L.4.1.

1 BELT CONVEYOR (BC-01)

untuk mengangkut material Clay dari Crusher Mining menuju Storage


Fungsi =
Raw Material.
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 773.05 Kg/jam = 0.773 Ton/jam
Bulk Density = 1.1 Ton/m3 (Perry,Table 21-4,hal 21-6)
Panjang Belt Conveyor (L) = 1000 m = 3280.8 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 0.773
= 0.93 Ton/jam
Kondisi Operasi =
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
(Walas,83) 27.99
= 0.92765696 x100
27.99
= 3.31424422 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = L W
( 0,4+ )( )
300 100
= 0,4 + 3280.8 0.773
300 100
= 0.08763369 HP

HPvertical = 0

HPempty = ( beltspeed . x ( c ))
100
3.31424422 x 3,1
100
0.10274157 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.08763369 + 0 + 0.103
= 0.19037526 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 0.19038
= 0.23 HP

Power Belt Conveyor = 0.23 / 1,34


= 0.17 KW

BELT CONVEYOR (BC-02)

untuk mengangkut material Clay dari Storage menuju Hopper (HP-


Fungsi =
02)
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 773.05 Kg/jam = 0.77 Ton/jam
Bulk Density = 1.1 Ton/m 3

Panjang Belt Conveyor (L) = 30 m = 98.4252 ft


Safety Factor = 20 %
Kapasitas BC = 1,2 x W
= 1.2 x 0.77
= 0.93 Ton/jam
Kondisi Operasi =
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
27.99
= 0.92765696 x100
27.99
= 3.31424422 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = L W
(0,4+ )( )
300 100
= 0,4 + 98.4252 0.77
300 100
= 0.00562843 HP

HPvertical = 0

HPempty = c
( beltspeed . x ( ))
100
3.31424422 x 3,1
100
0.10274157 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.00562843 + 0 + 0.103
= 0.10837001 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 0.10837
= 0.1300 HP

Power Belt Conveyor = 0.1300 / 1,34


= 0.0970 KW

BELT CONVEYOR (BC-03)

Fungsi = untuk mengangkut material Limestone dari Crusher Mining menuju Storage Raw Material.
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 96675.43 Kg/jam = 96.68 Ton/jam
Bulk Density = 1.3617 Ton/m 3

Panjang Belt Conveyor (L) = 1000 m = 3280.84 ft


Safety Factor =
Kapasitas (Cb) = 1,2 x W
= 1.2 x 96.68
= 116.010519 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
(Walas,83) = 27.99
= 116.010519 x100
= 27.99
= 414.471306 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = L W
(0,4+ )( )
300 100
= 0,4 + 3280.84 96.68
300 100
= 10.9592559 HP

HPvertical = 0

HPempty c
= ( beltspeed . x ( ))
100
414.471306 x 3,1
100
12.8486105 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 10.9592559 + 0 + 12.85
= 23.8078664 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 23.8079
= 28.5694397 HP

Power Belt Conveyor = 28.5694397 / 1,34


= 21.3204774 KW

BELT CONVEYOR (BC-04)

Fungsi = untuk mengangkut material Limestone dari Storage menuju Hopper (HP-04).
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 96675.43 Kg/jam = 96.68 Ton/jam
Bulk Density = 1.3617 Ton/m3
Panjang Belt Conveyor (L) = 30 m = 98.4252 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 96.68
= 116.010519 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
27.99
= 116.010519 x100
27.99
= 414.471306 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal =
L W
(0,4+ )( )
300 100
= 0,4 + 98.4252 96.68
300 100
= 0.70387835 HP

HPvertical = 0

HPempty = e
(beltspeed . x ( ))
100
414.471306 x 3,1
100
12.8486105 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.70387835 + 0 + 12.85
= 13.5524888 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 13.5525
= 16.2629866 HP

Power Belt Conveyor = 16.2629866 /1,34


= 12.1365572 KW

BELT CONVEYOR (BC-05)

Fungsi = untuk mengangkut material Iron Sand dari (HP-05) menuju Storage Raw Material.
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 1842.17 Kg/jam = 1.84 Ton/jam
Bulk Density = 2.4 Ton/m3
Panjang Belt Conveyor (L) = 15 m = 49.21 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 1.84
= 2.21060585 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
27.99
= 2.21060585 x100
27.99
= 7.89784156 ft/menit

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = ( 0,4+ L )( W )
300 100
= 0,4 + 49.2126 1.84
300 100
= 0.01039062 HP

HPvertical = 0

HPempty = e
(beltspeed . x ( ))
100
7.89784156 x 3,1
100
0.24483309 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.01039062 + 0 + 0.245
= 0.25522371 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 0.25522
= 0.30626845 HP

Power Belt Conveyor = 0.30626845 / 1,34


= 0.22855855 KW

BELT CONVEYOR (BC-06)

Fungsi = untuk mengangkut material Iron Sand dari Storage menuju Hopper (HP-06).
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 1842.17 Kg/jam = 1.84 Ton/jam
Bulk Density = 2.4 Ton/m3
Panjang Belt Conveyor (L) = 30 m = 98.4252 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 1.84
= 2.21060585 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
27.99
= 2.21060585 x100
27.99
= 7.89784156 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty
HPhorizontal = L W
(0,4+ )( )
300 100
= 0,4 + 98.4252 1.84
300 100
= 0.01341256 HP

HPvertical = 0

HPempty = e
(beltspeed . x ( ))
100
7.89784156 x 3,1
100
0.24483309 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.01341256 + 0 + 0.245
= 0.25824564 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 0.25825
= 0.30989477 HP

Power Belt Conveyor = 0.30989477 / 1,34


0.23126476 KW

BELT CONVEYOR (BC-07)

Fungsi = untuk mengangkut material Silica Sand dari (HP-07) menuju Storage Raw Material.
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 16358.32 Kg/jam = 16.36 Ton/jam
Bulk Density = 1.4418 Ton/m3
Panjang Belt Conveyor (L) = 15 m = 49.2126 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 16.36
= 19.6299816 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
27.99
= 19.6299816 x100
27.99
= 70.1321244 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = L W
( 0,4+ )( )
300 100
= 0,4 + 49.2126 16.36
300 100
= 0.09226778 HP

HPvertical = 0

HPempty = e
( beltspeed . x ( ))
100
= 70.1321244 x 3,1
100
= 2.17409586 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


0.09226778 + 0 + 2.174
2.26636364 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
1,2 x 2.26636
2.71963637 HP

Power Belt Conveyor = 2.71963637 / 1,34


2.02957938 KW

BELT CONVEYOR (BC-08)

Fungsi = untuk mengangkut material Silica Sand dari Storage menuju Hopper
(HP-08).
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 16358.32 Kg/jam = 16.36 Ton/jam
Bulk Density = 1.4418 Ton/m3
Panjang Belt Conveyor (L) = 30 m = 98.4252 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 16.36
= 19.6299816 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
27.99
= 19.6299816 x100
27.99
= 70.1321244 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = L W
(0,4+ )( )
300 100
= 0,4 + 98.4252 16.36
300 100
= 0.1191023 HP

HPvertical = 0

e
(beltspeed . x ( ))
100
HPempty = e
(beltspeed . x ( ))
100
= 70.1321244 x 3,1
100
= 2.17409586 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.1191023 + 0 + 2.174
= 2.29319815 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 2.2932
= 2.75183778 HP

Power Belt Conveyor = 2.75183778 /1,34


= 2.05361029 KW

BELT CONVEYOR (BC-09)

untuk mengangkut material campuran dari Storage menuju Hopper


Fungsi =
(HP-09).
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 115648.97 Kg/jam = 115.65 Ton/jam
Bulk Density = 1.2 Ton/m3
Panjang Belt Conveyor (L) = 30 m = 98.4252 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 115.65
= 138.778763 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
= 27.99
= 138.778763 x100
= 27.99
= 495.815515 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = L W
(0,4  )( )
300 100
= 0,4 + 98.4252 115.65
300 100
= 0.84202164 HP

HPvertical = 0

HPempty = e
(beltspeed . x ( ))
100
= 495.815515 x 3,1
100
= 15.370281 HP
HP Belt Conveyor = HPhorizontal + HPvertical + HPempty
= 0.84202164 + 0 + 15.37
= 16.2123026 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 16.2123
= 19.4547631 HP

Power Belt Conveyor = 19.4547631 / 1,34


14.51848 KW

BELT CONVEYOR (BC-10)

Fungsi = untuk mengangkut material campuran output dari Rotary Dryer (RD-
01) menuju BE-01
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 105430.63 Kg/jam = 105.43 Ton/jam
Bulk Density = 1.16 Ton/m3
Panjang Belt Conveyor (L) = 10 m = 33 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 105.43
= 126.516759 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
= 27.99
= 126.516759 x100
= 27.99
= 452.006997 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = L W
(0,4  )( )
300 100
= 0,4 + 32.8084 105.43
300 100
= 0.53702287 HP

HPvertical = 0

HPempty = e
(beltspeed . x ( ))
100
= 452.006997 x 3,1
100
= 14.0122169 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.53702287 + 0 + 14
= 14.5492398 HP
Faktor Keamanan 20%
Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 14.5492
= 17.4590877 HP

Power Belt Conveyor = 17.4590877 / 1,34


13.02917 KW

BELT CONVEYOR (BC-11)

untuk mengangkut tailing material raw mill campuran dari Separator


Fungsi =
(SPR-01) menuju Inlet Vertical Roller Mill (VRM-01).
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 5271.53 Kg/jam = 5.27 Ton/jam
Bulk Density = 1.16 Ton/m3
Panjang Belt Conveyor (L) = 5 m = 16 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 5.27
= 6.32583793 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
= 27.99
= 6.32583793 x100
= 27.99
= 22.6003499 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = LL W W
0,4 
((0,4+ )()( )
300
300 100100
= 0,4 + 16.4042 5.27
300 100
= 0.02396864 HP

HPvertical = 0

HPempty = e
(beltspeed. x ( ))
100
= 22.6003499 x 3,1
100
= 0.70061085 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.02396864 + 0 + 0.701
= 0.72457948 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 0.72458
= 0.86949538 HP

Power Belt Conveyor = 0.86949538 / 1,34


0.64887715 KW

BELT CONVEYOR (BC-12)

Fungsi = Untuk mengangkut Clinker dari Bucket Elevator (BE-05) menuju


clinker silo (CLS-01)
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 69146.75 Kg/jam = 69.15 Ton/jam
Bulk Density = 1.2015 Ton/m3
Panjang Belt Conveyor (L) = 8 m = 26 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 69.15
= 82.9760973 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
= 27.99
= 82.98 x100
= 27.99
= 296.45 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = L W
(0,4  )( )
300 100
= 0,4 + 26.2467 69.15
300 100
= 0.33708284 HP

HPvertical = 0

HPempty = e
(beltspeed . x ( ))
100
= 296.449079 x 3,1
100
= 9.18992146 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.33708284 + 0 + 9.19
= 9.52700429 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 9.527
= 11.4324052 HP

Power Belt Conveyor = 11.4324052 / 1,34


8.53164564 KW
BELT CONVEYOR (BC-13)

Fungsi = Untuk mengangkut Clinker dari clinker silo (CLS-01) menuju Bucket
Elevator (BE-06)
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 69146.75 Kg/jam = 69.15 Ton/jam
Bulk Density = 1.2015 Ton/m3
Panjang Belt Conveyor (L) = 8 m = 26 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 69.15
= 82.9760973 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
= 27.99
= 82.9760973 x100
= 27.99
= 296.449079 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = L W
(0,4  )( )
300 100
= 0,4 + 26.2467 69.15
300 100
= 0.33708284 HP

HPvertical = 0

HPempty = e
(beltspeed . x ( ))
100
= 296.449079 x 3,1
100
= 9.18992146 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.33708284 + 0 + 9.19
= 9.52700429 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 9.527
= 11.4324052 HP

Power Belt Conveyor = 11.4324052 / 1,34


8.53164564 KW

BELT CONVEYOR (BC-14)

Fungsi = Untuk mengangkut Clinker dari Bucket Elevator (BE-06) menuju


Hopper Inlet Cement Mill (HP-16).
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 69146.75 Kg/jam = 69.15 Ton/jam
Bulk Density = 1.2015 Ton/m 3

Panjang Belt Conveyor (L) = 8 m = 26 ft


Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 69.15
= 82.9760973 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
= 27.99
= 82.9760973 x100
= 27.99
= 296.449079 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = L W
(0,4  )( )
300 100
= 0,4 + 26.2467 69.15
300 100
= 0.33708284 HP

HPvertical = 0

HPempty = e
(beltspeed . x ( ))
100
= 296.449079 x 3,1
100
= 9.18992146 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.34 + 0 + 9.19
= 9.53 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 9.527
= 11.43 HP

Power Belt Conveyor = 11.43 / 1,34


8.53 KW

BELT CONVEYOR (BC-15)

Untuk mengangkut material Gypsum dari Weighing Feeder (WF-08)


Fungsi =
menuju Hopper Inlet Cement Mill (HP-16).
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 3191.39 Kg/jam = 3.19 Ton/jam
Bulk Density = 0.96 Ton/m3
Panjang Belt Conveyor (L) = 5.00 m = 16 ft
Safety Factor = 20.00 %
Kapasitas (Cb) = 1,2 x W
= 1.20 x 3.19
= 3.83 Ton/jam
Kondisi Operasi
T (Temperatur) = 30.00 C
P (Tekanan) = 1.00 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14.00 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
= 27.99
= 3.83 x100
= 27.99
= 13.68 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = L W
(0,4  )( )
300 100
= 0,4 + 16.4042 3.19
300 100
= 0.01 HP

HPvertical = 0

HPempty = e
(beltspeed . x ( ))
100
= 13.68 x 3,1
100
= 0.42 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.01 + 0 + 0.424
= 0.44 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 0.44
= 0.53 HP

Power Belt Conveyor = 0.53 / 1,34


0.39 KW

BELT CONVEYOR (BC-16)

Untuk mengangkut material Trass dari Weighing Feeder (WF-09)


Fungsi =
menuju Hopper Inlet Cement Mill (HP-16).
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 18084.53 Kg/jam = 18.08 Ton/jam
Bulk Density = 1.1 Ton/m3
Panjang Belt Conveyor (L) = 5 m = 16 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 18.08
= 21.7014408 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
= 27.99
= 21.7014408 x100
= 27.99
= 77.5328361 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = LL W W
0,4 
((0,4+ )()( )
300
300 100100
= 0,4 + 16.4042 18.08
300 100
= 0.08222688 HP

HPvertical = 0

HPempty = e
(beltspeed . x ( ))
100
= 77.5328361 x 3,1
100
= 2.40351792 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.08222688 + 0 + 2.404
= 2.4857448 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 2.48574
= 2.98289376 HP

Power Belt Conveyor = 2.98289376 / 1,34


2.22604012 KW

BELT CONVEYOR (BC-17)

Fungsi = Untuk mengangkut material Blast slag furnace dari Weighing Feeder
(WF-09) menuju Hopper Inlet Cement Mill (HP-16).
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 10637.96 Kg/jam = 10.64 Ton/jam
Bulk Density = 0.9612 Ton/m3
Panjang Belt Conveyor (L) = 5 m = 16 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 10.64
= 12.7655534 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat
Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :
Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
= 27.99
= 12.7655534 x100
= 27.99
= 45.6075507 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = L W
(0,4  )( )
300 100
= 0,4 + 16.4042 10.64
300 100
= 0.04836875 HP

HPvertical = 0

HPempty = e
(beltspeed. x ( ))
100
= 45.6075507 x 3,1
100
= 1.41383407 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.04836875 + 0 + 1.414
= 1.46220282 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 1.4622
= 1.75464339 HP

Power Belt Conveyor = 1.75464339 /1,34


1.30943536 KW

BELT CONVEYOR (BC-18)

Untuk mengangkut tailing material semen dari Separator (SPR-02)


Fungsi =
menuju Hopper Inlet Cement Mill (HP-16).
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 5318.98 Kg/jam = 5.32 Ton/jam
Bulk Density = 1.0413 Ton/m3
Panjang Belt Conveyor (L) = 20 m = 66 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 5.32
= 6.38277672 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
27.99
= 6.38277672 x100
27.99
= 22.8037753 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = (0,4  L W
)( )
300 100
= 0,4 + 65.6168 5.32
300 100
= 0.03290974 HP

HPvertical = 0

HPempty = e
(beltspeed . x ( ))
100
= 22.8037753 x 3,1
100
= 0.70691704 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.03290974 + 0 + 0.707
= 0.73982677 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 0.73983
= 0.88779213 HP

Power Belt Conveyor = 0.88779213 / 1,34


0.66253144 KW

BELT CONVEYOR (BC-19)

Fungsi = Untuk mengangkut semen dari Rotary Packer (RP-01) menuju truck.
Jenis = Horizontal Flat Belt Conveyor
Material = Rubber Belt
Laju Alir (W) = 101010.10 Kg/jam = 101.01 Ton/jam
Bulk Density = 1.1214 Ton/m3
Panjang Belt Conveyor (L) = 20 m = 66 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 101.01
= 121.212121 Ton/jam
Kondisi Operasi
T (Temperatur) = 30 C
P (Tekanan) = 1 atm
Fasa = Padat

Untuk Belt Conveyor kapasitas < 32 ton/jam,maka :


Lebar belt = 14 in = 35 cm (Perry, Tabel 21-7)
Kecepatan Belt Conveyor = Cb x100
27.99
= 121.212121 x100
27.99
= 433.055095 ft/menit

Power Belt Conveyor :


HP Belt Conveyor = HPhorizontal + HPvertical + HPempty
HPhorizontal = L W
(0,4+ )( )
300 100
= 0,4 + 65.6168 101.01
300 100
= 0.62497239 HP

HPvertical = 0

HPempty = e
(beltspeed. x ( ))
100
433.055095 x 3,1
100
13.4 HP

HP Belt Conveyor = HPhorizontal + HPvertical + HPempty


= 0.62 + 0 + 13.4
= 14.05 HP

Faktor Keamanan 20%


Total HP Belt Conveyor = 1,2 x HP Belt Conveyor
= 1,2 x 14.0497
= 16.86 HP

Power Belt Conveyor = 16.86 / 1,34


= 12.58 KW

Kebutuhan Power Belt Conveyor

N Power
No Belt
o (kW)
1 BC-01 0.17
2 BC-02 0.10
3 BC-03 21.32
4 BC-04 12.14
5 BC-05 0.23
6 BC-06 0.23
7 BC-07 2.03
8 BC-08 2.05
9 BC-09 14.52
10 BC-10 13.03
11 BC-11 0.65
12 BC-12 8.53
13 BC-13 8.53
14 BC-14 8.53
15 BC-15 0.39
16 BC-16 2.23
17 BC-17 1.31
18 BC-18 0.66
19 BC-19 12.58
Total 109.23
L.4.2.1 BUCKET ELEVATOR (BE-01)

