Professional Documents
Culture Documents
conducted at
SAI CREATIONS EXPORT HOUSE
Submitted by:
Preeti Baheti
Shubhi Agnihotri
2
Acknowledgment
We are grateful to Mr. Akash Anand and Mr. Rahul Anand for giving us the opportunity to
work at Sai Creations Export House, Noida, and also for their cooperation, guidance, as well
as encouragement which led to the successful completion of our project.
We want to express our deepest gratitude to our industry mentor, Mr. Gawri Shankar
(Quality Director, Sai Creations Export House), Mr. Ankit Sharma (Ex- VP of Operations)
and Mr. Rahul Anand (Marketing Head), for sharing their experience and knowledge and
without their help these projects would not be possible.
Our deepest appreciation to Dr. Amar Tewari (Professor, Centre Academic Coordinator,
National Institute of Fashion Technology, Gandhinagar) for his constant support and
encouragement throughout the period of internship.
We are indebted to all those individuals who have helped us in gaining knowledge and
insight into various aspects of mapping the standard operating procedure, implementing 5S
on Sewing and Finishing floors and doing the market research for Women’s wear and
WittyBae in Sai Creations Export House.
3
Certificates of Internship
4
5
Contents
Chapter One 13
1.1 Sai Creation 13
1.2 Company Profile 14
1.3 Company’s Mission 15
1.4 Company’s Vision 16
1.5 Company’s Values 16
1.6 Product Profile 16
1.6.1 Women’s Wear 17
1.6.2 Kid’s Wear 19
1.6.3 Bags 20
1.6.4 Home Decor 20
1.7 Major Buyers 21
1.8 Company Hierarchy 22
1.9 Process flow of Organization 23
Chapter Two 24
2.1 Marketing 24
2.2 Merchandising 25
2.2.1 Role of the Department- 25
2.2.2 Objectives of Merchandiser- 25
2.2.3 Activities of Merchandising Department 27
2.2.4 Documents used by Merchandising Department- 29
2.2.5 Process flow of Merchandising Department 30
Chapter Three 31
3.1 Sampling Department 31
3.2 Process Flow 33
Chapter Four 35
4.1 Fabric, Trim and Accessories Store 35
4.2 Fabric Store 36
4.2.1 Types of Fabric Stored: 37
4.2.2 Fabric Issued to: 37
4.2.3 Fabrics are Inspected for: 37
4.2.4 Fabric Store Process Flow 39
4.3 Trim Store: 40
4.3.1 Role of Trim Department: 40
4.3.2 Various Types of Trims: 41
4.3.3 Process Flow of Trim Store 42
4.4 Fabric Inspection 43
4.4.1 Fabric Inspection Report 45
4.4.2 Procedures in Fabric Inspection 45
6
Chapter Five 49
5.1 CAD Department 49
5.1.1 Marker Planning 49
5.1.2 Process Flow in CAD Department 51
5.2 Spreading 51
5.3 Cutting 53
5.3.1 Fusing 54
5.4 Ticketing & Bundling 54
5.5 Process flow of Spreading & Cutting Department 56
5.6 Re-cutting 57
5.7 Embroidery 57
Chapter Six 58
6.1 Sewing Department 58
6.2 Process flow of Sewing Department 60
Chapter Seven 62
7.1 Washing 62
7.2 Process flow of Washing 64
Chapter Eight 65
8.1 Finishing Department 65
8.2 Process Flow of Finishing Department 65
Chapter Nine 72
9.1 Human Resource Department 72
9.1.1 Coverage and Guidelines 72
9.1.2 Administrations 72
9.1.3 Confidentiality 73
9.1.4 HR Mission 73
9.2 HR Policy 73
9.2.1 Attendance 73
9.2.2 Public Holidays 73
9.2.3 Recruitment Policy 74
9.2.4 Joining Formalities and Induction 75
Chapter Ten 76
10.1 Project 1 76
Implementation Of 5S 76
Abstract 76
Introduction 76
Objective 77
Problem definition and Methodology 77
5s Implementation On: 77
Sewing Floor 77
Finishing Floor 88
7
Outcome 96
Conclusion 96
Learning outcome 97
10.2 Project 2 98
Standard Operating System For Sai Creations 98
Abstract 98
Introduction 98
Objective 98
Problem definition and methodology 99
Department-wise Standard Operating Procedures: 99
1.Merchandising Department 99
2. Fabric Store 102
3. Cutting Department 104
4. Sewing Department 105
5. Finishing Department 107
Outcome 109
Conclusion 109
Learning outcome 109
10.3 Project 3 110
Market Research 110
Abstract 110
Objective 110
Problem definition and Methodology 110
Introduction 110
Blossom 111
Wittybae 111
Outcome 111
Conclusion 111
Learning outcome 112
Bibliography 113
8
List of Tables
9
List of Figures
10
27 Fig 5.2: Hanbond-H8 plus 50
11
56 Fig 10.10: 5S chart - sewing floor 87
12
Chapter One
1.1 Sai Creation
Sai Creations is an apparel, fashion accessory and home goods export house which
is involved in producing and export of the fashion apparels and various other
relevant products in the international market since 1994 along with an annual
turnover of 80 crores. They have worked for over 2 decades in this industry, hence,
they have grown to be one of the known companies of the fashion industry and
retained a good position while catering the quality goods to various renowned
international brands.
Sai Creations, steered by the efforts of about 950 employees; has 2 production
factories. On our tenure of internship they closed their rented factory and bought
13
another unit near their HQ. They are a formidable force to meet any goal and
deadline.
The focus of the export house has always been on the production of high-quality fast
fashion garments. The client list speaks volume for the commitment Sai Creations
has towards customer satisfaction. The markets to which a chuck of exports go to
are Australia, US, UK, South Africa. The clients have relied on the company’s
commitment and that is a testimonial to the always on the time delivery and quality
checks, finishing and shipment are all taken care by exceptionally motivated and
experienced staff.
14
Uttar Pradesh, India
Sedex
● And finally, they aim to fulfill the expectations of their shareholders, supply
chain partners and the communities they operate in.
15
1.4 Company’s Vision
● To inspire and lead the Apparel Industry through Integrity, Innovation,
Collaboration and Operational Excellence
● Ethical: They maintain integrity in their dealings with all their stakeholders.
