NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers
A.1.1(11) 1.00 1.00 L.S. PEC 1.00 - 1.00 1.00 1.00 -
MTC - - - - - -
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 1,062.50 ln.m - - 1,062.50 1,062.50 - - -
a. Metal Guardrail 1,062.50 ln.m QT 1.00 - - - - 1.00
IR - - - - 1 1.00 - 1.00
b. Post 390.00 each IR - - - - 1 1.00 - 1.00
603(4)b Metal Beam End Piece, Bull Nose 10.00 10.00 each QT 1.00 - 10.00 10.00 - 1 1.00 -
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs 2.00 2.00 each QT 1.00 - - - - - 1.00
605(1)aj2 Pedestrian
Warning Crossing
Signs, 600mmAhead
x 600mm, W2-4B, Intersection and Junction Signs T- 3.00 3.00 each QT 1.00 - - - - - 1.00
605(2)ag3 Junction
Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension 2.00 2.00 each QT 1.00 - - - - - 1.00
605(2)ai2 Restriction
Regulatory Signs
Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 4.00 each QT 1.00 - - - - - 1.00
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs 3.00 3.00 each QT 1.00 - - - - - 1.00
612(1) REDUCE SPEED
Reflectorized Thermoplastic Pavement Markings (White) 498.00 502.00 sq.m - - 502.00 502.00 - - -
a. Thermoplastic Paint White 161.85 161.85 bags QT 3.00 - 502.00 502.00 - 3 3.00 -
b. Glass Beads 16.43 16.43 bags QT 1.00 - - - 1 1.00 -
c. Primer White 59.76 59.76 liters QT 1.00 - - - 1 1.00 -
612(2) Reflectorized Thermoplastic Pavement Markings (Yellow) 262.00 262.00 sq.m - - 262.00 262.00 - - -
a. Thermoplastic Paint White 85.15 85.15 bags QT 1.00 - - - 1 1.00 -
b. Glass Beads 8.65 8.65 bags included in ITEM 612(1) - - - - -
c. Primer Yellow 31.44 31.44 liters QT 1.00 - - - 1 1.00 -
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 54.00 sq.m QT 1.00 - 54.00 54.00 - 1 1.00 -
a. Thermoplastic Paint White 49.00 49.00 bags included in ITEM 612(1) - - - - -
b. Glass Beads 4.98 4.98 bags included in ITEM 612(1) - - - - -
c. Primer Yellow 18.12 18.12 liters included in ITEM 612(2) - - - - -
620(1)b Chevron Signs - 600mm x 800mm 8.00 8.00 each QT 1.00 - - - - - 1.00
NAME OF PROJECT :18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along
Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE April 2, 2022
We hereby certify that we have conducted inspection on the work accomplished on the above mentioned
project for the period of March 24 - 30, 2022
We further certify that the quality of materials in the following items of work corresponding to the quality accoplished conform to standard Spefication and Special Provision of Contract, to viz,
however, the result of test shall prevail.
Accomplishments
ITEM NO. DESCRIPTION Program Quantities Unit
This Week To Date
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 L.S. - 1.00
A.1.1(15) Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer 39.83 mos. 0.23 36.00
A.1.1(6) Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis) 39.83 mos. 0.23 35.00
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 each - 29.77
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer 29.77 mos. - 29.77
A.1.4(1) Provision of Progress Photographs 29.77 mos. - -
B.11 Provisional Sum - PS. - 288.50
B.19 Geotechnical Exploration 288.50 Ln.m - -
B.5 Project Billboard/Signboard 4.00 each - 33.77
B.7 Occupational Safety and Health Program 39.83 mos. 0.23 32.00
B.8 Traffic Management 29.77 mos. - 0.50
B.9 Mobilization/Demobilization 1.00 L.S. - 824.00
101(6) Removal of Actual Structures / Obstruction - Concrete 824.00 cu.m. - 4,681.00
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 4,811.00 sq.m - -
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete
101(6)
Piles)
Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) 624.00 cu.m. - 367,117.57
101(7)a for Detourof/ Craneway
Removal & Platform
Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana 367,117.57 kgs - 124,080.00
101(7)b Stockyard for Detour / Craneway & Platform) 124,080.00 kgs - -
104(1)a Embankment - from Roadway Excavation (Common Soil) 2,418.40 cu.m. - -
104(2)a Embankment - from Borrow (Common Soil) 31,470.56 cu.m. - -
104(2)d Embankment - from Borrow Granular Course Materials 1,435.00 cu.m. - -
105(1)a Subgrade Preparation - Common Materials 10,382.00 sq.m - 42.80
200(1) Aggregate Sub-Base Course 7,855.00 cu.m. - 257.75
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days - sq.m - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 12,779.00 sq.m 72.87 1,322.01
400(10) Steel H-Piles, Driven 1,320.00 ln.m. - 18.00
400(27)b Pile Integrity Test (PIT), Low Strain 18.00 ln.m. - 10.00
400(28) High Strain Dynamic Testing (PDA) 10.00 each - 1,320.00
400 (3) Steel H-Piles, Furnished 1,320.00 each - -
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 ln.m. - 414.00
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 414.00 ln.m. - 1,020.00
401(2)a Concrete Railing - Standard 1,020.00 ln.m - -
403(24)a1 Structural Steel, Furnished (Craneway & Platform) 402,056.57 kgs - -
403(3) Structural Steel, Erected (Craneway & Platform) 402,056.57 kgs - -
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 kgs - -
404(1)a Reinforcing Steel (Grade 40) 56,631.11 kgs - 3,152.74
404(1)b Reinforcing Steel (Grade 60) 673,154.40 kgs - 2,927.41
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 3,025.41 cu.m. - 68.00
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 each - 1.00
409(1) Welded Structural Steel 1.00 each - -
411(1) Paint 3,326.11 sq.m. 663.16 703.16
412(1) Elastomeric Bearing Pads 40.00 each - -
413(4)a Expansion Joint 60.00 each - -
413(1)a Premolded Expansion Joint Filler with sealant 1.79 ln.m. - 1,900.00
505(5) Grouted Riprap, Class "A" 2,234.14 cu.m. 19.30 184.73
506(1) Stone Masonry 1,106.77 cu.m. 2.51 97.01
511(1) Gabion 504.00 cu.m. 22.05 211.05
511(3) Filter Cloth 504.00 sq.m 19.76 189.09
517(1) Drain Pipe 136.00 ln.m - -
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 ln.m 247.92 247.92
603(4)b Metal Beam End Piece, Bull Nose 10.00 each 2.33 2.33
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahead 2.00 each - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction 3.00 each - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs 2.00 each - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 each - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED 3.00 each - -
612(1) Reflectorized Pavement Markings (White) 502.00 sq.m. 117.13 117.13
612(2) Reflectorized Pavement Markings (Yellow) 262.00 sq.m. 61.13 61.13
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 sq.m. 12.60 12.60
620(1)b Chevron Signs - 600mm x 800mm 8.00 each - -
NAME OF PROJECT :18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along
Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE April 8, 2022
We hereby certify that we have conducted inspection on the work accomplished on the above mentioned
project for the period of April 1 - 7, 2022
We further certify that the quality of materials in the following items of work corresponding to the quality accoplished conform to standard Spefication and Special Provision of Contract, to viz,
however, the result of test shall prevail.
