 22.05 25.20 22.05 3.15 94.50
511(3) Filter Cloth 19.76 19.76 22.58 19.76 2.82 84.67
517(1) Drain Pipe - - - - - -
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 247.92 247.92 283.33 247.92 35.42 1,062.50
603(4)b Metal Beam End Piece, Bull Nose 2.33 2.33 2.67 2.33 0.33 10.00
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahea - - - - - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction - - - - - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs - - - - - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing - - - - - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED - - - - - -
612(1) Reflectorized Pavement Markings (White) 117.13 117.13 133.87 117.13 16.73 502.00
612(2) Reflectorized Pavement Markings (Yellow) 61.13 61.13 69.87 61.13 8.73 262.00
618(1) Reflectorized Thermoplastic Rumble Strips 12.60 12.60 14.40 12.60 1.80 54.00
620(1)b Chevron Signs - 600mm x 800mm - - - - - -

PREPARED BY : SUBMITTED BY:

GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Project Quality Assurance Engineer Project Engineer
SUMMARY REPORT OF LABORATORY TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

Specification Sampled Tested


Lab. No Kind of Materials Quantity Represented
Item No. By Date By Date At Results Specifications Remarks
.(1) (2) (3) (4) (5) (6) (7) (8) (9)

Prepared By: ` Checked by: Noted by:

JAY MAR T. ISORENA GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Materials Engineer - Contractor Materials Engineer - DPWH Project Engineer - DPWH
SUMMARY REPORT OF FIELD TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

Original Source of Tested


Lab. No Kind of Materials Kind of Test Station Represented
Materials By Date At Results Specifications Remarks
.(1) (2) (3) (4) (5) (6) (7) (8)

405(1)b3 Structural Concrete Class "A", Fc'=28MPa


18BO0053-G-CA-405(1)b3-11 Coarse Aggregate Penablanca, Cagayan Grading JEO Oct. 11, 2020 Project Site Sample meets the specification above 405

Prepared By: ` Checked by: Noted by:

JAY MAR T. ISORENA GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Materials Engineer - Contractor Materials Engineer - DPWH Project Engineer - DPWH
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

Sampled Tested Results


Quantity Original Source of Age Average
Lab. No Kind of Materials Part of Structure Station Reading Strength Specifications Remarks
Represented Materials By Date By Date At (Days) (MPa)
(KN) (MPa)

PART F- BRIDGE CONSTRUCTION


ABUSAG BRIDGE

405(1)b3 Structural Concrete Class "A", Fc'=28MPa


526.72 28.87
AWAITING FOR Coping Beam @ 27.6 Mpa
Concrete Cylinder Project Site A. Buscas Jul. 24, 2020 Aug. 12, 2020 DPWH-RO2 14 534.12 29.28 29.22 Passed
OFFICIAL REPORT Pier 5 @ 28 days
538.33 29.51
30
556.17 30.49
Coping Beam @ 27.6 Mpa
Concrete Cylinder Project Site A. Buscas Jul. 24, 2020 Aug. 27, 2020 DPWH-RO2 34 554.60 30.40 30.51 Passed
Pier 5 @ 28 days
558.66 30.63

425.59 23.33
AWAITING FOR Coping Beam @ 27.6 Mpa
Concrete Cylinder Project Site A. Buscas Jul. 31, 2020 Aug. 16, 2020 DPWH-RO2 14 542.51 29.74 27.24 Passed
OFFICIAL REPORT Pier 3 @ 28 days
522.50 28.64
30
536.30 29.40
Coping Beam @ 27.6 Mpa
Concrete Cylinder Project Site A. Buscas Jul. 31, 2020 Sep. 03, 2020 DPWH-RO2 34 529.08 29.00 29.19 Passed
Pier 3 @ 28 days
531.77 29.15

534.02 29.28
AWAITING FOR Column Pier 27.6 Mpa
Concrete Cylinder 36 Project Site A. Buscas Jul. 11, 2020 Aug. 12, 2020 DPWH-RO2 28 519.56 28.48 29.06 Passed
OFFICIAL REPORT #13 L/R @ 28 days
536.65 29.42

562.30 30.83
AWAITING FOR 27.6 Mpa
Concrete Cylinder 18 Project Site A. Buscas Jul. 28, 2020 Aug. 12, 2020 DPWH-RO2 14 Column Pier #11R 527.83 28.94 28.46 Passed
OFFICIAL REPORT @ 28 days
467.36 25.62
551.02 30.21
27.6 Mpa
Concrete Cylinder 18 Project Site A. Buscas Jul. 28, 2020 Aug. 27, 2020 DPWH-RO2 30 Column Pier #11R 537.20 29.45 29.75 Passed
@ 28 days
539.58 29.58

Prepared By: ` Checked by: Noted by:

JAY MAR T. ISORENA GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Materials Engineer - Contractor Materials Engineer - DPWH Project Engineer - DPWH
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

Sampled Tested Results


Quantity Original Source of Age Average
Lab. No Kind of Materials Part of Structure Station Reading Strength Specifications Remarks
Represented Materials By Date By Date At (Days) (MPa)
(KN) (MPa)