● Innovation: They are never satisfied with the status quotient and always
strive to find better ways of doing things.
● Reliable: They don’t promise what they cannot deliver and will not
compromise on quality.
16
1.6.1 Women’s Wear
They produce from casual daywear to sparkling evening outfits. Their product range
is available in many eye-catching silhouettes and colors as per the trends of the
global market. They have experience in handling all kinds of fabrics, be it woven as
well as knits (outsource).
They have a womenswear collection ranging from petite to plus size, including
garments like tops, bottoms, dresses and many more.
17
Fig 1.3: (Anonymous, “Women’s Wear” 2020.JPEG file)
18
1.6.2 Kid’s Wear
Sai Creations offers a wide range of kid’s wear. Their product range is available in a
variety of appealing styles and colors as per the demand of the global market.
The clothes are made keeping all safety measures in consideration, without the
usage of any harmful chemicals. The different varieties of garments are produced for
girls and boys for various seasons, incorporating vibrant colors and of quality.
19
1.6.3 Bags
The product range contains a large variety of bags, basically consisting of tote bags.
They have a separate home concepts facility in Panipat. Cushions, pillows, pouffes,
curtains, bed linen, rugs, throws, wall hangings, doormat and many more
mesmerising products are present. They specialize in fabrics like Linen, Kantha
Quilting, Hemp, Rattan etc.
20
1.7 Major Buyers
21
1.8 Company Hierarchy
22
1.9 Process flow of Organization
23
Chapter Two
2.1 Marketing
Mr. Rahul Anand is the Marketing Head of Sai Creations. The organization believes
in direct contact with their buyers. They used to have business in two ways one
through the buying agencies while another with unmediated buyers or liaison offices.
They follow three practices to grab business around the world-
● Travel & Local Market Research- They schedule meetings with different
buyers by connecting with them from different social media platforms like
linkedin for instance. And when they go to the local markets in different cities
of their target country, they get to know about various other buyers and they
research about them and connect and set up meetings with them through
linkedin or gmail.
● Linkedin- They mainly use linkedin to connect with different people from
brands like forever 21 (current main client), zara, etc.
● Referencing- Referencing here means for instance they are one of the major
nominated factories in India for the Cotton on Group, Australia, so through
this group they’ve been referenced to other buyers in Australia and hence
build their network like this.
In the next five years, they are planning to set up offices or companies in different
countries where they can directly coordinate with the buyers of companies having
similar portfolios or they have the possibility to produce the requisite. They are
already working to expand their export company into multi-national in Los Angeles,
further planning to open offices in countries like Australia and the United Kingdom.
They believe that it may be a cost-oriented affair but worth it for better connection
and communication with their direct customers.
24
2.2 Merchandising
Merchandising department plays a critical role in the fulfilment of an export order.
The successful processing of an export order requires multiple procedures in
merchandising divisions.
The term Merchandising is the process of dealing with any product from its sales
confirmation, design analysis, raw material sourcing, production and quality control
and shipment arrangement to the customer within a specific time frame. This is the
heart of the organization.
After shipment and dispatching merchandiser is also responsible for buyer claim,
profit and subsequent orders. If the buyer has any problem with the quality of the
product, then it is the responsibility of the merchandiser to resolve the problem with
the buyer.
25
Fig 2.2: (Baheti, Preeti.”Merchandising Department” 2021. JPEG File.)
At all these stages samples are made for the particular style to be ordered.
Development Stage- Each kind of sample is made for four places, one they keep for
themselves and the last one for a factory i.e. for bulk production.
Whenever any sample is dispatched it does so with a dispatch challan. Three copies
of it are made; one kept by the merchandising department, the other to the buyer
and third to the factory.
26
b. LA Sample: Line Adoption sample is made keeping all the changes done in
proto sample. At this stage, it is of a particular style, if there are three colors
then the samples will be made for all of them. The costing will be altered.
Everything used in this sample will match all the specifications from fabric to
trims. Measurements may vary. This sample’s fabric and trims are ordered
from suppliers with a deadline. This sample is made from FOB from a
supplier.
In general for fabric it is 25-30 days and for trims it is 10-15 days. In case of late
deliveries reasons are to be mentioned and dates are rescheduled.
27
2. Preparation of Bill of Materials (BOM):
The merchandising team receives the details of all the style features in the
particular order. This also includes the following:
● Fabric quality details
● Thread details
● Finish details
● Accessories like beads, sequins, laces, etc.
● Prints and embroidery
● Trims like buttons,zippers
● Wash care labels
● Size labels
● Brand labels
● Packing material details
Besides this, the merchandisers also receive the fabric consumption per garment for
complete size set from the sampling section, thread consumption per garment from
the Planning Department and the accessories requirement per garment from the
sampling department. Based on this information received, the merchandiser
prepares a Bill of Materials (BOM).
The following are the common details which are found in it:
● Size and Color wise quantity
● Dispatch dates for all the lots and the quantity for the lots
● Total order quantity
28
● Cutting details
● Construction sheet
● Finishing and packing details
● Specification sheet
29
2.2.5 Process flow of Merchandising Department
30
Chapter Three
3.1 Sampling Department
The sampling department directly coordinates with the merchandising and
production department. Merchandiser procures orders from the buyer. The buyer
sends the specification sheet, sketches, fabric details, embellishment details, stitch
type etc., to the merchandiser. Merchandiser files this information along with the
details regarding costing, average consumption, prototype, fit, correction, size set
and approval into a style package and hands it over to the sampling department
head.
● Proto Sample:
Proto sample is the first sample in the production development stage in the
31
apparel industry. It is prepared according to the buyer’s specification. This
type of sample is designed by the designers. Fit and fabric detailing is not
considered in this sample.
● Fit Sample:
Fit samples are samples produced by a manufacturer so that the company
purchasing the product can review the garments to make certain they fit
properly to the human body. In other words, the primary function of a fit
sample is to evaluate fit.
● Pre-production Sample:
Pre-production samples are essentially an example of what will be produced
during the manufacturing processes. The pre-production samples are
garments that are produced in the facility that is planning to manufacture the
bulk order.
● TOP Sample:
TOP stands for “top of production” and is a set of samples that is taken off the
line during your first production run. Top of production is the final sample
stage that happens during production where we get to see what our line will
look like before it reaches our customers.
