J F M Report
A M J J Target
A S O N D 0 0
J F M Report
A M J J Target
A S O N D J F M Report
A M J J Target
A S O N D
MTC (Medical Treatment Case) FAC (First Aid Case) NMI (Near Miss Incident)
10 10 10
9 9 9
8 8 8
7 7 7
6 6 6
5
5 5 5
4 4 4
3 3 3
2 2 2
1
1 1 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
J F M Report
A M J J Target
A S O N D J F M Report
A M J J Target
A S O N D J F M Report
A M J J Target
A S O N D
CeRMAT Report Management Visit HSE Meeting on board
70 10 70
9
60 60
8
50 7 50
6 40
40
5
30 4 30
3
20 3 20
2 2 2 2
2
10 6 6 6 1 1 1 10
3 2 3 4 3 3 1 2
1 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1
0 0 0
J F M Report
A M J J Target
A S O N D J F M A M J
Report J A S O N D
Target J F M AReport
M J J Target
A S O N D
Man Hours
Hari kerja dalam 1
Jam Kerja
No Karyawan Jumlah Karyawan bulan
(Total Karyawan x 8 x hari kerja)
(Days)
1 AHTS Crest Ruby 15 31 5580
2 3 18 648
3 3 4 144
Total Man Hours: 6372
CeRMAT Report
No Date Description Location Report by Action and Recommendation Target date Status
During cleaning fresh water cooler generator I POSB jetty 1 Chief Officer
1 15.01,14 tell him & remaining to use helmet 16.01.14 Closed
saw 1 crew not wearing safety shoes balikpapan
During loading cargo on deck I found 1 crew POSB jetty 1 2nd Engineer I talk to him and discuss about the hazards and ask him to
2 16.01.14 16.01.14 Closed
without helmet walking at main deck balikpapan use standard PPE when working
1 crew not wearing safety shoes while working
Rig Hakuryu 10
3 18.01.14 at engine room whwn we cleaning condenser Oiler I intervene to use his safety shoes for his own safety 18.01.14 Closed
location
tube
Found one of the crew walking around in POSB Jetty 1 I approach him & tell him nicely to always follow the
4 20.01.14 Ch Officer 20.01.14 Closed
maindeck at PPE zone area not complete PPE balikpapan procedures to use requirements PPE at PPE zone area
Management Visit
NO Date Vessel Description of visit
24.01.14 Mv. Crest Ruby Pak Arif visit together technician for repair main engine
1 30.01.14 Mv. Crest Ruby Pak Arif visit together technician for repair main engine
MCU Validity
Total crew on board 15
Valid MCU up to this month 15
Expired MCU up to this month 0
Precentage 100%
Man Hours
Working days
Number of crew Man Hours
No Name of vessel in a month
on board (Crew on board x 12 x working days)
(Days)
1 CREST RUBY 17 28 5712
2 0
3 0
4 0
5 0
Total Man Hours: 5712
CeRMAT Report
No Date Description Location Report by Action and Recommendation Target date Status
1
2
3
4
5
Management Visit
NO Date Vessel Description of visit
1 22.02.2014 CREST RUBY MANAGEMENT FROM JTM AND STRATO S'PORE (MS.SIEW BOON & MR.WAHYUDI) FOR IN TERNAL AUDIT ISM & ISPS
2 23.02.2014 CREST RUBY ABS SURVEYOR FOR SURVEY ANNUAL HULL & MACHINERY
3 24.02.2014 CREST RUBY FMC FROM TOTAL CHARTERED FOR TEST FUEL CONSUMPTION ALL M/E, A/E & BOW THRUSTER
MCU Validity
Total crew on board 17
Valid MCU up to this month 17
Expired MCU up to this month 0
Precentage 100%
Man Hours
Working days
Number of crew Man Hours
No Name of vessel in a month
on board (Crew on board x 12 x working days)
(Days)
1 CREST RUBY 17 31 6324
2 0
3 0
4 0
5 0
Total Man Hours: 6324
CeRMAT Report
No Date Description Location Report by Action and Recommendation Target date Status
1
2
3
4
5
Management Visit
NO Date Vessel Description of visit
1
2
MCU Validity
Total crew on board 17
Valid MCU up to this month 17
Expired MCU up to this month 0
Precentage 100%
Man Hours
Working days
Number of crew Man Hours
No Name of vessel in a month
on board (Crew on board x 12 x working days)
(Days)
1 AHTS Crest Ruby 15 30 5400
2 0
3 0
4 0
5 0
Total Man Hours: 5400
CeRMAT Report
No Date Description Location Report by Action and Recommendation Target date Status
