You are on page 1of 1

LUGEON TEST - FIELD DATA SHEET

Job No.: Hole No.: Drilling Method: Borehole elevation (m RL): Test Date
Client: Dip (Deg): Drilling Contractor: Groundwater depth prior to test (m bgs):
Project: Bottom opf packer (m): Borehole Radius, rb (m): Height of drill rod stick-up (m):
Location: Base of borehole (m): Radius of Influence, R (m): Pressure Gauge Height (m ags):
Tested By: Test Length (m): Borehole flushed prior to test (yes / no): Packer Type:
Checked By: Test diameter (m): Injection water quality (clean, turbid, mud etc): Rock Type:

Flow Meter Flow Meter


Stage Test Pressure, P Time Stage Test Pressure, P Time Stage Test Pressure, P Time Flow Meter Reading
Reading Reading
(kPa) (min) (L) (kPa) (min) (L) (kPa) (min) (L)

Increase Water Pressure to P1 0 Increase Water Pressure to P2 0 Increase Water Pressure to P3 0

0.5 0.5 0.5

1.0 1.0 1.0

1.5 1.5 1.5

2.0 2.0 2.0

2.5 2.5 2.5


1 2 3
3.0 3.0 3.0

3.5 3.5 3.5

4.0 4.0 4.0

4.5 4.5 4.5

5.0 5.0 5.0

Increase Water Pressure to P4 0 Increase Water Pressure to P5 0 Decrease Water Pressure to P6 0

0.5 0.5 0.5

1.0 1.0 1.0

1.5 1.5 1.5

2.0 2.0 2.0

2.5 2.5 2.5


4 5 6
3.0 3.0 3.0

3.5 3.5 3.5

4.0 4.0 4.0

4.5 4.5 4.5

5.0 5.0 5.0

Decrease Water Pressure to P7 0 Decrease Water Pressure to P8 0 Decrease Water Pressure to P9 0

0.5 0.5 0.5

1.0 1.0 1.0

1.5 1.5 1.5

2.0 2.0 2.0

2.5 2.5 2.5


7 8 9
3.0 3.0 3.0

3.5 3.5 3.5

4.0 4.0 4.0

4.5 4.5 4.5

5.0 5.0 5.0

END OF TEST Flow meter reading 1 minute after end of injection

You might also like