You are on page 1of 2

LIST OF RENOVATION OFFICE

PROJECT NAME BRI

LOCATION

PROJECT NO.

N
SATUAN VOLUME HARGA SATUAN TOTAL
O.
Pekerjaan Persiapan

1 Arm Chair LS 2 Rp 3,200,000.00 Rp 6,400,000.00

2 Side Table LS 1 Rp 1,500,000.00 Rp 1,500,000.00

3 Community Bench LS 1 Rp 4,500,000.00 Rp 4,500,000.00

4 Table Tennis LS 1 Rp 5,000,000.00 Rp 5,000,000.00

5 High Table LS 1 Rp 3,500,000.00 Rp 3,500,000.00

6 Barstool LS 4 Rp 1,500,000.00 Rp 6,000,000.00

7 Bean Bag LS 2 Rp 1,800,000.00 Rp 3,600,000.00

8 TV Console LS 1 Rp 6,700,000.00 Rp 6,700,000.00

9 Sofa LS 1 Rp 8,500,000.00 Rp 8,500,000.00


10 Coffee Table Set LS 1 Rp 1,800,000.00 Rp 1,800,000.00

11 Wall Lamp LS 2 Rp 1,200,000.00 Rp 2,400,000.00

12 Standing Lamp LS 1 Rp 1,800,000.00 Rp 1,800,000.00

13 Shoe Cabinet LS 1 Rp 2,300,000.00 Rp 2,300,000.00

14 Round Mirror LS 1 Rp 1,500,000.00 Rp 1,500,000.00

15 Set of Frames LS 1 Rp 2,000,000.00 Rp 2,000,000.00

16 Logo LS 1 Rp 2,500,000.00 Rp 2,500,000.00

17 Mural LS 1 Rp 1,500,000.00 Rp 1,500,000.00

SUB TOTAL Rp 61,500,000.00

GRAND TOTAL #REF!

You might also like