During backload lub oil drum 1 crew without 2.O / Achmad Advice to the crew to use proper PPE
1 04.04.2014 Main Deck 04.04.2013 closed
PPE
Fishing boats are stayed sorround the rig. This Master / Cpt. Ask the fishing boat to move away
2 07.04.2014 is very dangerous during vessel come to the rig Soehana Rig Mahmud before vessel come close to the rig 07.04.2013 closed
for snatching or tied up
Master / Cpt. Report to the rig about condition of the
3 29.04.2014 The mooring rope on back down buoy for tied Soehana Rig Mahmud rope and requast to renew open
up to port side has been old. Need to renew it
4
5
Management Visit
NO Date Vessel Description of visit
1
2
MCU Validity
Total crew on board 15
Valid MCU up to this month 15
Expired MCU up to this month 0
Precentage 100%
Man Hours
Working days
Number of crew Man Hours
No Name of vessel in a month
on board (Crew on board x 12 x working days)
(Days)
1 AHTS CREST RUBY 15 30 5400
2 0
3 0
4 0
5 0
Total Man Hours: 5400
CeRMAT Report
No Date Description Location Report by Action and Recommendation Target date Status
While vsl proceed to approach Topaz for Make nacessary manouver to avoid
snatching. Found that thare is anchor pattern in anchor pattern. Recommended to
1 08.05.2014 that position. It is danger hit by vessle propeller Topaz 2/O Achmad Sofyan 08.15.2013 Closed
inform incoming vsl regarding
condition arround Rig area
while repairing toilet floshing one crew step on
2 23.05.2014 Crest Ruby Bridge C/O Bayu Stop the crew not to step on the toilet 23.05.2013 Closed
the toilet. It danger of body injured
3
4
5
Management Visit
NO Date Vessel Description of visit
1 07.05.2014 Mr. Amrul Mukminin TOTAL Marine Inspector
2 17.05.2014 Cpt. Erin Busrian OVID Inspection
3 18.05.2014 Cpt. Erin Busrian OVID Inspection
4
MCU Validity
Total crew on board 15
Valid MCU up to this month 15
Expired MCU up to this month 0
Precentage 100%
Man Hours
Working days
Number of crew Man Hours
No Name of vessel in a month
on board (Crew on board x 12 x working days)
(Days)
1 AHTS CREST RUBY 15 30 5400
2 0
3 0
4 0
5 0
Total Man Hours: 5400
CeRMAT Report
No Date Description Location Report by Action and Recommendation Target date Status
Found half drinking water on top of Indra Agus / Ch. Eng Remove the drinking water
1 05.06.2014 Crest Ruby Engine Room 05.06.2013 closed
transformator
During v/l cargo operation under Topaz, v/l can’t Bayu / Ch. Off Replace the crane operator radio
2 06.06.2014 communicate with crane operator due to crane Topaz 06.06.2013 closed
operator radio out of power
Found mooring line not arrange properly on Nur Hammim / Arrange mooring line properly
3 20.06.2014 Crest ruby forecastle deck 20.06.2013 closed
forecastle deck after use Bosun
4
5
Management Visit
NO Date Vessel Description of visit
1 05.06.2014 Crest Ruby Mr. Syamsul Bahri (TOTAL Marine) / intoduction
2 10.06.2014 Crest Ruby Mr. Syamsul Bahri (TOTAL Marine) / Safety Talk
3
MCU Validity
Total crew on board 15
Valid MCU up to this month 15
Expired MCU up to this month 0
Precentage 100%
Man Hours
Working days
Number of crew Man Hours
No Name of vessel in a month
on board (Crew on board x 12 x working days)
(Days)
1 AHTS CREST RUBY 15 30 5400
2 0
3 0
4 0
5 0
Total Man Hours: 5400
CeRMAT Report
No Date Description Location Report by Action and Recommendation Target date Status
Found crew was not wearing PPE properly Master Inform and remind to wear PPE during
1 09.07.2014 Rig Topaz Driller 09.07.2013 Close
cargo operation
While cargo ops, from Rig suddenly blow line Master Infor the rig to stop blow via radioroom
2 10.07.2014 Rig Topaz Driller 10.07.2013 Close
and covering vessel with dust
3 16.07.2014 Found passengger smoking o/main deck Rig Topaz Driller Master Direct inform him and give warning 16.07.2013 Close
