You are on page 1of 294

Contents

Covering Letter
SECTION-I
Company Profile
 Name and Address of the Firm
 Introduction to NESPAK
 Organization Chart of the Firm

Registration
 Certificate of Registration with PEC
 Certificate of Registration with PCATP
 Copy of Registration with Income Tax Department
 ISO Certificate
 Certificate from Securities and Exchange Commission of
Pakistan
 Certificate of Incorporation
 NTN Certificate

SECTION-2
Annexure-I
Civil Surveying project of comparable scale competed in last 05
Years (10 points for each project completed)
 List of Ongoing Projects (General)
 List of Projects Completed in last 5 years(General)
 List of Ongoing Health Care Projects
 List of Health Care Projects Completed in last 10 years
 Project Sheets of Similar Works
Annexure-II
Existing Key Personnel/Qualification
 Team Composition
 List of Key Personnel
 Job and Staff Status Summary
 Projects Undertaken to-date of each specialty at Nespak

Annexure-III
Logistic Capability
 List of Offices
 List of Equipment
 Audit Reports
SECTION-I
Company Profile
1-1 Name and Address of the Firm
1-2 Introduction to NESPAK
1-3 Organization Chart of the Firm
NAME OF THE FIRM: NATIONAL ENGINEERING
SERVICES PAKISTAN (PVT)
LIMITED

ADDRESS: NESPAK HOUSE


1-C, BLOCK N,
MODEL TOWN EXTENSION, P.O.
BOX NO. 1351
LAHORE - 54700 PAKISTAN

AUTHORIZED PERSON: MS. NABILA RASHID

DESIGNATION: GENERAL MANAGER/ HEAD


ARCHITECTURE & PLANNING
DIVISION – NESPAK LAHORE
CONTACT PHONE: 92-42-99090000
92-42-99231920

FAX: 92-42-99231950
92-42-99231962
WEB SITE: http://www.nespak.com.pk
EMAIL: info@nespak.com.pk
archnesp2@gmail.com
DATE OF
ESTABLISHMENT: March 20, 1973

INCOME TAX
REGISTRATION NO: 07-12-1710896
NESPAK

CONSULTANT’S ORGANIZATION
1. BRIEF DESCRIPTION
National Engineering Services Pakistan (Pvt.) Limited (NESPAK) is a consulting engineering organization
established by the Government of Pakistan. NESPAK has been conceived as a National engineering design
organization, pooling together country's best engineering skills and resources into a storehouse of meaningful
and coordinated expertise to fulfill the demands of
development at home and abroad. Within Forty-
Seven (47) years of its establishment, NESPAK, by
virtue of its impressive record of performance has
secured 4,065 different jobs having an estimated cost
of over US $ 314.00 billion. At present NESPAK has
a total staff of 4, 150 comprising 1,552 professionals,
1,411 paraprofessionals and the rest
non-professionals.
Besides working in Pakistan, NESPAK has also
offered consultancy services to almost 39
developing countries. At the moment, NESPAK has
561 important projects outside Pakistan at its credit
secured through international competition.
The detailed company profile can be viewed and
downloaded from the website www.nespak.com.pk
2. NESPAK’S MANAGEMENT
A Board of Directors consisting of a Chairman, a Managing Director, a Secretary and 11 other Directors,
manages the affairs of the Company. The Managing Director is assisted by Vice Presidents of all specialty
divisions.
In order to keep pace with the advancement of technology and to give specialized services to its Clients,
NESPAK has formed specialty groups in different disciplines.

Page 1 of 2
NESPAK

3. PROJECT MANAGEMENT
A Project assigned to NESPAK becomes the responsibility of a Vice President / Division Head for all phases
of the Project. He may either assume the responsibility of a Project Manager or appoint some other senior staff
member as the Project Manager directly responsible to him.
The Project Manager makes use of the large range of specialty groups in NESPAK and coordinates with
various agencies involved to ensure timely flow of information, criteria and decisions necessary for the
satisfactory completion of the assigned tasks.

The subject project shall be managed by Architecture & Planning Division (Concerned Project Management
Division) of NESPAK. A brief summary of the same is presented below.
4. ARCHITECTURE & PLANNING DIVISION
NESPAK's Architecture and Planning Division (A&PD), Lahore was established in 1975 and is one of the
most essential divisions of NESPAK. During the last 45 Years, this division has expanded gradually from a
staff of few engineers to more than 30 highly qualified Architects & Planners, 28 Para-professionals and 8
non-professionals. Most of the senior professional staff members have received post graduate qualifications
from various Prestigious Technical Universities of International repute and well versed with modern design
techniques with awareness about the local Socio-Economic conditions. Moreover, most of the professional staff
working in this division have vast practical Experience both inside the country and overseas.
In the Architectural and Planning Sector, NESPAK has successfully handled 1,050 domestic and overseas
projects. A total of 907 projects have been completed while 143 are under operation. Overseas, the Company
has worked in Afghanistan, Bahrain, Federal Islamic Republic of Comoros, Guinea, Islamic Republic of Iran,
Nepal, Nigeria, Oman, Qatar, Saudi Arabia, Sierra Leone, Tajikistan, Thailand, the United Arab Emirates and
Yemen.
The performance of NESPAK's Architecture and Planning Sector is characterised by elegance, magnificence
and splendour and that too under the limited budgets allocated by the public sector. The work done by
NESPAK in the Architecture and Planning
Sector is second to none in the consultancy
market. It can be proudly
presented to both the domestic and international
markets in the public and private sectors.
The services provided in this A&P Sector range
from the development of the design concept to
the completion of the project, including
feasibility studies, planning, designing, tender
documentation, cost estimation, valuation,
construction supervision and project
management in field of Urban Planning, Slum
Upgradation, Housing Projects, Healthcare
Buildings, Educational Buildings, Airport
Terminal Buildings, High-rise Buildings,
Office/Commercial Buildings, Sports Facilities,
Industrial Buildings, Landscaping and interior design etc.
5. ORGANIZATION CHART
Organizational Charts of NESPAK has been attached.
6. QUALITY MANAGEMENT SYSTEM
Our Quality Management System, ISO Certifications and Quality, Environmental, Health and Safety
Policies respectively have also been attached herewith.
Page 2 of 2
SECTION-2
Registration
2-1 Certificate of Registration with PEC
2-2 Certificate of Registration with PCATP
2-3 Copy of Registration with Income Tax
Department
2-4 ISO Certificate
2-5 Certificate from Securities and Exchange
Commission of Pakistan
2-6 Certificate of Incorporation
2-7 NTN Certificate
11/22/2020

Online NTN/STRN Inquiry

Printed On: 11/22/2020 10:13:39 PM

Registration No 0801470
Reference No 0801470-1
STRN 3277876117915
Name NATIONAL ENGINEERING SERVICES PAKISTAN (PRIVATE) LIMITED
Category Company
PP/REG/INC No. 0003955
Email *******
Cell ****
Address NESPAK HOUSE 1/C, BLOCK-N, MODEL TOWN EXTENSION, Lahore Iqbal Town
Registered On 31-OCT-1996
Tax Office LTO LAHORE
Registration Status Income Tax: Active , Sales Tax: OPERATIVE

Business/ Branch Business/ Branch


Sr. Principal Activity
Name Address
711000-Professional, scientific and
NATIONAL NESPAK HOUSE,
technical activities/Architectural and
ENGINEERING Near State Bank,
engineering activities and related
1 SERVICES Sector No G-5/2,
technical consultancy/Architectural and
PAKISTAN Islamabad
engineering activities and related
(PRIVATE) LIMITED Islamabad Urban
technical consultancy

1/1
Annexure-I

Civil Surveying project of comparable scale


competed in last 05 Years (10 points for each
project completed)
 List of Ongoing Projects(General)
 List of Projects Completed in last 5 years
(General)
 List of Ongoing Health Care Projects
 List of Health Care Completed in
last 10 years
 Project Sheets of Similar Works
 List of Projects
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
1 26-10-2005 Reconstruction and Earthquake Reconstruction Pakistan 200000 5973.100 bcdef
30-06-2021 Rehabilitation of and Rehabilitation Authority
Earthquake Affected Areas

2 10-06-2020 4500MW Diamer Basha Diamer Basha Development Pakistan 1862000 4000.050 bcdef
10-06-2030 Dam Company (Private) Limited, 1. Bid Evaluation
Pakistan 2. Survey
3 01-07-2009 Projects under Annual Irrigation & Power Pakistan 80000 2496.874 ef
30-04-2021 Development Program Department, Government of
the Punjab
4 01-06-2008 969MW Neelum-Jhelum Water and Power Pakistan 506808 2448.136 cef
31-12-2021 Hydroelectric Project Development Authority
5 01-01-2005 Lahore Ring Road Lahore Ring Road Authority, Pakistan 45000 1809.770 abcde
30-04-2021 (22.4km) Project Southern Government of the Punjab
Loop (Kamahan to Adda
Plot)
6 01-09-2020 National Program for National Project Coordinator, Pakistan 154500 1696.000 ef
30-09-2024 Improvement of Federal Water Management
Watercourses in Pakistan, Cell, Ministry of National
Phase-II Food Security & Research

7 01-08-2015 Lahore Orange Line Metro Punjab Masstransit Authority, Pakistan 163000 1582.721 cef
12-06-2021 Train Project (27km) Government of the Punjab

8 04-12-2003 Kachhi Canal Project Water and Power Pakistan 80000 1387.293 cde
30-04-2021 Development Authority
9 01-09-2008 Rehabilitation and Irrigation & Power Pakistan 30000 1253.842 cde
30-06-2021 Upgradation of Balloki Department, Government of
Barrage and Lower Bari the Punjab
Doab Canal System
10 15-12-2014 Study of Pollution Saudi Consulting Services Saudi Arabia N.A 1147.840 ef
30-11-2021 Treatment in Various (SAUDCONSULT) Saudi
Regions, Saudi Arabia Arabia
11 27-05-2019 800MW Mohmand Dam Water and Power Pakistan 309600 1101.223 cef
30-09-2027 Hydropower Project Development Authority
12 01-07-2002 Mangla Dam Raising Water and Power Pakistan 96855 1047.000 acde
30-06-2021 Project Development Authority
13 16-11-2009 500kV Transmission Line National Transmission & Pakistan 43000 960.081 def
30-06-2021 3rd Circuit Jamshoro- Despatch Company Survey
Matiari-Moro-Dadu-Rahim
Yar Khan and Moro
Substation

14 01-04-2015 Karachi-Hyderabad Frontier Works Organization Pakistan 38000 915.418 ef


30-04-2021 Motorway (136km) (M-9)

18-02-2021 Page 1 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
15 29-10-2018 500kV Transmission Lines National Transmission & Pakistan 11737 854.967 bcdeflps
28-10-2024 Interconnection Despatch Company 1. EIA Study
Arrangement for Power 2. LARP
Evacuation from Suki
Kinari, Kohala and Mahl
Hydropower Projects in
Northern Areas of Pakistan

16 01-06-2017 1263MW Re-Gasified Punjab Thermal Power (Pvt.) Pakistan 56000 835.469 adef
30-12-2023 Liquified Natural Gas Limited
(RLNG) Based Combined
Cycle Power Plant near
Trimmu Barrage in Jhang
District

17 01-07-2018 Dams in Southern Region, Ministry of Environment, Saudi Arabia 19198 797.220 ef
30-06-2022 Saudi Arabia Water & Agriculture, Saudi
Arabia
18 28-01-2015 1180MW Re-Gasified Quaid-e-Azam Thermal Pakistan 54000 740.193 adef
31-12-2021 Liquified Natural Gas Power (Pvt.) Limited
(RLNG) Based Combined
Cycle Power Plant at
Bhikki, District Sheikhupura

19 01-02-2007 Lining of Distributaries and Irrigation & Power Pakistan 14000 733.187 cde
30-06-2021 Minors in Sindh Province Department, Government of
Sindh
20 01-10-2015 Rehabilitation and Irrigation Department, Pakistan 18316 724.700 bdef
31-07-2022 Upgradation of Trimmu Government of the Punjab
and Panjnad Barrages
Improvement Project
21 08-02-2015 110kV Thuwal Saudi Electricity Company - Saudi Arabia N.A 712.550 e
22-05-2021 Substation/Transmission Western Operating Area,
Line Project Jeddah, Saudi Saudi Arabia
Arabia
22 01-12-2011 Remodelling of Warsak Irrigation Department, Pakistan 17000 676.630 cde
30-06-2021 Canal System in Peshawar Government of Khyber
and Nowshera Districts Pakhtunkhwa

23 01-06-2016 Permanent Reconstruction Temporarily Dislocated Pakistan 8000 660.087 c e


30-04-2021 Works in Federally Persons Support and
Administered Tribal Areas Management Secretariat
(FATA)
24 01-05-2015 1230MW Re-Gasified National Power Parks Pakistan 58900 642.854 adef
08-05-2022 Liquified Natural Gas Management Company Limited
(RLNG) Based Combined
Cycle Power Plant Haveli
Bahadur Shah

25 03-03-2015 1223MW Re-Gasified National Power Parks Pakistan 55000 642.854 adef
26-07-2022 Liquified Natural Gas Management Company Limited
(RLNG) Based Combined
Cycle Power Plant at
Balloki, District Kasur

18-02-2021 Page 2 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
26 01-07-2011 Qanuna and Yaba Dams, Ministry of Environment, Saudi Arabia 9870 608.790 ef
30-06-2021 Saudi Arabia Water & Agriculture, Saudi
Arabia
27 01-04-2018 Punjab Intermediate Cities 1. Punjab Intermediate Cities Pakistan 28000 587.900 bcde
30-04-2021 Improvement Investment Improvement Investment PC-I
Program (PICIIP) Program (PICIIP)
2. Local Government &
Community Development
Department, Punjab

28 01-03-2009 Rehabilitation of Roads in Communication & Works Pakistan 5000 575.225 c


30-04-2021 Rawalpindi Division Department, Government of
the Punjab
29 16-06-2019 Balochistan Water Irrigation Department, Pakistan 14000 565.623 acde
22-07-2024 Resources Development Government of Balochistan
Sector Project (BWRDSP)

30 01-04-2007 New Islamabad Civil Aviation Authority Pakistan 100000 524.000 cde
30-04-2021 International Airport (NIIA)

31 01-06-2007 425MW Combined Cycle Northern Power Generation Pakistan 58000 497.615 def
30-06-2021 Power Plant at Nandipur Company Limited

32 01-04-2010 Transmission Line for National Transmission & Pakistan 21697 496.312 def
31-03-2021 Neelum-Jhelum Power Despatch Company
Dispersal
33 25-07-2016 Pakistan Kidney & Liver Infrastructure Development Pakistan 3400 469.530 cde
30-06-2021 Institute and Research Authority Punjab
Center (Package-C) Lahore

34 01-06-2011 IP Gas Pipeline Project Inter State Gas System (Pvt.) Pakistan 142000 468.900 bcdmnpr
31-12-2024 Limited Survey
35 22-07-2020 Strengthening of East- Communication & Works Pakistan 15000 450.000 e
30-03-2023 West Connectivity of Department, Government of
Merged Areas with Settled Khyber Pakhtunkhwa
Districts and Improvement
Links (AIP 2019-20-CR042)

36 01-04-2016 Various Projects of Peshawar Development Pakistan 2250 438.559 acde


31-12-2021 Peshawar Development Authority
Authority
37 01-03-2019 Establishment of Lahore Development Authority Pakistan 33000 401.868 e f
31-05-2021 Infrastructure in LDA City
(Phase-I)
38 01-11-2015 Punjab Police Integrated Punjab Safe Cities Authority Pakistan 15000 390.000 ef
30-04-2021 Command, Control and (PSCA)
Communication (PPIC3)
Centre, Lahore

18-02-2021 Page 3 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
39 01-09-2011 LDA Projects: (i) Widening Lahore Development Authority Pakistan 20000 373.529 c e
30-04-2021 of Canal Bank Road and
Chaubacha Underpass (ii)
Shaukat Khanum Chowk
Flyover (iii) Sports
Complex (iv) LDA City etc.

40 01-09-2014 102MW Gulpur Mira Power Limited Pakistan 52000 347.700 ef


30-04-2021 Hydropower Project
41 01-07-2020 Khyber Pakhtunkhwa Communication & Works Pakistan 20000 322.000 ace
30-06-2022 Integrated Tourism Department, Government of
Development Project Khyber Pakhtunkhwa
42 01-12-2017 Upgradation of D.I. Khan Civil Aviation Authority Pakistan 5000 321.870 abce
30-06-2021 Airport
43 01-08-2008 New Gwadar International Civil Aviation Authority Pakistan 22000 321.045 bcde
31-12-2022 Airport
44 01-12-2017 Upgradation of Civil Aviation Authority Pakistan 5000 319.590 abce
30-06-2021 Muzaffarabad Airport,
Azad Jammu & Kashmir
45 01-02-2017 Infrastructure including National Highway Authority Pakistan 17000 318.345 ce
30-04-2021 Allied Works for Islamabad
Metro Bus from Peshawar
Morr to New Airport (27km)

46 01-01-2019 Evaluation of Federal Government Pakistan N.A 302.180 d


30-04-2021 Bids/Proposals Submitted Employees Housing Bid Evaluation
by the Bidders/JV Partners Authority, Islamabad
for Prime Minister's Naya
Pakistan Housing Program

47 01-07-2008 Lahore Airport Extension Civil Aviation Authority Pakistan 4500 298.000 cd
30-09-2021
48 04-01-2017 Raising of Wala Dam, Jordan Valley Authority, Jordan 3690 294.770 ef
30-04-2021 Jordan Ministry of Water & Irrigation,
Hashemite Kingdom of Jordan

49 01-09-2016 Gomal Zam Dam Gomal Zam Dam Command Pakistan 3000 278.989 cde
26-08-2021 Command Area Area Development Project
Development and OFWM
for High Value & High
Efficiency Agriculture
Project, Govt. of Khyber
Pakhtunkhwa

50 15-01-2021 Detailed for Harnessing of Irrigation Department, Pakistan N.A 278.000 ac


31-12-2023 Hill Torrents in D.G. Khan Government of the Punjab PC-I
and Rajanpur
(PWRM/DD-02)
51 01-07-2013 Crescent Bay DevelopmentEMAAR Giga Karachi Pakistan 246000 276.860 e
30-04-2021 Project (27 Storey), Limited
Karachi

18-02-2021 Page 4 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
52 01-07-2008 Extension of Terminal Civil Aviation Authority Pakistan 2900 273.649 ce
30-03-2021 Building at Bacha Khan
International Airport,
Peshawar
53 08-01-2007 Various Road Schemes of Communication & Works Pakistan 6500 271.017 e
30-04-2021 Sargodha City Department, Government of
the Punjab
54 01-07-2018 Remodelling/Expansion of Trade Development Authority Pakistan 11000 261.500 bce
31-10-2021 Expo Center, Karachi of Pakistan
55 15-07-2005 Asphalt Road (26km) from Ministry of Transport & Oman 2700 247.162 cde
31-03-2021 Biayaiq to Aqir Al-Abriyyin Communications, Oman
in Wadi Shafan, Oman

56 01-09-2015 Coal Conveying System Port Qasim Authority Pakistan 13332 244.500 acde
30-06-2021 from PIBT to Existing
Railway Network at Port
Qasim, Karachi
57 01-10-2020 500kV Double Circuit National Transmission & Pakistan N.A 227.517 e
12-04-2022 Transmission Line for Despatch Company
Interconnection of K2/K3
Nuclear Power Plant with
500kV Single Circuit Port
Qasim-Matiari
Transmission Line

58 01-12-2020 500kV Double Circuit Quad National Transmission & Pakistan N.A 221.891 e
30-11-2023 Bundle Transmission Line: Despatch Company
Allied Activities
Nokhar S/S - Lahore,
North S/S - Lahore HVDC
Converter Station (135km)

59 01-10-2011 Rathoa Haryam Bridge Public Works Department, Pakistan 6500 219.500 ef
30-06-2021 Across Reservoir Channel Government of Azad Jammu
on Mirpur Islamgarh Road, & Kashmir
Azad Jammu & Kashmir

60 01-04-2014 Pakpattan Canal and Irrigation Department, Pakistan 8000 215.308 e


31-03-2021 Suleimanki Barrage Government of the Punjab
Improvement Project
61 01-12-2019 Al-Meera Five Malls (Al- Al-Meera Consumer Goods Qatar N.A 201.873 cd
30-06-2021 Froosh, Umm Al-Amad, Al- Co., Qatar
Luqta, Al-Thumama and
Al-Muaither), Qatar
62 10-12-2020 Issuance of Certificates by Naya Pakistan Housing & Pakistan N.A 200.000 Verifications
31-12-2021 NESPAK to Builders and Development Authority
Developers (NAPHDA)
63 01-04-2015 ADP 2014-15 New Communication & Works Pakistan 55000 195.311 e
30-04-2021 Schemes Pertaining to Department, Government of
Provincial Highway Circle, the Punjab
Gujranwala

18-02-2021 Page 5 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
64 01-07-2017 Rehmani Khel to Kot Balian National Highway Authority Pakistan 32370 194.636 e f
31-10-2021 Road Package-2 (52km)
Section of Hakla (M-1)
Yarak (D.I. Khan) Motorway

65 01-04-2020 Development of Housing Pakistan Housing Authority Pakistan 101000 188.860 abcde
31-08-2023 Scheme at Surizai, 1. PC-I
Peshawar 2. Topo Survey
66 01-03-2015 Flood Protection Dam (B6) Ministry of Regional Oman 11896 187.451 ef
30-05-2023 in Al-Jufainah Muscat Municipalities & Water
Governorate, Oman Resources, Oman

67 01-11-2020 Infrastructure Work under Planning & Development Pakistan N.A 184.500 ce
30-11-2023 FATA Infrastructure Department, Government of
Program (FIP) Khyber Pakhtunkhwa

68 01-07-2014 University of Engineering University of Engineering & Pakistan 6000 183.340 cde
30-06-2021 and Technology Lahore, Technology, Lahore
Narowal Campus

69 15-12-2019 900MW Bin Qasim Power K-Electric Limited, Karachi Pakistan 100219 180.380 ef
31-12-2023 Station (BQPS-III)
Combined Cycle &
Associated Transmission
Projects

70 01-03-2017 20MW Hanzel Hydropower Water and Power Pakistan 6274 179.000 abdef
31-03-2021 Project, Gilgit-Baltistan Department, Gilgit Baltistan 1. EIA Study
2. PC-I
71 01-05-2012 16MW Naltar-III Heavy Mechanical Complex, Pakistan 2900 174.000 bcdef
30-04-2021 Hydropower Project, Gilgit Taxila

72 01-07-2020 Quaid-e-Azam Business Punjab Industrial Estates Pakistan N.A 171.780 ce


31-07-2023 Park (QABP) on Motorway Development and
M-2, District Sheikhupura Management Company

73 01-12-2019 220kV D.I. Khan-Zohb National Transmission & Pakistan N.A 171.266 e
08-12-2022 Transmission Line Despatch Company
74 01-12-2017 Upgradation of Shipyard Karachi Shipyard and Pakistan 20000 170.000 ef
30-06-2021 for Project 313 Engineering Works
75 01-04-2017 Topographic Survey and Buildings Department, Pakistan N.A 169.000 mnopqr
30-06-2021 Geotechnical Studies for Government of the Punjab
Landslide Hazard Zonation
of Murree Hills
76 01-06-2020 660kV HVDC Matiari- China Electric Power Pakistan N.A 167.000 e
30-04-2021 Lahore Transmission Line Equipment & Technology Co. Allied Activities
(Lot1-8) Ltd. (CET)
77 01-07-2015 Bus Rapid Transit (BRT) Transport & Mass Transit Pakistan 1800 166.822 cde
30-04-2021 Orange Line Karachi and Department, Government of
Construction of Roads in Sindh
Landhi Industrial Area,
Karachi

18-02-2021 Page 6 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
78 01-02-2017 Design Services for National Highway Authority Pakistan N.A 163.429 cd
30-04-2021 Infrastructure including
Allied Works for Islamabad
Metro Bus from Peshawar
Morr to New Airport

79 01-02-2021 Establishment of Communication & Works Pakistan 4000 160.000 ce


31-12-2024 Agriculture University at Department, Government of Master Planning
Swat ADP No. 18/190456 Khyber Pakhtunkhwa
(2020-21)
80 01-11-2019 Standardization of Higher Elementary and Secondary Pakistan 4469 159.020 ef
31-03-2021 Secondary Schools in Education Department,
Khyber Pakhtunkhwa Government of Khyber
Province (DFID Assisted) Pakhtunkhwa, Peshawar

81 04-07-2018 500kV Double Circuit National Transmission & Pakistan 3000 158.528 e
30-09-2021 Hubco-Jamshoro Despatch Company
Transmission Line
82 01-10-2020 UNHCR Offices in PakistanUnited Nations High Pakistan N.A 157.800 CE
30-09-2023 Commissioner for Refugees
83 01-10-2010 Naval Housing Scheme at Pakistan Navy Pakistan 5000 153.129 bcde
30-04-2021 Karsaz Phase-II, Phase-III
and Phase-IV, Karachi

84 01-02-2014 Marine and General Civil Karachi Shipyard and Pakistan 4000 151.845 e
30-04-2021 Works for Ship Lift and Engineering Works
Transfer System at
KS&EW, Karachi
85 01-08-2010 Stormwater Drainage for Ministry of Municipal & Rural Saudi Arabia N.A 149.770 acd
30-06-2021 Qilwa, Al-Mukhwa, Affairs, Saudi Arabia
Biljurashi, Al-Mandaq, Al-
Aqiq Cities in Al-Baha
Region, Saudi Arabia

86 01-11-2017 Upgradation and Water and Power Pakistan 52224 149.640 ef


31-12-2021 Refurbishment of Development Authority
Generating Units (1-6) of
Mangla Power Station
87 10-10-2017 Dualization of Communication & Works Pakistan 12000 142.094 ce
30-04-2021 Muzaffargarh-DG Khan Department, Government of
Road (52km) Pertaining to the Punjab
Highway Circle, DG Khan

88 01-03-2018 Development Works at Defence Housing Authority, Pakistan 10000 142.000 ce


30-06-2021 various Sectors of DHA Peshawar
Peshawar
89 31-10-2016 Kot Belian Road to Tarap National Highway Authority Pakistan 28000 141.311 e
31-05-2021 Package-3 (52km), Section
of Hakla (M-1) Yarak
(D.I.Khan) Motorway

18-02-2021 Page 7 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
90 01-02-2018 Preparation of Irrigation Department, Pakistan N.A 141.208 ab
30-04-2021 Comprehensive Flood Government of Khyber
Management Plan for Pakhtunkhwa
Khyber Pakhtunkhwa
91 01-12-2015 Annual Development Communication & Works Pakistan 4252 140.700 e
30-04-2021 Programme 2015-16 and Department, Government of
Khadim-e-Punjab Rural the Punjab
Roads Programme 2014-
15 Phase-II (Part-A)

92 01-02-2019 Circular Bypass Road Pakhtunkhwa Highway Pakistan 7000 140.220 ef


31-03-2022 (65km) Bannu Authority
93 01-06-2015 Prism-9 Phase-IX DHA & Defence Housing Authority, Pakistan 38500 134.620 cd
31-12-2022 IVY Green (Sector-Z) Lahore
Phase-VIII, DHA, Lahore
94 23-02-2018 500kV Faisalabad West National Transmission & Pakistan 7000 132.959 def
23-07-2021 Grid Station and Despatch Company Bid Evaluation
Associated 500/220/132kV
Transmission Lines

95 01-03-2015 Preparation of Engineering Ministry of Municipal & Rural Saudi Arabia N.A 126.760 Engg. Guide
31-12-2021 Guide for Standards of Affairs, Saudi Arabia
Studies, Terms &
Technical Specifications
for Stormwater & Flood
Protection Projects, Saudi
Arabia

96 01-04-2008 Jalozai Campus of University of Engineering & Pakistan 9367 124.800 abcdef
30-06-2021 University of Engineering Technology, Peshawar
and Technology, Peshawar

97 01-03-2016 Master Plan for Water Lahore Development Authority Pakistan 148928 123.610 b c
30-06-2021 Supply, Sewerage, EIA Study
Drainage and Groundwater
Management System for
Sheikhupura, Kasur and
Nankana Sahib Districts

98 01-04-2016 Construction/ Upgradation National Database & Pakistan 1750 120.410 ce


30-04-2021 of NADRA Offices at Registration Authority
Various Locations (NADRA)

99 01-08-2019 Dual Carriageway Road Special Economic Zone Oman N.A 120.156 cd
30-04-2021 for NR-32 Phase-I Duqm Authority at Duqm, Oman
Town, Oman
100 15-12-2018 Road Connecting Thumaid Ministry of Transport & Oman 20960 117.000 cd
30-09-2021 Interchange with Al- Communications, Oman
Mubaila Interchange,
Muscat Expressway, Oman

101 01-07-2013 University of the Punjab Punjab University Pakistan 3458 116.372 bcd
30-06-2021 Quaid-e-Azam Campus, Topo Survey
Lahore

18-02-2021 Page 8 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
102 01-05-2017 Establishment of 100-Bed Infrastructure Development Pakistan 3100 115.940 ce
31-05-2021 Mother and Child Care Authority Punjab
Hospital at Abu Dhabi
Road, Murree
103 01-01-2017 Dualization of Khuzdar- National Highway Authority Pakistan 82000 115.570 c
30-04-2021 Chaman Road (425km) N- Studies
25 along with Alternative
Route at Lakpass and
Tunnel at Khojak Bypass

104 01-05-2019 Wastewater Treatment Water & Sanitation Agency, Pakistan 40000 113.058 cd
30-06-2021 Plants for Mehmood Booti, Lahore 1. PC-I
Shadbagh, Shahdara and 2. ESIA Study
Babu Sabu, Lahore 3. LARP

105 01-03-2018 Field Survey and Mapping Islamabad Electric Supply Pakistan N.A 112.590 dghijklpq
30-04-2021 of HT/LT Distribution Company Limited (IESCO) Survey
Network of IESCO

106 05-12-2015 Third Party Design Review 1. Gulf GRC & Trading Qatar N.A 110.628 f
30-06-2021 & Validation Services for Company, Qatar
various Clients, Qatar 2. Al-Aqaria Real Estate,
Qatar
3. TAG Engineering, Qatar
4. United Precast Concrete
(UPC), Qatar

107 01-12-2016 ADP New Schemes for the Communication & Works Pakistan 1400 108.590 e
30-04-2021 Year 2016-2017 Pertaining Department, Government of
to Provincial Highway the Punjab
Circle, Faisalabad

108 01-02-2017 Annual Development Communication & Works Pakistan 2000 108.240 e
30-04-2021 Programme 2016-17 and Department, Government of
Khadim-e-Punjab Rural the Punjab
Roads (160km)
Programme Phase-IV Civil
Division Bahawalpur

109 01-03-2017 Resident Construction Communication & Works Pakistan 3678 108.052 e
30-04-2021 Supervision of Bridge Over Department, Government of
River Chenab at the Punjab
Shahbazpur to Connect
District Gujrat with District
Sialkot

110 01-09-2007 Workers Welfare Fund Workers Welfare Fund, Pakistan 2935 107.000 bcde
30-06-2021 Labour Complex, Taxila Ministry of Labour, Manpower
& Overseas Pakistanis,
Government of Pakistan

111 01-08-2019 220kV Tarbela-Burhan National Transmission & Pakistan 2019 106.230 ce
30-04-2023 Twin Bundle Transmission Despatch Company
Line, Using Low Loss
ACSR Conductor

18-02-2021 Page 9 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
112 01-01-2019 Dualization and National Highway Authority Pakistan 11000 105.694 ef
30-04-2021 Improvement of Sarai
Gambila to Karak Section
of Indus Highway N-55
(61km)

113 01-05-2020 Command Area Agriculture Department, Pakistan 4000 105.626 cdef
31-03-2024 Development Component of Government of the Punjab
Jalalpur Irrigation Project
(CAD-JIP)

114 01-07-2018 Awaran-Jhal Jhao Road Engineer-in-Chief (E-in-C) Pakistan 7785 105.318 ce
30-06-2021 (55km), Balochistan Branch, Pakistan Army
115 01-03-2016 DHA Projects;-;(i) Signal Defence Housing Authority, Pakistan 4200 101.501 ef
30-04-2021 Free Coridor from Walton Lahore
Road to Lalick Chowk (ii)
Underpass in Sector "C" to
Sector "M" Phase-V,
Lahore (iii) Bedian
Underpass Connecting to
Phase-VI to Phase-IX etc.

116 01-01-2021 Sewerage System along Government of Azad Jammu Pakistan N.A 99.700 c
31-01-2023 with Development of & Kashmir 1. GIS
Additional Water Sources 2. Geotechnical
for Muzaffarabad Water Investigations
Supply 3. Topo Survey
4. Climate Change
Study
117 01-10-2018 Infrastructure Works for Defence Housing Authority, Pakistan 40000 98.300 bce
30-06-2021 DHA Housing Scheme Gujranwala
Gujranwala
118 01-06-2020 Murunj Dam Project Water and Power Pakistan N.A 95.803 acd
30-06-2022 Development Authority PC-I
119 01-01-2020 Construction of Apartments Federal Government Pakistan 8000 95.800 cef
31-12-2023 at Faisal Margalla City, B- Employees Housing
17, Islamabad Authority, Islamabad

120 01-10-2018 Kano River and Hadejia Federal Ministry of Water Nigeria 308 95.680 e
30-09-2023 Valley Irrigation Schemes, Resources, Nigeria Training
Dams Safety and Rivers
Training in Hadejia
Jama'are River Basin,
Nigeria

121 01-03-2010 Punjab Assembly Building, Provincial Assembly of the Pakistan N.A 95.000 e
30-06-2021 Lahore Punjab
122 01-02-2018 Dualization and National Highway Authority Pakistan 18000 94.959 ef
28-02-2021 Improvement of Old Bannu
Road Project N-55 Gandhi
Chowk-Sarai Naurang
(8km) & Domail-Khurram
(75km) Sections

18-02-2021 Page 10 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
123 01-02-2016 Establishment of 100-Bed Infrastructure Development Pakistan 3927 91.748 abc
30-04-2021 Mother and Child Care Authority Punjab
Hospital at Abu Dhabi
Road, Murree
124 31-08-2018 Dualization & Improvement National Highway Authority Pakistan 20000 91.340 ef
30-04-2021 of Pindigheb-Kohat Road
N-80 (80km)

125 01-07-2017 Bypass Road (18km) from Communication & Works Pakistan 3500 90.750 aef
30-06-2021 Ayub Bridge Havelian to Department, Government of
Dhamtour N-35, Khyber Pakhtunkhwa
Abbottabad
126 01-07-2019 Pre-Treatment System on Thar Coal Water Works Pakistan 10000 87.497 acd
30-06-2021 LBOD Water as a feed to Mirpur Khas, Sindh
Reverse Osmosis (RO)
Plant for 1320MW Thar
Coal Power Project

127 01-01-2020 Development of Ziarat Town Ziarat Development Package, Pakistan 3000 87.000 bc
de
31-01-2024 Government of Balochistan

128 01-12-2016 Dedicated Coal Terminal Port Qasim Authority Pakistan 6000 86.300 f
30-06-2021 at Marginal Wharf Berths 3 Quality Audit
& 4 at Port Qasim on BOT
Basis
129 01-07-2015 Hakla-Dera Ismail Khan National Highway Authority Pakistan 125000 85.990 ce
30-04-2021 Motorway (285km) and
Four Lanes Road from
Yarak to Zhob including
Zhob Bypass (255km)

130 01-07-2020 NWS Housing Scheme, NDC Welfare Society, Pakistan N.A 85.800 ce
30-06-2021 Rawalpindi Rawalpindi Master Planning
131 01-04-2018 Central Prison Peshawar Communication & Works Pakistan 3206 85.100 abce
31-10-2021 (Phase-II) Department, Government of
Khyber Pakhtunkhwa
132 01-01-2013 Flood Protection and Ministry of Municipal & Rural Saudi Arabia 8989 82.090 acd
30-06-2021 Stormwater Drainage for Affairs, Saudi Arabia
Abu Arish, Saudi Arabia
133 01-10-2018 University of Buner, Swari University of Buner, Swari, Pakistan 2000 81.980 bcde
31-12-2023 Buner Geotechnical
Investigations
134 01-01-2020 Rudn Enclave Adiyala M/s. RMRSCO (Pvt.) Pakistan 8000 80.000 bce
31-12-2021 Road, Rawalpindi Limited, Rawalpindi
135 01-01-2021 Gravity Flow Water Supply Public Health Engineering Pakistan N.A 79.300 ac
de
31-10-2021 Scheme Mansehra Division Mansehra,
Government of Khyber
Pakhtunkhwa
136 01-03-2018 Jinnah Institute of Cancer Patients' Aid Foundation Pakistan 5000 78.800 bcde
31-03-2022 & Research Center at (PAF) Karachi
JPMC (PPP Mode),
Karachi

18-02-2021 Page 11 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
137 01-03-2019 Improvement & Lahore Development Authority Pakistan 2900 78.770 ce
30-09-2021 Rehabilitation of Grade
Works along Lahore
Orange Line Metro Train
Corridor, Lahore

138 01-03-2018 Dualization and National Highway Authority Pakistan 6400 78.212 ef
28-02-2021 Improvement of Old Bannu
Road N-55 Khuram-Krapa
Section
139 01-11-2020 Road Leading to Sheikh Communication & Works Pakistan 2584 75.350 ef
31-01-2023 Baddin (30.4km) Districts Department, Government of
Lakki Marwat & D.I. Khan Khyber Pakhtunkhwa
ADP No. 2063/190298
(2020-21)

140 01-07-2020 Transaction Advisory Government of Sindh Pakistan N.A 75.220 cd


31-12-2021 Services for Urban Road 1. EIA Study
Initiatives in Karachi 2. Geotechnical
Investigations
3. Survey
4. Cost Estimate
5. Transaction
Advisory
141 01-03-2005 410-Bed Women Hospital Pakistan Public Works Pakistan 5300 75.000 bcd
30-06-2021 and Chest Disease Centre Department
at Rawalpindi

142 01-07-2014 Upgradation of UCET into Mirpur University of Science Pakistan 1400 74.287 ef
30-06-2021 Mirpur University of & Technology Master Planning
Science and technology,
Azad Jammu & Kashmir
143 01-04-2018 Renovation/Rehabilitation Central Power Generation Pakistan 1500 73.300 bcde
31-12-2021 of over 2800 Houses of Company Limited
Residential Colony
Thermal Power Station at
Guddu

144 01-07-2006 Federal Hospital for Pakistan Public Works Pakistan 5300 72.693 e
30-06-2021 Women and Children, Department
Rawalpindi
145 01-08-2017 Upgradation of Present Irrigation Department, Pakistan 35600 71.370 a
30-04-2021 Network of Kalri Baghar Government of Sindh
Feeder and Keenjhar Lake
to Enhance Water
Requirement

146 01-05-2017 Infrastructure Development Khyber Pakhtunkhwa Pakistan 6000 68.778 bcde
30-06-2021 of Jalozai Economic Zone,Economic Zones
Nowshera Development & Management
Company
147 01-04-2019 Port Connectivity Project Karachi Port Trust Pakistan N.A 68.250 abcd
30-06-2021 under Public Private
Partnership (PPP)
Arrangement of KPT

18-02-2021 Page 12 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
148 01-08-2009 Prime Minister's Southern Water & Sanitation Agency, Pakistan 2863 68.200 e
30-06-2021 Punjab Development Multan
Package for Water Supply
and Sewerage Schemes,
Multan City (Part-I)

149 01-01-2015 200-Bed Jinnah Hospital at Ministry of National Health Afghanistan 1835 67.270 be
30-04-2021 Kabul, 100-Bed Naeb Services, Regulations and
Amin Ullah Khan Logari Coordination, Government of
Hospital at Logar and 60- Pakistan
Bed Nishter Kidney Centre
at Jalalabad

150 01-12-2016 Dualization of Naguman Pakhtunkhwa Highway Pakistan 1600 63.892 ef


31-05-2021 Shabqadar Road Section Authority
of Provincial Highway S-IA,
Charsadda (13km)

151 01-05-2017 Dualization/Rehabilitation National Highway Authority Pakistan 150000 62.899 ac


30-04-2021 of Jamshoro-Rajanpur
Section N-55 as 4-Lane
Highway (604km)
152 01-07-2019 Various Development Metropolitan Corporation Pakistan 2000 61.790 e
30-06-2022 Schemes of Lahore Roads Lahore
& Rehabilitation Project

153 01-02-2019 Improvement & Pakhtunkhwa Highway Pakistan 2266 60.050 ef


30-09-2021 Rehabilitation of Road Authority
(35km) from Karaapa to
Shakardara, Kohat
154 01-07-2018 Master Plan for National Aviation City, Pakistan Pvt Pakistan N.A 59.200 abce
30-04-2021 Aerospace Science & Limited
Technology Park
(NASTP), Aviation City
155 01-12-2016 Innovation Centre and University of Engineering & Pakistan 1828 57.711 ce
31-07-2021 Innovation Park Technology, Lahore
156 01-09-2019 Extension Works at 500kV National Transmission & Pakistan N.A 57.500 e
28-02-2021 Yousafwala and Jamshoro Despatch Company
Grid Station
157 01-10-2018 Hyderabad Southern Works & Services Pakistan 20000 57.340 cd
30-04-2021 Bypass Road (46km) Department, Government of
Sindh
158 01-07-2015 Establishment of Zoo in Forest & Wildlife Department, Pakistan 2104 56.818 acdef
30-06-2021 Peshawar Government of Khyber
Pakhtunkhwa
159 01-07-2016 Up-Lifting of Chaman Communication & Works Pakistan 1233 56.000 bcde
30-06-2021 Town District Qila Department, Government of
Abdullah, Balochistan Balochistan
160 01-09-2020 Balochistan Water Asian Development Bank Pakistan N.A 55.550 i
31-03-2022 Resources Information
System Project

18-02-2021 Page 13 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
161 01-07-2012 Villa of H.E. Hasan Bin H.E. Hasan Bin Abdullah Al- Qatar N.A 55.008 ef
30-06-2021 Abdullah Al-Ghanem at Al- Ghanem, Qatar
Wajba, Qatar
162 01-12-2012 Shatial-Thor Nullah National Highway Authority Pakistan 3844 54.600 ce
31-12-2021 Bypass (35km)
163 01-04-2017 Karachi Bus Rapid Transit Integrated Transport Pakistan 50000 54.586 bi
30-04-2021 Red Line Project (21km) Planning Limited (ITP), Sindh
Package-2
164 01-01-2020 Naval Research & Pakistan Navy Pakistan 1593 54.160 bcde
30-09-2021 Development Institute
(NRDI) Complex at
Greater Karsaz, Karachi
165 01-07-2019 Reconstruction/ Works & Services Pakistan 1348 53.900 ce
22-02-2022 Rehabilitation of Fully Department, Government of
Damaged Schools in Bara, Khyber Pakhtunkhwa
Tribal District Khyber,
Khyber Pakhtunkhwa
(Package I, II & III)

166 01-05-2016 Dualization of Old Bannu National Highway Authority Pakistan 15000 53.839 c
30-04-2021 Road
167 01-01-2020 Improvement/widening of Pakhtunkhwa Highway Pakistan 3000 53.014 e
31-12-2022 Nizampur Kohat Road Authority
(64km), Districts
Nowshera & Kohat
168 01-02-2015 Federal Government Federal Government Pakistan 3000 51.557 ce
30-06-2021 Employees Housing Employees Housing
Scheme, Bhara Kahu, Foundation, Islamabad
Islamabad (Package-I)
169 01-08-2020 Depalpur-Pakpattan-Vehari Communication & Works Pakistan 5100 51.270 c
31-03-2021 Road (150km) and Department, Government of 1. Advisory
Hasilpur-Bahawalnagar the Punjab Service
Road (75km) 2. Technical
Assistance
170 01-08-2020 Establishment of Dera Infrastructure Development Pakistan 1750 50.900 e
31-08-2022 Ghazi Khan Institute of Authority Punjab
Cardiology
171 01-07-2016 Development of Chunian Punjab Industrial Estates Pakistan 4358 50.650 abcd
30-06-2021 Industrial Estate, Kasur Development and EIA Study
Management Company
172 01-07-2019 Upgradation & 1. Multan Development Pakistan 2000 50.510 ce
30-06-2022 Environmental Improvement Authority 1. EIA Study
of Chungi No. 09 Disposal 2. Water & Sanitation Agency, 2. Geotechnical
Station, Multan Multan Investigations
3. Topo Survey
173 01-08-2020 Establishment of Cricket Director General of Sports, Pakistan 750 50.020 ce
30-06-2022 Stadium at Hayatabad Khyber Pakhtunkhwa
Peshawar, Khyber
Pakhtunkhwa
174 01-04-2019 Infrastructure Works for Defence Housing Authority, Pakistan N.A 50.000 e
31-03-2022 DHA Housing Scheme, Gujranwala
Gujranwala

18-02-2021 Page 14 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
175 01-05-2009 IT/BMS Infrastructure at Provincial Assembly of the Pakistan 348 49.987 cdefik
30-06-2021 New Punjab Assembly Punjab
Building, Lahore
176 01-06-2020 Club House Building at Pakistan Navy Pakistan 1450 49.300 ce
31-03-2022 Islamabad (Phase-I)
177 26-10-2018 500kV Faisalabad West National Transmission & Pakistan 3000 48.960 def
31-10-2021 Grid Station, Extension andDespatch Company
Associated 500kV
Transmission Lines
Project (Phase-II)

178 01-08-2019 Hyderabad-Sukkur National Highway Authority Pakistan 182736 48.942 ac


30-04-2021 Motorway (300km) Project 1. Bid Evaluation
on Built Operate Transfer 2. Traffic Studies
(BOT) Basis Under Public
Private Partnership (PPP)

179 01-01-2015 Jinnah Sindh Medical Jinnah Sindh Medical Pakistan N.A 48.000 bcde
30-06-2021 University, Karachi University, Karachi
180 01-05-2019 Combined Effluent National Industrial Parks Pakistan N.A 46.870 def
31-03-2021 Treatment Plant at Korangi Development and
Creek Industrial Park, Management Company,
Karachi Karachi
181 01-05-2008 Pakistan Institute of Trade Ministry of Commerce, Pakistan 193 46.500 bcde
30-04-2021 and Developoment Government of Pakistan
182 01-05-2018 Underpass at Kashmir Faisalabad Development Pakistan 1280 45.221 ce
30-04-2021 Bridge Along Canal, Authority
Faisalabad
183 01-10-2020 Development of the Karachi Port Trust Pakistan 72812 45.000 def
31-10-2021 Container Terminal at 1. Geotechnical
Pakistan Deep Water Investigations
Container Port Project 2. Survey
184 01-11-2015 New State Bank of Pakistan State Bank of PakistanPakistan 485 43.650 ce
30-04-2021 (SBP) Office Building at
D.I. Khan
185 20-06-2018 Cement Plant at Bandi Frontier Works Organization Pakistan 30000 43.000 Studies
30-04-2021 Muneem, Haripur
186 01-01-2020 Hiring of Transaction Rawalpindi Development Pakistan N.A 43.000 a
30-04-2021 Advisor for Lai Expressway Authority Transaction
Advisory
187 01-07-2016 Construction of Hospital Infrastructure Development Pakistan 8000 42.023 Miscellaneous
30-04-2021 Complex of Pakistan Kidney Authority Punjab
and Liver Institute and
Research Centre, Lahore

188 01-07-2020 Infrastructure Development Federal Government Pakistan 3879 41.904 ce


31-03-2023 Works at Sub Sector G- Employees Housing
14/1 & G-15/3 (Package- Authority, Islamabad
II), Islamabad

18-02-2021 Page 15 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
189 01-11-2016 Widening & Rehabilitation Pakhtunkhwa Highway Pakistan 800 41.650 e
28-02-2021 of Road from Mufti Authority
Mehmood Flyover upto
Wahid Garhi inculding
Reconstruction of Old
Budni Bridge, Peshawar
(Packages-II & III)

190 01-05-2017 Rehabilitation and National Highway Authority Pakistan 18000 41.495 ac
30-04-2021 Upgradation of Bela-
Awaran Road, Balochistan

191 15-08-2002 Workers Welfare Labour Workers Welfare Fund, Pakistan 875 41.428 cde
30-04-2021 Colony (Package-I), Zone- Ministry of Labour, Manpower
V, Islamabad & Overseas Pakistanis,
Government of Pakistan

192 01-04-2017 Bahawalpur Industrial Punjab Industrial Estates Pakistan 5800 40.975 abcd
30-06-2021 Estate Development and
Management Company
193 01-07-2018 Bridges Over Gilgit River Public Works Department, Pakistan 9700 40.000 ac
30-04-2021 Govt. of Gilgit-Baltistan
194 01-12-2018 Development and Ghazi University, Dera Ghazi Pakistan 1000 40.000 bcde
30-06-2022 Improvement of Academic Khan
Facilities at Ghazi
University, Dera Ghazi
Khan

195 15-10-2003 Valuation of various Punjab Privatization Board Pakistan N.A 40.000 f
31-12-2021 Properties Throughout
Punjab
196 01-05-2017 Construction Supervision 1. Lahore Development Pakistan 2900 39.920 e
31-01-2022 of Stormwater Drainage Authority
System from Haji Camp to 2. Water & Sanitation Agency,
River Ravi via Lakshmi Lahore
Chowk, Mcleod Road,
Nabha Road, Chuburji and
Sham Naghar, Lahore