● Shipment Sample:
This is the sample which is required by the buyer after the final inspection is
passed and the goods are ready for shipment.
● Salesman Sample:
Salesman sample is used by the sales team of buyers to enhance the sales of
any garment. Buyer sends the sample to the salesman in the market to
receive market feedback from the customers.
32
3.2 Process Flow
33
Fig 3.3: (Agnihotri, Shubhi.”Design to Pattern” 2021. JPEG file)
34
Chapter Four
4.1 Fabric, Trim and Accessories Store
Fabric and trim stores receive a merchant file from the merchandising department
which mentions all the specifications required as well as the requirement of fabric for
production. The file contains swatch and trim cards, BOM, the style image and
approved details about raw materials.
The fabric in Sai Creations comes from the textile industries of South, like
Coimbatore, Tripura, Salem by companies like Gnanam Tex and also from Surat.
They source majorly three types of fabric- Yarn Dyed Cotton, Greige 100% Cotton
which is further sent for dyeing and 100% polyester. The yarn dyed and polyester
can be arrived in 30-35 days whereas dyed fabric can arrive in 40-45 days. The first
two come from the south whereas polyester comes from Surat.
● The fabric required is printed then strike-off is checked for the scaling of
design, colour and print. The strike-off is a sample of fabric printed on the
requirements approved by the buyer.
● The solid colour fabric returned after dyeing is checked if the pantone colour
is the same, lab-dips are matched.
● The yarn dyed fabric receives bit loom which is one kind of fabric
development sample to have an idea how the fabric will be constructed.
After the bulk arrives the fabric is expected to be inspected 100% on the 4 point
system as well as check for colour bleeding, crocking, etc. Then after it passes on
the quality it is given the green sticker on it specifying the details about inspection.
There are other two stickers like slips of red and yellow which show the rejected
fabric and fabric whose further decision is to be taken by the merchant.
35
Fig 4.1: (Agnihotri, Shubhi. “Quality Stickers for Inspection” 2021. JPEG File.)
After the fabric is passed the entry is done in the ERP (Enterprise Resource
Planning) for which at present they are using GreenMaple, in the past they used
Bluekaktus and in the present course another ERP named VisibleGems seminars
are going on in Sai Creations. GreenMaple was easier to use with more features in
comparison to Bluekaktus whereas they are switching to VisibleGems as it is easier
to update the process in between and is more flexible as well as advance from the
later one.
The requirement slips from the cutting department comes in the fabric store to issue
challan for the same which keeps a track of how much fabric is issued and to which
unit. The main role of the store is to track the order from the supplier as well as the
internal sourcing of the raw materials.
The trim and accessories store track the same. The trims involved here are zippers,
lace, buttons, wash-care label and thread whereas accessories include hang tag,
size tape, etc. The lace used is majorly croatia and knitted which is chemically
treated whose prime supplier is which can be available in 15-20 days after ordering.
36
fabric lots as per the standard procedures. When the fabric is received from the
supplier, it is received along with an invoice which will contain the order reference
number and the buyer name. The fabric rolls are then checked whether the invoice
quantity and the actual quantity are same or not.
The swatches of fabrics are cut beforehand from the fabric rolls and they are used
for shrinkage tests. Markings are done on the swatch before washing and after
washing those marks are re-measured for shrinkage. Codes on fabric are written
which depict its color shade, length, width and style. According to shrinkage, patterns
are made. Each roll has its own shrinkage. Each style has a unique ‘DO’ number
which is given by the company.
37
● Weaving defects
● Shrinkage (steam and fusing)
● Color fastness
● Hand feel
● Face side
Each roll before being sent for spreading is passed through a relaxing process; in
this process the roll is kept for 24 hours or as specified by the buyer, for relaxing so
that cutting is accurate.
38
4.2.4 Fabric Store Process Flow
Fig. 4.3: (Agnihotri, Shubhi. “Process Flow of Fabric Store” 2021. JPEG File.)
39
4.3 Trim Store:
● Trims are an essential part of the construction of the garment. The trims
department controls the trims sourcing from various suppliers and then it is
supplied to the various departments at specified time as per the requirement.
The department does the function of inspection. And after inspection the trims
are stored in the store and then are issued to the particular department on
requisition.
● The duty of it is to keep the stock of different accessories and trims, machine
accessories, consumables and packing materials.
● Trims and accessories like- threads, labels, hand tags, buttons, etc.
● Machine accessories like- needle, presser foot,etc.
● Consumables like- oil, grease, chalks, etc.
● Packing Materials like- poly bags, cartons, hand bags, etc.
● They also keep the stock of folders and attachments and stationary needed
by the factory.
Storage: The trims and the accessories store have different racks allotted buyer
wise, for the storage of incoming trims and accessories. The goods are stored in
boxes or cardboard or in plastic bins
40
● Exact issuing of materials
● Keeping track of the stock
● Replenishing the store
● Keeping track of the leftovers
41
4.3.3 Process Flow of Trim Store
Fig. 4.5: (Agnihotri, Shubhi. “Process Flow of Trim Store” 2021. PNG File)
42
4.4 Fabric Inspection
After the fabric is received, it is inspected to determine its acceptability from a quality
point of view; otherwise, extra cost in garment manufacturing may be incurred due to
either the loss of the material or time, to say nothing of customer returns and
dissatisfaction due to poor quality. Fabric inspection prior to spreading will remove
the burden of quality responsibility from those performing the spreading and cutting
functions.
The important point is fabric should be inspected before cutting, the defects marked
and the patterns cut around the defects so as not to include them in the finished
garments.
The GSM is also calculated. The fabric is cut from the middle to take out the GSM as
the fabric on the ends or on the sides will not be in a correct position as it undergoes
a lot of stretch and stress. The fabric is cut into two halves. One half is cut to take out
the GSM. The other half of the fabric is folded and kept with other fabrics to see if
there is any shade variation among the rolls.
Fabric flaws and defects are assigned point values based on the following:
43
Length of defect Penalty Points Allotted
3 inches 1
3-6 inches 2
6-9 inches 3
Over 9 inches 4
Total defect points per 100 sq. yards are calculated, and normally those fabric rolls
containing more that 40 points per 100 sq. yard are considered “seconds”. However,
different buyers have their different acceptance criteria.
