You are on page 1of 4

Assignment#3

Fixation of D/S floor level using Blench Curve

Main weir
qweir USEL DSEL hL E2 DSFL
USWL + ho DSWL + ho USEL-DSEL Blench Cr. DSEL - E2
Normal
197.30 605.67 602.67 3.00 19 583.67
163.49 603.75 600.95 2.80 16.9 584.05
84.52 598.88 597.38 1.50 10.5 586.88
Retrogressed
196.58 603.65 596.45 7.20 19.8 576.65
169.45 602.58 597.08 5.50 18.7 578.38
83.72 597.46 592.46 5.00 12 580.46
Accreted
201.22 606.93 605.03 1.90 18.3 586.73
166.43 604.85 603.35 1.50 16.2 587.15
82.61 602.45 601.75 0.70 10 591.75

DSFL will be min of the above calculated = 576.65


Provide 576

Undersluices
qweir USEL DSEL hL E2 DSFL
USWL + ho DSWL + ho USEL-DSEL Blench Cr. DSEL - E2
Normal
284.39 606.65 604.95 1.70 23 581.95
Retrogressed
290.32 605.36 599.86 5.50 25.5 574.36
Accreted
278.18 607.82 606.82 1.00 22 584.82
DSFL will be min of the above calculated = 574.36
Provide 574

7) Fixation of DSFL for normal barrage section using Crumps approach


For Max DSWL
Q = 487450
DSWL (Corresponding to Q) = 602.5
USWL = 604
USEL = 604.85
RBL = 582
Crest level = 589.38
DSFL = 576
Dpool DSWL - DSFL = 26.5
d/s V Q/(Wabt*Dpool) = 5.434074
d/s V head = 0.458527
DSEL = 602.9585
K USEL - CL = 15.47
L USEL - DSEL = 1.891473
qweir Q/Wweir = 162.4833
C Critical flow depth = 9.359527
L/C = 0.202091
K+F/C Crumps curve = 2
F = 3.249055
Location of HJ CL - F = 586.1309
E2 DSEL - Loc HJ = 16.82758
Submergency of HJ Loc HJ - DSFL = 10.13095
Length of glasis d/s of jump sub. Of HJ * slope = 30.39284
Length of stilling pool 4.5 E2 = 75.72412
Length of d/s floor(4.5 E2 - (Submergency * slope of glasis)= 45.33128
7) Fixation of DSFL for normal barrage section using Crumps approach
For Min DSWL
Q = 487450
DSWL (Corresponding to Q) = 596
USWL = 601.5
USEL = 602.5781087
RBL = 582
Crest level = 589.38
DSFL = 576
Dpool DSWL - DSFL = 20
d/s V Q/(Wabt*Dpool) = 7.20014771
d/s V head = 0.805001973
DSEL = 596.805002
K USEL - CL = 13.1981087
L USEL - DSEL = 5.773106725
qweir Q/Wweir = 162.4833333
C Critical flow depth = 9.359527459
L/C = 0.616816047
K+F/C Crumps curve = 2.2
F = 7.392851712
Location of HJ CL - F = 581.9871483
E2 DSEL - Loc HJ = 14.81785368
Submergency of HJ Loc HJ - DSFL = 5.987148288
Length of glasis d/s of jump sub. Of HJ * slope = 17.96144486
Length of stilling pool 4.5 E2 = 66.68034158
Length of d/s floor(4.5 E2 - (Submergency * slope of glasis)= 48.71889672
d/s floor length is max of the two (45.31 ft and 48.719 ft) Take D/S floor Length =50 ft

8) Fixation of DSFL for undersluices using Crumps approach


max: DSWL
Q = 153418.8
DSWL (Corresponding to Q) = 604
USWL = 605
USEL = 607.8242
RBL = 582
Crest level = 586.04
DSFL = 574
Dpool DSWL - DSFL = 30
d/s V Q/(Wundersluice*Dpool) = 8.523267
d/s V head = 1.128045
DSEL = 605.128
K USEL - CL = 21.78418
L USEL - DSEL = 2.696134
qweir Q/Wweir = 255.698
C Critical flow depth = 12.66289
L/C = 0.212916
K+F/C Crumps curve = 2
F = 3.541607
Location of HJ CL - F = 582.4984
E2 DSEL - Loc HJ = 22.62965
Submergency of HJ Loc HJ - DSFL = 8.498393
Length of glasis d/s of jump sub. Of HJ * slope = 25.49518
Length of stilling pool 4.5 E2 = 101.8334
Length of d/s floor(4.5 E2 - (Submergency * slope of glasis)= 76.33825
8) Fixation of DSFL for undersluices using Crumps approach
min: DSWL
Q = 153418.8
DSWL (Corresponding to Q) = 595
USWL = 600.5
USEL = 605.3555
RBL = 582
Crest level = 586.04
DSFL = 574
Dpool DSWL - DSFL = 21
d/s V Q/(Wundersluice*Dpool) = 12.1761
d/s V head = 2.302132
DSEL = 597.3021
K USEL - CL = 19.31548
L USEL - DSEL = 8.053349
qweir Q/Wweir = 255.698
C Critical flow depth = 12.66289
L/C = 0.63598
K+F/C Crumps curve = 2.22
F = 8.796142
Location of HJ CL - F = 577.2439
E2 DSEL - Loc HJ = 20.05827
Submergency of HJ Loc HJ - DSFL = 3.243858
Length of glasis d/s of jump sub. Of HJ * slope = 9.731575
Length of stilling pool 4.5 E2 = 90.26223
Length of d/s floor(4.5 E2 - (Submergency * slope of glasis)= 80.53066
d/s floor length is Larger of the two (76.33 ft and 80.5 ft)
Take D/S floor Length equal to 85 ft