197 01-01-2018 Lahore Knowledge Park, Infrastructure Development Pakistan 700 39.786 e
30-04-2021 Package-I Authority Punjab
198 01-02-2013 High-Rise Residential Pakistan Navy Pakistan N.A 39.688 bcde
30-06-2021 Tower at Nore-I, Karachi
199 01-02-2015 New Bus/Truk Ada, Communication & Works Pakistan 373 39.500 bcde
30-06-2021 Vegetable/Fruit Market Department, Government of
Square and Police Station, Balochistan
Zhob
200 01-01-2017 Innovation Centre and University of Engineering & Pakistan 20819 39.300 bcd
30-06-2021 Innovation Park at Technology, Lahore
University of Engineering
& Technology Lahore,
Narowal Campus

18-02-2021 Page 16 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
201 09-12-2016 Quetta Safe City Project Science & IT Department, Pakistan 1500 39.000 fh
30-04-2021 Government of Balochistan 1. Bid Evaluation
2. Surveillance
202 01-07-2017 Expo Centre, Peshawar Pakistan Expo Centers (Pvt.) Pakistan N.A 39.000 cef
30-06-2021 Limited Geotechnical
Investigations
203 01-06-2020 Various Road Projects in Government of Sindh Pakistan 8000 38.799 1. EIA Study
30-04-2021 Sindh 2. LARP
204 01-04-2020 Uplifting of Academic & Hazara University, Mansehra Pakistan 1096 38.317 cde
30-04-2023 Infrastructure Facilities at Master Planning
Hazara University,
Mansehra
205 16-09-2020 Upgradation & Pakhtunkhwa Highway Pakistan N.A 38.124 e
31-03-2022 Rehabilitation of Authority
Lawrancepur-Tarbela
Road (24.5km)
206 01-09-2016 Multipurpose Dry Bulk Karachi Port Trust Pakistan 50000 37.900 abd
30-06-2021 Clean Cargo Terminal at IEE Study
East Wharf of Karachi Port
on BOT Basis
207 01-01-2020 220kV Transmission Lines National Transmission & Pakistan 1228 36.640 e
03-03-2022 included in Tranche 3 of Despatch Company
Second Power
Transmission
Enhancement Investment
Program

208 01-09-2018 Third Party Verification of SEPCOIII Electric Power Pakistan N.A 36.327 f
30-04-2021 Structural Documents for Construction Co., Ltd., China Third Party
660MW Coal Fired Power Verification
Plant, Karachi
209 01-08-2016 Academic & Allied University of Malakand Pakistan 650 35.009 bced
31-03-2021 Facilities at University of
Malakand
210 25-10-2020 Dualization of Chiniot- Road Assets Management Pakistan 7000 35.000 cd
25-02-2021 Pindi Bhattian Road System (RAMS)
(37.50km)
211 25-10-2020 Dualization of Road Assets Management Pakistan 6000 35.000 cd
25-02-2021 Sheikhupura-Hafizabad System (RAMS)
Road (47km)
212 01-10-2016 Multiple Facilities at Tarar University of Poonch, Pakistan 788 35.000 bcde
30-04-2021 Campus University of Rawalakot
Poonch Rawalakot, Azad
Kashmir
213 01-11-2017 IT Industrial Innovation, Islamia College University, Pakistan 1000 34.890 abcde
11-04-2021 Research Center and Peshawar
Strengthening of Islamia
College University,
Peshawar

214 01-07-2018 Academic & Research University of Kotli, AJK Pakistan 1000 34.880 cde
31-12-2021 Facilities at University of Topo Survey
Kotli, AJK

18-02-2021 Page 17 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
215 01-12-2017 03 Main Roads Including LTE Development & Pakistan 500 34.826 cde
30-04-2021 Construction of Drain Management Company, Survey
Channels in Landhi Pakistan
Industrial Area, Karachi
216 01-03-2012 Civil Services Cooperative Civil Services Cooperative Pakistan 2500 34.810 bcde
30-06-2022 Housing Society at Housing Society (Pvt.) Limited
Hawksbay, Karachi

217 01-12-2016 Labour Colony at Quaid-e- Punjab Workers Welfare Pakistan 3000 34.540 bcde
31-12-2021 Azam Apparel Park, Board (PWWB), Government
Sheikhupura of the Punjab
218 01-04-2020 Master Plan of Ziarat Department of Culture, Pakistan N.A 34.288 abc
30-04-2021 Town. Shaban Valley as a Tourism & Archives, Govt. of 1. Investigations
Major Tourist Site Balochistan 2. PC-I
3. Topo Survey
4. Geotech Study
219 01-11-2020 Dualization of Depalpur- Road Assets Management Pakistan 18000 34.264 Advisory Service
30-09-2022 Okara-Samundari-Jhang System (RAMS)
Road (Length 147km)
220 01-07-2019 Replacement of Outlived 1. Multan Development Pakistan 2000 34.050 cde
31-05-2022 Sewer in Multan Phase-II Authority 1. EIA Study
2. Water & Sanitation Agency, 2. Investigations
Multan 3. Topo Survey
221 01-09-2017 Dualization of Communication & Works Pakistan 5789 33.800 ef
30-04-2021 Sheikhupura-Gujranwala Department, Government of
Road Under PPP Mode the Punjab
(43km)
222 15-10-2020 Feasibility Study of Barang Pakhtunkhwa Highway Pakistan N.A 32.890 a
30-04-2021 Tunnel, District Bajaur Authority
(AIP-2019-20 CR042)

223 01-12-2020 Accompanying Measure Planning & Development Pakistan N.A 32.600 ace
31-12-2023 for Promoting Sustainable Department, Government of
Urban Development Khyber Pakhtunkhwa
Management in District
Mansehra (BMZ No. 2017
70 106)

224 01-02-2018 Infrastructure Upgradation Karachi Shipyard and Pakistan N.A 31.250 cef
31-03-2021 Project at Karachi Shipyard Engineering Works
and Engineering Works
Limited, Karachi

225 01-11-2020 Combined Effluent Port Qasim Authority Pakistan N.A 31.230 cdef
30-09-2022 Treatment Plant in Nwiz 1. Investigations
and Upgrading/ 2. Survey
Enhancement of Existing
Sewage Treatment Plant,
Karachi

226 01-09-2017 Joint Police Training United Nations Development Pakistan 800 31.200 bce
30-04-2021 Center Phase-II, at Programme (UNDP)
Hakeemabad-Nowshera

18-02-2021 Page 18 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
227 01-10-2019 Higher Education Higher Education Pakistan 1050 31.150 bcde
28-02-2022 Commission Secretariat Commission (HEC) 1. Geotechnical
Building at HEC H-8 Investigations
Premises, Islamabad 2. Topo Survey
228 02-10-2017 Roads (126km) in Al-Sahil Ministry of Transport & Oman 3574 29.978 c
30-04-2021 Area Wilayat Quriyat, Oman Communications, Oman

229 01-06-2020 Transaction Advisory Road Assets Management Pakistan 12000 29.930 c
30-04-2021 Services for Rehabilitation System (RAMS) Transaction
of Faisalabad-Chiniot- Advisory
Sargodha Road (60km)

230 01-05-2020 Construction of Hoshab- National Highway Authority Pakistan 58000 29.708 ac
30-04-2021 Awaran-Khuzdar (313km)
Section of Motorway M-8

231 01-05-2018 Establishment of Girl's Communication & Works Pakistan 2395 29.520 ef
01-04-2021 Cadet College, Mardan Department, Government of
Khyber Pakhtunkhwa
232 01-03-2020 Road from Pisson to Fakar Executive Engineer Bridge & Pakistan N.A 28.690 ac
30-04-2021 Nagar-II and Road from Road (B&R) Division, Gilgit
Pisson to Hoper Nagar as Baltistan
Alternative Route of KKH
(16km)

233 20-06-2020 Dualization of Multan- Road Assets Management Pakistan 18000 28.500 abcd
30-04-2021 Vehari Road (90km) System (RAMS) 1. Inspection
2. Evaluation
3. Environmental
Assessment
4. Transaction
Advisory
234 01-01-2021 Technical Support to K-Electric Limited, Karachi Pakistan N.A 27.800 1.
31-05-2021 Improve 11kV Distribution Review/Evaluation
Network
2. Data Collection
3. Survey
235 01-11-2017 Rajanpur-DG Khan National Highway Authority Pakistan 25000 27.607 ac
30-04-2021 Section as 4-Lane Highway
and Dualization and
Rehabilitation of DG Khan-
DI Khan Section N-55
(237km)

236 01-04-2020 Quaid-e-Azam University, Quaid-e-Azam University, Pakistan 1200 27.098 cef
31-08-2023 Islamabad Islamabad
237 01-06-2016 Completion of Leftover Hazara University, Mansehra Pakistan 559 26.341 cde
31-03-2021 Works of Academic Blocks
at Hazara University,
Mansehra
238 01-04-2020 Construction of Apartments Overseas Pakistanis Pakistan 6000 26.040 bcd
30-04-2021 at 58 Kanal Land, OPF Foundation
Housing Scheme Phase-
01 Raiwind Road, Lahore

18-02-2021 Page 19 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
239 01-10-2019 Road from Lodhran at Communication & Works Pakistan 1400 25.870 e
31-10-2021 Jalalpur Pirwala Road Department, Government of
Connecting KLM Motorway the Punjab
via Bahadurpur
240 17-04-2017 REDCO Int. Assignments, Redco International, Qatar Qatar N.A 25.497 f
30-06-2021 Qatar
241 01-12-2012 Permanent Campus of Federal Urdu University of Pakistan 420 25.000 bcde
30-12-2021 Federal Urdu University of Arts, Science & Technology
Arts, Science and (FUUAST)
Technology (FUUAST),
Islamabad

242 03-07-2020 Monitoring and Spot Competitive and Liveable City Pakistan 1100 24.800 Monitoring
30-04-2021 Checking of Nullah of Karachi (CLICK)
Cleaning Work at Karachi
243 01-01-2021 FATA Infrastructure Works Planning & Development Pakistan 500 24.750 ce
30-06-2023 under FATA Infrastructure Department, Government of
Programme (FIP) Khyber Pakhtunkhwa

244 01-12-2019 Greater Water Supply Public Health Engineering Pakistan N.A 24.700 acd
30-04-2021 Scheme, DHQ Kotli Division Kotli PC-I
(Phase-II), Azad Jammu &
Kashmir
245 07-10-2020 Feasibility Study & DetailedPakhtunkhwa Highway Pakistan N.A 24.050 ac
28-02-2021 Engineering Design Authority
along with Financial Cum
Commercial Feasibility
Study on PPP Modalities of
Dir Motorway (50km)

246 01-07-2018 Land Use Planning and Pakistan Air Force Pakistan 1000 24.000 bcde
30-06-2021 Infrastructure Designing Topo Survey
for Fazaia Housing
Scheme, Gujranwala
247 01-03-2020 500kV Transmission Lines National Transmission & Pakistan N.A 23.873 Survey
30-04-2021 from Thar to Matiari Despatch Company
248 01-04-2017 Infrastructure Facilities Port Qasim Authority Pakistan 650 23.140 cde
31-12-2021 Works in Gulshan-e-
Benazir Township Scheme,
Port Qasim
249 01-02-2020 Infrastructure Works at Federal Government Pakistan 1290 23.000 bce
30-09-2022 Mauve Area Sector G-13 & Employees Housing
G-14, Islamabad Authority, Islamabad
250 01-02-2017 Transaction Advisory Rawalpindi Development Pakistan 36000 22.931 a
30-04-2021 Services for Construction Authority Transaction
of Rawalpindi Ring Road Advisory

251 01-12-2009 Water Supply, Sewerage Communication & Works Pakistan 2700 22.855 cd
30-06-2021 and Drainage Works for Department, Government of
Chauburji to Thokar Niaz the Punjab
Baig Section of Lahore-
Multan Road

18-02-2021 Page 20 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
252 01-06-2015 Rehabilitation & Karachi Fisheries Harbour Pakistan N.A 22.700 ef
31-03-2021 Renovation of Karachi Fish Authority
Harbour
253 01-11-2020 Construction of Pump Port Qasim Authority Pakistan N.A 22.700 ce
30-09-2022 Houses, Underground 1. Investigations
Water Tanks, Overhead 2. Survey
Water Tanks and Auxiliary
Works in Eastern Industrial
Zone, Karachi

254 01-02-2020 Additional Block at PEC Pakistan Engineering Council Pakistan 850 22.650 cde
30-11-2021 Headquarter Sector G-5/2, 1. Geotechnical
Islamabad Investigations
2. Topo Survey
255 01-02-2020 Upgradation of Bannu University of Lakki Marwat, Pakistan 956 22.600 ce
31-10-2022 University of Sciences & KPK
Technology Lakki Marwat
Campus to Full Fledge
University

256 01-12-2017 Dualization of Kuchlak- National Highway Authority Pakistan 65000 22.140 acd
30-04-2021 Zhob Road (305km)
Section N-50
257 01-11-2017 Upgradation of Existing Evacuee Trust Property Pakistan 600 22.000 abcde
30-06-2022 HVAC System Installed at Board, Government of Pakistan
Evacuee Trust Complex
Near Marriot Hotel F-5/I
and Green Trust Tower,
Islamabad

258 01-08-2020 Transaction Advisory Road Assets Management Pakistan 16000 21.480 acd
30-06-2022 Services for Dualization of System (RAMS) 1. EIA Study
Jhelum Pind Dadan Khan 2. Topo Survey
Lillah Interchange M-2 3. Traffic Studies
Road (107km) 4. Transaction
Advisory
259 01-02-2018 New RCC Bridge at Pakhtunkhwa Highway Pakistan 460 21.420 ef
30-04-2021 Khazana Bypass Over Authority
River Panjkora, Lower Dir
260 01-09-2020 Transaction Advisory Road Assets Management Pakistan 6000 21.320 Transaction
30-06-2022 Services for Rehabilitation System (RAMS) Advisory
of Wazirabad-Sambrial-
Sialkot Road (37km)

261 01-03-2018 Neurology and Psychiatry Jinnah Post Graduate Pakistan 735 21.180 bcde
30-04-2021 Project at Jinnah Post Medical Center, Karachi
Graduate Medical Centre,
Karachi
262 01-09-2016 Stormwater Drainage 1. Lahore Development Pakistan 3000 20.321 bc
30-06-2021 System from Haji Camp to Authority
River Ravi via Lakshmi 2. Water & Sanitation Agency,
Chowk, McLeod Road, Lahore
Nabha Road, Chuburji and
Sham Nagar, Lahore

18-02-2021 Page 21 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
263 01-07-2019 Road (73km) and RCC Public Works Department, Pakistan N.A 20.000 ce
30-04-2021 Bridges from Mushkin- Govt. of Gilgit-Baltistan
Chilim including Bridge at
Ramghat over the Astore
River

264 01-05-2019 Capital Smart City, near Future Development Pakistan N.A 20.000 ac
30-04-2021 New Islamabad Airport, Holdings (Pvt.) Limited (FDH)
Islamabad
265 01-01-2019 Office Complex DHA Defence Housing Authority Pakistan 1533 19.828 bcde
30-04-2021 Bahawalpur (DHA), Bahawalpur
266 01-01-2019 Development and Federal Government Pakistan 477 19.000 cdef
31-03-2021 Rehabilitation of Sector G- Employees Housing
14/4 Islamabad Authority, Islamabad
267 01-01-2018 Combined Warehouse for Ministry of National Health Pakistan 476 19.000 ce
30-04-2021 TB, HIV & Malaria Services, Regulations and 1. Geotechnical
Programs Under HPSIU Coordination, Government of Investigations
Pakistan 2. Topo Survey
268 01-09-2020 School Construction & Foreign Commonwealth and Pakistan N.A 18.971 f
30-06-2021 Rehabilitation Programme Development Office (FCDO),
(SCRP) Design Checks British High Commission,
Islamabad
269 01-07-2019 Distribution of Sui-Gas Bankers Avenue Cooperative Pakistan 97 18.518 e
30-04-2021 Network & Remaining Housing Society (BACHS),
Infrastructure Works at Lahore
Bankers Avenue
Cooperative Housing
Society, Lahore

270 01-11-2020 Mitigation Sub-Schemes Pakistan Poverty Alleviation Pakistan N.A 18.134 ef
30-09-2021 Located in All Four Fund
Provinces of Pakistan and
Gilgit Baltistan
271 01-03-2020 Rapid Geotechnical & Agha Khan Foundation, Pakistan N.A 17.812 ce
30-04-2021 Hydrological Assessment Pakistan 1. Mapping
of Mitigation Infrastructure 2. Studies
for AKF

272 01-09-2013 Police Lines-II, Mardan Police Department, Pakistan 380 17.500 abced
30-04-2021 Government of Khyber
Pakhtunkhwa
273 01-10-2015 Evaluation and Maple Leaf Cement Factory Pakistan 350 17.454 cdef
31-12-2021 Rehabilitation of CF Silos Limited
and Topographic Survey at
Grey Cement Plant

274 01-07-2020 Dualization of Dina Communication & Works Pakistan 1500 17.385 e
30-09-2021 Mangla Road Tehsil Dina, Department, Government of
Jhelum the Punjab
275 01-11-2020 Establishment of Sports Communication & Works Pakistan 350 17.254 abce
30-11-2023 Complex at District Karak Department, Government of
Khyber Pakhtunkhwa

18-02-2021 Page 22 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
276 01-02-2018 Construction of Flats at Provincial Housing Authority, Pakistan 860 16.590 def
30-12-2021 Civil Quarter Peshawar Govt. of Khyber Pakhtunkhwa
Phase-II
277 01-07-2019 Rural Accessibility Communication & Works Pakistan N.A 16.570 e
30-04-2021 Programme for the Year Department, Government of
2018-2019 in Highway the Punjab
Circle No. 1&2, Rawalpindi

278 01-01-2017 Grey Cement Plant Line III, Maple Leaf Cement Factory Pakistan N.A 16.500 ab
cmnopqr
30-06-2021 Maple Leaf Cement Limited
Factory, Iskandarabad
279 01-02-2020 Transaction Advisory Road Assets Management Pakistan 3000 16.022 a
30-04-2021 Services for Dualization of System (RAMS) 1. Bid Evaluation
Gujrat-Jalalpur Jattan 2. Transaction
Road (15km) Advisory
280 01-09-2016 747MW (Gross) Combined Central Power Generation Pakistan 10580 15.850 df
31-12-2021 Cycle Power Plant Company Limited
(CCPP) at Guddu
281 01-03-2020 Structural Audit, Analysis & Agha Khan Foundation, Pakistan N.A 15.808 e
30-04-2021 Retrofitting Design for Pakistan Structural Stability
AKF Projects
282 01-02-2020 Provision of Access Road University of Science & Pakistan 362 15.740 ce
31-10-2022 and Strengthening of Technology, Bannu
University of Science &
Technology, Bannu
283 01-01-2019 Appropriate Capacity Water and Power Pakistan N.A 15.490 a
30-04-2021 Hydropower Project at Development Authority PC-I
Braldo River, Shigar
284 01-12-2020 Flyover at Tarnol Railway National Highway Authority Pakistan 25000 15.400 ac
30-04-2021 Phattak and Dualization of
Naogazi-FatehJang-Jand
Road Sections

285 01-03-2020 Matta Bypass Road Pakhtunkhwa Highway Pakistan 5000 15.270 e
30-09-2021 Authority
286 01-09-2011 Third Party Validation of Housing, Urban Development Pakistan 1134 15.080 1. Inspection
30-06-2021 Water Supply and & Public Health Engineering 2. Reports
Sewerage Drainage Department, Government of
Schemes Under Southern the Punjab
Punjab Development
program

287 01-10-2020 Master Planning of New Packages Limited, Lahore Pakistan N.A 15.000 bc
28-02-2021 Packages Plant near Kasur

288 01-01-2016 Construction of Landfill Lahore Waste Management Pakistan 2000 14.344 def
30-06-2021 Site Lot No. 3 & 4 at Company Topo Survey
Lakhodair, Lahore
289 01-03-2020 Privatization of 425- Privatization Commission, Pakistan N.A 13.660 d
30-09-2021 525MW Combined Cycle Ministry of Finance,
Power Plant Nandipur Government of Pakistan

18-02-2021 Page 23 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
290 01-09-2018 Women and Children Communication & Works Pakistan 250 12.950 ace
30-06-2022 Hospital at Old Tehsil Department, Government of
Building Sarai Naurang, Khyber Pakhtunkhwa
Lakki Marwat
291 01-11-2020 Kohat Institute of Medical Communication & Works Pakistan 2197 12.940 ce
31-12-2021 Sciences (KIMS) Phase-II, Department, Government of
Kohat Khyber Pakhtunkhwa
292 01-05-2011 Valuation of Various Securities and Exchange Pakistan N.A 12.456 f
30-04-2021 Properties in Sindh and Commission of Pakistan
Balochistan as Assigned (SECP)
by SECP and other Clients

293 01-07-2020 Supervision of PN Central Commander Military Pakistan 360 12.240 bcde
30-04-2022 Mess (G+5) with Engineering Services (Navy),
Basement at Nore-1, COMKAR, Karachi
Karachi (Phase-I)
294 01-07-2017 Resident Supervision for 1. Multan Development Pakistan 635 12.189 e
30-06-2021 Augmentation/ Authority
Improvement of Disposal 2. Water & Sanitation Agency,
Stations Multan (Phase-I) Multan
295 01-02-2018 Provincial Cold Chain United Nations High Pakistan 131 12.000 e
30-04-2021 Warehouse at Peshawar Commissioner for Refugees
296 01-10-2007 Punjab Government Punjab Government Pakistan 360 10.890 bcd
30-06-2021 Servants Housing Scheme Employees Co-operative
at Zakheera Samma Satta, Housing Society, Lahore
Bahawalpur

297 01-07-2014 Evaluation and Capacity Fatima Fertilizer Company Pakistan N.A 10.869 cf
31-07-2021 Enhancemnt of the Steel Limited, Rahim Yar Khan
Frame Building of CAN
Plant, Mukhtargarh District
Rahim Yar Khan

298 01-07-2018 Origin Destination Survey National Transport Research Pakistan N.A 10.866 Survey
30-04-2021 for Passenger and Freight Centre (NRTC)
Traffic Package No.III,
Punjab-I
299 01-06-2020 Leftover Works at College Ayub Medical College & Pakistan 152 10.624 ce
30-06-2021 of Dentistry, Ayub Hospital Complex, Abbottabad
Teaching Hospital,
Abbottabad
300 01-11-2019 Khyber College of Communication & Works Pakistan N.A 10.460 cde
30-06-2021 Dentistry, Peshawar Department, Government of
Khyber Pakhtunkhwa
301 01-03-2020 Various Roads in KPK Communication & Works Pakistan 450 10.370 e
28-02-2023 Department, Government of
Khyber Pakhtunkhwa
302 01-01-2019 Review of Structural Askari Cement Limited Pakistan 720 10.266 f
31-12-2021 Evaluation/Retrofitting Structural Stability
Reports of Silos and Kiln
Pier at Askari Cement
Limited

18-02-2021 Page 24 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
303 01-09-2016 Levelling Grading and Maple Leaf Cement Factory Pakistan N.A 10.077 acnopr
30-06-2021 Internal External Drainage Limited
Design for Line-III, Maple
Leaf Cement Factory,
Iskandarabad

304 01-03-2012 Services to Housing Kakezai Cooperative Housing Pakistan 20 10.000 e


30-06-2021 Societies Society (KCHS)
305 01-05-2017 Rehabilitation of Portions National Highway Authority Pakistan 74800 9.870 c
30-04-2021 of D.I. Khan - Peshawar
Section N-35 (374km)

306 01-09-2019 Office Complex at DHA Defence Housing Authority Pakistan 800 9.835 e
28-02-2021 Bahawalpur (DHA), Bahawalpur
307 01-07-2019 Commercial Building at Workers Welfare Fund, Pakistan 300 9.750 ce
31-07-2022 Block No. 16, F-6 Markaz, Islamabad
Super Market, Islamabad

308 01-08-2015 Infrastructure Works at Punjab Industrial Estates Pakistan 655 9.595 cdef
30-06-2021 Quaid-e-Azam Solar Park Development and
(QASP), Cholistan Management Company
309 01-04-2019 Pearl & Reef Crescent EMAAR Giga Karachi Pakistan N.A 9.541 c
28-02-2021 Bay, Karachi Limited
310 01-09-2020 Buildings at Neelum Pakistan Red Crescent Pakistan N.A 9.494 ef
30-04-2021 Hattian, Sudhnothi and Society
Bagh Districts of AJ&K
311 01-04-2019 Residential Building of Gilgit-Baltistan Public Works Pakistan N.A 9.490 cd
30-04-2021 Honorable Judges of Gilgit Department (GBPWD) 1. Geotechnical
Baltistan Chief Court, Investigations
Gilgit 2. Topo Survey
312 01-06-2020 Pakistan Digtal City Khyber Pakhtunkhwa Pakistan 620 9.450 c
30-04-2021 Haripur, Khyber Information Technology
Pakhtunkhwa Board (KPITB)
313 01-12-2019 Flyover at Jhal Road Communication & Works Pakistan 600 9.140 e
31-03-2021 Railway Crossing to Department, Government of
Sahiwal City the Punjab
314 01-01-2018 Medical Teaching Mardan Medical Complex, Pakistan 300 9.000 cde
30-06-2021 Institution (MTI) at Mardan Mardan
Medical Complex, Mardan

315 01-05-2014 Validation of DHA Pakistan Defence Officers Pakistan N.A 9.000 b
30-04-2021 Transport Planning and Housing Authority, Karachi
Management Plan

18-02-2021 Page 25 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
316 01-04-2016 Establishment of Research Khyber Medical University, Pakistan 258 8.960 bcde
30-06-2021 Institute of Hepatology, Khyber Pakhtunkhwa
Hepatobiliary Pancreatic
Surgery and
Transplantation (Relief) &
Research Institute of
Diabetology,
Endocrinology and NCDS
(RIDENC)

317 01-03-2020 Upgradation of Main Valley Executive Engineer Bridge & Pakistan N.A 8.951 ac
30-04-2021 Road from KKH to Darel Road (B&R) Division, Gilgit
and Shummari Tangir Baltistan
(40km)
318 01-07-2020 Remodeling of Katchery Rawalpindi Development Pakistan 2000 8.840 ac
30-04-2021 Chowk, Rawalpindi Authority
319 01-12-2020 Evaluation of Damaged Central Power Generation Pakistan N.A 8.800 Structural Stability
30-04-2021 Foundation of Siemens Company Limited
Steam Turbine G-13 for
415MW CCPP TPS,
Guddu

320 01-07-2020 Evaluation and Design of Ministry of Regional Oman N.A 8.680 cf
30-04-2021 Executed Works for the Municipalities & Water Evaluation
Project of Cut Open Jebel Resources, Oman
Area at Al-Dhuwaihir &
Hail Al-Rikka at Wilayat Al-
Khabourah Oman

321 01-12-2018 Irrigation Office, Irrigation Department, Pakistan N.A 8.370 ac


30-04-2021 Residences and Inspection Government of Khyber
Houses in Khyber Pakhtunkhwa
Pakhtunkhwa
322 01-06-2020 Design of Permanent Madina Foundation, Lahore Pakistan N.A 8.000 cd
30-04-2021 Shelter at Shrine of Hazrat 1. Geotechnical
Data Ganj Baksh Investigations
2. Structural
Stability
323 01-11-2018 Rehabilitation of National Sheikh Zayed Hospital, Lahore Pakistan 180 7.900 abcde
30-06-2021 Institute of Kidney
Diseases (NIKD) HVAC
System at Sheikh Zayed
Hosptial, Lahore

324 01-03-2018 Annual Development 1. Multan Development Pakistan 1000 7.854 e


30-06-2021 Programme (ADP) Authority
Schemes WASA Multan 2. Water & Sanitation Agency,
Multan
325 14-04-2019 QCDD Approvals and as Al-Meera Consumer Goods Qatar N.A 7.705 d
30-06-2021 Built Drawings for Al- Co., Qatar Survey
Meera Bin Omran and
Mansoura Branches, Qatar

326 01-09-2019 Various Roads in Khyber Pakhtunkhwa Highway Pakistan 3996 7.638 ac
30-04-2021 Pakhtunkhwa Authority

18-02-2021 Page 26 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
327 01-07-2020 Remodeling of Defence Rawalpindi Development Pakistan 1500 7.620 ac
30-04-2021 Chowk, Rawalpindi Authority
328 10-12-2020 President Initiative for National Information Pakistan N.A 7.500 ag
10-03-2021 Cyber Efficient Parliament Technology Board, Islamabad PC-I

329 01-03-2020 Improvement and Pakhtunkhwa Highway Pakistan 5000 7.374 e


30-04-2021 Treatment of Shoulders of Authority
Matta Fazal Banda Road
(23km), Swat
330 01-06-2019 Upgradation and Communication & Works Pakistan 167 7.145 cde
17-09-2021 Improvement of HVAC Department, Government of
System at KP Assembly, Khyber Pakhtunkhwa
Peshawar
331 01-04-2016 Conference Room and Pakistan Public Works Pakistan 265 7.130 ced
30-04-2021 Offices at Prime Minister Department
House, Islamabad
332 01-05-2014 Infrastructure Development International Center for Pakistan 175 6.874 cde
30-04-2021 of New Campus of the Chemical and Biological
Premier S&T Institutions of Sciences
Pakistan

333 01-04-2018 Dualization of Quetta National Highway Authority Pakistan 5300 6.840 ac
30-04-2021 Western Bypass N-25 Survey
(23km)
334 01-08-2020 Fauji Fertilizers Limited, Fauji Fertilizer Limited Pakistan 28 6.800 f
30-04-2021 Mirpur Mathelo Mirpur Mathelo Structural Stability
335 01-07-2020 Replacement of Power Sui Northern Gas Pipelines Pakistan N.A 6.040 a
30-04-2021 Generation, HVAC & Limited
Auxiliary System at SNGPL
Head Office Building,
Lahore

336 01-03-2020 Improvement, Additions and Laraib Energy Limited, Pakistan N.A 5.969 General
31-03-2022 Modifications at 84MW Islamabad Consultancy
New Bong Escape
Hydropower Project

337 01-04-2020 Expansion & Upgradation Hydrocarbon Development Pakistan 145 5.859 cde
30-06-2021 of Pakistan Petroleum Institute of Pakistan 1. Geotechnical
Corehouse (Petcore), Investigations
Islamabad 2. Topo Survey
338 01-01-2020 Master & Town Planning of Maritime Technologies Pakistan N.A 5.750 ac
30-06-2021 Site-10 &12 and Feasibility Complex (MTC),
Islamabad PC-I
Study for Water Retaining
Structure at Site-10 in
Islamabad and Karachi

339 03-09-2020 Report on work done by High Court of Sindh Pakistan N.A 5.750 Report
30-04-2021 Specific Party at Gas
Processing Facility at
Gambat South Block,
District Sanghar, Sindh

18-02-2021 Page 27 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
340 01-07-2020 Construction of Flyover at National Highway Authority Pakistan N.A 5.530 c
30-04-2021 Junction of N-5 & N-65 at
Sukkur 4-Lane Alongwith
Approach Road 1.2km

341 01-07-2019 Expansion of the Embassy Embassy of the People's Pakistan 547 5.470 f
30-04-2021 of People's Republic of Republic of China, Islamabad
China at Islamabad

342 01-06-2017 Installation of 105 Nos. 1. Lahore Development Pakistan 364 5.467 cde
28-02-2021 Water Filtration Plants, Authority
Lahore 2. Water & Sanitation Agency,
Lahore
343 01-12-2015 Upgradation and State Bank of Pakistan Pakistan 375 5.439 abcde
31-03-2021 Improvement of Existing
HVAC System at State
Bank of Pakistan Banking
Services Corporation SBP-
BSC (Bank), Rawalpindi

344 01-01-2016 Upgradation and State Bank of Pakistan Pakistan 315 5.274 abcde
30-04-2022 Improvement of Existing
HVAC System at State
Bank of Pakistan Banking
Services Corporation SBP-
BSC (Bank), Multan

345 01-10-2019 Establishment of University University of Science & Pakistan 408 5.190 ce
31-01-2023 Campus for Women at Technology, Bannu
Bannu
346 01-07-2018 Origin Destination Survey National Transport Research Pakistan N.A 5.167 Survey
30-04-2021 for Passenger and Freight Centre (NRTC)
Traffic Package-V, Sindh

347 01-11-2016 Ayub Medical College, Ayub Medical College & Pakistan 77 5.067 ced
28-02-2021 Abbottabad Hospital Complex, Abbottabad

348 01-06-2020 Design and Refurbishment Board of Revenue, Pakistan N.A 5.028 bcde
01-03-2021 of Shaheen Complex, Government of Sindh
Karachi

349 01-01-2019 Verification of Contractors' National Database & Pakistan N.A 4.836 Verifications
30-06-2022 Interim Payments Registration Authority
including Final Bill of (NADRA)
NADRA Building at
Hayatabad, Peshawar

350 01-02-2018 NDT of Cooling Tower and Rousch (Pakistan) Power Pakistan N.A 4.748 1. Structural
31-03-2021 Technical Assessment of Limited Stability
Foundation Cracks & 2. Remedial
Remedial Measures of CT Measures
FAN

18-02-2021 Page 28 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
351 01-04-2018 Traffic Impact Analysis Defence Housing Authority, Pakistan N.A 4.600 Traffic Studies
31-03-2021 including Traffic Lahore
Management Plan and
Circulation Area Required
for establishment of Mall in
DHA, Lahore

352 01-12-2015 Upgradation & State Bank of Pakistan Pakistan 320 4.464 abcde
30-04-2022 Improvement of Existing
HVAC System at State
Bank of Pakistan Banking
Services corporation SBP-
BSC (Bank), Faisalabad

353 01-11-2019 Assessment of Ash Engro PowerGen Thar (Pvt.) Pakistan N.A 4.322 EIA Study
31-03-2021 Usability for Engro's Thar Limited
Power Project
354 01-02-2014 Hall Building at Kohinoor Kohinoor Textile Mills Limited Pakistan 12.5 4.263 c
31-08-2021 Textile Mills Limited, 1. Report
Raiwind 2. Survey
355 01-05-2020 Structural Evaluation & Gharibwal Cement Limited, Pakistan 35 4.034 f
31-10-2021 Rehabilitation of CF Silo Chakwal Structural Stability
356 01-09-2020 NDMA Pakistan World Food Programme, Pakistan N.A 3.788 ce
30-06-2022 Warehouse Network PhasePakistan
6, Muzaffarabad, AJ&K

357 01-02-2017 Augmentation/Improvement 1. Multan Development Pakistan 635 3.662 c


30-06-2021 of Disposal Stations Authority
Multan Phase-I 2. Water & Sanitation Agency,
Multan
358 01-03-2019 Construction of Road, Ministry of Transport & Oman N.A 3.570 cd
31-03-2021 Madha Bypass Buraimi, Communications, Oman
Oman
359 01-04-2019 Sea Breeze Complex S.B Complex Owners Welfare Pakistan N.A 3.000 Structural Stability
30-04-2021 Building Muhammad Ali Association
Jinnah Road, Karachi
360 01-07-2019 Pir Mehar Ali Shah Pir Mehar Ali Shah (PMAS)- Pakistan N.A 2.992 cde
30-04-2021 (PMAS)-Arid Agriculture Arid Agriculture University, 1. EIA Study
University, Rawalpindi Rawalpindi 2. Geotechnical
Investigations
3. IEE Study
361 01-11-2019 Humanitarian Response World Food Programme, Pakistan 78.36 2.990 e
30-04-2021 Facility at Muzaffarabad Pakistan
362 01-09-2006 Comprehensive Sewerage Water & Sanitation Agency, Pakistan N.A 2.875 cd
30-06-2021 and Drainage Scheme for Lahore
Allama Iqbal Town and
Adjoining Areas, Lahore

363 01-05-2019 Repair and Maintenance National Police Foundation, Pakistan 82 2.870 ade
30-04-2021 Works of National Police Islamabad
Foundation Housing
Schemes at E-11 & O-9,
Islamabad

18-02-2021 Page 29 of 30
Ongoing Projects of NESPAK
a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery
b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Client Location Project


Fee Scope
of
364 01-08-2019 Vertical Expansion of National Medical Center, Pakistan N.A 2.600 Structural Stability
30-04-2021 National Medical Center, DHA, Karachi
DHA Phase-I, Karachi
365 01-06-2020 Human Rights Forum World Food Programme, Pakistan N.A 2.450 c
30-04-2021 (HRF) Karachi, Provincial Pakistan 1. Geotechnical
Disaster Management Investigations
Authority (PDMA), Sindh 2. Topo Survey

366 01-03-2020 New Library and ICT Block University of Agriculture, Pakistan N.A 2.400 ce
31-03-2021 at University of Agriculture, Faisalabad
Faisalabad
367 01-07-2020 Renovation/Rehabilitation Pakistan Engineering Council Pakistan 108 2.080 cde
30-04-2021 Work at Pakistan
Engineering Council
(PEC) Head Quarter,
Sector G-5/2, Islamabad

368 01-04-2020 Refurbishment of New Universal Service Fund (USF) Pakistan 75 2.000 cde
30-04-2021 Universal Service Fund
(USF) Office in Islamabad

369 01-12-2020 Red Fort Muzaffarabad Tourism and Archeology Pakistan N.A 1.985 c
31-03-2021 Department, Azad Jammu & Structural Stability
Kashmir
370 01-10-2019 Replacement of Old Lifts at Evacuee Trust Property Pakistan 62 1.977 ce
30-06-2021 Evacuee Trust Complex, Board, Government of Pakistan
Islamabad
371 01-08-2020 Export Cargo Building at Gerry's Dnata, Pakistan Pakistan N.A 1.860 e
28-02-2021 Allama Iqbal International 1. Geotechnical
Airport, Lahore Investigations
2. Structural
Stability
372 01-10-2020 National Bank of Pakistan National Bank of Pakistan Pakistan N.A 1.860 1. Structural
30-04-2021 Head Office Building, Stability
Karachi 2. Remedial
Measures
373 01-10-2020 Groundwater Availability Namal Education Foundation, Pakistan N.A 1.760 Studies
30-04-2021 Study for Namal Lahore
Knowledge City, Mianwali
374 01-11-2020 Flyover at Railway Bridge GEPCO Employees Housing Pakistan N.A 1.509 c
30-04-2021 No.68 along with Noorpur Foundation (GEHF),
Distributary G.T. Road Gujranwala
Gujranwala
375 01-11-2020 PTCL Garden Town Pakistan Telecommunication Pakistan N.A 1.300 Structural Stability
30-04-2021 Exchange near Kalma Company Limited
Chowk, Lahore
376 16-11-2020 Traffic Impact Analysis of Police Department, Pakistan N.A 1.000 Traffic Studies
31-03-2021 Investigation Complex Government of the Punjab
adjacent to PS Old Anarkali
(Rabbani Road), Lahore

18-02-2021 Page 30 of 30
Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
1 01-01-2010 Quick Impact Projects in Frontier Works Pakistan 34000 3011.370 ace
31-07-2020 North and South Organization Quality Assur.
Waziristan Agencies
2 01-04-2009 Punjab Irrigated Irrigation & Power Pakistan 275800 1070.418 ace
31-12-2018 Agriculture Investment Department, Government of
Program the Punjab

3 01-04-2012 Khyber Pakhtunkhwa Communication & Works Pakistan 14700 870.000 abcdef
31-01-2017 Emergency Rural Road Department, Government of
Rehabilitation Project Khyber Pakhtunkhwa

4 01-11-2012 Punjab Irrigated Agriculture Department, Pakistan 36000 804.930 ce


30-04-2018 Agriculture Productivity Government of the Punjab
Improvement Project
(PIAPIP)
5 01-06-2004 Mega Irrigation Projects, Irrigation & Power Pakistan 52000 719.959 ef
31-12-2018 Punjab Department, Government of
the Punjab

6 01-10-2008 Lahore Roads 1. City District Pakistan 5500 640.070 e


31-12-2019 Rehabilitation Project Government, Lahore
(Phase-II) 2. Traffic Engineering and
Planning Agency
7 01-06-2007 Upgradation and National Highway Authority Pakistan 34000 636.237 ce
31-12-2016 Widening of Surab-
Basima-Nag-Panjgure-
Hoshab Section of N-85
(459km)
8 01-06-2017 North South Gas Pipeline M/s Seigl Preskey Smith Pakistan 257500 500.000 abcdmnpr
31-12-2019 Project Financing Limited, U.K Survey

9 01-04-2016 Jalalpur Irrigation Project Irrigation Department, Pakistan 37000 497.865 ac


31-10-2019 Government of the Punjab

10 01-09-2016 Havelian-Thakot Section National Highway Authority Pakistan 134000 483.271 def
28-02-2020 (120km) under China
Pakistan Economic
Corridor (CPEC)

11 16-04-2014 Development of Water Irrigation Department, Pakistan N.A 474.764 abcdfgjklmn


30-06-2017 Resources Management Government of the Punjab opqr
Information System
(WRMIS) and Decision
Support System (DSS) for
Efficient Irrigation Water
Management in Punjab

12 01-04-2017 Quetta Development Planning & Development Pakistan 10000 436.851 ce


31-12-2020 Package - Roads (144km) Department, Government of Traffic Studies
Project Balochistan

General IQ-WITHOUT-STATUS Page 1 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
13 01-11-2018 Development of Kartarpur Frontier Works Pakistan 20000 432.490 bce
31-03-2020 Corridor Project Organization

14 01-09-2005 500MW Combined Cycle Northern Power Pakistan 27100 430.000 def
31-12-2016 Power Plant at Chichoki Generation Company
Mallian Limited
15 01-07-2010 500kV New Lahore National Transmission & Pakistan 13000 374.000 def
30-09-2020 Substation and Despatch Company
Associated Transmission
Lines (Lot-I)

16 01-04-2011 Rehabilitation and Irrigation & Power Pakistan 11794 361.560 ef


31-03-2016 Modernization of Jinnah Department, Government of
Barrage under Punjab the Punjab
Barrages Improvement
Phase-II
17 01-04-2017 Dualization of Khanewal- Communication & Works Pakistan 20000 350.736 ce
31-12-2018 Lodhran Road (98km) Department, Government of
Multan the Punjab

18 03-09-2014 Environmental and Social United States Agency for Pakistan 1150000 300.000 b
30-09-2016 Impact Assessment International Development ESIA Study
(ESIA) for Diamer (USAID)
Bhasha Dam Project

19 06-01-2004 G.C University Government College Pakistan 4500 261.800 bcd


31-12-2016 Faisalabad New Campus, University, Faisalabad
Jhang Road
20 01-05-2017 Optimizing Watercourse Agriculture Department, Pakistan 9287 255.590 bcef
30-06-2019 Conveyance Efficiency Government of the Punjab
Through Enhancing
Lining Length in Punjab

21 01-07-2008 Rahim Yar Khan 500kV National Transmission & Pakistan 7000 254.790 def
30-09-2018 Substation and Despatch Company
Associated 500kV
Transmission Lines
22 10-07-2010 220/132kV Gujrat National Transmission & Pakistan 3730 250.170 def
15-08-2020 Substation along with Despatch Company
Allied Transmission Lines

23 01-12-2011 Khanewal to Multan National Highway Authority Pakistan 13000 250.000 ef


30-11-2016 Section of M-4 Motorway
(57km)
24 01-11-2004 Quetta Water Supply and Project Management Unit, Pakistan 17093 246.730 bcde
30-06-2017 Environmental Government of Balochistan
Improvement Project
25 04-08-2014 Dualization of Mandra- Pakistan Public Works Pakistan 13000 236.639 ef
31-12-2020 Chakwal (64km) and Department
Sohawa-Chakwal Road
(70km)

General IQ-WITHOUT-STATUS Page 2 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
26 01-01-2006 New Pakistan Secretariat Pakistan Public Works Pakistan 3476 224.811 bcde
30-06-2017 Block at Constitution Department
Avenue, Islamabad

27 01-03-2004 Punjab Government Punjab Housing & Town Pakistan 5800 220.400 bcde
31-12-2016 Servants Housing Planning Agency
Scheme at Faisalabad
28 01-07-2006 Federal Projects Under Ministry of Law, Justice & Pakistan 2750 217.000 bcde
30-06-2018 Access to Justice program Human Rights,
Government of Pakistan
29 01-06-2009 Preparation of Case of Pakistan Commission for Pakistan N.A 210.976 Report
31-12-2017 Kishanganga Indus Water, Government
Hydroelectric Plant for of Pakistan
Presentation Before the
Neutral Expert
30 01-03-2016 Standardisation of 200 Communication & Works Pakistan 4620 209.366 ace
31-03-2018 Higher Secondary Department, Government of
Schools in Khyber Khyber Pakhtunkhwa
Pakhtunkhwa
31 01-11-2016 Various Facilities and Pakistan Cricket Board Pakistan 3000 203.674 abce
30-06-2020 Infrastructure Works on
PCB Land
32 01-06-2019 Development of CPEC Frontier Works Pakistan 144000 201.640 bc
30-06-2020 City Near Karnal Sher Organization
Khan Interchange,
Nowshera
33 01-01-2012 Prime Minister's Water & Sanitation Agency, Pakistan 10000 190.357 e
30-06-2019 Southern Punjab Multan
Development Package for
Water Supply and
Sewerage Schemes,
Multan City (Part-II)
34 01-12-2014 Canal Expressway from City District Government, Pakistan 6960 188.140 ce
31-01-2017 Gattwala Bridge to Faisalabad
Sahianwala Interchange,
Faisalabad
35 01-07-2016 Pakistan Railways Pakistan Railways Pakistan 2000 186.720 e
30-08-2019 Projects in Various Cities
Across Pakistan
36 01-01-2015 Cable Car System at Tourism Development Pakistan 5954 180.864 a
28-02-2017 Murree Corporation, Punjab
37 01-11-2017 Upgradation of Main Line Pakistan Railways Pakistan 1100000 180.170 df
31-12-2021 (ML-I) and Establishment
of Dry Port Near Havelian
Under China Pakistan
Economic Corridor
(CPEC)

38 01-07-2014 118MW Steam-based Fauji Fertilizer Bin Qasim Pakistan 40000 172.238 ce
31-12-2017 Coal Power Plant in Limited (FFBL)
Eastern Industrial Estate,
Bin Qasim

General IQ-WITHOUT-STATUS Page 3 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
39 01-06-2006 Assuring Water Supply to Irrigation & Power Pakistan 3423 169.142 abcde
30-06-2018 Karachi by Upgrading Department, Government of
Keenjhar Lake System Sindh

40 01-04-2013 Development of National Project Management & Pakistan N.A 162.486 bhjklnq
28-02-2016 Flood Protection Plan-IV Policy Implementation Unit
(NFPP-IV) and Related Ministry of Water & Power,
Studies to Enhance Government of Pakistan
Capacity Building of
Federal Flood Commission

41 01-03-2016 Establishment of Rangers Pakistan Rangers Pakistan 3000 158.656 bce


30-06-2020 Wings in various Cities 1. PC-I
of Punjab 2. Topo Survey
3. Geotech Study
42 01-05-2011 Ashiana Housing Scheme Punjab Land Development Pakistan 1490 158.580 e
30-06-2018 at Attari Saroba, Lahore Authority (PLDC),
Government of the Punjab

43 01-05-2014 Flyover (Complete Signal Communication & Works Pakistan 3439 157.890 ce
30-06-2020 Free Interchange) at Aziz Department, Government of
Cross, Gujranwala the Punjab

44 20-04-1998 Faisalabad Roads City District Government, Pakistan 7000 153.000 ce


31-03-2017 Rehabilitation Project Faisalabad
45 01-05-2015 Kachhi Command Area Agriculture & Cooperative Pakistan 1600 148.000 ef
30-06-2020 Phase-I Dera Bugti (Part- Department, Government of
A), Balochistan Balochistan

46 09-07-2017 500kV Transmission National Transmission & Pakistan 7860 145.535 e


07-12-2020 Lines Between Guddu and Despatch Company
Muzaffargarh
47 01-10-2005 FDA City Housing Faisalabad Development Pakistan 5000 142.000 cde
30-06-2017 Scheme at Faisalabad Authority
48 01-06-2012 Mohmand Dam (Design) Water and Power Pakistan 309558 141.310 bcd
31-03-2019 Project Development Authority
49 01-09-2010 Damages/Rehabilitation National Highway Authority Pakistan 6555 139.000 c
30-06-2018 of NHA Highways
Network Due to Flash
Flood 2010
50 01-10-2013 Milestone Monitoring United States Agency for Pakistan 8319 134.433 e
30-06-2020 Services for Construction International Development
of Schools in Sindh (USAID)

51 01-01-2017 Provision of Clean 1. Lahore Development Pakistan 6000 127.533 ef


30-06-2020 Drinking Water, Authority EIA Study
Sewerage System, PCC 2. Water & Sanitation
of Streets and Allied Agency, Lahore
Facilities in various areas
of Lahore

General IQ-WITHOUT-STATUS Page 4 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
52 01-05-2011 Refurbishment/Upgradati Water and Power Pakistan 43000 120.019 def
31-10-2017 on of Generating Units at Development Authority
Mangla Power Station
53 01-02-2014 Coal, Clinker and Cement TurkPak International Pakistan 12000 112.400 be
28-02-2018 Terminal at Port Qasim

54 01-12-2015 Strengthening Works of Water and Power Pakistan 1300 111.000 cde
05-07-2018 Mangla Reservoir Rim Development Authority
along Mirpur-Kotli Road
near Khaliqabad Chowk,
Mirpur By-Pass Road