Accomplishments
ITEM NO. DESCRIPTION Program Quantities Unit
This Week To Date
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 L.S. - 1.00
A.1.1(15) Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer 39.83 mos. 0.23 36.24
A.1.1(6) Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis)
39.83 mos. 0.23 35.24
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 each - 29.77
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer 29.77 mos. - 29.77
A.1.4(1) Provision of Progress Photographs 29.77 mos. - -
B.11 Provisional Sum - PS. - 288.50
B.19 Geotechnical Exploration 288.50 Ln.m - -
B.5 Project Billboard/Signboard 4.00 each - 33.77
B.7 Occupational Safety and Health Program 39.83 mos. 0.23 32.24
B.8 Traffic Management 29.77 mos. - 0.50
B.9 Mobilization/Demobilization 1.00 L.S. - 824.00
101(6) Removal of Actual Structures / Obstruction - Concrete 824.00 cu.m. - 4,681.00
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 4,811.00 sq.m - -
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete
101(6)
Piles)
Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) 624.00 cu.m. - 367,117.57
101(7)a for Detourof/ Craneway
Removal & Platform
Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana 367,117.57 kgs - 124,080.00
101(7)b Stockyard for Detour / Craneway & Platform) 124,080.00 kgs - -
104(1)a Embankment - from Roadway Excavation (Common Soil) 2,418.40 cu.m. - -
104(2)a Embankment - from Borrow (Common Soil) 31,470.56 cu.m. - -
104(2)d Embankment - from Borrow Granular Course Materials 1,435.00 cu.m. - -
105(1)a Subgrade Preparation - Common Materials 10,382.00 sq.m - 42.80
200(1) Aggregate Sub-Base Course 7,855.00 cu.m. - 257.75
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days - sq.m - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 12,779.00 sq.m 72.87 1,394.88
400(10) Steel H-Piles, Driven 1,320.00 ln.m. - 18.00
400(27)b Pile Integrity Test (PIT), Low Strain 18.00 ln.m. - 10.00
400(28) High Strain Dynamic Testing (PDA) 10.00 each - 1,320.00
400 (3) Steel H-Piles, Furnished 1,320.00 each - -
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 ln.m. - 414.00
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 414.00 ln.m. - 1,020.00
401(2)a Concrete Railing - Standard 1,020.00 ln.m - -
403(24)a1 Structural Steel, Furnished (Craneway & Platform) 402,056.57 kgs - -
403(3) Structural Steel, Erected (Craneway & Platform) 402,056.57 kgs - -
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 kgs - -
404(1)a Reinforcing Steel (Grade 40) 56,631.11 kgs - 3,152.74
404(1)b Reinforcing Steel (Grade 60) 673,154.40 kgs - 2,927.41
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 3,025.41 cu.m. - 68.00
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 each - 1.00
409(1) Welded Structural Steel 1.00 each - -
411(1) Paint 3,326.11 sq.m. 663.16 1,366.32
412(1) Elastomeric Bearing Pads 40.00 each - -
413(4)a Expansion Joint 60.00 each - -
413(1)a Premolded Expansion Joint Filler with sealant 1.79 ln.m. - 1,900.00
505(5) Grouted Riprap, Class "A" 2,234.14 cu.m. 19.30 204.03
506(1) Stone Masonry 1,106.77 cu.m. 2.51 99.53
511(1) Gabion 504.00 cu.m. 22.05 233.10
511(3) Filter Cloth 504.00 sq.m 19.76 208.84
517(1) Drain Pipe 136.00 ln.m - -
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 ln.m 247.92 495.83
603(4)b Metal Beam End Piece, Bull Nose 10.00 each 2.33 4.67
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahead 2.00 each - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction 3.00 each - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs 2.00 each - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 each - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED 3.00 each - -
612(1) Reflectorized Pavement Markings (White) 502.00 sq.m. 117.13 234.27
612(2) Reflectorized Pavement Markings (Yellow) 262.00 sq.m. 61.13 122.27
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 sq.m. 12.60 25.20
620(1)b Chevron Signs - 600mm x 800mm 8.00 each - -
NAME OF PROJECT :18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along
Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE April 16, 2022
We hereby certify that we have conducted inspection on the work accomplished on the above mentioned
project for the period of April 8 - 15, 2022
We further certify that the quality of materials in the following items of work corresponding to the quality accoplished conform to standard Spefication and Special Provision of Contract, to viz,
however, the result of test shall prevail.
