Professional Documents
Culture Documents
11
12
13
AHU
14
NOTES :
1. PIPA BS SPRINGKLER 2.5" BY CSPL (INSTALLASI BARU) (AMAN)
2. PIPA BS MAINLINE SPRINGKLER 6" BY CSPL (INSTALLASI BARU)
(AMAN)
3. PIPA BS MAINLINE HYDRANT 6" BY CSPL (INSTALLASI BARU) (AMAN)
4. PIPA BS GAS BY SINAR MUTIARA (INSTALLASI BARU) (AMAN)
5. PIPA PPR 4" BY CSPL (INSTALLASI BARU) (AMAN)
6. PIPA PVC 6" BY CSPL (INSTALLASI BARU) (AMAN)
7. PIPA BS HYDRANT EXISTING (RELOKASI)
8. PIPA GALVANIS AIR BERSIH 3" GRAVITASI (RELOKASI)
9. PIPA GALVANIS AIR BERSIH 3" TRANSFER KE ROOFTANK (RELOKASI)
10. PIPA PVC 6" PUTUS (EXISTING) (BONGKAR)
11. PIPA PVC 6" PUTUS (EXISTING) (BONGKAR)
TERRACE
12. PIPA PVC 6" DRAIN AC PUTUS (EXISTING) (RELOKASI)
13. PIPA PVC 4" (DRAIN) DARI SOGO (RELOKASI) X 2 LINE
14. PIPA GALVANIS 212" AIR BERSIH PUTUS (BONGKAR)
15. PIPA GALVANIS 11 4" (BONGKAR)
16. PIPA GALVANIS 3" (RELOKASI)
17. PIPA PVC 4" BY CSPL (INSTALLASI BARU) (AMAN)
18. PIPA PVC DARI DEEPWELL EXISTING 3" GANTI 2" (RELOKASI)
19. PIPA PVC 4" AIR HUJAN DARI FD EXISTING (BONGKAR)
15
TRAFO 04
RETAIL
STORAGE
AREA
BANK 4
CAP
MVDP
NRST
VM
LOBBY LVDP 4
NRST
16
STORE
RETAIL
AREA
BANK 3
CAP
RETAIL
BTS/
AREA
TRAFO 03
LOCKER STORE STORE WAREHOUSE
2000.000
NRST
VM CIVIL
OFFICE STORE
VM OFFICE
STORE OFFICE CCTV SECURITY BK LVDP 3
NRST
ENGINEERING
13.75 m2 2000.000
SERVER
PP VAC
LP PH Z1
BK
BANK 2
CAP
VACANT
TRAFO 02
STORAG
L-1
PH A&W
NRST
GD-11 ST
NRST
GD-07
13.75 m2 GD-09 GD-08 32.85 m2
CENTRO
LVDP 2
17
PANEL 30 m2 30.5 m2
Wudhu L/G
GD-10
GARDU PLN TRAFO 2 TRAFO 1
13.75 m2
TE
BA
CA
6035 KG 6035 KG CAPASITOR BANK