0 INTRODUCTION 5
4.1 Introduction 20
4.3 Services and Facilities at WORKSITE 21
4.4 Facilities During Warranty Period 22
5.0 DESIGN AND ENGINEERING 22
5.1 General 22
5.2 Design Basis Memorandum (DBM) 22
5.3 FEED Package Review 23
5.4 Detail Engineering and Engineering Deliverables 24
6.0 PROCUREMENT 39
6.1 General 39
6.2 VENDOR Requirements 41
6.3 SUBCONTRACTOR’s Requirements 42
6.4 Purchasing 43
6.5 Expediting 43
6.6 Audit 44
6.7 Inspection and Testing 44
6.8 Transportation and Shipment 45
6.9 Logistic Plan 47
6.10 Packing and Marking 48
6.11 Tax Exemption for Local/Imported Material 51
6.12 Customs Clearance and Customs Duty 52
6.13 Storage 53
6.14 Reports 53
6.15 Material Control and Tracking System 54
6.16 Procurement Close-out Report 55
7.0 CONSTRUCTION 55
7.1 General 55
7.2 Construction Plan 58
7.3 Site Mobilization 59
7.4 Site Organization and Facilities 60
7.5 Site Survey and Access 62
7.6 Permit To Work (PTW) 62
7.7 Safety 63
7.8 CONTRACTOR’S Representative at WORKSITE 64
7.9 Scope of Construction Work 70
8.0 CONSTRUCTION COMPLETION 72
9.1 General 74
9.2 PROVISIONAL Acceptance Date 74
9.3 PROVISIONAL Acceptance Certificate 75
10.0 WARRANTY 75
Dhafriyah
Kut
Al Ahdab
BUZURGAN
Ha
Garraf Wasit
w
ra
s
Sa MISAN
GROUP
Field
diya
32°N
32°N
Rafidian Noor
h
24"
Kumait
Al Qadisiyah
East Rafidian
Misan Huwaiza
Gharraf
8" HALFAYA
Amala
Ti
gr
is
Rifai
IRAQ AHWAZ
Maysan
Nasiriyah
MAJNOON
Samawah Eup S
hraPte
2 sS Dhi Qar
SP tr
Samawa
1 S ateg IRAN
tra ic P
teg i
ic P peNasiriyah
line
31°N
31°N
(planned)
i pe W.QURNA
lin
e
Ha w
r a l Ham
m ar NAHR UMR
42"
42"
24"
Muftiah
SUBBA Al Basra
PS-1
Ratawi Basra
Zb-1
10"
10"
Al Muthanna' RUMAILA Zb-2
" ZUBAIR
LUHAIS 42 TUBA
Rachi
Umm Qasr
Jerishan
"
30°N
30°N
Fao
54
RATQA
1
A-
d)
SP
se
IPS
RAUDHATAIN
42 1,SP
o
", 4 KAAOT
(cl
SABRIYAH 2
8"
KUWAIT BAHRAH
ABOT
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)
o)
p)
q)
r)
s)
t)
u)
v)
w)
x)
y)
z)
aa)
bb)
cc)
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
The PROVISIONAL ACCEPTANCE shall occur by the end of the Commissioning and
Performance Test Stage on completion of scope of the CONTRACT i.e. completion of
perimeter lighting performance test.
CONTRACTOR shall, within thirty (30) calendar days from the date of provisional
acceptance certificate for the WORK, submit to COMPANY a Work Closure Certificate
and Project Final Account stating outstanding punchlist items and billings under the
CONTRACT for COMPANY’s approval. Such items may include outstanding billing or
payment of CONTRACT Price, Change Order, reimbursable and other charges.
COMPANY shall not entertain CONTRACTOR’s inclusion or amendment to the Work
Closure Certificate which may arise beyond the date as described in this ARTICLE.
CONTRACTOR shall expeditiously resolve whatever outstanding punchlist items,
billings and any other obligations under the CONTRACT.