55 01-07-2019 600kV HVDC China Energy Engineering Pakistan N.A 110.293 e


31-07-2020 Transmission Line from Group Hunan Electric
Matiari to Lahore (Lot 2-3) Power Engineering
Consulting Co. Ltd. China

56 01-03-2016 Laying of Sewerage 1. Lahore Development Pakistan 10000 106.270 e


30-06-2020 System from Larech Authority
Colony to Gulshan-e- 2. Water & Sanitation
Ravi, Lahore Agency, Lahore
57 01-03-2017 Delineating Negative & 1. Directorate General of Pakistan N.A 105.000 Studies
30-06-2018 Positive Mining Areas for Mines & Minerals, Punjab
Installation of Cement
Plants in the Salt Range 2. Punjab Mineral
Company Pvt. Limited
58 01-03-2019 Karachi Bulk Water Karachi Water & Sewerage Pakistan 26000 104.428 f
08-11-2019 Supply Scheme, Phase-I, Board
K-IV Project
59 01-09-2008 Load Despatch System National Transmission & Pakistan 4000 100.530 def
09-03-2016 Upgrading Project Despatch Company
60 01-07-2019 600kV HVDC Shandong Chengxin Pakistan N.A 98.029 e
31-07-2020 Transmission Line from Engineering Construction
Matiari to Lahore (Lot 5-8) Supervision Co. Ltd. China

61 01-06-2011 200-Bed Mukhtar A. Pak Arab Fertilizers (Pvt.) Pakistan 1339 98.000 ced
30-06-2019 Sheikh Hospital, Multan Limited
62 01-01-2011 Daanish Schools at Jand Punjab Daanish School Pakistan 2070 92.518 e
30-06-2017 District Attock, Mianwali, System & Centers of
D.G. Khan and Rajanpur Excellence Authority, Govt
of the Punjab
63 01-05-2015 Upgrading Pakistan Pakistan Railways Pakistan 1332 90.000 a
31-12-2019 Railways Existing Main 1. EIA Study
Line (ML-I) and 2. Survey
Establishment of Havelian
Dry Port
64 01-03-2013 Consultancy Services at Society for the Promotion of Pakistan 1000 87.619 bce
31-12-2019 Ghulam Ishaq Khan (GIK) Engineering Sciences and Topo Survey
Institute of Engineering Technology in Pakistan
Sciences and
Technology, Swabi
65 01-09-2009 Sports City Narowal Pakistan Sports Board Pakistan 2498 87.194 cde
30-06-2019
General IQ-WITHOUT-STATUS Page 5 of 28
Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
66 01-11-2015 Master Planning of Water 1. Multan Development Pakistan 7020 87.023 bcd
30-06-2018 Supply, Sewerage and Authority EIA Study
Drainage System of 2. Water & Sanitation
WASA, Multan Agency, Multan

67 01-08-2015 Transmission Line National Transmission & Pakistan 3000 82.000 e


05-05-2018 Interconnection for Despatch Company
Dispersal of Power from
UCH-II Power
68 01-12-2016 Establishment of COMSATS Institute of Pakistan 1650 81.230 bce
30-11-2020 Permanent Campus of Information Technology,
Comsats Institute of Islamabad
Information Technology,
Quetta
69 01-03-2013 Exploration of Barite- Bolan Mining Enterprise, Pakistan N.A 79.939 ab
31-12-2019 Lead-Zinc Ore Deposits Balochistan Investigations
at Gunga, Khuzdar,
Balochistan
70 01-12-2018 Preparation of Bidding Water and Power Pakistan N.A 79.216 d
30-11-2019 Documents for Basha Development Authority Bid Evaluation
Dam Contract MW-1
71 01-01-2017 Airport Security Force Civil Aviation Authority Pakistan 3000 78.354 ce
31-03-2021 Camp (Phase-I) at
Islamabad International
Airport
72 01-10-2009 Improvement and Works & Services Pakistan 1548 77.400 bcde
30-06-2019 Rehabilitation of Central Department, Government of
Prison, Peshawar Khyber Pakhtunkhwa

73 01-10-2013 Residential Plot No. 7 and EMAAR Giga Karachi Pakistan N.A 76.300 cd
30-06-2018 8 Crescent Bay, DHA, Limited
Karachi
74 01-07-2017 Gwadar Smart Port City CCCC-FHDI Engineering Pakistan N.A 75.000 b
31-01-2020 Master Plan Co. Ltd. China

75 01-05-2011 Centres of Excellence in Punjab Daanish School Pakistan 1144 71.937 e


30-06-2017 Various Districts of the System & Centers of
Punjab Excellence Authority, Govt
of the Punjab
76 01-11-2012 Institute of Urology and Communication & Works Pakistan 3334 71.581 bce
31-05-2020 Transplantation at Department, Government of
Rawalpindi the Punjab

77 01-01-2014 Finished Material Peoples Steel Mills Limited Pakistan N.A 70.680 cd
31-12-2018 Production Shed at
Peoples Steel Mills,
Karachi
78 01-06-2013 Establishment of 510-Bed National University of Pakistan N.A 70.400 ce
30-11-2016 Teaching Hospital at Science & Technology,
NUST, Islamabad Islamabad
79 01-07-2005 State Life Tower, State Life Insurance Pakistan 571 68.629 be
31-03-2020 Islamabad Corporation of Pakistan

General IQ-WITHOUT-STATUS Page 6 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
80 01-07-2014 Khawaja Fareed Khawaja Fareed University Pakistan 2800 67.200 bcd
30-06-2018 University of Engineering of Engineering &
and Information Information Technology,
Technology, Rahim Yar Rahim Yar Khan
Khan

81 01-04-2015 Port Allied Structures in Gwadar Port Authority Pakistan 3000 66.580 cde
20-02-2020 Mullah Band Area, Gwadar Survey

82 01-04-2009 Water Supply System, Housing, Urban Pakistan 655 64.091 cde
30-06-2020 Gujrat Development & Public
Health Engineering
Department, Government of
the Punjab

83 01-07-2017 Improvement and National Highway Authority Pakistan 3000 62.643 ef


31-12-2020 Widening of Chakdara-
Mingora-Fatehpur
Section of National
Highway (82km)
84 01-12-2008 Hassanabdal-Havelian National Highway Authority Pakistan 29000 61.483 abcd
30-06-2018 Expressway (40km)
85 01-07-2015 Hazard Mapping & Central Design Office, Pakistan N.A 61.340 cdlmnopqr
19-04-2018 Landslide Treatment Government of Azad
along Major Roads in Jammu & Kashmir
Azad Jamu & Kashmir
86 01-08-2014 Provision of Sewerage Water & Sanitation Agency, Pakistan 7610 61.296 e
31-03-2017 System for UCs-117, 118 Lahore
and 120, Lahore
87 01-12-2015 Bannu-Kohat Road Pakhtunkhwa Highway Pakistan 1320 60.700 ef
31-12-2018 Authority
88 01-07-2017 Dams on Kaha, Chachar, Irrigation Department, Pakistan 24245 60.000 ac
31-12-2018 Mithawan and Vidore Hill Government of the Punjab
Torrents in Districts of
DG Khan & Rajanpur

89 01-10-2017 Preparation of Ecological Water and Power Pakistan N.A 58.190 bnm
30-11-2019 & Biodiversity Development Authority
Management Plans for
Dasu Hydropower Project

90 01-09-2018 Reconstruction and Communication & Works Pakistan N.A 57.931 ef


31-08-2019 Rehabilitation of Flood Department, Government of
Damaged Schools under Khyber Pakhtunkhwa
Khyber Pakhtunkhwa
Reconstruction Program
(KPRP-USAID/PaRRSA)

91 01-12-2007 Sewerage Schemes, Water & Sanitation Agency, Pakistan 1360 56.206 e
30-06-2017 Multan Multan

General IQ-WITHOUT-STATUS Page 7 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
92 01-01-2011 Judicial Complex Bannu Communication & Works Pakistan 598 55.917 bcef
30-06-2018 (Addition/Alterations/Stre Department, Government of
ngthening and Balance Khyber Pakhtunkhwa
Works for Phase I, II and
III)

93 01-11-2009 Remedial Measures for Communication & Works Pakistan N.A 54.134 ce
31-12-2019 Dewal Landslide, Murree Department, Government of 1. Survey
the Punjab 2. Remedial
Measures
94 01-01-2005 4.8MW Battar Hydro Electric Board, Pakistan 646 54.082 e
31-03-2017 Hydroelectric Project Government of Azad
Jammu & Kashmir
95 01-09-2013 Ravi Riverfront Urban Lahore Development Pakistan N.A 53.471 a
30-06-2016 Development Project Authority Survey
96 01-03-2014 New OPD & Surgical Patients' Aid Foundation Pakistan 2250 53.448 bcde
31-03-2019 Complex at JPMC, (PAF) Karachi
Karachi
97 01-03-2012 NBP Leadership National Bank of Pakistan Pakistan 1000 50.000 cde
30-06-2016 Development Centre,
Karachi
98 09-12-2013 Static Var Compensator National Transmission & Pakistan 1931 49.406 e
30-06-2018 at New Kotlakhpat Despatch Company

99 01-11-2015 Learning Resource State Bank of Pakistan Pakistan 545 49.050 ce


31-12-2019 Center and Allied
Facilities at Rafiqi Lane,
Peshawar
100 01-08-2017 Periodic Maintenance and National Highway Authority Pakistan 25000 49.048 ef
31-12-2019 Rehabilitation Work
Under Annual
Maintenance Plans
(Balochistan-North)
Region
101 01-02-2013 Improvement and Communication & Works Pakistan 1321 49.001 bce
30-06-2019 Reconstruction of Central Department, Government of
Prison, Peshawar Khyber Pakhtunkhwa

102 01-11-2015 New State Bank of State Bank of Pakistan Pakistan 544 48.960 ce
31-12-2019 Pakistan (SBP) Office
Building at G-5/2,
Islamabad
103 01-02-2014 Quaid-e-Azam Apparel Punjab Industrial Estates Pakistan 11000 48.341 abcd
31-12-2016 Park at M-2, Sheikhupura Development and EIA Study
Management Company

104 01-05-2014 220/132kV Air Insulated National Transmission & Pakistan 2000 47.800 e
31-12-2018 Switchgear Grid Station Despatch Company
Dera Murad Jamali
(New), Balochistan

General IQ-WITHOUT-STATUS Page 8 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
105 01-01-2014 Kohat Institute of Medical Communication & Works Pakistan 2197 44.704 abcdef
30-06-2019 Sciences (KIMS) Department, Government of
Khyber Pakhtunkhwa

106 01-07-2018 Bridge at Chak Nizam on Communication & Works Pakistan 2600 44.590 e
30-06-2020 River Jhelum in Mandi Department, Government of
Bahauddin the Punjab

107 01-06-2012 Coal and Clinker/Cement Port Qasim Authority Pakistan 30000 42.300 ef
30-06-2018 Terminal on BOT Basis at Audit
Port Qasim, Karachi

108 01-11-2018 Hydrological Modelling Water and Power Pakistan 92 41.042 cfghijkl
22-04-2020 for Flow Forecasting Development Authority
Study of Kabul River
Basin using GIS/RS
Technology
109 01-05-2011 Private Power Board Private Power & Pakistan 1200 40.400 bcde
31-12-2019 Office Building, Islamabad Infrastructure Board,
Government of Pakistan
110 01-12-2015 Pakistan Kidney & Liver Pakistan Kidney & Liver Pakistan 3000 39.863 ce
30-06-2018 Institute and Research Institute and Research
Center, Lahore Center
111 01-02-2016 Hydropower Training Water and Power Pakistan 241 36.796 cde
30-06-2019 Institute at Mangla Development Authority
112 01-02-2017 Improvement/Construction Irrigation Department, Pakistan 34000 34.340 a
31-01-2019 of Irrigation Canals and Government of Khyber
Channels in Khyber Pakhtunkhwa
Pakhtunkhwa
113 01-09-2019 Solar Water Pumping in National Transmission & Pakistan N.A 34.000 a
31-03-2021 Balochistan Despatch Company
114 01-09-2016 Updating of Balochistan Communication & Works Pakistan N.A 33.161 cgijkl
30-03-2018 Composite Schedule of Department, Government of
Rates Balochistan

115 01-09-2015 Two Residential State Bank of Pakistan Pakistan 600 32.820 bcde
31-12-2019 Buildings at Lalazar,
Karachi
116 01-10-2015 Laying of Sewerage Water & Sanitation Agency, Pakistan 14000 32.033 cdef
30-12-2020 System from Larech Lahore 1. EIA Study
Colony to Gulshan-e- 2. ESIA Study
Ravi, Lahore
117 01-06-2016 National Highway N-30 National Highway Authority Pakistan 20000 31.116 ac
30-06-2018 Basima-Khuzdar (110km),
Balochistan
118 01-12-2017 Water Supply, 1. Gujranwala Development Pakistan 2000 30.725 e
06-04-2020 Sewerage/Drainage Authority
Schemes in WASA, 2. Water & Sanitation
Gujranwala Agency, Gujranwala

General IQ-WITHOUT-STATUS Page 9 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
119 01-02-2014 Environment Assessment United States Agency for Pakistan N.A 30.615 EIA Study
30-06-2018 for Drinking Water and International Development
Wastewater Treatment (USAID)
Plants in Jacobabad and
Peshawar

120 01-04-2018 Divisional Complex Commissioner, Shaheed Pakistan 865 30.300 ce


31-10-2020 Shaheed Benazirabad Benazirabad Division,
Division Govt. of Sindh
121 01-08-2015 Staff Housing Complex Ministry of Foreign Affairs, Pakistan N.A 30.060 c
30-06-2019 Islamabad for Ministry of Saudi Arabia Survey
Foreign Affairs, Saudi
Arabia
122 01-09-2017 Prioritized Special Punjab Industrial Estates Pakistan 29000 30.000 ab
31-12-2019 Economic Zone near Kot Development and
Sarwar Interchange Management Company
(Sukheki-Hafizabad) on
Motorway M-2
123 01-04-2015 Renovation/Upgradation Pakistan Railways Pakistan 2000 30.000 bcd
30-06-2018 and Reconstruction of Geotechnical
Existing Railway Station Investigations
Buildings Across Pakistan

124 01-02-2014 Irrigation Package No. 7, Irrigation Department, Pakistan 460 30.000 cde
30-06-2016 Khyber Pakhtunkhwa Government of Khyber
Pakhtunkhwa
125 24-01-2003 60-Bed Burn Trauma Khyber Pakhtunkhwa Pakistan 550 29.283 bcde
31-05-2019 Centre at HMC, Workers Welfare Board
Peshawar (NWWB), Government of
Khyber Pakhtunkhwa
126 01-11-2015 Relocation of WASA Water & Sanitation Agency, Pakistan 2000 28.400 e
31-03-2020 Services for Orange Line Lahore
Metro Train Project,
Lahore
127 01-06-2015 Monitoring of UNDP United Nations Pakistan 800 28.180 ce
30-04-2019 Projects in Pakistan Development Programme
(UNDP)
128 01-05-2018 Environmental and Social Project Management Unit, Pakistan 6377 26.614 ESIA Study
31-07-2019 Safeguard Documents for Government of Khyber
Khyber Pakhtunkhwa Pakhtunkhwa
Integrated Tourism
Development Project

129 01-05-2014 Police Lines Daggar at Police Department, Pakistan 800 26.250 bced
31-12-2018 District Buner Government of Khyber
Pakhtunkhwa
130 01-07-2013 National Bank of Pakistan National Bank of Pakistan Pakistan 426 25.600 ce
30-06-2019 Branches All Over Pakistan

131 01-06-2017 Replacement of 1. Lahore Development Pakistan 487 25.279 ef


15-11-2018 Installation of 45 Nos. Authority
Tubewells 2. Water & Sanitation
Agency, Lahore

General IQ-WITHOUT-STATUS Page 10 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
132 02-05-2013 Interchange at AWT National Highway Authority Pakistan 200 25.191 e
31-12-2018 Housing Scheme
Sangjani on M-1,
Islamabad
133 30-06-2015 Remodelling of Water & Sanitation Agency, Pakistan N.A 24.750 ef
11-09-2017 Stormwater Channel No.1 Faisalabad
from Sheikhupura Road
to Paharang Drain,
Faisalabad
134 01-03-2016 Yusuf Wala Railway Station Pakistan Railways Freight Pakistan 162 24.466 bce
30-04-2018 Transportation Company Topo Survey

135 01-02-2014 Irrigation Packages-4, Irrigation Department, Pakistan 3016 24.090 cde
30-09-2016 Khyber Pakhtunkhwa Government of Khyber
Pakhtunkhwa
136 01-08-2015 Augmentation/ Water & Sanitation Agency, Pakistan 600 24.000 cde
31-08-2017 Improvement of Disposal Multan PC-I
Stations Multan Phase-I

137 01-09-2018 Changlagali Makhniyal Industries Department, Pakistan N.A 24.000 ac


30-06-2019 Road (44km), Abbottabad Khyber Pakhtunkhwa Survey

138 01-01-2015 1000 Students Hostel and University of Agriculture, Pakistan 1500 23.471 e
30-06-2017 Punjab Bio-energy Faisalabad
Institute at University of
Agriculture, Faisalabad
139 01-07-2013 Combined Academic University of Engineering Pakistan 519 23.340 bce
30-06-2019 Block and Hostels at UET & Technology Taxila
Taxila and Sub-campus
Chakwal
140 01-01-2016 Master Plan of Sewerage Tehsil Municipal Pakistan 22000 23.277 abc
30-06-2021 System for Tehsil Administration, Jhang PC-I
Municipal Administration,
Jhang
141 01-05-2013 State Life Office Buildings State Life Insurance Pakistan 300 22.648 ce
11-09-2019 at Rahim Yar Khan and Corporation of Pakistan
Sialkot
142 01-03-2019 Karachi Urban Mobility 1. Planning & Development Pakistan 45 22.614 c
30-11-2019 Project - Bus Rapid Department, Government 1. PC-I
Transit (BRT) Yellow of Sindh 2. Geotechnical
Line (21km) 2. Project Implementation Investigations
Unit, Karachi 3. Survey
3. Neighborhood 4. Cost Estimate
Improvement Project,
Karachi

143 01-03-2013 Construction of Landfill Lahore Waste Pakistan 1700 22.353 ef


30-12-2016 Site at Lakhodair (Lot I & Management Company
II), Lahore
144 01-11-2018 900MW Bin Qasim Power K-Electric Limited, Karachi Pakistan N.A 22.320 Bid Evaluation
30-09-2020 Station (BQPS)
Combined Cycle &
Associated Projects

General IQ-WITHOUT-STATUS Page 11 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
145 01-02-2015 Greater Iqbal Park, Lahore Parks & Horticulture Pakistan 1000 22.139 bcd
30-06-2017 Authority, Lahore
146 01-07-2015 Roads in Abbottabad Communication & Works Pakistan N.A 21.580 acde
30-06-2017 Department, Government of
Khyber Pakhtunkhwa

147 01-10-2013 World Trade Center DHA Al-Ghurair Giga (Pvt.) Pakistan 8000 20.808 bef
30-10-2016 Phase-II, Islamabad Limited, Islamabad

148 01-04-2013 Replacement of HVAC Communication & Works Pakistan 470 20.600 cde
28-02-2017 Plant, Lifts and Installation Department, Government of
of Heavy Duty Generator Khyber Pakhtunkhwa
in Peshawar High Court

149 01-02-2015 Khyber College of Communication & Works Pakistan 374 20.527 acde
31-12-2018 Dentistry, Peshawar Department, Government of
Khyber Pakhtunkhwa

150 01-09-2015 Improvement of Canal Irrigation Department, Pakistan 371 20.179 ef


30-06-2018 Patrol Road and Drain at Government of Khyber
Takhtbai By-Pass, District Pakhtunkhwa
Mardan
151 01-07-2006 Cadet College Esakhel, Education Department, Pakistan 405 20.141 cde
31-07-2016 Mianwali Government of the Punjab

152 01-12-2015 Rehabilitation of Haveli Irrigation Department, Pakistan N.A 20.115 ad


30-04-2016 Main Line Government of the Punjab

153 01-02-2017 MCR Revamp Project for Pak Arab Refinery Limited Pakistan N.A 20.000 ef
30-11-2020 PARCO-MID Country (PARCO)
Refinery
154 01-01-2014 Upgradation of Bacha Communication & Works Pakistan 2000 19.980 cde
31-12-2017 Khan Medical Complex Department, Government of
for Teaching Purpose, Khyber Pakhtunkhwa
Swabi
155 01-10-2014 Establishment of Communication & Works Pakistan 400 19.900 bcde
30-12-2020 International Standard Department, Government of
Multi-Purpose Khyber Pakhtunkhwa
Gymnasium, Govt. Girls
Degree College Galliyat
& Govt. Degree College
Lora, Abbottabad

156 01-12-2015 Bridges Over Lower Bari Pakistan Railways Freight Pakistan 754 19.860 e
30-04-2017 Doab Canal and Rail Transportation Company
Embankment, Yusafwala

157 01-09-2015 Ramps on Sangla Hill National Highway Authority Pakistan 299 19.649 ef
30-11-2016 Interchange, Motorway
(M-3)
158 15-02-2018 Development Works at Punjab Industrial Estates Pakistan N.A 19.000 e
15-02-2018 Bhalwal Industrial Estate Development and
Phase-II, Bhalwal Management Company

General IQ-WITHOUT-STATUS Page 12 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
159 01-01-2014 Khyber College of Communication & Works Pakistan 375 19.000 ace
30-06-2016 Dentistry, Peshawar Department, Government of
Khyber Pakhtunkhwa

160 15-09-2016 Upgrading Project of China Railway Eryuan Pakistan 837390 18.758 Geodetic Survey
31-12-2019 Pakistan Railway's Engineering Group Co.
Existing Main Line (ML- Limited (CREEC), China
1) and Establishment of
Havelian Dry Port
161 01-01-2016 Selection of Punjab Mineral Company Pakistan 272901 18.244 a
31-12-2019 Concessionaire / Pvt. Limited ESIA Study
Investor(s) for Iron Ore
and Associated Minerals
and Mining and
Establishing Steel Mill in
Chiniot, Punjab
162 01-11-2018 Study on Khyber Japan International Pakistan N.A 18.050 Survey
28-02-2019 Pakhtunkhwa Disaster Cooperation Agency
Affected Rural Roads &
Bridges and Disaster
Management
163 01-05-2011 Office Building of Ministry Ministry of Science & Pakistan 816 18.000 bcde
30-06-2016 of Science and Technology, Government of
Technology, Islamabad Pakistan
164 01-06-2019 Khyber Pakhtunkhwa Japan International Pakistan 110400 17.940 a
31-08-2019 Emergency Rural Roads Cooperation Agency 1. EIA Study
(623km) Rehabilitation 2. PC-I
Project (Phase-II) 3. Survey

165 01-08-2015 Bankers Avenue Bankers Avenue Pakistan 298 17.900 e


31-01-2018 Cooperative Housing Cooperative Housing
Society (BACHS), Lahore Society (BACHS), Lahore

166 01-11-2015 Relocation of WASA Water & Sanitation Agency, Pakistan N.A 17.879 c
30-06-2020 Design Services for Lahore
Orange Line Metro Train
Project, Lahore
167 01-08-2015 Construction of RCC 1. Gujranwala Development Pakistan 944 17.794 e
30-06-2017 Drain Qila Mian Singh Authority
Minor from Rajkot 2. Water & Sanitation
Disposal Station to Agency, Gujranwala
Western By-Pass,
Gujranwala
168 10-03-2014 Physical Protection International Atomic Pakistan 244 17.095 e
31-12-2017 Exterior Laboratories at Energy Agency (IAEA)
Chakri, Islamabad
169 01-10-2016 Flyover Across Railway Communication & Works Pakistan 1000 16.979 ce
30-04-2017 Track in Raiwind City Department, Government of
the Punjab

170 01-12-2014 Bus Rapid Transit Red Integrated Transport Pakistan 20000 16.723 ac
31-01-2017 Line Project in Karachi Planning Limited (ITP),
Sindh

General IQ-WITHOUT-STATUS Page 13 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
171 01-06-2016 Support to Project UN High Commissioner Pakistan N.A 15.500 1. Monitoring
31-12-2019 Implementation/German for Refugees 2. Evaluation
Contribution to the
Refugee Affected and
Hosting Areas
Programme (RAHA-III)
172 01-02-2015 Lower Topa-Kohala National Highway Authority Pakistan 30000 15.124 ac
31-12-2018 Expressway
173 01-01-2014 Gajju Khan Medical Communication & Works Pakistan 500 15.000 acde
31-12-2017 College, Swabi Department, Government of
Khyber Pakhtunkhwa

174 01-11-2019 Infrastructure Defence Housing Pakistan N.A 14.720 c


10-10-2020 Development Works for Authority, Lahore
Phase XI (Rahbar),
Sector IV, DHA Lahore
175 01-01-2016 Establishment of Sub- University of Agriculture, Pakistan 334 14.240 ce
31-12-2018 Campus of University of Faisalabad
Agricultrure, Faisalabad
at Depalpur, Okara

176 01-12-2014 Oil and Gas Well Qasim United Energy Pakistan Pakistan N.A 14.000 a
31-03-2018 Deep-2 near Sekhat, (Pvt.) Limited
Matiari
177 01-09-2015 Establishment of Punjab Lahore General Hospital Pakistan N.A 14.000 e
15-12-2016 Institute of
Neurosciences, Lahore
General Hospital
178 01-12-2012 Faiz Ahmed Faiz Public Ministry of Capital Pakistan 250 13.750 bcde
31-05-2016 Library, Islamabad Administration and
Development, Government
of Pakistan
179 01-03-2014 Schemes under ADP Public Health Engineering Pakistan 268 13.380 cde
28-02-2016 Nos. 215, 216 and 217 Department, Government of
(2013-2014) for Kohat, Khyber Pakhtunkhwa
Karak and Hangu

180 01-07-2014 Sports Complex at Khem Lahore Development Pakistan N.A 13.335 e
31-03-2018 Karan Road, Kasur Authority

181 01-12-2016 220/132kV Gas Insulated 1. National Transmission & Pakistan 2000 13.080 be
28-02-2019 Switchgear Ghazi Road Despatch Company
Substation, Lahore 2. Water and Power
Development Authority

182 01-07-2015 Rehabilitation & Communication & Works Pakistan 183 12.700 acd
30-04-2018 Emergent Nature of Department, Government of
Works in Governor's Khyber Pakhtunkhwa
House Peshawar and
Nathia Gali
183 01-09-2015 Supervision of World Food Programme, Pakistan 150 12.600 e
30-09-2016 Humanitarian Response Pakistan
Facilities at Sukkur

General IQ-WITHOUT-STATUS Page 14 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
184 01-06-2017 Overhead Bridge at Communication & Works Pakistan 667 12.599 e
31-05-2018 Depalpur Chowk, Okara Department, Government of
the Punjab

185 01-05-2020 Temporary Storage Cell World Bank Pakistan 175 12.500 cd
30-06-2020 for Waste Removal from 1. Investigations
Stormwater Drains in 2. Topo Survey
Karachi 3. Environmental
Assessment
4. Social
Assessment
186 01-03-2012 Verification of Milestones United States Agency for Pakistan 3600 12.444 Verifications
31-03-2016 of Gomal Zam Irrigation International Development
Project in Khyber (USAID)
Pakhtunkhwa
187 01-10-2018 Heat Rate and Capacity K-Electric Limited, Karachi Pakistan N.A 12.285 Testing
04-09-2019 Tests for 248MW Korangi
Power Complex (KPC)

188 01-10-2017 Burn & Trauma Centre at Communication & Works Pakistan 770 12.000 cde
31-12-2018 Hayatabad Medical Department, Government of
Complex, Peshawar Khyber Pakhtunkhwa

189 01-12-2019 Loop-in-Loop-Out K-Electric Limited, Karachi Pakistan N.A 11.978 a


30-06-2020 Scheme of 500kV Survey
Transmission Line and
Recommendation of Land
for 500kV Grid Station

190 01-02-2019 Heat Rate & Capacity K-Electric Limited, Karachi Pakistan N.A 11.905 Report
19-11-2019 Tests for 100MW SG
Power Plant
191 01-03-2019 Heat Rate & Capacity K-Electric Limited, Karachi Pakistan N.A 11.905 Report
09-01-2020 Tests for 100MW KG
Power Plant
192 01-04-2006 Cadet College Choa Education Department, Pakistan 450 11.880 bce
31-08-2016 Saiden Shah District Government of the Punjab
Chakwal
193 01-01-2018 Gilgit-Baltistan House at Public Works Department, Pakistan 330 11.500 bce
30-04-2020 Rawalpindi Govt. of Gilgit-Baltistan 1. Geotechnical
Investigations
2. Topo Survey
194 01-12-2016 Bankable Feasibility Study Engro PowerGen Limited, Pakistan N.A 11.500 a
31-10-2018 on Left Bank Outfall Drain Karachi
Scheme
195 01-01-2014 Road from Mufti Pakhtunkhwa Highway Pakistan 240 11.200 e
30-06-2016 Mehmood Flyover to Authority
Budni Bridge, Peshawar
196 01-01-2014 Naval Housing Scheme Pakistan Navy Pakistan N.A 11.000 bce
30-06-2020 Rawat, Islamabad

General IQ-WITHOUT-STATUS Page 15 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
197 01-10-2017 Dualization of Rawalpindi National Highway Authority Pakistan 20000 10.627 acf
31-12-2019 Kahuta Road (33km), 4-
Lane Overhead Bridge at
Sihala

198 01-04-2018 Conducting Heat Rate K-Electric Limited, Karachi Pakistan N.A 10.393 1. Report
31-12-2018 and Capacity Tests at 2. Studies
560MW Combined Cycle
Power Plant at Bin Qasim
II (BQPS-II), Karachi

199 01-06-2016 Establishment of Islamia University of Pakistan N.A 10.160 c


28-12-2019 Academic Block & Two Bahawalpur
Identical Hostels for The
Islamia University
Bahawalpur
200 01-10-2015 North South Gas Pipeline CHEMPRO a.s. Europe Pakistan 177000 10.000 a
31-12-2018 Project
201 01-12-2016 Site Specific Seismic Maple Leaf Cement Pakistan N.A 9.710 1. Studies
28-02-2020 Hazard Microzonation Factory Limited 2. Structural
Studies, Maple Leaf Stability
Cement Factory,
Iskandarabad
202 16-04-2004 Comprehensive Water & Sanitation Agency, Pakistan 30000 9.200 bcde
31-12-2016 Sewerage and Drainage Lahore
Scheme for Southern
Lahore
203 01-09-2016 128-Bed Liaquat United Nations High Pakistan 830 9.200 bc
31-12-2017 Memorial Hospital Commissioner for EIA Study
(LMH), Kohat Refugees
204 01-05-2018 Construction of PTCL Pakistan Pakistan 180 9.107 ce
30-06-2019 Warehouse at Islamabad Telecommunication
Company Limited
205 01-09-2013 Flood Studies and Design Maple Leaf Cement Pakistan N.A 9.013 c
30-06-2016 of Drainage Facilities Factory Limited

206 01-02-2009 Water Supply Scheme Water & Sanitation Agency, Pakistan 500 8.977 e
30-06-2016 Phase VI, Multan Multan
207 01-03-2015 Development of Parks & Horticulture Pakistan 190 8.950 c
31-05-2016 Conceptual Design and Authority, Lahore
Landscaping of Botanical
Garden Jallo, Lahore

208 01-09-2013 Establishment of Cadet Education Department, Pakistan N.A 8.900 bcd
31-12-2017 College Chilas at Daran, Government of Gilgit
Gilgit-Baltistan Baltistan
209 01-12-2015 Establishment of Model Primary & Secondary Pakistan 150 8.780 ce
31-12-2018 Drug Testing Laboratory, Healthcare Department,
Lahore Lahore
210 01-05-2018 Reconstruction of Bridge Pakhtunkhwa Highway Pakistan 76 8.750 ef
30-11-2019 at Tauheedabad Authority
Peshawar-Naguman
Section of Provincial
Highway S-I, Peshawar
General IQ-WITHOUT-STATUS Page 16 of 28
Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
211 01-09-2006 Sewerage and Drainage Walton Cantonment Boards Pakistan 2500 8.000 acd
31-12-2016 Systems in Lahore and Lahore
Walton Cantonment Areas

212 01-07-2013 Quetta Integrated Video Science & IT Department, Pakistan 1600 8.000 acd
29-02-2016 Surveillance System Government of Balochistan

213 01-08-2012 Daanish Schools at Board of Governance, Pakistan 486 8.000 cd


30-04-2018 Tehsil Mailsi District Daanish Schools at Tehsil Survey
Vehari Mailsi District Vehari

214 01-06-2019 Establishment of Education Department, Pakistan 478 8.000 cd


31-10-2019 Polytechnic Institute for Government of Gilgit
Boys at Skardu, Gilgit- Baltistan
Baltistan
215 01-11-2015 Montessori Section at Bahria College, Nore-I, Pakistan 169 8.000 ce
31-08-2018 Bahria College Nore-I, Karachi
MT Khan Road, Karachi
216 01-05-2014 Irrigation Package-12, Irrigation Department, Pakistan 115 8.000 def
30-06-2016 Khyber Pakhtunkhwa Government of Khyber
Pakhtunkhwa
217 01-03-2018 Humanitarian Response World Food Programme, Pakistan 94 7.966 e
12-11-2019 Facility in Gilgit Pakistan

218 01-09-2012 Punjab Government Punjab Government Pakistan 1038 7.950 bcd
30-06-2018 Servants Housing Servants Housing
Scheme, Sialkot Foundation, Lahore
219 01-05-2014 Preparation of Water & Sanitation Agency, Pakistan 2690 7.800 ce
31-03-2017 Comprehensive Lahore
Sewerage and Drainage
Scheme for South Lahore

220 01-04-2014 Bridges in District D.I. Communication & Works Pakistan 164 7.500 abce
30-06-2016 Khan and Nowshera Department, Government of
Khyber Pakhtunkhwa

221 01-11-2017 Structural Design Yangtze Three Gorges Pakistan N.A 7.500 f
31-01-2020 Review/Vetting of Six Technology & Economy Structural Stability
Bridges in Reservoir of Development Co. Limited,
Karot Hydropower Project China

222 01-08-2016 Construction Suitability Maple Leaf Cement Pakistan N.A 7.370 1. Geophy. Study
31-01-2017 Assessment of Grey Factory Limited 2. Geotech Study
Cement Plant, Line-III,
Maple Leaf Cement
Factory, Iskandarabad
223 01-06-2011 Restoration of Original Water & Sanitation Agency, Pakistan 242 7.317 e
31-12-2019 Cross Section of Lahore
Satukatla Drain, Lahore
224 01-09-2013 Mehran Highway Phase- Port Qasim Authority Pakistan 248 7.026 cde
30-06-2017 III from Port Qasim Road Survey
to Steel Mills Road
(3.13km)
General IQ-WITHOUT-STATUS Page 17 of 28
Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
225 01-09-2017 Gravity/Lift Irrigation Irrigation Department, Pakistan N.A 6.800 a
30-06-2018 Schemes for Nizampur Government of Khyber
Area, District Nowshera Pakhtunkhwa
226 01-08-2017 Glacier Monitoring AHT Group AG, Germany Pakistan N.A 6.790 a
31-07-2020 Network for Energy &
Water Safety in Pakistan

227 01-06-2014 Sports Complex at Khem Lahore Development Pakistan N.A 6.394 bcd
31-07-2016 karan Road, Kasur Authority

228 01-01-2014 Baran Dam Intake Irrigation Department, Pakistan 1000 6.199 ef
30-06-2018 Structure Bannu Government of Khyber
Pakhtunkhwa
229 01-05-2018 Connecting Faisalabad- National Highway Authority Pakistan 5000 6.103 ac
31-12-2018 Sahianwala Expressway
with Sangla Hill
Alongside Canal Bank

230 01-04-2007 National Bank Building, National Bank of Pakistan Pakistan 107 6.018 bcde
30-12-2016 Lahore
231 01-07-2014 Car Parking Plaza at Balochistan Engineering Pakistan 1031 6.000 ab
30-06-2017 Circular Road, Quetta Services Agency (BESA)
232 01-04-2016 Traffic Study of SL-II, SL- Lahore Ring Road Pakistan N.A 6.000 Traffic Studies
30-06-2016 III Lahore Ring Road Authority, Government of
(Southern-Loop) the Punjab
233 01-05-2017 Greater Peshawar Transport & Mass Transit Pakistan N.A 5.800 1. Geotechnical
30-09-2017 Region Mass Transit Department, Government of Investigations
System Circular Railway Khyber Pakhtunkhwa 2. Tech.
Assistance
234 01-04-2018 Auditorium for Bhakkar Punjab Council of the Arts, Pakistan N.A 5.790 c
31-08-2018 Arts Council, Bhakkar Lahore PC-I
235 01-11-2013 Rangmala Irrigation Irrigation Department, Pakistan 105 5.295 e
30-06-2019 Scheme, Malakand Government of Khyber
Pakhtunkhwa
236 01-06-2015 Upgradation of Major Works & Services Pakistan 132 5.290 e
30-01-2018 Sharif Shaheed (Nishan- Department, Gujrat
e-Haider) R.H.C. Kunjab
into 60-Bed Tehsil
Hospital, Gujrat

237 01-07-2018 Establishment of Communication & Works Pakistan N.A 5.132 e


22-05-2020 Government Girls Degree Department, Government of
College Rajoya, Khyber Pakhtunkhwa
Abbottabad
238 01-04-2019 Greater Karsaz Area, Pakistan Navy Pakistan N.A 5.062 b
31-07-2019 Karachi
239 01-07-2014 Geometric Improvements Balochistan Engineering Pakistan 700 5.000 ab
30-06-2017 at Koyla Pattak Services Agency (BESA)
Intersection, Quetta

General IQ-WITHOUT-STATUS Page 18 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
240 01-11-2011 Interior Designing and National University of Pakistan 163 5.000 c
30-06-2016 Space Management of Science & Technology,
Library/Information Islamabad
Resource Centre at
NUST, Islamabad
241 01-10-2017 MV/LV Underground Citi Housing Private Pakistan N.A 5.000 Studies
31-12-2017 Distribution Network at Limited, Gujranwala
citi Housing Gujranwala
242 01-01-2016 Development of Multi- National Logistic Cell Pakistan N.A 5.000 a
31-12-2016 purpose Commercial
Building Project on NLC
Plot Situated on Jinnah
Avenue, Blue Area,
Islamabad
243 01-03-2018 Environmental Studies of Water & Sanitation Agency, Pakistan N.A 4.998 1. EIA Study
31-07-2019 ADP Schemes of WASA, Faisalabad 2. IEE Study
Faisalabad
244 01-04-2015 Procurement of Water Police Department, Pakistan N.A 4.980 d
31-12-2018 Cannons and Various Government of the Punjab Inspection
Equipment
245 01-06-2019 Pishukhan Land & Town Headquarters Commander Pakistan N.A 4.975 b
31-08-2019 Planning of 150 Acres West at PNS Akram, Survey
Gwadar Gwadar
246 01-01-2012 High School for Boys at Workers Welfare Fund, Pakistan 90 4.500 bcde
30-12-2016 Surkhpur, Gujrat Ministry of Human
Resources Development,
Government of Pakistan

247 01-05-2011 Design Services for Water & Sanitation Agency, Pakistan 398 4.460 bc
30-06-2020 Restoration of Original Lahore
Cross Section of
Sattukatla Drain, Lahore
248 01-10-2018 Renovation of 3rd Floor, Board of Revenue, Pakistan 50 4.364 ce
28-02-2020 Northern and Southern Government of Sindh
Wings, Shaheen
Complex, Karachi

249 01-11-2016 132kV Double Circuit Multan Electric Power Pakistan 350 4.222 ef
31-05-2017 Transmission Line Company (MEPCO)
Sadiqabad-Guddu at
Indus River Crossing
250 01-06-2013 National Bank of Pakistan, National Bank of Pakistan Pakistan 70 4.200 bcde
30-06-2019 Sukkur Branch

251 01-10-2017 Gharibwal Cement Gharibwal Cement Limited, Pakistan N.A 4.120 Rehabilitation
30-06-2018 Limited Lahore Work
252 01-04-2016 Seismic Retrofitting of Health Infrastructure Pakistan N.A 4.100 cd
31-01-2018 Main Block of Abbas Program, AJK Structural Stability
Institute of Medical
Sciences, AJK

General IQ-WITHOUT-STATUS Page 19 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
253 01-05-2017 Library & Student Service Mirpur University of Pakistan 111 3.900 ce
31-12-2018 Centre at Mirpur Science & Technology
University of Science &
Technology (MUST),
Mirpur
254 01-05-2019 Faculty Block (Ground+8) National University of Pakistan 300 3.750 c
30-06-2019 at NUST Campus Sector Science & Technology,
H-12, Islamabad Islamabad

255 01-06-2019 Hydraulic/Topographic Irrigation Department, Pakistan N.A 3.540 1. Topo Survey
31-12-2019 Survey of River Chenab Government of the Punjab 2. Bathymetric
U/S & D/S Shahbazpur Surveys
Bridge
256 01-11-2019 Earthquake Assessment Laraib Energy Limited, Pakistan N.A 3.521 c
31-12-2019 of Civil Structures and Islamabad 1. Survey
Design of Fire Fighting 2. Structural
Water Storage Tank at Stability
84MW New Bong Escape
Hydropower Project

257 01-03-2016 Seismic Hazard Maple Leaf Power Limited Pakistan N.A 3.500 1. Studies
30-06-2016 Microzonation Studies for 2. Structural
Maple Leaf Factory, Stability
Iskandarabad
258 01-03-2012 Professional Capacity World Bank Pakistan N.A 3.342 Training
31-12-2018 Building Program on
Resettlement and
Rehabilitation
259 01-04-2019 Ambient Air Monitoring of K-Electric Limited, Karachi Pakistan N.A 3.120 Env. Monitoring.&
31-03-2020 Hydrogen Sulfide at K- Testing
Electric Bin Qasim Power
Station-II (BQPS-II),
Karachi
260 01-02-2017 Construction of National Highway Authority Pakistan 696 3.067 ac
30-08-2020 Farooqabad Interchange
on Motorway M-2,
Sheikhupura

261 01-11-2018 Assessment of Structural IAS Airport Solutions Pakistan N.A 3.000 f
31-03-2020 Calculation for Storage GmbH, Germany Structural Stability
Rack Structure at Gerry's
Dnata Warehouse at
JIAP, Karachi

262 01-11-2015 Environmental Impact Faisalabad Waste Pakistan N.A 2.769 1. EIA Study
31-12-2019 Assessment of Solid Management Company 2. Geotechnical
Waste Landfill Site at Investigations
Lakhuana, Faisalabad
263 01-10-2016 Cross Sectional Survey of Punjab Irrigated Pakistan N.A 2.750 Topo Survey
31-12-2016 Abbasia Link Canal and Agriculture Investment
Strip Survey of Proposed Program Consultants
Irrigation System in (PIAIP)
Greater Cholistan

General IQ-WITHOUT-STATUS Page 20 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
264 01-02-2017 Construction of Kot Pindi National Highway Authority Pakistan 502 2.726 ac
30-06-2018 Das Interchange on
Motorway M-2
265 01-09-2019 Agriculture Urban Sector Planning and Pakistan N.A 2.600 a
30-09-2020 Diversification Plan Management Services, Survey
(ADP) for Bahawalpur Government of the Punjab
Division
266 01-11-2019 Widening of Road from Khalid Rauf & Co. (Pvt.) Pakistan N.A 2.500 f
30-04-2020 Thokar Niaz Baig to Limited, Lahore Pedestrian Bridge
Hudyiara Drain, Multan
Road (N-5), Lahore
267 01-07-2015 NBP Branch at Sakrand National Bank of Pakistan Pakistan 45 2.470 bcde
31-12-2018
268 01-11-2015 Land Records Defence Housing Pakistan N.A 2.360 Mapping
28-02-2016 Management Information Authority, Peshawar
System Project Defence
Housing Authority,
Peshawar

269 01-03-2017 Girls Hostel at University University of Kotli, AJK Pakistan 140 2.350 cd
28-02-2018 of Kotli, AJK
270 01-03-2012 Second and Third Floors National Bank of Pakistan Pakistan 47 2.348 ce
30-06-2018 of National Bank of
Pakistan Branch, Larkana

271 01-03-2019 Canine Center - Lohi United Nations Office on Pakistan 40 2.250 c
30-04-2019 Bhair, Islamabad Drugs and Crime,
Islamabad
272 01-08-2018 248MW CCPP Korangi K-Electric Limited, Karachi Pakistan N.A 2.176 Verifications
03-10-2018 Power Complex, Karachi

273 01-01-2017 Provincial Cold Chain United Nations High Pakistan 131 2.000 bc
30-06-2017 Warehouse at Peshawar Commissioner for
Refugees
274 01-04-2019 Conceptual Study for Kohala Hydro Company Pakistan N.A 2.000 c
30-06-2019 Sewage Treatment Plant (Pvt) Limited, Studies
related to 1124MW Muzaffarabad, Azad
Kohala Hydropower Kashmir
Project, Azad Jammu &
Kashmir
275 01-02-2019 Structural Vetting of Pakistan Rangers Pakistan N.A 2.000 f
30-06-2019 Apartment Buildings of Structural Stability
Mehran Residential
Complex North
Nazimabad, Karachi
276 01-05-2018 Girls Student Hostel at University of Science & Pakistan 73.29 1.940 ce
30-06-2020 University of Science & Technology, Bannu
Technology, Bannu
277 01-01-2009 Environmental Impact City District Government, Pakistan 200 1.907 EIA Study
30-06-2018 Assessment of Kachha Lahore
Landfill Site, Lahore

General IQ-WITHOUT-STATUS Page 21 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
278 01-10-2019 PEC Regional Office Pakistan Engineering Pakistan 1000 1.867 Third Party
31-12-2019 Building at Hayatabad, Council Verification
Peshawar
279 01-05-2018 Examination Section, University of Science & Pakistan 76 1.843 cde
30-06-2020 Guest House and Technology, Bannu Geotechnical
Cafeteria at University of Investigations
Science & Technology,
Bannu
280 01-10-2018 Expansion of Casting Unit Atlas Honda (Pvt.) Limited Pakistan N.A 1.780 EIA Study
30-08-2019 at Atlas Honda Limited,
Sheikhupura
281 01-01-2016 Pakistan Red Crescent Pakistan Red Crescent Pakistan 140 1.700 ce
30-06-2017 Society State and District Society
Branches in Azad Jammu
& Kashmir
282 01-02-2019 Traffic Study in the Nue Multiplex & Pakistan N.A 1.700 Traffic Studies
30-04-2019 Vicinity of Nueplex Rashid Entertainment Square Co.
Minhas Road, Karachi (Pvt.) Limited, Karachi

283 01-11-2017 Establishment of Lahore Waste Pakistan N.A 1.609 EIA Study
30-06-2019 Autoclave for Treatment of Management Company
Infectious Hospital Waste
at Compost Plant
Mehmood Booti, Lahore

284 01-06-2013 National Bank of Pakistan, National Bank of Pakistan Pakistan 30 1.600 bcde
31-12-2018 Mehrabpur Branch

285 01-11-2016 Evaluation Report Federal Investigating Pakistan N.A 1.600 f


31-12-2016 Regarding MRL Lift Agency (FIA) Report
Installed at Election
Commission of Pakistan,
Islamabad
286 02-04-2018 Additional Offices at National University of Pakistan 150 1.500 c
31-01-2019 NUST Campus Sector H- Science & Technology,
12, Islamabad Islamabad
287 01-07-2011 Laying of Sewerage Water & Sanitation Agency, Pakistan N.A 1.500 f
31-12-2016 System at Allama Iqbal Lahore
Road from Garhi Shahu
Chowk to Mayo Gardens,
Lahore
288 12-05-2016 Shifting of Private Power Private Power & Pakistan N.A 1.500 c
31-08-2016 & Infrastructure Board Infrastructure Board,
Office to Emigration Government of Pakistan
Tower, Mauve Area, G-
8/1, Islamabad

289 01-03-2019 Town Planning SRE Land Pakistan Navy Pakistan N.A 1.490 b
31-05-2019 at Pakistan Navy
Ammunition Depot
(PNAD), Mauripur

General IQ-WITHOUT-STATUS Page 22 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
290 01-09-2016 Design Review of 36' Dia Sui Northern Gas Pakistan N.A 1.450 f
31-10-2016 Overhead River Sutluj Pipelines Limited
Pipeline Crossing near
UCH Shariff
291 01-07-2019 Vehicular Bridge at Agha Agha Khan University, Pakistan N.A 1.400 f
31-12-2019 Khan University Hospital, Karachi
Karachi
292 01-08-2020 Restoration/Upgradation Crimson Engineering Pakistan N.A 1.293 1. Traffic Studies
31-10-2020 of Jacobabad-Silra (Pvt.) Limited, Lahore 2. Traffic Survey
Shahdadkot-Larkana
Section (135km)
293 01-09-2015 Feasibility Study and Communication & Works Pakistan 150 1.260 bc
31-12-2017 Construction of Sub-Jail Department, Government of
Nathiagali, Abbottabad Khyber Pakhtunkhwa

294 01-08-2017 Training on Numerical Pakistan Nuclear Pakistan N.A 1.150 1. Studies
31-08-2017 Modeling and Dam Break Regulatory Authority 2. Training
Analysis/Studies
295 01-10-2017 Ground Water Availability Namal Education Pakistan N.A 1.078 Study
31-12-2017 Study for Namal Foundation, Lahore
Knowledge City Mianwali