Untuk mengangkut Raw Material dari Rotary Dryer (RD-01) menuju


Fungsi =
Vertical Raw Mill(VRM-01).
Jenis = Spaced –Bucket Centrifugal –Discharge Elevator
Material = Commercial Steel
Laju Alir (W) = 105430.63 Kg/jam 105.4306 Ton/jam
Bulk Density = 1.36 Ton/m3
Tinggi Bucket Elevator = 6 m = 20 ft
Safety Factor = 20%
Kapasitas = 1,2 x W
= 1,2 x 105.431
= 126.517 Ton/jam
Kapasitas terpasang = 126.517 Ton/jam = 29.2863 kg/s

Dari Perry, S.M, “Chemical Engineering Handbook”, tabel 21-9 hal 16 diperoleh:
Jumlah Bucket Elevator = 1 buah
Ukuran Bucket = 18 x 8 x 11 3/4
Bucket Spacing = 12 in
Lebar Belt = 18 in
Rpm poros = 20 rpm
HP poros = 20 HP
HP/ft = 0.22 HP/ft
HP yang dibutuhkan adalah, P = 0,07 x m 0,643 x Δz
Dimana, P = Daya (kW)
m = laju alir massa (kg/s)
Δz = Tinggi Elevator(meter)

Maka , P = 0,07 x m0,643 x Δz


= 0.07 x 29,28630,643 x 6
= 0.07 x 8.7713 x 6
= 3.68 kW

HP yang digunakan = 3.68 x 1.34


4.94
HP actual yang digunakan = 5.00 HP
Maka Power aktual yang digunakan = 3.73 kW

L.4.2.2 BUCKET ELEVATOR (BE-02)

Untuk mengangkut Raw Material dari Vertical Roller Mill (VRM-01)


Fungsi =
menuju Separator (SPR-01).
Jenis = Spaced –Bucket Centrifugal –Discharge Elevator
Material = Commercial Steel
Laju Alir (W) = 105430.63 Kg/jam 105.4306 Ton/jam
Bulk Density = 1.36 Ton/m3
Tinggi Bucket Elevator = 10 m = 33 ft
Safety Factor = 20%
Kapasitas = 1,2 x W
= 1,2 x 105.431
= 126.52 Ton/jam
Kapasitas terpasang = 126.52 Ton/jam = 29.29 kg/s

Dari Perry, S.M, “Chemical Engineering Handbook”, tabel 21-9 hal 16 diperoleh:
Jumlah Bucket Elevator = 1 buah
Ukuran Bucket = 18 x 8 x 11 3/4
Bucket Spacing = 12 in
Lebar Belt = 18 in
Rpm poros = 20 rpm
HP poros = 20 HP
HP/ft = 0.22 HP/ft
HP yang dibutuhkan adalah, P = 0,07 x m 0,643 x Δz
Dimana, P = Daya (kW)
m = laju alir massa (kg/s)
Δz = Tinggi Elevator(meter)

Maka , P = 0,07 x m0,643 x Δz


= 0.07 x 29,28630,643 x 10
= 0.07 x 8.7713 x 10
= 6.14 kW

HP yang digunakan = 6.14 x 1.34


8.23 HP
HP actual yang digunakan = 9.00 HP
Maka Power aktual yang digunakan = 6.72 kW

L.4.2.3 BUCKET ELEVATOR (BE-03)

Untuk mengangkut Raw Material dari Separator (SPR-01) menuju Raw


Fungsi =
meal silo (RMS-01).
Jenis = Spaced –Bucket Centrifugal –Discharge Elevator
Material = Commercial Steel
Laju Alir (W) = 110870.85 Kg/jam 110.8709 Ton/jam
Bulk Density = 1.36 Ton/m3
Tinggi Bucket Elevator = 28 m = 92 ft
Safety Factor = 20%
Kapasitas = 1,2 x W
= 1,2 x 110.871
= 133.0450233 Ton/jam
Kapasitas terpasang = 133.05 Ton/jam = 30.7975 kg/s

Dari Perry, S.M, “Chemical Engineering Handbook”, tabel 21-9 hal 16 diperoleh:
Jumlah Bucket Elevator = 1 buah
Ukuran Bucket = 18 x 8 x 11 3/4
Bucket Spacing = 12 in
Lebar Belt = 18 in
Rpm poros = 20 rpm
HP poros = 20 HP
HP/ft = 0.22 HP/ft
HP yang dibutuhkan adalah, P = 0,07 x m 0,643 x Δz
Dimana, P = Daya (kW)
m = laju alir massa (kg/s)
Δz = Tinggi Elevator(meter)
Maka , P = 0,07 x m0,643 x Δz
= 0.07 x 9,05970,643 x 28 m
= 0.07 x 9.0597 x 28 m
= 17.76 kW

HP yang digunakan = 17.76 x 1.34


23.79 HP
HP actual yang digunakan = 24 HP
Maka Power aktual yang digunakan = 17.91 kW

L.4.2.4 BUCKET ELEVATOR (BE-04)

Fungsi = Untuk mengangkut dari Raw meal silo (RMS-01) menuju Suspension
Preheater (SP-01).
Jenis = Spaced –Bucket Centrifugal –Discharge Elevator
Material = Commercial Steel
Laju Alir (W) = 110870.85 Kg/jam 110.8709 Ton/jam
Bulk Density = 1.14 Ton/m3
Tinggi Bucket Elevator = 12 m = 39 ft
Safety Factor = 20%
Kapasitas = 1,2 x W
= 1,2 x 110.871
= 133.05 Ton/jam
Kapasitas terpasang = 133.05 Ton/jam = 30.7975 kg/s

Dari Perry, S.M, “Chemical Engineering Handbook”, tabel 21-9 hal 16 diperoleh:
Jumlah Bucket Elevator = 1 buah
Ukuran Bucket = 18 x 8 x 11 3/4
Bucket Spacing = 12 in
Lebar Belt = 18 in
Rpm poros = 20 rpm
HP poros = 20 HP
HP/ft = 0.22 HP/ft
HP yang dibutuhkan adalah, P = 0,07 x m 0,643 x Δz
Dimana, P = Daya (kW)
m = laju alir massa (kg/s)
Δz = Tinggi Elevator(meter)

Maka , P = 0,07 x m0,643 x Δz


= 0.07 x 9,05970,643 x 12 m
= 0.07 x 9.0597 x 12 m
= 7.61017 kW

HP yang digunakan = 7.61017 x 1.34


10.1976278 HP
HP actual yang digunakan = 11 HP
Maka Power aktual yang digunakan = 8.208955224 kW

L.4.2.5 BUCKET ELEVATOR (BE-05)


Untuk mengangkut material Clinker dari Grate Cooler/Clinker Cooler
Fungsi =
(GC/CC) menuju Clinker Silo (CLS-01).
Jenis = Spaced –Bucket Centrifugal –Discharge Elevator
Material = Commercial Steel
Laju Alir (W) = 69146.75 Kg/jam 69.14675 Ton/jam
Bulk Density = 1.2015 Ton/m3
Tinggi Bucket Elevator = 23 m = 75 ft
Safety Factor = 20%
Kapasitas = 1,2 x W
= 1,2 x 69.1467
= 82.98 Ton/jam
Kapasitas terpasang = 82.98 Ton/jam = 19.2074 kg/s

Dari Perry, S.M, “Chemical Engineering Handbook”, tabel 21-8 hal 15 diperoleh:
Jumlah Bucket Elevator = 1 buah
Ukuran Bucket = 14 x 7 x 7 1/4
Bucket Spacing = 18 in
Lebar Belt = 13 in
Rpm poros = 38 rpm
HP poros = 11.7 HP
HP/ft = 0.115 HP/ft
HP yang dibutuhkan adalah, P = 0,07 x m 0,643 x Δz
Dimana, P = Daya (kW)
m = laju alir massa (kg/s)
Δz = Tinggi Elevator(meter)

Maka ,P = 0,07 x m0,643 x Δz


= 0.07 x 6,68760,643 x 23 m
= 0.07 x 6.6876 x 23 m
= 10.767047 kW

HP yang digunakan = 10.767047 x 1.34


14.4 HP
HP actual yang digunakan = 15 HP
Maka Power aktual yang digunakan = 11.19402985 kW

L.4.2.6 BUCKET ELEVATOR (BE-06)

Untuk mengangkut material Clinker dari Clinker Silo (CLS-01) menuju


Fungsi =
Belt Conveyor (BC-14).
Jenis = Spaced –Bucket Centrifugal –Discharge Elevator
Material = Commercial Steel
Laju Alir (W) = 69146.75 Kg/jam 69.14675 Ton/jam
Bulk Density = 1.2015 Ton/m3
Tinggi Bucket Elevator = 23 m = 75.5 ft
Safety Factor = 20%
Kapasitas = 1,2 x W
= 1,2 x 69.1467
= 82.9760973 Ton/jam
Kapasitas terpasang = 82.98 Ton/jam = 19.2074 kg/s
Dari Perry, S.M, “Chemical Engineering Handbook”, tabel 21-9 hal 16 diperoleh:
Jumlah Bucket Elevator = 1 buah
Ukuran Bucket = 14 x 7 x 7 1/4
Bucket Spacing = 18 in
Lebar Belt = 13 in
Rpm poros = 38 rpm
HP poros = 11.7 HP
HP/ft = 0.115 HP/ft
HP yang dibutuhkan adalah, P = 0,07 x m 0,643 x Δz
Dimana, P = Daya (kW)
m = laju alir massa (kg/s)
Δz = Tinggi Elevator(meter)

Maka , P = 0,07 x m0,643 x Δz


= 0.07 x 6,68760,643 x 23 m
= 0.07 x 6.6876 x 23 m
= 10.767047 kW

HP yang digunakan = 10.767047 x 1.34


14.42784297 HP
HP actual yang digunakan = 15 HP
Maka Power aktual yang digunakan = 11.19402985 kW

L.4.2.7 BUCKET ELEVATOR (BE-07)

Fungsi = Untuk mengangkut material Semen dari Vertical Roller Mill (VRM-01)
menuju Separator (SPR-02).
Jenis = Spaced –Bucket Centrifugal –Discharge Elevator
Material = Commercial Steel
Laju Alir (W) = 101060.63 Kg/jam 101.0606 Ton/jam
Bulk Density = 1.1214 Ton/m3
Tinggi Bucket Elevator = 38 m = 125 ft
Safety Factor = 20%
Kapasitas = 1,2 x W
= 1,2 x 101.061
= 121.2727576 Ton/jam
Kapasitas terpasang = 121.27 Ton/jam = 28.0724 kg/s

Dari Perry, S.M, “Chemical Engineering Handbook”, tabel 21-9 hal 16 diperoleh:
Jumlah Bucket Elevator = 1 buah
Ukuran Bucket = 18 x 8 x 11 3/4
Bucket Spacing = 12 in
Lebar Belt = 18 in
Rpm poros = 20 rpm
HP poros = 20 HP
HP/ft = 0.22 HP/ft
HP yang dibutuhkan adalah, P = 0,07 x m 0,643 x Δz
Dimana, P = Daya (kW)
m = laju alir massa (kg/s)
Δz = Tinggi Elevator(meter)
Maka , P = 0,07 x m0,643 x Δz
= 0.07 x 8,53580,643 x 38 m
= 0.07 x 8.5358 x 38 m
= 22.70520143 kW

HP yang digunakan = 22.70520143 x 1.34


30.42496992 HP
HP actual yang digunakan = 30.5 HP
Maka Power aktual yang digunakan = 22.76119403 kW

L.4.2.8 BUCKET ELEVATOR (BE-08)

Untuk mengangkut material Semen dari Separator (SPR-02) menuju


Fungsi . =
Cement Silo (CS-01)
Jenis = Spaced –Bucket Centrifugal –Discharge Elevator
Material = Commercial Steel
Laju Alir (W) = 101010.10 Kg/jam 101.0101 Ton/jam
Bulk Density = 1.1214 Ton/m3
Tinggi Bucket Elevator = 18 m = 59 ft
Safety Factor = 20%
Kapasitas = 1,2 x W
= 1,2 x 101.01
= 121.2121212 Ton/jam
Kapasitas terpasang = 121.21 Ton/jam = 28.0584 kg/s

Dari Perry, S.M, “Chemical Engineering Handbook”, tabel 21-9 hal 16 diperoleh:
Jumlah Bucket Elevator = 1 buah
Ukuran Bucket = 18 x 8 x 11 3/4
Bucket Spacing = 12 in
Lebar Belt = 18 in
Rpm poros = 20 rpm
HP poros = 20 HP
HP/ft = 0.22 H/ft
HP yang dibutuhkan adalah, P = 0,07 x m 0,643 x Δz
Dimana, P = Daya (kW)
m = laju alir massa (kg/s)
Δz = Tinggi Elevator(meter)

Maka , P = 0,07 x m0,643 x Δz


= 0.07 x 8,53300,643 x 18 m
= 0.07 x 8.5330 x 18 m
= 10.8 kW

HP yang digunakan = 10.8 x 1.34


14.4 HP
HP actual yang digunakan = 15.0 HP
Maka Power aktual yang digunakan = 11.2 kW

L.4.2.9 BUCKET ELEVATOR (BE-09)


Fungsi = Untuk mengangkut material Semen dari Cement Silo (CS-01) menuju
Packing Unit.
Jenis = Spaced –Bucket Centrifugal –Discharge Elevator
Material = Commercial Steel
Laju Alir (W) = 101010.10 Kg/jam 101.0101 Ton/jam
Bulk Density = 1.1214 Ton/m3
Tinggi Bucket Elevator = 26 m = 85 ft
Safety Factor = 20%
Kapasitas = 1,2 x W
= 1,2 x 101.01
= 121.2121212 Ton/jam
Kapasitas terpasang = 121.21 Ton/jam = 28.0584 kg/s

Dari Perry, S.M, “Chemical Engineering Handbook”, tabel 21-9 hal 16 diperoleh:
Jumlah Bucket Elevator = 1 buah
Ukuran Bucket = 18 x 8 x 11 3/4
Bucket Spacing = 12 in
Lebar Belt = 18 in
Rpm poros = 20 rpm
HP poros = 20 HP
HP/ft = 0.22 HP/ft
HP yang dibutuhkan adalah, P = 0,07 x m 0,643 x Δz
Dimana, P = Daya (kW)
m = laju alir massa (kg/s)
Δz = Tinggi Elevator(meter)

Maka , P = 0,07 x m0,643 x Δz


= 0.07 x 8,53300,643 x 26 m
= 0.07 x 8.5330 x 26 m
= 15.53 kW

HP yang digunakan = 15.53 x 1.34


20.81 HP
HP actual yang digunakan = 21.00 HP
Maka Power aktual yang digunakan = 15.67 kW

Diasumsi semua bucket memiliki speed 150 ft/min (45,7 m/min) (Perry, table 21-8, hal 15)

Kebutuhan Power Bucket Elevator

Power
No No Bucket
(kW)
1 BE-01 3.73134
2 BE-02 6.71642
3 BE-03 17.9104
4 BE-04 8.20896
5 BE-05 11.194
6 BE-06 11.194
7 BE-07 22.7612
8 BE-08 11.194
9 BE-09 15.6716
Total 108.582
er (RD-01) menuju

ller Mill (VRM-01)


SPR-01) menuju Raw
menuju Suspension
oler/Clinker Cooler

Silo (CLS-01) menuju


Roller Mill (VRM-01)
(SPR-02) menuju
ilo (CS-01) menuju
L.4.3.1 AIR SLIDE (AS-01)

Mengangkut material halus Raw Material dari Vertical Roller Mill


Fungsi =
(VRM-01) menuju Bucket Elevator (BE-02).
Jenis = Pneumatic Air Slide Continous
Material = Commercial Steel and Fabric
Menurut Perry’s Chemical Engineering 7th edition, laju Alir yang dibutuhkan untuk menggerakan
material dengan bulk density 1160 kg/m3 adalah:
Laju Alir Massa (V) = 105,430.63 Kg/jam
Bulk density = 1160 kg/m3
Laju Alir Volumetrik(Vu) = 90.89 m3/jam
Densitas Udara (ρ) = 1.1212 kg/m3 = 0.07 lb/ft3

Laju Alir Udara (Q) = (Vu x ρ)


90.89 x 1.1212
101.90 Kg/jam
Diamater Pipa(D) = 8 in = 0.2032 ft
Panjang = 21 m = 69 ft
P=Tekanan operasi= 1 atm = 406.784 in H2O

Power(HP) = 144 x 0,8 xVu


[ 33000 ]
= 144 x 0.8 x 90.89
33000
= 0.3172834069 HP

Efisiensi Motor = 80%


HP = 0.3172834069
0.8
= 0.40

Safety Factor = 20%


HP = 0.3966042587 x 1.2
= 0.4759251104 HP

Power yang dibutuhkan = 0.4759251104 /1,34


= 0.3551679928 kW

L.4.3.2 AIR SLIDE (AS-02)

Fungsi = Mengangkut material halus Raw Material dari Bucket Elevator (BE-02) menuju Separator (SPR-01)
Jenis = Pneumatic Air Slide Continous
Material = Commercial Steel and Fabric
Menurut Perry’s Chemical Engineering 7th edition, laju Alir yang dibutuhkan untuk menggerakan
material dengan bulk density 1160 kg/m3 adalah:

Laju Alir Massa (V) = 105,430.63 Kg/jam


Bulk density = 1160 kg/m3
Laju Alir Volumetrik(Vu) = 90.89 m3/jam
Densitas Udara (ρ) = 1.1212 kg/m3 = 0.07 lb/ft3

Laju Alir Udara (Q) = (Vu x ρ)


90.89 x 1.1212
101.90415923 Kg/jam
Diamater Pipa(D) = 8 in
Panjang = 23 m = 75 ft
P=Tekanan operasi= 1 atm = 406.784 in H2O

Power(HP) = 144 x 0,8 xVu


[ 33000 ]
= 144 x 0.8 x 90.88848
33000
= 0.3172834069 HP

Efisiensi Motor = 80%


HP = 0.3172834069
0.8
= 0.3966042587

Safety Factor = 20%


HP = 0.3966042587 x 1.2
= 0.4759251104 HP

Power yang dibutuhkan = 0.4759251104 /1,34


= 0.3551679928 kW

L.4.3.3 AIR SLIDE (AS-03)

Fungsi = Mengangkut material halus Raw Material dari Separator (SPR-01) menuju Bucket Elevator (BE-03).
Jenis = Pneumatic Air Slide Continous
Material = Commercial Steel and Fabric
Menurut Perry’s Chemical Engineering 7th edition, laju Alir yang dibutuhkan untuk menggerakan
material dengan bulk density 1160 kg/m3 adalah:

Laju Alir Massa (V) = 100159.10049 Kg/jam


Bulk density = 1160 kg/m3
Laju Alir Volumetrik(Vu) = 86.34 m3/jam
Densitas Udara (ρ) = 1.1212 kg/m3 = 0.07 lb/ft3

Laju Alir Udara (Q) = (Vu x ρ)


86.34 x 1.1212
96.808951265 Kg/jam
Diamater Pipa(D) = 8 in
Panjang = 23 m = 75 ft
P=Tekanan operasi= 1 atm = 406.784 in H2O