Inform via VHF ch.6 to stop and
Vsl a/s at P.Pionerr, suddenly from jetty release
4 20.07.2014 POSB Jetty Master always inform back if want to start 20.07.2013 Close
high pressure throw air vent P.Pioneerr
loading bulk cargo
Crew member working with good PPE while Give thumb and always think safety for
5 25.07.2014 Kampung Baru Anchorage C/O 25.07.2013 Close
repair chain fender vsl do anything job
Crew inform him and give safety
6 27.07.2014 Found crew contractor use grinding not safety Kampung Baru Anchorage C/O 27.07.2013 Close
goggles
7
Management Visit
NO Date Vessel Description of visit
1 25.07.2014 Mv. Crest Ruby Mr. Eng Kok Yang (Technical Supt) assist for maintenance days vessel
2
MCU Validity
Total crew on board 15
Valid MCU up to this month 15
Expired MCU up to this month 0
Precentage 100%
Man Hours
Working days
Number of crew Man Hours
No Name of vessel in a month
on board (Crew on board x 12 x working days)
(Days)
1 AHTS CREST RUBY 14 31 5208
2 1 1 12
3 0
4 0
5 0
Total Man Hours: 5220
CeRMAT Report
No Date Description Location Report by Action and Recommendation Target date Status
Any smoke at the messroom, and check 2nd Engineer Immediately switch off roasting bread
1 03.08.2014 roasting bread forget to stop POSB Jetty, Tanjung Batu and on blower to remove smoke 03.08.13 Closed
Found deck hand painting bulkwalk at sea side 2nd Officer Call him & inform to using PPE
2 05.08.2014 Rig Topaz Driller 05.08.13 Closed
without work vest (workvest)
The same time inform the engineer to
In workshop and steering compartment found
3 07.08.2014 POSB Jetty, Tanjung Batu Master put abel to identification content inside 07.08.13 Closed
so many jerigen without label or mark
gallon
Found any some electric machinery can't use Turn off the machinery and renewed
4 13.08.2014 Rig Topaz Driller Electrician 13.08.13 Closed
after check there some spatter burn with new spare part
Soon cleaned the water and remove
When engine crew working at E/R, some water
5 16.08.2014 Rig Topaz Driller 3rd Engineer all parts around the floor to avoid injury 16.08.13 Closed
on the floor almost make crew slipped
Engine crew check valve at E/R, suddenly sea Check his eyes & give water wash to
6 20.08.2014 POSB Jetty, Tanjung Batu Chief Engineer 20.08.13 Closed
water spray his eyes cleaned the eyes
7
Management Visit
NO Date Vessel Description of visit
1
2
MCU Validity
Total crew on board 15
Valid MCU up to this month 15
Expired MCU up to this month 0
Precentage 100%
Man Hours
Working days
Number of crew Man Hours
No Name of vessel in a month
on board (Crew on board x 12 x working days)
(Days)
1 AHTS CREST RUBY 13 30 4680
2 2 4 96
3 0
4 0
5 0
Total Man Hours: 4776
CeRMAT Report
No Date Description Location Report by Action and Recommendation Target date Status
Found crew working on deck when discharge Call hin and given instruction for using
1 09.09.2014 Rig Topaz Driller 2/O Febriandi 09.09.13 Closed
bulk cargo in progress not using google google
While vsl transsfering DW to Log. Reliance Call by radio and inform if there
Master/Capt. Galpus
2 09.09.2014 suddenly the parted & broken, found the barge Barge Logindo Reliance, Peciko Field change tank or closed valve to inform 09.09.13
K
change tank & closed valve w/out inform vsl vsl
Management Visit
NO Date Vessel Description of visit
1
2
MCU Validity
Total crew on board 15
Valid MCU up to this month 15
Expired MCU up to this month 0
Precentage 100%
Man Hours
Working days
Number of crew Man Hours
No Name of vessel in a month
on board (Crew on board x 12 x working days)
(Days)
1 AHTS CREST RUBY 14 31 5208
2 1 3 36
3 0
4 0
5 0
Total Man Hours: 5244
CeRMAT Report
No Date Description Location Report by Action and Recommendation Target date Status