296 14-11-2016 Traffic Studies at Balloki Irrigation Department, Pakistan N.A 1.074 1. Survey
30-06-2019 and Sidhnai Headworks Government of the Punjab 2. Traffic Studies

297 01-10-2015 Two Passenger Elevators Federal Board of Revenue Pakistan N.A 1.001 bcde
01-03-2017 for Regional Tax Office
at Tax House Building,
Lahore
298 01-05-2019 Naval Research & Pakistan Navy Pakistan N.A 1.000 c
31-08-2019 Development Institute
Technology Complex at
Greater Karsaz Area,
Karachi
299 01-08-2016 Structural Evaluation of Saudi Pak Industrial & Pakistan N.A 1.000 c
31-10-2016 Saudi Pak Tower Agricultural Investment Structural Stability
Building, Islamabad Company (Pvt.) Ltd
300 01-04-2014 Disposal Station near Walton Cantonment Board Pakistan N.A 0.973 IEE Study
30-06-2018 Askari-III Bedian Road,
Lahore
301 01-09-2012 Women Business Small & Medium Pakistan 19 0.970 ce
30-06-2016 Development Centre, Enterprise Development
Karachi Authority, Karachi
302 01-11-2017 Power House at Atlas Atlas Autos (Pvt.) Limited Pakistan N.A 0.891 IEE Study
30-12-2018 Autos Limited, Sheikhupura

303 01-03-2017 Preparation of Technical Medical Superintendent, Pakistan N.A 0.800 1. Survey
30-04-2017 Specifications of Five Lifts Holy Family Hospital, 2. Technical
of Holy Family Hospital, Rawalpindi Specifications
Rawalpindi

General IQ-WITHOUT-STATUS Page 23 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
304 01-01-2019 Remedial Measures for Sui Northern Gas Pakistan N.A 0.750 1. Survey
28-02-2019 16" Dia Overhead Pipelines Limited 2. Hydraulic Study
Crossing at BSL Canal 3. Remedial
MP 151.84 (N-LEG) Measures

305 01-03-2017 36" Dia Overhead River Sui Northern Gas Pakistan N.A 0.657 ce
30-04-2017 Sutluj Pipeline Crossing Pipelines Limited
near Uch Sharif
306 01-01-2016 One Passenger Elevators Federal Board of Revenue Pakistan N.A 0.604 bcde
01-02-2017 for Large Tax Payer Unit,
Federal Board of
Revenue at Tax House
Building, Lahore

307 01-02-2017 Initial Environmental Atlas Autos (Pvt.) Limited Pakistan N.A 0.597 IEE Study
31-12-2019 Examination (IEE) of
Construction of Delivery
Control Centre (DCC-3),
Sheikhupura
308 01-02-2017 IEE of Engine Plant Atlas Autos (Pvt.) Limited Pakistan N.A 0.597 IEE Study
30-04-2017 Extension at Atlas Honda
Limited, Sheikhupura

309 01-12-2016 Initial Environmental Atlas Foundation, Karachi Pakistan N.A 0.591 IEE Study
31-12-2019 Examination of Atlas
Vocational Training
Institute, Sheikhupura
310 01-02-2017 Initial Environmental Atlas Autos (Pvt.) Limited Pakistan N.A 0.591 IEE Study
31-12-2019 Examination (IEE) of
Construction of Atlas
Autos Limited Extension,
Sheikhupura
311 01-10-2015 Initial Environmental Atlas Honda (Pvt.) Limited Pakistan N.A 0.417 IEE Study
30-06-2018 Examination (IEE) for
Extension of Assembling
Unit, Welding Shop &
Canteen at Atlas Honda
Plant, Sheikhupura

312 01-10-2015 Initial Environmental Atlas Autos (Pvt.) Limited Pakistan N.A 0.417 IEE Study
30-06-2018 Examination (IEE) for
Extension of Plant Shop,
Warehouse & Canteen at
Atlas Honda Plant,
Sheikhupura

313 08-12-2016 Technical Evaluation of Medical Superintendent, Pakistan N.A 0.400 f


30-12-2016 Six Lifts of Holy Family Holy Family Hospital, Survey
Hospital, Rawalpindi Rawalpindi
314 02-04-2018 Rector's Residence at National University of Pakistan 23 0.288 c
23-04-2018 NUST Campus Sector H- Science & Technology,
2, Islamabad Islamabad

General IQ-WITHOUT-STATUS Page 24 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
315 01-11-2015 Flyover at Kahna Kacha Pakistan Railways Pakistan N.A 0.260 f
29-02-2016 Station Yard, Defence
Road, Lahore
316 01-05-2014 Urdu Bagh, Karachi Anjuman-e-Tarraqi-e- Pakistan N.A 0.000 ce
31-07-2016 Urdu Pakistan
317 01-11-2015 Establishment of State of Health Department, Pakistan 1500 e
31-08-2017 the Art Drug Testing Government of the Punjab
Laboratory, Lahore
318 01-08-2014 New Passenger Elevator NESPAK Pakistan 9 cde
01-11-2016 at NESPAK House, Lahore

319 01-07-2007 200-bed Jinnah Hospital Planning Commission, Afghanistan 1087 150.000 bcde
31-07-2018 at Kabul, Afghanistan Government of Pakistan

320 01-05-2008 Naeb Aminullah Khan Planning Commission, Afghanistan 1077 122.000 bcde
31-05-2018 Logari Hospital at Logar, Government of Pakistan
Afghanistan
321 01-05-2015 200-bed Jinnah Hospital Pakistan Public Works Afghanistan 1000 15.029 ce
31-12-2018 Kabul and Naeb Amin Department
Ullah Khan Logari
Hospital at Logar,
Afghanistan
322 01-05-2015 Supply & Fixation of Pakistan Public Works Afghanistan 91 3.375 be
30-04-2018 Furniture Works for Department
Jinnah Hospital at Kabul,
Naeb Amin Ullah Khan
Logari Hospital at Logar,
Nishter Kidney Center at
Jalalabad and Students
Hostel for Rehman Baba
School at Kabul

323 01-03-2019 Booue and Tsengue- Economic Community of Gabon N.A 5.400 c
28-02-2020 Leledi Hydroelectric Central African States
Projects, Gabon Central (ECCAS), Gabon
Africa
324 01-05-2015 Zarqa Maeen Dam, Jordan Ministry of Water & Jordan 1540 48.746 e
31-10-2017 Irrigation, Jordan
325 01-04-2018 Wadi Middein Dam, Jordan Jordan Valley Authority, Jordan 890 9.668 acd
01-01-2019 Ministry of Water &
Irrigation, Hashemite
Kingdom of Jordan
326 01-11-2016 Technical Assistance for Federal Ministry of Water Nigeria N.A 108.309 l
30-11-2019 Dam Safety Assurance Resources, Nigeria Technical
and Training of Dam & Assistance
Reservoir Operation
Department and River
Basin Development
Authority Staff Under the
Transforming Irrigation
Management, Nigeria

General IQ-WITHOUT-STATUS Page 25 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
327 24-11-2016 Upgradation and Government of Enugu State Nigeria 25460 13.200 e
11-11-2018 Rehabilitation of Rural of Nigeria
Access Roads (1450km)
and Mobility Project II,
Nigeria
328 01-06-2008 Madinat ul Ilam Ring Ministry of Transport & Oman 5260 453.548 cde
31-03-2020 Road, Oman Communications, Oman
329 13-02-2014 Roads and Infrastructure Economic Zone Authority Oman 62002 240.000 c
28-02-2023 in Town of Duqm Duqum, Oman
(Package-I), Oman

330 09-12-2013 Improvement of Main Economic Zone Authority Oman 3473 232.064 cde
31-03-2018 Road at Duqm, Oman Duqum, Oman
331 01-05-2013 Asphalt Road in Wilayat Ministry of Transport & Oman 4211 229.429 e
30-04-2019 Madha, Governorate of Communications, Oman
Musandam Oman

332 01-09-2012 Roundabouts at Sohar on Ministry of Transport & Oman 5437 205.950 e
31-03-2017 Existing Batinah Highway, Communications, Oman
Oman
333 01-06-2017 Water Distribution Public Authority for Oman 26072.24 147.682 e
21-01-2020 Networks for Nakhal, Electricity and Water, Oman
Awabi and Wadi Al-
Maawil Wilayats in Al-
Batinah Region Phase-I,
Oman
334 30-12-2013 Roads on Southern Ministry of Transport & Oman 2104 102.968 e
31-03-2017 Breakwater in Sohar Communications, Oman
Industrial Port Area, Oman

335 01-10-2011 Sewerage Network Ministry of Regional Oman 14298 83.933 cde
31-12-2017 System for Willayah Al- Municipalities & Water
Musanna, Oman Resources, Oman
336 21-12-2015 Integrated Waste Special Economic Zone Oman 1904 56.374 ce
31-08-2017 Treatment, Storage and Authority at Duqm, Oman
Disposal Facility in
Duqm, Oman
337 27-11-2018 Asphalt Road between Al- Ministry of Transport & Oman 1280 35.621 e
10-09-2020 Wajaja (Wilayat Shinas) Communications, Oman
and Al-Fai (Wilayat
Madha), Oman
338 03-07-2017 Building & Survey in Muscat Municipality, Oman Oman N.A 17.096 Survey
31-03-2019 Quriyat Muscat
Municipality, Oman
339 02-10-2018 Service Road at Aman Premier International Oman 1231 11.914 c
31-03-2019 District in Duqm, Oman Projects LLC, Oman
340 01-11-2015 110 Villas at Al-Khor Al-Aqaria Real Estate, Qatar 4314 369.021 e
31-05-2020 Housing Community Qatar
Package 9, Qatar
341 31-07-2017 Pakistan Embassy Embassy of Pakistan, Qatar Qatar 730 64.694 bcde
21-01-2020 Complex Doha, Qatar

General IQ-WITHOUT-STATUS Page 26 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
342 10-12-2015 Workers Accommodation M/s Shaqab Group, Qatar Qatar 14070 51.662 cd
30-06-2019 Community at Umme Slal,
Qatar

343 01-03-2013 Three Convenience Al-Meera Consumer Qatar 2978 50.528 cd


31-01-2020 Stores Leabaib, Jeryan Goods Co., Qatar
Junaihat and Al-Saileyah
Qatar
344 01-12-2014 MKM Office Tower, Qatar MKM Real Estate Qatar 1746 36.663 e
30-06-2019 Investment Contracting &
Trading, Qatar
345 09-04-2017 Alaqaria South Qatar Real Estate Qatar 7137 34.528 c
14-01-2018 Development Project at Investment Company, Qatar
Al-Wakra, Qatar
346 04-01-2017 New LV Room, Panel Doha English Speaking Qatar N.A 18.597 ef
31-08-2020 Room and Fire House School, Qatar
Reel System, Qatar
347 14-03-2019 Industrial Area and Redco International, Qatar Qatar 9594 7.586 cde
31-10-2019 Mubaireak Interchanges
at Salwa Road Doha,
Qatar
348 25-10-2016 Enabling Works Package Lamela International Qatar N.A 5.881 e
28-02-2018 for Marina 004 Tower, Design Consultant, Qatar
Qatar
349 22-01-2019 Proposed Metro Station Qatar University, Qatar Qatar N.A 5.157 cd
30-06-2019 Road at Qatar University, Bid Evaluation
Qatar
350 01-03-2017 HBK Labour Dynamic Management Qatar 3514 4.566 f
31-01-2020 Accommodation at Al Group, Qatar
Muither, Qatar
351 17-12-2015 Design of Interior & Mep M/s Shaqab, Qatar Qatar N.A 4.350 c
31-12-2017 Works for Al-Huda
Restaurant, Qatar
352 29-03-2016 Concept Design for M/s Sharaka Holding, Qatar N.A 3.966 c
31-07-2016 Manateq Labour Qatar
Accommodation Project,
Qatar
353 01-10-2017 Residential Building at Mr. Fareed Mohamed Al Qatar 955 2.670 cd
31-10-2019 Fox Hill Lusail, Qatar Abdulla, Qatar
354 01-04-2010 Dams in Southern Ministry of Environment, Saudi Arabia 10861 1201.460 ef
31-05-2019 Region, Saudi Arabia Water & Agriculture, Saudi
Arabia
355 01-10-2009 Water Transmission from Ministry of Environment, Saudi Arabia 69352 1006.420 ef
30-06-2021 Hali, Yabba, Qanuna and Water & Agriculture, Saudi
Laith Dams to Al- Arabia
Shoaibah Desalination
Plant Jeddah in Makkah
Al-Mukarramah Region,
Saudi Arabia

General IQ-WITHOUT-STATUS Page 27 of 28


Projects Completed by NESPAK During the Last Five Years

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
356 01-03-2008 2530MW Rabigh and Saudi Electricity Company Saudi Arabia 501163 769.000 e
26-08-2018 Shuqaiq Power Plants, - Western Operating Area,
Saudi Arabia Saudi Arabia

357 01-08-2009 Transmission of Water Ministry of Environment, Saudi Arabia 18502 736.175 ef
31-12-2017 from Khulais and Rabaigh Water & Agriculture, Saudi
Dams to Jeddah (Phase-I Arabia
& II) in Makkah Al-
Mukarramah Region,
Saudi Arabia

358 01-01-2007 454MW Tabouk Power Saudi Electricity Company Saudi Arabia 8546 264.000 e
31-12-2017 Plant Stage VII - Western Operating Area,
(Reinforcement), Saudi Saudi Arabia
Arabia
359 01-06-2010 2236MW Riyadh Power Saudi Electricity Company Saudi Arabia 414371 168.300 e
31-12-2017 Plant No. 10 and Simple - Central Operating Area,
Cycle and Combined Saudi Arabia
Cycle PP-12, Saudi Arabia

General IQ-WITHOUT-STATUS Page 28 of 28


Ongoing Hospital and Medical Facility Projects of NESPAK

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
1 25-07-2016 Pakistan Kidney & Liver Infrastructure Development Pakistan 3400 469.530 cde
30-06-2021 Institute and Research Authority Punjab
Center (Package-C)
Lahore

2 01-05-2017 Establishment of 100-Bed Infrastructure Development Pakistan 3100 115.940 ce


31-05-2021 Mother and Child Care Authority Punjab
Hospital at Abu Dhabi
Road, Murree

3 01-02-2016 Establishment of 100-Bed Infrastructure Development Pakistan 3927 91.748 abc


30-04-2021 Mother and Child Care Authority Punjab
Hospital at Abu Dhabi
Road, Murree

4 01-03-2018 Jinnah Institute of Cancer Patients' Aid Foundation Pakistan 5000 78.800 ce
31-03-2022 & Research Center at (PAF) Karachi
JPMC (PPP Mode),
Karachi

5 01-07-2006 Federal Hospital for Pakistan Public Works Pakistan 5300 72.693 e
30-06-2021 Women and Children, Department
Rawalpindi

6 01-08-2020 Establishment of Dera Infrastructure Development Pakistan 1750 50.900 e


31-08-2022 Ghazi Khan Institute of Authority Punjab
Cardiology

7 01-01-2015 Jinnah Sindh Medical Jinnah Sindh Medical Pakistan 200 48.000 bc
31-03-2021 University, Karachi University, Karachi 1. Survey
2. Evaluation
8 01-07-2016 Construction of Hospital Infrastructure Development Pakistan 8000 42.023 Miscellaneous
31-03-2021 Complex of Pakistan Authority Punjab
Kidney and Liver Institute
and Research Centre,
Lahore

9 01-03-2005 410-Bed Women Hospital Pakistan Public Works Pakistan 5300 40.423 bcd
30-06-2021 and Chest Disease Department
Centre at Rawalpindi

10 01-01-2018 Combined Warehouse for Ministry of National Health Pakistan 476 19.000 ce
31-03-2021 TB, HIV & Malaria Services, Regulations and 1. Geotechnical
Programs Under HPSIU Coordination, Government Investigations
of Pakistan 2. Topo Survey

11 01-09-2018 Women and Children Communication & Works Pakistan 250 12.950 ace
30-06-2022 Hospital at Old Tehsil Department, Government of
Building Sarai Naurang, Khyber Pakhtunkhwa
Lakki Marwat

12 01-06-2020 Leftover Works at College Ayub Medical College & Pakistan 152 10.624 ce
30-06-2021 of Dentistry, Ayub Hospital Complex,
Teaching Hospital, Abbottabad
Abbottabad

General IQ-WITHOUT-STATUS Page 1 of 2


Ongoing Hospital and Medical Facility Projects of NESPAK

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
13 01-03-2018 Neurology and Psychiatry Jinnah Post Graduate Pakistan 700 10.500 ce
31-03-2021 Project at Jinnah Post Medical Center, Karachi
Graduate Medical Centre,
Karachi

14 01-11-2019 Khyber College of Communication & Works Pakistan N.A 10.460 cde
30-06-2021 Dentistry, Peshawar Department, Government of
Khyber Pakhtunkhwa

15 01-01-2018 Medical Teaching Mardan Medical Complex, Pakistan 300 9.000 cde
30-06-2021 Institution (MTI) at Mardan
Mardan Medical
Complex, Mardan

16 01-04-2016 Establishment of Khyber Medical University, Pakistan 258 8.960 bcde


30-06-2021 Research Institute of Khyber Pakhtunkhwa
Hepatology, Hepatobiliary
Pancreatic Surgery and
Transplantation (Relief) &
Research Institute of
Diabetology,
Endocrinology and NCDS
(RIDENC)

17 01-11-2018 Rehabilitation of National Sheikh Zayed Hospital, Pakistan 180 7.900 abcde
30-06-2021 Institute of Kidney Lahore
Diseases (NIKD) HVAC
System at Sheikh Zayed
Hosptial, Lahore

18 01-11-2016 Ayub Medical College, Ayub Medical College & Pakistan 77 3.972 ced
28-02-2021 Abbottabad Hospital Complex,
Abbottabad

19 01-08-2019 Vertical Expansion of National Medical Center, Pakistan N.A 2.600 Structural Stability
31-03-2021 National Medical Center, DHA, Karachi
DHA Phase-I, Karachi

20 01-01-2015 200-Bed Jinnah Hospital Ministry of National Health Afghanistan 1835 67.270 be
31-03-2021 at Kabul, 100-Bed Naeb Services, Regulations and
Amin Ullah Khan Logari Coordination, Government
Hospital at Logar and 60- of Pakistan
Bed Nishter Kidney
Centre at Jalalabad

General IQ-WITHOUT-STATUS Page 2 of 2


Hospital and Medical Facility Projects Completed by NESPAK

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
1 01-06-2011 200-Bed Mukhtar A. Pak Arab Fertilizers (Pvt.) Pakistan 1339 98.000 ced
30-06-2019 Sheikh Hospital, Multan Limited

2 01-11-2012 Institute of Urology and Communication & Works Pakistan 3334 71.581 bce
31-05-2020 Transplantation at Department, Government of
Rawalpindi the Punjab

3 01-06-2013 Establishment of 510-Bed National University of Pakistan N.A 70.400 ce


30-11-2016 Teaching Hospital at Science & Technology,
NUST, Islamabad Islamabad

4 01-03-2014 New OPD & Surgical Patients' Aid Foundation Pakistan 2250 53.448 cde
31-03-2019 Complex at JPMC, (PAF) Karachi
Karachi

5 01-10-2007 Fatima Jinnah Institute of Health Department, Pakistan 2255 45.093 cd


30-06-2013 Dental Sciences, Lahore Government of the Punjab

6 01-01-2014 Kohat Institute of Medical Communication & Works Pakistan 2197 44.704 abcdef
30-06-2019 Sciences (KIMS) Department, Government of
Khyber Pakhtunkhwa

7 01-12-2015 Pakistan Kidney & Liver Pakistan Kidney & Liver Pakistan 3000 39.863 ce
30-06-2018 Institute and Research Institute and Research
Center, Lahore Center

8 01-11-2008 Repair and Maintenance Civil Hospital, Karachi Pakistan 350 29.320 ced
31-12-2015 Works at Civil Hospital,
Karachi

9 24-01-2003 60-Bed Burn Trauma Khyber Pakhtunkhwa Pakistan 550 29.283 bcde
31-05-2019 Centre at HMC, Workers Welfare Board
Peshawar (NWWB), Government of
Khyber Pakhtunkhwa

10 24-06-2005 Services Institute of Health Department, Pakistan 2000 25.543 bcde


31-12-2013 Medical Sciences Lahore Government of the Punjab

11 01-05-2012 1000-Bed Benazir Bhutto Communication & Works Pakistan 13000 24.400 bcd
30-06-2013 Hospital at Peshawar Department, Government of
Khyber Pakhtunkhwa

12 01-04-2011 410-Bed Civil Hospital, Health Department, Pakistan 1250 23.250 e


30-06-2014 Bahawalpur Government of the Punjab

13 01-01-2014 Upgradation of Bacha Communication & Works Pakistan 2000 19.980 cde
31-12-2017 Khan Medical Complex Department, Government of
for Teaching Purpose, Khyber Pakhtunkhwa
Swabi

14 01-09-2008 Sharif Medical and Dental Sharif Medical & Dental Pakistan 2700 17.669 bcde
25-07-2015 College Raiwind Road, College, Lahore
Lahore

General IQ-WITHOUT-STATUS Page 1 of 4


Hospital and Medical Facility Projects Completed by NESPAK

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
15 01-08-2010 Rawalpindi Institute of Health Department, Pakistan 940 17.000 e
31-12-2012 Cardiology Government of the Punjab

16 01-01-2014 Gajju Khan Medical Communication & Works Pakistan 500 15.000 acde
31-12-2017 College, Swabi Department, Government of
Khyber Pakhtunkhwa

17 25-12-2011 Medical College and Communication & Works Pakistan 810 14.400 e
30-06-2014 Hospital Complex at Department, Government of
Sahiwal the Punjab

18 10-12-2011 Medical College and Communication & Works Pakistan N.A 14.400 e
30-06-2014 Hospital Complex at D. G. Department, Government of
Khan the Punjab

19 01-09-2015 Establishment of Punjab Lahore General Hospital Pakistan N.A 14.000 e


15-12-2016 Institute of
Neurosciences, Lahore
General Hospital

20 01-09-2008 Modernization of Civil Hospital, Karachi Pakistan 311 13.450 bcdef


31-12-2015 Electrical Distribution 1. PC-I
Network at Civil Hospital 2. Survey
Karachi

21 01-10-2017 Burn & Trauma Centre at Communication & Works Pakistan 770 12.000 cde
31-12-2018 Hayatabad Medical Department, Government of
Complex, Peshawar Khyber Pakhtunkhwa

22 01-10-2012 Medical College at Sialkot Communication & Works Pakistan 810 10.730 e
31-12-2014 Department, Government of
the Punjab

23 01-12-2011 Medical College at Dera Communication & Works Pakistan 810 10.720 e
31-12-2014 Ghazi Khan Department, Government of
the Punjab

24 01-02-2012 Medical College at Communication & Works Pakistan 810 10.720 e


31-12-2014 Gujranwala Department, Government of
the Punjab

25 01-09-2016 128-Bed Liaquat United Nations High Pakistan 830 9.200 bc


31-12-2017 Memorial Hospital Commissioner for EIA Study
(LMH), Kohat Refugees

26 01-12-2015 Establishment of Model Primary & Secondary Pakistan 150 8.780 ce


31-12-2018 Drug Testing Laboratory, Healthcare Department,
Lahore Lahore

27 01-09-2012 50-Bed Hospital and Staff Housing Foundation of Pakistan 189 5.700 bc
31-03-2013 Apartments, District Islamic Revolution of Iran
Muzaffargarh

General IQ-WITHOUT-STATUS Page 2 of 4


Hospital and Medical Facility Projects Completed by NESPAK

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
28 01-06-2015 Upgradation of Major Works & Services Pakistan 132 5.290 e
30-01-2018 Sharif Shaheed (Nishan- Department, Gujrat
e-Haider) R.H.C. Kunjab
into 60-Bed Tehsil
Hospital, Gujrat

29 01-04-2016 Seismic Retrofitting of Health Infrastructure Pakistan N.A 4.100 cd


31-01-2018 Main Block of Abbas Program, AJK Structural Stability
Institute of Medical
Sciences, AJK

30 01-04-2011 Remedial Measures for Workers Welfare Board, Pakistan N.A 2.600 f
31-12-2015 50-Bed Hospital and High Government of Balochistan Remedial
School Building at GAI Measures
Khan Chowk, Quetta

31 01-01-2016 Pakistan Red Crescent Pakistan Red Crescent Pakistan 140 1.700 ce
30-06-2017 Society State and District Society
Branches in Azad Jammu
& Kashmir

32 01-03-2017 Preparation of Technical Medical Superintendent, Pakistan N.A 0.800 1. Survey


30-04-2017 Specifications of Five Lifts Holy Family Hospital, 2. Technical
of Holy Family Hospital, Rawalpindi Specifications
Rawalpindi

33 01-07-2012 Establishment of Separate Communication & Works Pakistan N.A 0.700 cde
30-04-2013 Emergency Block in Department, Government of
DHQ Hospital, the Punjab
Bahawalnagar

34 01-05-2014 Topographic Survey of King Edward Medical Pakistan N.A 0.600 Topo Survey
30-06-2014 King Edward Medical University, Lahore
University and Mayo
Hospital, Lahore

35 01-11-2015 Establishment of State of Health Department, Pakistan 1500 e


31-08-2017 the Art Drug Testing Government of the Punjab
Laboratory, Lahore

36 01-07-2007 200-bed Jinnah Hospital Planning Commission, Afghanistan 1087 150.000 bcde
31-07-2018 at Kabul, Afghanistan Government of Pakistan

37 01-05-2008 Naeb Aminullah Khan Planning Commission, Afghanistan 1077 122.000 bcde
31-05-2018 Logari Hospital at Logar, Government of Pakistan
Afghanistan

38 01-04-2006 Kidney Center at Planning Commission, Afghanistan 552 75.156 bcde


31-12-2011 Jalalabad, Afghanistan Government of Pakistan

39 01-07-2011 Seismic Study and Agha Khan University, Afghanistan N.A 19.200 1. Studies
31-12-2011 Structural Assessment of Karachi 2. Structural
Jumhoriat Hospital Kabul, Stability
Afghanistan

General IQ-WITHOUT-STATUS Page 3 of 4


Hospital and Medical Facility Projects Completed by NESPAK

a) Feasibility Study g) Software Requirement Specification m) Satellite Imagery


b) Project Planning h) Functional Specifications Document n) Map Digitization
c) Detailed Design i) System Study Design o) Digital Terrain Model
d) Tender Documents j) Software Development p) Global Positioning System Survey
e) Construction Supervision k) Testing, Debugging && Implementation q) GIS Database && Model Development
f) Design Review l) Documentation && Training r) Map Analyses

Sr. Start Date/ Name of the Project Fee Scope of


No. Comp.Date Project Client Location Cost (m.Rs.) (m.Rs.) Services
40 01-05-2015 200-bed Jinnah Hospital Pakistan Public Works Afghanistan 1000 15.029 ce
31-12-2018 Kabul and Naeb Amin Department
Ullah Khan Logari
Hospital at Logar,
Afghanistan

41 01-02-2015 Maternity Hospital Project ECO Secretariat Afghanistan N.A 0.915 Inspection
31-03-2015 in Faryab Province,
Afghanistan

42 01-07-2011 Sheikh Jassim Bin Jabor Sheikh Jassim Bin Jabor Comoros Island 2461 11.000 cde
31-12-2011 Al-Thani Hospital, Bin Mohammad Al Thani
Anjouan Island, Comoros Charitable Foundation,
Comoros Island

General IQ-WITHOUT-STATUS Page 4 of 4


 Project Sheets of Similar Works
B- CONSULTANT’S EXPERIENCE

Assignment name: Value of the Contract

Rs. 5.3 Billion


ESTABLISHMENT OF 200 BED
CENTER OF EXCELLENCE FOR
OBSTETRICS & GYNECOLOGY,
RAWALPINDI
Country: Pakistan Duration of assignment (months): 24
Location within country: Punjab

Name of Client: Total No of staff-months (by your firm) on the


assignment: 8
Cabinet Division, Government of Pakistan

Start date (year): 2006 Value of consultancy services provided by your


Completion date (year): ongoing firm under the contract (in current PKR):
Rs. N.A Million

Name of associated Firms, if any: NA No. of professional staff-months provided by


associated Firms: NA
Name of senior professional staff of your firm involved and functions performed (indicate most
significant profiles such as Project Director/Coordinator, Team Leader):

Mrs. Nabila Rashid Project Manager/Team Leader


Mr. Adil Nazir Architect
Mr. Saeed Mahmood Gul Electrical Engineer
Mr. Munir Uddin Mechanical Engineer
Mr. Nadeem Iqbal Contracts and Tender Document/BOQ Expert
Mr. Idrees Raza Structure Engineer
Mr.Muhammad Ayyub Public Health Engineer

Narrative description of Project:


The Site
- Site Area is 47,250 Sq.m (105 Kanals). 85 Kanals have been provided by the Old T.B Centre and
20 Kanals by TMA, Rawalpindi.
- Main approach from Asghar Mall Road
Design Concept
- Well defined circulation patterns.
- Physical and visual control of patients and visitors.
- Planning around courtyards, creating a pleasant environment for patients
- Flexibility in space planning to cater for the immediate and future needs.
- Economical and efficient structural and services systems, appropriate use of building materials to
minimize maintenance needs.
Salient Design Features
- Easy accessibility, Open Planning and Centralized waiting areas
- Hospital blocks arranged around the central Hospital Street for easy approach.
-OPD areas, Diagnostic Facilities, Specialist Clinics, Laboratories, Radiology Departments and
Pharmacy at the Ground Floor.
B- CONSULTANT’S EXPERIENCE

- Male and Female in-patient wards are planned at the 2nd and 3rd floors level.
Covered Area : 395,700 Sqft
Facilities :
Emergency,
OPD Centrally air conditioned
200 bed Inpatient Block,
Operation Theaters
Mortuary
Description of actual services provided by your staff within the assignment:
-Complete Architectural & Engineering Design
-Contract Documentation Supervision & Managemen
1. Firms Name :_______NESPAK___
2. Copy of Agreement is attached
Project Sheet
Name of the Project: Country:

Construction of Pakistan Kidney & Liver Institute and Pakistan


Research Center, Lahore Hospital PKLI, Package C-
1, Phase-1

Location of Project:Lahore – Pakistan Professional staff provided by your Company:


Name of Client: No. of Staff:
Infrastructure Development Authority Punjab, (IDAP) 24 for Construction Supervision period

No. of man –months


Date of Start: Date of Completion: Cost of Consultancy Services:
Rs. 197 Million
12th September, 2012 Ongoing Project Cost:
Rs. 3.4 Billion
Name of Associated Firm(s) if any: Contract Type:
Man month
NA
Name of Senior Staff involved and their responsibility:

Mr. Waseem Saif Dar


Project Manager
Mr. Mobina Badruddin
Project Architect
Mr. Idrees Raza
Structure Engineer
Mr. Saeed Muhammad Gul Khan
Electrical Engineer
Mr. Haris Farooqi
HVAC Engineer
Narrative description of Project:

PKLI, plans to establish a medical complex at Knowledge City Lahore. The three faceted purpose of the
project is to impart quality education and training at undergraduate / post graduate level in medical and related
fields, to provide par excellence health care to the community and perform cutting edge research in the
specialized area of Urology, Nephrology and Hepatology including Stem Cell Research. This provision of
health care is proposed through establishment of state-of-the-art hospital aiming at wellness and wellbeing of
patients rather than mere treatment of diseases. All elements of the complex are to be interconnected for ease
of functionality and efficiency. Owing to the importance of the location of the project and considering other
developments in the area, the object is to achieve a unique character of the project and the prestige it deserves.
300 Bed Patient’s apartment, Doctor’s apartments for the patients health safety has been provided.
10 floor apartment building includes:
 7 floors for Patients Accommodation
 3 for Medical Staff Accommodation (2 Beds and 3 Beds Apartments)
 Gymnasium
 Shop
On completion, the medical complex should become icon, not only in providing medical education in different
fields but quality health care facility to general public from all over Pakistan and overseas.

Description of actual services provided by your staff within the assignment:

 Design
 Architecture
 Structure
 Plumbing
 Electrics
 HVAC
 Fire fighting
 Elevators
 Scada and Telecom
 IT and Networking
 Construction Supervision
 Contract administration
 Quality Control
 Sampling & testing
 Progress monitoring
 Progress reporting
 Certification of Contractor’s payment certificates
 Final completion report.
MAJOR WORK WHICH BEST ILLUSTRATE QUALIFICATIONS

Assignment name: Value of the Contract: N.A.

Area Development and Improvement


Schemes of Pakistan Railways
Country: Pakistan Duration of assignment (months): 24
Location within country: All Over Pakistan

Name of Client:
Pakistan Railways Total No of staff-months (by your firm) on the
assignment: 120

Start date (month/year): March, 2014 Value of consultancy services provided by your
Completion date (month/year): June, 2018 firm under the contract (in current PKR):
Rs. 276.928 Million

Name of associated Firms, if any: Integrated No of professional staff-months provided by


Equities (Pvt) Limited associated Firms: 32

Name of senior professional staff of your firm involved and functions performed (indicate most
significant profiles such as Project Director/Coordinator, Team Leader):

Mr. S. Mujahid Hussain Urban/Town Planner/Project Manager


Mr. Abdul Baseer Sheikh Project Coordinator
Mr. Daud Awan Market Analyst
Mr. Muhammad Bashir Economist and Researchers
Mr. Sardar Ali Watto Financial Expert
Mr. Sardar Iqbal Legal & Institutional Development Expert
Mr. M. Javed Iqbal Governance & Operation Expert

Narrative description of Project:

Pakistan Railways engaged National Engineering Services Pakistan (Pvt.) Limited (NESPAK) Lahore, to document and
prepare the Master Plans of various Railway Stations in the Punjab, Sindh and KPK Provinces.
In order to exploit the economic potential of the available Railway lands, the existing Railway Station buildings located in 9
different cities (10 PR stations) have to be documented including detailed visual/structural study of these buildings and
therewith assessment of the facilities available vis-à-vis user requirements the up gradation plan of each station building
needs to be prepared.

In the first phase, Railway Stations in the following cities were documented/designed and their Master Plans were prepared:
- Bhawalpur
- Sahiwal
- Okara
- Nankana Sb.
- Narowal
- Gujranwala
- Hasanabdal
- Peshawar
- Karachi
- Yousaf wala

The Proposed Master Plans of these stations have been developed in accordance with the Business Viability Plan given
by Integrated Equities (Pvt.) Limited (IEL), a firm of financial consultants having extensive experience in Project Planning
and Development of Real Estate Projects in Pakistan with which NESPAK has been associated for preparation of a
viable Business Model.
Description of actual services provided by your staff within the assignment:
 Detailed Project Site Visits including discussion with relevant officials of PR;
 Feasibility Report
 Preparation of renovation/ refurbishment plans of station buildings and allied structures;
 Master Planning of Railways land at each station.
 Identification of commercially viable real estate development projects;
 Financial and Commercial Business Plan, including valuation of land for lease purposes and initial fund
MAJOR WORK WHICH BEST ILLUSTRATE QUALIFICATIONS

requirement.

MASTER PLAN – PESHAWAR RAILWAY STATION

3D VIEW – PESHAWAR RAILWAY STATION


MAJOR WORK WHICH BEST ILLUSTRATE QUALIFICATIONS

MASTER PLAN – HASANABDAL RAILWAY STATION


MAJOR WORK WHICH BEST ILLUSTRATE QUALIFICATIONS

3D VIEW – HASANABDAL RAILWAY STATION


MAJOR WORK WHICH BEST ILLUSTRATE QUALIFICATIONS

Land Offer in Phase 1, 2 & 3

Land Offer in Phase 1

Land Offer in Phase 2

Land Offer in Phase 3

Allocation of land in Phase 1 and 2


Banks/Offices
Commercial Arcade
Commercial Shops
Superstore
Warehouse
Petrol Pump
Hotel
Marquee
Restaurant
Cineplex
Commercial Park
Joyland
Food Street
Health Club
Residential Apartments
Mosque/Taxi Stand

BUSINESS PROPOSAL – PESHAWAR RAILWAY STATION


MAJOR WORK WHICH BEST ILLUSTRATE QUALIFICATIONS

Land Offer in Phase 1, 2 & 3

Land Offer in Phase 1


Land Offer in Phase 2
Land Offer in Phase 3

Allocation of land in Phase 1 and 2


Banks/Offices
Commercial Arcade
Commercial Shops
Superstore
Warehouse
Petrol Pump
Hotel
Marquee
Restaurant
Cineplex
Commercial Park
Joyland
Food Street
Health Club
Residential Apartments
Mosque/Taxi Stand

BUSINESS PROPOSAL – HASANABDAL RAILWAY STATION


MAJOR WORK WHICH BEST ILLUSTRATE QUALIFICATIONS

MASTER PLAN – NANKANA SB. RAILWAY STATION

3D VIEW – NANKANA SB. RAILWAY STATION


MAJOR WORK WHICH BEST ILLUSTRATE QUALIFICATIONS

Allocation of land in Phase 1 and 2


Banks/Offices
Commercial Arcade
Commercial Shops
Superstore
Warehouse
Petrol Pump
Hotel
Marquee
Restaurant
Cineplex
Commercial Park
Joyland
Food Street
Health Club
Residential Apartments
Mosque/Taxi Stand

Land Offer in Phase 1, 2 & 3

Land Offer in Phase 1


Land Offer in Phase 2
Land Offer in Phase 3

BUSINESS PROPOSAL – NANKANA SB. RAILWAY STATION


MAJOR WORK WHICH BEST ILLUSTRATE QUALIFICATIONS

3D VIEWS OF RAILWAY STATIONS

BHAWALPUR RAILWAY STATION

SAHIWAL RAILWAY STATION NANKANA SB. RAILWAY STATION

OKARA RAILWAY STATION GUJRANWALA RAILWAY STATION

HASANABDAL RAILWAY STATION PESHAWAR RAILWAY STAION


B- CONSULTANT’S EXPERIENCE

Assignment Name: Establishment of Rangers Wings Value of the agreement (in current PKR): 3,000 Million.
in Various Cities in Punjab

Country: Pakistan Duration of assignment (months): 24


Location within country: Punjab

Name of Client: Pakistan Rangers - Punjab Total No. of staff –months (by your firm) on the
assignment:

Start date (month/year): March, 2016 Value of consultancy services provide by your firm
Completion date (month /year) March, 2018 under the agreement (in current PKR or US$):
Rs. 109 Million

Name of associated Consultants, if any: NIL No. of professional staff-months provided by associated
Consultants: NIL

Name of senior professional staff of your firm involved and functions performed (indicate most significant profiles
such as Project Director/ Coordinator, Team Leader):

Abdul Baseer Sheikh Project Manager


Anwar-ul Haq Town Planner
Shoukat Qadeer Structural Engineer
Sohail Kibria Geotechnical Expert
M Ayyub Public Health engineering Expert
Faisal Ali Electrical Engineer
Basit Ejaz Road Design Expert
Arooj Anwar Project Coordinator
Hafiz Nazeer Ahmad Resident Engineer
Wajid Mehmood Resident Engineer
Rai M. Bilal Resident Engineer

Narrative description of Project:

NESPAK has been awarded Consultancy Services for Master Planning, Engineering Design of Buildings and
Infrastructure Works including Resident Construction Supervision of following proposed establishments of
Pakistan Rangers in Punjab:

(i) 1 x Special Security Division Wing (Chinese Security) at District Multan


(ii) 2 x Special Security Division Wings at Chakri District Rawalpindi
(iii) 2 x Internal Security Wings for the Capacity Building of Pakistan Rangers at District Lahore

These Wings are consist of following Structures;


 Residential Accommodation includes Single Men Double Storey Barracks for troops, Bachelor Officer
Quarters, Married Officer Quarters, Inspector Quarters (Cat-IV), Soldier Quarters (Cat-V), Inspector
Mess, Wing Commander Residence (Cat-II)
 Non-Residential Accommodation includes Wing Office, Officers Mess, Masjid, Dining Hall with Cook
House etc
 Others Structures/ Building includes Recreational Hall, Canteen, Dispensary, Services Areas Short
Tunnel Firing Range etc.
 Storage Accommodation includes, Storage Block, Ammunition Magazine, Mechanical Transport Garage
Store and Repair Shed with PIT, Quarter Guards and Kote etc.
Description of actual services provided by your staff within the assignment:
- Topographic Survey.
- Town Planning
- Soil Investigation/ Analysis
- Architectural Drawings (Both 2D and 3D)
- Complete Working / Structural/ Services designing
- Preparation of Bill of Quantities and allied projects documents
- Infrastructure Design
- Construction Supervision

1. Firms Name : NESPAK


2. Certificate by the Client / Employer that the work was successfully completed by the Consultant
PROJECT SHEET

Name of the Project: Country:

Construction of Danish Schools in Various Districts Pakistan


of Punjab
Location of Project: Punjab - Pakistan Professional staff provided by your Company:
Name of Client: No. Of Staff: 27
Punjab Daanish School & Centers of Excellence No. of man –months 277.65
Authority, Lahore.
Date of Start: Date of Completion: Cost of Consultancy Services:
Rs. 37 Million
01-01-2011 1-04-2014 Project Cost:
Rs. 1458 Million
Name of Associated Firm(s) if any: Contract Type:

Lump Sum
Name of Senior Staff involved and their responsibility:

Mr. Khalid Iqbal Khan Mr. Muhammad Aamir Ali


Project Manager Resident Engineer

Narrative description of Project:

Establishment of Daanish Schools in the Punjab is a concrete step towards materializing my vision of poverty
alleviation through quality and free education to the poorest sections of the society. Within in a short span of
one year, six schools have already started functioning in Bahawalpur Division. These cater equally to the
deprived girls and boys who are selected purely on merit according to the provisions laid down in the Punjab
Daanish Schools and Centres of Excellence Authority Act 2010. These schools emphasize quality both in terms
of academic excellence and extra-curricular activities. The Daanish schools are boarding schools and look after
all the requirements of the students.

Description of actual services provided by your staff within the assignment:


-Construction Supervision
- Contract administration
- Review of contractor’s work plan & methods
- Quality control
- Sampling & testing
- Progress monitoring
- Progress reporting
- Certification of contractor’s pay certificates
- Final completion report.
EDUCATIONAL FACILITIES

Establishment of Punjab Danish School at


Fazilpur, District Rajanpur.

Client :
Punjab Danish School and Center of Excellence Authority

Project Cost :
Rs. 600 Million.

Date of Commencement :
December, 2009.

Characteristics :

Facilities :
Boys High School

- Academic Block for Boys = 33,225 sq.ft


- 02 # Hostel Buildings for Boys = 42508 sq.ft per unit
- Principal’s Residence = 5241 sq.ft
- 04 # Married Teaching / Non-
Teaching Staff Residences = 2225 sq.ft per unit
- Bachelor Teaching / Non-
Teaching Staff Apartment = 6185 sq.ft
- 04 # Junior Staff Quarters = 750 sq.ft per unit
- Barrack = 3128 sq.ft

Girls High School

- Academic Block for Girls = 33,225 sq.ft


- 02 # Hostel Buildings for Girls = 42508 sq.ft perGovt.
unit Boys / Girls High School ( Academic Block)
- Principal’s Residence = 5241 sq.ft
- 04 # Married Teaching / Non-
Teaching Staff Residences = 2225 sq.ft per unit
- Bachelor Teaching / Non-
Teaching Staff Apartment = 6185 sq.ft
- 04 # Junior Staff Quarters = 750 sq.ft per unit
- Barrack = 3128 sq.ft

Services:

- Topographic surveys
- Geotechnical Investigations Report.
- Detailed Architectural and Engineering Designs/Drawings
- Design of Infrastructural Works
- Preparation of Tender Documents The Site
- Prequalification of Construction Firms
- Top Construction Supervision Services The project site is located at Indus Highway. The total site area is
111Acres, 05 kanals.

General Description
There are two schools to be developed as the Punjab Danish School in District Rajanpur with the provision of all allied facilities.

- Govt. Boys High School


The Academic Block in Govt. Boys High School is designed for 450 students. The two storeyed Academic Block having a covered area of
33,225 Sq.ft includes 15 # Class Rooms, 04 # Labs, Library, Administration, Staff room, Stationary room and Multipurpose hall.

- Govt. Girls High School


The Academic Block in Govt. Boys High School is designed for 450 students. The two storeyed Academic Block having a covered area of
33,225 sq.ft includes 15 # Class Rooms, 08 # Labs, Library, Administration, Staff room, Stationary room and Multipurpose hall.

- Hostel buildings
In this school 02 # Hostel buildings for boys and 02 # Hostel buildings for girls have been provided. The two storeyed hostel buildind having a
covered area of 42508 sq.ft includes 36 Dormitories Dining hall, T.V room, Prayer room and Games room. Each hostel building having the total
capacity of 225 students.
EDUCATIONAL FACILITIES

Establishment of Punjab Danish School at


District Dera Ghazi Khan.
Client :
Punjab Danish School and Center of Excellence Authority

Project Cost :
Rs. 600 Million.

Date of Commencement :
December, 2009.

Characteristics :

Covered area : 289,390 sq.ft

Facilities : Independent Schools for Boys and


Girls, including all the related facilities

NESPAK Services:

- Topographic surveys
- Geotechnical Investigations Report.
- Detailed Architectural and Engineering Designs/Drawings
- Design of Infrastructural Works
- Preparation of Tender Documents
- Prequalification of Construction Firms
- Top Construction Supervision Services

Master Plan

GeneralGovt. Boys / Girls High School


Description ( Academic Block)
NESPAK has designed numerous buildings for the Punjab Danish
School and Center of Excellence Authority which include buildings for
education facilities.

Punjab Danish School for Boys and Girls is located at Indus Highway
in Dera Ghazi Khan city. The campus spread over an area of 802
kanals comprises independent Academic areas for primary and
secondary education, Auditorium, Students Service Center, Hostels,
Residential and Recreational facilities. This campus is planned to
develop in subsequent phases. Implementation of Phase-I
comprises independent Academic Blocks for secondary education of
boys and girls, Hostel Buildings, Principal’s Residences, Married Teaching/Non-Teaching Staff Residences, Bachelor Teaching/ Non-
Hostel Building
Teaching Staff Apartments, Junior Staff Quarters and Barracks. Each school has a spacious and well spread layout of all facilities.

In each school academic facilities consisting of separate blocks for primary and secondary education. The Academic block for secondary
education of each school has 15 class rooms accommodating 450 students. In addition, Science Laboratories, Library, Administration,
Staff room, Stationary room and Multipurpose hall have been provided. The total covered area of this block is 33,225 Sq.ft.

Well designed shading elements have been provided in front of all the rooms’ windows to avoid the direct sun. The building has been
finished in brick facing along with the use of traditional motifs.
RESIDENTIAL FACILITIES

Punjab Government Servants Housing Scheme


Bahawalpur

Client :
Punjab Government Servants Housing Foundation Lahore

Project Cost :
Rs 424.611Million

Date of Commencement :
January 18, 2014

View of Mosque

Master Plan

The Site

The proposed Punjab Government Servants Housing Scheme Bahawalpur


is being constructed on main Zakheera Samma Satta Road, in Bahawalpur.
Total area of the Scheme is 600.65 Kanal and has two separate Sites
i.e. Site-A having an area of 146.35 Kanal and Site-B having an area of
454.30 Kanal the distance between two sites is about 1.5 Kilometer.
General Description View of Civic Center
Punjab Government is in the process of providing developed residential
plots to their retired officers. The project is located on main Zakheera Samma NESPAK Scope of Services:
Satta Road, in Bahawalpur and is in close proximity to a large number of
upcoming modern housing societies/schemes e.g. Model Town & Cheema - Topographic surveys
Town etc. - Geotechnical Investigations Report
Four types of residential plots are planned in this Scheme i.e. 1 Kanal, - Preparation of PC-1
10 Marla, 7 Marla and 5 Marla. In addition to Residential plots Schools, Civic - Detailed Architectural and Engineering Designs / Drawings
Center, Health Club, Mosques, Shops, Commercial Center and Parks are also - Preparation of Tender Documents & Cost Estimates
provided. - Resident Construction Supervision Services
RESIDENTIAL PROJECTS
Punjab Government Servants Housing
Scheme at Satiana Road, Faisalabad.
Client :

Punjab Government Servants Housing Foundation


Lahore.

Project Cost: General Description


Rs. 5800 Million
The priorities laid down by the Provincial Government for
the welfare of its employees and especially the shelter less
Characteristics : class of its retired employees, has led to the development
of this housing scheme. This would also compensate in
solving the housing problems being faced by the Government
Residential Plots : (3432 Nos.) employees and the ever increasing market prices.
- One kanal 249 Nos. It would benefit especially the low income cadre who is
- Ten marla 810 Nos. not in position to own a house on retirement.
- Seven marla 1080 Nos.
- Five marla 1293 Nos.
NESPAK Services
Total Site Area : 2581 kanals
- Master Planning
- Detailed Infrastructural Design
The Site - Design of Houses of each category
- Preparation of PC-1 & Bidding Documents
- Construction Drawings
Punjab Government Servants Housing Scheme is
- Supervision of Infrastructure Works and Housing Units
located on Satiana Road, Faisalabad about 8-km from
the city centre and has a site area of 2581 kanals.
RESIDENTIAL PROJECTS
Punjab Government Servants Housing
Scheme at Mohlanwal, Lahore.
Client :
Punjab Government Servants Housing Founation
Lahore.

