You are on page 1of 2

HAZARD CHECKLIST and PRODUCTION RISK ASSESSMENT

PRODUCTION COMPANY Yestoday Productions

PRODUCTION TITLE From Under the Bed

PRODUCER Olivia Inns

CREW Olivia Inns and Rochélle Inns

FILMING LOCATION 7 Pilgrimsway Weston Super Mare, BS22 9EG

ACTIVITY Board Games scene

DATE TIME
START FILMING 6th May 2021 06/05/2021 – 12:30 am

FINISH FILMING 6th May 2021 06/05/2021 – 03:30 pm

CONTACT DETAILS Email - Inns.olivia@gmail.com


Mobile phone number – 07834 228487

HAZARDS x
1 Audience or Public Safety
2 Cables
3 Camera Cranes / Dolly / Slider / Drones
4 Derelict Buildings
5 Electricity
6 Fire - Flammable materials etc
7 Hazardous Terrain - Slipping / Tripping / Falling
8 Hazardous Terrain – Sand / Mud / Gravel etc
9 Manual Handling – Heavy lifting X
10 Noise / Sound levels
11 Medical Conditions – Allergies / Health problems etc X
12 Physical Exertion X
13 Stunts / Dangerous activities
14 Theft of Equipment
15 Weapons – Prop Guns / Knives / Swords etc
16 Weather Conditions - Hot / Cold / Rainy / Windy / Snow etc
17 Working with Animals
18 Working with Children
19 Working with Disabled / Elderly
20 Working at Night
21 Working on or near Water X
22 Vehicles
22 Other -
PRODUCTION RISK ASSESSMENT Sheet 1 of 2

HAZARD IDENTIFIED PEOPLE AT RISK RISK CONTROL WHO’S


LEVEL MEASURES RESPONSIBLE
HML
Physical exertion Crew L Taking in turns to go and get Olivia Inns
equipment from downstairs and
carrying the props that are being
used for the scene.

Medical Conditions – Crew, Actors L To ask about all allergies/medical Rochélle Inns
Allergies / Health conditions, have it in writing.
problems etc Asthma – to make sure they
have an inhaler on them and take
regular breaks if feeling a
shortness of breath.

Working near or on Crew M Keep the camera away from the Rochélle Inns
Water water, make sure that there is
minimal splashing and not. Being
thrown neater camera. Have
towels on hand.

PRODUCTION RISK ASSESSMENT Sheet 2 of 2

I have read the above and I am happy that:

 It constitutes a proper and adequate risk assessment in respect of the programme


activity and that control measures identified are sufficient to control the risks.
 Adequate measures are in place to communicate the risk assessment findings and to
co-ordinate the safety arrangements of all those affected.

Signed:
Producer

Date:

Signed:
Tutor or Technician

You might also like