This is to endorse to A TTY. VICE TE C. PETIERRE Ill - Secretary to the


Sangguniang Panlungsod, the letter sign d by Atty. Danny L. Pondevilla, Acting
General Manager of Central Negros Electric Cooperative, Inc. (CENECO)
submitting their official reply in relation to Resolution No. 179, Series of 2021
requesting CENECO for an urgent expla ation on the matter of recent power
outages in Bacolod City.

For inclusion in the Agenda and appfopriate action.

Thank you.

Vice IMayor
Bacdlod City

'

i~WlliiMl!i<MN~---wwww......... ~--;iw,;·
-..w..-~-......,"""";;w;;_-,_ __,.......,._____
j
O!I!' .i· ., ·--~---Jill/li-awioillllli;iiiM;~Jilw~~~l" ~~~~....,;,

nd
ADDRESS: 2 Floor New Government Cente,I- Circumferential Road, Brgy. Villamonte,
CENECO
CENTRAL NEGROS ElEC IC COOPERATIVE, INC.
(CENECO)
Bacolod City
Office of the General rvfanager
Tel. Nos. 458 67';f7

-··-.l~(.·-..,-.,_,..,._...,_,. -· ·.j·,,-,,~.-·---.,..--..,_,_~,N-, ..
t1J r i r:,h,h.i-l;
r ,- "ri \r- :;.- n ,,
1 U! 11. lz ~., ,., -~
R N
,..~
April 26, 2021 f• 'I

~
- -~ f,'AY CR
COVERAGE AREA

Hon. El Cid M. Familiaran


Vice Mayor
q/irJi, --1',:: __ .,, . QJ@
BACOLOD CITY
Gonzaga Mabini Streets
435-3640 to 55
FAX # 435-4079
City of Bacolod

Dear Vice Mayor Familia ran:


·c."" ~
. _ _ ,.~- ,.,,,....... ..,,,..,.,,.,..,....,. .... ,~,......,.,r.._,.,
·- ... _,_._____,.

1
:a..- ...... ,....,,.,.. ~-,..,,_,,,._..,,.._,._.- ~
. ~--- -
,-..~~

This is in relation to the Sanggu1iang Panlungsod (SP) resolution no. 179, series of
BAGOCITY 2021 requesting CENECO for an prgent explanation on the matter of recent power
N.S. Araneta Street outages in Bacolod City.
461-0301

For the reference of the Honorabl SP members, CENECO is operating three (3) 69 kV
lines namely; Bacolod-Silay, E}a clod-Reclamation, and Bacolod-Alijis-Murcia. For
Bacolod-Silay 69 kV line the conn ted substations are the 30 MVA Burgos Substation,
SILAYCITY
30 MVA Mountain View Substati n, 20 MVA Talisay Substation, 10 MVA Panaogao
Figueroa Street
495-3889 * 495-3897 Substation, and 10 MVA Lopez S bstation. For Bacolod-Reclamation 69 kV line the
connected substations are 30 MVA ASDES Gonzaga Substation and 20 MVA
Reclamation Substation. For Bae lod-Alijis-Murcia 69 kV line connected substations
are 30 MVA Alijis Substation and O MVA Murcia Substation. Another 69 kV line is the
Bacolod-San Enrique owned and operated by the National Grid Corporation of the
TALISAY CITY Philippines (NGCP) and the conne ted Substations are the 10 MVA Sum-ag Substation
Mabini Street and 10 MVA Hilangban Substation
495-1832
The power substations of CENE!0 are distributing power at a voltage level of
13,200/7,620 volts from a prima voltage of 69 kV from NGCP Bacolod Substation
through sub-transmission lines. he 230 volts supply voltage of our residence is
MURCIA coming from the step-down distri ution transformer connected from a 13,200/7,620
Rizal Street volts distribution system.
345-2206

Currently, the source of power ~upply distributed by CENECO is coming from the
power plant of KEPCO in Naga, C bu City, Palm Conception Power Corporation in the
SALVADOR BENEDICTO
province of lloilo, and Greencore from Valencia, Negros Oriental. Those generating
Negros Occidental plants are interconnected using t e transmission lines and submarine cable of NGCP
going to the Bacolod substation.