Characteristics : General Description

The priorities laid down by the Provincial Government for


Residential Plots : (1344 No.) welfare of its employees and especially the shelter less
- One kanal 107 No.
class of its retired employees, has led the development of
- Ten marla 305 No.
this housing scheme. To alleviate the housing problems
- Seven marla 334 No.
being faced by the Government employees, in view of the
- Five marla 598 No.
ever increasing market prices. Especially for the low
income cadre who is not in position to own a house on
Total Area : 566 Kanals retirement.

NESPAK Services
- Master Planning
- Detailed Design of Infrastructure The Site
- Design of houses of each category
- Preparation of PC-1 & Bidding Documents Punjab Government Servants Housing Scheme is
- Construction Drawings located on 566 kanals site at Mohlanwal Defence
- Construction Supervision of Infrastructure Works and Road, Lahore.
Construction of Houses.
RESIDENTIAL PROJECTS

SATELLITE TOWN HOUSING SCHEME, GT ROAD JHELUM

Nespak Scope of Services:


Client :
PRD (Pvt) Ltd, Lahore. - Topographic Surveys
Project Cost: - Master Planning
3000 Million (Approx) . - Detail Infrastructural Design
- Design of Society Office Building
- Bid Evaluation
- Construction Drawings

Characteristics :
General Description:
Residential Plots :

- 2.0 Kanal 62 NOs. - State of the art Housing Scheme has been planned
- 1.0 Kanal 1274 NOs. spread over an area of about 4600 kanals.
- 10 Marla 778 NOs.
- 07 Marla 1145 NOs. - Master Plan is developed on best International Standards
- 05 Marla 973 Nos. keeping in view the undulating topography of the site and
Total : 4232 Plots provision of modern day facilities has been ensured in
order to serve an ultimate population of over 30,000.

The Site

The Project Site is located on western side of G.T.Road about 9 km from Jhelum
City and is a rolling terrain with an overall elevation difference of about 230 ft. .

P.T.O.
PROJECT SHEET

Name of the Project: Country:


Lahore Orange Line Metro Train Project
Pakistan
Location of Project: Lahore - Pakistan Professional staff provided by your
Company:
Name of Client:
Punjab Mass transit Authority
No. Of Staff: N/A
Date of Start: Date of Completion: Cost of Consultancy Services:
Rs. 1.150 Billion
August 2015 November 2018 Project Cost:
Rs. 162.628 Billion
Name of Associated Firm(s) if any: Contract Type:

China Railway Engineering Consultants Lump Sum


Group Co. Ltd (CEC)
Name of Senior Staff involved and their responsibility:

Mr.ShaukatQadeerMr Hafiz Muhammad AhmadMsMobinaBadruddin


Project Manager Structural EngineerArchitect
Mr.Faisal Ali Mr. M. HarisFarooqi Muhammad Ayyub
Electrical Engineer Mechanical Engineer Public Health Engineering
Mr. BasitEjaz
Highway & Transportation Expert

description of Project:

The Government of Punjab has a strong commitment to develop and improve its public
transport by implementing the Lahore Rapid Mass Transit System (LRMTS) on the
following four corridors of Lahore city:
 Green Line: Ferozpur Road (Kahna to Shahdara) 27 km {Completed}
 Orange Line: Multan Road – GT Road (Ali Town to DeraGujran) 27.1 km
 Blue Line: Jinnah Hall to Green Town, 20 km {Future}
 Purple Line: Data Darbar to Airport, 19 km {Future}

The existing traffic system requires a major uplift in level of service and efficiency in the
wake of increasing passenger demand owing to rapid growth of urban population. The
concept of LRMTS is a rapid mode of transportation that can provide safe, comfortable and
efficient public transport system. Similar Rapid Mass Transit Systems have been
implemented in several cities throughout the world as a low cost transport system of
moving people quickly and efficiently.
The overall objective of the Lahore Orange Line Project is to provide a safe, reliable and
fast mode of transportation for the commuters and improve the traffic flow in the city. The
project will greatly benefit the public by providing a transport facility that is more efficient
than the existing bus services and reduce the number of vehicles on road.
Lahore Orange Line Metro Train offers well organized, effective way of transportation to the
public providing a high quality transportation services and also improves job access. The
LRMTS Orange Line will improve the efficiency and effectiveness of the region’s current
transit system. Currently many major cities all over the world use Metro rail system. For
instance Shanghai in China, Tokyo in Japan, Dubai in UAE, Istanbul in Turkey and Los
Angeles in USA are the main cities that enjoy its benefits.
Scope of Services
As a Project Management Consultant (PMC), NESPAK shall provide consulting services
for:

• Execution of the project in accordance with the Commercial contract between PMA
and CR-NORINCO
• Review and approval of Concept Design for overall Project
• Detailed Civil Works design and preparation of Tender Documents
• Review of E&M design and specifications
• Project Progress Monitoring and Construction Supervision to ensure quality control
and timely completion of the Project
• Follow best international practices for managing various aspects of the project
including design; interface between civil and E&M works; construction supervision and
quality control
Description of actual services provided by our staff within the assignment:
 Feasibility study
 Design Review
 Construction Supervision
ROADS AND HIGHWAYS

Metro Bus System, Lahore


Client
Lahore Development Authority
Cost of Project
Rs. 30 billion (US$ 311 million)
NESPAK Services
+ Detailed Design
+ Tender Documents
+ Construction Supervision
Characteristics
+ No. of lanes 2 nos.
+ Lane width 3.5 meter
+ Outer shoulder width 0.5 meter each side
+ Median width (soft) 1.0 meter
View of at-grade Station
+ Fence height 1.7 meter
+ Designed capacity 8000 persons per
hour daily
+
A 27 km long dedicated busway corridor
including an 8.5 km long elevated section in
the downtown
+
A total of 27 bus stations with all facilities
for passengers
+
Pedestrian underpasses/bridges and
escalators at each station for access and
convenience of passengers
+
Passenger information system (PIS)
+
Intelligent transport system (ITS)
+
Level platform boarding and alighting
+
E-ticketing and turnstiles
View of Escalator Installed at MBS View of Platform Screen Doors (PSD) at MBS
+
All air-conditioned buses every 5 minutes
+
Tuck shops and janitorial services at stations General Description
+
Park & ride facilities The Metro Bus System (MBS) Lahore is an example of the fastest Bus Rapid
+
Surveillance cameras and security system. Transit System projects executed in the World. From a vision to a concept plan
and from concept plan to design and execution of 27 km long BRTS including
+
Average speed of over 30 Kph (one of the 8.5km long elevated section with 27 stations and other state-of-the-art facilities,
best in the World) saving about an hour of all in one year, is a gigantic achievement, unmatched by any BRTS in the world.
journey time from end to end i.e. from
Gajjumattah to Shahdara The design and construction of an 8.5 km flyover for elevated BRTS section in
less than ten months is a remarkable feat, which sets new standards of project
Project Commencement implementation in urban areas. Some of the salient features of the elevated
February, 2012 section are as following:

Project Completion Sleek and slender superstructure with flat soffit for enhanced aesthetics and
+
cleaner looks in urban setting.
March, 2013 Use of precast inverted T-beams with minimal in-situ work for
+
superstructure for speedy construction and quality work.
Beautifully shaped, single column piers with hidden transoms to enhance
+
aesthetics.
Ps3416
ROADS AND HIGHWAYS

Metro Bus System, Lahore


For the first time in Pakistan use of pre-cast transoms
+ will also alleviate traffic jams and noise as well as air pollution.
to reduce in-situ construction thus saving time &
reducing inconvenience of road users. This is the first project of its kind in which revolutionary
technological advancement has been made to cut down the
For the last two decades, several transport studies of construction time and provide hassle free transport facility to
Lahore have been carried out, funded either through natives. The mono-pile arrangement has reduced the space
international loans or local budget plans. Although some requirements for construction activities significantly for the sub-
of those studies were conducted in a very comprehensive structure. In order to expedite the work, precast system was
manner and showed a very good recommendation, yet adopted as far as possible. Precast transoms (bents) were used for
none of them was officially selected and determined as the the first time in the country in addition to precast girders. Stable,
Lahore Transport Master Plan. environmentally acceptable and aesthetically appealing design
was adopted to fit in the heart of the city.
In this perspective, Government of the Punjab has
planned the Metro Bus Service on Ferozepur Road (Gajju The need for a new transportation system in the city can be
Matta to Shahdara), 27 km in Lahore. accessed from the fact that the existing transportation mechanism
is simply inadequate both in terms of number of buses and quality
The concept of Metro Bus System (MBS) is a rapid mode to serve the existing and incremental travel demand. Earlier, it were
of transportation that can provide the quality of rail transit common scenes during peak hours that vehicles were seem
and flexibility of buses. Dedicated lanes have been overloaded with people hanging on the doors and riding on the
proposed in the median for articulated buses for rooftop of the mini buses thus, endangering their lives and causing
uninterrupted flow with well-coordinated integrated traffic hazards. Therefore, the only viable option left was a Metro
operational system. MBS stations have been proposed at Bus Service being low cost and highly effective to cater for the
suitable locations on the main carriageway. Pedestrian transportation needs of the citizens of Lahore.
bridges shall be introduced for commuters to provide
easier access to MBS stations. The overall objective of this project was to improve the efficiency
and performance of the public transport system in Lahore by
Ferozepur Road, being congested due to fast growing introducing environment friendly mass transit.
urban development & industrial infra-structure, was
selected as a priority corridor. This MBS will also reduce Now, the project has been completed and offering world class
traffic load on adjacent Ferozepur Road, consisting of transport facility to commuters from Gajjumata to Shahdara.
mixed traffic lanes and arterial roads within the city. It

View of at-grade Station


View of Elevated Section
Annexure-II

Existing Personnel/Qualification of the Team in


project focused are
 Team Composition
 List of Key Personnel
 Job and Staff Status Summary
 Projects Undertaken to-date of each
specialty at Nespak
 Team Composition
TEAM COMPOSITION

List of Staff
Sr. No Name Position Assigned Task Assigned
Overall responsibility for management and
supervision of the team inform the client about
technical issues and the progress of all works through
Team Leader/Resident discussions or correspondence Assists Clients in
1. Sadaqat ali
Engineer preparation of annual work plan and budget,
preparation of project completion report (PCR) and
preparing the response to Audit queries. Coordinates
with all related Client’s organizations
Responsible for Preparation of Detailed Architectural
Principal Architect Design/Drawings oversee and supervise preparation
2. Mobina Badruddin
of design BOQ and Specifications for Tender
documents of BHUs and RHCs.
Responsible for preparation and maintenance of
Financial and Management management information system for the Project
3. Fatima Jamil
Assistant including progress monitoring, budgeting,
accounting, control reporting system etc.

Responsible for preparing Bill of Quantities, Cost


4. Amir Sohail Quantity Surveyor
Estimates and Technical Specifications.

Responsible for the Preliminary Architectural/


5. Omer Saeed Architect Schematic Designs with necessary details for the
approval from the Client.

Infrastructural and Building Responsible for Surveys / analysis, planning and


6. Muhammad Umer Works Expert design guidelines for utility services such as water
supply, sewerage & drainage systems etc.
TEAM COMPOSITION
List of Staff
Sr. No Name Position Assigned Task Assigned
Responsible for Contract Administration,
Bidding Documents and
Prequalification of Contractors, Engineer’s Cost
Procurement Facilitation
7. Nadeem Iqbal Estimates, Rate Analyses, Bill of Quantities,
Expert
Evaluation of Bids and preparation of Bid Evaluation
Reports.
Responsible for Studies, Analysis, Planning & Design
Environment and safeguard guidelines for environment related aspects of plans such
8. Hammad Qamar
Expert as Air quality, Water Quality, Soil Contamination, Soil and
Geological Survey/Data, Analysis of Noise level etc.

GIS Mapping & Analysis, Image Acquisition and


9. Mr. Safder Hussain GIS/MIS Specialist Processing, Digital Image Classification, existing land use
and Proposal Maps Development etc.

Responsible for Active overall site supervision,


ensure compliance of works with design, drawings
and specifications within work schedule, Scrutiny and
10. Ali Zahid Assistant Resident Engineer
verification of IPCs,Risk management, Preparation of
estimates, analysis of rates, progress reports,
Meeting and briefing to Client and relevant.
Supervise the scoping, surveying, and designing
tasks as well as provide technical assistance for the
purpose as, where and when required, Verify the
design process carried out by the supply & service
Field Team Incharge/senior companies to ensure adherence to design in
11. Aslam Soomro
engineer(sub-region) accordance with the prescribed standards,
specifications, and parameters, Carry out continuous
monitoring of the designing plans and maintain liaison
with implementation staff/other stakeholders, Assist
in reviewing and modifying the designs for cost
TEAM COMPOSITION
List of Staff
Sr. No Name Position Assigned Task Assigned
effectiveness and technical suitability, Perform other
duties as required for the success of Project.
Assist the Field Team leader and other relevant staff
in planning and supervision of construction activities.
Support all rehabilitation and construction activities
undertaken by Consultant in the relevant districts with
improved coordination and timely technical inputs in
order to effectively meet completion targets.
Supervise / oversee implementation activities such
as design reviews, procurement of project materials,
12. Rana Abdul Hameed Civil Site Engineer At District and construction work. Undertake extensive field
Level visits to assess the quality of construction activities
and progress through contractors. Supervise
contractors and provide advice and support to help
overcome any shortcomings in the construction
quality and management procedures. Assist the Field
team leader in timely submission of monthly progress
reports on all rehabilitation & construction activities
undertaken in the respective districts.
 List of Key Personnel
This file was created by Oracle Reports.
Please view this document in Page Layout mode.LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 1 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

1 10575 DR. TAHIR MASOOD MANAGING DIRECTOR PHD CIVIL 13-07-2018 CORPORATE MANAGEMENT,
MD OFFICE 05/90 36/07 PROJECT MANAGEMENT,
CIVIL 7900 GEOTECHNICAL, HYDRO &
THERMAL POWER
ENGINEERING AND DAMS.
2 3842 SYED IMRAN WAHEED VICE PRESIDENT/HEAD ME CIVIL 15-07-1985 CONSTRUCTION MANAGEMEMT
CM 12/90 35/07 AND CONTRACT
CIVIL 70997 (L) ADMINISTRATION, PROJECT
PLANNING, IRRIGATION &
DRAINAGE DESIGN REVIEW
3 4232 IRFAN-UL-HAQ VICE PRESIDENT/HEAD ME SOIL ENGG. 19-07-1987 GEOTECHNICAL ENGINEERING
GT&GE 10/90 33/06
CIVIL 09981 (L)

4 4383 SHAUKAT QADEER VICE PRESIDENT/HEAD ME CIVIL 07-03-1988 EARTHQUAKE ENGINEERING,


SED 04/91 32/11 INFRASTRUCTURE FOR MASS
CIVIL 10355(L) TRANSIT, THERMAL POWER
PLANTS, INDUSTRIAL AND
HIGH-RISE BUILDINGS,
BRIDGES, SEISMIC RETROFIT
5 4668 MUHAMMAD ARIF CHANGEZI VICE PRESIDENT/HEAD B ARCH 27-09-1989 ARCHITECTURAL DESIGN &
A&P(K) 06/87 33/07 PROJECT MANAGEMENT
A 01026

6 4919 MRS. NABILA RASHID VICE PRESIDENT/HEAD B ARCH 18-01-1990 PROJECT MANAGEMENT OF
A&P(L) 09/89 31/04 COMPUTER BASED
A 01252 ARCHITECTURAL DESIGN AND
DETAILING
7 4953 MUHAMMAD ZUBAIR VICE PRESIDENT/HEAD ME CIVIL 31-01-1990 PROJECT MANAGEMENT,
E&PHE 09/97 31/00 PLANNING, DESIGNING AND
CIVIL 11764 (L) CONSTRUCTION SUPERVISION
OF SEWAGE / DRAINAGE
PROJECTS INCLUDING
SEWAGE TREATMENT PLANTS
8 4971 NADEEM ASHRAF VICE PRESIDENT/HEAD BE ELECT 17-06-1990 PLANNING, DESIGN,
P&M 10/89 30/07 PREPARATION OF CONTRACT
ELECT 08104 (L) DOCUMENTS, CONTRACT
EVALUATION, COORDINATION
AND PROJECT MANAGEMENT
OF POWER DISTRUBUTION
NETWORKS INCLUDING
EXTERNAL & INTERNAL
ELECTRIFICATION, ISO 9001
QUALITY MANAMENT SYSTEM
9 6527 MUHAMMAD DAWOOD RANA VICE PRESIDENT/HEAD BE CIVIL 29-11-1992 CONSTRUCTION SUPERVISION
H&TE 03/90 30/02 OF HIGHWAYS & BRIDGES
CIVIL 12498 (L)

10 6078 AHMAD SAID GM/HEAD ME CIVIL 03-03-1991 PROJECT MANAGEMENT,


BDD 10/90 29/11 CONTRACT ADMINISTRATION &
CIVIL 11760 (L) BUSINESS DEVELOPMENT

11 6187 AHSAN ANWAR GM/HEAD BE CIVIL 27-01-1993 CORPORATE MANAGEMENT,


COORD 09/91 29/02 CONSTRUCTION PLANNING
CIVIL 13624 AND MONITORING, CIVIL
ENGINEERING CONSTRUCTION
MANAGEMENT,
ADMINISTRATION AND QUALITY
ASSURANCE OF DOCUMENTS
12 4871 AZIZ ASLAM GM/HEAD ME CIVIL 19-11-1989 DISASTER PROJECT
DM&RD 09/08 31/02 MANAGEMENT AND
CIVIL 11750 INFRASTRUCTURE & URBAN
PLANNING
13 6125 TARIQ MAHMOOD TAHIR GM/HEAD MSC GEOLOGY 13-04-1992 EXPLORATION GEOPHYSICS
OVERSEAS 03/92 28/10
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 2 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

14 7669 FAISAL MAJEED GM/HEAD CA 24-02-2005 CORPORATE MANAGEMENT,


FINANCE 06/02 15/11 FINANCE, ACCOUNTS,
CA 03794 TAXATION, AUDIT, COMPANY
SECRETARIAL AFFAIRS
15 6038 KAUKAB HUSSAIN BHATTI GM/HEAD BE CIVIL 23-12-1990 DESIGN & SUPERVISION OF
CONTRACTS 02/90 30/01 CIVIL WORKS PERTAINING TO
CIVIL 12466 SUBSTATIONS

16 4937 DANISH RAZA GM/HEAD ME CIVIL 20-05-1990 HIGHWAY & INTERCHANGE


ISLAMABAD 04/96 30/08 DESIGN, TRANSPORTATION
CIVIL 12422 ENGINEERING

17 4940 OMER FAROOQ GM/HEAD ME CIVIL 21-05-1990 TRANSPORTATION


HR 08/95 30/08 ENGINEERING
CIVIL 12469(L)

18 6252 M. ZARGHAM ESHAQ KHAN GM/HEAD BE ELECT 04-07-1993 POWER SECTOR POLICY
BSD 08/92 28/06 DEVELOPMENT COVERING
ELECT 10316 (L) GENERATION, TRANSMISSION,
DISTRIBUTION AND
REGULATION, REFORM AND
POWER SECTOR MARKETS
DEVELOPMENT AND
TRANSITION INCLUDING COST
STRUCTURES, FINANCIAL
ANALYSIS AND MODELLING.
PLANNING, DESIGN, ANALYSIS
AND PROJECT MANAGEMENT
OF VARIOUS PROJECTS
RELATING TO POWER
SYSTEMS
19 6582 SYED TAJAMMAL HUSSAIN GM/HEAD ME WRM 03-02-1992 HYDROLOGIST/IRRIGATION &
W&A 11/91 31/00 DRAINAGE ENGINEER
AGRI 00616 (L)

20 3928 M. IKRAM LATIF WAIN GENERAL MANAGER BE CIVIL 05-09-1985 CONSTRUCTION SUPERVISION
P&M 03/85 35/05 OF TRANSMISSION LINES AND
CIVIL 08047 GRID STATIONS,
CONSTRUCTION SUPERVISION
OF THERMAL POWER
PROJECTS
21 4359 YAWER SAEED ANSARI GENERAL MANAGER MS GEO-PHYSICS 31-12-1987 GIS/ EXPLORATION
GT&GE 10/87 33/01 GEOPHYSICS/ SEISMOLOGY

22 4878 SALMAN HAFEEZ GENERAL MANAGER ME CIVIL 24-12-1989 STRUCTURAL ENGINEER


SED 12/92 31/07
CIVIL 11632 (L)

23 4530 GOHAR ALI GENERAL MANAGER ME CIVIL 01-10-1988 CONSTRUCTION MANAGEMENT


DM&RD 04/09 32/04
CIVIL 10753 (L)

24 6123 TAHIR AMIN GENERAL MANAGER BE CIVIL 17-11-1989 CONSTRUCTION SUPERVISION


CM 10/88 32/02 & CONTRACT ADMINISTRATION
CIVIL 10448

25 5683 MUHAMMAD MOHSIN MALIK GENERAL MANAGER BE CIVIL 07-04-1990 CONSTRUCTION/CONTRACT


KARACHI 11/88 31/07 MANAGEMENT
CIVIL 11890

26 7608 KAMRAN Y. KAZI GENERAL MANAGER ME SANIT.ENGG 09-09-2002 ENVIRONMENTALIST


GT&GE 09/98 30/10
CIVIL 12470 (L)
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 3 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

27 3664 MUHAMMAD MISBAH-UL-HAQ GENERAL MANAGER BE CIVIL 27-05-1984 CONSTRUCTION


KARACHI 09/83 37/07 SUPERVISION/MANAGEMENT
CIVIL 07218

28 4363 KHALID MAHMOOD AHMED GENERAL MANAGER B ARCH 14-01-1988 DESIGN AND DETAILING,
A&P(L) 06/87 33/07 INTERIOR DESIGNING AND
A 00998 CONSTRUCTION SUPERVISION
OF ARCHITECTURAL PROJECTS
29 6121 MRS. MOBINA BADRUDDIN GENERAL MANAGER B ARCH 01-01-1990 PLANNING, DESIGNING AND
A&P(L) 07/86 34/01 PROJECT MANAGEMENT OF
A 01089 ARCHITECTURAL PROJECTS
INCLUDING HEALTH,
EDUCATIONAL, RELIGIOUS,
HOUSING & LAND SCAPING
AND BUSINESS PROMOTION
30 6148 MUSHTAQ AHMAD GENERAL MANAGER BE CIVIL 08-08-1991 PLANNING, DESIGN AND
E&PHE 01/88 32/09 CONSTRUCTION SUPERVISION
CIVIL 10265 OF WATER SUPPLY,
SEWERAGE, DRAINAGE AND
SEWAGE TREATMENT
PROJECTS
31 4354 ASHFAQ AHMED GENERAL MANAGER BE CIVIL 19-11-1987 PLANNING, DESIGN AND
E&PHE 07/87 33/02 CONSTRUCTION SUPERVISION
CIVIL 10021 OF WATER SUPPLY,
SEWERAGE AND DRAINAGE
PROJECTS
32 4555 ASAD LATIF PIRACHA GENERAL MANAGER M ARCH 28-06-1988 COMPUTER AIDED DESIGNING
A&P(L) 03/97 33/01 & DETAILING OF
A 01077 ARCHITECTURAL AND
PLANNING PROJECTS,
MULTIMEDIA PRESENTATIONS
FOR ARC HITECTURAL
PROJECTS
33 4570 JAMSHAID IQBAL GENERAL MANAGER M ARCH 30-07-1989 PROJECT MANAGEMENT,
A&P(L) 06/04 33/00 COMPUTER BASED
A 01240 ARCHITECTURAL DESIGN AND
DETAILING
34 4695 MRS. SAMINA BUTT GENERAL MANAGER B ARCH 04-03-1990 DESIGN CONCEPT AND
A&P(K) 02/88 32/11 PREPARATION OF
A 01053 PRESENTATION DRAWINGS,
TENDER DRAWING AND
DOCUMENTS, PREPARATION
OF DESIGN REPORTS AND
WRITE-UPS
35 6569 BASIT EJAZ GENERAL MANAGER BE CIVIL 02-07-1992 PROJECT MANAGEMENT,
H&TE 09/89 30/10 PLANNING, DESIGNING AND
CIVIL 12125 (L) CONSTRUCTION SUPERVISION
OF SEWAGE / DRAINAGE
PROJECTS INCLUDING
SEWAGE TREATMENT PLANTS
36 6206 ZAHID MAHMOOD KHAN GENERAL MANAGER ME TRANSP. 17-11-1989 CONSTRUCTION
CM 12/03 32/02 MANAGEMENT/CONTRACT
CIVIL 11104 (L) ADMINISTRATION AND
CONSTRUCTION SUPERVISION
37 4962 IMRAN BADAR GENERAL MANAGER BE CIVIL 29-05-1990 CONSTRUCTION SUPERVISION
CM 06/89 31/08 OF INFRASTRUCTURE WORKS,
CIVIL 11855 BUILDINGS, PRESTRESSED
CONCRETE BRIDGES AND
VALUATION OF LAND AND CIVIL
WORKS
38 6065 MUJAHID MUNIR GENERAL MANAGER BE ELECT 09-07-1991 PLANNING, FEASIBILITY
P&M 09/90 30/01 STUDIES, DESIGN,
ELECT 09031 (L) PREPARATION OF TECH.
SPECIFICATIONS, BOQS,
BIDDING DOCUMENTS,
CONTRACT DOCUMENTS
39 7518 IRFAN ULLAH GENERAL MANAGER ME WRM 04-03-2004 CIVIL ENGINEERING
W&A 06/05 30/03
CIVIL 14405
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 4 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

40 5677 SYED MUNAWWAR ABBAS GENERAL MANAGER ME CIVIL 20-09-1990 TRANSPORTATION,


KARACHI 02/93 31/04 GEOTECHNICAL ENGINEERING
CIVIL 12008 AND CONSTRUCTION
MANAGEMENT
41 6111 SHAKIR HAFEEZ GENERAL MANAGER ME ELECT 01-03-1992 TRANSMISSION
P&M 06/98 28/11
ELECT 09631

42 6587 MANSOOR ALI GENERAL MANAGER ME WRM 29-06-1993 PROCUREMENT, CONTRACT


W&A 08/99 29/08 ADMINISTRATION AND
CIVIL 13369 PROJECT MANAGEMENT

43 7113 KHADIM HUSSAIN JHAKAR GENERAL MANAGER BE CIVIL 17-09-1998 PROJECT MANAGEMENT,
H&TE 09/91 28/09 GEOMETRIC DESIGN &
CIVIL 13637(L) CONSTRUCTION SUPERVISION,
HIGHWAY/MOTORWAY
SPECIALIST AND BUSINESS
PROMOTION
44 7144 KHALID MAHMOOD GENERAL MANAGER ME CIVIL 23-01-1999 WATER RESOURCES
W&A 12/97 24/07
CIVIL 15243

45 7384 NAUMAN-UL-HAQ GENERAL MANAGER ME CIVIL 19-06-2002 HIGHWAY PLANNING & DESIGN
H&TE 00/00 29/00
CIVIL 13084

46 5769 MUHAMMAD AYUB MALIK GENERAL MANAGER ME IRRIG. 07-12-2006 CONSTRUCTION SUPERVISION
GT&GE 00/95 29/08
CIVIL 11666 (L)

47 3809 MUNIR-UD-DIN CHIEF ENGINEER BE MECH 26-05-1984 HVAC DESIGN AND


BSD 10/83 36/08 SUPERVISION
MECH 04313 (L)

48 4064 INAMULLAH KHAN S/O HABIB CHIEF ENGINEER ME WRM 23-07-1986 IRRIGATION AND DAMS
RO PESH. 08/14 34/06
CIVIL 08633

49 6032 HAMID ULLAH KHAN CHIEF ENGINEER BE MECH 13-05-1989 CONSTRUCTION SUPERVISION
P&M 04/88 31/09 OF HAVC PROJECT,
MECH 06965 CONSTRUCTION SUPERVISION
OF PASSENGER LIFT,
CONSTRUCTION SUPERVISION
OF EHV TRANSMISSION LINES
AND SUBSTATION
50 4849 MUHAMMAD SHOAIB CHIEF ENGINEER BE CIVIL 08-11-1989 STRUCTURAL ENGINEERING,
SED 06/89 31/03 HYDROPOWER, WATER
CIVIL 11624 TREATMENT, TECHNICAL
COORDINATION, PROJECT
MANAGEMENT, REGIONAL &
URBAN DEVELOPMENT,
STRATEGIC PLANNING,
UPGRADING OF SQUATTER
SETTLEMENTS, SITE AND
SERVICES
51 4931 MUHAMMAD ILYAS CHIEF ENGINEER BE CIVIL 17-04-1990 DESIGN REVIEW &
P&M 04/88 32/03 CONSTRUCTION SUPERVISION
CIVIL 10959 OF EHV TRANSMISSION LINES
& SUBSTATIONS AND PROJECT
MONITORING
52 6029 MUHAMMAD ZAFAR AMAN REGIONAL MANAGER ME CIVIL 12-05-1990 DAM PROJECT MANAGEMENT,
RO PESH. 06/96 31/09 CONTRACT, QUALITY
CIVIL 11650 (L) ASSURANCE & CONSTRUCTION
SUPERVISION, GEOTECHNICAL,
EARTH WORKS, QUALITY
CONTROL
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 5 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

53 6554 MUHAMMAD JAHANZEB CHIEF ENGINEER BE CIVIL 03-04-1994 GEOTECHNICAL ENGINEERING,


GT&GE 06/89 29/08 CONSTRUCTION MANAGEMENT
CIVIL 11786 (L)

54 6706 RAFAQUAT ALI CHIEF ENGINEER ME WRM 01-06-1995 HYDRAULICS, FLOOD


W&A 09/94 26/08 FORECASTING AND
CIVIL 15062 (L) MANAGEMENT, IRRIGATION &
DRAINAGE
55 7124 SHAMSHAD AHMAD CHIEF ENGINEER ME HYDROLOGY 14-12-1998 GROUNDWATER, HYDROLOGY
W&A 03/92 27/08 AND IRRIGATION & DRAINAGE
AGRI 00794

56 9515 MUHAMMAD UMAR FAROOQ CHIEF ENGINEER ME WRM 07-05-2012 PROJECT MANAGEMENT, FIDIC
GT&GE 04/07 29/08 CONTRACTS, CLAIMS
CIVIL 13362 (L) EVALUATION, TENDER
DOCUMENTS FOR CIVIL
WORKS, PREPARATION AND
EVALUATION OF
PREQUALIFICATION,
CONSULTANCY CONTRACTS,
MONITORING, COST ANALYSIS,
COORDINATION, PREPARATION
OF TECHNICAL AND FINANCIAL
PROPOSALS, HUMAN
RESOURCE MANAGEMENT,
QUALITY MANAGEMENT
57 4805 ABDUL KALEEM CHIEF ENGINEER BE CIVIL 21-08-1988 CONSTRUCTION
KARACHI 04/88 32/05 MANAGEMENT, CONTRACT
CIVIL 10526 ADMINISTRATION

58 4541 ABDUL SHAKOOR CHIEF ENGINEER BE MECH 24-12-1988 CONSTRUCTION SUPERVISION


P&M 01/88 32/01 OF SUBSTATIONS AND
MECH 06631 TRANSMISSION LINES

59 6207 ARFAN-UL-HAQ CHIEF ENGINEER BE CIVIL 10-01-1989 CONSTRUCTION SUPERVISION


H&TE 10/88 32/01 OF HIGHWAY PROJECTS
CIVIL 11108

60 4968 MUHAMMAD ARIF S/O G.QADIR CHIEF ENGINEER BE CIVIL 16-04-1990 CONSTRUCTION SUPERVISION
P&M 04/89 30/09
CIVIL 11708

61 6688 MUHAMMAD AMIN CHIEF ENGINEER BE CIVIL 07-10-1990 PROCUREMENT PLANNING,


CM 07/88 32/04 BIDDING PROCESS,
CIVIL 10988 (L) PREPARATION OF
SPECIFICATIONS, BIDDING
DOCUMENTS,
62 6113 MUHAMMAD DAWOOD AKHTAR CHIEF ENGINEER BE CIVIL 17-03-1991 CONSTRUCTION SUPERVISION
RO PESH. 11/90 29/10 OF ROADS, BRIDGES,
CIVIL 12792 (L) HYDRAULIC STRUCTURES &
DAMS
63 6901 ZAHEER AHMAD AWAN CHIEF ENGINEER ME WRM 25-05-1992 IRRIGATION
W&A 06/08 35/08
AGRI 00407 (L)

64 8209 MUHAMMAD BAKHSH CHIEF ENGINEER BE CIVIL 20-04-2006 DESIGN & CONSTRUCTION
W&A 06/88 32/03 SUPERVISION OF IRRIGATION
CIVIL 10929(L) AND DRAINAGE

65 4537 TAHIR RASHEED CHIEF ENGINEER BE MECH 15-01-1989 MECHANICAL ENGINEERING,


P&M 01/88 32/01 POWER GENERATION (HYDEL)
MECH 06691

66 4811 SYED MUHAMMAD NADEEM CHIEF ENGINEER BE AGRI 12-09-1989 IRRIGATION DRAINAGE,
M&QC 08/88 31/05 PROPOSALS & COORDINATION
AGRI 00932
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 6 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF PROJECT


DIVISION WITH MTH/YEAR JOINING/ MANAGEMENT OF
PEC REG. # TOTAL EXPER. MEGA PROJECTS
INCLUDING
PREPARATION OF
67 4969 MALIK RAEES AKBAR CHIEF ENGINEER BE ELECT 10-06-1990 SUBSTATIONS
PC-1, PROJECT
P&M 03/89 30/08 APPRAISAL,
ELECT 08140 CONSTRUCTION
SUPERVISION OF
68 4745 ADIL NAZIR CHIEF ARCHITECT B ARCH 31-03-1991 THE PROJECTS. DESIGN
ARCHITECTURAL
01/91 29/10 PLANNING,
A&P(L)
A 01444 DESIGNING AND
CONSTRUCTION
SUPERVISION FOR
69 6322 ABDUL RASHEED MEHAR CHIEF ENGINEER BE MECH 26-11-1991 POWER TRANSMISSION
THE PROJECTS OF LINES
P&M 12/88 31/10 HIGH WAYS, FARM
MECH 07358 (L) TO MARKET ROADS,
BRIDGES,
70 6150 MUHAMMAD SALEEM SHAHID CHIEF ENGINEER BE CIVIL 03-06-1992 CONSTRUCTION SUPERVISION
SPECIALIZATION
P&M 12/90 28/08
CIVIL 13227

71 7116 MUHAMMAD ITTFAQ CHIEF ENGINEER MPHILL WRM 14-12-1998 IRRIGATION & DRAINAGE
W&A 06/93 27/06
AGRI 01087

72 7389 MUHAMMAD AZAM CHIEF ENGINEER MPHILL WRM 06-08-2002 DAM ENGINEERING
GT&GE 03/07 29/01
CIVIL 13274 (L)

73 7545 ABDUL BASIT SHEIKH CHIEF ENGINEER ME CIVIL 27-04-2004 GEOMETRIC/TRANSPORT


H&TE 02/09 30/02
CIVIL 12663 (L)

74 9261 OMER HAQ CHIEF ENGINEER BE CIVIL 01-04-2011 CIVIL ENGINEERING, BUILDING
CM 03/85 35/00 WORKS AND SOCIETY
CIVIL 08034 (L) INFRASTRUCTURE

75 6193 MUHAMMAD ARIF S/O MIRAJ DIN CHIEF ENGINEER BE ELECT 16-06-1992 POWER TRANSMISSION LINES
P&M 07/91 28/07
ELECT 09581

76 6143 KAMRAN AHMAD CHIEF ENGINEER ME WRM 14-07-1992 HYDRAULIC DESIGN


W&A 08/99 28/07
CIVIL 13523 (L)

77 7008 MUHAMMAD ASLAM CHIEF ENGINEER BE ELECT 22-10-1992 ELECTRICAL ENGINEERING,


P&M 10/91 28/03 SUBSTATION (PROTECTION)
ELECT 10018

78 7019 FAIZ ULLAH CHIEF ENGINEER BE ELECT 23-11-1992 SUBSTATIONS


P&M 06/91 28/02
ELECT 09767

79 6254 AFTAB HUSSAIN LAKHO CHIEF ENGINEER BE CIVIL 20-03-1993 CONTRACT ADMINISTRATION,
P&M 01/92 28/10 DESIGN REVIEW
CIVIL 13952 SPECIFICATIONS FOR POWER
TRANSMISSION LINES
80 6348 MUHAMMAD SALEEM JAVAID CHIEF ENGINEER BE ELECT 29-07-1993 POWER DISTRIBUTION
P&M 05/89 31/05
ELECT 07700 (L)

81 6695 MUKHTAR ARSHAD REGIONAL MANAGER MSC TQM 27-10-1993


ISLAMABAD 03/06 29/03
CIVIL 14430 (L)
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 7 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

INFRASTRUCTURE PROJECTS

82 7036 TARIQ MANSOOR CHIEF ENGINEER BE CIVIL 19-12-1993 CONSTRUCTION SUPERVISION


H&TE 06/89 31/01 OF PUMPING STATION, D.I
CIVIL 13446 PRESSURE LINE AND WATER
LINE
83 6355 WASEEM SAIF DAR CHIEF ENGINEER ME CIVIL 10-03-1994 CONSTRUCTION
CM 10/07 28/02 MANAGEMENT, PLANNING AND
CIVIL 14333 (L) MONITORING

84 7261 MUHAMMAD ABDUL NASIR CHIEF ENGINEER BE CIVIL 01-09-1996 CONSTRUCTION SUPERVISION
GT&GE 09/94 26/05 AND GEOTECHNICAL
CIVIL 16406 ENGINEERING

85 7396 MUHAMMAD HASEEB SAQIB CHIEF ENGINEER ME MECH 31-10-2002 FEASIBILITY/ANALYTICAL


P&M 06/07 18/03 STUDIES, DESIGN AND DESIGN
MECH 16982 (L) REVIEW OF THERMAL POWER
PLANTS
86 7430 TARIQ JAVED BHATTI CHIEF GEOLOGIST ME GEOLOGY 04-11-2002 ENGINEERING GEOLOGY AND
GT&GE 08/92 21/10 CONSTRUCTION MATERIAL

87 8027 KHAN ZAMAN LAGHARI CHIEF ENGINEER BE CIVIL 31-05-2005 IRRIGATION & DRAINAGE
W&A 12/88 30/05
CIVIL 11243

88 7736 FAISAL ALI CHIEF ENGINEER BE ELECT 23-06-2005 POWER DISTRIBUTION,


P&M 01/98 22/05 NETWORK PLANNING, DESIGN
ELECT 15716(L) & ANALYSIS, ILLUMINATION
SCHEMES DESIGN, LIGHTNING
PROTECTION, GROUNDING
AND CATHODIC PROTECTION
SYSTEMS
89 6081 ABDUL JABBAR KHAN CHIEF ENGINEER BE CIVIL 10-08-1991 CONSTRUCTION MANAGEMENT
GT&GE 02/89 29/06
CIVIL 11725 (L)

90 6201 SAJJAD KHALID CHIEF ENGINEER ME WRM 21-05-1992 IRRIGATION, DRAINAGE,


W&A 08/91 28/08 GROUND WATER,
AGRI 00871 (L) GEOGRAPHIC INFORMATION
SYSTEM (GIS)
91 6943 MUHAMMAD ILYAS KHAN CHIEF ENGINEER ME AGRI 25-05-1992 IRRIGATION AND DRAINAGE
RO PESH. 02/02 32/06
AGRI 771 (L)

92 6127 KHURSHID AHMAD CHIEF ENGINEER BE ELECT 10-06-1992 INSTRUMENTATION, CONTROL


P&M 06/91 28/11 & SUBSTATIONS
ELECT 09607

93 7046 RIAZ AHMAD MEMON CHIEF COMPUTER MCS 06-07-1992 COMPUTER SCIENCES & GIS
SYSTEM SPECIALIST 06/89 31/07
W&A

94 6154 MUHAMMAD IQBAL CHIEF ENGINEER BE ELECT 30-07-1992 POWER TRANSMISSION LINES
P&M 06/91 28/06
ELECT 09574

95 6681 SAJJAD HAIDER CHIEF ENGINEER BE CIVIL 01-12-1992 CONSTRUCTION SUPERVISION


P&M 03/91 29/09 OF TRANSMISSION LINES,
CIVIL 13407 (L) SUBSOIL INVESTIGATION,
POWER HOUSES AND
SUBSTATIONS
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 8 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

96 6351 DAYA RAM CHIEF ENGINEER BE ELECT 09-02-1993 CONSTRUCTION OF HIGH


P&M 07/91 28/00 VOLTAGE TRANSMISSION
ELECT 09789 (L) LINES AND SUBSTATIONS

97 6908 NABI BAKHSH BHATTI CHIEF ENGINEER BE ELECT 09-03-1993 INSTRUMENTATION AND
P&M 06/89 31/02 CONTROL
ELECT 07969

98 6292 RIASAT ALI CHIEF ENGINEER BE CIVIL 17-03-1993 BUILDING STRUCTURES


SED 06/90 29/10
CIVIL 12657 (L)

99 6963 WAQAR HASSNAIN CHIEF ENGINEER BE CIVIL 09-06-1993 CONSTRUCTION SUPERVISION


P&M 02/91 28/11
CIVIL 13347

100 7395 SALMAN SHAHID S/O S. CHIEF ENGINEER ME CIVIL 09-08-1999 PROJECT MANAGEMENT
HUMAYUN ISLAMABAD 09/08 21/06
CIVIL 19657 (L)

101 7458 MUHAMMAD JAVED IQBAL CHIEF ENGINEER BE CIVIL 10-11-1999 CONSTRUCTION SUPERVISION
H&TE 03/92 28/05 OF CONVENTIONAL BRIDGES
CIVIL 14099 OF DIFFERENT SPAN LENGTHS

102 7359 FURQAN ALI MALIK CHIEF ENGINEER BE CIVIL 09-03-2001 STRUCTURAL ENGINEERING
SED 06/94 24/05
CIVIL 16532 (L)

103 7542 MUHAMMAD SALEEM CHIEF GEOLOGIST MSC GEOLOGY 25-02-2003 ENGINEERING GEOLOGY
GT&GE 12/88 30/10

104 7592 NADEEM AMJAD CHIEF ENGINEER ME CIVIL 29-04-2004 PAVEMENT DESIGN
H&TE 07/10 29/03
CIVIL 13377 (L)

105 8132 IMRAN KHAN GANDAPUR CHIEF ENGINEER BE CIVIL 19-04-2006 PROJECT MANAGEMENT AND
RO PESH. 07/90 28/02 CONSTRUCTION SUPERVISION
CIVIL 12774 (L)

106 8125 ABID SULEMAN BUTT CHIEF ENGINEER ME CIVIL 10-04-2007 CONSTRUCTION MANAGEMENT
CM 08/03 29/00
CIVIL 13295 (L)

107 8847 NOOR MUHAMMAD KHAN CHIEF ENGINEER BE CIVIL 08-09-2009 CIVIL ENGINEERING
RO PESH. 03/90 30/02
CIVIL 12542 (L)

108 9109 OBAID ULLAH CHIEF ENGINEER BE CIVIL 02-12-2009 CONSTRUCTION SUPERVISION
CM 08/91 29/03 OF ROADS & BRIDGES
CIVIL 13514(L)

109 9102 MUHAMMAD ASLAM SOOMRO CHIEF ENGINEER ME CONST. MGT. 16-04-2010 WATER RESOURCES,
CM 03/19 28/10 HIGHWAYS AND OIL SECTOR
CIVIL 13976 (L) WORKS

110 6936 SANAULLAH HAKRO CHIEF ENGINEER BE ELECT 21-03-1993 CONSTRUCTION SUPERVISION
P&M 10/88 29/10 OF 500 KV TRANSMISSION LINE
ELECT 07379 (L) & THERMAL POWER HOUSE

111 7419 MAHMOOD AHMAD CHIEF ENGINEER BE CIVIL 25-02-1999 PLANNING AND DESIGN OF
E&PHE 09/95 24/09 WATER SUPPLY, SEWERAGE
CIVIL 16706 AND DRAINAGE PROJECTS
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 9 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

112 7172 HASNAT AHMAD MINHAS CHIEF ENGINEER BE CIVIL 19-04-1999 SUPERVISION &
H&TE 00/93 27/10 CONSTRUCTION OF BRIDGES,
CIVIL 15409(L) UNDERPASSES AND ROADS

113 7333 ASIM MASUD CHIEF ENGINEER ME ENGG.MGT. 01-05-1999 PROJECT MANAGEMENT,
GT&GE 06/11 21/09 CONSTRUCTION
CIVIL 18507 (L) MANAGEMENT, GEOTECHNICAL
ENGINEERING, FEASIBILITY
STUDIES, LANDSLIDE STUDIES,
PROJECT PROPOSAL
DEVELOPMENT
114 7675 NASIR KHAN AFRIDI CHIEF ENGINEER ME CIVIL 11-02-2004 DESIGN ENGINEER
W&A 07/08 26/09
CIVIL 16094(L)

115 7732 EHSANULLAH CHIEF ENGINEER BE CIVIL 24-11-2004 CONSTRUCTION SUPERVISION


RO PESH. 06/88 30/07
CIVIL 10968 (L)

116 8178 SYED MUJAHID HUSSAIN CHIEF TOWN PLANNER M C&RP 17-03-2005 URBAN PLANNING
DM&RD 01/17 29/02
P 00295

117 8351 MUHAMMAD IRSHAD CHIEF ENGINEER ME WRM 21-03-2005 WATER RESOURCES
W&A 08/04 29/04 MANAGEMENT
AGRI 00667 (L)

118 7970 AHMAD NAVEED SHAHBAZ CHIEF ENGINEER BE CIVIL 31-07-2006 CONSTRUCTION MANAGEMENT
CM 03/91 29/08
CIVIL 13329 (L)

119 7402 AAMIR RASHID CHIEF ENGINEER ME CIVIL 01-11-2006 STRUCTURAL ENGINEERING
ISLAMABAD 11/11 21/06
CIVIL 18622

120 8311 NADEEM AHMAD CHIEF NETWORK ME INTERNET 14-01-2008 DATA & VOICE NETWORK,
ENGINEER 00/01 25/01 COMPUTER HARDWARE
CONTRACTS CIVIL 14301 (L)

121 8848 DR. NAVEED ASLAM AWAN CHIEF AGRONOMIST PHD 01-06-2009 AGRONOMY
W&A 07/03 25/03

122 D537 REHAN ZAMIN CHIEF ENGINEER ME CIVIL 10-10-2011 TRANSPORTATION/TRAFFIC


7 KARACHI 12/98 21/00 ENGINEERING
CIVIL 18245

123 6473 MUHAMMAD ASIF S/O MAHMOOD CHIEF ENGINEER BE MECH 08-06-1994 MECHANICAL ENGINEERING
P&M 05/93 26/08
MECH 10535

124 7382 HAFIZ MUHAMMAD AHMAD CHIEF ENGINEER ME CIVIL 13-05-2002 STRUCTURAL ENGINEERING,
SED 10/01 21/06 BRIDGES, NUCLEAR POWER
CIVIL 19724(L) PLANT, TRANSMISSION
TOWERS, BUILDINGS AND
COMPLEXES (CONCRETE &
STEEL)
125 7441 MUHAMMAD SALEEM PIRZADA CHIEF ENGINEER ME ELECT 11-11-2002 DESIGN & DISTRIBUTION OF
P&M 07/07 25/02 BUILDING, ROAD AND POWER
ELECT 12365 (L) PLANTS

126 8073 ARSHAD HUSSAIN MALIK CHIEF ENGINEER ME CIVIL 18-12-2006 TRANSPORTATION ENGINEER
H&TE 06/05 22/08
CIVIL 16470(L)
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 10 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

127 8745 MANOHAR LAL CHIEF ENGINEER ME CIVIL 15-05-2009 PROJECT MANAGEMENT,
H&TE 04/09 26/04 CONSTRUCTION SUPERVISION,
CIVIL 14733(L) CIVIL WORKS, HIGHWAY

128 10620 SABIR HUSSAIN CHIEF ENGINEER ME CIVIL 17-10-2015 PROJECT MANAGEMENT,
W&A 12/08 31/06 PLANNING, SCHEDULING,
CIVIL 11762 DESIGNING, MANAGEMENT
AND CONSTRUCTION
SUPERVISION OF DAMS,
CANALS, HYDRAULIC AND
HYDROPOWER PROJECTS,
SPILLWAY
129 10304 DR. ALI RAZA CHIEF ENGINEER PHD 10-03-2016 PROJECT MANAGEMENT, ON-
W&A 11/11 24/11 FARM WATER MANAGEMENT
AGRI 828 SPECIALIST, PROJECT DESIGN,
CONSTRUCTION SUPERVISION
OF CIVIL WORKS
130 10481 UMAIR SAEED CHIEF ENGINEER ME ELECT 13-05-2016 SCADA & TELECOM,
P&M 10/03 27/04 INSTRUMENT & CONTROL,
ELECT 9300 AUTOMATION, PROJECT
MANAGEMENT, TENDER
DOCUMENTS
131 10573 DR. MUHAMMAD MASOOD CHIEF ENGINEER PHD 18-07-2016 PROJECT MANAGEMENT,
AHMAD W&A 12/09 27/09 CONSTRUCTION SUPREVISION
CIVIL 14264 OF EARTHWORKS AT CANAL
BANKS & CIVIL WORKS,
REHABILITATION &
UPGRADATION OF MAIN CANAL
BANKS, DESIGN REVIEW OF
STRUCTURES. TENDER
DOCUMENTS.
132 7079 AZHAR RAHIM CHIEF ENGINEER BE CIVIL 12-05-1998 GEOMETRIC DESIGN
H&TE 07/96 24/06
CIVIL 17406(L)