Power(HP) = 144 x0,8 xVu 


 33000 

= 144 x 0.8 x 86.34


33000
= 0.3014192366 HP

Efisiensi Motor = 80%


HP = 0.3014192366
0.8
= 0.3767740457

Safety Factor = 20%


HP = 0.3767740457 x 1.2
= 0.4521288549 HP

Power yang dibutuhkan = 0.4521288549 /1,34


= 0.3374095932 kW

L.4.3.4 AIR SLIDE (AS-04)

Fungsi = Mengangkut material halus Raw Material dari Bucket Elevator (BE-03) menuju Raw meal silo (RMS-01)
Jenis = Pneumatic Air Slide Continous
Material = Commercial Steel and Fabric
Menurut Perry’s Chemical Engineering 7th edition, laju Alir yang dibutuhkan untuk menggerakan
material dengan bulk density 1160 kg/m3 adalah:

Laju Alir Massa (V) = 100159.10049 Kg/jam


Bulk density = 1160 kg/m3
Laju Alir Volumetrik(Vu) = 86.34 m3/jam
Densitas Udara (ρ) = 1.1212 kg/m3 = 0.07 lb/ft3

Laju Alir Udara (Q) = (Vu x ρ)


86.34 x 1.1212
96.808951265 Kg/jam
Diamater Pipa(D) = 8 in
Panjang = 25 m = 82 ft
P=Tekanan operasi= 1 atm = 406.784 in H2O

Power(HP) = 144 x 0,8 xVu


[ 33000 ]
= 144 x 0.8 x 86.34
33000
= 0.3014192366 HP

Efisiensi Motor = 80%


HP = 0.3014192366
0.8
= 0.3767740457

Safety Factor = 20%


HP = 0.3767740457 x 1.2
= 0.4521288549 HP

Power yang dibutuhkan = 0.4521288549 /1,34


= 0.3374095932 kW
L.4.3.5 AIR SLIDE (AS-05)

Fungsi = Mengangkut material halus Raw Material dari Raw meal silo (RMS-01) menuju Bucket elevator (BE-04)
Jenis = Pneumatic Air Slide Continous
Material = Commercial Steel and Fabric
Menurut Perry’s Chemical Engineering 7th edition, laju Alir yang dibutuhkan untuk menggerakan
material dengan bulk density 1160 kg/m3 adalah:
Laju Alir Massa (V) = 115648.97 Kg/jam
Bulk density = 1160 kg/m3
Laju Alir Volumetrik(Vu) = 99.70 m3/jam
Densitas Udara (ρ) = 1.1212 kg/m3 = 0.07 lb/ft3

Laju Alir Udara (Q) = (Vu x ρ)


99.70 x 1.1212
111.78071059 Kg/jam
Diamater Pipa(D) = 8 in
Panjang = 25 m = 82 ft
P=Tekanan operasi= 1 atm = 406.784 in H2O

Power(HP) = 144 x 0,8 xVu


[ 33000 ]
= 144 x 0.8 x 99.70
33000
= 0.3480345155 HP

Efisiensi Motor = 80%


HP = 0.3480345155
0.8
= 0.4350431444

Safety Factor = 20%


HP = 0.4350431444 x 1.2
= 0.5220517732 HP

Power yang dibutuhkan = 0.5220517732 /1,34


= 0.3895908756 kW

L.4.3.6 AIR SLIDE (AS-06)

Fungsi = Mengangkut debu klinker dari Screw Conveyor (SC-02) menuju Clinker Silo (CLS-01)
Jenis = Pneumatic Air Slide Continous
Material = Commercial Steel and Fabric
Menurut Perry’s Chemical Engineering 7th edition, laju Alir yang dibutuhkan untuk menggerakan
material dengan bulk density 1201,5 kg/m3 adalah:

Laju Alir Massa (V) = 2767.25 Kg/jam


Bulk density = 1201.5 kg/m3
Laju Alir Volumetrik(Vu) = 2.30 m3/jam
Densitas Udara (ρ) = 1.1212 kg/m3 = 0.07 lb/ft3

Laju Alir Udara (Q) = (Vu x ρ)


2.30 x 1.1212
2.5823093345 Kg/jam
Diamater Pipa(D) = 4 in 0.1016
Panjang = 18 m = 59 ft
P=Tekanan operasi= 1 atm = 406.784 in H2O

Power(HP) = 144 x 0,8 xVu


[ 33000 ]
= 144 x 0.8 x 2.30
33000
= 0.0080401419 HP

Efisiensi Motor = 80%

HP = 0.0080401419 = 0.01005
0.8

Safety Factor = 20%


HP = 0.010 x 1.2
= 0.012 HP

Power yang dibutuhkan = 0.012 /1,34


= 0.01 kW

L.4.3.7 AIR SLIDE (AS-07)

Fungsi = Mengangkut semen halus dari Vertical Roller Mill (VRM-02) menuju Bucket Elevator (BE-07).
Jenis = Pneumatic Air Slide Continous
Material = Commercial Steel and Fabric
Menurut Perry’s Chemical Engineering 7th edition, laju Alir yang dibutuhkan untuk menggerakan
material dengan bulk density 1121,4 kg/m3 adalah:
Laju Alir Massa (V) = 101060.63 Kg/jam
Bulk density = 1121.4 kg/m3
Laju Alir Volumetrik(Vu) = 90.12 m3/jam
Densitas Udara (ρ) = 1.1212 kg/m3 = 0.07 lb/ft3

Laju Alir Udara (Q) = (Vu x ρ)


90.12 x 1.1212
101.04260731 Kg/jam
Diamater Pipa(D) = 4 in
Panjang = 21 m = 69 ft
P=Tekanan operasi= 1 atm = 406.784 in H2O

Power(HP) = 144 x 0,8 xVu


[ 33000 ]
= 144 x 0.8 x 90.12
33000
= 0.3146009244 HP

Efisiensi Motor = 80%


HP = 0.3146009244
0.8
= 0.3932511555

Safety Factor = 20%


HP = 0.3933 x 1.2
= 0.4719 HP

Power yang dibutuhkan = 0.4719 /1,34


= 0.3522 kW

L.4.3.8 AIR SLIDE (AS-08)

Fungsi = Mengangkut semen halus dari Bucket Elevator (BE-07) menuju separator (SPR-02)
Jenis = Pneumatic Air Slide Continous
Material = Commercial Steel and Fabric
Menurut Perry’s Chemical Engineering 7th edition, laju Alir yang dibutuhkan untuk menggerakan
material dengan bulk density 1121,4 kg/m3 adalah:
Laju Alir Massa (V) = 101060.63 Kg/jam
Bulk density = 1121.4 kg/m3

Laju Alir Volumetrik(Vu) = 90.12 m3/jam

Densitas Udara (ρ) = 1.1212 kg/m3 = 0.07 lb/ft3

Laju Alir Udara (Q) = (Vu x ρ)


90.12 x 1.1212
101.04260731 Kg/jam
Diamater Pipa(D) = 4 in
Panjang = 23 m = 75 ft
P=Tekanan operasi= 1 atm = 406.784 in H2O

144 x 0,8 xVu


Power(HP) =
[ 33000 ]
= 144 x 0.8 x 90.12
33000
= 0.3146009244 HP
Efisiensi Motor = 80%
HP = 0.3146009244
0.8
= 0.3932511555
Safety Factor = 20%
HP = 0.3932511555 x 1.2
= 0.4719013866 HP

Power yang dibutuhkan = 0.4719013866 /1,34


= 0.3521652139 kW

L.4.3.9 AIR SLIDE (AS-09)

Fungsi = Mengangkut produk semen halus dari separator (SPR-02) menuju Bucket elevator (BE-08)
Jenis = Pneumatic Air Slide Continous
Material = Commercial Steel and Fabric
Menurut Perry’s Chemical Engineering 7th edition, laju Alir yang dibutuhkan untuk menggerakan
material dengan bulk density 1121,4 kg/m3 adalah:

Laju Alir Massa (V) = 101010.10 Kg/jam


Bulk density = 1121.4 kg/m3
Laju Alir Volumetrik(Vu) = 90.07 m3/jam
Densitas Udara (ρ) = 1.1212 kg/m3 = 0.07 lb/ft3

Laju Alir Udara (Q) = (Vu x ρ)


90.07 x 1.1212
100.99208601 Kg/jam
Diamater Pipa(D) = 4 in
Panjang = 23 m = 75 ft
P=Tekanan operasi= 1 atm = 406.784 in H2O

Power(HP) = 144 x 0,8 xVu


[ 33000 ]
= 144 x 0.8 x 90.07
33000
= 0.3144436239 HP

Efisiensi Motor = 80%


HP = 0.3144436239
0.8
= 0.3930545299

Safety Factor = 20%


HP = 0.3930545299 x 1.2
= 0.4716654359 HP

Power yang dibutuhkan = 0.4716654359 /1,34


= 0.3519891313 kW

L.4.3.10 AIR SLIDE (AS-010)

Fungsi = Mengangkut produk semen halus dari Bucket elevator (BE-08) menuju semen silo (CS-01)
Jenis = Pneumatic Air Slide Continous
Material = Commercial Steel and Fabric
Menurut Perry’s Chemical Engineering 7th edition, laju Alir yang dibutuhkan untuk menggerakan
material dengan bulk density 1121,4 kg/m3 adalah:

Laju Alir Massa (V) = 101010.10 Kg/jam


Bulk density = 1121.4 kg/m3
Laju Alir Volumetrik(Vu) = 90.07 m3/jam
Densitas Udara (ρ) = 1.1212 kg/m3 = 0.07 lb/ft3

Laju Alir Udara (Q) = (Vu x ρ)


90.07 x 1.1212
100.99208601 Kg/jam
Diamater Pipa(D) = 8 in
Panjang = 25 m = 82 ft
P=Tekanan operasi= 1 atm = 406.784 in H2O

Power(HP) =
144 x 0,8 xVu
[ 33000 ]
= 144 x 0.8 x 90.07
33000
= 0.3144436239 HP

Efisiensi Motor = 80%


HP = 0.3144436239
0.8
= 0.3930545299

Safety Factor = 20%


HP = 0.3930545299 x 1.2
= 0.4716654359 HP

Power yang dibutuhkan = 0.4716654359 /1,34


= 0.3519891313 kW

L.4.3.11 AIR SLIDE (AS-011)

Fungsi = Mengangkut semen dari semen silo (CS-01) menuju bucket elevator (BE-09)
Jenis = Pneumatic Air Slide Continous
Material = Commercial Steel and Fabric
Menurut Perry’s Chemical Engineering 7th edition, laju Alir yang dibutuhkan untuk menggerakan
material dengan bulk density 1121,4 kg/m3 adalah:

Laju Alir Massa (V) = 101010.10 Kg/jam


Bulk density = 1121.4 kg/m3
Laju Alir Volumetrik(Vu) = 90.07 m3/jam
Densitas Udara (ρ) = 1.1212 kg/m3 = 0.07 lb/ft3
Laju Alir Udara (Q) = (Vu x ρ)
90.07 x 1.1212
100.99208601 Kg/jam
Diamater Pipa(D) = 8 in
Panjang = 25 m = 82 ft
P=Tekanan operasi= 1 atm = 406.784 in H2O

144 x0,8 xVu


Power(HP) =
[ 33000 ]
= 144 x 0.8 x 90.07
33000
= 0.3144436239 HP

Efisiensi Motor = 80%


HP = 0.3144436239
0.8
= 0.3930545299
Safety Factor = 20%
HP = 0.3930545299 x 1.2
= 0.4716654359 HP
Power yang dibutuhkan = 0.4716654359 /1,34
= 0.3519891313 kW

L.4.3.12 AIR SLIDE (AS-012)

Fungsi = Mengangkut semen dari bucket elevator (BE-09) menuju packing unit
Jenis = Pneumatic Air Slide Continous
Material = Commercial Steel and Fabric
Menurut Perry’s Chemical Engineering 7th edition, laju Alir yang dibutuhkan untuk menggerakan
material dengan bulk density 1121,4 kg/m3 adalah:

Laju Alir Massa (V) = 101010.10 Kg/jam


Bulk density = 1121.4 kg/m3

Laju Alir Volumetrik(Vu) = 90.07 m3/jam


Densitas Udara (ρ) = 1.1212 kg/m3 = 0.07 lb/ft3

Laju Alir Udara (Q) = (Vu x ρ)


90.07 x 1.1212
100.99208601 Kg/jam
Diamater Pipa(D) = 8 in
Panjang = 20 m = 66 ft
P=Tekanan operasi= 1 atm = 406.784 in H2O

144 x 0,8xVu
Power(HP) =
[ 33000 ]
= 144 x 0.8 x 90.07
33000
= 0.3144436239 HP
Efisiensi Motor = 80%
HP = 0.3144436239
0.8
= 0.3930545299
Safety Factor = 20%
HP = 0.3930545299 x 1.2
= 0.4716654359 HP

Power yang dibutuhkan = 0.4716654359 / 1,34


= 0.3519891313 kW

Kebutuhan Power Air Sliding

Power
No No AS
(kW)
1 AS-01 0.36
2 AS-02 0.36
L.4.5.1 Screw Conveyor (SC-01)

Fungsi = Mengangkut material debu raw mill dari Electrical Preciptator (EP-01) menuju
Raw Meal Silo (RMS-01)
Jenis = Centrifugal Discharge Screw
Bahan Kontruksi = Carbon Steel
Densitas Raw Meal = 1.14 ton/m3 = 1140 kg/m3
Laju Alir (Q) = 10709.01 kg/jam = 10.70901 ton/jam
= 10 ton/jam
Data Perry,Tabel 21-6, hal 21-8
Dengan Kapasitas 10 ton maka :
Diameter of flights = 10.00 in
Diameter of pipe = 2.50 in
Diameter of shafts = 2.00 in
Speed = 55.00 rpm
All lumps = 1.50 in
Feed Section = 9.00 in
Panjang = 21.00 m = 69 ft

Power Screw Conveyor


Power motor yang dibutuhkan : W0( faktor gesekan)= 2.5

N0 = Q x L x W0 - Sin 0
367
= 10,70901 x 5 x 2,5 - 0
367
= 1.53 kW
= 2.05 Hp

Screw Conveyor (SC-02)

Mengangkut material debu klinker dari Electrical Preciptator (EP-02) menuju


Fungsi =
klinker Silo (CLS-01)
Jenis = Centrifugal Discharge Screw
Bahan Kontruksi = Carbon Steel
Densitas Raw Meal = 1.6 ton/m3 = 1600 kg/m3
Laju Alir (Q) = 2767.25 kg/jam = 2.767254 ton/jam

Data Perry,Tabel 21-6, hal 21-8


Dengan Kapasitas 10 ton maka :
Diameter of flights = 10.00 in
Diameter of pipe = 2.50 in
Diameter of shafts = 2.00 in
Speed = 55.00 rpm
All lumps = 1.50 in
Feed Section = 9.00 in
Panjang = 21.00 m = 69 ft

Power Screw Conveyor


Power motor yang dibutuhkan : W0( faktor gesekan)= 2.5
N0 = Q x L x W0 - Sin 0
367
= 2,7672 x 5 x 2,5 - 0
367
= 0.40 kW
= 0.53 Hp

Screw Conveyor (SC-03)

Mengangkut material dari Electrical Preciptator (EP-03) menuju semen Silo (CS-
Fungsi =
01)
Jenis = Centrifugal Discharge Screw
Bahan Kontruksi = Carbon Steel
Densitas Raw Meal = 1.6 ton/m3 = 1600 kg/m3
Laju Alir (Q) = 5,002.50 kg/jam = 5.002501 ton/jam

Data Perry,Tabel 21-6, hal 21-8


Dengan Kapasitas 10 ton maka :
Diameter of flights = 10.00 in
Diameter of pipe = 2.50 in
Diameter of shafts = 2.00 in
Speed = 55.00 rpm
All lumps = 1.50 in
Feed Section = 9.00 in
Panjang = 21.00 m = 69 ft

Power Screw Conveyor


Power motor yang dibutuhkan : W0( faktor gesekan)= 2.5

N0 = Q x L x W0 - Sin 0
367
= 5,0025 x 5 x 2,5 - 0
367
= 0.71561666392 kW
= 0.95892632965 Hp

Screw Conveyor (SC-04)

Fungsi = Mengangkut material semen dari Hopper (HP-14) menuju rotary packer (RP-01)
Jenis = Centrifugal Discharge Screw
Bahan Kontruksi = Carbon Steel
Densitas Raw Meal = 1.6 ton/m3 = 1600 kg/m3
Laju Alir (Q) = 101010.10101 kg/jam = 101.0101 ton/jam

Data Perry,Tabel 21-6, hal 21-8


Dengan Kapasitas 10 ton maka :
Diameter of flights = 10.00 in
Diameter of pipe = 2.50 in
Diameter of shafts = 2.00 in
Speed = 55.00 rpm
All lumps = 1.50 in
Feed Section = 9.00 in
Panjang = 14.00 m = 46 ft

Power Screw Conveyor


Power motor yang dibutuhkan : W0( faktor gesekan)= 2.5

N0 = Q x L x W0 - Sin 0
367
= 101,0101 x 5 x 2,5 - 0
367
= 9.63 kW
= 12.91 Hp

Screw Conveyor (SC-05)

Fungsi = Mengangkut material semen dari cement silo (CS-01) menuju Hopper (HP-17)

Jenis = Centrifugal Discharge Screw


Bahan Kontruksi = Carbon Steel
Densitas Raw Meal = 1.6 ton/m3 = 1600 kg/m3
Laju Alir (Q) = 101010.10101 kg/jam = 101.0101 ton/jam

Data Perry,Tabel 21-6, hal 21-8


Dengan Kapasitas 10 ton maka :
Diameter of flights = 10.00 in
Diameter of pipe = 2.50 in
Diameter of shafts = 2.00 in
Speed = 55.00 rpm
All lumps = 1.50 in
Feed Section = 9.00 in
Panjang = 19.00 m = 62 ft

Power Screw Conveyor


Power motor yang dibutuhkan : W0( faktor gesekan)= 2.5

N0 = Q x L x W0 - Sin 0
367
= 101,0101 x 5 x 2,5 - 0
367
= 13.0735144359 kW
= 17.5185093441 Hp

Kebutuhan Power Screw Conveyor

Power
NO No SC
(kW)
1 SC-01 1.53
2 SC-02 0.40
3 SC-03 0.72
4 SC-04 9.63
5 SC-05 13.07
Total 25.35
L.4.7.1 Hammer Crusher (HC - 01)

Fungsi = Mereduksi ukuran material Limestone


Jenis = Double Hammer Crusher
Bahan = Carbon Steel unless otherwise indicated
Laju Alir (Q) = 96,675.43 kg/jam = 96.7 ton/jam
= m3/jam
Dia Feed Size, max (D max) = 100 mm
Dia Product Size, max (d max) = 20 mm
Bulk Density = 1361.7 Ton/m3
Safety Factor = 20 %
Kapasitas Crusher (Q) = 1,2 x 96,67543
= 116.0105186 Ton/jam
Reduction ratio (n) :
Reduction ratio (n) = D max (Duda,40)
dmax
= 100 mm
20 mm
= 5

Diameter Rotor Hammer :