PART F- BRIDGE CONSTRUCTION


ABUSAG BRIDGE

405(1)b3 Structural Concrete Class "A", Fc'=28MPa

525.21 28.79
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 17, 2020 DPWH-RO2 12 482.99 26.48 25.24 Passed
OFFICIAL REPORT @ 28 days
Coping Beam @ 372.84 20.44
Concrete Cylinder 30 Project Site A. Buscas Aug. 05, 2020
Pier 6 579.14 31.75
AWAITING FOR 27.6 Mpa
B. Mallillin Sep. 03, 2020 DPWH-RO2 29 524.69 28.76 29.69 Passed
OFFICIAL REPORT @ 28 days
520.96 28.56

515.67 28.27
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 19, 2020 DPWH-RO2 11 423.25 23.20 26.56 Passed
OFFICIAL REPORT @ 28 days
Coping Beam @ 514.68 28.21
Concrete Cylinder 30 Project Site A. Buscas Aug. 08, 2020
Pier 2 580.29 31.81
AWAITING FOR 27.6 Mpa
B. Mallillin Sep. 08, 2020 DPWH-RO2 31 527.65 28.93 30.15 Passed
OFFICIAL REPORT @ 28 days
542.22 29.72

530.09 29.06
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 24, 2020 DPWH-RO2 7 521.53 28.59 28.88 Passed
OFFICIAL REPORT @ 28 days
Coping Beam @ 528.91 28.99
Concrete Cylinder 30 Project Site A. Buscas Aug. 17, 2020
Pier 1 516.39 28.31
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 43 531.67 29.15 28.96
@ 28 days
536.62 29.42

508.62 27.88
AWAITING FOR 27.6 Mpa
B. Mallillin Sep. 03, 2020 DPWH-RO2 8 527.75 28.93 28.60 Passed
OFFICIAL REPORT @ 28 days
Coping Beam @ 528.81 28.99
Concrete Cylinder 30 Project Site A. Buscas Aug. 26, 2020
Pier 9 537.60 29.47
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 34 537.24 29.45 28.99
@ 28 days
511.80 28.06

356.97 19.57
27.6 Mpa
B. Mallillin Sep. 03, 2020 DPWH-RO2 10 375.04 20.56 21.43 Passed
@ 28 days
Coping Beam @ 440.62 24.15
Concrete Cylinder 30 Project Site A. Buscas Aug. 24, 2020
Pier 8 525.82 28.83
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 36 540.11 29.61 29.60
@ 28 days
554.01 30.37
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

501.66 27.50
27.6 Mpa
B. Mallillin Sep. 03, 2020 DPWH-RO2 7 530.45 29.08 28.51 Passed
@ 28 days
PC Coping Beam 528.29 28.96
Concrete Cylinder 9 Project Site A. Buscas Aug. 27, 2020
@ Pier 13 548.02 30.04
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 33 547.63 30.02 29.99
@ 28 days
545.59 29.91

524.74 28.77
27.6 Mpa
B. Mallillin Sep. 08, 2020 DPWH-RO2 7 553.28 30.33 29.23 Passed
@ 28 days
Coping Beam @ 521.33 28.58
Concrete Cylinder 30 Project Site A. Buscas Sep. 01, 2020
Pier 7 533.56 29.25
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 28 544.69 29.86 29.52
@ 28 days
537.01 29.44

522.96 28.67
27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 21 577.35 31.65 29.89 Passed
@ 28 days
PC Coping Beam 535.59 29.36
Concrete Cylinder 10 Project Site A. Buscas Sep. 10, 2020
@ Pier 10 0.00
27.6 Mpa
B. Mallillin Oct. 08, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00

497.18 27.26
27.6 Mpa
Concrete Cylinder 18 Project Site A. Buscas Sep. 19, 2020 B. Mallillin Oct. 01, 2020 DPWH-RO2 12 518.16 28.41 28.05
@ 28 days
519.59 28.48

445.57 24.43
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 17, 2020 DPWH-RO2 12 493.83 27.07 26.14 Passed
OFFICIAL REPORT @ 28 days
Column Pier 491.29 26.93
Concrete Cylinder 18 Project Site A. Buscas Aug. 05, 2020
#9 R 602.34 33.02
27.6 Mpa
B. Mallillin Sep. 03, 2020 DPWH-RO2 29 479.64 26.29 29.96 Passed
@ 28 days
557.61 30.57

305.14 16.73
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 19, 2020 DPWH-RO2 7 459.72 25.20 22.75
OFFICIAL REPORT @ 28 days
Column Pier 480.36 26.33
Concrete Cylinder 18 Project Site A. Buscas Aug. 12, 2020
#9 L 527.28 28.91
27.6 Mpa
B. Mallillin Sep. 08, 2020 DPWH-RO2 27 578.13 31.69 30.11
@ 28 days
542.22 29.72

530.21 29.07
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 24, 2020 DPWH-RO2 11 532.05 29.17 29.22 Passed
OFFICIAL REPORT @ 28 days
Column Pier 536.75 29.42
Concrete Cylinder 18 Project Site A. Buscas Aug. 13, 2020
Abutment b L 530.63 29.09
27.6 Mpa
B. Mallillin Sep. 11, 2020 DPWH-RO2 29 533.64 29.25 29.37
@ 28 days
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan Column Pier


Concrete Cylinder 18 Project Site A. Buscas Aug. 13, 2020
CONTRACTOR FREY-FIL CORPORATION Abutment b L
27.6 Mpa
PERIOD March 24 - April 23, 2022 B. Mallillin Sep. 11, 2020 DPWH-RO2 29 29.37
@ 28 days
543.23 29.78
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