Found one crew member, when he is working 2/O Febriandi Call him and given instruction for using
1 01.10.2014 Rig Topaz Driller 01.10.13 Closed
o/d not using workvest workvest
When any trouble difficult to start M/E, we try to ETO/Herry Wardana After turn on M/E we cut parallel cable
2 15.10.2014 Kampung Baru Area 15.10.13 Closed
parallel accu but any fire spatter to avoid spatter
When arrival at Topaz, barge master given Inform to barge master there is no
instruction to double bank with Log.Destiny at Master/Capt. Galpus safety for the two boat double bank at
3 10.10.2014 Rig Topaz Driller p/s rig during that weather 10.10.13 Closed
p/s of rig, in time weather was getting up and Kaminang
sea condition moderate
Inform to crane operator to inform us
While operation cargo at rig, crane operator
4 15.10.2014 Rig Raniworo AB/Sekri Mananggel what hose bring down so we know 15.10.13 Closed
bring down hose but no information
before connected to manifold
5
Management Visit
NO Date Vessel Description of visit
1 25.10.2014 Mv. Crest Ruby To Increase HSE awareness onboard respective crew of vessel visited
To Improve safety culture specific in marine operations
To improve contractor HSE management
2
MCU Validity
Total crew on board 15
Valid MCU up to this month 15
Expired MCU up to this month 0
Precentage 100%
Man Hours
Working days
Number of crew Man Hours
No Name of vessel in a month
on board (Crew on board x 12 x working days)
(Days)
1 AHTS CREST RUBY 13 30 4680
2 2 27 648
3 2 3 72
4 0
5 0
Total Man Hours: 5400
CeRMAT Report
No Date Description Location Report by Action and Recommendation Target date Status
Management Visit
NO Date Vessel Description of visit
1 24.11.2014 Mv. Crest Ruby Mr. Nick Ng (Management S'pore) visit for inspection vessel condition
2 30.11.2014 Mv. Crest Ruby Capt. Isaac C (Manag. S'pore), Pak Genta (JTM) and Agent Pak Arief, visit for discuss about memo from Charter Total
MCU Validity
Total crew on board 15
Valid MCU up to this month 15
Expired MCU up to this month 0
Precentage 100%
Man Hours
Working days
Number of crew Man Hours
No Name of vessel in a month
on board (Crew on board x 12 x working days)
(Days)
1 AHTS CREST RUBY 10 31 3720
2 3 18 648
3 2 4 96
4 0
5 0
Total Man Hours: 4464
CeRMAT Report
No Date Description Location Report by Action and Recommendation Target date Status
Crew work prepared for hot work with permit to Appreciate for think safety for anything
1 03.12.2014 work Balikpapan Anchorage Chief Officer job especially work use it Permit to 03.12.14 Closed
Work
Stop and call him to use face shields
Crew not wearing face protection while using
2 21.12.2014 Workshop (Rig Hakuryu-10) 2nd Engineer for protect face especially small 21.12.14 Closed
grinding machine
material from grinding machine
While cargo operation at rig CS-1, rig crane Inform to crane operator to give 2 tug
3 19.12.2014 Main deck (Rig Constellation-1) Bosun 19.12.14 Closed
lifting cargo only use 1 tug line line for make easy lifting cargo
4
5
Management Visit
NO Date Vessel Description of visit
1 05.12.2014 Mv. Crest Ruby Pak Genta (JTM) and Agent Pak Arief, visit for discuss about memo from Charter Total
2 13.12.2014 Mv. Crest Ruby Pak Genta (JTM) and Agent Pak Arief, visit for discuss about memorandum for operation vessel
MCU Validity
Total crew on board 15
Valid MCU up to this month 15
Expired MCU up to this month 0
Precentage 100%
7 CeRMAT Report
J F M A M J J A S O N D
Report 1 0 0 3 2 3 6 6 6 4 3 3
Target 2 2 2 2 2 2 2 2 2 2 2 2
8 Management Visit
J F M A M J J A S O N D
Report 2 1 0 0 3 2 1 0 0 1 2 2
Target 1 1 1 1 1 1 1 1 1 1 1 1
11 MCU Validity
J F M A M J J A S O N D
Report 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Target 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%