You are on page 1of 2

(Bottleneck Model Example )

19.1 A flexible manufacturing cell consists of two machining workstations plus a load/unload station. The load/unload station is
station 1. Station 2 performs milling operations and consists of one server (one CNC milling machine). Station 3 has one
server that performs drilling (one CNC drill press). The three stations are connected by a part handling system that has one
work carrier. The mean transport time is 2.5 min. The FMC produces three parts, A, B, and C. The part mix fractions and
process routings for the three parts are presented in the table below. The operation frequency fijk = 1.0 for all operations.
Determine
(a) maximum production rate of the FMC,
(b) corresponding production rates of each product,
(c) utilization of each machine in the system, and
(d) number of busy servers at each station.

Part j Part mix pj Operation k Description Station i Process time tijk


A 0.2 1 Load 1 3 min
2 Mill 2 20 min
3 Drill 3 12 min
4 Unload 1 2 min
B 0.3 1 Load 1 3 min
2 Mill 2 15 min
3 Drill 3 30 min
4 Unload 1 2 min
C 0.5 1 Load 1 3 min
2 Drill 3 14 min
3 Mill 2 22 min
4 Unload 1 2 min
Solution:

(a) WL1 = (3+2)(0.2)(1.0) + (3+2)(0.3)(1.0) + (3+2)(0.5)(1.0) = 5.0 min


WL2 = 20(0.2)(1.0) + 15(0.3)(1.0) + 22(0.5)(1.0) = 19.5 min
WL3 = 12(0.2)(1.0) + 30(0.3)(1.0) + 14(0.5)(1.0) = 18.4 min
nt = 3(0.2)(1.0) + 3(0.3)(1.0) + 3(0.5)(1.0) = 3, WL4 = 3(2.5) = 7.5 min

Bottleneck station has largest WLi/si ratio:


Station WLi/si ratio
1 (load/unload) 5.0/1 = 5.0 min
2 (mill) 19.5/1 = 19.5 min  Bottleneck
3 (drill) 18.4/1 = 18.4 min
4 (material handling) 7.5/1 = 7.5 min
Bottleneck is station 2: Rp* = 1/19.5 = 0.05128 pc/min = 3.077 pc/hr

(b) RpA = 0.05128(0.2) = 0.01026 pc/min = 0.6154 pc/hr


RpB = 0.05128(0.3) = 0.01538 pc/min = 0.9231 pc/hr
RpC = 0.05128(0.5) = 0.02564 pc/min = 1.5385 pc/hr

(c) U1 = (5.0/1)(0.05128) = 0.256 = 25.6%


U2 = (19.5/1)(0.05128) = 1.0 = 100%
U3 = (18.4/1)(0.05128) = 0.944 = 94.4%
U4 = (7.5/1)(0.05128) = 0.385 = 38.5%

(d) BS1 = (5.0)(0.05128) = 0.256 servers


BS2 = (19.5)(0.05128) = 1.0 servers
BS3 = (18.4)(0.05128) = 0.944 servers
BS4 = (7.5)(0.05128) = 0.385 servers
(Extended Bottleneck Model Example)
19.2 Use the extended bottleneck model to solve problem 19.1 with the following number of parts in the system:
(a) N = 2 parts and
<(b) N = 4 parts. Also determine the manufacturing lead time for the two cases of N in (a) and (b).

Solution: See solution to Problem 19.1.

MLT1 = 5.0 + 19.5 + 18.4 + 7.5 = 50.4 min


Rp* = 0.05128 pc/min from solution to Problem 19.1.
N* = 0.05128(50.4) = 2.58

(a) For N = 2 < N* = 2.58, apply case 1 (Table 19.5)


MLT1 = 50.4 min, and Tw = 0

Rp = 2/50.4 = 0.0397 pc/min = 2.38 pc/hr


RpA = 0.0397(0.2) = 0.00794 pc/min = 0.476 pc/hr
RpB = 0.0397(0.3) = 0.01191 pc/min = 0.714 pc/hr
RpC = 0.0397(0.5) = 0.01985 pc/min = 1.191 pc/hr

U1 = (5.0/1)(0.0397) = 0.198 = 19.8%


U2 = (19.5/1)(0.0397) = 0.774 = 77.4%
U3 = (18.4/1)(0.0397) = 0.730 = 73.0%
U4 = (7.5/1)(0.0397) = 0.298 = 29.8%

BS1 = (5.0)( 0.0397) = 0.198 servers


BS2 = (19.5)( 0.0397) = 0.774 servers
BS3 = (18.4)( 0.0397) = 0.730 servers
BS4 = (7.5)( 0.0397) = 0.298 servers

(b) N = 4 > N* = 2.58, apply case 2 (Table 19.5)


Rp* = 0.05128 pc/min = 3.077 pc/hr
MLT2 = 4/0.05128 = 78.0 min, and Tw = 78.0 - 50.4 = 27.6 min

RpA = 0.05128(0.2) = 0.01026 pc/min = 0.6154 pc/hr*


RpB = 0.05128(0.3) = 0.01538 pc/min = 0.9231 pc/hr*
RpC = 0.05128(0.5) = 0.02564 pc/min = 1.5385 pc/hr*

U1 = (5.0/1)(0.05128) = 0.256 = 25.6%*


U2 = (19.5/1)(0.05128) = 1.0 = 100%*
U3 = (18.4/1)(0.05128) = 0.944 = 94.4%*
U4 = (7.5/1)(0.05128) = 0.385 = 38.5%*

BS1 = (5.0)(0.05128) = 0.256 servers*


BS2 = (19.5)(0.05128) = 1.0 servers*
BS3 = (18.4)(0.05128) = 0.944 servers*
BS4 = (7.5)(0.05128) = 0.385 servers*
* These answers are the same as in Problem 19.1