Modification Instructions for the

DRX-Revolution Mobile X-ray System


Modification No. 80

Service Code1243
Type 1 Selective

Purpose: To install YUASA, 12 Volt, 12 Amp hour cart batteries to improve the life of
the cart batteries.

Important

• Qualified service personnel must perform this modification.


• See the Carestream Service Portal for possible updates before doing this modification.
• When doing the procedures in this document, you must use safe work practices and wear the correct
personal protective equipment (for example, safety eyewear) according to your company’s standard
operating procedures.
• When servicing this equipment, be sure to read and follow the manufacturer’s Safety Data Sheets for
any chemical, cleaner, solvent, paint, lubricant, adhesive, or replacement battery to understand proper
use and disposal precautions.
Service Effects: Install YUASA, 12 Volt, 12 Amp hour cart batteries and update with Mod 79
CMB battery firmware.

Important
Do not mix Interstate cart batteries with YUASA cart batteries in the same
DRX-Revolution system.

Confidential
Publication No. MA1243-80
2016-04-19
Serial Numbers: 101 - 2198, 2200, and 2203 - 2207
(For non-China systems only)
Prerequisites: Mod 79 must be installed
Installation Time: 8.0 hours
• 1.0 hour for installation of Mod 79
• 2.0 hours for installation of Mod 80
• 4 to 5 hours to fully charge the batteries before operating the
DRX-Revolution
Special Tools: None
Parts Status: Available from Service Parts Management
Parts Requirements: To replace all 20 cart batteries, you must order 4 of the following:
YUASA, 12 Volt, 12 Amp hour cart battery, lead acid, charged, 5 pack,
SPAD2095.
The information contained herein is based on the experience and knowledge relating to the subject
matter gained by Carestream Health prior to publication.
No patent license is granted by this information.
Carestream Health reserves the right to change this information without notice, and makes no
warranty, express or implied, with respect to this information. Carestream Health shall not be liable
for any loss or damage, including consequential or special damages, resulting from any use of this
information, even if loss or damage is caused by Carestream Health’s negligence or other fault.

ESD
Possible damage from electrostatic discharge.
Check the Parts

Check the Parts


Check the modification kit, SPAD2095 for the following parts:
Part number Description Quantity

SPAD2095 Kit-Battery 5 Pack, charged 4

MA1243-80 | 2016-04-19 3
Install the Batteries

Install the Batteries

1. To remove and replace the cart batteries, see the Adjustments and Replacements for
the DRX-Revolution Mobile X-ray System, AR1243-1.
2. Perform the “Calibrate the Charger Monitor Board (CMB)” procedure, see the
Adjustments and Replacements for the DRX-Revolution Mobile X-ray System,
AR1243-1.

4 MA1243-80 | 2016-04-19
Complete the Modification

Complete the Modification


1. Check that the operation of the system is correct.
2. Circle 80 on the Modification label located on the DRX-Revolution front cover.
3. Record the following information for feedback:
K-number

SID DRX-Revolution

Mainframe Service Code 1243

Mainframe Serial No.

Activity Code M80

Installation Time 2.0

Part Number SPAD2095

Quantity 4

4. Report your time against SC1243M80 in CRM/Vantive.

MA1243-80 | 2016-04-19 5
Carestream Health
150 Verona Street
Rochester, NY 14608
USA
© Carestream Health, Inc., 2016
Made in USA.
CARESTREAM is a trademark of Carestream Health.
Pub. No. MA1243-80
Rev. A

6 MA1243-80 | 2016-04-19