Accomplishments
ITEM NO. DESCRIPTION Program Quantities Unit
This Week To Date
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 L.S. - 1.00
A.1.1(15) Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer 39.83 mos. 0.27 36.50
A.1.1(6)
Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis) 39.83 mos. 0.27 35.50
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 each - 29.77
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer 29.77 mos. - 29.77
A.1.4(1) Provision of Progress Photographs 29.77 mos. - -
B.11 Provisional Sum - PS. - 288.50
B.19 Geotechnical Exploration 288.50 Ln.m - -
B.5 Project Billboard/Signboard 4.00 each - 33.77
B.7 Occupational Safety and Health Program 39.83 mos. 0.27 32.50
B.8 Traffic Management 29.77 mos. - 0.50
B.9 Mobilization/Demobilization 1.00 L.S. - 824.00
101(6) Removal of Actual Structures / Obstruction - Concrete 824.00 cu.m. - 4,681.00
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 4,811.00 sq.m - -
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete
101(6)
Piles)
Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) 624.00 cu.m. - 367,117.57
101(7)a for Detourof/ Craneway
Removal & Platform
Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana 367,117.57 kgs - 124,080.00
101(7)b Stockyard for Detour / Craneway & Platform) 124,080.00 kgs - -
104(1)a Embankment - from Roadway Excavation (Common Soil) 2,418.40 cu.m. - -
104(2)a Embankment - from Borrow (Common Soil) 31,470.56 cu.m. - -
104(2)d Embankment - from Borrow Granular Course Materials 1,435.00 cu.m. - -
105(1)a Subgrade Preparation - Common Materials 10,382.00 sq.m - 42.80
200(1) Aggregate Sub-Base Course 7,855.00 cu.m. - 257.75
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days - sq.m - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 12,779.00 sq.m 83.28 1,478.15
400(10) Steel H-Piles, Driven 1,320.00 ln.m. - 18.00
400(27)b Pile Integrity Test (PIT), Low Strain 18.00 ln.m. - 10.00
400(28) High Strain Dynamic Testing (PDA) 10.00 each - 1,320.00
400 (3) Steel H-Piles, Furnished 1,320.00 each - -
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 ln.m. - 414.00
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 414.00 ln.m. - 1,020.00
401(2)a Concrete Railing - Standard 1,020.00 ln.m - -
403(24)a1 Structural Steel, Furnished (Craneway & Platform) 402,056.57 kgs - -
403(3) Structural Steel, Erected (Craneway & Platform) 402,056.57 kgs - -
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 kgs - -
404(1)a Reinforcing Steel (Grade 40) 56,631.11 kgs - 3,152.74
404(1)b Reinforcing Steel (Grade 60) 673,154.40 kgs - 2,927.41
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 3,025.41 cu.m. - 68.00
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 each - 1.00
409(1) Welded Structural Steel 1.00 each - -
411(1) Paint 3,326.11 sq.m. 757.90 2,124.21
412(1) Elastomeric Bearing Pads 40.00 each - -
413(4)a Expansion Joint 60.00 each - -
413(1)a Premolded Expansion Joint Filler with sealant 1.79 ln.m. - 1,900.00
505(5) Grouted Riprap, Class "A" 2,234.14 cu.m. 22.06 226.08
506(1) Stone Masonry 1,106.77 cu.m. 2.87 102.40
511(1) Gabion 504.00 cu.m. 25.20 258.30
511(3) Filter Cloth 504.00 sq.m 22.58 231.42
517(1) Drain Pipe 136.00 ln.m - -
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 ln.m 283.33 779.17
603(4)b Metal Beam End Piece, Bull Nose 10.00 each 2.67 7.33
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahead 2.00 each - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction 3.00 each - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs 2.00 each - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 each - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED 3.00 each - -
612(1) Reflectorized Pavement Markings (White) 502.00 sq.m. 133.87 368.13
612(2) Reflectorized Pavement Markings (Yellow) 262.00 sq.m. 69.87 192.13
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 sq.m. 14.40 39.60
620(1)b Chevron Signs - 600mm x 800mm 8.00 each - -
NAME OF PROJECT :18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along
Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE April 23, 2022
We hereby certify that we have conducted inspection on the work accomplished on the above mentioned
project for the period of April 16 - 22, 2022
We further certify that the quality of materials in the following items of work corresponding to the quality accoplished conform to standard Spefication and Special Provision of Contract, to viz,
however, the result of test shall prevail.
Accomplishments
ITEM NO. DESCRIPTION Program Quantities Unit
This Week To Date
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 L.S. - 1.00
A.1.1(15) Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer 39.83 mos. 0.23 36.74
A.1.1(6)
Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis) 39.83 mos. 0.23 35.74
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 each - 29.77
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer 29.77 mos. - 29.77
A.1.4(1) Provision of Progress Photographs 29.77 mos. - -
B.11 Provisional Sum - PS. - 288.50
B.19 Geotechnical Exploration 288.50 Ln.m - -
B.5 Project Billboard/Signboard 4.00 each - 33.77
B.7 Occupational Safety and Health Program 39.83 mos. 0.23 32.74
B.8 Traffic Management 29.77 mos. - 0.50
B.9 Mobilization/Demobilization 1.00 L.S. - 824.00
101(6) Removal of Actual Structures / Obstruction - Concrete 824.00 cu.m. - 4,681.00
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 4,811.00 sq.m - -
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete
101(6)
Piles)
Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) 624.00 cu.m. - 367,117.57
101(7)a for Detourof/ Craneway
Removal & Platform
Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana 367,117.57 kgs - 124,080.00
101(7)b Stockyard for Detour / Craneway & Platform) 124,080.00 kgs - -
104(1)a Embankment - from Roadway Excavation (Common Soil) 2,418.40 cu.m. - -
104(2)a Embankment - from Borrow (Common Soil) 31,470.56 cu.m. - -
104(2)d Embankment - from Borrow Granular Course Materials 1,435.00 cu.m. - -
105(1)a Subgrade Preparation - Common Materials 10,382.00 sq.m - 42.80
200(1) Aggregate Sub-Base Course 7,855.00 cu.m. - 257.75
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days - sq.m - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 12,779.00 sq.m 72.87 1,551.02
400(10) Steel H-Piles, Driven 1,320.00 ln.m. - 18.00
400(27)b Pile Integrity Test (PIT), Low Strain 18.00 ln.m. - 10.00
400(28) High Strain Dynamic Testing (PDA) 10.00 each - 1,320.00
400 (3) Steel H-Piles, Furnished 1,320.00 each - -
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 ln.m. - 414.00
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 414.00 ln.m. - 1,020.00
401(2)a Concrete Railing - Standard 1,020.00 ln.m - -
403(24)a1 Structural Steel, Furnished (Craneway & Platform) 402,056.57 kgs - -
403(3) Structural Steel, Erected (Craneway & Platform) 402,056.57 kgs - -
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 kgs - -
404(1)a Reinforcing Steel (Grade 40) 56,631.11 kgs - 3,152.74
404(1)b Reinforcing Steel (Grade 60) 673,154.40 kgs - 2,927.41
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 3,025.41 cu.m. - 68.00
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 each - 1.00
409(1) Welded Structural Steel 1.00 each - -
411(1) Paint 3,326.11 sq.m. 663.16 2,787.37
412(1) Elastomeric Bearing Pads 40.00 each - -
413(4)a Expansion Joint 60.00 each - -
413(1)a Premolded Expansion Joint Filler with sealant 1.79 ln.m. - 1,900.00
505(5) Grouted Riprap, Class "A" 2,234.14 cu.m. 19.30 245.38
506(1) Stone Masonry 1,106.77 cu.m. 2.51 104.91
511(1) Gabion 504.00 cu.m. 22.05 280.35
511(3) Filter Cloth 504.00 sq.m 19.76 251.18
517(1) Drain Pipe 136.00 ln.m - -
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 ln.m 247.92 1,027.08
603(4)b Metal Beam End Piece, Bull Nose 10.00 each 2.33 9.67
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahead 2.00 each - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction 3.00 each - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs 2.00 each - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 each - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED 3.00 each - -
612(1) Reflectorized Pavement Markings (White) 502.00 sq.m. 117.13 485.27
612(2) Reflectorized Pavement Markings (Yellow) 262.00 sq.m. 61.13 253.27
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 sq.m. 12.60 52.20
620(1)b Chevron Signs - 600mm x 800mm 8.00 each - -
NAME OF PROJECT :18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along
Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE April 24, 2022
We hereby certify that we have conducted inspection on the work accomplished on the above mentioned
project for the period of April 23, 2022
We further certify that the quality of materials in the following items of work corresponding to the quality accoplished conform to standard Spefication and Special Provision of Contract, to viz,
however, the result of test shall prevail.
