CONTRACT NAME: CONTRACT NO.

HOT WORK TO BE PERFORMED:

AUTHORISED DURATION DATE: _______TO_______ TIME: _______TO_______

SOURCE OF IGNITION
ACETYLENE TORCH HELIARC WELDING SOLDERING
ELECTRIC ARC PROPANE TORCH OTHER
THIS HOT WORK PERMIT MAY BE AUTHORIZED ONLY AFTER SATISFACTORY COMPLIANCE WITH ALL ITEMS
ITEMS TO BE CHECKED
Floors swept clean and free of combustible material at least 10m horizontally as well as vertically
Non-movable combustible or flammable materials isolated, covered / shielded with fire retardant material?
Vertical and horizontal openings within 10 m sealed or covered for spark or vapor control?
Heat transmission, conduction, radiation, controlled or ventilated?
Hazardous / flammable / explosive material transfers disconnected within 21 m of hot work?
Lockout / tagout of electrical, mechanical, chemical, blanking, cap piping implemented?
Vessels, equipment drained, purged, ventilated, and cleaned?
Inert gas blanket required?
Building/area air currents and outdoor wind direction known / monitored?
Hazardous chemical spill kit location equipment and remedial plan available?
Supervisor notified of work location and time of operation? NAME:____________________________________
Involved personnel and contractor employees notified of hazards? NAME:______________________________
Means of egress identified and available / accessible?
Fire fighting equipment available and operational? (correct type for risk)
Automatic fire sprinkler system operational where available?
Continuous monitoring of atmospheric conditions? Oxygen enriched, poor ventilated, flammable atmosphere etc
Special danger, caution, warning signs posted?
Trenches more than 1.5 m deep shored or sloped?
Fire watch provided during work and 30 minutes after completion of work?
Work areas and adjacent areas where sparks may have spread checked out 30 minutes after work completed?
PPE required / ID type:_______________________________________________________________________
APPROVALS AND AUTHORIZATIONS

This permit is valid as long as work conditions existing at the time of issuance continue.
It expires on any change of condition that adversely affects safety of the work area while work is in progress.
I have personally inspected the location where the above work is to be done.
I have checked for compliance with the safety precautions listed on the permit and authorized the work to be performed.

ORIGINATOR PC Supervisor WELDER FIRE WATCH


Printed Name:
Signature:
Date:

Document Custodian: SHE Systems Manager Electronically stored on Sharepoint Date of print: 10 February 2021

Note 1: It is the individual user’s responsibility to ensure that he/she is using the latest version of this document, unless this document has been issued as a
contolled hard copy.
Note 2: This document is the property of Aveng Grinaker-LTA and may not be used, reproduced, transmitted or disclosed without prior written permission.

You might also like