133 7176 MAJID ALI MEMON CHIEF ENGINEER ME WRM 13-03-1999 PROJECT MANAGEMENT,
KARACHI 07/05 21/11 PLANNING & COORDINATION,
CIVIL 19002 (L) PROGRESS MONITORING,
QUALITY CONTROL,
REPORTS/DOCUMENTATION,
OFFICE MANAGEMENT, DESIGN
REVIEW AND CONSTRUCTION
SUPERVISION
134 7271 MALIK IKRAM ULLAH CHIEF ENGINEER ME WRM 22-11-1999 IRRIGATION/HYDRAULICS
W&A 12/04 21/07
CIVIL 19101 (L)

135 8709 MUHAMMAD HARIS FAROOQUI CHIEF ENGINEER MPHILL 28-02-2002 HVAC, BMCS, GREEN
BSD 03/09 18/11 BUILDINGS, BUILDING ENERGY
MECH 16482 (L) AUDIT, FIRE FIGHTING,
ELEVATORS AND ESCALATORS
136 7415 MUHAMMAD SHARIQ AHMAD CHIEF ENGINEER ME ENVIR. 09-10-2002 ENVIRONMENTAL, CIVIL AND
GT&GE 04/01 23/05 VALUATION ENGINEER AND
CIVIL 17692 (L) RAP EXPERT, HSE ENGINEER,
AIR DISPERSION MODELING
EXPERT
137 7438 POHOO SOOTAHER CHIEF ENGINEER BE CIVIL 28-12-2002 DESIGN AND ENGINEERING OF
P&M 09/98 22/04 TRANSMISSION LINE,
CIVIL 19011(L) SUPERVISION OF FIELD WORK,
DRAWING WORK, PROJECT
MONITORING, CONTRACT AND
ASSISTING THE
CONSTRUCTION MANAGER IN
CORRESPONDENCE AND
COORDINATION B/W PROJECT
OFFICE, CONTRACTOR &
CLIENT AND ALSO IN VARIOUS
ACTIVITIES RELATED TO THE
PROJECT
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 11 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

138 7618 MUHAMMAD ZAKI CHIEF ENGINEER BE CIVIL 26-03-2004 CONSTRUCTION SUPERVISION
H&TE 01/88 30/11 OF ROADS
CIVIL 11120(L)

139 7581 AAMIR MUNIR CHIEF ENGINEER MSC ENVR.SC. 22-07-2004 ENVIRONMENTAL & PUBLIC
E&PHE 05/12 17/06 HEALTH ENGINEERING
CIVIL 23074 (L)

140 8288 AJAZ AHMAD GONDAL CHIEF ENGINEER BE CIVIL 29-04-2005 CONSTRUCTION SUPERVISION
W&A 09/91 28/02
CIVIL 13641 (L)

141 8690 ABDUL RASHID CHIEF ENGINEER BE CIVIL 31-07-2006 HIGHWAYS, BUILDING WORKS,
CM 01/93 27/02 WATER SECTOR (CANAL
CIVIL 14500 (L) WORKS)

142 8269 ARSLAN ZAMIR CHIEF ENGINEER BE CIVIL 02-08-2006 CONSTRUCTION MANAGEMENT
CM 04/92 28/07 OF CIVIL ENGINEERING
CIVIL 14061 (L) WORKS, EARTH WORK IN
DAMS, URBAN DEVELOPMENT
PROJECTS INCLUDING ROADS,
WATER SUPPLY AND
SEWERAGE WORKS
143 8189 MUHAMMAD MOEEN CHIEF ENGINEER ME CIVIL 02-04-2007 PROJECT MANAGEMENT,
GT&GE 05/05 18/09 MONITORING & EVALUATION,
CIVIL 20413(L) GEOTECHNICAL DESIGN,
BUILDING WORKS,
ENGINEERING DESIGN,
DETAILED DESIGN, TENDER
DOCUMENTS
144 5762 SAEED AHMAD SOOMRO PRINCIPAL ENGINEER BE MECH 01-09-2006 MECHANICAL ENGINEERING
KARACHI 10/87 32/06
MECH 06462

145 6140 SYED SAJID ALI ZAIDI PRINCIPAL ENGINEER BE AGRI 19-07-1992 IRRIGATION, DRAINAGE,
W&A 10/88 32/01 PROPOSALS & COORDINATION
AGRI 00908 (L)

146 7313 ISRAR ULLAH KHAN PRINCIPAL ENGINEER ME CIVIL 05-10-1998 CONSTRUCTION SUPERVISION
H&TE 05/99 29/10
CIVIL 13325(L)

147 7654 MUHAMMAD RAMZAN JAVED PRINCIPAL ENGINEER ME WATER&ENV. 01-02-2005 ENVIRONMENTAL IMPACT
GT&GE 04/01 26/02 ASSESSMENT, PLANNING,
CIVIL 14630 DESIGN & MANAGEMENT OF
WATER/WASTEWATER
TREATMENT SYSTEM
148 8212 TANVIR HUSSAIN PRINCIPAL ENGINEER BE CIVIL 16-07-2007 CONSTRUCTION SUPERVISION
H&TE 02/90 30/10
CIVIL 12559(L)

149 8772 MUHAMMAD NADEEM AKHTAR PRINCIPAL ENGINEER BE CIVIL 07-05-2009 DESIGN AND CONSTRUCTION
RO QUETTA 01/90 30/06 SUPERVISION
CIVIL 12375(L)

150 7373 NASIR MAHMOOD PRINCIPAL ENGINEER BE CIVIL 18-10-1992 CONSTRUCTION SUPERVISION
H&TE 09/91 28/03 OF CIVIL ENGINEERING
CIVIL 13902 (L) PROJECTS

151 7463 JAVAID HUSSAIN PRINCIPAL ENGINEER BE CIVIL 06-07-1998 GEOMETRIC DESIGN
H&TE 10/95 24/10
CIVIL 17123(L)

152 7431 MUHAMMAD AMIR SOHAIL PRINCIPAL GEOLOGIST ME GEOLOGY 04-12-2002 GEOTECHNICAL
GT&GE 03/92 28/00 INVESTIGATIONS/GEOLOGICAL
/LITHO STRUCTURAL
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 12 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

153 8072 MUHAMMAD SALEEM ZAFAR PRINCIPAL ENGINEER ME CIVIL 01-12-2005 PROJECT MANAGEMENT,
ISLAMABAD 10/19 27/07 CONSTRUCTION SUPERVISION
CIVIL 14878 (L)

154 8191 HAMAYUN BASHIR PRINCIPAL ENGINEER BE CIVIL 02-04-2007 CONSTRUCTION SUPERVISION
CM 06/89 28/10
CIVIL 11623(L)

155 9217 MUHAMMAD AZHAR PRINCIPAL ENGINEER ME ENVIR. 20-08-2009 CIVIL / ENVIRONMENTAL
W&A 05/06 28/03 ENGINEERING
CIVIL 14182 (L)

156 6255 SYED M. ASIF ALI PRINCIPAL ENGINEER BE ELECT 18-04-1993 500KV/220KV SUBSTATIONS,
ISLAMABAD 01/91 29/00 500KV TRANSMISSION LINES,
ELECT 09485 (L) 11KV & 440V DISTRIBUTION
SYSTEM, BUILDING
ELECTRIFICATION WORK,
INSTALLATION OF UPS/ DIESEL
GENERATORS, HVAC SYSTEM
& TESTING & COMMISSIONING
OF HYDROELECTRIC
GENERATORS, PREPARATION
OF TENDER DOCUMENTS FOR
2*500MW COMBINED CYCLE
POWER PLANT.
157 6538 MAZHAR ALI PRINCIPAL ENGINEER ME CIVIL 20-11-1994 CIVIL ENGINEERING
H&TE 09/06 27/03
CIVIL 14409

158 7368 IMRAN AHMAD KHAN PRINCIPAL ENGINEER BE CIVIL 02-02-1999 CIVIL ENGINEERING
A&P(L) 03/93 26/06
CIVIL 14729

159 7165 SYED SHUJA-UD-DIN PRINCIPAL ENGINEER BE CIVIL 22-04-1999 GEOMETRIC DESIGN
H&TE 10/95 25/00 ENGINEER/HIGHWAY
CIVIL 16878(L) ENGINEER

160 8028 MUHAMMAD FAHIM KHATTAK PRINCIPAL ENGINEER BE AGRI 01-03-2005 WATER & AGRICULTURE
W&A 09/92 25/05
CIVIL 18132(L)

161 7914 ASHIQ HUSSAIN MALIK PRINCIPAL ENGINEER BE AGRI 24-03-2005 FIELD ENGINEER INCHARGE
W&A 01/88 31/04 PWMC (NPIW), FIELD
AGRI 00815 (L) COORDINATOR, TRAINING
COORDINATOR (PPSGDP),
FIELD ENGINEER OFWM
PROJECTS
162 7876 MUHAMMAD NAEEM PRINCIPAL ENGINEER BE CIVIL 24-05-2005 CONSTRUCTION SUPERVISION
W&A 08/92 27/06 OF VARIOUS CIVIL
CIVIL 14239(L) ENGINEERING WORKS

163 8121 ALI ASGHAR PRINCIPAL ENGINEER ME CIVIL 22-10-2005 IRRIGATION, DAMS,
CM 02/08 26/00 STRUCTURE, BUILDING,
CIVIL 15793(L) INFRASTRUCTURE, ROAD AND
BRIDGES WORKS
164 8940 GHULAM SARWAR PRINCIPAL ENGINEER BE CIVIL 07-11-2009 CIVIL ENGINEERING
H&TE 09/91 29/00
CIVIL 13588(L)

165 6386 NOORAZ GUL PRINCIPAL ENGINEER MPHILL 07-08-1993 PROJECT MANAGEMENT,
RO PESH. 04/14 28/10 POLICY MAKING, QUALITY
CIVIL 14055 (L) CONTROL & QUALITY
ASSURANCE SERVICES,
CONTRACTS &
MEASUREMENTS
ENGINEERING SERVICES
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 13 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

166 6510 SAEED AHMAD PRINCIPAL ENGINEER ME AGRI 18-08-1994 DESIGN/CONSTRUCTION FOR
W&A 10/16 27/04 IRRIGATION, DRAINAGE &
AGRI 00880 (L) WATER MANAGEMENT

167 7168 ASIF HUSSAIN PRINCIPAL SYSTEM MCS 08-06-1999 COMPUTER APPLICATIONS,
ANALYST 02/99 21/08 SRS (SOFTWARE
M&QC REQUIREMENT
SPECIFICATIONS)
168 7393 IBTESAM RAHIM KHAN PRINCIPAL ENGINEER BE CIVIL 12-08-1999 CONTRACTS, CONSTRUCTION
ISLAMABAD 01/93 22/10 SUPERVISION, QMS CO-
CIVIL 14687 ORDINATOR

169 7683 IMRAN ISHAQ PRINCIPAL ENGINEER ME TRANSP. 04-04-2005 HIGHWAYS DESIGN, URBAN
H&TE 01/11 20/01 DEVELOPMENT, FLYOVERS &
CIVIL 20666(L) INTERCHANGES, ROADS,
TRAFFIC MODELLING
170 7751 MUHAMMAD UMER PRINCIPAL ENGINEER ME ENVIR. 26-04-2005 SEWERAGE & DRAINAGE
E&PHE 08/03 20/08 SYSTEM, LAYING OF TRUNK
CIVIL 20550 SEWER, DESIGN PROPOSALS,
ENVIRONMENTAL
ENGINEERING
171 8097 MUHAMMAD ZIA PRINCIPAL ENGINEER BE CIVIL 12-12-2005 CANAL AND STRUCTURAL
CM 00/95 25/01 WORKS
CIVIL 17206(L)

172 7824 ABDUL GHAFOOR PRINCIPAL ENGINEER ME CIVIL 02-01-2006 CIVIL WORKS, FLOOD
CM 03/17 25/09 SUPERVISION, DAM POWER
CIVIL 16430 (L) HOUSE, SUBSTATIONS,
IRRIGATION & DRAINAGE,
MOTORWAY SUPERVISION
173 5763 SYED IQBAL RAZA PRINCIPAL ENGINEER BE CIVIL 07-06-2006 ROADS & INTERCHANGE, CIVIL
KARACHI 02/93 27/08 WORKS, ASPHALT WORKS
CIVIL 14903

174 5775 ZAKI ANWAR PRINCIPAL ENGINEER BE MECH 28-08-2006 TENDER DOCUMENTS,
KARACHI 07/90 26/01 PLUMBING, FIRE FIGHTING,
MECH 08876 TECHNICAL DRAWINGS,
OPERATION AND
MAINTENANCE
175 2376 DAWOOD AZIZ KHOSO PRINCIPAL ENGINEER BE ELECT 09-05-2009 TRANSMISSION LINES,
P&M 03/93 26/10 ELECTRICAL & MECHANICAL
ELECT 10853(L) WORKS

176 D486 ABDUR REHMAN PRINCIPAL ENGINEER BE CIVIL 07-04-2011 CONSTRUCTION SUPERVISION,
1 W&A 10/91 25/10 WATER TREATMENT, PROJECT
CIVIL 13608 MANAGEMENT

177 6711 NAUMAN AHMED PRINCIPAL GEOLOGIST MSC GEOLOGY 09-04-1994 CIVIL ENGINEERING,
KARACHI 00/88 31/10 CONSTRUCTION SUPERVISION,
QUALITY ASSURANCE AND
CONTROL, PROJECT
MONITORING, DESIGN REVIEW
178 9067 IFTIKHAR AHMAD BHATTI PRINCIPAL ENGINEER BE CIVIL 02-03-1999 CONSTRUCTION SUPERVISION,
W&A 10/93 26/02 CONSTRUCTION OF OUTLET
CIVIL 15413 STRUCTURES AND
REHABILITATION/ REMODELING
OF BRIDGES, QUALITY
CONTROL, MEASUREMENT
SURVEYS
179 7522 HAMID ALI PRINCIPAL ENGINEER BE CIVIL 22-09-1999 CIVIL ENGINEERING,
H&TE 07/96 23/11 CONSTRUCTION SUPERVISION,
CIVIL 17374 FLOOD DAMAGES
ASSESSMENT & RESTORATION
OF FLOOD DAMAGES, PROJECT
MANAGEMENT, MONITORING
OF PROJECT PROGRESS
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 14 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

180 7502 SAEED ULLAH JAN PRINCIPAL ENGINEER BE CIVIL 11-10-1999 CONSTRUCTION SUPERVISION
H&TE 00/95 20/04 OF HIGHWAY ROADS, TUNNEL
CIVIL 16310 & HYDRO PROJECTS

181 7505 TAUQIR AHMAD QURESHI PRINCIPAL ENGINEER ME MECH 21-08-2002 SUPERVISING ERECTION,
P&M 11/94 26/02 TESTING AND COMMISSIONING
MECH 09362 (L) OF HYDRO/THERMAL POWER
PLANTS, CONSTRUCTION
SUPERVISION OF 500 KV A.C
TRANSMISSION LINES
182 8039 RIZWAN MAQSOOD PRINCIPAL ENGINEER ME CIVIL 15-10-2002 PROJECT MANAGEMENT,
W&A 09/06 20/05 WATER RESOURCES
CIVIL 20682 (L) ENGINEERING, DETAILED
ENGINEERING DESIGN OF
IRRIGATION/DRAINAGE
SYSTEM, TENDER
DOCUMENTS, PC-I, PC-II AND
PC-IV PERFORMA
183 7533 KHURRAM AHMAD KHAN PRINCIPAL ENGINEER MPHILL 19-02-2004 GIS DATABASE OF
W&A 07/18 20/07 HYDROMETRIC/HYDROGRAPHI
CIVIL 20124 C AND GROUNDWATER DATA,
DESIGN AND DEVELOPMENT
OF A CENTRALIZED WEB
MAPPING, SATELLITE IMAGERY
184 4777 MUHAMMAD ARIF KHAN PRINCIPAL ARCHITECT B ARCH 15-10-2004 PROJECT MANAGEMENT,
A&P(K) 09/00 19/11 DETAILED DESIGN REVIEWS,
A 02357 HIGH RISE BUILDINGS, MASTER
PLAN, HOSPITAL BUILDINGS
185 7953 MALIK IFTIKHAR AHMED PRINCIPAL ENGINEER BE CIVIL 31-01-2005 ENVIRONMENTAL
E&PHE 04/00 20/01 ENGINEERING, PROJECT
CIVIL 20460 (L) MANAGEMENT,
PREQUALIFICATIONS,
TECHNICAL & FINANCIAL
PROPOSALS, PC-1, BIDDING &
CONTRACT DOCUMENTS
186 7779 ABDUL QAYYUM PRINCIPAL ENGINEER BE CIVIL 11-03-2005 CONSTRUCTION MANAGEMENT
H&TE 07/96 24/03 AND QUALITY CONTROL FOR
CIVIL 17449(L) ROAD CONSTRUCTION AND
STRUCTURE WORKS,
CONSTRUCTION SUPERVISION
187 7666 IMRAN SHAFIQUE BUTT PRINCIPAL ENGINEER ME CIVIL 22-03-2005 CONSTRUCTION SUPERVISION,
H&TE 08/05 20/03 CONSTRUCTION
CIVIL 21455(L) MANAGEMENT, QUALITY
CONTROL AND QUALITY
ASSURANCE, BUILDING
WORKS, HIGHWAY WORKS,
DETAILED DESIGN,
STRUCTURE DESIGN
188 7670 JAMSHED FAISAL JANJUA PRINCIPAL ENGINEER ME WRM 25-03-2005 CONSTRUCTION SUPERVISION
CM 01/12 22/06 OF HIGH RISE BUILDINGS,
CIVIL 20455(L) INFRASTRUCTURE
DEVELOPMENT WORKS AND
HYDRAULIC STRUCTURES.
189 8057 GHULAM MURTAZA CHATHA PRINCIPAL ENGINEER BE AGRI 02-05-2005 WATER MANAGEMENT
W&A 00/88 26/10 SPECIALIST
AGRI 00906 (L)

190 8633 RIZWAN AHMAD PRINCIPAL ENGINEER BE CIVIL 17-06-2005 CONSTRUCTION SUPERVISION
CM 09/95 23/11
CIVIL 16876(L)

191 7763 ZULFIQAR ALI BHUTTO PRINCIPAL ENGINEER BE CIVIL 18-07-2005 CONSTRUCTION SUPERVISION,
W&A 10/93 25/05 CIVIL WORKS, QUALITY
CIVIL 15679 CONTROL

192 7747 DR. MUHAMMAD RIZWAN PRINCIPAL ENGINEER PHD TECH SC. 26-07-2005 DESIGN OF RESIDENTIAL,
DM&RD 04/04 15/06 EDUCATIONAL AND
CIVIL-21656 (L) INDUSTRIAL BUILDINGS, DAMS,
IRRIGATION SYSTEMS, HIGH
RISE CONCRETE BUILDINGS
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 15 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

193 7726 JAWAD-UL-HAQ PRINCIPAL ENGINEER BE CIVIL 01-11-2005 CONSTRUCTION SUPERVISION


H&TE 06/95 24/11 OF ROADS/BRIDGES, PROJECT
CIVIL 16616 (L) MONITORING

194 7947 SHAUKAT ALI PRINCIPAL ENGINEER BE CIVIL 13-03-2006 CONSTRUCTION SUPERVISION,
H&TE 08/90 28/03 HIGHWAYS WORKS,
CIVIL 12723(L) ROAD/BRIDGES WORKS

195 10246 ABDULLAH HUSSAIN PRINCIPAL ENGINEER BE CIVIL 07-07-2006 SUPERVISION OF SEWERAGE
E&PHE 09/95 24/03 AND WATER
CIVIL 17482

196 8612 DR. ABDUS SUBHAN PRINCIPAL ENGINEER PHD 09-08-2006 WATER MANAGEMENT
W&A 09/18 17/08 SPECIALIST, CONSTRUCTION
AGRI 00930 (L) SUPERVISION

197 5773 AIJAZ AHMAD SHEIKH PRINCIPAL ENGINEER BE CIVIL 15-01-2007 CONSTRUCTION
KARACHI 02/96 24/09 MANAGEMENT,
CIVIL 17359 CONSTRUCTION SUPERVISION
OF HIGHWAYS & BRIDGES,
WATER SUPPLY, SEWERAGE
SYSTEM, HYDRAULIC
STRUCTURES, BUILDINGS AND
PROTECTION WORKS
198 8248 MIAN KHALID HAFIZ PRINCIPAL ENGINEER BE CIVIL 16-05-2007 PROJECT PLANNING,
CM 03/96 24/05 CONTRACT ADMINISTRATION
CIVIL 17288(L)

199 8629 MUHAMMAD ZUFRULLAH PRINCIPAL ENGINEER BE CIVIL 12-03-2008 CONSTRUCTION


GT&GE 00/92 25/08 SUPERVISION/MANAGEMENT
CIVIL 13992 (L)

200 8700 SYED BILAL GHAZI PRINCIPAL MATERIAL MSC 19-03-2008 MATERIAL SPECIALIST,
SPECIALIST APL.GEOLOGY 26/09 CONSTRUCTION SUPERVISION
SED 09/91 OF ROADS AND BRIDGES,
SUPERIOR PERFORMING
ASPHALT PAVEMENT DESIGN,
GEOTECHNICAL
INVESTIGATION, STRCUTURE
WORKS, INDUSTRIAL CITY
DEVELOPMENT WORKS
201 9231 MUHAMMAD SHAHZAD AFZAL PRINCIPAL ENGINEER BE CIVIL 31-08-2009 CONSTRUCTION SUPERVISION
SED 03/94 26/01
CIVIL 15922(L)

202 9725 GHULAM SHABBIR HASHMANI PRINCIPAL ENGINEER BE CIVIL 01-09-2009 CONSTRUCTION SUPERVISION,
H&TE 11/93 27/00 QUALITY CONTROL, PROJECT
CIVIL 16001(L) MANAGEMENT, CIVIL WORKS,
STRUCTURE WORKS
203 9470 MUHAMMAD IRSHAD SHAMI PRINCIPAL ENGINEER BE MECH 11-01-2012 PROJECT MANAGEMENT,
P&M 03/94 25/04 OPERATIONAL MANAGEMENT,
MECH 24574 (L) DESIGN REVIEW, SUPERVISION
OF ERECTION/INSTALLATION,
TESTING AND COMMISSIONING,
QA/QC PLANS
204 9469 SAIF ULLAH AMIN PRINCIPAL ENGINEER BE CIVIL 07-03-2012 PROJECT MANAGEMENT,
E&PHE 09/95 25/04 PLANNING, DESIGN AND
CIVIL 16703 CONSTRUCTION SUPERVISION
OF SEWERAGE/DRAINAGE
PROJECTS, WASTE WATER
TREATMENT, SOLID WASTE
MANAGEMENT, WATER SUPPLY
SYSTEM, ROADS, BRIDGES,
INDUSTRIAL BUILDINGS AND
DEVELOPMENT WORKS
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 16 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF INFRASTRUCTURAL,


DIVISION WITH MTH/YEAR JOINING/ INDUSTRIAL &
PEC REG. # TOTAL EXPER. POWER PLANTS
RELATED PROJECT
DESIGN,
205 9472 KHALID MAHMOOD PRINCIPAL ENGINEER ME CIVIL 12-03-2012 QA/ QC, CONTRACT
STRUCTURAL
E&PHE 01/16 21/04 ADMINISTRATION,
WORKS,
CIVIL 19761 CONSTRUCTION
PREPARATION OFSUPERVISION
OF BUILDINGS
BOQ, AND
DETAILED
INFRASTRUCTURE
TECHNICAL & WORKS
206 4389 MUAZZAM JAMIL MGR. MAINT./SECURITY BBA 07-03-1988 MANGEMENT/ADMINISTRATION
FINANCIAL
COORD 12/85 33/07 OPERATIONAL
EVALUATION, EXPERT
TENDER
DRAWINGS,
207 7527 MIRZA KAMRAN HASAN PRINCIPAL ARCHITECT M ARCH 03-09-2002 STRUCTURAL
PROJECT ARCHITECT,
08/09 21/05 STABILITY
PREPARATION OF PLANNING &
ISLAMABAD
A 02072 SPECIALIZATION
DESIGN PROPOSALS,
CONCEPT REPORTS, DETAILED
DESIGN, MASTER PLANNING,
PROJECT CO-ORDINATION
208 7529 MUHAMMAD SALMAN PRINCIPAL ENGINEER ME CIVIL 14-01-2003 PROJECT MANAGEMENT,
DM&RD 09/08 18/01 HIGHWAY DESIGN
CIVIL 22733 (L)

209 7555 FAIZ FAYYAZ SHEIKH PRINCIPAL ENGINEER MCS 01-10-2003 PROJECT MANAGEMENT,
H&TE 10/03 19/10 CONSTRUCTION SUPERVISION,
CIVIL 21311(L) QUALITY CONTROL, TENDER
DOCUMENTS
210 7659 SAYYED MUHAMMAD IDREES PRINCIPAL ENGINEER ME CIVIL 10-01-2005 STRUCTURAL REVIEW &
RAZA SED 09/04 16/05 DESIGN OF TOWERS,
CIVIL 20767 (L) STRUCTURAL WORKS,
TESTING OF STRUCTURAL
WORKS
211 7715 SHEHZAD AHMED PRINCIPAL ENGINEER MPHILL WRM 30-03-2005 HIGH EFFICIENCY IRRIGATION
W&A 08/00 18/11 SYSTEM (DRIP & SPRINKLE
AGRI 02379 (L) IRRIGATION SYSTEM)

212 7748 YASIR ABBAS PRINCIPAL ENGINEER ME CIVIL 05-04-2005 WATER RESOURCES WORKS,
W&A 06/07 17/06 HYDRAULICS &
CIVIL 23084 HYDRODYNAMIC MODELLING

213 7778 AHMAD MASOOD PRINCIPAL TOWN B C&RP 15-09-2005 PROJECT MANAGEMENT, LAND
PLANNER 10/98 21/03 USE PLANNING, FEASIBILITY
A&P(L) P 00471 STUDIES, MASTER PLANNING,
URBAN MASTER PLANNING OF
BIG CITIES, TECHNICAL/
FINANCIAL PROPOSALS
214 7871 MUHAMMAD MUDASSAR PRINCIPAL ENGINEER ME CIVIL 01-12-2005 CULVERTS & BRIDGES DESIGN,
MUSHTAQ SED 08/04 20/05 STRUCTURE WORKS,
CIVIL 20399 (L) HYDRAULICS & STRUCTURAL
DESIGN, DETAILED SEISMIC &
DYNAMIC ANALYSIS, CAD
SUPERVISION
215 7835 USMAN HAFEEZ PRINCIPAL ENGINEER ME HYDROLOGY 19-01-2006 MASTER PLANNING OF WATER
W&A 05/09 22/11 RESOURCES PROJECTS,
CIVIL 20025(L) DESIGN HYDRAULICS SYSTEM,
HYDRAULICS & IRRIGATION
216 7910 FAZAL REHMAN KASHIF PRINCIPAL ENGINEER ME HYDROLOGY 28-02-2006 WATER RESOURCES
W&A 02/05 20/04 ENGINEER, HYDRAULICS
CIVIL 19109(L) DESIGN, HYDRAULICS
STRUCTURE, CANAL WORKS
217 7857 ABDUL QAYYUM KHAN PRINCIPAL ENGINEER BE CIVIL 14-03-2006 CONSTRUCTION SUPERVISION
H&TE 04/97 23/07 OF BRIDGES, QUALITY
CIVIL 17926 (L) MEASUREMENT

218 8007 MRS. AYESHA FARAZ PRINCIPAL ENGINEER ME CIVIL 15-08-2006


SED 09/10 18/02
CIVIL 22458(L)
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 17 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

EVALUATION OF BUILDINGS &


BRIDGES, ANALYSIS OF
STRUCTURE, PLANNING AND
MONITORING
219 5764 SHAMSU ZAMAN BOHIO PRINCIPAL ENGINEER BE CIVIL 13-10-2006 DETAILED ENGINEERING
KARACHI 03/97 23/04 DESIGN, CONSTRUCTION
CIVIL 18257 MANAGEMENT, ROADS &
BRIDGES, AIRPORT CHAIN LINK
FENCE, WORKS, WATER
SUPPLY, SEWERAGE SYSTEM,
CANAL LINING WORKS,
QUALITY ASSURANCE/QUALITY
CONTROL
220 8254 MUHAMMAD KHURSHID PRINCIPAL GEOLOGIST MSC GEOLOGY 23-06-2007 SUPERVISION OF
GT&GE 10/91 28/06 GEOTECHNICAL WORKS,
GEOTECHNICAL
INVESTIGATIONS, ROADS &
MULTI-STOREY BUILDINGS
SUPERVISION OF EARTH
WORKS, SUPERVISION OF PILE
CONSTRUCTION, PROJECT
MANAGEMENT/ PLANNING,
TUNNEL EXCAVATION
221 8381 REHAN-UR-REHMAN PRINCIPAL ENGINEER ME WRM 18-04-2008 WATER RESOURCES
W&A 04/05 23/05 ENGINEER, HYDRAULICS
CIVIL 17979(L) DESIGN, HYDRAULIC
STRUCTURE, CANAL WORKS
222 8921 AFTAB AHMAD PRINCIPAL ENGINEER MSC INTG.BUILD. 15-09-2009 HYDRAULIC STRUCTURE,
CM 07/18 22/11 BRIDGES WORKS, CANAL
CIVIL 17705 (L) LINING, CONTRACT &
CONSTRUCTION
MANAGEMENT,
REHABILITATION WORKS OF
IRRIGATION CANALS, ROAD
DEVELOPMENT, MANAGEMENT
SUPERVISION OF INFRA-
STRUCTURAL WORKS
223 10621 NOOR-UR-REHMAN NASIR PRINCIPAL ENGINEER BE CIVIL 05-10-2009 CONSTRUCTION SUPERVISION
H&TE 09/91 29/03 OF URBAN ROADS &
CIVIL 13630 HIGHWAYS

224 10115 ABDUL GHAFOOR KHAN PRINCIPAL ENGINEER BE CIVIL 28-09-2010 BRIDGES & ROAD WORKS,
H&TE 07/96 24/01 PROJECT MANAGEMENT,
CIVIL 17473 SLOPE PROTECTION &
STABILIZATION WORKS
225 6452 MUHAMMAD AHMAD NADEEM PRINCIPAL GRAPHIC B DESIGN 07-04-1994 Professional Graphic Designer,
DESIGNER 06/91 29/07 Prepare Annual Reports, Posters,
BDD News Letters, Brochures, Profile
etc.
226 6566 M. NISAR SHAHZAD PRINCIPAL ENGINEER BE CIVIL 03-01-1995 Project Management, Contract
W&A 06/89 30/10 Management, Civil Works, Design
CIVIL 11877 (L) Analysis, Construction Supervision
and Costing
227 7305 QAMAR HUSSAIN PRINCIPAL ENGINEER BE CIVIL 02-03-1999 Construction Supervision,
W&A 09/95 23/01 Construction Management, Project
CIVIL 17158(L) Management, Canal Works,
Hydraulic Structure Works and
Quality Control
228 7244 DR. QAISER NAHEED HASHMI PRINCIPAL ENGINEER PHD 01-10-1999 Hydrologist, Pavement Design,
W&A 10/12 21/04 Hydrological Study
CIVIL 18718 (L)

229 7376 ZULFIQAR ALI TARIQ PRINCIPAL ARCHITECT M ARCH 04-03-2002 Project Management, Detailed
A&P(L) 07/17 19/07 Design, Architectural Design,
A 02242 Tender Document, Interior Design
and Construction Supervision of
Architectural Projects
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 18 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF Geotechnical


DIVISION WITH MTH/YEAR JOINING/ Engineer,
PEC REG. # TOTAL EXPER. Geotechnical
Investigation,
Geotechnical Design
230 7416 SHAHBAZ RIAZ PRINCIPAL GEOLOGIST MSC 28-11-2002 Engineering Geology, Construction
and Construction
P&M APL.GEOLOGY 24/06 Management,
Supervision ofQuality
DamsAssurance,
06/97 Quality Control, Monitoring &
SPECIALIZATION
Supervision of Core Drilling in RCC
& Installation
231 5732 ATIF NAVEED BIN KHAN PRINCIPAL ENGINEER ME MECH 24-02-2004 Design & Supervision of
KARACHI 01/08 17/10 Mechanical Systems and
MECH 17717 (L) Equipments, Airport Works, Ports
& Harbour Works, Quality
Assurance and Quality Control
232 4775 UBEDULLAH PRINCIPAL ARCHITECT B ARCH 21-05-2004 Architecture, Interior Design,
A&P(K) 09/00 19/10 Graphic Design, 3D Modeling, Site
A 02165 Supervision, Preparation of
AutoCAD Construction Design,
Project Management
233 4776 MUHAMMAD ANWAR-UL-HAQ PRINCIPAL URBAN M C&RP 15-06-2004 PROJECT MANAGEMENT,
PLANNER 10/03 20/05 MASTER PLANNING, TOWN
A&P(L) P 00494 PLANNAG

234 8137 JAFFAR HUSSAIN PRINCIPAL ENGINEER BE CIVIL 01-03-2005 Construction Supervision of Canal
W&A 00/94 25/01 Works, Mechanical Works,
CIVIL 16568(L) Drainage Culverts, Detailed Design
and Hydraulic Structure
235 5744 SYED MEHDI HASSAN PRINCIPAL ENGINEER BE CIVIL 02-05-2005 Construction Management,
KARACHI 04/98 21/00 Construction Supervision of Roads,
CIVIL-19474 Bridges, Dams, Water Supply,
Electrical Distribution, Buildings
etc. Supervising/Testing
236 8665 SHAHID MANZOOR PRINCIPAL ENGINEER BE CIVIL 17-05-2005 Construction Supervision of
W&A 09/93 26/05 Irrigation Projects, Canal Lining,
CIVIL-15245 Cross Drainage Structure

237 7563 M. KHALID KHURSHID PRINCIPAL ENGINEER BE CIVIL 17-06-2005 Construction Supervision of Roads
H&TE 09/99 21/02 (Structures), Contract Documents,
CIVIL 19860(L) Monitoring, Quality Assurance

238 7812 RANA ABDUL HAMEED PRINCIPAL ENGINEER MCS 25-11-2005 Project Management, Contract
CM 10/04 21/01 Administration, Tender
CIVIL 19689(L) Documentation, Construction
Supervision of Highrise Buildings,
Quality Assurance, Quality Control
239 7864 SYED KASHIF RABB PRINCIPAL ENGINEER BE CIVIL 16-01-2006 Project Management, Project
W&A 02/00 20/07 Planning, Monitoring, Tender
CIVIL 20196 Documentation, Contract
Management and Construction
Supervision
240 8119 ASIM MUSHTAQ SULERI PRINCIPAL ENGINEER BE CIVIL 28-02-2006 Project Management, Planning,
CM 09/00 19/11 Scheduling, Monitoring,
CIVIL 21087(L) Construction Supervision of Infra-
Structure and Development Works,
Structure Mechanics & RCC
Design
241 7886 MUHAMMAD REHAN ASGHAR PRINCIPAL ENGINEER BE CIVIL 16-03-2006 Procurement & Contract
W&A 02/98 21/10 Management, Planning &
CIVIL 18553 Scheduling

242 7873 IMRAN MAHMOOD PRINCIPAL ENGINEER BE CIVIL 26-04-2006 Structural Engineer, Bridges
SED 06/00 20/03 Structural Work, Construction
CIVIL 20398 (L) Supervision of Buildings, Hydraulic
Structure, Analysis and Design of
Bridges
243 7963 MUHAMMAD KANWAR MAJEED PRINCIPAL ENGINEER BE CIVIL 31-07-2006 Design & Construction Supervision
H&TE 09/98 21/08 of Highways
CIVIL 18830(L)

244 8048 HAMID MASOOD QURESHI PRINCIPAL ENGINEER ME CIVIL 17-10-2006


GT&GE 03/06 19/07
CIVIL 21639 (L)
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 19 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF DESIGN


DIVISION WITH MTH/YEAR JOINING/ DEVELOPMENT,
PEC REG. # TOTAL EXPER. PREPARATION OF
TENDER &
CONTRACT
&DOCUMENTS,
Sediment Control Weirs
TECHNICAL
SPECIFICATION,
PRE-QUALIFICATION
245 5767 ATHER ALI KHAN PRINCIPAL ENGINEER BE CIVIL 06-11-2006 OF SPECIALIZATION
Project Management, Monitoring,
KARACHI 05/00 20/08 Planning, Construction & Contract
CIVIL 20712 Management of Buildings and
Industrial Complexes,
246 8713 MUHAMMAD SALEEM CHEEMA PRINCIPAL ENGINEER BE MECH 30-08-2007 Project Management & Planning,
P&M 05/02 18/08 Monitoring, Scheduling, Testing &
MECH 17676 (L) Commissioning, Construction
Supervision, Design Review,
Tender Documentation, Detailed
Design, Contract Documentation
247 8260 AHSAN RAFIQUE KHOKHAR PRINCIPAL ENGINEER ME CIVIL 19-10-2007 Structure Works, Project
SED 06/15 19/07 Management, Civil Works, Steel
CIVIL 19247 (L) Structure Works

248 9045 MUHAMMAD ASLAM LAGHARI PRINCIPAL ENGINEER ME CIVIL 30-01-2008 Construction Supervision of
W&A 02/14 24/02 buildings, Roads, Public Health,
CIVIL 17513 Sewerage, Irrigation, Drainage and
Hydraulic works, Tender
Documents, Site Supervision
249 8369 CH. ATIQUE AHMAD PRINCIPAL ENGINEER BE CIVIL 24-03-2008 Construction Supervision of
CM 03/98 22/03 Building, Roads, Concrete Bridges,
CIVIL 18549(L) Canal and Dams, Monitoring,
Quality Control and Topographic
Services
250 9234 MUHAMMAD TAHIR NAWAZ PRINCIPAL ENGINEER BE CIVIL 22-03-2010 Contract Administration &
CHEEMA W&A 10/96 24/00 Construction Supervision,
CIVIL 17509 Construction Management, Tender
Documents and Quality Control
251 9499 NASRUMINALLAH PRINCIPAL ENGINEER BE CIVIL 30-04-2012 Construction Supervision,
W&A 10/96 23/07 Structure & Canal Works, Civil
CIVIL 21338 Works, Design of Spillways/Dams,
Construction Drawings
252 D538 ALI NAWAZ PRINCIPAL ENGINEER BE CIVIL 02-05-2012 Ports & Harbours (Hydrography &
1 KARACHI 06/99 21/05 Planning/Designing including
CIVIL 19609 Construction Supervision),
Contract Management
253 6173 SHAHID SAEED KHAN PRINCIPAL ENGINEER BE CIVIL 28-12-1992 CONSTRUCTION ENGINEER,
E&PHE 02/91 29/06 SUPERVISED SEWERAGE,
CIVIL 13252 (L) WATER SUPPLY, REINFORCED
CONCRETE GROUND
RESERVOIRS, RECTANGULAR
SHAPE OVERHEAD TANKS AND
DISTRIBUTION NETWORK OF
DIFFERENT DIAMETERS
254 6939 IRFAN ALI MEMON PRINCIPAL ENGINEER BE ELECT 28-06-1993 PROJECT COORDINATION,
P&M 03/90 28/03 PROJECT MANAGEMENT,
ELECT 08658 (L) PROJECT MONITORING,
BIDDING DOCUMENTS,
EVALUATION REPORTS,
DESIGN REVIEW, TESTING AND
COMMISSIONING OF CONTROL,
PROTECTION, METERING AND
MONITORING SYSTEMS OF
VARIOUS 500KV, 220KV AND
132KV AIS AND GIS
SUBSTATIONS.
255 7444 NADEEM ARSHAD MANAGER M HRM 01-09-2000 PERSONNEL ADMINISTRATION
ADMINISTRATION 06/12 20/05 AND HUMAN RESOURCES
COORD MANAGEMENT

256 7528 SOHAIL AZAM PRINCIPAL ENGINEER BE CIVIL 17-07-2001


ISLAMABAD 05/01 19/06
CIVIL 21642
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 20 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF DESIGN,


DIVISION WITH MTH/YEAR JOINING/ MONITORING,
PEC REG. # TOTAL EXPER. REPORTING,
CONSTRUCTION
SUPERVISION AND
CONTRACTORS,
PROJECT BID
EVALUATION
MANAGEMENT ANDOF
COORDINATION
PROJECTS
RELATED TO CIVIL
257 7492 ABDUL GHANI SOLANGI PRINCIPAL ENGINEER BE ELECT 22-11-2002 ENGINEERING,
GENERAL SUPERVISION OF ALL
04/90 22/05 IRRIGATION
ACTIVITIES REGARDING THE
P&M
ELECT 09079 (L) SYSTEMS,
CONSTRUCTION OF 500 KV
DRAINAGE STATION MORO,
SWITCHING
FACILITIES,WORK AT 500KV
EXTENSION
REMODELING
SUBSTATION AND AND 500
DADDU
KVREHABILITATION
TRANSMISSIONOF LINE,
IRRIGATION
CONTRACT ADMINISTRATION,
CANALS,
ASSISTANCE TO
CONCRETE LINING
CONSTRUCTION MANAGER IN
OF IRRIGATION
DIFFERENT ADMINISTRATIVE
CHANNELS,
AND CONTRACTSSMALL
MATTERS
DAMS,
FOR SPILLWAY
QUALITY CONTROL AND
STRUCTURES,
PROGRESS MONITORING.
258 5727 MUHAMMAD YASIR UJJAN PRINCIPAL ENGINEER ME CIVIL 21-01-2004 BRIDGES,
STRUCTURAL DESIGN &
07/10 17/00 BUILDINGS
STRUCTURAL AND
EVALUATION,
KARACHI
CIVIL 23813 (L) RETAININGDESIGNING
PLANNING, WALLS, AND
CONSTRUCTION
OVER ALL SUPERVISION OF
SUPERVISION
DESIGN OF
OF REINFORCED
HYDRAULICPRE-STRESSED
CONCRETE,
SPECIALIZATION
CONCRETE AND STEEL
STRUCTURES, COST
EVALUATION OF STRUCTURES,
SEISMIC EVALUATION OF
EXISTING STRUCTURES AND
PREPARATION OF
RETROFITTING SCHEMES AND
PREPARATION OF FINAL
DETAILED REPORTS.
259 7787 MUHAMMAD WAQAS ANWAR PRINCIPAL ENGINEER BE CIVIL 18-10-2004 CIVIL ENGINEER, SUPERVISION
H&TE 09/02 18/02 OF CIVIL WORKS, STRUCTURE
CIVIL 23185 WORKS, DRAWINGS OF
STRUCTURES, CONSTRUCTION
DRAWINGS OF REALIGNMENTS
AND IPC'S, QUALITY TESTING
OF MATERIALS & CONCRETE
MIX DESIGN
260 7650 MRS. SADAF SAEED PRINCIPAL ENGINEER ME CIVIL 18-01-2005 CIVIL ENGINEERING
GT&GE 12/09 16/00
CIVIL/25472

261 7781 KHALID MAHMOOD PRINCIPAL MATERIAL MSC GEOLOGY 11-02-2005 QUALITY CONTROL &
SPECIALIST 02/90 29/04 SUPERVISION OF HIGHWAYS &
H&TE DAMS

262 7729 GHULAM YASEEN PRINCIPAL ENGINEER BE CIVIL 01-03-2005 CONSTRUCTION ENGINEER,
W&A 02/93 22/07 CONSTRUCTION SUPERVISION
CIVIL-14820

263 7687 NASIR MAQBOOL PRINCIPAL ENGINEER ME CIVIL 01-04-2005


CM 11/08 16/07
CIVIL 23862(L)
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 21 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

STRUCTURES, RETAINING
WALLS, CANAL
REHABILITATION WORKS,
RIVER TRAINING AND FLOOD
PROTECTION WORKS.
264 8924 KANWAL KUMAR PINJANI PRINCIPAL ENGINEER ME AGRI 07-04-2005 IRRIGATION & DRAINAGE
W&A 04/11 24/08 ENGINEER, PROJECT
AGRI 01648 MANAGEMENT, PROJECT
PLANNING, AND
COORDINATION, TECHNICAL
REVIEW OF SUBMITTALS
265 5749 MUHAMMAD SAUD BARAKZAI PRINCIPAL ENGINEER BE CIVIL 18-04-2005 BRIDGES WORKS, ROADS
KARACHI 03/01 19/05 WORKS, AIRPORT EXTENSION,
CIVIL 21865 CAUSEWAY, UNDERPASS,
JETTIES, FISHERIES, WATER
SUPPLY, STORM WATER
DRAINAGE, SEWAGE
DRAINAGE, CONTRACT AND
SPECIFICATION ETC.
CONTRACT EVALUATION,
RATES EVALUATION,
TENDERING
266 5735 MUHAMMAD ZAHID ZIA PRINCIPAL ENGINEER ME CIVIL 16-05-2005 STRUCTURAL DESIGNING OF
KARACHI 06/08 15/08 AIRPORTS, JETTIES,
CIVIL 25137 (L) INDUSTRIAL PROJECTS,
BUILDINGS, PROJECT
COORDINATION, STRUCTURAL
EVALUATION
267 5738 RAHEEL AHMED PRINCIPAL ENGINEER ME CIVIL 28-10-2005 PAVEMENT REHABILITATION
KARACHI 06/08 15/00 WORKS, BUILDINGS PROJECTS
CIVIL 25390 (L) INCLUDING HANGERS, FLIGHT
KITCHEN, TECHNICAL GROUND
SERVICES, ULD, CARGO
COMPLEX, BID DOCUMENT,
COST ESTIMATES,
CONSTRUCTION DRAWINGS
268 7858 ASAD RIAZ PRINCIPAL NETWORK MSC COMP.SC. 01-01-2006 BUILDING MANAGEMENT
ENGINEER 09/05 17/02 SYSTEM, AUTOMATION &
BSD MECH 14142 (L) CONTROLS

269 7862 SAEED MAHMOOD GUL KHAN PRINCIPAL ENGINEER ME ELECT 28-02-2006 ELECTRICAL DISTRIBUTION
P&M 12/10 19/07 NETWORKS, POWER
ELECTRO 06483(L DISTRIBUTION NETWORK
PLANNING, DESIGN AND
ANALYSIS, ILLUMINATION
SCHEMES DESIGN, LIGHTNING
PROTECTION SYSTEM,
EARTHING SYSTEM
270 9077 MUNAWAR HUSSAIN PRINCIPAL ENGINEER BE CIVIL 14-06-2006 PROJECT MANAGEMENT,
ISLAMABAD 07/97 23/02 COORDINATION, BIDDING
CIVIL 18067 DOCUMENTS/RURAL
DEVELOPMENT &
CONSTRUCTION SUPERVISION
271 7978 MUHAMMAD SHAFIQ CH. PRINCIPAL ENGINEER BE CIVIL 31-07-2006 CONSTRUCTION SUPERVISION
CM 06/00 20/06 OF BUILDING AND
CIVIL 20486(L) INFRASTRUCTURE WORKS,
QUALITY CONTROL
272 5771 GHAUS BUX PRINCIPAL ENGINEER BE MECH 21-12-2006 SUPERVISION OF THE HVAC
KARACHI 10/98 20/07 PROJECTS, IMPLEMENTATION
MECH 16683 AND MAINTAINING THE
QUALITY OF WORK AS PER
INTERNATIONAL STANDARDS
273 8660 MUHAMMAD AZMAT PRINCIPAL ENGINEER BE CIVIL 20-02-2007 CONSTRUCTION SUPERVISION
CM 07/99 21/00 OF RESIDENTIAL COMPLEXES,
CIVIL 19931 (L) INDUSTRIAL BUILDINGS
POWER PLANTS, MEDICAL
COLLEGE, PRE-FABRICATED
BUILDING PROJECTS
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 22 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

274 9052 ZIA-UD-DIN SALMAN PRINCIPAL ENGINEER BE CIVIL 28-09-2007 CONTRACT ADMINISTRATION,
DM&RD 08/97 21/10 IMPLEMENTATION OF
CIVIL 26141 SCHEDULES
QUALITY/QUANTITY CONTROL
SYSTEM
275 8331 MUZAFFAR ALI PRINCIPAL HYDRO- MSC GEOLOGY 29-10-2007 MATERIAL ENGINEER AND
GEOLOGIST 09/95 24/03 HYDROGEOLOGIST,
W&A TECHNICAL EVALUATION OF
PREQUALIFICATION AND
BIDDING DOCUMENTS, TENDER
DOCUMENTATION, COST
ESTIMATE, SUPERVISION OF
DRILLING, DEVELOPMENT AND
TESTING OF WATER SUPPLY
TUBE WELL, DEVELOPMENT &
TESTING (D&T),
CONSTRUCTION OF PUMP
HOUSE, INSTALLATION OF
PERMANENT PUMPS AND
RISING MAIN
276 9897 ZAKIR ALI PRINCIPAL ENGINEER BE CIVIL 06-03-2009 CONSTRUCTION SUPERVISION
DM&RD 03/99 20/02 OF BUILDINGS AND RELATED
CIVIL 20005 (L) CIVIL COMPONENTS