613.89 33.65
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 24, 2020 DPWH-RO2 10 521.71 28.60 29.60 Passed
OFFICIAL REPORT @ 28 days
Column Pier 484.43 26.56
Concrete Cylinder 18 Project Site A. Buscas Aug. 14, 2020
Abutment A R 519.16 28.46
27.6 Mpa
B. Mallillin Sep. 11, 2020 DPWH-RO2 28 519.28 28.47 28.45
@ 28 days
518.68 28.43

526.30 28.85
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 24, 2020 DPWH-RO2 4 538.10 29.50 29.76 Passed
OFFICIAL REPORT @ 28 days
Column Pier 564.20 30.93
Concrete Cylinder 18 Project Site A. Buscas Aug. 20, 2020
#7 L 530.63 29.09
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 40 583.64 32.00 30.29
@ 28 days
543.23 29.78

528.29 28.96
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 27, 2020 DPWH-RO2 5 516.20 28.30 29.04 Passed
OFFICIAL REPORT @ 28 days
Column Pier 544.80 29.87
Concrete Cylinder 18 Project Site A. Buscas Aug. 22, 2020
Abutment B L 530.63 29.09
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 38 583.64 32.00 30.29
@ 28 days
543.23 29.78

537.79 29.48
AWAITING FOR 27.6 Mpa
B. Mallillin Sep. 03, 2020 DPWH-RO2 7 435.57 23.88 27.78 Passed
OFFICIAL REPORT @ 28 days
Column Pier 546.67 29.97
Concrete Cylinder 18 Project Site A. Buscas Aug. 27, 2020
#15 L 549.08 30.10
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 33 547.96 30.04 29.96
@ 28 days
542.33 29.73

527.64 28.93
AWAITING FOR 27.6 Mpa
B. Mallillin Sep. 08, 2020 DPWH-RO2 6 524.35 28.74 28.78 Passed
OFFICIAL REPORT @ 28 days
Column Pier 522.84 28.66
Concrete Cylinder 18 Project Site A. Buscas Sep. 02, 2020
#14 R 542.73 29.75
27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 29 532.93 29.22 29.81
@ 28 days
555.90 30.47

519.99 28.51
AWAITING FOR 27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 17 518.08 28.40 28.52 Passed
OFFICIAL REPORT @ 28 days
Column Pier 522.81 28.66
Concrete Cylinder 18 Project Site A. Buscas Sep. 14, 2020
#10 R/L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44088 0.00 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

535.60 29.36
AWAITING FOR 27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 14 516.98 28.34 28.88 Passed
OFFICIAL REPORT @ 28 days
Column Pier 527.68 28.93
Concrete Cylinder 18 Project Site A. Buscas Sep. 17, 2020
#12 R/L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44091 0.00 0.00
@ 28 days
0.00

0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44093 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 19, 2020
#11 L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44093 0.00 0.00
@ 28 days
0.00

0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44096 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 22, 2020
#16 R/L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44096 0.00 0.00
@ 28 days
0.00

0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44099 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 25, 2020
#14 L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44099 0.00 0.00
@ 28 days
0.00

0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44102 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier @ 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 28, 2020
ABUTMENT BR 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44102 0.00 0.00
@ 28 days
0.00

0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier @ 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 30, 2020
ABUTMENT A L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 30, 2020
#15 R 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Sep. 16, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 09, 2020 Embedment @
Pier 11 L 0.00
27.6 Mpa
B. Mallillin Oct. 07, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Sep. 16, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 09, 2020 Embedment @
Pier 12 R/ L 0.00
27.6 Mpa
B. Mallillin Oct. 07, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Sep. 26, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 19, 2020 Embedment @
Pier 16 R/ L 0.00
27.6 Mpa
B. Mallillin Oct. 17, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Sep. 28, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 21, 2020 Embedment @
Pier 14 L 0.00
27.6 Mpa
B. Mallillin Oct. 19, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Sep. 30, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 23, 2020 Embedment @
ABUTMENT B R 0.00
27.6 Mpa
B. Mallillin Oct. 21, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

0.00
27.6 Mpa
B. Mallillin Oct. 02, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 25, 2020 Embedment @
ABUTMENT A L 0.00
27.6 Mpa
B. Mallillin Oct. 23, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Oct. 02, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 25, 2020 Embedment @
Pier 15 R 0.00
27.6 Mpa
B. Mallillin Oct. 23, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00

Prepared By: ` Checked by: Noted by:

JAY MAR T. ISORENA GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Materials Engineer - Contractor Materials Engineer - DPWH Project Engineer - DPWH
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

Sampled Tested Results


Quantity Original Source of Age Average
Lab. No Kind of Materials Part of Structure Station Reading Strength Specifications Remarks
Represented Materials By Date By Date At (Days) (MPa)
(KN) (MPa)

PART F- BRIDGE CONSTRUCTION


ABUSAG BRIDGE

405(1)b3 Structural Concrete Class "A", Fc'=28MPa

501.66 27.50
27.6 Mpa
B. Mallillin Sep. 03, 2020 DPWH-RO2 7 530.45 29.08 28.51 Passed
@ 28 days
PC Coping Beam 528.29 28.96
Concrete Cylinder 9 Project Site A. Buscas Aug. 27, 2020
@ Pier 13 548.02 30.04
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 33 547.63 30.02 29.99 Passed
@ 28 days
545.59 29.91