The lines are protected by the o;ercurrent protective device at every voltage level
from the generating plant down our residence to ensure the safety of equipment
and the public. The said protec ive device will automatically trip in case of line !• r;,
disturbance or a short circuit.
CENTRAL NEGROS ELECTRIC C88PERATIVE, INC.
(CENECO)
Bacolod City
Office of the General ~anager
Tel. Nos. 458 6Ti17

(OVERAGF;ARfA Power outages have two types, pinned and unplanned, planned power interruptions
are intended for the preventive aintenance of the equipment, transmission lines,
and distribution facilities while u planned is the activation of protective equipment
BACOLOD CITY due to transient fault and emerge cy repair of facilities.
Gonzaga MabinlS1reets
43S-3640 to SS Records show that the occurrenc s of transient faults are the bad weather condition
FAX ti 43S-4079
resulted in a power failure such s rain, wind, and lightning. Other faults were the
electrocution of wildlife in the d tribution lines. Likewise, histories of kites human
error happened in some buildin construction due to mishandling of conductive
BAGOCITY
materials that hit our distribution ystem.
N.S, Aran eta Street
461-0301 An example of the above obse ations of the human error was the tripping of
Bacolod-Silay 69 kV line last arch 31, 2021. The (2) units 100 MVA power
transformers of NGCP at Bacol d Substation tripped off that affects the whole
coverage area of CENECO. This s due to the accident that happened at Prk. Arao
SILAV CITY Relocation Site, Brgy. Vista Alegr when the heavy equipment accidentally touched
Figueroa Street
the 69 kV conductor resulted in th activation of an overcurrent relay that triggers the
495-3889 • 495·3897
tripping of the system.

Another example was the trippinglof NGCP submarine cable and power plant in Panay
last September 24, 2020, which af1ects the coverage of CENECO.
TALISAY CITY
Mabi ni Street Attached are the diagrams from fjenerating plant, transmission line, distribution line,
495-1832 customers, and 69 kV line for yourlreference.

MURCIA
Respectfully yours,
Rizal Strut
345-2206

Atty. D~y L. Pondevilla


NEA PS/A~g General Manager
SALVADOR BENEDICTO
Negros Occidental
1
CENECO
CENTRAL NEGROS ElECTOIIC COOPERATIVE, INC.
(CENECO)
Bacolod City
Office of the General Nlanager
Tel. Nos. 458 67~7

Cofor K...., .
Red
Bill
Substation
Step (}&.,m
Tr ansfo1 mer
d9
.. : .. • • •
Subtransmissmn
Customer
Gieen: Distnt1ut1on Transmission Imes ~
26kV and 69kV
Black: Custome, 765. 500. 345, 230. and 138

Generating Statton
., ..... P11mruy Custome1
13kV and4kV

Transmission Customer ~ Secondary CustomJ.


Generating 138kV or 230kV ·~ 120V and 240V i
Step Up I
Transformer

REFERENCE:
NGCP - National Corporation of the Philippines
kV - Kilo volt (1 kilo volt = 1,000 volts)
69 kV - 69,000 volts
NGCP Bacolod
Substation


2-100 MVA Power

...nz
Substation

Bacolod Sllay 69 kV line Bacolod San Enrique 69 kV line

Circuit Break.er
0
3
=
•...z
...
ri a,
--3
(0
IP
0
:--'~a,
z::rll)-.
o ro n n
=
=
rn
~ C) 0 I:'!:!
,ll,,("002!
u,::l i=,.l:'!:I
30 MVA Mt, View 10 MVA Sum-ag
10 MVA Lopez 10 MVA Panaogao 20 MVA Talisav 30 MVA Burgos 10 MVA Hilangban oo !:Fl n n
Substation Substation Substation substatton Substatton Substation Substation
°''1 : : ~ '-'0

-
Ill -·

Batolod Re<lamation 69 kV line Bacolod Alijis Murcia 69 kV line

..
n
=
...==
;
...-z
20 MVA Reclamation 30 MVA ASDES Gonzaga 30MVAAlljls 30 MVA Murcia
Substation Substation Substation Substation

..C
n

SINGLE LINE DIAGRAM