44
Fig. 4.7: (Baheti, Preeti.”Fabric Inspection Table” 2021. JPEG File)
45
● Point allowed: The total points to be allowed are calculated via a standard
formula= Weight of all (kg)X 383/GSM
● Accept/Reject: Then the decision is made whether to accept or reject the
particular lot. This is determined again by a formula= Total Points X
100/Points Allowed.
● This tells whether to grade the fabric as A,B,C or D grade.
○ 0- 25%: A= Accepted
○ 25- 50%: B= Under Decision
○ 50- 75%: C= Under Decision
○ 75% and above: D= Rejected
Each fabric roll of a particular style has different shrinkages. As for fabrics
with different shrinkage, the markers are to be developed accordingly by
grading (upgrading, downgrading) the size of marker. Shrinkage is important
46
as the fabric after wash will shrink or change its dimensions differently for
different fabric rolls and if in cutting the fabrics with different shrinkage are cut
together, then at later stage in the sewing section the different parts of the
garment will shrink differently after dyeing; giving the garment a deformed
shape and hence would be rejected.
47
Category B (textile products 4.0 to 8.5
in direct contact with skin)
48
Chapter Five
5.1 CAD Department
In the Computer Aided Design Department patterns were being developed by
software Optitex. Mr. Sanjay, the head of the CAD department, digitizes the paper
patterns through digitizer. Patterns initially are made in only one size and then
graded for a complete range of sizes.
The previous softwares used by the company were Tukacad, Gerber Technology,
and Red tree. The changes happen due to the fact that optitex provides better
optimisation and is user-friendly. The usual comments of buyers related to the
pattern are directly corrected in the respective DXF file of that style.
49
Procedures:
● Buyer or designer sends a soft pattern or sketch.
● A master in the sampling department develops a paper pattern that has to be
developed as per sketch and later on it is to digitize a soft pattern.
● Note: Adding shrinkage percentage length and width wise and fabric usable
width in a pattern as per details received from fabric department for particular
purchase order.
● A pattern to be approved by Style Executive
● A sample garment to be developed as per approved pattern
● Sample to be approved by buyer; buyer sends comments and size ratio.
● CAD technician is to do grading as per size ratio and specification sheet
● Sampling department is to develop size set and send to buyer for approval
● Buyer will place a purchase order
● If buyer asked for pre-production sample, pre-production sample is to be
developed and buyer approval needs to be taken
● Simultaneously, Purchase/ merchandising department has to procure fabric,
trims and accessories
● Bulk production starts after taking approval of pre-production sample and
buyer comments taken into consideration
● Cutting department is to prepare the cut plan for a required purchase order as
per required size, ratio and color.
● CAD operator is to develop a marker plan as per required size, ratio and
usable fabric width.
● The general efficiency of the marker ranges from 75% to 80%.
50
● As per departmental planning, lay report, cut summary, mini marker and
plotter marker is to be generated and given to the laying section.
● For bulk orders 8 way and 4 way markers were used instead of 2 way and 1
way
5.2 Spreading
After the fabric is issued from the Fabric Store, the fabric is unloaded in the
spreading and cutting room for the purpose of cutting. The fabric is sent for washing
to check the Lot Shrinkage. After the fabric is received from washing, again the
shrinkage check is done. If the shrinkage comes out to be less than or equal to 5%,
then the shrinkage is added in the pattern. But, if the shrinkage comes out to be
more than 5%, then the fabric is again sent for washing for the shrinkage check of
the residual shrinkage. Now, again there can be two possibilities here- if the fabric
shrinkage comes out to be less than 3% then the shrinkage is added to the pattern
itself otherwise the fabric is sent for the wash again.
51
When the Lot shrinkage check is done, then the fabric is spread. Spreading is the
process of superimposing lengths of fabric on a spreading table, cutting table, or
specially designed surface in preparation for the cutting process. The actual process
of spreading involves laying out fabric in the desired number of layers. Block cutting
is done for those panels which are to be sent for embroidery and printing. A spread
may be laid up by one person or two, depending on the width and type of fabric,
equipment, and size of spread.
Normally there are two to three people involved in the process of spreading. One
person stands on the end of the table and pulls the fabric and releases it for
spreading. The other two people carry the fabric from one end to the other.
For Spreading, the normal relaxation time given was 4 hours, but depending on the
time and emergency of the style, the time was even reduced to 1 hour.
7-8cms = 7-8cms = 2.5-3” 7.5-9cms = r 7.5-9cms = 3-3.5” Single Jersey Jacquard
7-8cms = 2.5-3” 7-8 cms = 2.5-3” 10-12cms = 10-12cms = 4-4.5” Pique Solid
7.5-9cms = 3-3.5” Single Jersey Solid 7.5-9cms = 3-3.5”
52
Jersey Auto-Stripe 3”-3.5”
Fleece 4”-4.5”
5.3 Cutting
After the marking is done, the CAD marker is spread over the fabric. The CAD
marker has all the information regarding the pattern such as the size of the pattern,
style number, notches, length of the marker, width of the marker, efficiency and
number of patterns in the marker.
The marker is taped on the top of fabric after tearing some spot so it doesn’t move
and it is easy to cut.
53
Fig 5.6: (Agnihotri, Shubhi.“Kingsew Straight Knife” 2021.JPEG File)
5.3.1 Fusing
It was being done on the pieces of fabric, on top of them the pattern pieces were
placed and then cut.
54
Ticketing is the process of marking the cut components for shade matching
precision, size, and sequence identification. The worker secures one end of the
stack and puts on the ticket using a ticket gun as he flips over the cut parts. The
ticket serves as an important means to track the parts of the garment in the
assembly line from start to end.
Bundling: It is done to prevent mixing and distortion of pieces. A bundle is tied and a
bundle ticket is attached to it, this ticket contains:
● Bundle Number
● Order Number
● Number of Pieces
● Lay Number
● Sizes
● Pattern
● Style
The pieces are sorted out size wise and quantity wise. The details are sorted in a
sorting register to check whether the correct amount has been cut or not.