0.00
27.6 Mpa
B. Mallillin Oct. 09, 2020 DPWH-RO2 7 0.00 0.00 Passed
Coping Beam @ @ 28 days
0.00
Concrete Cylinder 21 Project Site A. Buscas Oct. 02, 2020 Pier 13
(Internal) 0.00
27.6 Mpa
B. Mallillin Oct. 30, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00

524.74 28.77
27.6 Mpa
B. Mallillin Sep. 08, 2020 DPWH-RO2 7 553.28 30.33 29.23 Passed
@ 28 days
Coping Beam @ 521.33 28.58
Concrete Cylinder 30 Project Site A. Buscas Sep. 01, 2020
Pier 7 533.56 29.25
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 28 544.69 29.86 29.52
@ 28 days
537.01 29.44

522.96 28.67
27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 21 577.35 31.65 29.89 Passed
@ 28 days
PC Coping Beam 535.59 29.36
Concrete Cylinder 10 Project Site A. Buscas Sep. 10, 2020
@ Pier 10 526.61 28.87
27.6 Mpa
B. Mallillin Oct. 08, 2020 DPWH-RO2 28 480.09 26.32 28.13 Passed
@ 28 days
532.94 29.22

497.18 27.26
27.6 Mpa
Concrete Cylinder 18 Project Site A. Buscas Sep. 19, 2020 B. Mallillin Oct. 01, 2020 DPWH-RO2 12 518.16 28.41 28.05
@ 28 days
519.59 28.48
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022
537.79 29.48
AWAITING FOR 27.6 Mpa
B. Mallillin Sep. 03, 2020 DPWH-RO2 7 435.57 23.88 27.78 Passed
OFFICIAL REPORT @ 28 days
Column Pier 546.67 29.97
Concrete Cylinder 18 Project Site A. Buscas Aug. 27, 2020
#15 L 549.08 30.10
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 33 547.96 30.04 29.96
@ 28 days
542.33 29.73

527.64 28.93
AWAITING FOR 27.6 Mpa
B. Mallillin Sep. 08, 2020 DPWH-RO2 6 524.35 28.74 28.78 Passed
OFFICIAL REPORT @ 28 days
Column Pier 522.84 28.66
Concrete Cylinder 18 Project Site A. Buscas Sep. 02, 2020
#14 R 542.73 29.75
27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 29 532.93 29.22 29.81
@ 28 days
555.90 30.47

519.99 28.51
AWAITING FOR 27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 17 518.08 28.40 28.52 Passed
OFFICIAL REPORT @ 28 days
Column Pier 522.81 28.66
Concrete Cylinder 18 Project Site A. Buscas Sep. 14, 2020
#10 R/L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44088 0.00 0.00
@ 28 days
0.00

535.60 29.36
AWAITING FOR 27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 14 516.98 28.34 28.88 Passed
OFFICIAL REPORT @ 28 days
Column Pier 527.68 28.93
Concrete Cylinder 18 Project Site A. Buscas Sep. 17, 2020
#12 R/L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44091 0.00 0.00
@ 28 days
0.00

0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44093 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 19, 2020
#11 L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44093 0.00 0.00
@ 28 days
0.00

0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44096 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 22, 2020
#16 R/L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44096 0.00 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022
0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44099 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier 0.00
Concrete Cylinder 16 Project Site A. Buscas Sep. 25, 2020
#14 L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44099 0.00 0.00
@ 28 days
0.00

0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44102 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier @ 0.00
Concrete Cylinder 16 Project Site A. Buscas Sep. 28, 2020
ABUTMENT BR 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44102 0.00 0.00
@ 28 days
0.00

0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier @ 0.00
Concrete Cylinder 16 Project Site A. Buscas Sep. 30, 2020
ABUTMENT A L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00
@ 28 days
0.00

0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier 0.00
Concrete Cylinder 16 Project Site A. Buscas Sep. 30, 2020
#15 R 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00
@ 28 days
0.00

489.50 26.83
27.6 Mpa
Concrete Cylinder 9 Project Site A. Buscas Sep. 07, 2020 B. Mallillin Oct. 08, 2020 DPWH-RO2 31 547.71 30.03 28.75 Passed
@ 28 days
536.28 29.40

530.42 29.08
27.6 Mpa
Concrete Cylinder 9 Project Site A. Buscas Sep. 09, 2020 B. Mallillin Oct. 08, 2020 DPWH-RO2 29 512.95 28.12 28.89 Passed
@ 28 days
537.83 29.48

526.72 28.87
27.6 Mpa
Concrete Cylinder 9 Project Site A. Buscas Sep. 09, 2020 B. Mallillin Oct. 08, 2020 DPWH-RO2 29 522.32 28.63 28.83 Passed
@ 28 days
528.41 28.97
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022
0.00
27.6 Mpa
B. Mallillin Sep. 26, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 19, 2020 Embedment @
Pier 16 R/ L 0.00
27.6 Mpa
B. Mallillin Oct. 17, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Sep. 28, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 21, 2020 Embedment @
Pier 14 L 0.00
27.6 Mpa
B. Mallillin Oct. 19, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Sep. 30, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 23, 2020 Embedment @
ABUTMENT B R 0.00
27.6 Mpa
B. Mallillin Oct. 21, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Oct. 02, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 7.5 Project Site A. Buscas Sep. 25, 2020 Embedment @
ABUTMENT A L 0.00
27.6 Mpa
B. Mallillin Oct. 23, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Oct. 02, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 7.5 Project Site A. Buscas Sep. 25, 2020 Embedment @
Pier 15 R 0.00
27.6 Mpa
B. Mallillin Oct. 23, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00