Accomplishments
ITEM NO. DESCRIPTION Program Quantities Unit
This Week To Date
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 L.S. - 1.00
A.1.1(15) Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer 39.83 mos. 0.03 36.77
A.1.1(6)
Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis) 39.83 mos. 0.03 35.77
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 each - 29.77
A.1.2(6) Operation & Maintenance of Pick uo Tyoe Service Vehicle foe the Engineer 29.77 mos. - 29.77
A.1.4(1) Provision of Progress Photographs 29.77 mos. - -
B.11 Provisional Sum - PS. - 288.50
B.19 Geotechnical Exploration 288.50 Ln.m - -
B.5 Project Billboard/Signboard 4.00 each - 33.77
B.7 Occupational Safety and Health Program 39.83 mos. 0.03 32.77
B.8 Traffic Management 29.77 mos. - 0.50
B.9 Mobilization/Demobilization 1.00 L.S. - 824.00
101(6) Removal of Actual Structures / Obstruction - Concrete 824.00 cu.m. - 4,681.00
101(3)b3 Removal of Actual Structures / Obstruction - PCCP 4,811.00 sq.m - -
Removal of Actual Structures / Obstruction (Demolition of Superstructure, Coping and Exposed Reinforced Concrete
101(6)
Piles)
Removal of Actual Structures / Obstruction - Steel (Dismantling & Hauling from Project Site to Lingu, Solana Stockyard) 624.00 cu.m. - 367,117.57
101(7)a for Detourof/ Craneway
Removal & Platform
Actual Structures / Obstruction - Steel H-Piles (Retrieve & Hauling from Project Site to Lingu, Solana 367,117.57 kgs - 124,080.00
101(7)b Stockyard for Detour / Craneway & Platform) 124,080.00 kgs - -
104(1)a Embankment - from Roadway Excavation (Common Soil) 2,418.40 cu.m. - -
104(2)a Embankment - from Borrow (Common Soil) 31,470.56 cu.m. - -
104(2)d Embankment - from Borrow Granular Course Materials 1,435.00 cu.m. - -
105(1)a Subgrade Preparation - Common Materials 10,382.00 sq.m - 42.80
200(1) Aggregate Sub-Base Course 7,855.00 cu.m. - 257.75
311(1)a PCC Pavement (Unreinforced), 0.15 mm thick 14 days - sq.m - -
311(1)e1 PCC Pavement (Unreinforced), 0.28 mm thick 14 days 12,779.00 sq.m 10.41 1,561.43
400(10) Steel H-Piles, Driven 1,320.00 ln.m. - 18.00
400(27)b Pile Integrity Test (PIT), Low Strain 18.00 ln.m. - 10.00
400(28) High Strain Dynamic Testing (PDA) 10.00 each - 1,320.00
400 (3) Steel H-Piles, Furnished 1,320.00 each - -
400(23)a13 Bored Piles (2200mm diameter) 1,440.00 ln.m. - 414.00
400(24)o1 Permanent Steel Casing (2200mm diameter x 12mm thick) 414.00 ln.m. - 1,020.00
401(2)a Concrete Railing - Standard 1,020.00 ln.m - -
403(24)a1 Structural Steel, Furnished (Craneway & Platform) 402,056.57 kgs - -
403(3) Structural Steel, Erected (Craneway & Platform) 402,056.57 kgs - -
403(5) Structural Steel, Furnished, Fabricated and Erected (Expansion Dam) 2,514.77 kgs - -
404(1)a Reinforcing Steel (Grade 40) 56,631.11 kgs - 3,152.74
404(1)b Reinforcing Steel (Grade 60) 673,154.40 kgs - 2,927.41
405(1)b3 Structural Concrete Class "A", Fc'=28MPa 3,025.41 cu.m. - 68.00
406(1)f8 Prestressed Structural Concrete Girder, Members 30.0, (Type IV-A-1 Girders) 68.00 each - 1.00
409(1) Welded Structural Steel 1.00 each - -
411(1) Paint 3,326.11 sq.m. 94.74 2,882.11
412(1) Elastomeric Bearing Pads 40.00 each - -
413(4)a Expansion Joint 60.00 each - -
413(1)a Premolded Expansion Joint Filler with sealant 1.79 ln.m. - 1,900.00
505(5) Grouted Riprap, Class "A" 2,234.14 cu.m. 2.76 248.14
506(1) Stone Masonry 1,106.77 cu.m. 0.36 105.27
511(1) Gabion 504.00 cu.m. 3.15 283.50
511(3) Filter Cloth 504.00 sq.m 2.82 254.00
517(1) Drain Pipe 136.00 ln.m - -
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam 1,062.50 ln.m 35.42 1,062.50
603(4)b Metal Beam End Piece, Bull Nose 10.00 each 0.33 10.00
605(1)ai1 Warning Signs, 600mm x 600mm, W6-1B, Pedestrian and School Signs Pedestrian Crossing Ahead 2.00 each - -
605(1)aj2 Warning Signs, 600mm x 600mm, W2-4B, Intersection and Junction Signs T-Junction 3.00 each - -
605(2)ag3 Regulatory Signs, 600mm, R6-4, Miscellaneous Signs Load and Dimension Restriction Signs 2.00 each - -
605(2)ai2 Regulatory Signs, 600mm, R6-8B, Miscellaneous Signs Pedestrian Crossing 4.00 each - -
605(5)b1 Traffic Instruction Signs 1500mm x 750mm, S2-1 Movement Instruction Signs REDUCE SPEED 3.00 each - -
612(1) Reflectorized Pavement Markings (White) 502.00 sq.m. 16.73 502.00
612(2) Reflectorized Pavement Markings (Yellow) 262.00 sq.m. 8.73 262.00
618(1) Reflectorized Thermoplastic Rumble Strips 54.00 sq.m. 1.80 54.00
620(1)b Chevron Signs - 600mm x 800mm 8.00 each - -
NAME OF PROJECT :18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges
- Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
LOCATION : Baggao, Cagayan
CONTRACTOR : FREY-FIL CORPORATION
DATE April 24, 2022
We hereby certify that we have conducted an inspection and verification on work accomplishment on the above - mentioned project
for the period
March 24 - April 23, 2022
We further certify that we have found that the quality of materials in the following items of work corresponding to the
quantity accomplished conforms with the Standard Specifications and Special Provisions of the Contract:
425.59 23.33
AWAITING FOR Coping Beam @ 27.6 Mpa
Concrete Cylinder Project Site A. Buscas Jul. 31, 2020 Aug. 16, 2020 DPWH-RO2 14 542.51 29.74 27.24 Passed
OFFICIAL REPORT Pier 3 @ 28 days
522.50 28.64
30
536.30 29.40
Coping Beam @ 27.6 Mpa
Concrete Cylinder Project Site A. Buscas Jul. 31, 2020 Sep. 03, 2020 DPWH-RO2 34 529.08 29.00 29.19 Passed
Pier 3 @ 28 days
531.77 29.15
534.02 29.28
AWAITING FOR Column Pier 27.6 Mpa
Concrete Cylinder 36 Project Site A. Buscas Jul. 11, 2020 Aug. 12, 2020 DPWH-RO2 28 519.56 28.48 29.06 Passed
OFFICIAL REPORT #13 L/R @ 28 days
536.65 29.42
562.30 30.83
AWAITING FOR 27.6 Mpa
Concrete Cylinder 18 Project Site A. Buscas Jul. 28, 2020 Aug. 12, 2020 DPWH-RO2 14 Column Pier #11R 527.83 28.94 28.46 Passed
OFFICIAL REPORT @ 28 days
467.36 25.62
551.02 30.21
27.6 Mpa