277 8783 ABID RAUF PRINCIPAL ENGINEER BE CIVIL 22-05-2009 BRIDGE ENGINEERING,
H&TE 03/00 20/07 CONSTRUCTION MANAGEMENT
CIVIL 20962 (L) AND SUPERVISION OF CIVIL
WORKS LIKE BUILDINGS,
ROADS, HIGHWAYS, BRIDGES,
SEWERAGE & WATER SUPPLY
PROJECTS
278 8964 TAHIR MAHMOOD BUTT PRINCIPAL REMOTE MPHILL 30-12-2009 GEOGRAPHIC INFORMATION
SENSING ANALYST 07/17 20/07 SYSTEM (GIS) & REMOTE
W&A SENSING

279 9294 KHURRAM TARIQ PRINCIPAL ENGINEER BE CIVIL 10-05-2010 HIGHWAY ENGINEER, SITE
H&TE 10/97 22/08 SUPERVISION, SITE CIVIL
CIVIL 19618 (L) WORKS, EXECUTION OF
WORKS EARTHWORK, RCC
TRENCHES, FLYOVERS, RIGID
PAVEMENTS, STEEL
STRUCTURES AND
AESTHETICALLY SOUND RCC
AND MASONRY BUILDINGS
280 D509 SYED ALI SHER SHAH PRINCIPAL ENGINEER ME ENVIR. 28-05-2012 WATER AND WASTEWATER
3 KARACHI 06/05 17/05 TREATMENT, RAW WATER
CIVIL 22301 STORAGE, LIFT STATIONS,
CHEMICALLY ENHANCED
PRIMARY TREATMENT,
FILTRATION, TREATED WATER
STORAGE TANKS AND
DISINFECTION, HYDRAULIC
DESIGN, COMBINED EFFLUENT
TREATMENT PLANTS (CETP),
INDUSTRIAL EFFLUENT
TREATMENT PLANTS (ETP) AND
SEWAGE TREATMENT PLANTS
(STP), PREPARATION OF
TENDER DOCUMENTATION,
ENVIRONMENTAL IMPACT
ASSESSMENT (EIA) AND INITIAL
ENVIRONMENTAL
EXAMINATION (IEE).
281 7783 MUHAMMAD SALEEM PRINCIPAL MATERIAL MSC GEOLOGY 21-10-1998 QUALITY ASSURANCE,
SPECIALIST 02/90 29/05 MATERIAL TESTING IN
H&TE HIGHWAYS, BRIDGES AND
AIRPORT CONSTRUCTION
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 23 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

282 7193 FAISAL RIAZ QAZI PRINCIPAL MATERIAL MSC 05-05-1999 MATERIAL SPECIALIST, SOIL
SPECIALIST APL.GEOLOGY 22/10 CLASSIFICATION, ATTERBERG
H&TE 00/98 LIMIT, CBR, SOUNDNESS, LOS
ANGELES ABRASION, SAND
EQUIVALENT, AND MIX DESIGN
OF ASPHALT AND CEMENT
CONCRETE, FIELD TESTS
283 7220 SYED YASIR ALI PRINCIPAL ENGINEER BE CIVIL 22-11-1999 CONSTRUCTION SUPERVISION
CM 12/97 22/04 OF BUILDINGS, PRE -
CIVIL 18597(L) STRESSED CONCRETE
BRIDGES, ROADS, CANALS AND
DAMS.
284 7617 YASIR KIANI PRINCIPAL ENGINEER MCS 10-10-2000 CIVIL ENGINEER,
M&QC 05/03 20/03 CONSTRUCTION SUPERVISION
OF EXTENSION BUILDING,
ADDITIONAL BUILDING,
SERVICE BUILDING, EXTERNAL
DEVELOPMENT WORKS,
CONCRETE GRAVITY DAMS &
EARTHFILL EMBANKMENT
DAMS.
285 7578 MUHAMMAD WASEEM PRINCIPAL ENGINEER BE CIVIL 05-05-2001 CONSTRUCTION SUPERVISION
H&TE 03/94 26/02 OF ROAD PROJECTS AND
CIVIL 15983(L) DESIGN I.E. GEOMETRIC
DESIGN, DESIGN OF
INTERCHANGES,
PREPARATION OF BILL OF
QUANTITIES, HYDROLOGICAL
DESIGN, ENGINEERING
ESTIMATES AND OTHER
TENDER DOCUMENTS
286 7628 NOMAN SHAHZAD PRINCIPAL ENGINEER BE CIVIL 21-04-2003 CONSTRUCTION
ISLAMABAD 09/02 17/09 MANAGEMENT, PLANNING, SITE
CIVIL 22772 SUPERVISION, PROJECT
MANAGEMENT, CONTRACT
MANAGEMENT
287 7459 ASAD JANJUA PRINCIPAL ENGINEER ME MECH 09-06-2003 HYDROPOWER & PIPELINES
P&M 09/07 17/08 PROJECTS, PROJECT
MECH 17231 MANAGEMENT

288 7474 SARDAR ALAMGEER KHAN PRINCIPAL ENGINEER BE CIVIL 10-09-2003 PROJECT MANAGEMENT,
SED 02/03 17/05 STRUCTURAL ENGINEERING
CIVIL 23195 (L) DESIGN, ANALYSIS,
PREPARATION OF
TENDER/CONSTRUCTION
DRAWINGS, BOQS, COST
ESTIMATES
289 7725 RASHID ULLAH PRINCIPAL ENGINEER ME CIVIL 01-07-2004 PROJECT MANAGEMENT,
ISLAMABAD 11/10 16/07 PLANNING, COORDINATION,
CIVIL 24054 (L) CONSTRUCTION SUPERVISION,
TENDER DOCUMENTATION,
QUALITY ASSURANCE, QUALITY
CONTROL
290 7580 MUHAMMAD ASIF RAZA PRINCIPAL ENGINEER ME CIVIL 19-07-2004 PROJECT MANAGEMENT, ROAD
H&TE 09/08 18/00 DESIGN AND CONSTRUCTION
CIVIL 22759(L) SUPERVISION, FEASIBILITY
STUDIES AND EVALUATION
STUDIES, GEOMETRIC DESIGN
OF EXPRESSWAYS, HIGHWAYS,
COASTAL ROADS,
INTERCHANGES,
ROUNDABOUTS,
INTERSECTIONS, URBAN
DEVELOPMENT ETC.
291 5740 SOHAIB AHMAD MUSHTAQ PRINCIPAL ENGINEER ME MECH 05-01-2005 DESIGN OF FACILITY,
KARACHI 06/08 16/11 EQUIPMENT HANDLING FROM
MECH 17716 (L) PROCUREMENT TO
INSTALLATION FOR BUILDINGS,
AIRPORTS, AND SEA PORT
PROJECTS
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 24 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

292 7792 KARAMAT ULLAH PRINCIPAL ENGINEER BE CIVIL 02-02-2005 CONSTRUCTION SUPERVISION
H&TE 10/98 21/11 OF ROAD PROJECTS AND
CIVIL 19576(L) DESIGN I.E. GEOMETRIC
DESIGN, DESIGN OF
INTERCHANGES,
PREPARATION OF BILL OF
QUANTITIES, HYDROLOGICAL
DESIGN, ENGINEERING
ESTIMATES AND OTHER
TENDER DOCUMENTS
293 8654 SHAHZAD HAMEED PRINCIPAL ENGINEER BE CIVIL 01-03-2005
W&A 02/02 18/00
CIVIL 23597

294 7741 ANJUM SAEED PRINCIPAL ENGINEER BE CIVIL 05-04-2005 HYDRAULIC ENGINEER,
W&A 03/01 19/03 CONSTRUCTION SUPERVISION
CIVIL 23533 OF CIVIL WORKS,
CANAL/MINOR CONCRETE
LINNING, OFF FARM DRAINAGE
STRUCTURE, COMMERCIAL
BUILDINGS
295 7739 MUHAMMAD SHAHZAD ANWAR PRINCIPAL ENGINEER BE CIVIL 05-04-2005 PROJECT MANAGEMENT,
H&TE 07/99 20/10 DESIGN, CONSTRUCTION
CIVIL 19654(L) SUPERVISION OF BRIDGES,
STRUCTURES, ROADS ETC.
QUALITY CONTROL OF
STRUCTURES, MASS
CONCRETING, HIGHWAYS ETC.
296 8634 KHALID MAHMOOD BHATTI PRINCIPAL ENGINEER BE CIVIL 28-11-2005 PROJECT MANAGEMENT, SITE
ISLAMABAD 10/96 23/00 SUPERVISION OF SUB-
CIVIL 17602 (L) STRUCTURES LIKE RCC
BEAMS, ROOF ETC., RESIDENT
ENGINEER, TENDER
DOCUMENTS, QUANTITY
SURVEYOR
297 8104 M. HANIF ASHRAF KHOKHAR PRINCIPAL ENGINEER BE CIVIL 21-12-2005 CONSTRUCTION
CM 11/00 19/03 MANAGEMENT, CONTRACT
CIVIL 21724 (L) ADMINISTRATION, PROJECT
MANAGEMENT, AND
CONSTRUCTION SUPERVISION
OF BUILDINGS, ROADS,
BRIDGES, WATER
STRUCTURES
298 4792 SHAHID ABBAS PRINCIPAL ENGINEER BE CIVIL 20-01-2006 PROJECT MANAGEMENT, SITE
KARACHI 05/00 19/00 SUPERVISION, CONSTRUCTION
CIVIL 20622 MANAGEMENT & QUALITY
CONTROL
299 7950 HAMMAD QAMAR PRINCIPAL ENGINEER ME ENVIR. 23-02-2006 PROJECT MANAGEMENT,
GT&GE 03/15 18/03 PREPARING AND CONDUCTING
CHEM 06784 ENVIRONMENTAL IMPACT
ASSESSMENT (EIA) REPORTS,
ENVIRONMENTAL & HSE
AUDITS, ENVIRONMENTAL
MONITORING & ASSESSMENT
OF MULTI-SECTORAL
PROJECTS
300 7863 MURTAZA ALI SHAH PRINCIPAL ENGINEER BE CIVIL 24-03-2006 HYDRAULIC & IRRIGATION
W&A 03/03 17/10 ENGINEER, PLANNING AND
CIVIL 23125 DESIGN OF IRRIGATION AND
DRAINAGE SYSTEM OF
PROJECT AREA ALONG WITH
HYDRAULIC DESIGN OF ALL
TYPE OF IRRIGATION
STRUCTURES
301 5754 MUHAMMAD ADNAN PRINCIPAL ENGINEER ME CIVIL 03-07-2006 AIRPORT RUNWAYS,
KARACHI 06/09 14/07 PAVEMENT DESIGN AND
CIVIL 25798 ROAD'S DESIGNER,
PREPARATION OF
SPECIFICATIONS, BOQ AND
COST ESTIMATES
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 25 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

302 8144 MURAD AHMAD PRINCIPAL ENGINEER BE CIVIL 26-03-2007


RO PESH. 07/99 21/04
CIVIL 20088 (L)

303 5783 MUKESH KUMAR PRINCIPAL ENGINEER ME CIVIL 24-04-2007 PROJECT COORDINATION &
KARACHI 01/13 16/09 MANAGEMENT,
CIVIL 24207 INFRASTRUCTURE DESIGN AND
TECHNICAL REVIEWS
304 8857 NAVEED AKHTAR PRINCIPAL ENGINEER ME CIVIL 06-07-2007 PROJECT MANAGEMENT,
ISLAMABAD 08/07 21/02 PLUMBING/INFRASTRUCTURE
CIVIL 20680 ENGINEER, ANALYSIS AND
DESIGN REVIEW, DESIGN
COORDINATION, DETAILING
AND CHECKING OF PLUMBING /
INFRASTRUCTURE DRAWINGS
AND DESIGN
305 10372 KHALID MAHMOOD PRINCIPAL ENGINEER BE CIVIL 08-09-2007 CONSTRUCTION MANAGEMENT
W&A 03/98 22/07 & SUPERVISION OF BARRAGE &
CIVIL 18496 (L) CANAL WORKS, BUILDINGS
INFRASTRUCTURE
DEVELOPMENT PROJECTS
306 8607 SHAHABUDDIN MEMON PRINCIPAL ENGINEER BE CIVIL 05-12-2007 CONSTRUCTION SUPERVISION
W&A 10/99 17/06 OF STRUCTURES, BRIDGES,
CIVIL 25998(L) IRRIGATION CHANNELS,
DRAINAGE NETWORK,
SEWERAGE SYSTEM, WATER
SUPPLY SYSTEM, OVER HEAD
TANK, AND ASPHALT ROAD NET
WORK & EMBANKMENT
CONSTRUCTION ALSO
SUPERVISED STONE BLOCK &
BRICK MASONRY AS WELL AS
RCC WORKS
307 8647 GHULAM RASUL DOMKI PRINCIPAL ENGINEER BE CIVIL 18-01-2008 CONSTUCTION SUPERVISION
H&TE 05/02 18/05 OF HIGHWAYS &
CIIVL 23633 TRANSPORTATION, WATER
RESOURCES, POWER
PROJECTS,
BRIDGES/STRUCTURES,
TUNNELS, FLYOVER, FAST
TRACK PROJECTS i.e. METRO
TRAIN, METRO BUS etc.
308 8399 FAHAD ALI SOOMRO PRINCIPAL ENGINEER ME HYDROLIC 30-01-2008 IRRIGATION & DRAINAGE
W&A 06/12 18/05 ENGINEER, DESIGN OF
CIVIL 22615(L) IRRIGATION CHANNESLS,
SUPERVISION / EXECUTION
AND QUALITY CONTROL OF
IRRIGATION EARTHWORK AND
STRUCTURE
309 9966 FAROOQ SALAHUDDIN PRINCIPAL ENGINEER BE CIVIL 09-09-2008 PROJECT MANAGEMENT,
RO PESH. 07/99 18/09 CONSTRUCTION ENGINEERING,
CIVIL 21083 (L) SITE SUPERVISION &
MANAGEMENT
310 9053 MUHAMMAD ZAKI ASLAN PRINCIPAL ENGINEER BE CIVIL 31-01-2009 SUPERVISION AND
DM&RD 07/99 20/10 CONSTRUCTION OF
CIVIL 19644 (L) INFRASTRUCTURE WORKS,
PUBLIC BUILDINGS, ROADS,
EMBANKMENTS AND
BRIDGRES, RESOLVING ON
SITE TECHNICAL AND DESIGN
ISSUES, QUALITY CONTROL
311 7394 MRS. WAJIHA REHAN PRINCIPAL ARCHITECT B ARCH 03-08-2011 ARCHITECTURAL DESIGN,
ISLAMABAD 05/96 19/09 MASTER PLANNING,
A 01926 PREPARATION OF PLANNING &
DESIGN PROPOSALS,
CONCEPT REPORTS, CLIENT
MEETINGS, DESIGN
PREPARATION AND PROJECT
COORDINATION
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 26 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

312 7035 ABDUL REHMAN PRINCIPAL MATERIAL MSC 24-03-1994


SPECIALIST APL.GEOLOGY 27/07
H&TE 07/92

313 7577 FARRUKH FAYYAZ SH. PRINCIPAL SYSTEM BCS (H) 10-10-2003
ANALYST 05/03 17/04
W&A

314 7546 ATIF ALEEM FAIZI SOFTWARE DEVELOPER MCS 29-04-2004


OVERSEAS 04/04 16/09

315 7585 MISS BEENISH FARRUKH AZIZ PRINCIPAL ENGINEER BE CIVIL 30-04-2004
SED 03/04 16/09
CIVIL 25474

316 8084 MUHAMMAD JAWAD ASLAM PRINCIPAL SYSTEM MCS 02-05-2005


BAJWA ANALYST 07/08 18/04
W&A

317 5736 MISS NIGHAT FATIMA PRINCIPAL ENGINEER ME CIVIL 23-05-2005


KARACHI 10/07 15/08
CIVIL-24524 (L)

318 5759 MUHAMMAD BASIT PRINCIPAL ENGINEER ME CIVIL 27-02-2006


KARACHI 02/11 16/10
CIVIL 21576 (L)

319 7890 IMRAN ZAFAR PRINCIPAL REMOTE MSC GIS 10-04-2006


SENSING ANALYST 07/09 16/11
W&A

320 7909 RANA SHARJEEL AYAZ PRINCIPAL ENGINEER ME CIVIL 28-04-2006


W&A 06/18 15/09
CIVIL 25028

321 8002 KHALID NAVEED KHAN PRINCIPAL ENGINEER MSC COMP.SC. 10-08-2006
M&QC 02/06 17/01
CIVIL 23343

322 8656 SAADAT ULLAH KHAN PRINCIPAL MATERIAL MSC GEOLOGY 09-09-2006
SPECIALIST 12/77 23/00
W&A

323 5793 MUHAMMAD FAISAL KHAN PRINCIPAL ENGINEER ME CIVIL 02-11-2006


KARACHI 06/09 19/06
CIVIL 21424

324 9147 QAISAR ABBAS BASHIR PRINCIPAL ENGINEER BE CIVIL 15-05-2007


ISLAMABAD 02/04 16/05
CIVIL 24197

325 8727 JAVAID IQBAL PRINCIPAL ENGINEER ME CONST. MGT. 15-06-2007


CM 03/19 20/01
CIVIL 20547(L)

326 8205 MUHAMMAD USMAN KHAN PRINCIPAL ENGINEER ME CIVIL 18-06-2007


SED 01/14 14/07
CIVIL 25740

327 8220 SADAQAT AHMAD PRINCIPAL ENGINEER BE CIVIL 19-07-2007


CM 06/01 19/05
CIVIL 24941(L)
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 27 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

328 8403 UMAIR BABER PRINCIPAL ENGINEER BE CIVIL 29-02-2008


A&P(K) 03/02 17/03
CIVIL 22663 (L)

329 9957 SHERAZ SHAKIL PRINCIPAL ENGINEER BE ELECT 01-11-2008


DM&RD 01/01 18/11
ELECT 17111 (L)

330 9163 MUHAMMAD ZUBAIR PRINCIPAL ENGINEER MSC AGRI 27-04-2009


W&A 10/16 18/04
AGRI 002301 (L)

331 9230 HARUN ALI PRINCIPAL ENGINEER BE ELECT 23-06-2010


P&M 09/93 18/05
ELECT 10508 (L)

332 9359 IRFAN MAHMOOD PRINCIPAL ENGINEER ME HYDRO 25-10-2011


W&A POWER 19/10
06/09
CIVIL 21556
333 8820 SHAH HUSSAIN PRINCIPAL ENGINEER ME CIVIL 01-07-2009 PLANNING & DESIGN OF
W&A 07/03 31/01 HYDRAULIC STRUCTURES /
CIVIL 12346(L) FLOOD PROTECTION WORK /
CONSTRUCTION SUPERVISION
/ QUALITY ASSURANCE
334 9447 MUHAMMAD ARIF PRINCIPAL MATERIAL MSC 21-10-2011 MATERIAL ENGINEERING,
SPECIALIST APL.GEOLOGY 28/03 QUALITY CONTROL
GT&GE 03/92

335 9539 MUHAMMAD IQBAL PRINCIPAL ENGINEER BE CIVIL 27-03-2012 PROJECT MANAGEMENT,
W&A 06/93 26/05 PREQUALIFICATION OF
CIVIL 14972 CONTRACTORS, CONTRACT
ADMINISTRATION, CONTRACT
CONSULTANCY, MONITORING,
EVALUATION, COORDINATION,
PC-I DOCUMENTS,BARRAGE
WORKS, CONSTRUCTION
SUPERVISION, AIRPORT,
ROADS, SITE SUPERVISION
336 10182 WAQAR SAEED PRINCIPAL ENGINEER ME ELECT 29-10-2015 CONTROL &
P&M 12/09 22/11 INSTRUMENTATION,
ELECT 14417 AUTOMATION, PROJECT
MANAGEMENT
337 10344 NADEEM IQBAL PRINCIPAL ENGINEER ME GEOLOGY 30-10-2015 CIVIL ENGINEERING,
A&P(L) 06/11 23/05 GEOTECHNICAL ENGINEERING,
CIVIL 15001 PROJECT MANAGEMENT,
PLANNING, CONSTRUCTION
MANAGEMENT AND CONTRACT
ADMINISTRATION
338 10092 MUHAMMAD SOHAIL WALI PRINCIPAL ENGINEER BE CIVIL 05-11-2015 CONSTRUCTION SUPERVISION
H&TE 08/93 24/10 OF ROADS PROJECTS, BOQ
CIVIL 13030 AND TENDER DOCUMETNS OF
ROADS, SUPERVISION OF
NATIONAL ARTERIAL
SECONDARY AND DISTRIBUTER
HIGHWAY PROJECTS
339 10216 AFTAB AHMAD KHAN PRINCIPAL MATERIAL MSC GEOLOGY 04-02-2016 PROJECT MANAGEMENT,
SPECIALIST 03/92 25/03 PLANNING, MATERIAL
GT&GE ENGINEERING, QUALITY
ASSURANCE AND QUALITY
CONTROL
340 10439 MUHAMMAD AKRAM NAZAMANI PRINCIPAL ENGINEER ME CIVIL 13-02-2016 PROJECT MANAGEMENT,
GT&GE 06/14 20/11 COORDINATION,
CIVIL 18637 CONSTRUCTION SUPERVISION,
DESIGN OF MOTORWAYS,
ROADS, BRIDGES AND DAMS
LIST OF NESPAK KEY PERSONNEL

February 12, 2021 Page 28 of 28

SR# CODE NAME DESIGNATION/ QUALIFICATION DATE OF SPECIALIZATION


DIVISION WITH MTH/YEAR JOINING/
PEC REG. # TOTAL EXPER.

341 10368 NAVEED AHMAD MALIK PRINCIPAL ENGINEER BE MECH 16-02-2016 PROJECT MANAGEMENT,
P&M 04/90 28/11 PLANT CONSTRUCTION,
MECH 8379 PROCUREMENT, SUPPLY
CHAIN FUCTIONS,
CONSTRUCTION MANAGEMENT
& MANUFACTRUING, EPC
CONSTRUCTION, DESIGN &
CONSULTANCY ETC.
342 10359 ABDUL SAMAD KHOSO PRINCIPAL ENGINEER BE ELECT 10-03-2016 PROJECT MANAGEMENT,
P&M 03/93 27/07 PLANNING, CONSTRUCTION
ELECT 10711 MANAGEMENT OF
TRANSMISSION LINES, SITE
SUPERVISION, CONTRACT
MANAGEMENT, QUALITY
CONTROL
343 10537 JEHANZEB KHAN PRINCIPAL ENGINEER BE MECH 28-03-2017 CONSTRUCTION OF DAMS,
P&M 12/94 24/10 POWER HOUSES, BARRAGES
MECH 11480 AND TELECOM SECTOR

344 8434 RASHID HUSSAIN PRINCIPAL ENGINEER BE CIVIL 28-11-2018 PROJECT MANAGEMENT,
A&P(K) 08/97 22/06 CONSTRUCTION & CONTRACT
CIVIL 18572 MANAGEMENT &
ADMINISTRATION
345 10585 ASIF JUNAID KAREEM PRINCIPAL ENGINEER ME CIVIL 24-12-2018 PROJECT MANAGEMENT,
CONTRACTS 08/07 16/06 DISPUTE RESOLUTION AND
CIVIL 24168 CONSTRUCTION CONTRACTS
ADMINISTRATION. CONTRACT
MANAGEMENT PROFESSIONAL
346 10623 MUHAMMAD TANVIR ABBAS PRINCIPAL ENGINEER ME CIVIL 15-10-2019
GT&GE 01/07 18/10
CIVIL 22381

347 4914 MUHAMMAD FAROOQ GM/ACTING HEAD ME CIVIL 01-12-1988 PROJECT/CONSTRUCTION


KARACHI 04/96 32/02 MANAGEMENT,
CIVIL 10788 INFRASTRUCTURE PLANNING,
CONTRACT/TENDER
DOCUMENTS, CLAIMS
ASSESSMENT & SCHEDULING
348 4546 RIZWAN ZAIN-UL-ABEDIN GM/ACTING HEAD ME CIVIL 30-05-1989 STRUCTURAL ENGINEERING
M&QC 06/92 32/08
CIVIL 10437 (L)

349 10331 MUHAMMAD IQBAL SOFTWARE DEVELOPER MCS 17-03-2016 SDLC MANAGEMENT,
TEAM LEAD 08/97 22/01 SOFTWARE APPLICATION
W&A DEVELOPMENT TEAM
SUPERVISION & MANAGEMENT,
FINALISE DESIGN AND
DEVELOPMENT
METHODOLOGISE, SUPERVISE
.NET, ANDROID & MSSQL
SERVER ETC.
 Job and Staff Status Summary
 Projects Undertaken to-date of each
specialty at Nespak
NESPAK JOBS
TOTAL PROJECTS AS ON FEBRUARY 01, 2021 = 4092

INHAND
LOCAL 357
OVERSEAS 20
377

3715

COMPLETED
LOCAL 3174
OVERSEAS 541
ENERGY SECTOR
TOTAL PROJECTS AS ON FEBRUARY 01, 2021 = 532

ONGOING : 34 COMPLETED : 498 STAFF: 712

SOLAR HEATING, VENTILATION &


OIL & GAS AIR-CONDITIONING

HYDROPOWER
35 2 46 TRANSMISSION &
DISTRIBUTION
81 109

NUCLEAR POWER 25
22
RURAL 21
ELECTRIFICATION 151
27
25

SCADA & TELE-


COMMUNICATION
SYSTEMS
THERMAL POWER
SUBSTATIONS

SYSTEM STUDIES &


UTILITY PLANNING
WATER RESOURCES
TOTAL PROJECTS AS ON FEBRUARY 01, 2021 = 537

ONGOING : 31 COMPLETED : 506 STAFF: 921

WATER RESOURCES DRAINAGE, SALINITY CONTROL&


PLANNING LAND RECLAMATION

INSTITUTIONAL
DEVELOPMENT

37 31
4 DAMS & BARRAGES

149
86
FLOOD MANAGEMENT

46
42 142

GROUND WATER RESOURCES IRRIGATION SYSTEMS

AGRICULTURE DEVELOPMENT
HIGHWAYS & BRIDGES
TOTAL PROJECTS AS ON FEBRUARY 01, 2021 = 672

ONGOING : 89 COMPLETED : 583 STAFF: 1030

HIGHWAYS RAILWAYS

MOTORWAYS

4
24 85
URBAN TRANSPORTATION 16
STUDIES

372
165

9
BRIDGES, FLYOVERS,
TUNNELS, INTERCHAGE & URBAN &
UNDERPASSES RURAL ROADS

GRADE SEPARATED
INTERCHANGES
AIRPORT SERVICES
TOTAL PROJECTS AS ON FEBRUARY 01, 2021 = 66

ONGOING : 7 COMPLETED : 59 STAFF: 40

AIR TRAFFIC
CONTROL TOWERS

4
24
RUNWAYS & TAXIWAYS

35
3

AIRPORTS &
TERMINAL BUILDINGS

HANGARS
SEAPORTS
TOTAL PROJECTS AS ON FEBRUARY 01, 2021 = 51

ONGOING : 6 COMPLETED : 45 STAFF: 42

MARINE TERMINALS
IN-LAND RIVER NAVIGATION

FISH HARBOURS

1 2
7

11
DEEP SEA PORTS
30

CONTAINER TERMINALS
ARCHITECTURE & PLANNING
TOTAL PROJECTS AS ON FEBRUARY 01, 2021 = 1084

ONGOING : 146 COMPLETED : 938 STAFF: 1050

SLUM UPGRADATION & PARKING AREAS SPORTS COMPLEXES


KATCHI ABADIS
AREA DEVELOPMENT

11 9 40
141
370

COMMERCIAL/HIGHRISE 188
BUILDINGS

EDUCATIONAL
BUILDINGS
116
14 15
48 86 20
26
MUSEUMS & AUDITORIUMS

HOSPITALS & MEDICAL


MOSQUES & DARGHAS
FACILITIES
MASTER PLANNING
INTERIOR DESIGN & HOUSING HOTELS &
LANDSCAPING TOURIST RESORTS
PUBLIC HEALTH ENGINEERING
TOTAL PROJECTS AS ON FEBRUARY 01, 2021 = 348

ONGOING : 43 COMPLETED : 305 STAFF: 200

MUNICIPAL
WATER TREATMENT PLANTS
INFRASTRUCTURE

SEWERAGE &
DRAINAGE SYSTEM

3 18
107

13 164
SOLID WASTE 43
MANAGEMENT

WATER SUPPLY
WASTE WATER
TREATMENT & DISPOSAL
ENVIRONMENT STUDIES
TOTAL PROJECTS AS ON FEBRUARY 01, 2021 = 90

ONGOING : 1 COMPLETED : 89 STAFF: 50

MULTI-STOREYED
BUILDINGS

OIL & GAS

8
21
17
POWER PLANTS

10

22 DAMS
6

MOTORWAYS
AND ROADS
AIRPORTS
ENGINEERING FOR INDUSTRY
(Covering Buildings & Infrastructure)
TOTAL PROJECTS AS ON FEBRUARY 01, 2021 = 284

ONGOING : 13 COMPLETED : 271 STAFF: 84

COOKING OIL,
FOOD & RICE

MOTOR VEHICLES &


MACHINERY
28
17

37
144
CHEMICAL &
FERTILIZER
27
CEMENT,SUGAR,
31 STEEL & TEXTILE

INDUSTRIAL
ZONES

SILOS
GEOGRAPHICAL INFORMATION
SYSTEMS (GIS)
TOTAL PROJECTS AS ON FEBRUARY 01, 2021 = 72

ONGOING : 07 COMPLETED : 65 STAFF: 34

HIGHWAYS

5 URBAN
DEVELOPMENT
UTILITY NETWORK 16
15

36

WATER
RESOURCES
INFORMATION TECHNOLOGY (IT)
TOTAL PROJECTS AS ON FEBRUARY 01, 2021 = 41

ONGOING : 04 COMPLETED : 37 STAFF: 21

Ongoing

04

37

Completed
Annexure-III

Logistic Capability
 List of Offices
 List of Equipment
 Audit Reports
 List of Offices
HEAD OFFICE

National Engineering Services Pakistan (Pvt.) Ltd.


Nespak House, 1-C, Block-N
Model Town Extension, GPO Box: 1351, Lahore, Pakistan 54700
Phone : (92 42) 99090000
Fax : (92 42) 99231950
E-mail : info@nespak.com.pk
Website: www.nespak.com.pk
REGIONAL OFFICES FOREIGN OFFICES

KARACHI
13th Floor, N.I.C. Building,
Abbasi Shaheed Road,
Kingdom of Saudi Arabia
Off. Shahrah-e-Faisal,
Office # 2, First Floor, Ibrahim
Karachi
Muhammad Al Moosa
Commercial Complex,
Phone: (0092 21) 99207277-84 Shahra-e-Dabbab, Riyadh
Fax : (0092 21) 35651994 P.O. Box 50344, Riyadh 11523,
E-mail : nespakkh@khi.wol.net.pk Kingdom of Saudi Arabia
karachi@nespak.com.pk
Phone (00966-11)-4052297,
: 4059583
Fax: (00966-11)-4051031
E-
nespaksa@gmail.com
mail:

ARCHITECTURE & PLANNING KARACHI


4th Floor, NICL Building,
Abbasi Shaheed Road,
Off. Shahra-e-Faisal, Karachi Sultanate of Oman
NESPAK & Partners LLC
P.O.Box 3506,
Phone: (0092 21) 99201430-3 Postal Code: 112 Ruwi,
Fax : (0092 21) 99201424 Muscat, Sultanate Of Oman
E-Mail: apk@nespak.com.pk
marifapk@wateen.net
00968-24789668,
Phone :
24701729
Fax : 00968-24703702
E-mail
nespak@omantel.net.om
:

ISLAMABAD
NESPAK HOUSE,
Sector-G, 5/2,
P. O. Box 2461, Islamabad Islamic Republic of Iran
Unit No. 6, Block Number 82, 35 meter
Phone : (0092 51) 9221910-13 Golestan Street, between Adl square and
Fax : (0092 51) 9221914 Sardare Jangal Street, Pounk Avenue,
E-mail : nespak@cyber.net.pk Tehran , Iran
Postal Code: 1476684541

Phone : 98-21-44441479
Fax : 98-21-44441479
nespak.roi@gmail.com
E-mail :
bjavid51@gmail.com

DISASTER MANAGEMENT AND RECONSTRUCTION


DIVISION
House # 78,
Main Margalla Road Afghanistan
F-6/2 Islamabad Karte-3 Pule Surkh Saraye Ghazni Bus
Stop,
Phone (0092 51) 2874018, 2874021 3rd in row behind Finest Super Store,
: (92 51) 9221995, (92 51) 2516398 Kabul
Fax : (92 51) 2820144, 2874033 Afghanistan
E-mail info@nespakerp.com; nespakerd@gmail.c
: om Phone : 0093-(0)20-2503537
URL : www.nespakerp.com Fax : 0093-(0)20-2503538
E-mail : nespak_af@yahoo.com
nespak_af@hotmail.com
QUETTA
House no. 18- 19/B, Street No. 2,
Phase-III, Shahbaz Town,
Quetta Cantt. Qatar
14 Cleopatra Building Musherib,
P. O. Box: 32057,
Phone : (92 81) 9202454, 9201707 Doha, Qatar
Fax : (92 81) 9202982
E-mail : roquetta@nespak.com.pk
Phone : (00974) 44429696
Fax : (00974) 44429969
Mobile : (00974) 55863929
E-mail : qatar@nespak.com.pk
khalidkhan@nespak-
qatar.com
kikhann@yahoo.com

PESHAWAR
NESPAK House 24, Sector B-2,
Phase - V, Hayatabad, Peshawar
United Kingdom (UK)
Parkview 183-189 The Vale,
Phone : (92 91) 5828478-79 London,
Fax : (92 91) 5828481 UK W3 7RW
E-mail : nespakp@gmail.com
Phone : (0044) 02088111188
Fax : (0044) 02088111189
E-mail : nespakuk@gmail.com
 List of Equipment
 Audit Reports
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

