VESSEL ENTRY/(CONFINED SPACES)

Vessel Entry Permit No._______________


Note: -
1. This permit will be initialed by user department, but will be authorized by the department head in whose dept.
The work will be carried out
2. This permit is valid only on the date of issue and the tirne specified. Fresh permit to be taken everyday.
3. Incase any work of open flame is to be done in the area ‘HOT WORK PERMIT’ must accompany this permit
4. This permit should be in possession of the person carrying out the work and he should return the same to his
supervisor after the job is over.
5. It must be made sure that the person on the job fully understands the prescribed conditions.
6. This permit does not relieve the permit user from his responsibility to safety.
7. Site conditions must be personally checked by permit issuer and user dept. personnel.
8. Ensure that a safety observer is kept out side throughout the work .In the event of discontinuation of work the permit
should be revalidated by SAFETY OFFICER
9. This permit is to be issued during daytime only.
10. Authorized signature means unit head,
11. Electrical isolation to be carried out by Electrical dept before starting the job.
12. All electrical connections must be checked by electrical dept.
13. No alteration should be done in permit.
14. In case of emergency, follow instructions of shift officer.
15. For same day, Oxygen content to be checked for re-entry by safety.
16. Hand lamps if required to be of 24 Volts source.
A: (Engg.)
Department/Area : Equipment No
Details of work :

Permit valid from Date: Time:


To Date: Time:
CHECKLIST
B: Production Done Sign

1. Equipment cleaned with water, steamed and cooled to ambient temp.


2. Equipment, process utility pipelines carrying hazardous liquid /gases
removed / blanked.
3. PPE to be used

C: Engg.
4. Bottom valve dismantled in case of Reactor /Vessel.
5. Equipment electrically isolated by and fuses handed-
Over to ___________________
6. Motor belts removed in case of reactor entry.
7. Electrical Isolation Permit No.
8. N2 line is dismentled.

D: Safety
9. Equipment tested for presence of Oxygen, (Oxygen test result should be
min 19% % by volume.
10. Keep compressed air purging in reactor / vessel /tank at breathing zone.
11. Self-breathing apparatus available.
12. Safety ladder available.
13. Equipment / vessel & surrounding checked for explosive mixture & found
14. Hot work permit accompanied Yes /No Permit No.
15. Any other special precautions to be taken:
Check to be done by Safety.
The above-mentioned conditions have been confirmed and area/ equipment cleared for entry.

SSP:005/00:F1
E: Signature of permit issuer: Signature of Authorized person:
Date: Time: Date: Time:
Signature of permit user: Signature of Safety in charge:
Date: Time: Date: Time

Validated up to
Signature of Responsible officer
Date Time

Count of materials
taken in during
Vessel Entry

Checked by
Item Quantity (IN) Quantity (Out) User
department.

F.1. Welding M/C, cables, debris removed from the area.


2. Welding m/c connections removed.
3. Gas cylinder trolley moved away.
1. Guards, covers, belts restored.
2. Electrical lockout removed, fuses replaced and caution tags removed.
3. General caution tags, boards and cordon removed.
4. Fire extinguisher stored in original place.
5. Removed lines, valves are restored.
6. Gunny bag, drainage blocks removed.
7. Time of Final inspection carried on

Sign of Engg Dept. Sign of Prod. Dept.

SSP:005/00:F1