Prepared By: ` Checked by: Noted by:

JAY MAR T. ISORENA GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Materials Engineer - Contractor Materials Engineer - DPWH Project Engineer - DPWH
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

Sampled Tested Results


Quantity Original Source of Age Average
Lab. No Kind of Materials Part of Structure Station Reading Strength Specifications Remarks
Represented Materials By Date By Date At (Days) (MPa)
(KN) (MPa)

PART F- BRIDGE CONSTRUCTION


ABUSAG BRIDGE

405(1)b3 Structural Concrete Class "A", Fc'=28MPa


COPING BEAMS
0.00
27.6 Mpa
B. Mallillin Oct. 09, 2020 DPWH-RO2 7 0.00
@ 28 days
Precast Coping 0.00
Concrete Cylinder 6 Project Site A. Buscas Oct. 02, 2020
Beam @ Pier 14 0.00
27.6 Mpa
B. Mallillin Oct. 23, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

Precast Coping
24
Beam @ Pier 14

Precast Coping
6
Beam @ Pier 10

0.00
27.6 Mpa
B. Mallillin Oct. 16, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 24 Project Site A. Buscas Oct. 09, 2020
Pier 10 0.00
27.6 Mpa
B. Mallillin Oct. 30, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Oct. 31, 2020 DPWH-RO2 7 0.00
@ 28 days
Pre-Cast Coping 0.00
Concrete Cylinder 8.5 Project Site A. Buscas Oct. 24, 2020
Beam @ Abut. A 0.00
27.6 Mpa
B. Mallillin Nov. 21, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

0.00
27.6 Mpa
B. Mallillin Nov. 22, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 31 Project Site A. Buscas Nov. 15, 2020
Abut. A 0.00
27.6 Mpa
B. Mallillin Dec. 13, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Nov. 11, 2020 DPWH-RO2 7 0.00
@ 28 days
Pre-Cast Coping 0.00
Concrete Cylinder 8.5 Project Site A. Buscas Nov. 04, 2020
Beam @ Abut. B 0.00
27.6 Mpa
B. Mallillin Dec. 02, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Dec. 06, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 31 Project Site A. Buscas Nov. 29, 2020
Abut. B 0.00
27.6 Mpa
B. Mallillin Dec. 27, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

Precast Coping
6
Beam @ Pier 16

0.00
27.6 Mpa
B. Mallillin Nov. 29, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 24 Project Site A. Buscas Nov. 22, 2020
Pier 16 0.00
27.6 Mpa
B. Mallillin Dec. 20, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

B. Mallillin Nov. 26, 2020 DPWH-RO2 7


Precast Coping
Concrete Cylinder 6 Project Site A. Buscas Nov. 19, 2020
Beam @ Pier 15
B. Mallillin Dec. 17, 2020 DPWH-RO2 28
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

0.00
27.6 Mpa
0.00
@ 28 days
Coping Beam @ 0.00
24
Pier 15 0.00
27.6 Mpa
0.00
@ 28 days
0.00
END DIAPHRAGMS
0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 2 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 3 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 4 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 5 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Nov. 12, 2020 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas Nov. 05, 2020
Pier 6 0.00
27.6 Mpa
B. Mallillin Dec. 03, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 7 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
INTERMEDIATE DIAPHRAGMS
0.00
27.6 Mpa
B. Mallillin Nov. 28, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 21, 2020
2-3 0.00
27.6 Mpa
B. Mallillin Dec. 19, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Nov. 24, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 17, 2020
3-4 0.00
27.6 Mpa
B. Mallillin Dec. 15, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Nov. 12, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 05, 2020
4-5 0.00
27.6 Mpa
B. Mallillin Dec. 03, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

0.00
27.6 Mpa
B. Mallillin Nov. 04, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Oct. 28, 2020
5-6 0.00
27.6 Mpa
B. Mallillin Nov. 25, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Oct. 26, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Oct. 19, 2020
6-7 0.00
27.6 Mpa
B. Mallillin Nov. 16, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00

0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022
BACKWALLS
0.00
27.6 Mpa
0.00
@ 28 days
Abutment A 0.00
20 Nov. 22, 2020
Backwall 0.00
27.6 Mpa
0.00
@ 28 days
0.00

0.00
27.6 Mpa
0.00
@ 28 days
Abutment A 0.00
20
Backwall 0.00
27.6 Mpa
0.00
@ 28 days
0.00

0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
DECK SLAB
0.00
27.6 Mpa
0.00
Deck Slab @ @ 28 days
0.00
80 Span 5' - 6'
(30 m) 0.00
27.6 Mpa
0.00
@ 28 days
0.00

0.00
27.6 Mpa
Deck Slab @ 0.00
@ 28 days
Span 0.00
80
6' - 7' 0.00
(30 m) 27.6 Mpa
0.00
@ 28 days
0.00

0.00
27.6 Mpa
Deck Slab @ 0.00
@ 28 days
Span 0.00
80
7' - 8' 0.00
(30 m) 27.6 Mpa
0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00

Prepared By: ` Checked by: Noted by:

JAY MAR T. ISORENA GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Materials Engineer - Contractor Materials Engineer - DPWH Project Engineer - DPWH
SUMMARY OF PROJECT ENGINEER'S CERTIFICATE
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

Accomplishment
Contract
Item No. Description Unit Balance
Quantity Previous This Month Total