Concrete Cylinder 18 Project Site A. Buscas Jul. 28, 2020 Aug. 27, 2020 DPWH-RO2 30 Column Pier #11R 537.20 29.45 29.75 Passed
@ 28 days
539.58 29.58
525.21 28.79
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 17, 2020 DPWH-RO2 12 482.99 26.48 25.24 Passed
OFFICIAL REPORT @ 28 days
Coping Beam @ 372.84 20.44
Concrete Cylinder 30 Project Site A. Buscas Aug. 05, 2020
Pier 6 579.14 31.75
AWAITING FOR 27.6 Mpa
B. Mallillin Sep. 03, 2020 DPWH-RO2 29 524.69 28.76 29.69 Passed
OFFICIAL REPORT @ 28 days
520.96 28.56
515.67 28.27
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 19, 2020 DPWH-RO2 11 423.25 23.20 26.56 Passed
OFFICIAL REPORT @ 28 days
Coping Beam @ 514.68 28.21
Concrete Cylinder 30 Project Site A. Buscas Aug. 08, 2020
Pier 2 580.29 31.81
AWAITING FOR 27.6 Mpa
B. Mallillin Sep. 08, 2020 DPWH-RO2 31 527.65 28.93 30.15 Passed
OFFICIAL REPORT @ 28 days
542.22 29.72
530.09 29.06
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 24, 2020 DPWH-RO2 7 521.53 28.59 28.88 Passed
OFFICIAL REPORT @ 28 days
Coping Beam @ 528.91 28.99
Concrete Cylinder 30 Project Site A. Buscas Aug. 17, 2020
Pier 1 516.39 28.31
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 43 531.67 29.15 28.96
@ 28 days
536.62 29.42
508.62 27.88
AWAITING FOR 27.6 Mpa
B. Mallillin Sep. 03, 2020 DPWH-RO2 8 527.75 28.93 28.60 Passed
OFFICIAL REPORT @ 28 days
Coping Beam @ 528.81 28.99
Concrete Cylinder 30 Project Site A. Buscas Aug. 26, 2020
Pier 9 537.60 29.47
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 34 537.24 29.45 28.99
@ 28 days
511.80 28.06
356.97 19.57
27.6 Mpa
B. Mallillin Sep. 03, 2020 DPWH-RO2 10 375.04 20.56 21.43 Passed
@ 28 days
Coping Beam @ 440.62 24.15
Concrete Cylinder 30 Project Site A. Buscas Aug. 24, 2020
Pier 8 525.82 28.83
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 36 540.11 29.61 29.60
@ 28 days
554.01 30.37
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
501.66 27.50
27.6 Mpa
B. Mallillin Sep. 03, 2020 DPWH-RO2 7 530.45 29.08 28.51 Passed
@ 28 days
PC Coping Beam 528.29 28.96
Concrete Cylinder 9 Project Site A. Buscas Aug. 27, 2020
@ Pier 13 548.02 30.04
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 33 547.63 30.02 29.99
@ 28 days
545.59 29.91
524.74 28.77
27.6 Mpa
B. Mallillin Sep. 08, 2020 DPWH-RO2 7 553.28 30.33 29.23 Passed
@ 28 days
Coping Beam @ 521.33 28.58
Concrete Cylinder 30 Project Site A. Buscas Sep. 01, 2020
Pier 7 533.56 29.25
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 28 544.69 29.86 29.52
@ 28 days
537.01 29.44
522.96 28.67
27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 21 577.35 31.65 29.89 Passed
@ 28 days
PC Coping Beam 535.59 29.36
Concrete Cylinder 10 Project Site A. Buscas Sep. 10, 2020
@ Pier 10 0.00
27.6 Mpa
B. Mallillin Oct. 08, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00
497.18 27.26
27.6 Mpa
Concrete Cylinder 18 Project Site A. Buscas Sep. 19, 2020 B. Mallillin Oct. 01, 2020 DPWH-RO2 12 518.16 28.41 28.05
@ 28 days
519.59 28.48
445.57 24.43
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 17, 2020 DPWH-RO2 12 493.83 27.07 26.14 Passed
OFFICIAL REPORT @ 28 days
Column Pier 491.29 26.93
Concrete Cylinder 18 Project Site A. Buscas Aug. 05, 2020
#9 R 602.34 33.02
27.6 Mpa
B. Mallillin Sep. 03, 2020 DPWH-RO2 29 479.64 26.29 29.96 Passed
@ 28 days
557.61 30.57
305.14 16.73
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 19, 2020 DPWH-RO2 7 459.72 25.20 22.75
OFFICIAL REPORT @ 28 days
Column Pier 480.36 26.33
Concrete Cylinder 18 Project Site A. Buscas Aug. 12, 2020
#9 L 527.28 28.91
27.6 Mpa
B. Mallillin Sep. 08, 2020 DPWH-RO2 27 578.13 31.69 30.11
@ 28 days
542.22 29.72
530.21 29.07
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 24, 2020 DPWH-RO2 11 532.05 29.17 29.22 Passed
OFFICIAL REPORT @ 28 days
Column Pier 536.75 29.42
Concrete Cylinder 18 Project Site A. Buscas Aug. 13, 2020
Abutment b L 530.63 29.09
27.6 Mpa
B. Mallillin Sep. 11, 2020 DPWH-RO2 29 533.64 29.25 29.37
@ 28 days
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
613.89 33.65
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 24, 2020 DPWH-RO2 10 521.71 28.60 29.60 Passed
OFFICIAL REPORT @ 28 days
Column Pier 484.43 26.56
Concrete Cylinder 18 Project Site A. Buscas Aug. 14, 2020
Abutment A R 519.16 28.46
27.6 Mpa
B. Mallillin Sep. 11, 2020 DPWH-RO2 28 519.28 28.47 28.45
@ 28 days
518.68 28.43
526.30 28.85
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 24, 2020 DPWH-RO2 4 538.10 29.50 29.76 Passed
OFFICIAL REPORT @ 28 days
Column Pier 564.20 30.93
Concrete Cylinder 18 Project Site A. Buscas Aug. 20, 2020
#7 L 530.63 29.09
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 40 583.64 32.00 30.29
@ 28 days
543.23 29.78
528.29 28.96
AWAITING FOR 27.6 Mpa
B. Mallillin Aug. 27, 2020 DPWH-RO2 5 516.20 28.30 29.04 Passed
OFFICIAL REPORT @ 28 days
Column Pier 544.80 29.87
Concrete Cylinder 18 Project Site A. Buscas Aug. 22, 2020
Abutment B L 530.63 29.09
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 38 583.64 32.00 30.29
@ 28 days
543.23 29.78
537.79 29.48
AWAITING FOR 27.6 Mpa
B. Mallillin Sep. 03, 2020 DPWH-RO2 7 435.57 23.88 27.78 Passed
OFFICIAL REPORT @ 28 days
Column Pier 546.67 29.97
Concrete Cylinder 18 Project Site A. Buscas Aug. 27, 2020
#15 L 549.08 30.10
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 33 547.96 30.04 29.96
@ 28 days
542.33 29.73
527.64 28.93
AWAITING FOR 27.6 Mpa
B. Mallillin Sep. 08, 2020 DPWH-RO2 6 524.35 28.74 28.78 Passed
OFFICIAL REPORT @ 28 days
Column Pier 522.84 28.66
Concrete Cylinder 18 Project Site A. Buscas Sep. 02, 2020
#14 R 542.73 29.75
27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 29 532.93 29.22 29.81
@ 28 days
555.90 30.47
519.99 28.51
AWAITING FOR 27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 17 518.08 28.40 28.52 Passed
OFFICIAL REPORT @ 28 days
Column Pier 522.81 28.66
Concrete Cylinder 18 Project Site A. Buscas Sep. 14, 2020