Q = 45 x D x L (Duda,68)
Dimana,Q = Kapasitas,m3/jam
D = Diameter rotor untuk memutar Hammer, m
L = Panjang Lengan Rotor ,m= 4/3 D
Sehingga,
D = Q
45 x L
D = 116.010518618179
40 x 4
= 10 m = 10 m
V = 33 ft
L = 4/3D
L = 13.7 m

Kecepatan circumferensial Rotor(v)


V = 2π .R.n (Duda,69)
60.0
Dimana, V = kecepata circumferensial rotor, m/s
n = Putaran rotor,250 rpm
R = diameter Rotor,m

Sehingga, V = 2 x3,14 x 10 x 250


60.0
= 261.7 m/s

Daya(N) :
N = G.R2.n3.e.f (Duda,69)
8.100000.η
Dimana, N = Daya, HP
G = berat 1 buah hammer, 30 kg
n = putaran Rotor hammer, 250 rpm
e = jumlah hammer ,2 x 16 hammer = 32
f = konstanta kecepatan hammer untuk V = 261,7 m/s = 11x10 -4
η = faktor tenaga transmisi = 0,85

maka, N = 30 x 102 x2503 x 32 x 11.10-4


8 x 100000 x 0,85
= 24.26470588 HP
Faktor Keamanan = 20 %
Total Motor Power (N) = 1,2 x Motor Power
= 1,2 x24,2647059
= 29.12 Hp
Motor Power yang digunakan = 21.73 kW
L.4.6.1 Roller Crusher (RC - 01)

Fungsi = Mereduksi ukuran material Clay


Laju Alir (W) = 773.05 kg/jam = 0.773047 ton/jam
Feed Size (df) = max 65 mm
= 2.56 in
Produk Size (dp) = 20 mm
= 0.79 in
Bulk Density (ρ) = 1.1 ton/m3

Reduction Ratio (r) = Dmax (duda,40)


dmax
= 2.56
0.79
= 3.25 in

Jarak antar Roll (d0) = 20 mm


= 0.79 in

Safety Factor = 20 %
= 1,2 x W
Kapasitas Crusher (Q) = 1,2 x 0,773047 ton/jam
= 0.927657 ton/jam

Diameter Roll (dr)


Diameter Roll (dr) = 0,961 df - d0 (Walas,pers.12.4,hal 341)
0.039
= 0,961 x 2,56 - 0,79
0.039
= 43 in 4 ft

Q
Putaran rpm Roll :
Putaran rpm Roll (n)
=
[ 50 x L x dr x dp x ρ ]
= 0.927656647867128
50 x 0,55 x 43 x 20 x 1,1
= 9.6 rpm

Motor Power (N) : = 0,12 x r x Q


Motor Power (N) = 0,12 x 3,25 x 0,927657
= 0.36 kW
= 0.48 Hp

Faktor keamanan 10% = 1,1 x motor power


Total Motor Power (N) = 1,1 x0,48
= 0.53 Hp
= 0.40 KW
Motor power yang digunakan = 1 kW
L.4.4.1 HOPPER (HP-01)

Fungsi = Menampung partikel yang tidak seragam dari Clay mining.


Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-283 grade C
Jumlah = 1 unit
Laju Alir (W) = 773.05 Kg/jam = 0.77 Ton/jam
Bulk Density = 881.1 kg/m3 = 0.8811 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
wxt
Volume Hopper(VH) =
[ ] p
= 0.77 x 1
0.8811
= 0.87736603 m3

Safety Factor = 20%


Volume Hopper = 1,2 x 0.87737
= 1.05283923 m3
Volume Hopper yang diambil (Vs) = 1.06 m3 = 37.4 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D (walas)

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 0.68 m3

D = 2993,631 ^ 0,33
= 0.9 m 34.6 in

r = 1/2 D
= 0.44 m 17.3 in

H = 2D
= 1.76 m 69.2 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 1m
h = Vs
π x Di2
4
= 1.06
3,14/4 x 192
= 1.7 m

Tekanan desain
Poperasi = 1 atm = 14.7 psi
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 17.3 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 12650 (sumber : Table 13.1 brownell n young hal.263)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 14,7 x 17,2 + 0,125
16250 x 0,8 - 0,6 x14,7
= 305.03 0.125
10109.42
= 0.2 in

Dipilih tebal standar sheell (ts) = 1/4 in = 0.25 in = 0.00635 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) 1
=
[( )2
xD x tg 45
]
= 1x 1 x 1
2
= 0.44 m

π
Volume Kerucut =
[ 4
2
xD x H ]
= 3.14 x 1^2 0.43921
4
= 0.3 m3
Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 1.06 m3 - 0.27 m3
= 0.79 m3

Tinggi Silinder (HH) = 4 xVol . Silinder


[ π x D2 ]
= 4 x 0.79396
3,14 x 1^2
= 1.31074809 m

Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 1.31074809 + 0.44
= 1.74995994 m

HOPPER (HP-02)

Fungsi = Menampung material sementara clay dari Clay Storage.


Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-328 grade C
Jumlah = 1 unit
Laju Alir (W) = 773.05 Kg/jam = 0.77 Ton/jam
Bulk Density = 881.1 kg/m3 = 0.8811 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
wxt
Volume Hopper(VH) =
[ ] p
= 0.77 x 1
0.8811
= 0.87736603 m3

Safety Factor = 20%


Volume Hopper = 1,2 x 0.87737
= 1.05283923 m3
Volume Hopper yang diambil (Vs) = 1.06 m3 = 37.4 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 0.67515924 m3
D = 0,5369 ^ 0,33
= 1m 34.6 in

r = 1/2 D
= 0.4 m 17.3 in

H = 2D
= 2m 69.2 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 1m
h = Vs
π x Di2
4
= 1.06
3,14/4 x 192
= 1.7 m

Tekanan desain
Poperasi = 1 atm = 14.7 psi
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 17.3 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 12650 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in (Tabel 23-2 Perry's )
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 20,67 x 276,2 + 0,125
16250 x 0,8 - 0,6 x20,67
= 305.03 0.125
10109.42
= 0.2 in
Dipilih tebal standar sheell (ts) = 1/4 in = 0.25 in = 0.00635 m
(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) =  1  
 2 xD  x tg 45
  
= 1x 1 x 1
2
= 0.43921186

π
Volume Kerucut =
[ 4
2
xD x H ]
= 3.14 x 1^2 0.43921
4
= 0.26604298 m3

Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 1.06 m3 - 0.26604 m3
= 0.79395702 m3

Tinggi Silinder (HH) =  4 xVol.Silinder


  x D2 
 
= 4 x 0.79396
3,14 x 1^2
= 1.31074809 m

Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 1.31074809 + 0.43921
= 1.74995994 m

HOPPER (HP-03)

Fungsi = Menampung partikel material sementara dari Limestone Mining.


Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-283 grade C
Jumlah = 1 unit
Laju Alir (W) = 96675.43 Kg/jam = 96.68 Ton/jam
Bulk Density = 1361.7 kg/m3 = 1.3617 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
wxt
Volume Hopper(VH) =
[ ] p
= 96.68 x 1
1.3617
= 70.9961314 m3
Safety Factor = 20%
Volume Hopper = 1,2 x 70.9961
= 85.2 m3
Volume Hopper yang diambil (Vs) = 86 m3 = 3037 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 54.7770701 m3

D = 54,77^ 0,33
= 3.7 m 147.5 in

r = 1/2 D
= 1.9 m 73.8 in

H = 2D
= 7.49 m 295.1 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 4m
h = Vs
π x Di2
4
= 86
3,14/4 x 192
= 7.8 m

Tekanan desain
Poperasi = 1 atm = 14.7 psi
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 73.8 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 12650 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 10 %
P = 17.64 psi
Sehingga :
t = 35,74 x 78,9 + 0,125
16250 x 0,8 - 0,6 x 35,74
= 1301.29 0.125
10109.42
= 0.3 in

Dipilih tebal standar sheell (ts) = 4/9 in = 0.25 in = 0.00635 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) =  1  
 2 xD  x tg 45
  
= 1x 4 x 1
2
= 1.87

π
Volume Kerucut =
[ 4
2
xD x H ]
= 3.14 x 4^2 1.87373
4
= 20.6562971 m3

Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 86 m3 - 20.6563 m3
= 65.3437029 m3

Tinggi Silinder (HH) =  4 xVol.Silinder


  x D2 
 
= 4 x 65.3437
3,14 x 4^2
= 5.92732687 m

Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 5.92732687 + 1.87373
= 7.80105944 m

HOPPER (HP-04)

Fungsi = Menampung partikel material sementara dari Limestone Storage.


Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-283 grade C
Jumlah = 1 unit
Laju Alir (W) = 96675.43 Kg/jam = 96.68 Ton/jam
Bulk Density = 1361.7 kg/m3 = 1.3617 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
wxt
Volume Hopper(VH) =
[ ] p
= 96.68 x 1
1.3617
= 71.00 m3

Safety Factor = 20%


Volume Hopper = 1,2 x 70.9961
= 85.1953577 m3
Volume Hopper yang diambil (Vs) = 86 m3 = 3037 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 54.7770701 m3

D = 54,77^ 0,33
= 4m 147.5 in

r = 1/2 D
= 1.9 m 73.8 in

H = 2D
= 7m 295.1 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 4m
h = Vs
π x Di2
4
= 86
3,14/4 x 192
= 7.8 m

Tekanan desain
Poperasi = 1 atm = 14.7 psi
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 73.8 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 12650 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 35,74 x 78,9 + 0,125
16250 x 0,8 - 0,6 x 35,74
= 1301.29 0.125
10109.42
= 0.3 in

Dipilih tebal standar sheell (ts) = 1/4 in = 0.25 in = 0.00635 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) =  1  
 2 xD  x tg 45
  
= 1x 4 x 1
2
= 1.87

π
Volume Kerucut =
[ 4
2
xD x H ]
= 3.14 x 4^2 1.87373
4
= 20.6562971 m3

Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 86 m3 - 20.6563 m3
= 65.3437029 m3

Tinggi Silinder (HH) =  4 xVol.Silinder


  x D2 
 
= 4 x 65.3437
3,14 x 4^2
= 5.92732687 m

Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 5.92732687 + 1.87373
= 7.80105944 m

HOPPER (HP-05)

Fungsi = Menampung partikel material sementara dari Iron Sand Supplier.


Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-283 grade C
Jumlah = 1 unit
Laju Alir (W) = 1842.17 Kg/jam = 1.84 Ton/jam
Bulk Density = 1441.8 kg/m3 = 1.4418 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
wxt
Volume Hopper(VH) =
[ ] p
= 1.84 x 1
1.4418
= 1.27768868 m3

Safety Factor = 20%


Volume Hopper = 1,2 x 1.27769
= 1.53322642 m3
Volume Hopper yang diambil (Vs) = 1.55 m3 = 55 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 0.98726115 m3

D = 0,5923^ 0,33
= 1.00 m 39.2 in

r = 1/2 D
= 0.50 m 19.6 in

H = 2D
= 2.0 m 78.4 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 1m
h = Vs
π x Di2
4
= 1.55
3,14/4 x 192
= 2.0 m

Tekanan desain
Poperasi = 1 atm
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 19.6 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 12650 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 22,53 x 78,9 + 0,125
16250 x 0,8 - 0,6 x 22,53
= 345.78 0.125
10109.42
= 0.2 in

Dipilih tebal standar sheell (ts) = 1/4 in = 0.25 in = 0.00635 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) =  1  
 2 xD  x tg 45
  
= 1x 1 x 1
2
= 0.50

π
Volume Kerucut =
[ 4
2
xD x H ]
= 3.14 x 1^2 0.49789
4
= 0.38754968 m3

Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 1.55 m3 - 0.38755 m3
= 1.16245032 m3

Tinggi Silinder (HH) =  4 xVol.Silinder


  x D2 
 
= 4 x 1.16245
3,14 x 1^2
= 1.49341185 m

Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 1.49341185 + 0.49789
= 2.0 m

HOPPER (HP-06)

Fungsi = Menampung partikel material sementara dari Iron Sand Storage.


Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-283 grade C
Jumlah = 1 unit
Laju Alir (W) = 1842.17 Kg/jam = 1.84 Ton/jam
Bulk Density = 1441.8 kg/m3 = 1.4418 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
Volume Hopper(VH) =  wxt 
 p 
 
 wxt 
 p 
 
= 1.84 x 1
1.4418
= 1.278 m3

Safety Factor = 20%


Volume Hopper = 1,2 x 1.27769
= 1.53322642 m3
Volume Hopper yang diambil (Vs) = 1.55 m3 = 55 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 0.98726115 m3

D = 0,987^ 0,33
= 1m 39.2 in

r = 1/2 D
= 0.5 m 19.6 in

H = 2D
= 2m 78.4 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 1m
h = Vs
π x Di2
4
= 1.55
3,14/4 x 192
= 2.0 m

Tekanan desain
Poperasi = 1 atm
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 19.6 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 12650 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 37,04 x 78,9 + 0,125
16250 x 0,8 - 0,6 x 37,04
= 345.78 0.125
10109.42
= 0.2 in

Dipilih tebal standar sheell (ts) = 1/4 in = 0.25 in = 0.00635 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) =  1  
 2 xD  x tg 45
  
= 1x 1 x 1
2
= 0.50

π
Volume Kerucut =
[ 4
2
xD x H ]
= 3.14 x 1^2 0.49789
4
= 0.38754968 m3

Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 1.55 m3 - 0.38755 m3
= 1.16245032 m3

Tinggi Silinder (HH) =  4 xVol.Silinder


  x D2 
 
= 4 x 1.16245
3,14 x 1^2
= 1.49341185 m
Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 1.49341185 + 0.49789
= 1.99130091 m

HOPPER (HP-07)

Fungsi = Menampung partikel material sementara dari silica Sand Supplier.


Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-283 grade C
Jumlah = 1 unit
Laju Alir (W) = 16358.32 Kg/jam = 16.36 Ton/jam
Bulk Density = 1441.8 kg/m3 = 1.4418 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
Volume Hopper(VH) =  wxt 
 p 
 
= 16.36 x 1
1.4418
= 11.35 m3

Safety Factor = 20%


Volume Hopper = 1,2 x 11.3458
= 13.614913 m3
Volume Hopper yang diambil (Vs) = 13.7 m3 = 484 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 8.73 m3

D = 10,414^ 0,33
= 2.0 m 80.5 in

r = 1/2 D
= 1.02 m 40.2 in

H = 2D
= 4.09 m 160.9 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 2m
h = Vs
π x Di2
4
= 13.7
3,14/4 x 192
= 4.2 m

Tekanan desain
Poperasi = 1 atm
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 40.2 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 12650 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 27,90 x 78,9 + 0,125
16250 x 0,8 - 0,6 x 27,90
= 709.75 0.125
10109.42
= 0.2 in

Dipilih tebal standar sheell (ts) = 1/4 in = 0.25 in = 0.00635 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) =  1  
 2 xD  x tg 45
  
= 1x 2 x 1
2
= 1.02

π
Volume Kerucut =
[ 4
2
xD x H ]
π
[ 4
2
xD x H ]
= 3.14 x 2^2 1.02198
4
= 3.35160143 m3

Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 13.7 m3 - 3.3516 m3
= 10.3483986 m3

Tinggi Silinder (HH) =  4 xVol.Silinder


  x D2 
 
= 4 x 10.3484
3,14 x 1^2
= 3.15545279 m

Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 3.15545279 + 1.02198
= 4.17742928 m

HOPPER (HP-08)

Fungsi = Menampung partikel material sementara dari silica Sand Storage.


Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-283 grade C
Jumlah = 1 unit
Laju Alir (W) = 16358.32 Kg/jam = 16.36 Ton/jam
Bulk Density = 1441.8 kg/m3 = 1.4418 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
Volume Hopper(VH) =  wxt 
 p 
 
= 16.36 x 1
1.4418
= 11.3457609 m3

Safety Factor = 20%


Volume Hopper = 1,2 x 11.3458
= 13.614913 m3
Volume Hopper yang diambil (Vs) = 13.7 m3 = 484 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 8.72611465 m3

D = 8,726^ 0,33
= 2m 80.5 in

r = 1/2 D
= 1.0 m 40.2 in

H = 2D
= 4m 160.9 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 2m
h = Vs
π x Di2
4
= 13.7
3,14/4 x 192
= 4.2 m

Tekanan desain
Poperasi = 1 atm
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 40.2 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 12650 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 27,90 x 78,9 + 0,125
16250 x 0,8 - 0,6 x 27,90
= 709.75 0.125
10109.42
= 0.2 in

Dipilih tebal standar sheell (ts) = 1/4 in = 0.25 in = 0.00635 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) =  1  
 2 xD  x tg 45
  
= 1x 2 x 1
2
= 1.02

π
Volume Kerucut =
[ 4
2
xD x H ]
= 3.14 x 2^2 1.02198
4
= 3.35160143 m3

Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 13.7 m3 - 3.35 m3
= 10.35 m3

Tinggi Silinder (HH) =  4 xVol.Silinder


  x D2 
 
= 4 x 10.3484
3,14 x 2^2
= 3.15545279 m

Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 3.15545279 + 1.02198
= 4.17742928 m
HOPPER (HP-09)

Fungsi = Sebagai Corong untuk memasukan material ke dalam dryer


Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-283 grade C
Jumlah = 1 unit
Laju Alir (W) = 115648.97 Kg/jam = 115.65 Ton/jam
Bulk Density = 961.2 kg/m3 = 0.9612 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
Volume Hopper(VH) =  wxt 
 p 
 
 wxt 
 
 p 
= 115.65 x 1
0.9612
= 120.317279 m3

Safety Factor = 20%


Volume Hopper = 1,2 x 120.317
= 144.380735 m3
Volume Hopper yang diambil (Vs) = 145 m3 = 5120 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 92.3566879 m3

D = 10,414^ 0,33
= 4.5 m 175.3 in

r = 1/2 D
= 2.2 m 87.6 in

H = 2D
= 8.9 m 350.6 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 4m
h = Vs
π x Di2
4
= 145
3,14/4 x 192
= 9.3 m

Tekanan desain
Poperasi = 1 atm = 14.7 psi
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 87.6 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 16250 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 32,90 x 78,9 + 0,125
16250 x 0,8 - 0,6 x 32,90
= 1546.11 0.125
12989.42
= 0.2 in

Dipilih tebal standar sheell (ts) = 1/4 in = 0.25 in = 0.00635 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) =  1  
 2 xD  x tg 45
  
= 1x 4 x 1
2
= 2.23

π
Volume Kerucut =
[ 4
2
xD x H ]
= 3.14 x 4^2 2.22625
4
= 34.6460181 m3

Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 145 m3 - 35 m3
= 110.4 m3

Tinggi Silinder (HH) =  4 xVol.Silinder


  x D2 
 
= 4 x 110.354
3,14 x 2^2
= 7.09102866 m
Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 7.09102866 + 2.22625
= 9.31728188 m
HOPPER (HP-10)

Fungsi = Menampung sementara batu bara


Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-283 grade C
Jumlah = 1 unit
Laju Alir (W) = 11435.68 Kg/jam = 11.44 Ton/jam
Bulk Density = 801 kg/m3 = 0.801 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
Volume Hopper(VH) =  wxt 
 p 
 
