You are on page 1of 6

List of Projects

Sr. Project Brief Scope & Project Value Consultant Remarks if


Client Name
No. Duration in AED Ref. any
PRJ-031;
Jumeirah Al Naseem External Walls, Crack 1468987, Dtd.
1 AED 433,860/= Jumeriah Group
Hotel, Dubai, UAE Repairs & Painting 08-03-2020
Landscaped Areas, Ongoing
PRJ-030;
Repair Painting of Flare IPPL/ENN/PT-
IPPL-Indian Oil
stack and Supporting Petronas, 06/2019-20
2 Petronas Pvt. Ltd. AED 82,051/=
structures by Rope access Chennai Dated 10th Feb
Chennai, India
2020
28th Feb 2020 to 20th March
2020
PRJ-029
Dismantling and removal of B6CS6084047
SIXCO Construct, scaffolding/Deck platform SIXCO Masdar dated 18th Dec
3 from a planned shaft AED 25,000/=
Dubai, UAE City 2019.
27th Jan 2020 to 5th Feb
2020
Al Ghurair Resources PRJ-028; 351204001481
Dubai Oil Mill
4 LLC, Jebel Ali, Dubai, Removal of Roofing sheet AED 18,942/= dated 26th Nov
DOM Area
UAE form TR03 Metallic tower 2019.

PRJ-027;
Al Ghurair Resources 351204001481
Anchorage Rail GGE Elevator
5 LLC, Jebel Ali, Dubai, AED 16,275/= dated 23rd Nov
Inspection Plant
UAE 2019.
4th Feb 2020 to 9th Feb 2020
PRJ-026;
Cleaning of RRC collection
352104005353
Al Ghurair Resources Pit - Confined space work Extraction area,
dated 12th Nov
6 LLC, Jebel Ali, Dubai, AED 26,775/= RRC Collection
18th Dec 2019 to 15th Jan 2019.
UAE Pit- 95
2020

Doc. Ref:SubDivo-01-Access Systems Submission Page 1 of 6


Pre-Qualification Documentation
List of Projects – Project Experiences
Sr. Project Brief Scope & Project Value Consultant Remarks if
Client Name
No. Duration in AED Ref. any
PRJ-025;
Emirates Steel Removal of Dust and DRI
5909117112,
Industries PJSC., ICAD, above the roof of the Utility
7 AED 10,000/= SMP1 Dated 10th Oct
Mussafah, Abu habi, Pump Room,SMP1
2019.
UAE
16th Oct 2019 to 02nd Nov
2019
PRJ-024;
Ongoing Project,
Waagner Biro Installation of LED Panel on
expected to be
8 Emirates Contracting ADNEC Tower, AbuDhabi. AED 285,150/= ADNEC Tower
completed by 15
LLC., Dubai, UAE
26 Aug 2018 – 15 Nov
th th
Nov 2019
2019
PRJ-023;
Annual Maintenance Yearly
Grand Hyatt Hotel Abu Contract; External Glass Maintenance
9 AED 499,800/= Grand Hyatt
Dhabi, UAE & Facade Cleaning Contract until
13th July 2020
14th July 2019 to 13th July
2020
PRJ-022;
Proof Load Test- Hand
Master Bakers L.L.C
rail20 Main Office
10 AED 10,920/= 4500167994
Building

PRJ-021;
Integrity Inspection & Paint Bharat Heavy 7530000404,
INR 3,20,000/=
11 BHEL Bangalore, India Refurbishment of 7 Electricals Dated 22nd May
AED 19,900/=
Chimneys Limited. 2019
26th July – 10th Aug 2019
PRJ-020;
Emirates Steel
Damaged Roof Parapet
Industries PJSC., ICAD, POD-190519-
12 Gutter Sheet AED 32,379/= Rolling Mill
Mussafah, Abu Dhabi, 5909116590-
Replacement at RM2
UAE v1
Plant
26th Jun to 12th Sep 2019
Jumeirah Al Order Number:
14 Jumeirah Group PRJ-019 AED 8,927/=
Naseem Hotel 1365843