#10 R/L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44088 0.00 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
535.60 29.36
AWAITING FOR 27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 14 516.98 28.34 28.88 Passed
OFFICIAL REPORT @ 28 days
Column Pier 527.68 28.93
Concrete Cylinder 18 Project Site A. Buscas Sep. 17, 2020
#12 R/L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44091 0.00 0.00
@ 28 days
0.00
0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44093 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 19, 2020
#11 L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44093 0.00 0.00
@ 28 days
0.00
0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44096 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 22, 2020
#16 R/L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44096 0.00 0.00
@ 28 days
0.00
0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44099 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 25, 2020
#14 L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44099 0.00 0.00
@ 28 days
0.00
0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44102 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier @ 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 28, 2020
ABUTMENT BR 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44102 0.00 0.00
@ 28 days
0.00
0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier @ 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 30, 2020
ABUTMENT A L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 30, 2020
#15 R 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Sep. 16, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 09, 2020 Embedment @
Pier 11 L 0.00
27.6 Mpa
B. Mallillin Oct. 07, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Sep. 16, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 09, 2020 Embedment @
Pier 12 R/ L 0.00
27.6 Mpa
B. Mallillin Oct. 07, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Sep. 26, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 19, 2020 Embedment @
Pier 16 R/ L 0.00
27.6 Mpa
B. Mallillin Oct. 17, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Sep. 28, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 21, 2020 Embedment @
Pier 14 L 0.00
27.6 Mpa
B. Mallillin Oct. 19, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Sep. 30, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 23, 2020 Embedment @
ABUTMENT B R 0.00
27.6 Mpa
B. Mallillin Oct. 21, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
27.6 Mpa
B. Mallillin Oct. 02, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 25, 2020 Embedment @
ABUTMENT A L 0.00
27.6 Mpa
B. Mallillin Oct. 23, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Oct. 02, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 25, 2020 Embedment @
Pier 15 R 0.00
27.6 Mpa
B. Mallillin Oct. 23, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00
501.66 27.50
27.6 Mpa
B. Mallillin Sep. 03, 2020 DPWH-RO2 7 530.45 29.08 28.51 Passed
@ 28 days
PC Coping Beam 528.29 28.96
Concrete Cylinder 9 Project Site A. Buscas Aug. 27, 2020
@ Pier 13 548.02 30.04
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 33 547.63 30.02 29.99 Passed
@ 28 days
545.59 29.91
0.00
27.6 Mpa
B. Mallillin Oct. 09, 2020 DPWH-RO2 7 0.00 0.00 Passed
Coping Beam @ @ 28 days
0.00
Concrete Cylinder 21 Project Site A. Buscas Oct. 02, 2020 Pier 13
(Internal) 0.00
27.6 Mpa
B. Mallillin Oct. 30, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00
524.74 28.77
27.6 Mpa
B. Mallillin Sep. 08, 2020 DPWH-RO2 7 553.28 30.33 29.23 Passed
@ 28 days
Coping Beam @ 521.33 28.58
Concrete Cylinder 30 Project Site A. Buscas Sep. 01, 2020
Pier 7 533.56 29.25
27.6 Mpa
B. Mallillin Sep. 29, 2020 DPWH-RO2 28 544.69 29.86 29.52
@ 28 days
537.01 29.44
522.96 28.67
27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 21 577.35 31.65 29.89 Passed
@ 28 days
PC Coping Beam 535.59 29.36
Concrete Cylinder 10 Project Site A. Buscas Sep. 10, 2020
@ Pier 10 526.61 28.87
27.6 Mpa
B. Mallillin Oct. 08, 2020 DPWH-RO2 28 480.09 26.32 28.13 Passed
@ 28 days
532.94 29.22
497.18 27.26
27.6 Mpa
Concrete Cylinder 18 Project Site A. Buscas Sep. 19, 2020 B. Mallillin Oct. 01, 2020 DPWH-RO2 12 518.16 28.41 28.05
@ 28 days
519.59 28.48
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
527.64 28.93
AWAITING FOR 27.6 Mpa
B. Mallillin Sep. 08, 2020 DPWH-RO2 6 524.35 28.74 28.78 Passed
OFFICIAL REPORT @ 28 days
Column Pier 522.84 28.66
Concrete Cylinder 18 Project Site A. Buscas Sep. 02, 2020
#14 R 542.73 29.75
27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 29 532.93 29.22 29.81
@ 28 days
555.90 30.47
519.99 28.51
AWAITING FOR 27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 17 518.08 28.40 28.52 Passed
OFFICIAL REPORT @ 28 days
Column Pier 522.81 28.66
Concrete Cylinder 18 Project Site A. Buscas Sep. 14, 2020
#10 R/L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44088 0.00 0.00
@ 28 days
0.00
535.60 29.36
AWAITING FOR 27.6 Mpa
B. Mallillin Oct. 01, 2020 DPWH-RO2 14 516.98 28.34 28.88 Passed
OFFICIAL REPORT @ 28 days
Column Pier 527.68 28.93
Concrete Cylinder 18 Project Site A. Buscas Sep. 17, 2020
#12 R/L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44091 0.00 0.00
@ 28 days
0.00
0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44093 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 19, 2020
#11 L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44093 0.00 0.00
@ 28 days
0.00
0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44096 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier 0.00
Concrete Cylinder 18 Project Site A. Buscas Sep. 22, 2020
#16 R/L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44096 0.00 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44102 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier @ 0.00
Concrete Cylinder 16 Project Site A. Buscas Sep. 28, 2020