= 11.44 x 1
0.801
= 14.28 m3

Safety Factor = 20%


Volume Hopper = 1,2 x 14.2767
= 17.1320977 m3
Volume Hopper yang diambil (Vs) = 20 m3 = 706 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 12.7388535 m3

D = 12,73^ 0,33
= 2.3 m 91.2 in

r = 1/2 D
= 1.2 m 45.6 in

H = 2D
= 4.6 m 182.3 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 2m
h = Vs
π x Di2
4
= 20
3,14/4 x 192
= 4.7 m

Tekanan desain
Poperasi = 1 atm
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 45.6 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 12650 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 24,12 x 45,6 + 0,125
16250 x 0,8 - 0,6 x 24,12
= 804.13 0.125
10109.42
= 0.2 in

Dipilih tebal standar sheell (ts) = 1/4 in = 0.25 in = 0.00635 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) =  1  
 2 xD  x tg 45
  
= 1x 2 x 1
2
= 1.16

π
Volume Kerucut =
[ 4
2
xD x H ]
π
[ 4
2
xD x H ]
= 3.14 x 2^2 1.15788
4
= 4.87437234 m3

Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 20 m3 - 4.87437 m3
= 15.1256277 m3

Tinggi Silinder (HH) =  4 xVol.Silinder


  x D2 
 
= 4 x 15.1256
3,14 x 2^2
= 3.59300418 m

Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 3.59300418 + 1.15788
= 4.75088275 m
HOPPER (HP-11)

Fungsi = Menampung batu bara dari HP-10 untuk bahan bakar suspension preheater
Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-283 grade C
Jumlah = 1 unit
Laju Alir (W) = 6861.41 Kg/jam = 6.86 Ton/jam
Bulk Density = 801 kg/m3 = 0.801 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
Volume Hopper(VH) =  wxt 
 p 
 
= 6.86 x 1
0.801
= 8.57 m3

Safety Factor = 20%


Volume Hopper = 1,2 x 8.56605
= 10.2792586 m3
Volume Hopper yang diambil (Vs) = 11 m3 = 388 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 7.00636943 m3

D = 7,643^ 0,33
= 2m 74.8 in

r = 1/2 D
= 1.0 m 37.4 in

H = 2D
= 4m 149.7 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 2m
h = Vs
π x Di2
4
= 11
3,14/4 x 192
= 3.9 m

Tekanan desain
Poperasi = 1 atm
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 37.4 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 12650 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 22,93 x 45,6 + 0,125
16250 x 0,8 - 0,6 x 22,93
= 660.16 0.125
10109.42
= 0.2 in

Dipilih tebal standar sheell (ts) = 1/4 in = 0.25 in = 0.00635 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) =  1  
 2 xD  x tg 45
  
= 1x 2 x 1
2
= 1

π
Volume Kerucut =
[ 4
2
xD x H ]
= 3.14 x 2^2 0.95057
4
= 3 m3

Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 11 m3 - 3 m3
= 8 m3

Tinggi Silinder (HH) =  4 xVol.Silinder


  x D2 
 
= 4 x 8.30302
3,14 x 2^2
= 2.9 m

Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 2.92644936 + 0.95057
= 3.8770163 m

HOPPER (HP-12)
Fungsi = Menampung batu bara dari HP-10 untuk bahan bakar Rotary Kiln
Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-283 grade C
Jumlah = 1 unit
Laju Alir (W) = 4574.27 Kg/jam = 4.57 Ton/jam
Bulk Density = 801 kg/m3 = 0.801 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
Volume Hopper(VH) =  wxt 
 
 p 
 wxt 
 
 p 
= 4.57 x 1
0.801
= 5.71069925 m3

Safety Factor = 20%


Volume Hopper = 1,2 x 5.7107
= 6.8528391 m3
Volume Hopper yang diambil (Vs) = 7 m3 = 247 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 4.45859873 m3

D = 7,643^ 0,33
= 1.6 m 64.5 in

r = 1/2 D
= 0.8 m 32.2 in

H = 2D
= 3.3 m 129.0 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 2m
h = Vs
π x Di2
4
= 7
3,14/4 x 22
= 3.3 m

Tekanan desain
Poperasi = 1 atm
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 32.2 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 12650 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 22,17 x 32,2 + 0,125
16250 x 0,8 - 0,6 x 22,17
= 568.68 0.125
10109.42
= 0.2 in

Dipilih tebal standar sheell (ts) = 1/4 in = 0.25 in = 0.00635 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) =  1  
 2 xD  x tg 45
  
= 1x 2 x 1
2
= 1

π
Volume Kerucut =
[ 4
2
xD x H ]
= 3.14 x 2^2 0.8
4
= 1.7 m3

Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 7 m3 - 1.68434 m3
= 5.31565683 m3

Tinggi Silinder (HH) =  4 xVol.Silinder


  x D2 
 
= 4 x 5.31566
3,14 x 2^2
= 2.52473816 m
Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 2.5 + 1
= 3.3 m

HOPPER (HP-13)
Fungsi = Menampung material gypsum sebelum ditimbang dengan WF-08
Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-283 grade C
Jumlah = 1 unit
Laju Alir (W) = 3191.39 Kg/jam = 3.19 Ton/jam
Bulk Density = 961.2 kg/m3 = 0.9612 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
Volume Hopper(VH) =  wxt 
 p 
 
= 3.19 x 1
0.9612
= 3.32021261 m3

Safety Factor = 20%


Volume Hopper = 1,2 x 3.32021
= 3.98425513 m3
Volume Hopper yang diambil (Vs) = 4 m3 = 141 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 2.5477707 m3

D = 2,547^ 0,33
= 1.4 m 53.6 in

r = 1/2 D
= 0.7 m 26.8 in

H = 2D
= 2.7 m 107.2 in
Menentukan Tebal Hopper (tT)
Vs = π x Di2 x h
4
Dimana, Di=D = 1.4 m
h = Vs
π x Di2
4
= 4
2
3,14/4 x 1
= 2.7 m

Tekanan desain
Poperasi = 1 atm
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 26.8 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 12650 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 22,14 x 26,8 + 0,125
16250 x 0,8 - 0,6 x 22,14
= 472.79 0.125
10109.42
= 0.2 in

Dipilih tebal standar sheell (ts) = 1/4 in = 0.25 in = 0.00635 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) =  1  
 2 xD  x tg 45
  
= 1x 1 x 1
2
= 0.68

π
[ 4
2
xD x H ]
π
Volume Kerucut =
[ 4
2
xD x H ]
= 3.14 x 1^2 0.68077
4
= 0.99069141 m3

Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 4 m3 - 0.99069 m3
= 3.00930859 m3

Tinggi Silinder (HH) =  4 xVol.Silinder


  x D2 
 
= 4 x 3.00931
3,14 x 2^2
= 2.06790815 m

Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 2.06790815 + 0.68077
= 3m
HOPPER (HP-14)

Fungsi = Menampung material Trass sebelum ditimbang dengan WF-09


Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-283 grade C
Jumlah = 1 unit
Laju Alir (W) = 18084.53 Kg/jam = 18.08 Ton/jam
Bulk Density = 1380 kg/m3 = 1.38 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
Volume Hopper(VH) =  wxt 
 p 
 
= 18.08 x 1
1.38
= 13.1047348 m3

Safety Factor = 20%


Volume Hopper = 1,2 x 13.1047
= 15.7256818 m3
Volume Hopper yang diambil (Vs) = 16 m3 = 565 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D


Volume Hopper = π/4 x D2 x H
= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 10.2 m3

D = 10,828^ 0,33
= 2.2 m 84.7 in

r = 1/2 D
= 1.1 m 42.3 in

H = 2D
= 4.3 m 169.4 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 2m
h = Vs
π x Di2
4
= 16
2
3,14/4 x 1
= 4.4 m

Tekanan desain
Poperasi = 1 atm
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 42.3 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 12650 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 22,99 x 42,3 + 0,125
16250 x 0,8 - 0,6 x 22,99
= 747.05 0.125
10109.42
= 0.2 in

Dipilih tebal standar sheell (ts) = 1/4 in = 0.25 in = 0.00635 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) =  1  
 2 xD  x tg 45
  
= 1x 2 x 1
2
= 1.08

π
Volume Kerucut =
[ 4
xD 2 x H ]
= 3.14 x 2^2 1.07568
4
= 3.90820907 m3

Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 16 m3 - 3.90821 m3
= 12.0917909 m3

Tinggi Silinder (HH) =  4 xVol.Silinder


  x D2 
 
= 4 x 12.0918
3,14 x 2^2
= 3.32809378 m

Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 3.32809378 + 1.07568
= 4.40377283 m

HOPPER (HP-15)

Fungsi

= Menampung material blast slag furnace sebelum ditimbang dengan WF-09


Bentuk
Bahan konstruksi = Silinder tegak dengan alas kerucut dan tutup datar
Jumlah = Carbon Steel SA-283 grade C
Laju Alir (W) = 1 unit
Bulk Density = 10637.96 Kg/jam = 10.64 Ton/jam
Angle of Respone (θ) = 2000 kg/m3 = 2 Ton/m3
Lama Penyimpanan = 45°
Volume Hopper(VH) = 1 jam
=  wxt 
 p 
 
= 10.64 x 1
2
3
= 5.3189806 m

Safety Factor = 20%


Volume Hopper = 1,2 x 5.31898
= 6.38277672 m3
Volume Hopper yang diambil (Vs) = 7 m3 = 247 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 4.45859873 m3

D = 4,458^ 0,33
= 1.6 m 64.5 in

r = 1/2 D
= 0.8 m 32.2 in

H = 2D
= 3.3 m 129.0 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 2m
h = Vs
π x Di2
4
= 7
2
3,14/4 x 1
= 3.3 m

Tekanan desain
Poperasi = 1 atm
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 32.2 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 12650 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 28,97 x 32,2 + 0,125
16250 x 0,8 - 0,6 x 28,97
= 568.68 0.125
10109.42
= 0.2 in

Dipilih tebal standar sheell (ts) = 1/4 in = 0.25 in = 0.00635 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) =  1  
 2 xD  x tg 45
  
= 1x 2 x 1
2
= 0.82

π
Volume Kerucut =
[ 4
2
xD x H ]
= 3.14 x 2^2 0.81885
4
= 1.72403495 m3

Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 7 m3 - 1.72403 m3
= 5.27596505 m3

Tinggi Silinder (HH) =  4 xVol.Silinder


  x D2 
 
 4 xVol.Silinder
  x D2 
 
= 4 x 5.27597
3,14 x 2^2
= 2.50588605 m

Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 2.51 + 1
= 3.3 m
HOPPER (HP-16)

Fungsi = Menampung campuran aditif dan klinker dingin


Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-283 grade C
Jumlah = 1 unit
Laju Alir (W) = 101060.63 Kg/jam = 101.06 Ton/jam
Bulk Density = 1281.6 kg/m3 = 1.2816 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
Volume Hopper(VH) =  wxt 
 p 
 
= 101.06 x 1
1.2816
= 78.8550494 m3

Safety Factor = 20%


Volume Hopper = 1,2 x 78.855
= 94.63 m3
Volume Hopper yang diambil (Vs) = 95 m3 = 3354 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)

Diambil , H/D = 2, maka H=2D

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 60.5095541 m3

D = 55,414^ 0,33
= 4m 152.5 in

r = 1/2 D
= 1.9 m 76.2 in
H = 2D
= 8m 305 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 4m
h = Vs
π x Di2
4
= 95
3,14/4 x 12
= 8.1 m

Tekanan desain
Poperasi = 1 atm
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
rf (tegangan
(jari - jari maksimum
dalam tangki)
yang = 76.2 in
diinginkan (allowable strss) = 16250 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 35,26 x 76,2 + 0,125
16250 x 0,8 - 0,6 x 35,26
= 1344.74 0.125
12989.42
= 0.2 in

Dipilih tebal standar sheell (ts) = 1/3 in = 0.3125 in = 0.007938 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah:
Tinggi Kerucut Bawah (kerucut) =  1  
 2 xD  x tg 45
  
= 1x 4 x 1
2
= 1.94
π
Volume Kerucut =
[ 4
2
xD x H ]
= 3.14 x 4^2 1.9363
4
= 22.7953033 m3

Silinder :
Volume Silinder = Vol. Hopper – Vol. Kerucut bawah
= 95 m3 - 22.7953 m3
= 72.2046967 m3

Tinggi Silinder (HH) =  4 xVol.Silinder


  x D2 
 
= 4 x 72.2047
3,14 x 4^2
= 6.13326857 m

Tinggi Hopper:
Tinggi Hopper(HH) = H silinder + H kerucut bawah
= 6.13326857 + 1.9363
= 8.06956529 m

HOPPER (HP-17)

Fungsi = Menampung semen halus dari CS-01 menuju packing unit


Bentuk = Silinder tegak dengan alas kerucut dan tutup datar
Bahan konstruksi = Carbon Steel SA-283 grade C
Jumlah = 1 unit
Laju Alir (W) = 101010.10 Kg/jam = 101.01 Ton/jam
Bulk Density = 1121.4 kg/m3 = 1.1214 Ton/m3
Angle of Respone (θ) = 45°
Lama Penyimpanan = 1 jam
Volume Hopper(VH) =  wxt 
 p 
 
= 101.01 x 1
1.1214
= 90.0749964 m3

Safety Factor = 20%


Volume Hopper = 1,2 x 90.075
= 108.1 m3
Volume Hopper yang diambil (Vs) = 109 m3 = 3849 ft3

Menentukan Diameter (D) dan Tinggi Hopper (H)


Diambil , H/D = 2, maka H=2D

Volume Hopper = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 69.4 m3

D = 55,414^ 0,33
= 4.05 m 159.5 in

r = 1/2 D
= 2.03 m 79.8 in

H = 2D
= 8.10 m 319.1 in

Menentukan Tebal Hopper (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 4m
h = Vs
π x Di2
4
= 109
3,14/4 x 12
= 8.4 m

Tekanan desain
Poperasi = 1 atm
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r (jari - jari dalam tangki) = 79.8 in
f (tegangan maksimum yang
diinginkan (allowable strss) = 12650 psi (sumber : Apendix D, Brownell and young, Hal 342)
E (Efisiensi Penyambung) = 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun 10 tahun
= 0.125 in
Safety Factor 20 %
P = 17.64 psi
Sehingga :
t = 33,79 x 79,8 + 0,125
16250 x 0,8 - 0,6 x 33,79
= 1407.14 0.125
10109.42
= 0.3 in

Dipilih tebal standar sheell (ts) = 1/4 in = 0.25 in = 0.00635 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Kerucut bawah: =  1  
Tinggi Kerucut Bawah (kerucut)  2 xD  x tg 45
  
= 1x 4 x 1
2
= 2.03

π
Volume Kerucut
=
[ 4
2
xD x H ]
= 3.14 x 4^2 2.02616
4
= 26.1186808 m3

Silinder : = Vol. Hopper – Vol. Kerucut bawah


Volume Silinder = 109 m3 - 26.1187 m3
= 82.9 m3

=  4 xVol.Silinder
Tinggi Silinder (HH)   x D2 
 
= 4 x 82.8813
3,14 x 4^2
= 6.4 m

Tinggi Hopper: = H silinder + H kerucut bawah


Tinggi Hopper(HH) = 6.42953079 + 2.02616
= 8.45569137 m
oung, Hal 342)
iradiografi)
oung, Hal 342)
iradiografi)
oung, Hal 342)
iradiografi)
oung, Hal 342)
iradiografi)
oung, Hal 342)
iradiografi)
nd Supplier.
oung, Hal 342)
iradiografi)
oung, Hal 342)
iradiografi)
oung, Hal 342)
iradiografi)
oung, Hal 342)
iradiografi)
suspension preheater
oung, Hal 342)
iradiografi)
oung, Hal 342)
iradiografi)
ngan WF-08
oung, Hal 342)
iradiografi)
oung, Hal 342)
iradiografi)
mbang dengan WF-09
oung, Hal 342)
iradiografi)
oung, Hal 342)
iradiografi)
unit
oung, Hal 342)
iradiografi)
L.4.8.1 Raw Meal Silo (RMS - 01)

Fungsi = Menampung raw meal dari Vertical Raw Mill (VRM-01)


Jenis = Silo Storage
Bentuk = Silinder Tegak dengan alas cone tutup datar
Bahan Kontruksi = Carbon Steel SA-283 grade A
Laju Alir (W) = 110870.85271 kg/jam = 110.8709 ton/jam
Bulk Density = 1.36 Ton/m3 = 1360 kg/m3
Data, T = 30 °
P = 1 atm
Angle of respone (θ) = 36 °
Lama Penyimpanan = 2 hari
t = 48 jam
Jumlah Tangki = 15 Buah

Volume raw meal(Vrm) = Wxt


ρ
= 110,8709 x 48
1.36
= 3913.0889191 m3

Direncanakan digunakan 15 buah tangki berbentuk silinder, maka volume tiap tangki :
Volume silo (Vs) = 260.87 m3

Safety Factor = 20 %
Volume Silo (Vs) = 1,2 x 260,87
= 313.0 m3

Volume silo yang diambil (Vs) = 313 m3 = 1967 galon

Menentukan Diameter (D) dan Tinggi Tangki (H)

Diambil , H/D = 2, maka H=2D

Volume Tangki = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 199.36305732 m3

D = 199,3631 ^ 0,33
= 6m = 226.0 in

r = 1/2 D
= 2.9 m = 113.0 in

H = 2D
= 11 m = 451.9 in

Menentukan Tebal Tangki (tT)


Vs = π x Di2 x h
4
Dimana, Di=D = 6m
h = Vs
π x Di2
4
= 313.0
3,14/4 x 192
= 12.1 m

Tekanan desain
Poperasi = 1 atm = 14.7 psi
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r = jari - jari dalam tangki
= 113.0 in
f = tegangan maksimum yang diinginkan (allowable strss)
= 10350 (sumber : Tabel 13.1, Brownell and young, Hal 263)
E = Efisiensi Penyambung
= 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun = 10 tahun
= 0.125 in
Safety Factor 20%
P = 17.64 psi

Sehingga :
t = 45,6899 x 276,2 + 0,125
16250 x 0,8 - 0,6 x 45,6899
= 1993.05 0.125
8269.416
= 0.4 in

Dipilih tebal standar sheell (ts) = 4/9 in = 0.4375 in = 0.01


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Menentukan Diameter Tangki Sesungguhnya :


Diameter luar shell (DO) adalah
DO = Di + (2ts)
= 226,0 in + (2x0,4375)
= 226.8 in = 5.8 m

Diambil diameter luar standar shell (Do)


= 228 in
diameter dalam tangki sesungguhnya adalah :
Di = Do - (2ts)
= 228 - (2 x 0,4375)
= 227.125 in = 5.77 m
Menentukan Kerucut

Kerucut Bawah :
1
Tinggi Kerucut Bawah (H kerucut) =
[ ]
2
xD x tan 45
= (1 x 6) x 1
2
= 2.9 m

Volume Kerucut Bawah = π x D2 x H kerucut


12
= 3,14/12 x 62 x 9,5
= 24.74 m3

Silinder :
Vol Silinder = Vol Silo - vol. kerucut bawah
= 313 - 24.74
= 288 m3

Tinggi Silinder (Hs) = Vol. Silinder


π x (r)2
= 288
3,14 x(2,9)2
= 11 m
d young, Hal 263)

anpa diradiografi)

m
L.4.9.1 Clinker Silo (CLS- 01)