Doc. Ref:SubDivo-01-Access Systems Submission Page 2 of 6


Pre-Qualification Documentation
List of Projects – Project Experiences
Sr. Project Brief Scope & Project Value Consultant Remarks if
Client Name
No. Duration in AED Ref. any
Supply & Application of
Special Paint, Match the
existing colour
PRJ-018;
Power International Luxury Villa 2 / Deep EIBFS Email
15 AED 12,600/=
Group, Dubai, UAE Internal Cleaning byPower Building/AUH Confirmation
International Personnel
PRJ-017;
M/s ENE – Emirates
Deep Internal Cleaning by HE Al Dhaheri’s Email
16 National Est., Abu AED 9,975/=
Power International Office Confirmation
Dhabi. Personnel

PRJ-016;
M/s ENE – Emirates External Window & Wall HE Al Dhaheri’s Email
17 National Est., Abu and Inside Cleaning of AED 12,600/=
Office Confirmation
Dhabi. by FAS and Power
International
PRJ-015;
M/s ENE – Emirates Luxury Villa 1 / External HE Al Dhaheri’s Email
18 National Est., Abu Window by FAS Team AED 12,500/=
Office Confirmation
Dhabi. and Inside Cleaning by
Power International
PRJ-014;
19 Internal Company N/A N/A N/A
Assignment
PRJ-013;
M/s Ali & Sons Marine
Installation of Sacrificial
Engineering Factory, Selective
20 Anode on Jack up Legs of AED 8,925/= PO 2019000274
ICAD II, Mussafah, Abu Marine Services
SMS Faith & SMS
Dhabi, UAE
Mariam
5th – 9th March 2019
PRJ-012;
M/s ENE – Emirates Window & Wall and Inside
H E Al Email
21 National Est., Abu Cleaning of Emirates AED 5,980/=
Dhaheri’s Confirmation
Dhabi. Computer Building
Office
6th – 9th Feb 2019
Jumeirah Group,
Jumeirah Al
22 Jumeirah Al Naseem PRJ-011; AED 9,691.50/= PO 1365843
Naseem Hotel
Hotel, Dubai, UAE

Doc. Ref:SubDivo-01-Access Systems Submission Page 3 of 6


Pre-Qualification Documentation
List of Projects – Project Experiences
Sr. Project Brief Scope & Project Value Consultant Remarks if
Client Name
No. Duration in AED Ref. any
Painting the Lobby Approx
98Sqm Area to match the
Old Colour Scheme
24 – 25 Jan 2019

PRJ-010;
Window & Façade Cleaning
Etjar Investment LLC, PO Dated 31st
23 of Al Baraha Building AED 6,400/= Al Baraha Bldg.
Dubai, UAE Dec 2018
(Floor+Mz+Roof - 20Floors)
7 – 17 Jan 2019
PRJ-009;
Window & Façade Cleaning
M/s ENE – Emirates
of Al Nar Building H E Al Email
24 National Est., Abu AED 7,980/=
(18Floor+Mz+Roof - Dhaheri’s Confirmation
Dhabi.
20Floors) Office
28 Nov 2018 to 24 Dec 2018
PRJ-008;
Replace the Damaged
M/s Emirates Steel Emirates Steel
roofing Sheets & SMP-1, Steel
25 Industries PJSC., AED 163,666/= Purchase Order
Accumulated Dust, Mill Plant
Mussafah, Abu Dhabi ref. 5909115047
approx.
16Ton by Rope Access Crew
19 Feb 2018 to 30 Apr 2018
PRJ-007;
M/s ONGC – Oil Purchase Order
M/s CSL – Derrick Painting at ONGC INR & Natural Gas ref.SR9/
26 Cochin Shipyard MODU Sagar Bhushan,
AED 322,100/= Corporation of 4080011442,
Limted, Kerala, ST3 Prep., 4000Sqm
India. dated 30.01.18
India
3rd April to 3rd July 2018
PRJ-006;
Sheikh Zayed Memorial,
Removal of Temporary
M/s Al Fara’a Mesh around the pavilion
Email
27 General Contracting building by 6-member AED 18,000/= M/s Aurecon
Confirmation
LLC., Abu Dhabi Rope Access Crew, The
Constellation Project Abu
Dhabi.
10th to 12th Dec 2017