The bundling label contains the following:
● Serial number of bundles
● Ticket numbers of the garments present in the bundle
● Size number of garment
● Number of pieces in the bundle
● Name of parts contained in the garment
● Number of lots contained in the bundle
55
5.5 Process flow of Spreading & Cutting
Department
Fig 5.8: (Agnihotri, Shubhi.“Process Flow of Spreading & Cutting” 2021.PNG File)
56
5.6 Re-cutting
Re-cutting is the process of cutting a panel from the fabric to replace the defective
panel. Re-cutting is done when the panel or part of a garment is found with some
weaving or dyeing defect which cannot be fixed by any means.
In re-cutting, the panel is brought to the cutting table. The panel has some marked
details such as the fabric lot number, pattern number, shrinkage, name of the panel
and the ticketing number.
At re-cutting, cut bits of the fabric left out after spreading are brought to the table
having the same pattern number and shrinkage as that of the defective panel. The
labour then takes out the hardcopy pattern for the panel, traces it on the cut bit fabric
and then cuts it accordingly. The newly cut panel is sent to the bundling QC area
where it is again inspected and if it passes the test, it is included in the bundle and
then later dispatched for batch production.
5.7 Embroidery
The cutting department is responsible for sending the cut components of a style for
embroidery or printing as stated in the production packages. They check for any
embroidery/printing and follow up these departments accordingly. Blocks of panels
are sent for embroidery/printing, which are re-cut after receiving back. For intricate
embroidery and printing the department outsources it as these are not available in
the export house. Only basic embroidery can be done inhouse.
57
Chapter Six
6.1 Sewing Department
The factory manager receives a production file whereas the Quality manager
receives a Quality Control file from the production planning department. The
production planning department works hand in hand with the merchandising
department to make a time and action plan to have daily, weekly and monthly targets
to accomplish, so that production for order is on time. The files before coming into
production are collaborated in various pre-production meetings; these have been
analyzed by research and development to make sure that the product is made in
optimal conditions which is also financially beneficial.
After the final pre-production meeting on the set standards, the received bundles
from the cutting department are brought to be stitched. The sewing floors of unit
D-129 have 8 sewing lines of which 3-5 are dedicated to production of bags
depending on the orders. The line for a common garment can be set within 1 to 2
days. The first day is utilized in setting up the line; on the second day it tries to give
certain production whereas on the third day in most cases they reach peak
production of around 350-500 pieces per line per day.
58
The production produced is checked hourly by line supervisor and floor supervisors,
while quality is kept in check by quality supervisor at the end of line by calculating
defects per hundred unit (DHU). In the beginning phase of production in-line
checking is also done to perish at the root of its occurrence or it is done if in the end
line the defects at certain areas are coming constantly.
The Industrial Engineering department closely works with production. They provide
merchants with the initial cost of production beside material cost is calculated by the
merchant itself. They give them thread average, CMT cost, etc.
The Operation Breakdown made by them is based on their experience of work, such
as Mr. Devendar, I.E. professional, says that his previous experience and practical
knowledge acquired from Shahi Exports helps him in doing so further the SAM is
verified by the VP of Operations as well. The target is like 15% of the order on the
first day of set-up then 30%, 45% and goes up till 60% for orders of 5,000 pieces;
65% for 7,000 pieces; and maximum upto 70% for orders above 7,000 pieces.
59
6.2 Process flow of Sewing Department
60
Fig. 6.3: (Agnihotri, Shubhi.“Process flow of Sewing Floor” 2021.PNG File)
If in production any additional machinery is required then they rent them from
contractors for the time basis of the order.
61
Chapter Seven
7.1 Washing
The garment washing is done after the sewing process. This area is also utilised by
the sampling department while producing samples for the buyer to give the feel after
washing fabric or garment during the approval process. The washing recipe depends
upon the requirements of the buyer.
62
The purpose of washing a fabric is to bring dimensional stability in garments by
eliminating the possibility of shrinkage. While garment washing is also done to have
a faded or colour tinted look.
The other washing process that they outsource to other vendors are:
● Heavy enzyme or Vintage Wash: The term "vintage" refers to an aged
appearance. Garments are laundered in the washing machine with enzymes
to give them an old or worn appearance. The heavy enzyme is used to wash
fleece sweatshirts.
● Cloud wash: Cloud wash creates white areas on the surface of the garment
that resemble clouds in the sky.
● Stonewash: During the washing process, white stone is combined with
enzymes to provide a faded appearance on the garment surface. Fabric
comes into contact with stones when being washed, and the colour fades as a
result of rubbing. Denim products are commonly washed using stonewash.
● Acid wash: Acid wash removes the garment's basic colour by spraying acid on
the designated spots.
In the house there are two tumble dryers and one washing Machine as well as a dry
cleaning machine.
63
7.2 Process flow of Washing
64
Chapter Eight
8.1 Finishing Department
Finishing operations include final pressing, trimming, inspecting, labeling, ticketing
and bagging. Pressed garments are tagged and bagged for shipping. The labels and
tickets used depending on the buyer’s needs.
Objective:
● Improve the appearance of the garment
● Improve the drape by pressing
● Improve the durability of the garments
● Packing for dispatch
65
Fig. 8.1: (Agnihotri, Shubhi.“Process Flow of Finishing Department” 2021.PNG File)
● Trimming of Threads:
Trimming removes thread ends and loose threads and contributes to a neat
appearance in the final garment. Trimming is another indication of quality and
attention to detail in the production process. They also take care of the thread
66
which clots during the stitching process. This is done with the help of a
trimmer.
● Removal of Stickers:
This process removes the unwanted stickers stuck on the garments. The
operator can use a rod wrapped by cello tape to remove the threads or can do
it manually by hand.
● Spotting:
This is done to remove the stains from the garments. The stains are generally
pen, pencil or chalk marks, oil spots etc. the operator uses acetone or vinyl for
removing spots. They have jet spray also attached to their table. They also
have a dry air pipe which dries the wet spots.
67
Fig. 8.3:(Baheti, Preeti.”Material Safety Data Sheet” 2021.JPEG File)
● Pressing:
Pressing is the most prevalent molding process used in the apparel industries.
Pressing is any molding process which varies the fabric’s geometric structure
or characteristics by applying mechanical pressure (solid or air) to the fabric.
Iron Pressing: It is the molding process in which pressure is applied with the
flat contact surface of a flat iron.
Pressing Table: The pressing table is attached with steam which provides
steam to the press and a vacuum table which helps in easy laying of the
garment.
