Materials All components of the Cable Operated Bar Screen COB are
manufactured with top quality materials:
· · Steel with high quality surface coating
· · Stainless steel
Product variants The Passavant ® Cable Operated Bar Screen COB is, depending on
the respective application, available in the following versions:
COB-XXL Mexico
Page 2
Design features The Passavant ® Cable Opera- The slack rope monitoring
ted Bar Screen COB is equip- system detects a possible blo-
ped with two independent cking of the grab cleaner due
drive units for lifting and to floating refuse, debris, etc.
pivoting gears. The cleaner and interrupts the descent to
carriage runs in guideways the lower meshing point so
and is actuated by means of that the cleaning cycle is star-
pivoting and lifting ropes. ted.
These components are
designed as a unit in such a An intelligent cleaning tech-
way that, during the cleaning nique allows the cleaning of
cycle, the lifting force acts as the bar rack to be started from
a lever on the grab cleaner every position of the grab cle-
and forces it to close. The re- aner. Deposits on the invert or
sulting strong closing force of bulky screenings are removed
the grab cleaner enables it layer by layer. In the case of
to transport bulky screenings blockage or overload, the in-
and very heavy loads. stallation is switched off by
means of a special electro-
The descent and the cleaning mechanical safety control sys-
cycle are controlled by the tem. This automation system
lifting gear. The meshing of ensures unusually high opera-
the grab rake into the bar tional reliability and, there-
rack is controlled by the fore, a high throughput rate.
pivoting gear.
Passavant ®
Cable Operated
Bar Screen COB
COB-XL
Page 3
Function As soon as the drive is activa- the discharge position and then
ted, the cleaning starts in order pushed by the scraper device
to adjust a difference in water into the container, conveyor
levels which has resulted from belt, etc. This screenings clea-
a build-up of screenings in the ning cycle is repeated until the
bar rack. The grab cleaner is difference in water levels has
lowered to the screen bars in an been adjusted. The grab cleaner
open position. When it reaches then returns to the parking posi-
the channel bottom it swings tion above operation floor.
into the screen bars. During the
cleaning cycle the screenings
are collected, transported to
COB-C
www.aqseptence.com
Version 1.1
The technical data stated in this brochure are indicative only and have to be determined for each individual case.
Reserve technical changes.