Fungsi = Menampung clinker dari clinker cooler


Jenis = Silo Storage
Bentuk = Silinder Tegak dengan alas cone tutup datar
Bahan Kontruksi = Carbon Steel SA-283 grade A
Laju Alir (W) = 69146.75 kg/jam = 69.14675 ton/jam
Bulk Density = 1.6 Ton/m3 = 1600 kg/m3
Angle of respone (θ) = 36 °
Lama Penyimpanan = 2 hari
t = 48 jam
Jumlah Tangki = 8 Buah

Volume raw meal(Vrm) = Wxt


ρ
= 69,14675 x 48
1.6
= 2074.40 m3

Direncanakan digunakan 8 buah tangki berbentuk silinder, maka volume tiap tangki :
Volume silo (Vs) = 259.30 m3

Safety Factor = 20 %
Volume Silo (Vs) = 1,2 x 259,30
= 311.2 m3

Volume silo yang diambil (Vs) = 315 m3 = 1979 galon

Menentukan Diameter Silo (D) dan Tinggi Tangki (H)

Diambil , H/D = 2, maka H=2D

Volume Tangki = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 200.63694 m3

D = 200,63^ 0,33
= 5.8 m = 226.4 in

r = 1/2 D
= 2.8758458 m = 113.2 in

H = 2D
= 12 m = 452.9 in
Menentukan Tebal Tangki (tT)
Vs = π x Di2 x h
4
Dimana, Di=D = 6m
h = Vs
π x Di2
4
= 311.16036
3,14/4 x 62
= 12.0 m

Tekanan desain
Poperasi = 1 atm
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r = jari - jari dalam tangki
= 113.2 in
f = tegangan maksimum yang diinginkan (allowable strss)
= 10350 (sumber : Tabel 13.1, Brownell and young, Hal 263)
E = Efisiensi Penyambung
= 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun = 10 tahun
= 0.125 in
Safety Factor 20%
P = 17.64 psi

Sehingga :
t = 50,304 x 224,3 + 0,125
16250 x 0,8 - 0,6 x 50,304
= 1997.241 0.125
8269.416
= 0.4 in

Dipilih tebal standar sheell (ts) = 4/9 in = 0.4375 in = 0.01 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Menentukan Diameter Tangki Sesungguhnya :


Diameter luar shell (DO) adalah
DO = Di + (2ts)
= 226,4 in + (2x0,4375)
= 227.320 in = 6m

Diambil diameter luar standar shell (Do)


= 228 in
diameter dalam tangki sesungguhnya adalah :
Di = Do - (2ts)
= 228- (2x0,4375)
= 227.125 in = 5.77 m
Menentukan Kerucut

Kerucut Bawah :
1
Tinggi Kerucut Bawah (H kerucut) =

=
[ ]
2
xD x tan 45
(1 x 11,4) x 1
2
= 2.9 m

Volume Kerucut Bawah = π x D2 x H kerucut


12
= 3,14/12 x 11,42 x 5,7
= 24.89 m3

Silinder :
Vol Silinder = Vol Silo -vol. kerucut bawah
= 315 - 24.89
= 290 m3

Tinggi Silinder (Hs) = Vol. Silinder


π x (r)2
= 290
3,14 x(2,87)2
= 11.17 m
L.4.10.1 Cement Silo (CS- 01)

Fungsi = Menampung produk semen dari vertikal raw mill (VRM - 02)
Jenis = Silo Storage
Bentuk = Silinder Tegak dengan alas cone tutup datar
Bahan Kontruksi = Carbon Steel SA-283 grade A
Laju Alir (W) = 101010.1 kg/jam = 101.0101 ton/jam
Bulk Density = 1.6 Ton/m3 = 1600 kg/m3
Angle of respone (θ) = 36 °
Lama Penyimpanan = 2 hari
t = 48 jam
Jumlah Tangki = 10 Buah

Volume Cement (Vc) = Wxt


ρ
= 101,0101 x 48
1.6
= 3030.303 m3

Direncanakan digunakan 10 buah tangki berbentuk silinder, maka volume tiap tangki :
Volume silo (Vs) = 303.03 m3

Safety Factor = 20 %
Volume Silo (Vs) = 1,2 x 303,30
= 363.6364 m3

Volume silo yang diambil (Vs) = 365 m3 = 2294 galon

Menentukan Diameter (D) dan Tinggi Tangki (H)

Diambil , H/D = 2, maka H=2D

Volume Tangki = π/4 x D2 x H


= 2 x π x D3
4
D3 = 4 x Vs
2 x 3,14
= 232.4841 m3

D = 2356,688^ 0,33
= 6.04 m = 237.7 in

r = 1/2 D
= 3.019116 m = 118.9 in

H = 2D
= 12.1 m = 475.5 in
Menentukan Tebal Tangki (tT)
Vs = π x Di2 x h
4
Dimana, Di=D = 6m
h = Vs
π x Di2
4
= 363.6364
3,14/4 x 62
= 12.7 m

Tekanan desain
Poperasi = 1 atm
g = 9.8 m/dt2

Tebal Tangki
t = Pxr + c
f x E - 0,6 x P
(Sumber : Persamaan (14.34), Brownell and Young, hal 275)
Dimana, t = Tebal dinding tangki (in)
r = jari - jari dalam tangki
= 118.9 in
f = tegangan maksimum yang diinginkan (allowable strss)
= 10350 psi (sumber : Apendix D, Brownell and young, Hal 342)
E = Efisiensi Penyambung
= 80 % (tipe double welded butt joint tanpa diradiografi)
(Sumber : Tabel 13.2, Brownell and Young, Hal 254)
c = faktor korosi (0,0125 in/tahun)
Umur tangki diperkirakan 10 tahun,sehingga :
c = 0.0125 in/tahun = 10 tahun
= 0.125 in
Safety Factor 20%
P = 17.64 psi

Sehingga :
t = 52,2762 x 255,3 + 0,125
16250 x 0,8 - 0,6 x 52,2762
= 2096.74 0.125
8269.416
= 0.38 in

Dipilih tebal standar sheell (ts) = 4/9 in = 0.4375 in = 0.01 m


(sumber : Tabel 5.8 ,brownell and Young, hal 93)

Menentukan Diameter Tangki Sesungguhnya :


Diameter luar shell (DO) adalah
DO = Di + (2ts)
= 237,7 in + (2x0,4375)
= 239 in = 6.060 m

Diambil diameter luar standar shell (Do)


= 240 in
diameter dalam tangki sesungguhnya adalah :
Di = Do - (2ts)
= 240- (2 x 0,4375)
= 239.125 in = 6.074 m
Menentukan Kerucut

Kerucut Bawah :
1
Tinggi Kerucut Bawah (H kerucut) =

=
[ ]
2
xD x tan 45
(1 x 6) x 1
2
= 3.02 m

Volume Kerucut Bawah = π x D2 x H kerucut


12
= 3,14/12 x 62 x 7,7
= 28.80 m3

Silinder :
Vol Silinder = Vol Silo - vol. kerucut bawah
= 365 - 28.80
= 336 m3

Tinggi Silinder (Hs) = Vol. Silinder


π x (r)2
= 336
3,14 x(3,01)2
= 11.7 m
L.4.11.1 Blower (BL- 01)

Meniupkan udara untuk mendorong batubara ke burning gun


Fungsi =
Suspension Preheater (SP-01)
Jenis = Blower Centrifugal
Bahan kontruksi = Carbon steel
Jumlah = 1 buah
Laju Alir (W) = 1372.28 kg/jam
Safety Factor = 20 %
Laju Alir Aktual (Wu) = 1,2 x 1372,281 kg/jam
= 1646.74 kg/jam

Densitas Udara = 1.1212 kg/m3 = 0.07 lb/ft3


Laju Alir Volumetrik (Vu) = Wu
ρu

= 1646.74 kg/jam
1.12 kg/m3
= 1468.73 m3/jam = 52454.5523 ft3/jam
= 874 Ft3/min

Optimum Diameter Pipa (D) = 3,9 x V0,45 x ρ0,13


= 3,19 x 52455 0,45 x 0,070,13 x 0,0393
= 11.8 in = 0.29947758 m

T = Tekanan operasi = 1 atm = 406.784 in H2O


Power (HP) = 144 x 0,8 x Vu
33000
= 144 x 0,8 x 1468,72
33000
= 5.1271940624 HP
Effisiensi Motor = 80 %
HP = 5.1271940624
0.8
= 6.4 HP

Safety Factor = 20.0 %


HP = 6,40 x 1,2
= 7.7 HP
Power yang dibutuhkan = 7.7 HP / 1.34
= 5.7 kW

L.4.11.1 Blower (BL- 02)

Meniupkan udara untuk mendorong batubara ke burning gun Rotary


=
Fungsi Kiln (RK-01)
Jenis = Blower Centrifugal
Jumlah = 1 buah
Laju Alir (W) = 914.85 kg/jam 0.91485402
Safety Factor = 20 %
Laju Alir Aktual (Wu) = 1,2 x 914,85 kg/jam
= 1097.8248231 kg/jam
Densitas Udara = 1.1212 kg/m3 = 0.07 lb/ft3
Laju Alir Volumetrik (Vu) = Wu
ρu

= 1097.8248231
1.1212
= 979.15164386 m3/jam = 34969.7016 ft3/jam
= 583 Ft3/min

Optimum Diameter Pipa (D) = 3,9 x V0,45 x ρ0,13


= 3,19 x 1023696 0,45 x 0,070,13 x 0,0393
= 9.82 in

T = Tekanan operasi = 1 atm = 406.784 in H2O


Power (HP) = 144 x 0,8 x Vu
33000
= 144 x 0,8 x 979,15
33000
= 3.4181293749 HP
Effisiensi Motor = 80 %
HP = 3.4181293749
0.8
= 4.2726617187 HP

Safety Factor = 20 %
HP = 4,272 x 1,2
= 5.13 HP
Power yang dibutuhkan = 5.13 HP / 1.34
= 3.83 kW

L.4.11.1 Blower (BL- 03)

= Menghisap udara buang suspension preheter yang akan menuju Rotary


Fungsi dryer
Jenis = Blower Centrifugal
Jumlah = 1 buah
Laju Alir (W) = 162829.44 kg/jam 162.829445 ton/jam
Safety Factor = 20 %
Laju Alir Aktual (Wu) = 1,2 x 162829,44 kg/jam
= 195395.3 kg/jam

Densitas Udara = 1.1212 kg/m3 = 0.07 lb/ft3


Laju Alir Volumetrik (Vu) = Wu
ρu

= 195395.33396
1.1212
= 174273.39811 m3/jam = 6224050 ft3/jam
= 103734.166 Ft3/min

Optimum Diameter Pipa (D) = 3,9 x V0,45 x ρ0,13


= 3,19 x 1023696 0,45 x 0,070,13 x 0,0393
= 101.15 in = 2.56918137 m

T = Tekanan operasi = 1 atm = 406.784 in H2O


Power (HP) = 144 x 0,8 x Vu
33000
= 144 x 0,8 x 174.273
33000
= 608.37 HP
Effisiensi Motor = 80 %
HP = 608.37258977
0.8
= 760.5 HP

Safety Factor = 20 %
HP = 4,272 x 1,2
= 912.56 HP
Power yang dibutuhkan = 912.56 HP / 1.34
= 681.01 kW

L.4.11.1 Blower (BL- 04)

= Menghisap udara buang suspension preheter yang akan menuju Rotary


Fungsi dryer dari Gas Conditioning Tower
Jenis = Blower Centrifugal
Jumlah = 1 buah
Laju Alir (W) = 162829.44 kg/jam 162.829445 ton/jam
Safety Factor = 20 %
Laju Alir Aktual (Wu) = 1,2 x 162829,44 kg/jam
= 195395.3 kg/jam

Densitas Udara = 1.1212 kg/m3 = 0.07 lb/ft3


Laju Alir Volumetrik (Vu) = Wu
ρu

= 195395.33396
1.1212
= 174273.39811 m3/jam = 6224049.93 ft3/jam
= 103734.166 Ft3/min

Optimum Diameter Pipa (D) = 3,9 x V0,45 x ρ0,13


= 3,19 x 1023696 0,45 x 0,070,13 x 0,0393
= 101.15 in = 2.56918137 m

T = Tekanan operasi = 1 atm = 406.784 in H2O


Power (HP) = 144 x 0,8 x Vu
33000
= 144 x 0,8 x 174.273
33000
= 608.37 HP
Effisiensi Motor = 80 %
HP = 608.37258977
0.8
= 760.5 HP

Safety Factor = 20 %
HP = 4,272 x 1,2
= 912.56 HP
Power yang dibutuhkan = 912.56 HP / 1.34
= 681.01 kW

L.4.11.1 Blower (BL-5-19)

Fungsi = Mendinginkan klinker pada alat Greate cooler


Jenis = Blower Centrifugal
Jumlah = 15 buah
Laju Alir (W) = 128946.83 kg/jam
Safety Factor = 20 %
Laju Alir Aktual (Wu) = 1,2 x 128946,8 kg/jam
= 154736.19242 kg/jam
Jumlah blower yang akan digunakan ada 15 buah,maka :
Laju Alir Aktual (Wu)/buah = 154736.19 /15
= 10315.75 kg/jam
= 22694.64 lb/jam

Densitas Udara = 1.1212 kg/m3 = 0.07 lb/ft3


Laju Alir Volumetrik (Vu) = Wu
ρu

= 10315.7
1.1
= 9200.6298261 m3/jam = 328593.922 ft3/jam
= 5476.56537 Ft3/min
= 365 ft3/min per 1 buah

Optimum Diameter Pipa (D) = 3,9 x V0,45 x ρ0,13


= 3,19 x 300000 0,45 x 0,070,13 x 0,0393
= 27 in 1.79486928

T = Tekanan operasi = 1 atm = 406.784 in H2O


Power (HP) = 144 x 0,8 x Vu
33000
= 144 x 0,8 x 9200,63
33000
= 32.118562302 HP
Effisiensi Motor = 80 %
HP = 32.118562302
0.8
= 40.15 HP

Safety Factor = 20 %
HP = 40,1482 x 1,2
= 48.18 HP
Power yang dibutuhkan = 48.18 HP / 1.34
= 35.95 kW
Total HP yang dibutuhkan untuk 15 blower adalah :
HP = 48.18 x 15
= 722.67 HP
Total power yang dibutuhkan = 35.95 x 15
= 539.30 kW

Kebutuhan Power Blower

Power
No No BL
(kW)
1 BL -01 5.74
2 BL -02 3.83
3 BL-03 681.01
4 BL-04 681.01
4 BL -04 - BL 18 539.30
Total 1910.90
L.4.11.1 Blower Kiln (BLK- 01)

Fungsi = Meniupkan udara primer ke burning gun


Jenis = Blower Centrifugal
Bahan Kontruksi = Commercial Steel
Jumlah = 1 buah
Laju Alir (W) = 6294.60 kg/jam
Safety Factor = 20 %
Laju Alir Aktual (Wu) = 1,2 x 6294,60 kg/jam
= 7553.518 kg/jam

Densitas Udara = 1.1212 kg/m3 = 0.07 lb/ft3


Laju Alir Volumetrik (Vu) = Wu
ρu

= 7553.518 kg/jam
1.1212 kg/m3
= 6737.0 m3/jam = 240606.9 ft3/jam
= 4010 Ft3/min

Optimum Diameter Pipa (D) = 3,9 x V0,45 x ρ0,13


= 3,19 x 6736,9 0,45 x 0,070,13
= 23.40 in

T = Tekanan operasi = 1 atm = 406.784 in H2O


Power (HP) = 144 x 0,8 x Vu
33000
= 144 x 0,8 x 6736,9
33000
= 23.51824 HP
Effisiensi Motor = 80 %
HP = 23.51824
0.8
= 29.39779 HP

Safety Factor = 20 %
HP = 125,0771 x 1,2
= 35.27735 HP
Power yang dibutuhkan = 35.27735 HP / 1.34
= 26.32638 kW
L.4.14.1 Vertikal Raw Mill (VRM- 01)

Fungsi = Mengecilkan ukuran material campuran dari Rotary Dryer(RD-01)


Jenis = Vertical Mill with Four Roller Unit
Bahan = Commercial Steel
Laju Alir Produk = 105,430.63 kg/jam
Faktor Kemanan = 20 %
Kapasitas Mill (PM) = 126,517 ton/jam
Kapasitas Mill Aktual(PM akt) = 127 ton/jam
L/D = 2
(Sumber : FLSMIDTH “Mechanical Design for VRM”, exercise)

Berdasarkan Kapasitas Aktual maka dipilih VRM Tipe (36-4) , dengan Dimensi :
A = 19 m , B = 16,8 m , C = 8,4 m , D = 9,4 m 31 ft
Dimana, A = Height, m
B = Height separator outlet,m
C = Separator Widht, m
D = Widht, m

Data untuk mill type (36 - 4)


Table speed = 25 rpm
Product Fineness (Blaine) = 3300 cm3/g
Capacity = 260 ton/jam
Mill Motor = 3750 kW
Grinding bed thickness H = 80 mm dan (Pρ diasumsi 2000 kb/m3 bahan padat)
Kecepatan Aliran Udara = 120 Nm3/s
Do = 5 m (diameter luar efektif)
Berat satu roller = 57 ton
= 568 kN , DR = 3 m,W = 1
Hydraulic Presure = 160 bar
Hydraulic Cylinder 0,42 / 0,21 m korespondensi (sesuai dengan) = 0.1039 m2

Menghitung Grinding Pressure (kT)

kT = T
W.Di
Roller Force , T = 1/4 x π x (0,42 2 - 0,21 2 ) x 160 x 100 + 568
= 2229.688 kN
maka, kT = 2229.688
3x1
= 743.22933333 kN/m2

Menghitung Friction Factor (μ)

μ= 3750
0,844 x kT x D0 2,5
= 0.107

Menghitung Maximum Pressure (Pmax), Spesific Power Consumption (N) dan circulation
Under Roller (C)

Pmax = 4 x kT /μ
= 27799.81 kN/m2

F-1 = 1/4 x Dr/H x μ2


= 1.07

N = 1/3 x pmax x (F-1)/Pρ


= 4.97 kj/kg
= 1.380 kWh/Ton

C = (N/P)/N
= 10 Kali

Spesific Motor Comsumption = 18 kWh/t


Mill Motor Power(N) = Pm (akt) x Spesific Motor Comsumption
= 2,286 HP

Gear Efficiency = 75 % (Duda)


Mill Motor Power(N) = Mill motor/Effisiensi Gear
= 3,048 HP

Safety Factor = 20 %
Mill Motor yang dibutuhkan = 1,2 x mill motor
= 3,658 HP
= 2729.6 kW

Vertikal Raw Mill (VRM- 02)