68
Fig 8.4: (Baheti, Preeti.”Pressing Area” 2021.JPEG File)
● Measurement:
The garments are now checked for the required measurements.
● Final Pressing:
Final Pressing adds the final shape to seams and garments. It softens fibres
and sets the desired shape.
● Tagging:
Ticketing and tagging prepare the garment for retail presentation. In this hang
tag are attached. It includes:
❖ UPC codes
❖ Style number
❖ Price
69
❖ Size
❖ Color
● Folding:
The garments are either folded or hung on hangers according to the buyer’s
requirements. This process is completely manual.
● Packing:
Garments are folded and packaged or placed on hangers and covered with
plastic bags. The carton packing is done countrywise depending on where the
shipment is going to be delivered, at times the goods are of mixed colour and
sizes depending on the order specification.
● Metal Detectors:
The 100% check happens before carton packing and after that final inspection
is done by the buyer or its nominated representative.
70
Fig. 8.7: (Baheti, Preeti.”Easement Needle Detector” 2021.JPEG File)
71
Chapter Nine
9.1.2 Administrations
This policy should be maintained by HR. From time-to-time additional information
may be added, or instruction updated, and unit HR is responsible for ensuring that
any changes / Modification /deletion are properly updated and have the prior
approval of management.
72
9.1.3 Confidentiality
This policy manual and all forms and strictly confidential are not to be shown to
non-employees outside the company. Sharing of this information with an outside
individual is in violation of the confidentiality agreement.
9.1.4 HR Mission
To facilitate an environment where each member of the organisation is able to
contribute their best.
9.2 HR Policy
9.2.1 Attendance
Objective-
To clearly define the terms and conditions for all the employees for coming and
going from the place of work so as to maintain proper discipline in the organisation.
Scope-
All the employees of the organisation are covered under this.
Procedure-
● All employees are required to mark their daily attendance by punching their
card / Thumb impression on a biometric machine while entering and leaving
the office /Plant premises. Without Punching no attendance will be
recognised.
● All employees are required to fill in the outdoor duty slip before leaving from
the office plant for office work during office hours and submit the approved slip
from the concerned HOD / immediate superior, to the location HR department
for making necessary entries in attendance record.
● The company discourages employees from coming late to Office / Factory.
● For extreme circumstances it provides a grace period of 15 minutes.
Scope-
All the employees of the organisation are covered under this.
Procedure-
73
● The Company provides a maximum 10 Leaves to its employees based at
organisation.
● The Management has the discretion to open the unit on any holidays except
National holidays depending upon the exigencies of the work.
Kinds of Leave-
1. Earned Leave (EL):
● EL is given with the purpose of providing the employees with an annual
Vacation from work.
● All employees are entitled for 14 days EL in-calendar years.
● No, El Can be availed by employees during the notice period while under
resignation.
Procedure-
● For taking any leave, an employee is required to submit the leave application
giving all the details regarding duration, type of leaves, etc.
● Leaves record in respect of the unit shall be maintained by the Unit HR
Department. However, in respect of branches, the concerned branch office
shall be responsible for maintaining the leave record.
74
9.2.4 Joining Formalities and Induction
Objective-
To establish a company wide orientation programme to familiarise the new employee
with the organisation, its business, working culture, rules, policies and practices
directly affect him, to build confidence so that he is able to give his best to the
organisation.
Policy-
● The location HR Department will be responsible for providing an orientation to
the new employee starting from the next day of joining of the new employee.
● The HR Department is responsible for designing the induction program of
every new employee joining the company.
● The HR Department will ensure completion of all joining formalities for the
new employees.
75
Chapter Ten
10.1 Project 1
Implementation Of 5S
Abstract
An industry whether garment, automobile or food processing, requires certain set
protocols and methods to function properly, efficiently and as a whole. In absence of
an organised and well settled work-environment, the production may face several
difficulties and unnecessary delays which may lead to inconsistency. The 5S system
helps keep the departments and floors organised which will always help in finding
the required materials on time and hence will help increase the efficiency.
The objective of the project is to provide an organised and tidy environment across
the company. 5S makes it easy to locate items and places on the floor which
ultimately increases the efficiency.
Introduction
5S is a system for organizing spaces so work can be performed efficiently,
effectively, and safely. This system focuses on putting everything where it belongs
and keeping the workplace clean, which makes it easier for people to do their jobs
without wasting time or risking injury.
1. Seiri Sort
3. Seiso Shine
4. Seiketsu Standardize
5. Shitsuke Sustain
We aimed to introduce 5S in the two departments with the most tedious tasks
making the workers and management understand its benefits. The implementation
of 5S on sewing and finishing floors helped to increase the efficiency and speed.
76
Objective
On sewing and finishing floors, the purpose of 5S implementation is to bring items
closer to operations and workers, organise and label them, and eliminate wasted
time and materials. The 5S philosophy is based on the principle of “a place for
everything and everything in its place,” and it aids in the elimination of wasted time,
space, and inventory. The objective of the project is to provide an organised and tidy
environment across the company. 5S makes it easy to locate items and places on
the floor which ultimately increases the efficiency.
5s Implementation On:
Sewing Floor
Sewing is an important department in the garment industry. All the parts of a garment
are joined here by making stitches with the help of needle and thread.
If all the items/materials are placed in their designated positions, then getting them
when required will get easier.
There are workers, helpers, checkers, line masters, floor supervisors and production
managers in the sewing department.
77
Main responsibilities of a worker:
● Sew the panels together without making any error.
Before starting the product construction, the most efficient and cheap stitches are
researched and finalized which helps the organization maximize profit, produce good
quality products and minimize the efforts.
Activities Involved:
1. Sourcing cut panels from cutting floor
2. Sourcing trims and accessories from the trim store
78
5S
1. Seiri (Sort):
Unnecessary items Sorted them out on the More cleaner floors and
lying on the floor and basis of their space created for items
kept on tables requirement frequency needed
Table 10.1 Sort- Sewing floor
79
Problem Identified Actions taken Results
Cut panels were lying Got segments More cleaner floors and
at random places on constructed under the space created for items
the floor tables behind each line needed
Table 10.3 Set in order- Sewing floor
80
Fig. 10.3: (Baheti, Preeti.“Accepting and rejecting boxes” 2021.JPEG File)
No designated place for Got racks placed on More cleaner floors and
the workers to keep each floor for the space created for items
their belongings so they workers to keep their needed and search
time reduced
used to keep them near belongings
their legs which might
become a reason for
some kind of accident
in future and occupying
space
Table 10.5 Set in order- Sewing floor
81
Fig. 10.4: (Baheti, Preeti.“Racks” 2021.JPEG File)
3. Seisu (Shine):
The floors and Removed the unwanted More cleaner floors and
pathways were always pieces and kept the space created for
dirty, with cut pieces needed ones on the walking and in case of
emergency
and threads lying all tables and racks
over the floor.
