SL NO Operation Name M/C Type Time loss(min) Time loss(sec)
1 Dart Pressing
These are activities performed for sewing machines that are already in line, example gauge set, SPI change, folder adjustment or any other similar operation, as
per the requirement of new style. The time taken to complete all the internal activities constitutes the set-up phase.
rnal activities are performed outside the line without disturbing the production inline. For example, pre-setting of a sewing machine for new style or early loading of cut parts without disturb
LE CHANGE
m/c setting
g of a sewing machine for new style or early loading of cut parts without disturbing the production of running style
TIME LOSSES IN DURING STYLE CHANGE
BUYER- JCP
STYLE-195470(classic Fit)
LINE-3(05.02.21)
In between Time In between Time
SL NO Operation Name M/C Type loss(min) loss(sec) Reason for Time loss
1 Back pocket welting Auto welt 10 600 M/c setting
2 Welt pocket pressing Back pocket press
Pressure foot change, thread
3 Front pocket attach SNLS 15 900 change
4 Front pocket top stitch SNLS 5.5 350 Thread & bobbin change
5 Welt pocket Top stitch SNLS
6 Button hole Button holer 12.25 745 m/c setting, thread change
7 Back pocket close SNLS
M/c setting, used worng
8 Bartack Bartack 10.2 620 Thread for bartack
9 Button attach Button sewer 1.04 64 Thread & bobbin change
23 Press Extn, Left & right fly FIT 1 60 operator was not there
24 Hook & bar attach Hook & bar attach 5.11 311 Delay due to operator
25 J stitch SNLS 2 120
26 Front rise SNLS
27 Top stitch right zipper SNLS
28 slider & brad attach YKK slider 1.08 68
29 Back rise sew TNCS 1.11 71 Thread bobbin change
Press waist band & back Waist band measurement & quality
30 rise check
31 Bartack Bartack 20.3 1230 Operator was not there
32 Button hole Button holer 6.09 369
33 Button attach Button sewer 10 600 M/c layout change, M/c setting
34 Bartack on Belt loop Bartack
35 Curtain fell waistband Blind stitch
36 Belt loop finish Bartack
37 Pintack Pintack m/c
38 Bartack on crotch Bartack 13.08 788 Bobbin needle thread change
39 Button serging 3 T overlock
40 Blind hem on Buttom Blind stitch
Total(min) 187.6
TIME LOSSES IN DURING STYLE CHANGE
Buyer-
Style- philips -F20
Line-2(05.02.21)
#REF! Welt pocket pressing
#REF! Front pocket attach 1 60
#REF! Front pocket pressing
#REF! Front pocket Top stitch 13 780
#REF! Welt pocket fabric Top stitch 6.35 395
#REF! Button hole on welt pocket 23.06 1386
#REF! Back stitch
#REF! Back pocket close
Due to alteration
M/c setting
m/c layout
TIME LOSSES IN DURING STYLE CHANGE
Buyer-Raymond
Style-
Line-6(09.02.21)
In between Time In between Time
SL NO Operation Name M/C Type loss(min) loss(sec)
1 Front Back serging
2 Back Dart 5
3 Pairing 30
M/c setting
Operator was not there , m/c setting
Thread change
Delay due to some alter pics
1 Machines of running styles by Green, Yellow, Red card. Green- Machine will be in position,
Yellow Machine will be in line but in different position and the future position will be
mentioned, Red- Machine will be removed from line
Machines will be adjusted before bringing in the line as per new style's process and fabrics.
2
3 Arrange m/c setting Part & component before style change
Making template for waistband loop marking, J stitch, Waist band lining attching template
4 before style change
Quality supervisor and Quality checker are trained before changeover so that they are well
5 known about required quality
6 Can be use Carrier tool box for m/c setting part & component
If extra m/c is availble for button hole & welt pocket making, can be setting the
7 m/c for new style before style change