Menghaluskan campuran klinker dengan bahan aditif (trass dan blast slag
Fungsi = furnace ) dari Hopper -16
Jenis = Vertical Mill with Four Roller Unit
Bahan = Commercial Steel
Kapasitas Raw Meal = 101,060.63 kg/jam
Faktor Kemanan = 20 %
Kapasitas Mill (PM) = 121,273 ton/jam
Kapasitas Mill Aktual 122 ton/jam
L/D = 2
(Sumber : FLSMIDTH “Mechanical Design for VRM”, exercise)
Berdasarkan Kapasitas Aktual maka dipilih VRM Tipe (36-4) , dengan Dimensi :
A = 19 m , B = 16,8 m , C = 8,4 m , D = 9,4 m 31 ft
Dimana, A = Height, m
B = Height separator outlet,m
C = Separator Widht, m
D = Widht, m

Data untuk mill type (36 - 4)


Table speed = 25 rpm
Product Fineness (blaine) = 3300 cm3/gram
Capacity = 260 ton/jam
Mill Motor = 3750 kW
Grinding bed thickness H = 80 mm dan (Pρ diasumsi 2000 kb/m3 bahan padat)
Kecepatan Aliran Udara = 120 Nm3/s
Do = 5 m (diameter luar efektif)
Berat satu roller = 57 ton
= 568 kN , DR = 3 m,W = 1
Hydraulic Presure = 160 bar
Hydraulic Cylinder 0,42 / 0,21 m korespondensi (sesuai dengan) = 0.1039 m2

Menghitung Grinding Pressure (kT)

kT = T
W.Di
Roller Force , T = 1/4 x π x (0,42 2 - 0,21 2 ) x 160 x 100 + 559
= 2229.688 kN

maka, kT = 2229.688
3x1
= 743.2 kN/m2

Menghitung Friction Factor (μ)


μ= 3750
0,844 x kT x D0 2,5
= 0.107

Menghitung Maximum Pressure (Pmax), Spesific Power Consumption (N) dan circulation
Under Roller (C)

Pmax = 4 x kT /μ
= 27799.81 kN/m2

F-1 = 1/4 x Dr/H x μ2


= 0.107

N = 1/3 x pmax x (F-1)/Pρ


= 0.50 kj/kg
= 0.138 kWh/Ton

C = (N/P)/N
= 104.5 Kali

Spesific Motor Comsumption = 30 kWh/t


Mill Motor Power(N) = Pm (akt) x Spesific Motor Comsumption
= 3,660 HP

Gear Efficiency = 75 % (Duda)


Mill Motor Power(N) = Mill motor/Effisiensi Gear
= 4,880 HP

Safety Factor = 20 %
Mill Motor yang dibutuhkan = 1,2 x mill motor
= 5,856 HP
= 4370.1 kW

Kebutuhan Power VRM

Power
No No VRM
(kW)
1 VRM -01 2729.55
2 VRM -02 4370.15
Total 7099.70
Dryer(RD-01)

ahan padat)

m
f (trass dan blast slag
ahan padat)

m
L.4.12.1 Fan (F - 01)

Menghembuskan udara luar ke dalam vertikal raw mill (VRM - 1) untuk


Fungsi =
menghomogenisasikan material
Jenis = Fan Axial
Bahan Kontruksi = Carbon Steel
Jumlah = 1 buah
Laju Alir (W) = 2,549,866 kg/jam
Safety Factor = 20 %
Pressure = 4 kPa = 16.0588 in H2O
Laju Alir Aktual (Wu) = 1,2 x 2549866 kg/jam
= 3,059,840 kg/jam
Densitas Udara = 1.1212 kg/m3 = 0.07 lb/ft3
Laju Alir Volumetrik (Vu) = Wu
ρu

= 3059839.72534
1.1212
= 2729076 m3/jam = 9746699.1 ft3/jam
= 162444.98 cfm ( ft3/menit)

Optimum Diameter Pipa (D) = 3,9 x V0,45 x ρ0,13


= 3,19 x 9746691 0,45 x 0,070,13
= 124 in = 3m
T = Tekanan operasi = 1 atm = 407 in H2O
Power (HP) = 0,000157 x cfm x total pressure
Total Efficiency
= 0,000157 x 1624450 cfm x 200822 in H2O
80%
= 512.0 HP

Safety Factor = 20 %
HP = 5119,5 x 1,2
= 614 HP
Power yang dibutuhkan = 458 kW

Fan (F - 02)

Menghisap gas buang Rotary Dryer (RD-01) dan Vertical Raw Mill (VRM-01)
Fungsi =
menuju Electrical Precipitator (EP-01)
Jenis = Fan Axial
Bahan Kontruksi = Carbon Steel
Jumlah = 1 buah
Laju Alir (W) = 2,549,866 kg/jam
Safety Factor = 20 %
Pressure = 3.5 kPa = 14.05145 in H2O
Laju Alir Aktual (Wu) = 1,2 x 401719 kg/jam
= 3059839.72534 kg/jam
Densitas Udara = 1.1212 kg/m3 = 0.07 lb/ft3
Laju Alir Volumetrik (Vu) = Wu
[ ]
ρu
= 3059839.72534
1.1212
= 2729075.74504 m3/jam = 9746699.1 ft3/jam
= 162444.98 cfm
Optimum Diameter Pipa (D) = 3,9 x V0,45 x ρ0,13
= 3,19 x 974669910,45 x 0,070,13
= 25 in 0.64 m
T = Tekanan operasi = 1 atm = 407 in H2O
Power (HP) = 0,000157 x cfm x total pressure
Total Efficiency
= 0,000157 x 1624450ft3/jam x 16,0588 in H2O
80%
= 447.957812968 HP

Safety Factor = 20 %
HP = 5119,5 x 1,2
= 537.5 HP
Power yang dibutuhkan = 401.2 kW

Fan (F - 03)

Menghisap gas buang greate cooler (GC-01) menuju Electrical Precipitator


Fungsi =
(EP-01)
Jenis = Fan Axial
Bahan Kontruksi = Carbon Steel
Jumlah = 1 buah
Laju Alir (W) = 27197.42 kg/jam
Safety Factor = 20 %
Pressure = 3.5 kPa = 14.05145 in H2O
Laju Alir Aktual (Wu) = 1,2 x27197,42 kg/jam
= 32636.9019719 kg/jam
Densitas Udara = 1.1212 kg/m3 = 0.07 lb/ft3
Laju Alir Volumetrik (Vu) = Wu
[ ]
ρu
= 32636.9019719
1.1212
= 29108.9029361 m3/jam = 1039603.7 ft3/jam
= 17326.728 cfm

Optimum Diameter Pipa (D) = 3,9 x V0,45 x ρ0,13


= 3,19 x1039604 0,45 x 0,070,13
= 18.0 in 0.46 m
T = Tekanan operasi = 1 atm = 406.784 in H2O
Power (HP) = 0,000157 x cfm x total pressure
Total Efficiency
= 0,000157 x 288154,0173ft3/jam x14,05145 in H2O
80%
= 47.7801340649 HP

Safety Factor = 20 %
HP = 11356529 x 1,2
= 57.34 HP
Power yang dibutuhkan = 42.79 kW
Fan (F - 04)

Menghembuskan udara luar ke dalam vertikal raw mill (VRM - 2) untuk


Fungsi = menghomogenisasikan material
Jenis = Fan Axial
Bahan Kontruksi = Stainless Steel
Jumlah = 1 buah
Laju Alir (W) = 15,730,885 kg/jam
Safety Factor = 20 %
Pressure = 3.5 kPa = 14.05145 in H2O
Laju Alir Aktual (Wu) = 1,2 x15730885,1 kg/jam
= 18877062.1355 kg/jam
Densitas Udara = 1.1212 kg/m3 = 0.07 lb/ft3
Laju Alir Volumetrik (Vu) = Wu
[ ]ρu
= 18877062.1355
1.1212
= 16,836,481 m3/jam = 6013028.8 ft3/jam
= 100217.15 cfm

Optimum Diameter Pipa (D) = 3,9 x V0,45 x ρ0,13


= 3,19 x 6,01x10 0,45 x 0,070,13
= 100 in 2.5 m
T = Tekanan operasi = 1 atm = 406.784 in H2O
Power (HP) = 0,000157 x cfm x total pressure
Total Efficiency
= 0,000157 x 288154,0173ft3/jam x 200822 in H2O
80%
= 276.358509875 HP

Safety Factor = 20 %
HP = 27635,851 x 1,2
= 331.6 HP
Power yang dibutuhkan = 247.5 kW

Kebutuhan Power Fan

No No BL Power (kW)
1 F-01 458.46
2 F-02 401.16
3 F-03 42.79
4 F-04 247.49
Total 1149.89
L.4.16.1 Rotary Kiln (RK - 01)

Fungsi = Sebagai tempat pembakaran material menjadi klinker


Jenis = Dry Rotary Kiln
Bahan Kontruksi = Commercial Steel
Bahan Mentah Masuk = 73038.95 kg/jam
Klinker yang dihasilkan(Q) = 69146.7 Kg/jam

Ratio Bahan masuk = 73038.95


dengan klinker 69146.75
= 1.06
Basis = 1 jam

a.Menghitung Diameter Rotary Kiln


Dari Duda Hal 319 - 324 didapatkan :
Fg = Q x E x (T + Ta)
24 x 3600 x Vg x Ta

Dg =
√ 4 xfg
π
Fw = Q x W
24 x e

Dw = √ 4 xfw
π
N = D x L x Rd

D = Dg + Dw
2
Dimana :
Q = Klinker yang keluar , kg/hari
Fg = Effective internal cross sectional dari Rotary Kiln dengan dasar kecepatan gas, m2
G = Jumlah gas keluar kiln, m3/kg klinker
T = Temperatur gas keluar kiln, °C
Ta = Temperatur reference, °C
Vg = Kecepatan gas keluar kiln, m/detik
Dg = Diameter dalam efektif rotary kiln dengan kecepatan gas, m

Fw = Effective internal cross sectional dari Rotary Kiln dengan dasar


thermal loading pada sintering, m2
W= Panas yang dibutuhkan untuk menghasilkan 1 kg klinker,kkal/kg klinker
e= Muatan panas pada daerah pembakaran, kkal/m2jam
Dw = Diameter effective rotary kiln dengan dasar thermal loading pada sintering, m
L= Panjang rotary kiln, m
D= Diameter roraty kiln, m
N= Power yang dibutuhkan, HP
Rd = Faktor power yang dibutuhkan

Diketahui :
Q= 69146.75 kg/jam
= 1659521.946 kg/hari
= 1659.521946 ton/hari

G = Jumlah gas keluar kiln (Nm3/kg klinker) (Fuller, hal 9)

CO2 = 13411.99295 kg/jam


= 1.3205 kg/m3
= 10156.75346 m3/jam

H2O = 2947.032028 kg/jam


= 1.0787 kg/m3
= 2732.021904 m3/jam

SO2 = 45.69989744 kg/jam


= 1.9216 kg/m3
= 23.78221141 m3/jam

O2 = 1390.722296 kg/jam
= 0.8522 kg/m3
= 1631.920084 m3/jam

N2 = 32880.93003 kg/jam
= 0.8178 kg/m3
= 40206.56643 m3/jam
Total Gas Buang = 54751.0 m3/jam
G = Total Gas Buang
Q
= 54751.04 m3/jam
69146.75 kg/jam
= 0.79 m3/kg klinker jam

T = 900 °C
Ta = 25 °C
Vg = 10 m/det (Duda Hal 351)

Fg = 1659521.946 kg/hari x 0.7918094 m3/kg klin 925 °C


24 jam/hari 3600 det/ 10 m/det x 25 °C
= 56.27190643 m2

Dg = 4xfg 0,5
3.14
= 4.778000182 m

e = 3460000 kkal/m2 jam (Duda, hal 351)

W = 400 kkal/klinker

Fw = 1659521.95 kg/hari 400 kkal/kg klinker


24 jam/hari 3460000 kkal/m2 jam
= 7.99384367 m2

DW = 4 x Fw 0,5
3.14
= 1.800852624 m

D = 4.778000182 + 1.8008526
2
= 3.3 m
= 10.7921 ft

Dengan menggunakan refractory dengan ketebalan 220 mm maka diameter shell kiln :
= 3.3 + 0.22
= 3.5 m = 11.513866 ft

b. Menghitung Panjang Rotary Kiln


Dari Duda didapatkan :

Dimensi rotary kiln L antara 14:1 sampai 16:1


D
Dalam perancangan diambil 15 : 1

Panjang Kiln (L) = 14 x3


= 46.052 m
= 151.089 ft

c. Menghitung Volume Rotary Kiln

V = π x D2 x L
4
= 3,14 x (0,32795)2 m2 x 4,591 m
4
= 391 m3

d. Menghitung spesifik output rotary kiln

Ls = Q
j
Dimana :
Q = Kapasitas klinker, ton/hari
J = Volume efektif dalam rotary kiln, m3

Ls = 1659522 ton/hari
391.163 ton/m3 hari
= 4243 ton/m3 hari

e. Menghitung Putaran Rotary Kiln

Putaran Kiln = V
πxD
Dimana :
D = diameter shell kiln,ft
V = kecepatan rotary kiln
Kecepatan rotary kiln dari data :
= 3,14 x 3,3 rpm x 1,7977681 ft
= 119 ft/menit

Putaran Kiln = 119.3066811 ft/menit


3,14 x 1,7977681 ft
= 3.3 rpm

f. Menentukan Kiln Slope

Diambil 3% (Duda Tabel 19.1 hal 385)


Dari tabel 19.2 Hal 387 Duda didapatkan fraction for inch per feet lenght 11/32" - 3/8"
Dari tabel 19.3 Hal 387 Duda dengan kiln slope inch per feet 3/8" didapatkan slope in
degress (S) = 1,790

g. Menghitung resident time kiln

Dari Duda hal.388


t = 1,77 x L x 6,325
sxDxN
t= 1,77 x 15,064 ft x 6,325
1,790 x 1,7977681 ft x 3,3 rpm
= 25 menit
h. Menentukan % Kiln Load

Dari Duda page 385 tabel 19.1


Untuk kiln slope 3% didapatkan % kiln load = 12 %

i. Menghitung Power

Rotary kiln menggunakan 3 buah penyangga


diameter tire = 276.7718 in
diameter as roler = 11.811 in
diameter roller = 38.189 in

Perkiraan beban yang bekerja pada roller sebesar


= 1600000 lb

a. Power untuk melawan gesekan pada tire dan roller

HPl = N x Dar x Dt x n x f x 0,000009


Dr
Dimana =
N = Gaya vertikal pada roller total,lb
Dar = diameter as roller, in
Dt = diameter tire , in
n = kiln speed, rpm
f = koefesien gesekan pada roller dengan pelumas oil
= 0.018

HP1 = 1600000 lb x 11,811 in x 276,7718 in x 3,301 rpm x 0,018 x 0,0000092


38,1890 in
= 74.83895325 HP

b. Power untuk menahan beban muatan kiln

Hpu = (Db sin θ)3 x N x L x K


(Duda,hal.390)
Dimana :
Db = diameter dalam kiln, ft
Sin θ = Dari fig.19.7 Duda, dengan kiln load = 12% = 0,77
N = putaran kiln, rpm
L = panjang rotary kiln, ft
K = konstan 0,00076

HpII = (1,076 ft x 0,77)3 x 3,3rpm x15,064 ft x 0,00076


= 217.444581 HP

Total HP = Hp1 +HP2


= 74.84 + 217.44
= 292.28 HP

Untuk efisiensi transmisi = 80 %


HP motor = 292.2835342
0.8
= 365.4 HP

HP motor yang diambil = 370 HP


Power Motor = 276.12 kW
L.4.13.1 Separator (SPR- 01)

Memisahkan raw material yang masih kasar dan yang sudah halus di unit
Fungsi =
Vertikal Raw Mill (VRM - 01)
Jenis = Mechanical Air Separator
Bahan Kontruksi = Commercial Steel
Jumlah = 1 buah
Laju Alir Produk = 105,430.63 kg/jam 105.43
= 105,430.63 kg/jam
Faktor Keamanan = 10 %
Kapasitas Separator = 1,2 x 110702,164
= 126516.76 kg/jam

Dari Duda,W.H,"Cement Data Book,"tabel 15.2.1,hal.266 didapatkan :


Diameter Separator (dspr) = 7.3 m = 287 in
H = 2D
= 14.6 m
Rpm = 140 rpm

Dari Duda,W.H,"Cement Data Book,"hal.265 didapatkan :


Dari diameter separator didapatkan :
B = 0,1 d = 0.73 m
d1 = 0,7 d = 5.11 m
d1 = 0,7 d = 5.11 m
d2 = 0,5 d = 3.65 m
d3 = 0,33 d = 2.41 m

HP input = 600 HP
Effisiensi = 80 %
HPinput
HP yang dibutuhkan =

=
[ Effisiensi
600
]
0.8
= 750 HP
Faktor Keamanan = 20 %
Total HP yang dibutuhkan = 1,2 x HP yang dibutuhkan
= 1,2 x 750 HP
= 900 HP
HP yang digunakan = 900 HP
= 671.64 kW

Separator (SPR- 02)

Memisahkan raw material yang masih kasar dan yang sudah halus di unit
Fungsi =
Vertikal Raw Mill (VRM - 02)
Jenis = Mechanical Air Separator
Bahan Kontruksi = Commercial Steel
Jumlah = 1 buah
Laju Alir Produk = 101,060.63 kg/jam
= 101060.631326 kg/jam
Faktor Keamanan = 10 %
Kapasitas Separator = 1,2 x 101060,63
= 121272.757591 kg/jam
Dari Duda,W.H,"Cement Data Book,"tabel 15.2.1,hal.266 didapatkan :
Diameter Separator (dspr) = 7.3 m = 287 in
H = 2D
= 14.6 m
Rpm = 140 rpm

Dari Duda,W.H,"Cement Data Book,"hal.265 didapatkan :


Dari diameter separator didapatkan :
B = 0,1 d = 0.73 m
d1 = 0,7 d = 5.11 m
d1 = 0,7 d = 5.11 m
d2 = 0,5 d = 3.65 m
d3 = 0,33 d = 2.41 m

HP input = 600 HP
Effisiensi = 80 %
HPinput
HP yang dibutuhkan =

=
[ Effisiensi
600
]
0.8
= 750 HP
Faktor Keamanan = 20 %
Total HP yang dibutuhkan = 1,2 x HP yang dibutuhkan
= 1,2 x 750 HP
= 900 HP
HP yang digunakan = 900 HP
= 671.64 kW

Kebutuhan Power Separator

Power
No No SPR
(kW)
1 SPR -01 671.64
2 SPR -02 671.64
Total 1343.284
L.4.15.1 Suspension Preheater (SP- 01)

Cyclone Suspension Preheater (SP Stage 4 - Line A)

Fungsi = Sebagai pemanasan awal material menuju Rotary Kiln (RK-01)


