18.08.2018 1
Maintenance – Status Message
2
Maintenance – Vacuum Cleaner
Weekly
3
Maintenance – Check Pressure
Weekly
4
Maintenance – Check Spindle Chuck
Weekly
Chuck already
without a bit
5
Maintenance – Get Tool Out
Weekly
6
Maintenance – Clean Spindle Chuck
7
Maintenance – Clean Spindle Chuck
8
Maintenance – Clean Spindle Chuck
9
Maintenance – Ionisation
Monthly
The air nozzles must be clean. For
cleaning simply use a vacuum
cleaner. Never touch the
ionization tips,
when the machine
is running.
10
Ionisation – Switch Off High Voltage
Quarterly
1.) PLC controller with
connections to
camera und PC
By performing maintenance
jobs at the ionisation system,
the power switch of the main
ionisation unit must be 3.) Main ionisation unit with
switched off necessarily! power switch. The green
LED must be on, fault when
it is red.
11
Maintenance – Control Cabinet
PLC
Phase monitoring,
control the rotation of
the vacuum cleaner,
voltage too high or
too low.
12
Maintenance – Cabinet Filter
Remove the dirt and dust from the Every six
ventilator filter in the control cabinet. 2.) Check the filter or clean it
month
with the upright vacuum
cleaner.
Air
1.) To remove the cover use a screw driver. 3.) Replace it at least
Remove the cover from outside the cabinet. every six month.
13
Maintenance – Lubrication of the Linear Axes
According to
plan
14
Tool Kit for Maintenance
Grease cartridge
Grease gun
15
Maintenance Tool Kit
Replacement brushes
16
Maintenance Tool Kit Spindle
18
Maintenance Items
Create a Backup at
least after 168 hours
or one week.
19
Reset Maintenance Entries