1.

Calculate The Pressure Gradient for each of the following Fluids

1. 8.33 lbs/gal 0.433 psi/ft

2. 10.62 lbs/gal 0.552 psi/ft

3. 0.785 SG 0.077 bar/m

4. 1.24 SG 0.122 bar/m

2.

Calculate The Hydrostatic pressure at 10000 ft TVD for each of the following Fluids.

1. 8.33 lbs/gal 4330 Psi 

2. 10.62 lbs/gal  5520 Psi

3. 0.785 SG 234.7 Bar 

4. 1.24 SG 371.8 Bar 

3.

Calculate the Hydrostatic Pressure of the following Fluid. There is a full column of the Fluid

Well Details

Total Depth 10500ft MD (10100ft TVD)

Fluid 9 ppg Brine

Answer 4726.8 Psi 


4.

Calculate the Hydrostatic Pressure of the following Fluid. There is a full column of the Fluid

Well Details

Total Depth 13200ft MD (11000ft TVD)

Fluid 10 ppg Brine

Answer  5720 Psi

5.

Calculate the Hydrostatic Pressure of the following Fluid. There is a full column of the Fluid

Well Details

Total Depth 12950ft MD (9580ft TVD)

Fluid 11 ppg Brine

Answer 5479.76 Psi 

6.

The well is to be killed with the brine stated. Calculate the resulting Overbalance or Underbalance
at the Formation

Well Details

Total Depth 10500ft MD (10100ft TVD)

Fluid 9 ppg Brine

Formation Pressure 4955 Psi

Answer 4726.8 Psi Underbalance

7.
The well is to be killed with the brine stated. Calculate the resulting Overbalance or Underbalance
at the Formation

Well Details

Total Depth 13200ft MD (11000ft TVD)

Fluid 10.5 ppg Brine

Formation Pressure 5815 Psi

Answer 6006 Psi Overbalance

8.

The well is to be killed with the brine stated. Calculate the resulting Overbalance or Underbalance
at the Formation

Well Details

Total Depth 12950ft MD (9580ft TVD)

Fluid 10 ppg Brine

Formation Pressure 5025 Psi

Answer 4981.6 Psi Underbalance

9.

From the following Well, Calculate:


1. The Time to pump Bottoms Up for reverse
2. The Time for a complete Circulation
Well Details

Tubing End at 10500ft MD (10100ft TVD)

Tubing Capacity 0.00387 bbl/ft

Ann Capacity 0.00910 bbl/ft

Pump Rate 1.5 bpm

Answer Btms Up 61.27 min 

Answer Full Circulation 87.33 min 

10.
From the following Well, Calculate:
1. The Time to pump Bottoms Up for reverse
2. The Time for a complete Circulation
Well Details

Tubing End at 13200ft MD (11000ft TVD)

Tubing Capacity 0.00425 bbl/ft

Ann Capacity 0.00970 bbl/ft

Pump Rate 1.75 bpm

Answer Btms Up  71 min

Answer Full Circulation  242.86 min

11.

From the following Well, Calculate:


1. The Time to pump Bottoms Up for reverse
2. The Time for a complete Circulation
Well Details

Tubing End at 12950ft MD (9850ft TVD)

Tubing Capacity 0.00455 bbl/ft

Ann Capacity 0.01010 bbl/ft

Pump Rate 1.25 bpm

Answer Btms Up 79.58 min 

Answer Full Circulation 115.442 min 

12.
Calculate The Differential Pressure that exists across the SSD before it is opened and the Direction
That is Acting.

Well Details

SSD Depth 9950ft MD (9550ft TVD)

Completion Fluid Density 9.5 ppg

Oil Density 6.2 ppg

SIWHP 925 psi

Answer Differential Pressure 713.78 psi 

Answer Direction  

13.

Calculate The Differential Pressure that exists across the SSD before it is opened and the Direction
That is Acting.

Well Details

SSD Depth 10000ft MD (9600 ft TVD)

Completion Fluid Density 9.6 ppg

Oil Density 6.4 ppg

SIWHP 800 psi

Answer Differential Pressure  797.44 psi

Answer Direction  

14.
Calculate The Differential Pressure that exists across the SSD before it is opened and the Direction
That is Acting.

Well Details

SSD Depth 10350ft MD (9750 ft TVD)

Completion Fluid Density 9.8 ppg

Oil Density 6.0 ppg

SIWHP 730 psi

Answer Differential Pressure 1196.6 psi 

Answer Direction  