Jenis = Multi Stage Preheter Single String
Bahan Kontruksi = Commercial Steel
Laju Alir udara (F) = 66080.02 kg/jam + 50676 kg/jam
2
= 58,378.20 kg/jam
= 128,432.03 lb/jam
Densitas Raw Meal = 1120 kg/m3 = 69.4085 lb/ft3
Faktor Keamanan = 20 %
Laju Alir = 1,2 x 128432
= 154,118.44 lb/jam
Laju Alir Terpasang (Wg) = 154118.4399 lb/jam = 70054 kg/jam
Densitas Campuran Udara (Vt) = 0.07 lb/ft3 = 1.12955 kg/m3 (Indocement)
Kecepatan Udara (Vg) = 10 ft/sec
ε = Coeffecient for pressure drop : 110
(W.H.Duda Hal 451)
Δp = Pressure drop in cyclone, 520 mm
(W.H.Duda Hal 451)

Dimensi Shell Cyclone :

Wg
Volumetric Flow Rate (v) =

=
[ ]
ρg
70053.8363
1.129545455
= 17.22763692 m3/s

4
Diameter Cyclone (Dc) = 0,536 x V2 x 1,1295 x 110
520
= 0.536 x 2.90192
= 1.6 m = 2m
= 61 in
Tinggi Shell (Lb) = 1,5 x D
= 1,5 x 2
= 3m

Kecepatan Uap Masuk cyclone(Vu) = 18 m/s (Duda, hal 451)

Direncanakan menggunakan cyclone dengan diameter, (D) = 2 m= 78.74 in

Percepatan Sentrifugal Partikel Raw


Meal (as) = Vu2
R
= 18 2
1/2 x 3
= 486 m/s2

Waktu yang dibutuhkan gas untuk melakukan satu kali rotasi :


tr = 2πR
Vu
= 2 x 3,14 x (1/2 x 3)
18
= 0.523333333 s

Bottom Conocal , θ = 60 °
Diameter bottom opening (Product outlet suction)
Dc = 0.1 x D
= 0.2 m = 8 in
Tinggi Conical Head, Hc = 1/2 x (D - Dc)tan 60°
= 1/2 x (3-0,3)tan 60°
= 1.557 m

Cyclone Suspension Preheater (SP Stage 3 - Line A)

Fungsi = Sebagai pemanasan awal material menuju Rotary Kiln(RK-01)


Jenis = Multi Stage Preheter Single String
Bahan Kontruksi = Commercial Steel
Laju Alir udara (F) = 66080.02 kg/jam + 50676 kg/jam
2
= 58378.20 kg/jam
= 128432.03 lb/jam
Densitas Raw Meal = 1120.00 kg/m3 = 69.4085 lb/ft3
Faktor Keamanan = 10.00 %
Laju Alir = 1,2 x 128432
= 154118.44 lb/jam
Laju Alir Terpasang (Wg) = 154118.44 lb/jam = 70054 kg/jam
Densitas Campuran Udara (Vt) = 0.07 lb/ft3 = 1.12955 kg/m3 (Indocement)
Kecepatan Udara (Vg) = 10.00 ft/sec
ε = Coeffecient for pressure drop : 110
(W.H.Duda Hal 451)
Δp = Pressure drop in cyclone, 520 mm
(W.H.Duda Hal 451)

Dimensi Shell Cyclone :

Wg
Volumetric Flow Rate (v) =

=
[ ]
ρg
70053.8363
1.129545455
= 17.22763692 m3/s

4
Diameter Cyclone (Dc) = 0,536 x V2 x 1,1212 x 110
520
= 0.536 x 2.90192
= 2m = 2m

Tinggi Shell (Lb) = 1,5 x D


= 1,5 x m
= 3m
Kecepatan Uap Masuk cyclone(Vu) = 18 m/s (Duda, hal 451)

Direncanakan menggunakan cyclone dengan diameter, (D) = 2 m= 78.74 in

Percepatan Sentrifugal Partikel Raw


Meal (as) = Vu2
R
= 18 2
1/2 x 3
= 486 m/s2

Waktu yang dibutuhkan gas untuk melakukan satu kali rotasi :


tr = 2πR
Vu
= 2 x 3,14 x (1/2 x 3)
18
= 0.523333333 s

Bottom Conocal , θ = 60 °

Diameter bottom opening (Product outlet suction)


Dc = 0.1 D
= 0.2 m

Tinggi Conical Head, Hc = 1/2 x (D - Dc)tan 60°


= 1/2 x (3-0,3)tan 60°
= 1.557 m

Cyclone Suspension Preheater (SP Stage 2 - Line A)

Fungsi = Sebagai pemanasan awal material menuju Rotary Kiln(RK-01)


Jenis = Multi Stage Preheter Single String
Bahan Kontruksi = Commercial Steel
Laju Alir udara (F) = 66080.02 kg/jam + 50676 kg/jam
2
= 58378.19692 kg/jam
= 128432.0332 lb/jam
Densitas Raw Meal = 1120 kg/m3 = 69.4085 lb/ft3
Faktor Keamanan = 20 %
Laju Alir = 1,2 x 128432
= 154118.4399 lb/jam
Laju Alir Terpasang (Wg) = 154118.4399 lb/jam = 70054 kg/jam
Densitas Campuran Udara (Vt) = 0.07 lb/ft3 = 1.12955 kg/m3 (Indocement)
Kecepatan Udara (Vg) = 10 ft/sec
ε = Coeffecient for pressure drop : 110
(W.H.Duda Hal 451)
Δp = Pressure drop in cyclone, 520 mm
(W.H.Duda Hal 451)
Dimensi Shell Cyclone :

Wg
Volumetric Flow Rate (v) =

=
[ ]
ρg
70053.8363
1.129545455
= 17.22763692 m3/s

4
Diameter Cyclone (Dc) = 0,536 x V2 x 1,1212 x 110
520
= 0.536 x 2.90192
= 2m = 2m

Tinggi Shell (Lb) = 1,5 x D


= 1,5 x m
= 3m

Kecepatan Uap Masuk cyclone(Vu) = 18 m/s (Duda, hal 451)

Direncanakan menggunakan cyclone dengan diameter, (D) = 2 m= 78.74 in

Percepatan Sentrifugal Partikel Raw


Meal (as) = Vu2
R
= 18 2
1/2 x 3
= 486 m/s2

Waktu yang dibutuhkan gas untuk melakukan satu kali rotasi :


tr = 2πR
Vu
= 2 x 3,14 x (1/2 x 3)
18
= 0.523333333 s

Bottom Conocal , θ = 60 °

Diameter bottom opening (Product outlet suction)


Dc = 0.1 D
= 0.2 m

Tinggi Conical Head, Hc = 1/2 x (D - Dc)tan 60°


= 1/2 x (3 - 0,3)tan 60°
= 1.557 m

Cyclone Suspension Preheater (SP Stage 1 - Line A)

Fungsi = Sebagai pemanasan awal material menuju Rotary Kiln(RK-01)


Jenis = Multi Stage Preheter Single String
Bahan Kontruksi = Commercial Steel
Laju Alir udara (F) = 66080.02 kg/jam + 50676 kg/jam
2
= 58378.19692 kg/jam
= 128432.0332 lb/jam
Densitas Raw Meal = 1120 kg/m3 = 69.4085 lb/ft3
Faktor Keamanan = 20 %
Laju Alir = 1,2 x Laju alir udara lb/jam
= 154118.4399 lb/jam
Laju Alir Terpasang (Wg) = 154118.4399 lb/jam = 70054 kg/jam
Densitas Campuran Udara (Vt) = 0.07 lb/ft3 = 1.12955 kg/m3 (Indocement)
Kecepatan Udara (Vg) = 10 ft/sec
ε = Coeffecient for pressure drop : 110
(W.H.Duda Hal 451)
Δp = Pressure drop in cyclone, 520 mm
(W.H.Duda Hal 451)

Dimensi Shell Cyclone :

Wg
Volumetric Flow Rate (v) =

=
[ ]
ρg
70053.8363
1.129545455
= 17.22763692 m3/s

4
Diameter Cyclone (Dc) = 0,536 x V2 x 1,129545 x 110
520
= 0.536 x 2.90192
= 1.555431566 m = 2m

Tinggi Shell (Lb) = 1,5 x D


= 1,5 x m
= 3m

Kecepatan Uap Masuk cyclone(Vu) = 18 m/s (Duda, hal 451)

Direncanakan menggunakan cyclone dengan diameter, (D) = 2 m= 78.74 in

Percepatan Sentrifugal Partikel Raw


Meal (as) = Vu2
R
= 18 2
1/2 x 3
= 486 m/s2

Waktu yang dibutuhkan gas untuk melakukan satu kali rotasi :


tr = 2πR
Vu
= 2 x 3,14 x (1/2 x 3)
18
= 0.523333333 s

Bottom Conocal , θ = 60 °

Diameter bottom opening (Product outlet suction)


Dc = 0.1 D
= 0.2 m

Tinggi Conical Head, Hc = 1/2 x (D - Dc)tan 60°


= 1/2 x (3 - 0,3)tan 60°
= 1.557 m
L.4.17.1 Apron Conveyor (AC-01)

Fungsi = untuk mengangkut klinker dingin dari GC-01 menuju Bucket Elevator (BE-05)
Jenis = Horizontal Flat Apron Conveyor
Material = Carbon Steel
Laju Alir (W) = 69146.75 Kg/jam = 69.15 Ton/jam
Bulk Density = 1.1 Ton/m3
Panjang Conveyor (L) = 100 m = 328 ft
Safety Factor = 20 %
Kapasitas (Cb) = 1,2 x W
= 1.2 x 69.15
= 82.98 Ton/jam
= 83 Ton/jam

Dikarenakan Kapasitas
Lebar belt = 54 in = 1370 mm (Perry, Table 21-11 hal,19)
Kecepatan Apron Conveyor = Cb x100
40
= 82.98 x100
40.00
= 207.44 ft/menit

Power Apron :
HP Apron Conveyor = HPhorizontal + HPvertical + HPempty

HPhorizontal = L W
( 0,4+ )( )
300 100
= 0,4 + 328.084 82.976
300 100
= 1.239342053 HP

HPvertical = 0

HPempty = e
(beltspeed . x ( ))
100
207.4402432 x 3,1
100
6.430647541 HP

HP Apron Conveyor = HPhorizontal + HPvertical + HPempty


= 1.24 + 0 + 6.43
= 7.67 HP

Faktor Keamanan 20%


Total HP Apron Conveyor = 1,2 x HP Apron Conveyor
= 1,2 x 7.66999
= 9.20 HP

Power Apron Conveyor = 9.20 /1,34


= 6.87 KW
L.4.19.1 Rotary Dryer (RD-01)

Fungsi = Mengeringkan raw material yang akan digrinding pada Vertical Roller Mill (VRM-01)
Jenis = Current Rotary Dryer
Bahan = Carbon Steel
Temperatur Udara Masuk = 180 °C
Laju Alir steam (Gs) = 161201.15 kg/jam = 354642.5 lb/jam
Laju Alir udara pengering aktual = 1,2 x 161201,15 kg/jam = 193441.4 kg/jam
Kecepatan pengering dengan = 30 kg/m3jam
lifting flight
Volume gas pengering = banyaknya gas pengering/ 30 kg/m3 jam
= 193441.4 kg/jam / 30 kg/m3 jam
= 6448.0 m3
Ratio L/D = 5
Bulk Density (ρ) = 1.1 ton/m3
Angle of respone (θ) = 35 °
Kemiringan Dryer (ƿ) = 3°
Faktor Hambatan = 1.5
Diameter (D) = 5m = 16.4 ft
Panjang Dryer (L) = 2xD A
= 10 m = 32.8 ft 538.2 ft2
Waktu Tinggal (t) = 1,77 x L x θ X f
ƿxDxn
= 1,77 x 25 x (35)^0,5
x 1,5
3x5x2
= 5.2 menit

Kecepatan putaran Dryer (N) =


Range N x D = 25 s/d 35 ; maka di ambil 20
NxD = 20
Nx 5 = 20
N = 4 rpm

Jumlah Flight :
Range jumlah flight 2D s/d 3,4 D ; dan diambil 3D
Jumlah Flight= = 3x5
= 15 buah

Tinggi Flight :
Range tinggi flight 0,08 D s/d 0,12 D; dan diambil 0,1D
Tinggi Flight = 0,1 x 5 m
= 0.5 m

Power Dryer =
Range HP : 0,5D2 s/d 1,0 D2 : dan diambil HP 0,8D2
HP = 0,8 x 52
= 20 HP
Effisiensi Motor = 80 %
HP = 20 HP x effisiensi motor
= 16 HP

Safety Faktor = 20 %
HP = 1,2 x HP
= 19.2 HP
= 14.33 kW
L.4.20.1 Electrical Precipitator (EP-01)

Memisahkan debu yang terbawa oleh gas buang Rotary Dryer (RD-01) dan Vertical Roller
Fungsi = Mill (VRM - 01)
Jenis = Electric Dust Collector
Bahan Kontruksi = Carbon Steel
Laju Alir Udara (Gas) (Q) = 2,549,866 kg/jam = 42,498 kg/menit
Laju Alir Udara Volumetrik (Q) = 46,128 m3/menit = 37 acfm
Densitas Udara = 0.9213 kg/m3 (120°C)
Effisiensi = 99 %
Effective Drift Velocity (We) = 4,2 m /menit (semen) ; 6 m/menit (dust)
(Air Pollution Control Equipment)
Velocity = 0.2 ft/detik ((Air Pollution Control Equipment,tabel 10.1,Hal.407)
Plate Area = 3mx6m
Luas Total Penampang Plate Area
In ( 1 - ŋ) = − AWe
Q
A =
Q
ln(1)
We
A = -42497.77
ln (1 - 0,01)
6
A = 71 m2

Jumlah Plate yang dibutuhkan:


A = Ap(n-1)
n = A +1
Ap
n = 71 +1
3x2x6
n = 2.977326983 plate = 3 plate

Power EP
Pc = W xQ
1000cfm
= 150 W x Q m3 x 35,3 ft3 x 1 kW
1000 cfm menit 1 m3 1000 W
= 245.6 kW

Safety Factor = 20 %
Power EP = Pc x 1,2
= 294.8 kW

Electrical Precipitator (EP-02)

Fungsi = Memisahkan debu yang terbawa oleh gas buang (EP -02)
Jenis = Electric Dust Collector
Bahan Kontruksi = Carbon Steel
Laju Alir Udara (Gas) (Q) = 27197.42 kg/jam = 453.290305 kg/menit
Laju Alir Udara Volumetrik (Q) = 492 m3/menit = 0.39902142 acfm
Densitas Udara = 0.9213 kg/m3 (120°C)
Effisiensi = 99 %
Effective Drift Velocity (We) = 4,2 m /menit (semen) ; 6 m/menit (dust)
(Air Pollution Control Equipment)
Velocity = 0.2 ft/detik ((Air Pollution Control Equipment,Hal.407)
Plate Area = 3mx6m
Luas Total Penampang Plate Area
In ( 1 - ŋ) = − AWe
Q
A =
−Q
ln(1−η)
A =
We
-453.29030517
ln (1 - 0,01)
6
A = 0.76 m2
Jumlah Plate yang dibutuhkan:
A = Ap(n-1)
n = A +1
Ap
n = 45,56 +1
3x2x6
n = 1.02 plate = 2 plate

Power EP
Pc = W xQ
1000cfm
= 150 W x Q m3 x 35,3 ft3 x 1 kW
1000 cfm menit 1 m3 1000 W
= 2.620 kW

Safety Factor = 20 %
Power EP = Pc x 1,2
= 3.14395424944 kW

Electrical Precipitator (EP-03)

Fungsi = Memisahkan debu yang terbawa oleh gas buang (EP -03)
Jenis = Electric Dust Collector
Bahan Kontruksi = Carbon Steel
Laju Alir Udara (Gas) (Q) = 15,730,885 kg/jam = 262,181 kg/menit
Laju Alir Udara Volumetrik (Q) = 284,578 m3/menit = 230.7925 acfm
Densitas Udara = 0.9213 kg/m3 (120°C)
Effisiensi = 99 %
Effective Drift Velocity (We) = 4,2 m /menit (semen) ; 6 m/menit (dust)
(Air Pollution Control Equipment)
Velocity = 0.2 ft/detik ((Air Pollution Control Equipment,Hal.407)
Plate Area = 3mx6m
Luas Total Penampang Plate Area
In ( 1 - ŋ) = − AWe
Q
A = −Q
ln(1−η)
We
A = (262,181)
ln (1 - 0,01)
6
A = 439.2 m2

Jumlah Plate yang dibutuhkan:


A = Ap(n-1)
n = A +1
Ap
n = 439,2 + 1
3x2x6
n = 13.1987187797 plate = 14 plate

Power EP
Pc = W xQ
1000cfm
= 150 W x Q m3 x 35,3 ft3 x 1 kW
1000 cfm menit 1 m3 1000 W
= 1515.37615736 kW

Safety Factor = 20 %
Power EP = Pc x 1,2
= 1818.5 kW

Kebutuhan Power EP

No No VRM Power (kW)

1 EP -01 294.76
2 EP -02 3.14
3 EP -03 1818.45
Total 2116.35
L.4.21.1 Grate cooler (GC-01)

Fungsi = Mendinginkan Klinker Panas keluaran RK -01


Jenis = Air Trough Grate
Bahan Kontruksi = Commercial Steel
Kondisi Operasi
Temperatur = 80 C

Massa Klinker = 69838.56 kg/jam


Densitas klinker = 1300 kg/m3
Volume klinker = 69838.5611
1300
= 53.7 m3/jam

Volume klinker cooler = 80 % volume klinker


= 43.0 m3/jam

Kecepatan Material = 24 m/jam


Maka:
Luas = Volume klinker cooler
Kecepatan material
= 42.9775761
24
= 1.79073234 m2
= 1.8 m2 = 20 ft2

Tinggi = 0.5 m
Lebar = Luas
Tinggi
= 1.79073234
0.5
= 3.58146467 m
= 3.6 m
L.4.22.1 Gas Conditioning Tower (GCT-01)

Menurunkan tempertur gas panas dari Suspension Preheater(SP -01)


Fungsi =
menuju Electrical Precipitator (EP-01)
Bahan Kontruksi = Carbon Steel
Velocity = 2 m/s
Waktu Tinggal = 12 s
Laju Alir Gas (Q) = 162829.44 kg/jam = 2713.824 kg/menit
L/D = 3 :1 - 3,5 : 1
Diambil = 3,5 : 1

A = Laju Alir Gas/detik


velocity
162829.44 / 3600
2 45.2304
= 23 m2
= 246 ft2

Diameter GCT = 6m
Panjang Kolom GCT = 3,5 x D
= 3,5 x 6
= 21 m
Total Power Keseluruhan Alat

No Jenis Alat Alat Kode Alat Power (kW)


1 Alat Utama Rotary Dryer RD 14.33
2 Vertikal Roller Mill VRM 7099.70
4 Rotary Kiln RK 276.12
5 Separator SPR 1343.28
6 Electrical Precipitator EP 2116.35
Alat Angkut
7 Belt Conveyor BC 109.23
8 Bucket Elevator BE 108.58
9 Air Slide AS 3.95
10 Screw Conveyor SC 25.35
11 Apron Conveyor AC 6.87
Alat Bantu
12 Fan F 1149.89
13 Blower BL 1910.90
14 Blower Kiln BLK 26.33
15 Hammer Crusher HC 21.73
16 Roller Crusher RC 1.00
Total Power Keseluruhan Alat 14213.62