Doc. Ref:SubDivo-01-Access Systems Submission Page 4 of 6


Pre-Qualification Documentation
List of Projects – Project Experiences
Sr. Project Brief Scope & Project Value Consultant Remarks if
Client Name
No. Duration in AED Ref. any
PRJ-005;
Repairs & Painting of
Burner Stacks and Support Prezioso
M/s Prezioso EMDAD
Structures of ADMA-OPCO Purchase Order
28 LLC., Mussafah, Abu AED 193,650/= M/s Petrofac
at DAS Island, Abu Dhabi ref. 4500141074
Dhabi
Offshore by Rope A ccess / A642
Crew
28 Oct 2017 to 31 Dec 2017

PRJ-004;
6 Nos. Coke Drum Kelly /
Derrick Structure Painting /
Washing, Degreasing, St2
prep., Two coat primer
M/s Essar Oil Limited, touch-up, one final coat, INR Purchase Order
29 Jamnagar Refinery, Total Sqm - 19,469 / Berger DCU Ref. 4300022640
Gujrat, India Paint System: Primer: 2 coat AED 173,000/= dated 22-09-2017
Protectomastic + 1 Topcoat
Bergerthane / Client
Supplied the Paint

3rd Dec 2017 to 15th April


2018

PRJ-003;
INS SHAKTI - Hydro
Abrasive Blasting & Painting
of Superstructure, 625 Sqm:
SA2.5 Surf Prep.(HAB)
M/s ONGC – Oil
M/s CSL – (garnet)+1primer full coat INR & Natural Gas SR3/4080009659
30 Cochin Shipyard (Sigma Mastic Primer)
AED 116,500/= Corporation of Dated 14.08.2017
Limted, Kerala, (50micron)+ 2 intermediate
India.
India coat (MIO)(125 micron each
coat)+ 1 Topcoat Full Area.
(50 micron).
06 – 26 Oct 2017

Doc. Ref:SubDivo-01-Access Systems Submission Page 5 of 6


Pre-Qualification Documentation
List of Projects – Project Experiences
Sr. Project Brief Scope & Project Value Consultant Remarks if
Client Name
No. Duration in AED Ref. any

PRJ-002;
Trellis Arm Alignment - 2
Nos. / Installationof
M/s CBRE South Asia INR
Fasteners / DrillingMetal M/s FIFC Email
31 Pvt. Ltd. Mumbai –
Structure / 3memebr Rope AED 12,700/= Condominium Confirmation
India
Access Crew executed the
scope in one day
17th – 19th June 2017

PRJ-001;
Painting of 2 Heater Stacks
with associated structures
at HCU Complex; Wire
Brushing & Apply 2 Coat of
Heat Resistance Paint - Purchase Order
M/s BPCL
M/s Gopec – Shalimar Paints / Ladder & INR Ref. GOPEC /IPES
(Bharat Petro-
32 Gopinath Engineering Associated Structures; /BPCL-HCU SD
AED83,800/= Chemical
Company, Mumbai- Spot Prep. + 1 Coat Primer /095-2017 dated
Limited)
India Touch-up+ 1 Coat 20th Feb 2017
Intermediate Touch-up + 2
Coats of Topcoat Full Area. /
Paint provided by Client /
Brush & Rollers in our scope
24th Feb – 10th Mar 2017

(End of Document)

Doc. Ref: SubDivo-01-Access Systems Submission Page 6 of 6