ABUTMENT BR 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44102 0.00 0.00
@ 28 days
0.00
0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier @ 0.00
Concrete Cylinder 16 Project Site A. Buscas Sep. 30, 2020
ABUTMENT A L 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00
@ 28 days
0.00
0.00
AWAITING FOR 27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00 Passed
OFFICIAL REPORT @ 28 days
Column Pier 0.00
Concrete Cylinder 16 Project Site A. Buscas Sep. 30, 2020
#15 R 0.00
27.6 Mpa
B. Mallillin DPWH-RO2 -44104 0.00 0.00
@ 28 days
0.00
489.50 26.83
27.6 Mpa
Concrete Cylinder 9 Project Site A. Buscas Sep. 07, 2020 B. Mallillin Oct. 08, 2020 DPWH-RO2 31 547.71 30.03 28.75 Passed
@ 28 days
536.28 29.40
530.42 29.08
27.6 Mpa
Concrete Cylinder 9 Project Site A. Buscas Sep. 09, 2020 B. Mallillin Oct. 08, 2020 DPWH-RO2 29 512.95 28.12 28.89 Passed
@ 28 days
537.83 29.48
526.72 28.87
27.6 Mpa
Concrete Cylinder 9 Project Site A. Buscas Sep. 09, 2020 B. Mallillin Oct. 08, 2020 DPWH-RO2 29 522.32 28.63 28.83 Passed
@ 28 days
528.41 28.97
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
27.6 Mpa
B. Mallillin Sep. 28, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 21, 2020 Embedment @
Pier 14 L 0.00
27.6 Mpa
B. Mallillin Oct. 19, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Sep. 30, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 9 Project Site A. Buscas Sep. 23, 2020 Embedment @
ABUTMENT B R 0.00
27.6 Mpa
B. Mallillin Oct. 21, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Oct. 02, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 7.5 Project Site A. Buscas Sep. 25, 2020 Embedment @
ABUTMENT A L 0.00
27.6 Mpa
B. Mallillin Oct. 23, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Oct. 02, 2020 DPWH-RO2 7 0.00 0.00
Column @ 28 days
0.00
Concrete Cylinder 7.5 Project Site A. Buscas Sep. 25, 2020 Embedment @
Pier 15 R 0.00
27.6 Mpa
B. Mallillin Oct. 23, 2020 DPWH-RO2 28 0.00 0.00
@ 28 days
0.00
Precast Coping
24
Beam @ Pier 14
Precast Coping
6
Beam @ Pier 10
0.00
27.6 Mpa
B. Mallillin Oct. 16, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 24 Project Site A. Buscas Oct. 09, 2020
Pier 10 0.00
27.6 Mpa
B. Mallillin Oct. 30, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Oct. 31, 2020 DPWH-RO2 7 0.00
@ 28 days
Pre-Cast Coping 0.00
Concrete Cylinder 8.5 Project Site A. Buscas Oct. 24, 2020
Beam @ Abut. A 0.00
27.6 Mpa
B. Mallillin Nov. 21, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
27.6 Mpa
B. Mallillin Nov. 22, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 31 Project Site A. Buscas Nov. 15, 2020
Abut. A 0.00
27.6 Mpa
B. Mallillin Dec. 13, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Nov. 11, 2020 DPWH-RO2 7 0.00
@ 28 days
Pre-Cast Coping 0.00
Concrete Cylinder 8.5 Project Site A. Buscas Nov. 04, 2020
Beam @ Abut. B 0.00
27.6 Mpa
B. Mallillin Dec. 02, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Dec. 06, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 31 Project Site A. Buscas Nov. 29, 2020
Abut. B 0.00
27.6 Mpa
B. Mallillin Dec. 27, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
Precast Coping
6
Beam @ Pier 16
0.00
27.6 Mpa
B. Mallillin Nov. 29, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 24 Project Site A. Buscas Nov. 22, 2020
Pier 16 0.00
27.6 Mpa
B. Mallillin Dec. 20, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
Coping Beam @ 0.00
24
Pier 15 0.00
27.6 Mpa
0.00
@ 28 days
0.00
END DIAPHRAGMS
0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 2 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 3 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 4 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 5 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Nov. 12, 2020 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas Nov. 05, 2020
Pier 6 0.00
27.6 Mpa
B. Mallillin Dec. 03, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 7 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
INTERMEDIATE DIAPHRAGMS
0.00
27.6 Mpa
B. Mallillin Nov. 28, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 21, 2020
2-3 0.00
27.6 Mpa
B. Mallillin Dec. 19, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Nov. 24, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 17, 2020
3-4 0.00
27.6 Mpa
B. Mallillin Dec. 15, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Nov. 12, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 05, 2020
4-5 0.00
27.6 Mpa
B. Mallillin Dec. 03, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
27.6 Mpa
B. Mallillin Nov. 04, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Oct. 28, 2020
5-6 0.00
27.6 Mpa
B. Mallillin Nov. 25, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Oct. 26, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Oct. 19, 2020
6-7 0.00
27.6 Mpa
B. Mallillin Nov. 16, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
27.6 Mpa
0.00
@ 28 days
Abutment A 0.00
20
Backwall 0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
DECK SLAB
0.00
27.6 Mpa
0.00
Deck Slab @ @ 28 days
0.00
80 Span 5' - 6'
(30 m) 0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
Deck Slab @ 0.00
@ 28 days
Span 0.00
80
6' - 7' 0.00
(30 m) 27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
Deck Slab @ 0.00
@ 28 days
Span 0.00
80
7' - 8' 0.00
(30 m) 27.6 Mpa
0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
Accomplishment
Contract
Item No. Description Unit Balance
Quantity Previous This Month Total
A.1.1(11) Provision of Furmiture/Fixtures & Appliances for the Field Office for the Engineers 1.00 -
L.S. 1.00 1.00 -
A.1.1(15) Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer 36.77 - 11.77
mos. 25.00 35.77 1.00
A.1.1(6) Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis) 36.77 - 11.77
mos. 25.00 35.77 1.00
A.1.2(3) Provision of 4x2 Pick up Type Service Vehicle for the Engineer 1.00 -
each 1.00 1.00 -
A.1.2(6) Operation & Maintenance of Pick up Type Service Vehicle for the Engineer 29.77 - 4.77
