Nota: The dimensions of the grids depend on the size of the channel where it will be located, so a
concrete channel will be designed capable of transporting the necessary flow.
RATIOS TO CONSIDER
Area-Water height ratio 2y2
Wet perimeter-Water height ratio 4y
Wet perimeter b+2y
Y's ITERATION
Parameter Symbol Value Units
Insert values for y 0.094 m
Area 0.017672 m
Wet perimeter 0.376 m
Calculated flow rate 0.01213 m3/s
Flow rate to equalize 0.0121 m3/s
GUTTER CALCULATIONS
Observations Parameter Symbol Value Units Observations
Water's height y 0.094 m Iteration
RAS 2000, Titulo C Gutter base b 0.188 m
RAS 2000, Titulo C y's sobredimension y 0.1128 m
Ajustment of b b 0.2 m
will be located, so a
Cross sectional area At 0.02256 m2
Flow velocity V 0.53635 m/s
ATER
Units
m³/s
°C
ONS
Units
kg/m*s
kg/m²*s²
kg/m³
m/s²
HALL GUTTER
Units Terms
m
m
m
m *Values derived
m from design tables
m
Adimensional
Adimensional
DESIGN CALCULATIONS FOR THE PARSHALL GUTTER
5. HYDRAULIC JUMP
Parameter Symbol Value Units
Hydraulic Jump’s length L 0.19 m
Average velocity of Hydraulic Jump Vm 0.61 m/s
Rapid mixing time td 0.50 s
Wastewater’s velocity gradient in Hydraulic Jump G 867.59 1/s
OBSERVATIONS
*
****
*
P SECTION
Terms
TION
Terms
TION
Terms
Terms
RATIOS TO CONSIDER
Length-width ratio L=3W
Surface load As=L*W
CLARIFIER CALCULATIONS
Parameter Symbol Value Units
Observations 1. TANK VOLUME
Volume V 87.12 m3
Res 0330 de 2017 2. TANK SURFACE AREA
Res 0330 de 2017 Surface Area As 69.70 m2
Recommended Vel 3. LONGITUD Y ANCHO
Width W 4.82 m
1,7 <= Tb <= 3,1 Length L 14.46 m
4. PROFUNDIDAD
Depth p 1.25 m
Sobredimension p 1.875 m
5. SEDIMENTATION VELOCITY
Cross sectional area At 9.04 m2
Velocidad de sedimentación Vs 115.68 m/d
6. INPUT CONDITIONS
Base area Ab 0.08 m2
# of holes Or 8.07 Holes
7. OUTPUT CONDITIONS
Length of the weir Lv 7.12 m
# of weirs #weirs 1.48 Weirs
Aproximation # of weirs #weirs 1.5 Weirs
ATIONS
Observations
Between 1 and 5 m
Sobredimension of 20% (Rain) y 30% (Sludge)
0.12 0 to 15
0.08 0 to 10
0.30 10 to 50
ARIFIER
Percentage Rate (Resolution 0330
of 2017)
0.35 30 to 40
0.35 30 to 40
0.60 50 to 65