PART A - FACILITIES FOR THE ENGINEER

A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 -
L.S. 1.00 1.00 -
A.1.1(15) Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer 36.77 - 11.77
mos. 25.00 35.77 1.00
A.1.1(6) Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis) 36.77 - 11.77
mos. 25.00 35.77 1.00
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 -
each 1.00 1.00 -
A.1.2(6) Operation & Maintenance of Pick up Type Service Vehicle for the Engineer 29.77 - 4.77
mos. 25.00 29.77 -
A.1.4(1) Provision of Progress Photographs 29.77 - 4.77
mos. 25.00 29.77 -

PART B - OTHER GENERAL REQUIREMENTS

B.11 Provisional Sum - 1.00


PS. 1.00 - -
B.19 Geotechnical Exploration 288.50 - 48.50
Ln.m 240.00 288.50 -
B.5 Project Billboard/Signboard 4.00 -
each 4.00 4.00 -
B.7 Occupational Safety and Health Program 36.77 - 11.77
mos. 25.00 35.77 1.00
B.8 Traffic Management 29.77 - 4.77
mos. 25.00 29.77 -
B.9 Mobilization/Demobilization 0.50 0.50
L.S. 1.00 0.50 -
SUMMARY OF PROJECT ENGINEER'S CERTIFICATE
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

PART C - EARTHWORKS

101(3)b3 Removal of Actual Structures / Obstruction - PCCP 4,681.00 -


sq.m 4,681.00 4,681.00 -
101(6) Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete Piles) cu.m. 535.00 - - - 535.00
Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) for
101(7)a kgs 521,835.00 367,117.57 - 367,117.57 154,717.44
Detour / Craneway & Platform
Removal of Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana Stockyard for
101(7)b kgs 225,600.00 124,080.00 - 124,080.00 101,520.00
Detour / Craneway & Platform)
102(1) Excavation - 132.50
cu.m. 132.50 - -
102(2) Surplus Common Excavation - 393.19
cu.m. 393.19 - -
103(1)a Structure Excavation (common soil) - for drainage structure - 188.12
cu.m. 188.12 - -
103(3) Foundation Fill - 25.86
cu.m. 25.86 - -
104(1)a Embankment - from Roadway Excavation (Common Soil) 2,042.40 - 1,463.40
cu.m. 579.00 2,042.40 -

PART E - SURFACE COURSES

311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days - WATER


sq. m. 5,250.00

PART F - BRIDGE CONSTRUCTION

400(10) Steel H-Piles, Driven 1,320.00


ln.m. 2,400.00 1,200.00 -
400(23)a13 Bored Piles (2200mm diameter) - WATER
ln.m. 1,440.00
401(2)a Concrete Railing - Standard - WATER
ln.m 1,020.00
403(24)a1 Structural Stee, Furnished (Craneway & Platform) - MISCELANEOUS ITEMS 367,117.57
kgs 558,885.29 367,117.57 -
405(1)b3 Structural Concrete Class "A", Fc'=28MPa - WATER
cu.m. 2,873.98
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) - WATER
each 68.00
SUMMARY OF PROJECT ENGINEER'S CERTIFICATE
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022
SUMMARY OF PROJECT ENGINEER'S CERTIFICATE
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

PART G. DRAINAGE AND SLOPE PROTECTION STRUCTURES

505(2)a Grouted Riprap, Class "A" - WATER


cu.m. 2,345.00
506(1) Stone Masonry - WATER
cu.m. 3,072.00

Prepared By: ` Checked by: Noted by:

JAY MAR T. ISORENA GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Materials Engineer - Contractor Materials Engineer - DPWH Project Engineer - DPWH
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

Sampled Tested Results


Quantity Original Source of Age Average
Lab. No Kind of Materials Part of Structure Station Reading Strength Specifications Remarks
Represented Materials By Date By Date At (Days) (MPa)
(KN) (MPa)

PART F- BRIDGE CONSTRUCTION


ABUSAG BRIDGE

405(1)b3 Structural Concrete Class "A", Fc'=28MPa


COPING BEAMS
0.00
27.6 Mpa
B. Mallillin Oct. 09, 2020 DPWH-RO2 7 0.00
@ 28 days
Precast Coping 0.00
Concrete Cylinder 6 Project Site A. Buscas Oct. 02, 2020
Beam @ Pier 14 0.00
27.6 Mpa
B. Mallillin Oct. 23, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

Precast Coping
24
Beam @ Pier 14

Precast Coping
6
Beam @ Pier 10

0.00
27.6 Mpa
B. Mallillin Oct. 16, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 24 Project Site A. Buscas Oct. 09, 2020
Pier 10 0.00
27.6 Mpa
B. Mallillin Oct. 30, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Oct. 31, 2020 DPWH-RO2 7 0.00
@ 28 days
Pre-Cast Coping 0.00
Concrete Cylinder 8.5 Project Site A. Buscas Oct. 24, 2020
Beam @ Abut. A 0.00
27.6 Mpa
B. Mallillin Nov. 21, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

0.00
27.6 Mpa
B. Mallillin Nov. 22, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 31 Project Site A. Buscas Nov. 15, 2020
Abut. A 0.00
27.6 Mpa
B. Mallillin Dec. 13, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Nov. 11, 2020 DPWH-RO2 7 0.00
@ 28 days
Pre-Cast Coping 0.00
Concrete Cylinder 8.5 Project Site A. Buscas Nov. 04, 2020
Beam @ Abut. B 0.00
27.6 Mpa
B. Mallillin Dec. 02, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Dec. 06, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 31 Project Site A. Buscas Nov. 29, 2020
Abut. B 0.00
27.6 Mpa
B. Mallillin Dec. 27, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