Table 10.6 Shine- Sewing floor
82
Fig. 10.5: (Agnihotri, Shubhi.“Dirty pathways” 2021.JPEG File)
83
4. Seiketsu (Standardize):
The floors were always The line masters and Clean and tidy floors
overloaded with cut floor supervisors were and easy to locate
panels as they were instructed to source cut pieces for sewing
sourced from the panels from cutting
cutting floor more than department two times a
required day, i.e. (I) In the
evening for the next
days’ work of first-half
and (II) Half-an-hour
before the lunch break;
no more than required
for each half in-order to
avoid overload
Table 10.8 Standardize- Sewing floor
84
Fig. 10.8: (Agnihotri, Shubhi.“Cut panels organization” 2021.JPEG File)
85
Fig. 10.9: (Baheti, Preeti.“Unwanted heaps lying in the corner” 2021.JPEG File)
86
The workers were informed to clean their workplace 3 times a day (In the morning
before they start working; before lunch and before departure) and make that a habit.
The sweeper was assigned the duty to clean the floor after every 2 hours
5. Shitsuke (Sustain):
Got some 5S charts printed and pasted in all departments where 5S was
implemented. The spots are clearly visible to everyone who is facing that
direction.
87
Finishing Floor
One of the most significant departments in the garment industry is the finishing
department. The finishing department has a significant impact on the final
transportation of the products. This department is also responsible for the target
product quality level. As a result, the finishing department's smooth and efficient
functioning is critical.
5S
1. Seiri (Sort):
Unnecessary items Sorted them out on the More cleaner floors and
lying on the floor and basis of their space created for items
kept on and under the requirement frequency needed
tables
Table 10.10 Sort- Finishing floor
88
and effort and
made walk paths
clear using
tapes.
● We instructed
the workers to
place the fabric
under the table
with labelling of
the order
number, style
number, colour
and size.
89
Problem Identified Actions taken Results
90
Fig. 10.13: (Baheti, Preeti.“Personal belongings” 2021.JPEG File)
91
Fig. 10.14: (Baheti, Preeti.“Rejected garments” 2021.JPEG File)
3. Seiso (Shine):
Cleanliness is a crucial part of the working conditions in the finishing floor
where trimming of threads happens and various other plastics are used for
packaging and other processes. These can project a disturbance in the
working procedures.
92
● And we made
sure proper
cleaning is done
in the morning
before starting
the work, in the
lunch break and
in the evening
after the workers
leave.
Table 10.15 Shine- Finishing floor
93
Fig. 10.16: (Agnihotri, Shubhi.“Usage of polybags to collect waste” 2021.JPEG File)
4. Seiketsu (Standardise):
94
Fig. 10.17: (Agnihotri, Shubhi.“Standardization” 2021.JPEG File)
5. Shitsuke (Sustain):
Got the HR Department to print 5S charts and pasted in all departments
where 5S was implemented and gave workers proper training. The spots are
clearly visible to everyone who is facing that direction.
95
Fig. 10.18: (Agnihotri, Shubhi.“5S chart - finishing floor” 2021.JPEG File)
Outcome
As we visualised, the speed and efficiency increased and thus the lead time was reduced
and delivery happened in time and more space was created for the inventory and no extra
space was needed to keep products thus reducing inventory cost and eliminating wastage.
Conclusion
Apparel production demands efficient and cheap production to make more profit out
of every order. And, 5S proves to be the foundation for any organization that wants
their efficiency to increase.
96
● The procedures will not guarantee excellent performance nor good results.
However, what 5S will do is ensure that you have an organized, tidy and
well-settled environment, and a motivating company culture.
Learning outcome
We learned a bunch of new skills including a very important one called people
management and realised about the issues that arise when you apply a tool in a
practical scenario. Since it was our first industry meeting, we learned how to
convince industry people for our ideas and how to put forward our views and
highlight issues in a professional manner.
97
10.2 Project 2
Standard Operating System For Sai Creations
Abstract
An industry whether garment, automobile or food processing, requires certain set
protocols and methods to function properly, efficiently and as a whole. In the
absence of a standardized work method; the production may face several halts and
unnecessary delays which lead to inconsistency. Standard Operating Procedures
which are kept up to date, help negate the chaos as they not only play a pivotal role
in helping manage the work but also provide a learning curve for new employees.
Through a standard routine, employees enjoy more predictability in their work
environment and can sharpen their skills on each task to raise their overall
performance.
Introduction
Specific to operation, an SOP describes the activities necessary to complete tasks in
accordance with industry regulations, provincial laws or even just one’s own
standards for running business.
SOPs are procedures, policies and standards one needs in the operations,
marketing and administration disciplines within the business.
Objective
The objective of the project is to provide needed consistency across the company,
ensuring that the tasks which keep the organization running effectively are done the
way they should be. SOPs make it easy to find out what policies and procedures are
98
in place to handle a repetitive business scenario or tasks and standardizes many
crucial processes.
1.Merchandising Department
The mediating department between marketing and production is called the
merchandising department. Merchandiser is the person whose responsibility is to
execute the orders perfectly as per the costing and pricing. So, it is a very valuable
department.
Before starting the costing for a style, merchandiser must consider the following:
1. Fabric consumption
2. Margin
3. Labour Expenses
99
4. Exchange Rate
5. Thread Consumption
6. Trims and accessories cost
7. Finishing
8. Packaging
Activities involved:
1. Receive detailed information from buyers like style details, fabric type, quality
and fiber content, trim requirements and quality, color details and various
other details like washing, printing, embroideries etc.
2. Make prototypes, coordinate with the R & D team, find fabric costing and
initial costing, send samples with price and various other job works at
sampling stage etc.