mos. 25.00 29.77 -
A.1.4(1) Provision of Progress Photographs 29.77 - 4.77
mos. 25.00 29.77 -
PART C - EARTHWORKS
Precast Coping
24
Beam @ Pier 14
Precast Coping
6
Beam @ Pier 10
0.00
27.6 Mpa
B. Mallillin Oct. 16, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 24 Project Site A. Buscas Oct. 09, 2020
Pier 10 0.00
27.6 Mpa
B. Mallillin Oct. 30, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Oct. 31, 2020 DPWH-RO2 7 0.00
@ 28 days
Pre-Cast Coping 0.00
Concrete Cylinder 8.5 Project Site A. Buscas Oct. 24, 2020
Beam @ Abut. A 0.00
27.6 Mpa
B. Mallillin Nov. 21, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
27.6 Mpa
B. Mallillin Nov. 22, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 31 Project Site A. Buscas Nov. 15, 2020
Abut. A 0.00
27.6 Mpa
B. Mallillin Dec. 13, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Nov. 11, 2020 DPWH-RO2 7 0.00
@ 28 days
Pre-Cast Coping 0.00
Concrete Cylinder 8.5 Project Site A. Buscas Nov. 04, 2020
Beam @ Abut. B 0.00
27.6 Mpa
B. Mallillin Dec. 02, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Dec. 06, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 31 Project Site A. Buscas Nov. 29, 2020
Abut. B 0.00
27.6 Mpa
B. Mallillin Dec. 27, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
Precast Coping
6
Beam @ Pier 16
0.00
27.6 Mpa
B. Mallillin Nov. 29, 2020 DPWH-RO2 7 0.00
@ 28 days
Coping Beam @ 0.00
Concrete Cylinder 24 Project Site A. Buscas Nov. 22, 2020
Pier 16 0.00
27.6 Mpa
B. Mallillin Dec. 20, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
Coping Beam @ 0.00
24
Pier 15 0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 3 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 4 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 5 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Nov. 12, 2020 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas Nov. 05, 2020
Pier 6 0.00
27.6 Mpa
B. Mallillin Dec. 03, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
27.6 Mpa
B. Mallillin Jan. 06, 1900 DPWH-RO2 7 0.00
@ 28 days
End Diaphragm @ 0.00
Concrete Cylinder 9 Project Site A. Buscas
Pier 7 0.00
27.6 Mpa
B. Mallillin Jan. 27, 1900 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
INTERMEDIATE DIAPHRAGMS
0.00
27.6 Mpa
B. Mallillin Nov. 12, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 05, 2020
4-5 0.00
27.6 Mpa
B. Mallillin Dec. 03, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
27.6 Mpa
B. Mallillin Nov. 04, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Oct. 28, 2020
5-6 0.00
27.6 Mpa
B. Mallillin Nov. 25, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Oct. 26, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Oct. 19, 2020
6-7 0.00
27.6 Mpa
B. Mallillin Nov. 16, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
27.6 Mpa
0.00
@ 28 days
Abutment A 0.00
20
Backwall 0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
DECK SLAB
0.00
27.6 Mpa
0.00
Deck Slab @ @ 28 days
0.00
Span 5' - 6'
(30 m) 0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
Deck Slab @ 0.00
@ 28 days
Span 0.00
6' - 7' 0.00
(30 m) 27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
Deck Slab @ 0.00
@ 28 days
Span 0.00
7' - 8' 0.00
(30 m) 27.6 Mpa
0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Nov. 26, 2020 DPWH-RO2 7 0.00
@ 28 days
Precast Coping 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 19, 2020
Beam @ Pier 15 0.00
27.6 Mpa
B. Mallillin Dec. 17, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
544.49 29.85
27.6 Mpa
B. Mallillin Dec. 15, 2020 DPWH-RO2 6 442.24 24.24 25.73
@ 28 days
Coping Beam @ 421.58 23.11
24 Dec. 09, 2020
Pier 15 0.00
27.6 Mpa
B. Mallillin Jan. 06, 2021 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
0.00
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
INTERMEDIATE DIAPHRAGMS
0.00
27.6 Mpa
B. Mallillin Nov. 28, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 21, 2020
2-3 0.00
27.6 Mpa
B. Mallillin Dec. 19, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Nov. 24, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 17, 2020
3-4 0.00
27.6 Mpa
B. Mallillin Dec. 15, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
27.6 Mpa
B. Mallillin Nov. 12, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Nov. 05, 2020
4-5 0.00
27.6 Mpa
B. Mallillin Dec. 03, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Nov. 04, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Oct. 28, 2020
5-6 0.00
27.6 Mpa
B. Mallillin Nov. 25, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
B. Mallillin Oct. 26, 2020 DPWH-RO2 7 0.00
@ 28 days
Inter Diagphragm 0.00
Concrete Cylinder 6 Project Site A. Buscas Oct. 19, 2020
6-7 0.00
27.6 Mpa
B. Mallillin Nov. 16, 2020 DPWH-RO2 28 0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
27.6 Mpa
0.00
@ 28 days
Abutment A 0.00
20
Backwall 0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
DECK SLAB
0.00
27.6 Mpa
0.00
Deck Slab @ @ 28 days
0.00
Span 5' - 6'
(30 m) 0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
Deck Slab @ 0.00
@ 28 days
Span 0.00
6' - 7' 0.00
(30 m) 27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
Deck Slab @ 0.00
@ 28 days
Span 0.00
7' - 8' 0.00
(30 m) 27.6 Mpa
0.00
@ 28 days
0.00
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road
0.00
27.6 Mpa
0.00
@ 28 days
0.00
0.00
27.6 Mpa
0.00
@ 28 days
0.00
38.47 876.05
STA 0+020 - STA 550 psi @ 14
Concrete Beam 48 Project Site B. Saladino Apr. 12, 2021 J. Babaran Apr. 28, 2021 DPWH-RO2 16 PCCP LS 39.07 889.58 927.16 Passed
0+060 days
44.61 1,015.86
0.00
STA. 0+060 - STA. 550 psi @ 14
Concrete Beam 48 Project Site B. Saladino Apr. 27, 2021 J. Babaran DPWH-RO2 PCCP RS 0.00 0.00 Passed
0+100 days
0.00
0.00
STA. 0+060 - STA. 550 psi @ 14
Concrete Beam 48 Project Site B. Saladino Apr. 29, 2021 J. Babaran DPWH-RO2 PCCP LS 0.00 0.00 Passed
0+100 days
0.00
0
0.23 0.31 0.23 0
0.23 0.31 0.23 0
0.23 0.31 0.23 0