Precast Coping
6
Beam @ Pier 16

0.00
27.6 Mpa
B. Mallillin Nov. 29, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 24 Project Site A. Buscas Nov. 22, 2020
Pier 16 0.00
27.6 Mpa
B. Mallillin Dec. 20, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

B. Mallillin Nov. 26, 2020 DPWH-RO2 7


Precast Coping
Concrete Cylinder 6 Project Site A. Buscas Nov. 19, 2020
Beam @ Pier 15
B. Mallillin Dec. 17, 2020 DPWH-RO2 28
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

0.00
27.6 Mpa
0.00
@ 28 days
Coping Beam @ 0.00
24
Pier 15 0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00

Prepared By: ` Checked by: Noted by:

JAY MAR T. ISORENA GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Materials Engineer - Contractor Materials Engineer - DPWH Project Engineer - DPWH
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

Sampled Tested Results


Quantity Original Source of Age Average
Lab. No Kind of Materials Part of Structure Station Reading Strength Specifications Remarks
Represented Materials By Date By Date At (Days) (MPa)
(KN) (MPa)

PART F- BRIDGE CONSTRUCTION


ABUSAG BRIDGE

405(1)b3 Structural Concrete Class "A", Fc'=28MPa


END DIAPHRAGMS
0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 2 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 3 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 4 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 5 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Nov. 12, 2020 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas Nov. 05, 2020
Pier 6 0.00
27.6 Mpa
B. Mallillin Dec. 03, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 7 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
INTERMEDIATE DIAPHRAGMS
0.00
27.6 Mpa
B. Mallillin Nov. 12, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 05, 2020
4-5 0.00
27.6 Mpa
B. Mallillin Dec. 03, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

0.00
27.6 Mpa
B. Mallillin Nov. 04, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Oct. 28, 2020
5-6 0.00
27.6 Mpa
B. Mallillin Nov. 25, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Oct. 26, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Oct. 19, 2020
6-7 0.00
27.6 Mpa
B. Mallillin Nov. 16, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00

0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022
BACKWALLS
0.00
27.6 Mpa
0.00
@ 28 days
Abutment A 0.00
20 Nov. 22, 2020
Backwall 0.00
27.6 Mpa
0.00
@ 28 days
0.00

0.00
27.6 Mpa
0.00
@ 28 days
Abutment A 0.00
20
Backwall 0.00
27.6 Mpa
0.00
@ 28 days
0.00

0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
DECK SLAB
0.00
27.6 Mpa
0.00
Deck Slab @ @ 28 days
0.00
Span 5' - 6'
(30 m) 0.00
27.6 Mpa
0.00
@ 28 days
0.00

0.00
27.6 Mpa
Deck Slab @ 0.00
@ 28 days
Span 0.00
6' - 7' 0.00
(30 m) 27.6 Mpa
0.00
@ 28 days
0.00

0.00
27.6 Mpa
Deck Slab @ 0.00
@ 28 days
Span 0.00
7' - 8' 0.00
(30 m) 27.6 Mpa
0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00

Prepared By: ` Checked by: Noted by:

JAY MAR T. ISORENA GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Materials Engineer - Contractor Materials Engineer - DPWH Project Engineer - DPWH
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

Sampled Tested Results


Quantity Original Source of Age Average
Lab. No Kind of Materials Part of Structure Station Reading Strength Specifications Remarks
Represented Materials By Date By Date At (Days) (MPa)
(KN) (MPa)

PART F- BRIDGE CONSTRUCTION


ABUSAG BRIDGE

405(1)b3 Structural Concrete Class "A", Fc'=28MPa

0.00
27.6 Mpa
B. Mallillin Nov. 26, 2020 DPWH-RO2 7 0.00
@ 28 days
Precast Coping 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 19, 2020
Beam @ Pier 15 0.00
27.6 Mpa
B. Mallillin Dec. 17, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

544.49 29.85
27.6 Mpa
B. Mallillin Dec. 15, 2020 DPWH-RO2 6 442.24 24.24 25.73
@ 28 days
Coping Beam @ 421.58 23.11
24 Dec. 09, 2020
Pier 15 0.00
27.6 Mpa
B. Mallillin Jan. 06, 2021 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
0.00
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
INTERMEDIATE DIAPHRAGMS
0.00
27.6 Mpa
B. Mallillin Nov. 28, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 21, 2020
2-3 0.00
27.6 Mpa
B. Mallillin Dec. 19, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Nov. 24, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 17, 2020
3-4 0.00
27.6 Mpa
B. Mallillin Dec. 15, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

0.00
27.6 Mpa
B. Mallillin Nov. 12, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 05, 2020
4-5 0.00
27.6 Mpa
B. Mallillin Dec. 03, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Nov. 04, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Oct. 28, 2020
5-6 0.00
27.6 Mpa
B. Mallillin Nov. 25, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
B. Mallillin Oct. 26, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Oct. 19, 2020
6-7 0.00
27.6 Mpa
B. Mallillin Nov. 16, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00

0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00

0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022
BACKWALLS
0.00
27.6 Mpa
0.00
@ 28 days
Abutment A 0.00
20 Nov. 22, 2020
Backwall 0.00
27.6 Mpa
0.00
@ 28 days
0.00