3. Receive the purchase order and labour expenses, amendments if any,
confirm price, category, delivery schedule and the required lead time etc.
4. Get the approval for samples and trims, prepare the time and action calendar,
prepare the fabric and trim indent.
5. Coordinate with R&D and I.E., for further detailed technical reports.
6. Coordinate with PPC for production planning, send order status to the buying
office at every stage.
7. Call for the production meeting, prepare the production file and take care of
the budget at each stage.
100
Fig 10.19.(Baheti, Preeti. “SOP of Merchandising Department” 2021)
101
2. Fabric Store
Fabric Stores in the garment industry serve as the raw material storage facility. In
garment production, an adequate amount of fabric must be acquired and stored for
carrying out orders in time and maintaining continuity in manufacturing.
102
Fig 10.20.(Baheti, Preeti. “SOP of Fabric Store” 2021)
103
3. Cutting Department
Spreading is the process of smooth layering of fabrics in superimposed layers of
specified length. Spreading is done with the type of fabric, print of fabric and marker
issued by the CAD department.
Cutting is the process of separating out different garment parts from the lay of fabric
with the help of cutting templates and devices.
Objective:
● To maintain the quality of cut parts,
● To cut the fabric is required shape and quality
● Availability of cut parts on time.
104
Fig. 10.21.(Agnihotri, Shubhi. “SOP of Cutting Department” 2021)
4. Sewing Department
Sewing is an important department in the garment industry. All the parts of a garment
are joined here by making stitches with the help of needle and thread. Where, the
sewing process flow chart helps to make a complete garment easily. By maintaining
the sewing process flow chart, an order can be completed in time.
105
Fig. 10.22.(Baheti, Preeti. “SOP of Sewing Department” 2021)
106
5. Finishing Department
After assembly, the garments now come for finishing- a key stage of the garment
production process. It is done to prepare the final garment according to the quality
standards of the buyer before packing it for shipment.
Packing Norms:
1. All garments to be packed in individual poly bags,
2. Order must be completed (packed, ready for shipment) prior to loading.
3. Order must be inspected and audited by the factory.
4. Order must be of first quality; no repaired or ungraded garments should be in
licensed shipment.
5. Order must be shipped 100% complete otherwise notified.
6. After fulfilling the above standards, only then the packed goods are ready to
be passed through.
107
Fig. 10.23.(Agnihotri, Shubhi.“SOP of the Finishing Department” 2021).
108
Outcome
The result of these operating procedures is not having unnecessary delays and thus
reducing the lead time and other costs. Following a standard routine helped the departments
to maintain consistency.
Conclusion
Apparel production demands organized and timely output. SOP proves to be an
extremely useful business tool as it communicates the correct way of carrying out an
activity within the organization.
Learning outcome
We all know the benefits of following a routine but discovering its benefits in a
manufacturing environment was new for us. It made us realise why and how routines
and standard operating procedures are helpful to a corporation practically. We
learned the processes of the different departments in detail.
109
10.3 Project 3
Market Research
Abstract
Any business, be it garment, accessory, food or any other field, always needs a
proper research and careful analysis before taking a step towards it. A detailed
market research can help decide the products/services that can expand in the
market and gain profit.
Objective
The project is to get some handy but detailed information for the owner of Sai
Creations to rebuild and expand their brand that failed earlier due to poor market
research and planning.
Introduction
Market research is a detailed study of every event and product that is popular in the
market, the business rivals, threats, etc. It helps to understand what the
customer/consumer wants, needs, desires for.
Wittybae (for women) was a brand founded by Mr. Rahul Anand and Mr. Akash
Anand, the Directors of Sai Creations. The brand was doing well for some period of
time but then it collapsed. The demand for their products decreased while their
inventory was still not empty. They had to sell all the left-over product on loss and
then they shut the brand in 2017. This was all the result of poor market research and
110
poor strategy. Now, they want to restart their brand Wittybae and 2 other brands
dedicated purely for kids and men.
1. Blossom
● Blossom is the tentative name given to the brand for kids. Their target
markets are Indian and Dubai markets.
● This brand has been planned to launch in the 1st phase as it has the least
competition.
● We searched for some potential e-commerce sites that they could partner
with, both in India and Dubai.
Women’s wear:
For women’s wear their target markets are Indian and Dubai markets. We browsed
through various e-commerce platforms both available in India and Dubai. We also
researched about the women’s wear that is majorly worn in Dubai and got to know
about a lot of different kinds of apparel items worn in such Gulf Countries. They
target the women from age 16-25.
2. Wittybae
● Wittybae is the confirmed name for womens’ wear brand. Their target markets
are Indian and Dubai Markets.
● This brand has been planned to re-launch in the 2nd phase as this is the
category with the most traffic.
● We made a lean canvas for the same.
We searched for some potential e-commerce sites that they could partner with, both
in India and Dubai.
Outcome
The result of this research resulted Mr. Anand and all of us realised the mistakes that
were made earlier and we helped him with the detailed analysis about this brand's
competitors also. This made his work to start the brand again easier and more clear.
Conclusion
Market research is the base to a business, and this cannot be done wrong or the
consequences can be very harsh. One wrong information can ruin the complete
research and also waste all the efforts and investments made for the business.
This does not guarantee hundred percent profit but if done right then it makes sure
that business does not fail and instead rises with at least baby steps.
111
Learning outcome
As our interdisciplinary minor we have been studying marketing but applying it
practically gave us a lot of confidence and we learned about different customer
bases and what factors affect the buying decision of the customers. We also learned
a new tool called lean canvas that helps you identify problems and jot down solutions
as well. This tool is not only smart but it makes the picture more clearer and makes
you visualise things a lot better.
112
Bibliography
ASQ Quality Press. (n.d.). What are the five S'S of Lean.
https://asq.org/quality-resources/lean/five-s-tutorial
Oragui, D. (2019, November 20). How to Write Effective Standard Operating Procedures.
https://helpjuice.com/blog/standard-operating-procedure
https://ordnur.com/apparel/merchandising-duties-and-responsibilities-in-garments-fac
tory/
https://tallyfy.com/write-standard-operating-procedure-sop/
Textile Academy. (2019, May 6). Role of Merchandiser with Different Departments.
https://www.onlinetextileacademy.com/Role-merchandiser-departments-garment-indu
stry/
113