0.00
27.6 Mpa
0.00
@ 28 days
Abutment A 0.00
20
Backwall 0.00
27.6 Mpa
0.00
@ 28 days
0.00

0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
DECK SLAB
0.00
27.6 Mpa
0.00
Deck Slab @ @ 28 days
0.00
Span 5' - 6'
(30 m) 0.00
27.6 Mpa
0.00
@ 28 days
0.00

0.00
27.6 Mpa
Deck Slab @ 0.00
@ 28 days
Span 0.00
6' - 7' 0.00
(30 m) 27.6 Mpa
0.00
@ 28 days
0.00

0.00
27.6 Mpa
Deck Slab @ 0.00
@ 28 days
Span 0.00
7' - 8' 0.00
(30 m) 27.6 Mpa
0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00

Prepared By: ` Checked by: Noted by:

JAY MAR T. ISORENA GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Materials Engineer - Contractor Materials Engineer - DPWH Project Engineer - DPWH
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD March 24 - April 23, 2022

Sampled Tested Results


Quantity Original Source of Age Average
Lab. No Kind of Materials Part of Structure Station Reading Strength Specifications Remarks
Represented Materials By Date By Date At (Days) (MPa)
(KN) (MPa)

PART F- BRIDGE CONSTRUCTION


ABUSAG BRIDGE

405(1)b3 Structural Concrete Class "A", Fc'=28MPa


32.15 732.15
STA 0+000 - STA 550 psi @ 14
Concrete Beam 72 Project Site B. Saladino Apr. 05, 2021 J. Babaran Apr. 23, 2021 DPWH-RO2 18 PCCP RS 31.70 721.84 784.84 Passed
0+060 days
39.55 900.53

38.47 876.05
STA 0+020 - STA 550 psi @ 14
Concrete Beam 48 Project Site B. Saladino Apr. 12, 2021 J. Babaran Apr. 28, 2021 DPWH-RO2 16 PCCP LS 39.07 889.58 927.16 Passed
0+060 days
44.61 1,015.86

0.00
STA. 0+060 - STA. 550 psi @ 14
Concrete Beam 48 Project Site B. Saladino Apr. 27, 2021 J. Babaran DPWH-RO2 PCCP RS 0.00 0.00 Passed
0+100 days
0.00

0.00
STA. 0+060 - STA. 550 psi @ 14
Concrete Beam 48 Project Site B. Saladino Apr. 29, 2021 J. Babaran DPWH-RO2 PCCP LS 0.00 0.00 Passed
0+100 days
0.00

Prepared By: ` Checked by: Noted by:

JAY MAR T. ISORENA GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Materials Engineer - Contractor Materials Engineer - DPWH Project Engineer - DPWH
Total SEPTE
DESCRIPTION
Quanity 24 - 30
Operation & Maintenance of Temporary Field Office, Laboratory and Living
0.77
Quarters Building for the Engineer
Provision of Combined Field Office, Laboratory & Living Quarters Building for
0.77
the Engineer (Rental Basis)
Operation and Maintenance of 4x2 Pick Up Type Service Vehicle for the
0.77
Engineer
Provision of Progress Photographs 0.77
Occupational Safety and Health Program 0.77
Traffic Management 0.77

Removal of Actual Structures/Obstruction-Steel(Dismantling & Hauling from


183,558.78 21,415.19
Project Site to Lirgu, Solana Stockyard) for Detour/Craneway & Platform

Removal of Actual Structures/Obstruction-Steel H-Piles (Retrieve & Hauling


62,040.00 7,238.00
from Project Site to Lingu, Solana Stockyard) for Detour/Craneway & Platform

Embankment-from Roadway Excavation(Common Soil) 70.00


Aggregate Subbase Course 200.00 46.67
PCC Pavement (Unreinforced), 0.15mm thick, 14 days 572.00 133.47
PCC Pavement (Unreinforced), 0.28mm thick, 14 days 815.00 190.17
Concrete Railing Standard 280.00
Reinforcing Steel -Grade 40 1,154.41 134.68
Structural Concrete, Class "A" 28 Mpa 301.41 35.16
Expansion Joint 60.00 14.00
Premolded Expansion Joint Filler with Sealant, 1.79 0.42
Grouted Riprap A 200.00
Sheet Piles (Concrete) (Alignment B) 1,000.00
Filter Cloth 50.00 5.83
Drain Pipe 50.00 5.83
Reinforcing Steel Grade 40 Precast Wall Panel & Wall Cap 416.70
Reinforcing Steel Grade 60 Precast Wall Panel & Wall Cap 79.40
Structural Concrete Class "A" 30Mpa Precast Wall Panels & Wall Caps 50.25
SEPTEMBER
1-7 8 - 15 16 - 22 23

0
0.23 0.31 0.23 0
0.23 0.31 0.23 0
0.23 0.31 0.23 0

21,415.19 24,474.50 21,415.19 3,059.31


0

7,238.00 8,272.00 7,238.00 1,034.00


0
0
46.67 53.33 46.67 6.67 0
133.47 152.53 133.47 19.07 0
190.17 217.33 190.17 27.17 0
0
134.68 153.92 134.68 19.24 0
35.16 40.19 35.16 5.02 0
14.00 16.00 14.00 2.00 0
0.42 0.48 0.42 0.06 0
0
0
5.83 6.67 5.83 0.83 0
5.83 6.67 5.83 0.83 0
-416.7
-79.4
-50.25