16 Jan 18 Account Transfer 48250689 16 Jan 18 6,035.00 22,300,249.79

16 Jan 18 Clearing 48250690 16 Jan 18 133,605.00 22,166,644.79

16 Jan 18 Clearing 48250681 16 Jan 18 19,996.00 22,146,648.79

16 Jan 18 Account Transfer 48250705 16 Jan 18 9,501.00 22,137,147.79

17 Jan 18 Account Transfer 48250710 17 Jan 18 19,025.00 22,118,122.79

17 Jan 18 Online Charges AC-0010001898260027 17 Jan 18 290.00 22,117,832.79

17 Jan 18 Online Transfer 48250707 17 Jan 18 52,890.00 22,064,942.79

17 Jan 18 Account Transfer 48250706 17 Jan 18 6,418.00 22,058,524.79

17 Jan 18 Account Transfer 48250709 17 Jan 18 72,000.00 21,986,524.79

18 Jan 18 Account Transfer 48250704 18 Jan 18 2,324.00 21,984,200.79

18 Jan 18 Cash Withdrawal 48250708 18 Jan 18 6,030.00 21,978,170.79

18 Jan 18 Online Transfer 48250703 18 Jan 18 41,639.00 21,936,531.79

18 Jan 18 Account Transfer 48250713 18 Jan 18 27,550.00 21,908,981.79

18 Jan 18 Account Transfer 48250712 18 Jan 18 3,686.00 21,905,295.79

19 Jan 18 Online Charges AC-0010033724090010 19 Jan 18 290.00 21,905,005.79

19 Jan 18 Online Transfer 48250700 19 Jan 18 3,000.00 21,902,005.79

19 Jan 18 Account Transfer 48250702 19 Jan 18 26,449.00 21,875,556.79

19 Jan 18 Account Transfer 48250714 19 Jan 18 15,000.00 21,860,556.79

19 Jan 18 Account Transfer 48250698 19 Jan 18 9,495.00 21,851,061.79

19 Jan 18 Outward Cheque Realized 19 Jan 18 9,730,517.00 31,581,578.79

19 Jan 18 Account Transfer 48250715 19 Jan 18 10,370.00 31,571,208.79

22 Jan 18 Account Transfer 48250716 22 Jan 18 3,752.00 31,567,456.79

22 Jan 18 Account Transfer 22 Jan 18 10,832.00 31,556,624.79

22 Jan 18 Online Transfer 48250717 22 Jan 18 54,734.00 31,501,890.79

23 Jan 18 Account Transfer 48250720 23 Jan 18 189,000.00 31,312,890.79

23 Jan 18 Account Transfer 48250718 23 Jan 18 8,842.00 31,304,048.79

Page 1 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

24 Jan 18 Account Transfer 48250722 24 Jan 18 35,210.00 31,268,838.79

25 Jan 18 Outward Cheque Realized 25 Jan 18 10,000,000.00 41,268,838.79

26 Jan 18 Online Charges AC-0010001898260027 26 Jan 18 290.00 41,268,548.79

26 Jan 18 Online Transfer 48250726 26 Jan 18 35,638.00 41,232,910.79

29 Jan 18 Account Transfer 48250724 29 Jan 18 69,390.00 41,163,520.79

29 Jan 18 Account Transfer 48250725 29 Jan 18 42,895.00 41,120,625.79

29 Jan 18 Online Transfer 29 Jan 18 20,562,101.00 20,558,524.79

29 Jan 18 Account Transfer 29 Jan 18 800.00 20,557,724.79

29 Jan 18 Account Transfer 48250729 29 Jan 18 1,022.00 20,556,702.79

30 Jan 18 Clearing 48250683 30 Jan 18 95,579.00 20,461,123.79

30 Jan 18 Account Transfer 48250723 30 Jan 18 37,105.00 20,424,018.79

30 Jan 18 Online Transfer 30 Jan 18 2,239,146.00 18,184,872.79

31 Jan 18 Online Transfer 31 Jan 18 11,160,025.00 29,344,897.79

31 Jan 18 Online Charges AC-0010001924780046 31 Jan 18 2,320.00 29,342,577.79

31 Jan 18 Profit 01 Feb 18 106,294.62 29,448,872.41

31 Jan 18 WHT Deduction 01 Feb 18 10,629.00 29,438,243.41

01 Feb 18 Account Transfer 48250735 01 Feb 18 9,575.00 29,428,668.41

01 Feb 18 Account Transfer 01 Feb 18 21,590.00 29,407,078.41

01 Feb 18 Account Transfer 01 Feb 18 37,810.00 29,369,268.41

01 Feb 18 Online Transfer 48250738 01 Feb 18 14,402.00 29,354,866.41

02 Feb 18 Account Transfer 48250741 02 Feb 18 58,100.00 29,296,766.41

02 Feb 18 Account Transfer 48250733 02 Feb 18 31,605.00 29,265,161.41

02 Feb 18 Account Transfer 48250745 02 Feb 18 17,172.00 29,247,989.41

06 Feb 18 Cash Withdrawal 48250747 06 Feb 18 14,332.00 29,233,657.41

06 Feb 18 Account Transfer 48250734 06 Feb 18 10,295.00 29,223,362.41

06 Feb 18 Account Transfer 48250744 06 Feb 18 8,593.00 29,214,769.41

Page 2 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

07 Feb 18 Account Transfer 48250746 07 Feb 18 34,116.00 29,180,653.41

07 Feb 18 Account Transfer 48250727 07 Feb 18 156,606.00 29,024,047.41

07 Feb 18 Clearing 48250739 07 Feb 18 25,765.00 28,998,282.41

08 Feb 18 Account Transfer 48250754 08 Feb 18 19,664.00 28,978,618.41

08 Feb 18 Account Transfer 48250752 08 Feb 18 36,560.00 28,942,058.41

09 Feb 18 Clearing 48250728 09 Feb 18 178,126.00 28,763,932.41

09 Feb 18 Account Transfer 48250749 09 Feb 18 19,896.00 28,744,036.41

09 Feb 18 Account Transfer 48250753 09 Feb 18 210,701.00 28,533,335.41

09 Feb 18 Account Transfer 48250756 09 Feb 18 18,155.00 28,515,180.41

09 Feb 18 Online Charges AC-0010030031270011 09 Feb 18 290.00 28,514,890.41

09 Feb 18 Online Transfer 48250748 09 Feb 18 11,570.00 28,503,320.41

09 Feb 18 Account Transfer 48250742 09 Feb 18 125,351.00 28,377,969.41

09 Feb 18 Online Transfer 09 Feb 18 2,312,439.00 26,065,530.41

12 Feb 18 Account Transfer 48250766 12 Feb 18 336,720.00 25,728,810.41

12 Feb 18 Account Transfer 48250759 12 Feb 18 164,048.00 25,564,762.41

12 Feb 18 Account Transfer 48250760 12 Feb 18 15,138.00 25,549,624.41

13 Feb 18 Account Transfer 48250769 13 Feb 18 20,000.00 25,529,624.41

13 Feb 18 Account Transfer 48250751 13 Feb 18 67,680.00 25,461,944.41

13 Feb 18 Account Transfer 48250757 13 Feb 18 426,471.00 25,035,473.41

14 Feb 18 Account Transfer 48250767 14 Feb 18 8,116.00 25,027,357.41

14 Feb 18 Online Charges AC-0010021898270010 14 Feb 18 290.00 25,027,067.41

14 Feb 18 Online Transfer 48250770 14 Feb 18 121,516.00 24,905,551.41

14 Feb 18 Account Transfer 48250764 14 Feb 18 37,350.00 24,868,201.41

14 Feb 18 Account Transfer 48250763 14 Feb 18 33,440.00 24,834,761.41

15 Feb 18 Online Charges AC-0010021898270010 15 Feb 18 290.00 24,834,471.41

15 Feb 18 Online Transfer 048250973 15 Feb 18 120,816.00 24,713,655.41

Page 3 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

15 Feb 18 Account Transfer 48250758 15 Feb 18 142,233.00 24,571,422.41

15 Feb 18 Online Transfer 15 Feb 18 67,900.00 24,503,522.41

16 Feb 18 Online Charges AC-0010001898260027 16 Feb 18 290.00 24,503,232.41

16 Feb 18 Online Transfer 48250974 16 Feb 18 60,485.00 24,442,747.41

16 Feb 18 Account Transfer 48250977 16 Feb 18 31,430.00 24,411,317.41

16 Feb 18 Account Transfer 48250972 16 Feb 18 70,319.00 24,340,998.41

17 Feb 18 Account Transfer 48250971 17 Feb 18 31,129.00 24,309,869.41

19 Feb 18 Account Transfer 48250978 19 Feb 18 72,991.00 24,236,878.41

19 Feb 18 Cheque Book Charges 19 Feb 18 300.00 24,236,578.41

20 Feb 18 Account Transfer 48250981 20 Feb 18 8,370.00 24,228,208.41

20 Feb 18 Account Transfer 48250980 20 Feb 18 44,364.00 24,183,844.41

20 Feb 18 Online Transfer 48250979 20 Feb 18 84,206.00 24,099,638.41

20 Feb 18 Account Transfer 48250982 20 Feb 18 64,720.00 24,034,918.41

20 Feb 18 Cheque Book Charges 20 Feb 18 300.00 24,034,618.41

21 Feb 18 Online Transfer 21 Feb 18 1,036,251.20 25,070,869.61

21 Feb 18 Outward Cheque Realized 21 Feb 18 3,201,600.00 28,272,469.61

21 Feb 18 Account Transfer 48250984 21 Feb 18 4,525,125.00 23,747,344.61

21 Feb 18 Account Transfer 48250983 21 Feb 18 15,000.00 23,732,344.61

22 Feb 18 Account Transfer 48250975 22 Feb 18 27,575.00 23,704,769.61

22 Feb 18 Outward Cheque Realized 22 Feb 18 12,000,000.00 35,704,769.61

23 Feb 18 Transfer 23 Feb 18 6,303,589.00 42,008,358.61

23 Feb 18 Account Transfer 48250987 23 Feb 18 22,498.00 41,985,860.61

26 Feb 18 Account Transfer 48250985 26 Feb 18 8,593.00 41,977,267.61

26 Feb 18 Account Transfer 48250986 26 Feb 18 12,946.00 41,964,321.61

26 Feb 18 Online Transfer 26 Feb 18 19,821,514.00 22,142,807.61

26 Feb 18 Account Transfer 48250991 26 Feb 18 36,900.00 22,105,907.61

Page 4 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

26 Feb 18 Transfer 26 Feb 18 232,000.00 22,337,907.61

26 Feb 18 Account Transfer 48250990 26 Feb 18 463,733.00 21,874,174.61

27 Feb 18 Account Transfer 48251000 27 Feb 18 2,328,327.00 19,545,847.61

27 Feb 18 Account Transfer 48250997 27 Feb 18 24,029.00 19,521,818.61

28 Feb 18 Account Transfer 48251002 28 Feb 18 199,646.00 19,322,172.61

28 Feb 18 Profit 01 Mar 18 99,238.22 19,421,410.83

28 Feb 18 WHT Deduction 01 Mar 18 9,924.00 19,411,486.83

01 Mar 18 Account Transfer 48251008 01 Mar 18 28,894.00 19,382,592.83

01 Mar 18 Account Transfer 48251007 01 Mar 18 27,800.00 19,354,792.83

01 Mar 18 Online Charges AC-0010001898260027 01 Mar 18 290.00 19,354,502.83

01 Mar 18 Online Transfer 48251004 01 Mar 18 52,120.00 19,302,382.83

01 Mar 18 Account Transfer 48250992 01 Mar 18 6,035.00 19,296,347.83

01 Mar 18 Online Transfer 48250995 01 Mar 18 38,028.00 19,258,319.83

02 Mar 18 Account Transfer 48251011 02 Mar 18 11,550.00 19,246,769.83

02 Mar 18 Account Transfer 48251006 02 Mar 18 19,500.00 19,227,269.83

02 Mar 18 Account Transfer 48251001 02 Mar 18 20,900.00 19,206,369.83

02 Mar 18 Account Transfer 48251005 02 Mar 18 4,380.00 19,201,989.83

05 Mar 18 Account Transfer 48251010 05 Mar 18 29,818.00 19,172,171.83

06 Mar 18 Account Transfer 48250996 06 Mar 18 42,400.00 19,129,771.83

06 Mar 18 Account Transfer 48251013 06 Mar 18 19,140.00 19,110,631.83

06 Mar 18 Cash Deposit 06 Mar 18 6,000.00 19,116,631.83

06 Mar 18 Account Transfer 48251009 06 Mar 18 95,145.00 19,021,486.83

07 Mar 18 Clearing 48251003 07 Mar 18 104,125.00 18,917,361.83

07 Mar 18 Account Transfer 48251012 07 Mar 18 19,992.00 18,897,369.83

07 Mar 18 Account Transfer 48251015 07 Mar 18 277,580.00 18,619,789.83

07 Mar 18 Account Transfer 48251022 07 Mar 18 159,007.00 18,460,782.83

Page 5 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

07 Mar 18 Online Transfer 07 Mar 18 2,247,006.00 16,213,776.83

08 Mar 18 Account Transfer 48251016 08 Mar 18 43,414.00 16,170,362.83

08 Mar 18 Account Transfer 48251017 08 Mar 18 16,474.00 16,153,888.83

08 Mar 18 Account Transfer 08 Mar 18 2,000,000.00 14,153,888.83

08 Mar 18 Account Transfer 08 Mar 18 4,024.00 14,149,864.83

08 Mar 18 Account Transfer 48251019 08 Mar 18 9,575.00 14,140,289.83

09 Mar 18 Account Transfer 48251033 09 Mar 18 86,974.00 14,053,315.83

09 Mar 18 Account Transfer 48251030 09 Mar 18 12,067.00 14,041,248.83

09 Mar 18 Account Transfer 48251036 09 Mar 18 21,219.00 14,020,029.83

09 Mar 18 Account Transfer 09 Mar 18 336,720.00 13,683,309.83

09 Mar 18 Online Transfer 09 Mar 18 60,400.00 13,622,909.83

09 Mar 18 Account Transfer 48251023 09 Mar 18 10,693.00 13,612,216.83

09 Mar 18 Account Transfer 48251020 09 Mar 18 17,566.00 13,594,650.83

09 Mar 18 Online Charges AC-0010071877350011 09 Mar 18 290.00 13,594,360.83

09 Mar 18 Online Transfer 48251014 09 Mar 18 2,460.00 13,591,900.83

09 Mar 18 Account Transfer 48251027 09 Mar 18 13,045.00 13,578,855.83

09 Mar 18 Online Charges AC-0010021898270010 09 Mar 18 290.00 13,578,565.83

09 Mar 18 Online Transfer 48251031 09 Mar 18 141,616.00 13,436,949.83

12 Mar 18 Outward Cheque Realized 12 Mar 18 4,975,987.00 18,412,936.83

13 Mar 18 Account Transfer 48251024 13 Mar 18 43,856.00 18,369,080.83

13 Mar 18 Online Transfer 48251037 13 Mar 18 58,945.00 18,310,135.83

13 Mar 18 Online Transfer 48251034 13 Mar 18 66,300.00 18,243,835.83

13 Mar 18 Online Charges AC-0010033724090010 13 Mar 18 290.00 18,243,545.83

13 Mar 18 Online Transfer 48251035 13 Mar 18 3,000.00 18,240,545.83

13 Mar 18 Online Charges AC-0010001898260027 13 Mar 18 290.00 18,240,255.83

13 Mar 18 Online Transfer 48251032 13 Mar 18 50,598.00 18,189,657.83

Page 6 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

13 Mar 18 Account Transfer 48250998 13 Mar 18 38,710.00 18,150,947.83

14 Mar 18 Account Transfer 48251038 14 Mar 18 32,676.00 18,118,271.83

14 Mar 18 Account Transfer 48251039 14 Mar 18 54,393.00 18,063,878.83

15 Mar 18 Account Transfer 48251040 15 Mar 18 15,468.00 18,048,410.83

15 Mar 18 Account Transfer 48251029 15 Mar 18 72,455.00 17,975,955.83

20 Mar 18 Account Transfer 48251046 20 Mar 18 1,006.00 17,974,949.83

20 Mar 18 Account Transfer 48251048 20 Mar 18 15,975.00 17,958,974.83

20 Mar 18 Outward Cheque Realized 20 Mar 18 10,244,582.00 28,203,556.83

20 Mar 18 Account Transfer 48251044 20 Mar 18 29,753.00 28,173,803.83

20 Mar 18 Account Transfer 48251043 20 Mar 18 800.00 28,173,003.83

22 Mar 18 Account Transfer 48251049 22 Mar 18 18,540.00 28,154,463.83

22 Mar 18 Account Transfer 48251051 22 Mar 18 1,430.00 28,153,033.83

22 Mar 18 Account Transfer 48251042 22 Mar 18 82,671.00 28,070,362.83

26 Mar 18 Account Transfer 48251052 26 Mar 18 11,360.00 28,059,002.83

26 Mar 18 Account Transfer 48251053 26 Mar 18 33,577.00 28,025,425.83

27 Mar 18 Outward Cheque Realized 27 Mar 18 10,000,000.00 38,025,425.83

27 Mar 18 Account Transfer 48251050 27 Mar 18 19,712.00 38,005,713.83

28 Mar 18 Account Transfer 48251058 28 Mar 18 6,264.00 37,999,449.83

28 Mar 18 Account Transfer 48251057 28 Mar 18 63,620.00 37,935,829.83

28 Mar 18 Account Transfer 48251056 28 Mar 18 7,208.00 37,928,621.83

29 Mar 18 Account Transfer 48251066 29 Mar 18 2,028,112.00 35,900,509.83

29 Mar 18 Account Transfer 29 Mar 18 9,995.00 35,890,514.83

29 Mar 18 Online Transfer 29 Mar 18 19,495,412.00 16,395,102.83

30 Mar 18 Account Transfer 48251069 30 Mar 18 53,973.00 16,341,129.83

30 Mar 18 Account Transfer 48251063 30 Mar 18 426,471.00 15,914,658.83

30 Mar 18 Account Transfer 48251062 30 Mar 18 2,823.00 15,911,835.83

Page 7 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

30 Mar 18 Online Charges AC-0010021898270010 30 Mar 18 290.00 15,911,545.83

30 Mar 18 Online Transfer 48251065 30 Mar 18 108,138.00 15,803,407.83

30 Mar 18 Account Transfer 48251047 30 Mar 18 5,200.00 15,798,207.83

30 Mar 18 Online Transfer 30 Mar 18 1,873,737.00 13,924,470.83

31 Mar 18 Account Transfer 48251064 31 Mar 18 30,308.00 13,894,162.83

31 Mar 18 Profit 01 Apr 18 82,430.02 13,976,592.85

31 Mar 18 WHT Deduction 01 Apr 18 8,243.00 13,968,349.85

03 Apr 18 Account Transfer 03 Apr 18 86,974.00 13,881,375.85

03 Apr 18 Transfer 03 Apr 18 100,000.00 13,981,375.85

03 Apr 18 Account Transfer 48250772 03 Apr 18 38,470.00 13,942,905.85

03 Apr 18 Account Transfer 48250775 03 Apr 18 16,431.00 13,926,474.85

03 Apr 18 Online Transfer 48250776 03 Apr 18 12,090.00 13,914,384.85

03 Apr 18 Account Transfer 03 Apr 18 149,688.00 13,764,696.85

04 Apr 18 Account Transfer 48251070 04 Apr 18 14,445.00 13,750,251.85

04 Apr 18 Online Charges AC-0010001898260027 04 Apr 18 290.00 13,749,961.85

04 Apr 18 Online Transfer 48251067 04 Apr 18 29,308.00 13,720,653.85

04 Apr 18 Outward Cheque Realized 04 Apr 18 8,566,208.00 22,286,861.85

05 Apr 18 Clearing 48250773 05 Apr 18 13,160.00 22,273,701.85

05 Apr 18 Account Transfer 48250777 05 Apr 18 33,016.00 22,240,685.85

05 Apr 18 Account Transfer 48250771 05 Apr 18 7,125.00 22,233,560.85

05 Apr 18 Cash Withdrawal 48250782 05 Apr 18 13,866.00 22,219,694.85

05 Apr 18 Account Transfer 48250783 05 Apr 18 30,960.00 22,188,734.85

05 Apr 18 Online Charges AC-0010071877350011 05 Apr 18 290.00 22,188,444.85

05 Apr 18 Online Transfer 48250778 05 Apr 18 2,388.00 22,186,056.85

06 Apr 18 Account Transfer 48250780 06 Apr 18 20,420.00 22,165,636.85

09 Apr 18 Account Transfer 48250781 09 Apr 18 15,840.00 22,149,796.85

Page 8 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

10 Apr 18 Account Transfer 10 Apr 18 30,260.00 22,119,536.85

10 Apr 18 Online Transfer 10 Apr 18 188,980.00 21,930,556.85

10 Apr 18 Account Transfer 48250791 10 Apr 18 7,685.00 21,922,871.85

10 Apr 18 Account Transfer 48250792 10 Apr 18 19,250.00 21,903,621.85

10 Apr 18 Account Transfer 48250787 10 Apr 18 18,280.00 21,885,341.85

10 Apr 18 Online Transfer 10 Apr 18 2,254,813.00 19,630,528.85

10 Apr 18 Outward Cheque Realized 10 Apr 18 751,167.00 20,381,695.85

10 Apr 18 Outward Cheque Realized 10 Apr 18 5,554,331.00 25,936,026.85

10 Apr 18 Online Transfer 10 Apr 18 54,393.00 25,881,633.85

10 Apr 18 Account Transfer 48250779 10 Apr 18 19,817.00 25,861,816.85

11 Apr 18 Account Transfer 48251054 11 Apr 18 57,437.00 25,804,379.85

11 Apr 18 Online Charges AC-0010021898270010 11 Apr 18 290.00 25,804,089.85

11 Apr 18 Online Transfer 48250800 11 Apr 18 163,006.00 25,641,083.85

11 Apr 18 Account Transfer 48250793 11 Apr 18 445,786.00 25,195,297.85

11 Apr 18 Account Transfer 48250788 11 Apr 18 351,360.00 24,843,937.85

12 Apr 18 Account Transfer 48250794 12 Apr 18 71,595.00 24,772,342.85

12 Apr 18 Online Charges AC-0010001898260027 12 Apr 18 290.00 24,772,052.85

12 Apr 18 Online Transfer 48250795 12 Apr 18 59,170.00 24,712,882.85

12 Apr 18 Online Transfer 12 Apr 18 63,400.00 24,649,482.85

13 Apr 18 Account Transfer 48250801 13 Apr 18 55,515.00 24,593,967.85

13 Apr 18 Account Transfer 48250802 13 Apr 18 14,637.00 24,579,330.85

16 Apr 18 Account Transfer 48250803 16 Apr 18 30,000.00 24,549,330.85

16 Apr 18 Account Transfer 48250803 16 Apr 18 30,000.00 24,579,330.85

17 Apr 18 Account Transfer 48250803 17 Apr 18 30,000.00 24,549,330.85

17 Apr 18 Cash Withdrawal 48250805 17 Apr 18 1,659.00 24,547,671.85

17 Apr 18 Account Transfer 48250804 17 Apr 18 14,475.00 24,533,196.85

Page 9 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

17 Apr 18 Online Transfer 17 Apr 18 9,671,669.40 34,204,866.25

17 Apr 18 Online Charges AC-0010001924780046 17 Apr 18 2,320.00 34,202,546.25

17 Apr 18 Online Transfer 17 Apr 18 9,671,669.40 24,530,876.85

17 Apr 18 Online Charges AC-0010001924780046 17 Apr 18 2,320.00 24,533,196.85

17 Apr 18 Online Transfer 17 Apr 18 9,617,669.40 34,150,866.25

17 Apr 18 Online Charges AC-0010001924780046 17 Apr 18 2,320.00 34,148,546.25

18 Apr 18 Account Transfer 48250806 18 Apr 18 192,473.00 33,956,073.25

19 Apr 18 Account Transfer 48250810 19 Apr 18 35,615.00 33,920,458.25

19 Apr 18 Online Charges AC-0010021898270010 19 Apr 18 290.00 33,920,168.25

19 Apr 18 Online Transfer 48250812 19 Apr 18 89,865.00 33,830,303.25

19 Apr 18 Account Transfer 48250813 19 Apr 18 320,000.00 33,510,303.25

20 Apr 18 Account Transfer 48250798 20 Apr 18 36,496.00 33,473,807.25

20 Apr 18 Account Transfer 48250808 20 Apr 18 22,061.00 33,451,746.25

20 Apr 18 Account Transfer 48250809 20 Apr 18 14,225.00 33,437,521.25

23 Apr 18 Account Transfer 48250797 23 Apr 18 55,648.00 33,381,873.25

23 Apr 18 Account Transfer 48250815 23 Apr 18 31,001.00 33,350,872.25

24 Apr 18 Online Transfer 48250814 24 Apr 18 4,424.00 33,346,448.25

24 Apr 18 Account Transfer 48250807 24 Apr 18 82,735.00 33,263,713.25

24 Apr 18 Clearing 48250811 24 Apr 18 30,375.00 33,233,338.25

24 Apr 18 Outward Cheque Realized 24 Apr 18 2,000,000.00 35,233,338.25

26 Apr 18 Account Transfer 26 Apr 18 11,941.00 35,221,397.25

27 Apr 18 Account Transfer 48250816 27 Apr 18 28,488.00 35,192,909.25

27 Apr 18 Account Transfer 48250796 27 Apr 18 34,102.00 35,158,807.25

27 Apr 18 Online Transfer 27 Apr 18 2,153,100.00 33,005,707.25

27 Apr 18 Online Transfer 27 Apr 18 19,633,357.00 13,372,350.25

30 Apr 18 Online Charges AC-0010001898260027 30 Apr 18 290.00 13,372,060.25

Page 10 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

30 Apr 18 Online Transfer 48250818 30 Apr 18 51,267.00 13,320,793.25

30 Apr 18 Account Transfer 48250832 30 Apr 18 14,445.00 13,306,348.25

30 Apr 18 Online Transfer 30 Apr 18 12,090.00 13,294,258.25

30 Apr 18 Online Transfer 30 Apr 18 23,285.00 13,270,973.25

30 Apr 18 Account Transfer 48250828 30 Apr 18 27,861.00 13,243,112.25

30 Apr 18 Account Transfer 48250829 30 Apr 18 31,595.00 13,211,517.25

30 Apr 18 Account Transfer 48250824 30 Apr 18 237,539.00 12,973,978.25

30 Apr 18 Profit 01 May 18 94,598.97 13,068,577.22

30 Apr 18 WHT Deduction 01 May 18 9,460.00 13,059,117.22

02 May 18 Account Transfer 48250819 02 May 18 65,038.00 12,994,079.22

02 May 18 Account Transfer 48250823 02 May 18 116,997.00 12,877,082.22

03 May 18 Account Transfer 48250827 03 May 18 28,752.00 12,848,330.22

03 May 18 Account Transfer 48250834 03 May 18 86,416.00 12,761,914.22

03 May 18 Account Transfer 48250833 03 May 18 70,920.00 12,690,994.22

03 May 18 Account Transfer 48250838 03 May 18 64,260.00 12,626,734.22

03 May 18 Account Transfer 48250822 03 May 18 33,651.00 12,593,083.22

04 May 18 Account Transfer 48250839 04 May 18 14,858.00 12,578,225.22

08 May 18 Transfer 08 May 18 89,000.00 12,667,225.22

08 May 18 Account Transfer 08 May 18 185,153.00 12,482,072.22

08 May 18 Account Transfer 08 May 18 352,275.00 12,129,797.22

08 May 18 Account Transfer 48250842 08 May 18 9,501.00 12,120,296.22

08 May 18 Online Transfer 08 May 18 2,550,481.00 9,569,815.22

08 May 18 Account Transfer 48250843 08 May 18 135,923.00 9,433,892.22

09 May 18 Outward Cheque Realized 09 May 18 495,768.00 9,929,660.22

09 May 18 Account Transfer 48250841 09 May 18 34,130.00 9,895,530.22

09 May 18 Outward Cheque Realized 09 May 18 17,527,440.00 27,422,970.22

Page 11 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

11 May 18 Online Charges AC-0010021898270010 11 May 18 290.00 27,422,680.22

11 May 18 Online Transfer 48250847 11 May 18 137,194.00 27,285,486.22

11 May 18 Account Transfer 48250849 11 May 18 446,993.00 26,838,493.22

11 May 18 Account Transfer 48250855 11 May 18 107,702.00 26,730,791.22

11 May 18 Account Transfer 48250846 11 May 18 25,040.00 26,705,751.22

11 May 18 Online Transfer 11 May 18 69,400.00 26,636,351.22

12 May 18 Account Transfer 48250852 12 May 18 39,148.00 26,597,203.22

14 May 18 Online Charges AC-0010071877350011 14 May 18 290.00 26,596,913.22

14 May 18 Online Transfer 48250854 14 May 18 1,230.00 26,595,683.22

14 May 18 Account Transfer 48250858 14 May 18 5,000,000.00 21,595,683.22

15 May 18 Online Transfer 48250859 15 May 18 6,400.00 21,589,283.22

15 May 18 Online Transfer 15 May 18 3,000.00 21,586,283.22

15 May 18 Account Transfer 48250851 15 May 18 12,283.00 21,574,000.22

15 May 18 Account Transfer 48250848 15 May 18 33,336.00 21,540,664.22

15 May 18 Account Transfer 48250831 15 May 18 9,826.00 21,530,838.22

15 May 18 Account Transfer 48250860 15 May 18 2,682,908.00 18,847,930.22

18 May 18 Account Transfer 48250865 18 May 18 94,690.00 18,753,240.22

18 May 18 Account Transfer 48250864 18 May 18 155,695.00 18,597,545.22

18 May 18 Account Transfer 48250856 18 May 18 5,130.00 18,592,415.22

18 May 18 Online Charges AC-0010001898260027 18 May 18 290.00 18,592,125.22

18 May 18 Online Transfer 48250861 18 May 18 13,938.00 18,578,187.22

21 May 18 Outward Cheque Realized 21 May 18 14,000,000.00 32,578,187.22

21 May 18 Account Transfer 21 May 18 19,250.00 32,558,937.22

22 May 18 Service Charges IWCLGRTLCY 22 May 18 450.00 32,558,487.22

22 May 18 Online Charges AC-0010021898270010 22 May 18 290.00 32,558,197.22

22 May 18 Online Transfer 48250870 22 May 18 110,657.00 32,447,540.22

Page 12 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

22 May 18 Account Transfer 48250850 22 May 18 33,190.00 32,414,350.22

22 May 18 Clearing 48250867 22 May 18 75,752.00 32,338,598.22

22 May 18 Account Transfer 48250862 22 May 18 49,080.00 32,289,518.22

22 May 18 Account Transfer 48250866 22 May 18 33,665.00 32,255,853.22

22 May 18 Account Transfer 52046214 22 May 18 20,000.00 32,235,853.22

22 May 18 Account Transfer 52046212 22 May 18 76,320.00 32,159,533.22

23 May 18 Account Transfer 52046220 23 May 18 28,169.00 32,131,364.22

23 May 18 Outward Cheque Realized 23 May 18 3,000,000.00 35,131,364.22

24 May 18 Online Transfer 23 May 18 1,619,189.00 33,512,175.22

24 May 18 Online Transfer 24 May 18 19,421,802.00 14,090,373.22

24 May 18 Account Transfer 52046223 24 May 18 11,550.00 14,078,823.22

24 May 18 Account Transfer 24 May 18 20,630.00 14,058,193.22

24 May 18 Account Transfer 52046211 24 May 18 267,486.00 13,790,707.22

25 May 18 Account Transfer 52046224 25 May 18 22,740.00 13,767,967.22

25 May 18 Online Transfer 52046225 25 May 18 7,848.00 13,760,119.22

25 May 18 Account Transfer 52046227 25 May 18 7,497.00 13,752,622.22

25 May 18 Account Transfer 52046218 25 May 18 19,292.00 13,733,330.22

25 May 18 Account Transfer 25 May 18 23,422.00 13,709,908.22

28 May 18 Clearing 52046217 28 May 18 55,825.00 13,654,083.22

28 May 18 Account Transfer 52046219 28 May 18 28,859.00 13,625,224.22

28 May 18 Account Transfer 52046213 28 May 18 6,745.00 13,618,479.22

29 May 18 Account Transfer 52046231 29 May 18 21,200.00 13,597,279.22

29 May 18 Account Transfer 52046228 29 May 18 13,850.00 13,583,429.22

30 May 18 Clearing 48250869 30 May 18 18,410.00 13,565,019.22

31 May 18 Account Transfer 52046230 31 May 18 2,670.00 13,562,349.22

31 May 18 Outward Cheque Realized 31 May 18 8,921,145.00 22,483,494.22

Page 13 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

31 May 18 Profit 01 Jun 18 74,301.69 22,557,795.91

31 May 18 WHT Deduction 01 Jun 18 7,430.00 22,550,365.91

01 Jun 18 Account Transfer 52046221 01 Jun 18 54,362.00 22,496,003.91

01 Jun 18 Account Transfer 52046233 01 Jun 18 27,175.00 22,468,828.91

01 Jun 18 Account Transfer 01 Jun 18 24,000.00 22,444,828.91

01 Jun 18 Account Transfer 52046234 01 Jun 18 446,993.00 21,997,835.91

01 Jun 18 Account Transfer 52046238 01 Jun 18 131,502.00 21,866,333.91

02 Jun 18 Account Transfer 52046241 02 Jun 18 45,000.00 21,821,333.91

04 Jun 18 Account Transfer 52046232 04 Jun 18 11,455.00 21,809,878.91

05 Jun 18 Account Transfer 52046239 05 Jun 18 73,440.00 21,736,438.91

06 Jun 18 Account Transfer 06 Jun 18 352,275.00 21,384,163.91

06 Jun 18 Clearing 48250863 06 Jun 18 66,850.00 21,317,313.91

06 Jun 18 Online Transfer 06 Jun 18 2,452,945.00 18,864,368.91

06 Jun 18 Account Transfer 06 Jun 18 75,120.00 18,789,248.91

06 Jun 18 Outward Cheque Realized 06 Jun 18 8,566,210.00 27,355,458.91

06 Jun 18 Account Transfer 52046242 06 Jun 18 34,967.00 27,320,491.91

07 Jun 18 Account Transfer 52046237 07 Jun 18 74,065.00 27,246,426.91

08 Jun 18 Online Transfer 08 Jun 18 658,000.00 26,588,426.91

08 Jun 18 Online Transfer 08 Jun 18 1,490,000.00 25,098,426.91

08 Jun 18 Account Transfer 52046236 08 Jun 18 12,509.00 25,085,917.91

08 Jun 18 Account Transfer 52046246 08 Jun 18 9,000.00 25,076,917.91

08 Jun 18 Online Transfer 52046250 08 Jun 18 10,045.00 25,066,872.91

11 Jun 18 Online Transfer 11 Jun 18 60,400.00 25,006,472.91

11 Jun 18 Online Transfer 11 Jun 18 190,000.00 24,816,472.91

12 Jun 18 Account Transfer 52046251 12 Jun 18 34,893.00 24,781,579.91

12 Jun 18 Account Transfer 52046253 12 Jun 18 29,860.00 24,751,719.91

Page 14 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

12 Jun 18 Account Transfer 52046256 12 Jun 18 16,398.00 24,735,321.91

12 Jun 18 Account Transfer 52046254 12 Jun 18 2,849.00 24,732,472.91

13 Jun 18 Account Transfer 52046262 13 Jun 18 31,499.00 24,700,973.91

13 Jun 18 Account Transfer 52046255 13 Jun 18 12,960.00 24,688,013.91

13 Jun 18 Online Charges AC-0010033812590017 13 Jun 18 290.00 24,687,723.91

13 Jun 18 Online Transfer 52046252 13 Jun 18 48,585.00 24,639,138.91

13 Jun 18 Account Transfer 52046259 13 Jun 18 82,671.00 24,556,467.91

13 Jun 18 Online Transfer 13 Jun 18 36,125,284.00 60,681,751.91

13 Jun 18 Online Charges AC-0010001924780046 13 Jun 18 2,320.00 60,679,431.91

13 Jun 18 Outward Cheque Realized 13 Jun 18 800,000.00 61,479,431.91

13 Jun 18 Outward Cheque Realized 13 Jun 18 1,188,103.00 62,667,534.91

14 Jun 18 Online Charges AC-0010021898270010 14 Jun 18 290.00 62,667,244.91

14 Jun 18 Online Transfer 52046263 14 Jun 18 112,824.00 62,554,420.91

14 Jun 18 Account Transfer 52046258 14 Jun 18 87,145.00 62,467,275.91

14 Jun 18 Account Transfer 52046264 14 Jun 18 72,540.00 62,394,735.91

14 Jun 18 Utility Bills 14 Jun 18 3,886,660.00 58,508,075.91

14 Jun 18 Account Transfer 52046267 14 Jun 18 189,647.00 58,318,428.91

14 Jun 18 Account Transfer 52046266 14 Jun 18 6,986.00 58,311,442.91

19 Jun 18 Account Transfer 52046270 19 Jun 18 15,895.00 58,295,547.91

20 Jun 18 Online Charges AC-0010023929500010 20 Jun 18 290.00 58,295,257.91

20 Jun 18 Online Transfer 52046265 20 Jun 18 24,185.00 58,271,072.91

21 Jun 18 Account Transfer 21 Jun 18 147,709.00 58,123,363.91

22 Jun 18 Account Transfer 52046276 22 Jun 18 5,000,000.00 53,123,363.91

22 Jun 18 Online Charges AC-0010021898270010 22 Jun 18 290.00 53,123,073.91

22 Jun 18 Online Transfer 52046273 22 Jun 18 66,792.00 53,056,281.91

22 Jun 18 Account Transfer 52046275 22 Jun 18 3,432.00 53,052,849.91

Page 15 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

22 Jun 18 Account Transfer 22 Jun 18 12,774.00 53,040,075.91

22 Jun 18 Account Transfer 22 Jun 18 14,130.00 53,025,945.91

22 Jun 18 Account Transfer 52046272 22 Jun 18 4,585.00 53,021,360.91

25 Jun 18 Account Transfer 52046281 25 Jun 18 74,065.00 52,947,295.91

26 Jun 18 Account Transfer 26 Jun 18 32,310.00 52,914,985.91

26 Jun 18 Account Transfer 26 Jun 18 1,568,431.00 51,346,554.91

26 Jun 18 Cash Withdrawal 52046282 26 Jun 18 14,187.00 51,332,367.91

26 Jun 18 Online Transfer 26 Jun 18 18,680,978.00 32,651,389.91

27 Jun 18 Instr. Issue Commission AC- 27 Jun 18 116.00 32,651,273.91


0010001924780046
27 Jun 18 Instrument Issued 52046285 27 Jun 18 32,640,000.00 11,273.91

29 Jun 18 Account Transfer 52046280 29 Jun 18 10,329.00 944.91

29 Jun 18 Encashment of Instrument 12112148 29 Jun 18 32,640,000.00 32,640,944.91

29 Jun 18 Account Transfer 29 Jun 18 6,977,901.00 25,663,043.91

30 Jun 18 Profit 01 Jul 18 141,831.11 25,804,875.02

30 Jun 18 WHT Deduction 01 Jul 18 14,183.00 25,790,692.02

03 Jul 18 Account Transfer 52046278 03 Jul 18 26,952.00 25,763,740.02

04 Jul 18 Account Transfer 52046302 04 Jul 18 7,275,167.00 18,488,573.02

05 Jul 18 Account Transfer 52046289 05 Jul 18 9,663.00 18,478,910.02

05 Jul 18 Account Transfer 52046304 05 Jul 18 168,460.00 18,310,450.02

06 Jul 18 Account Transfer 06 Jul 18 370,270.00 17,940,180.02

06 Jul 18 Cash Deposit 06 Jul 18 8,106.00 17,948,286.02

06 Jul 18 Account Transfer 52046257 06 Jul 18 52,835.00 17,895,451.02

06 Jul 18 Online Transfer 06 Jul 18 180,045.00 17,715,406.02

06 Jul 18 Account Transfer 52046309 06 Jul 18 130,417.00 17,584,989.02

06 Jul 18 Account Transfer 06 Jul 18 5,763.00 17,579,226.02

Page 16 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

06 Jul 18 Online Transfer 52046291 06 Jul 18 10,896.00 17,568,330.02

09 Jul 18 Account Transfer 52046308 09 Jul 18 70,000.00 17,498,330.02

09 Jul 18 Online Transfer 09 Jul 18 2,344,101.00 15,154,229.02

09 Jul 18 Account Transfer 52046303 09 Jul 18 45,380.00 15,108,849.02

09 Jul 18 Account Transfer 52046297 09 Jul 18 12,921.00 15,095,928.02

09 Jul 18 Account Transfer 52046310 09 Jul 18 487,225.00 14,608,703.02

09 Jul 18 Account Transfer 52046293 09 Jul 18 469,935.00 14,138,768.02

10 Jul 18 Outward Cheque Realized 10 Jul 18 920,000.00 15,058,768.02

10 Jul 18 Account Transfer 10 Jul 18 62,400.00 14,996,368.02

10 Jul 18 Clearing 52046268 10 Jul 18 6,011,379.00 8,984,989.02

10 Jul 18 Account Transfer 52046015 10 Jul 18 12,990.00 8,971,999.02

10 Jul 18 Account Transfer 52046013 10 Jul 18 12,000.00 8,959,999.02

10 Jul 18 Account Transfer 52046014 10 Jul 18 3,475.00 8,956,524.02

10 Jul 18 Account Transfer 52046296 10 Jul 18 12,921.00 8,943,603.02

10 Jul 18 Account Transfer 52046305 10 Jul 18 109,387.00 8,834,216.02

10 Jul 18 Account Transfer 52046011 10 Jul 18 108,488.00 8,725,728.02

10 Jul 18 Transfer 10 Jul 18 464,000.00 9,189,728.02

10 Jul 18 Outward Cheque Realized 10 Jul 18 8,972,208.00 18,161,936.02

11 Jul 18 Online Charges AC-0010071877350011 11 Jul 18 290.00 18,161,646.02

11 Jul 18 Online Transfer 52046012 11 Jul 18 1,230.00 18,160,416.02

11 Jul 18 Account Transfer 52046020 11 Jul 18 206,820.00 17,953,596.02

11 Jul 18 Transfer 11 Jul 18 679,291.00 18,632,887.02

11 Jul 18 Account Transfer 52046017 11 Jul 18 6,744.00 18,626,143.02

11 Jul 18 Account Transfer 52046018 11 Jul 18 7,800.00 18,618,343.02

12 Jul 18 Account Transfer 52046026 12 Jul 18 96,812.00 18,521,531.02

12 Jul 18 Account Transfer 52046025 12 Jul 18 27,175.00 18,494,356.02

Page 17 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

13 Jul 18 Account Transfer 52046021 13 Jul 18 50,000.00 18,444,356.02

13 Jul 18 Account Transfer 52046027 13 Jul 18 19,655.00 18,424,701.02

13 Jul 18 Online Transfer 52046031 BR0531 13 Jul 18 152,865.00 18,271,836.02

13 Jul 18 Account Transfer 52046029 13 Jul 18 86,974.00 18,184,862.02

13 Jul 18 Account Transfer 52046022 13 Jul 18 119,902.00 18,064,960.02

16 Jul 18 Account Transfer 52046294 16 Jul 18 12,921.00 18,052,039.02

16 Jul 18 Account Transfer 52046023 16 Jul 18 38,760.00 18,013,279.02

16 Jul 18 Account Transfer 52046028 16 Jul 18 4,900.00 18,008,379.02

16 Jul 18 Account Transfer 52046016 16 Jul 18 16,700.00 17,991,679.02

17 Jul 18 Instr. Issue Commission AC- 17 Jul 18 116.00 17,991,563.02


0010001924780046
17 Jul 18 Instrument Issued 52046033 17 Jul 18 17,975,000.00 16,563.02

17 Jul 18 Account Transfer 52046032 17 Jul 18 4,427.00 12,136.02

19 Jul 18 Service Charges IWCLGRTLCY 19 Jul 18 450.00 11,686.02

19 Jul 18 Encashment of Instrument 12112163 19 Jul 18 17,975,000.00 17,986,686.02

19 Jul 18 Account Transfer 52046035 19 Jul 18 213,751.00 17,772,935.02

19 Jul 18 Account Transfer 52046260 19 Jul 18 27,175.00 17,745,760.02

20 Jul 18 Account Transfer 52046044 20 Jul 18 100,000.00 17,645,760.02

20 Jul 18 Account Transfer 52046040 20 Jul 18 6,000.00 17,639,760.02

20 Jul 18 Account Transfer 52046042 20 Jul 18 4,900.00 17,634,860.02

20 Jul 18 Account Transfer 52046038 20 Jul 18 30,485.00 17,604,375.02

23 Jul 18 Online Charges AC-0010021898270010 23 Jul 18 290.00 17,604,085.02

23 Jul 18 Online Transfer 5204603 23 Jul 18 50,098.00 17,553,987.02

23 Jul 18 Account Transfer 52046030 19 Jul 18 1,743.00 17,552,244.02

23 Jul 18 Account Transfer 52046041 19 Jul 18 2,621.00 17,549,623.02

23 Jul 18 Account Transfer 52046037 23 Jul 18 40,092.00 17,509,531.02

Page 18 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

23 Jul 18 Account Transfer 52046036 23 Jul 18 28,437.00 17,481,094.02

23 Jul 18 Account Transfer 52046306 23 Jul 18 72,931.00 17,408,163.02

24 Jul 18 Account Transfer 52046046 24 Jul 18 19,926.00 17,388,237.02

24 Jul 18 Account Transfer 24 Jul 18 33,440.00 17,354,797.02

24 Jul 18 Online Charges AC-0010009174340010 24 Jul 18 290.00 17,354,507.02

24 Jul 18 Online Transfer 5204634 24 Jul 18 28,830.00 17,325,677.02

24 Jul 18 Account Transfer 24 Jul 18 710.00 17,324,967.02

26 Jul 18 Account Transfer 52046058 26 Jul 18 21,715.00 17,303,252.02

26 Jul 18 Account Transfer 26 Jul 18 30,860.00 17,272,392.02

26 Jul 18 Online Transfer 26 Jul 18 21,738,940.00 -4,466,547.98

26 Jul 18 Online Transfer 52046056 26 Jul 18 14,414.00 -4,480,961.98

26 Jul 18 Outward Cheque Realized 26 Jul 18 10,000,000.00 5,519,038.02

26 Jul 18 Outward Cheque Realized 26 Jul 18 5,000,000.00 10,519,038.02

26 Jul 18 Outward Cheque Realized 26 Jul 18 5,000,000.00 15,519,038.02

26 Jul 18 Account Transfer 52046053 26 Jul 18 3,315,676.00 12,203,362.02

26 Jul 18 Account Transfer 52046050 26 Jul 18 2,076,975.00 10,126,387.02

27 Jul 18 Online Transfer 27 Jul 18 50,000.00 10,076,387.02

27 Jul 18 Account Transfer 52046063 27 Jul 18 6,000.00 10,070,387.02

27 Jul 18 Account Transfer 52046057 27 Jul 18 31,850.00 10,038,537.02

30 Jul 18 Transfer 27 Jul 18 161,619.00 10,200,156.02

30 Jul 18 Account Transfer 52046054 30 Jul 18 12,608.00 10,187,548.02

30 Jul 18 Account Transfer 52046066 30 Jul 18 90,255.00 10,097,293.02

30 Jul 18 Account Transfer 52046055 30 Jul 18 34,700.00 10,062,593.02

31 Jul 18 Account Transfer 52046298 31 Jul 18 12,921.00 10,049,672.02

31 Jul 18 Clearing 52046060 31 Jul 18 51,810.00 9,997,862.02

31 Jul 18 Account Transfer 52046067 31 Jul 18 70,920.00 9,926,942.02

Page 19 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

31 Jul 18 Profit 01 Aug 18 62,652.61 9,989,594.63

31 Jul 18 WHT Deduction 01 Aug 18 6,265.00 9,983,329.63

01 Aug 18 Online Charges AC-0010006341640019 01 Aug 18 290.00 9,983,039.63

01 Aug 18 Online Transfer 52046069 01 Aug 18 43,215.00 9,939,824.63

01 Aug 18 Account Transfer 01 Aug 18 69,223.00 9,870,601.63

01 Aug 18 Account Transfer 52046070 01 Aug 18 1,666.00 9,868,935.63

01 Aug 18 Account Transfer 52046074 01 Aug 18 10,000.00 9,858,935.63

01 Aug 18 Account Transfer 52046076 01 Aug 18 539,664.00 9,319,271.63

02 Aug 18 Clearing 52046065 02 Aug 18 192,473.00 9,126,798.63

02 Aug 18 Account Transfer 52046075 02 Aug 18 58,100.00 9,068,698.63

02 Aug 18 Account Transfer 52046064 02 Aug 18 7,810.00 9,060,888.63

02 Aug 18 Account Transfer 52046071 02 Aug 18 4,007.00 9,056,881.63

03 Aug 18 Outward Cheque Realized 03 Aug 18 7,000,000.00 16,056,881.63

03 Aug 18 Account Transfer 52046307 03 Aug 18 74,065.00 15,982,816.63

03 Aug 18 Account Transfer 52046078 03 Aug 18 39,825.00 15,942,991.63

06 Aug 18 Account Transfer 06 Aug 18 6,000.00 15,936,991.63

06 Aug 18 Account Transfer 06 Aug 18 378,200.00 15,558,791.63

06 Aug 18 Account Transfer 52046084 06 Aug 18 480,222.00 15,078,569.63

07 Aug 18 Account Transfer 07 Aug 18 116,798.00 14,961,771.63

07 Aug 18 Online Transfer 07 Aug 18 2,657,581.00 12,304,190.63

07 Aug 18 Account Transfer 07 Aug 18 105,444.00 12,198,746.63

07 Aug 18 Online Charges AC-0010023929490019 07 Aug 18 290.00 12,198,456.63

07 Aug 18 Online Transfer 52046080 07 Aug 18 4,572.00 12,193,884.63

08 Aug 18 Account Transfer 52046079 08 Aug 18 19,390.00 12,174,494.63

08 Aug 18 Online Charges AC-0010017660070010 08 Aug 18 290.00 12,174,204.63

08 Aug 18 Online Transfer 52046095 08 Aug 18 3,000.00 12,171,204.63

Page 20 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

08 Aug 18 Online Transfer 08 Aug 18 55,600.00 12,115,604.63

08 Aug 18 Account Transfer 52046091 08 Aug 18 63,900.00 12,051,704.63

08 Aug 18 Account Transfer 52046083 08 Aug 18 43,975.00 12,007,729.63

09 Aug 18 Account Transfer 09 Aug 18 3,923.00 12,003,806.63

09 Aug 18 Online Charges AC-0010023929490019 09 Aug 18 290.00 12,003,516.63

09 Aug 18 Online Transfer 52046093 09 Aug 18 12,160.00 11,991,356.63

10 Aug 18 Account Transfer 52046098 10 Aug 18 48,813.00 11,942,543.63

10 Aug 18 Online Transfer 10 Aug 18 138,000,000.00 149,942,543.63

10 Aug 18 Online Charges AC-0010001924780046 10 Aug 18 2,320.00 149,940,223.63

13 Aug 18 Clearing 52046097 13 Aug 18 43,096.00 149,897,127.63

13 Aug 18 Account Transfer 13 Aug 18 11,000,000.00 138,897,127.63

13 Aug 18 Account Transfer 52046101 13 Aug 18 46,385.00 138,850,742.63

15 Aug 18 Clearing 52046106 15 Aug 18 9,000,000.00 129,850,742.63

15 Aug 18 Clearing 52046102 15 Aug 18 35,000,000.00 94,850,742.63

15 Aug 18 Clearing 52046103 15 Aug 18 25,000,000.00 69,850,742.63

15 Aug 18 Clearing 52046104 15 Aug 18 10,000,000.00 59,850,742.63

15 Aug 18 Clearing 52046105 15 Aug 18 15,000,000.00 44,850,742.63

15 Aug 18 Online Transfer 15 Aug 18 165,108.00 44,685,634.63

16 Aug 18 Online Transfer 16 Aug 18 21,363,169.00 23,322,465.63

16 Aug 18 Account Transfer 52046110 16 Aug 18 39,300.00 23,283,165.63

16 Aug 18 Account Transfer 52046415 16 Aug 18 61,808.00 23,221,357.63

17 Aug 18 Account Transfer 17 Aug 18 26,728.00 23,194,629.63

17 Aug 18 Account Transfer 17 Aug 18 7,000,000.00 16,194,629.63

17 Aug 18 Account Transfer 17 Aug 18 39,305.00 16,155,324.63

17 Aug 18 Outward Cheque Realized 17 Aug 18 800,000.00 16,955,324.63

17 Aug 18 Account Transfer 17 Aug 18 1,730,844.00 15,224,480.63

Page 21 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

17 Aug 18 Account Transfer 52046414 17 Aug 18 15,532.00 15,208,948.63

17 Aug 18 Account Transfer 52046108 17 Aug 18 14,727.00 15,194,221.63

20 Aug 18 Online Transfer 20 Aug 18 4,723,309.00 10,470,912.63

20 Aug 18 Account Transfer 20 Aug 18 408,685.00 10,062,227.63

20 Aug 18 Account Transfer 20 Aug 18 681,902.00 9,380,325.63

20 Aug 18 Account Transfer 52046426 20 Aug 18 25,170.00 9,355,155.63

20 Aug 18 Account Transfer 52046429 20 Aug 18 1,410,280.00 7,944,875.63

24 Aug 18 Account Transfer 24 Aug 18 1,500,000.00 6,444,875.63

24 Aug 18 Account Transfer 24 Aug 18 65,340.00 6,379,535.63

24 Aug 18 Account Transfer 24 Aug 18 90,940.00 6,288,595.63

24 Aug 18 Account Transfer 24 Aug 18 16,000.00 6,272,595.63

27 Aug 18 Account Transfer 27 Aug 18 30,151.00 6,242,444.63

27 Aug 18 Online Charges AC-0010033724090010 27 Aug 18 290.00 6,242,154.63

27 Aug 18 Online Transfer 52046096 27 Aug 18 135,675.00 6,106,479.63

27 Aug 18 Online Charges AC-0010023931190012 27 Aug 18 290.00 6,106,189.63

27 Aug 18 Online Transfer 52046422 27 Aug 18 23,435.00 6,082,754.63

28 Aug 18 Account Transfer 52046094 28 Aug 18 6,168.00 6,076,586.63

28 Aug 18 Online Transfer 52046436 28 Aug 18 10,778.00 6,065,808.63

29 Aug 18 Account Transfer 52046437 29 Aug 18 954,032.00 5,111,776.63

29 Aug 18 Online Transfer 52046425 28 Aug 18 12,695.00 5,099,081.63

30 Aug 18 Account Transfer 52046435 30 Aug 18 47,215.00 5,051,866.63

30 Aug 18 Account Transfer 30 Aug 18 250,000.00 4,801,866.63

30 Aug 18 Account Transfer 52046434 30 Aug 18 10,741.00 4,791,125.63

31 Aug 18 Account Transfer 52046441 31 Aug 18 12,750.00 4,778,375.63

31 Aug 18 Outward Cheque Realized 31 Aug 18 6,482,175.00 11,260,550.63

31 Aug 18 Account Transfer 31 Aug 18 38,040.00 11,222,510.63

Page 22 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

31 Aug 18 Profit 01 Sep 18 192,760.44 11,415,271.07

31 Aug 18 WHT Deduction 01 Sep 18 19,276.00 11,395,995.07

03 Sep 18 Account Transfer 52046439 03 Sep 18 66,040.00 11,329,955.07

03 Sep 18 Account Transfer 52046443 03 Sep 18 32,916.00 11,297,039.07

03 Sep 18 Account Transfer 52046442 03 Sep 18 14,245.00 11,282,794.07

04 Sep 18 Account Transfer 04 Sep 18 8,000.00 11,274,794.07

04 Sep 18 Account Transfer 04 Sep 18 23,290.00 11,251,504.07

05 Sep 18 Account Transfer 52046438 05 Sep 18 30,184.00 11,221,320.07

05 Sep 18 Outward Cheque Realized 05 Sep 18 800,000.00 12,021,320.07

06 Sep 18 Online Transfer 06 Sep 18 2,497,291.00 9,524,029.07

06 Sep 18 Online Transfer 06 Sep 18 165,663.00 9,358,366.07

06 Sep 18 Account Transfer 52046454 06 Sep 18 70,380.00 9,287,986.07

06 Sep 18 Account Transfer 52046448 06 Sep 18 46,076.00 9,241,910.07

06 Sep 18 Account Transfer 06 Sep 18 4,648.00 9,237,262.07

06 Sep 18 Account Transfer 06 Sep 18 5,254.00 9,232,008.07

06 Sep 18 Account Transfer 06 Sep 18 21,667.00 9,210,341.07

06 Sep 18 Account Transfer 06 Sep 18 7,939.00 9,202,402.07

07 Sep 18 Account Transfer 07 Sep 18 13,187.00 9,189,215.07

07 Sep 18 Account Transfer 07 Sep 18 8,855.00 9,180,360.07

07 Sep 18 Account Transfer 07 Sep 18 14,000.00 9,166,360.07

07 Sep 18 Account Transfer 52046458 07 Sep 18 480,624.00 8,685,736.07

07 Sep 18 Online Transfer 07 Sep 18 59,100.00 8,626,636.07

07 Sep 18 Account Transfer 07 Sep 18 26,320.00 8,600,316.07

07 Sep 18 Account Transfer 07 Sep 18 4,900.00 8,595,416.07

10 Sep 18 Account Transfer 10 Sep 18 6,000.00 8,589,416.07

11 Sep 18 Account Transfer 11 Sep 18 9,000.00 8,580,416.07

Page 23 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

11 Sep 18 Account Transfer 11 Sep 18 4,463.00 8,575,953.07

11 Sep 18 Account Transfer 11 Sep 18 6,260.00 8,569,693.07

12 Sep 18 Outward Cheque Realized 12 Sep 18 5,522,300.00 14,091,993.07

13 Sep 18 Account Transfer 52046470 13 Sep 18 33,770.00 14,058,223.07

13 Sep 18 Account Transfer 13 Sep 18 206,820.00 13,851,403.07

13 Sep 18 Account Transfer 13 Sep 18 19,156.00 13,832,247.07

13 Sep 18 Cash Withdrawal 52046474 13 Sep 18 6,209.00 13,826,038.07

13 Sep 18 Account Transfer 13 Sep 18 341,305.00 13,484,733.07

13 Sep 18 Account Transfer 52046449 13 Sep 18 11,166.00 13,473,567.07

13 Sep 18 Account Transfer 13 Sep 18 5,165.00 13,468,402.07

17 Sep 18 Account Transfer 17 Sep 18 66,600.00 13,401,802.07

17 Sep 18 Account Transfer 52046271 17 Sep 18 98,871.00 13,302,931.07

18 Sep 18 Online Charges AC-0010021898270010 18 Sep 18 290.00 13,302,641.07

18 Sep 18 Online Transfer 52046475 18 Sep 18 93,127.00 13,209,514.07

18 Sep 18 Account Transfer 18 Sep 18 43,294.00 13,166,220.07

19 Sep 18 Account Transfer 19 Sep 18 4,900.00 13,161,320.07

19 Sep 18 Account Transfer 52046479 19 Sep 18 58,815.00 13,102,505.07

24 Sep 18 Outward Cheque Realized 24 Sep 18 15,110,332.00 28,212,837.07

24 Sep 18 Outward Cheque Realized 24 Sep 18 15,110,332.00 43,323,169.07

25 Sep 18 Clearing 52046482 25 Sep 18 5,000,000.00 38,323,169.07

25 Sep 18 Clearing 52046481 25 Sep 18 5,000,000.00 33,323,169.07

26 Sep 18 Clearing 52046484 26 Sep 18 78,368.00 33,244,801.07

26 Sep 18 Online Transfer 52046483 BR0477 26 Sep 18 119,908.00 33,124,893.07

26 Sep 18 Online Transfer 26 Sep 18 8,121,899.00 41,246,792.07

26 Sep 18 Online Charges AC-0010001924780046 26 Sep 18 2,320.00 41,244,472.07

27 Sep 18 Account Transfer 52046495 27 Sep 18 750,344.00 40,494,128.07

Page 24 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

27 Sep 18 Account Transfer 52046489 27 Sep 18 24,403.00 40,469,725.07

27 Sep 18 Account Transfer 52046494 27 Sep 18 8,000,000.00 32,469,725.07

27 Sep 18 Account Transfer 52046480 27 Sep 18 27,180.00 32,442,545.07

27 Sep 18 Online Transfer 27 Sep 18 20,442,272.00 12,000,273.07

27 Sep 18 Online Transfer 27 Sep 18 1,801,341.00 10,198,932.07

27 Sep 18 Account Transfer 52046485 27 Sep 18 31,893.00 10,167,039.07

27 Sep 18 Account Transfer 52046488 27 Sep 18 34,422.00 10,132,617.07

27 Sep 18 Online Transfer 27 Sep 18 1,801,341.00 11,933,958.07

27 Sep 18 Account Transfer 52046492 27 Sep 18 30,805.00 11,903,153.07

27 Sep 18 Online Transfer 27 Sep 18 1,801,341.00 10,101,812.07

27 Sep 18 Online Transfer 52046493 27 Sep 18 12,596.00 10,089,216.07

28 Sep 18 Account Transfer 52046490 28 Sep 18 12,518.00 10,076,698.07

28 Sep 18 Account Transfer 28 Sep 18 29,718.00 10,046,980.07

28 Sep 18 Account Transfer 52046502 28 Sep 18 20,050.00 10,026,930.07

29 Sep 18 Profit 01 Oct 18 79,058.85 10,105,988.92

29 Sep 18 WHT Deduction 01 Oct 18 7,906.00 10,098,082.92

01 Oct 18 Online Charges AC-0010030031270011 01 Oct 18 290.00 10,097,792.92

01 Oct 18 Online Transfer 52046497 01 Oct 18 11,865.00 10,085,927.92

01 Oct 18 Account Transfer 52046496 01 Oct 18 315,676.00 9,770,251.92

01 Oct 18 Account Transfer 52046500 01 Oct 18 61,200.00 9,709,051.92

01 Oct 18 Account Transfer 01 Oct 18 4,000,000.00 5,709,051.92

01 Oct 18 Account Transfer 52046498 01 Oct 18 58,100.00 5,650,951.92

03 Oct 18 Account Transfer 52046499 03 Oct 18 11,968.00 5,638,983.92

03 Oct 18 Account Transfer 52046507 03 Oct 18 82,671.00 5,556,312.92

05 Oct 18 Account Transfer 52046510 05 Oct 18 341,275.00 5,215,037.92

05 Oct 18 Account Transfer 52046503 05 Oct 18 6,260.00 5,208,777.92

Page 25 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

05 Oct 18 Account Transfer 52046501 05 Oct 18 19,559.00 5,189,218.92

06 Oct 18 Account Transfer 52046509 06 Oct 18 13,662.00 5,175,556.92

08 Oct 18 Outward Cheque Realized 08 Oct 18 7,000,000.00 12,175,556.92

08 Oct 18 Outward Cheque Realized 08 Oct 18 9,445,250.00 21,620,806.92

08 Oct 18 Account Transfer 52046111 08 Oct 18 6,050.00 21,614,756.92

08 Oct 18 Account Transfer 52046508 08 Oct 18 49,385.00 21,565,371.92

08 Oct 18 Online Transfer 08 Oct 18 2,437,927.00 19,127,444.92

09 Oct 18 Account Transfer 52046116 09 Oct 18 5,000,000.00 14,127,444.92

09 Oct 18 Online Charges AC-0010021695590013 09 Oct 18 290.00 14,127,154.92

09 Oct 18 Online Transfer 52046504 09 Oct 18 72,931.00 14,054,223.92

10 Oct 18 Account Transfer 10 Oct 18 162,326.00 13,891,897.92

11 Oct 18 Clearing 52046115 11 Oct 18 81,329.00 13,810,568.92

11 Oct 18 Account Transfer 52046122 11 Oct 18 19,812.00 13,790,756.92

11 Oct 18 Account Transfer 52046120 11 Oct 18 29,888.00 13,760,868.92

11 Oct 18 Account Transfer 52046118 11 Oct 18 28,830.00 13,732,038.92

11 Oct 18 Account Transfer 52046114 11 Oct 18 1,495.00 13,730,543.92

11 Oct 18 Account Transfer 52046121 11 Oct 18 19,265.00 13,711,278.92

12 Oct 18 Account Transfer 52046125 12 Oct 18 21,455.00 13,689,823.92

12 Oct 18 Clearing 52046126 12 Oct 18 6,000,000.00 7,689,823.92

12 Oct 18 Account Transfer 52046124 12 Oct 18 67,860.00 7,621,963.92

12 Oct 18 Account Transfer 12 Oct 18 5,035.00 7,616,928.92

15 Oct 18 Account Transfer 52046131 15 Oct 18 6,260.00 7,610,668.92

15 Oct 18 Account Transfer 52046129 15 Oct 18 480,624.00 7,130,044.92

15 Oct 18 Outward Cheque Realized 15 Oct 18 15,500.00 7,145,544.92

15 Oct 18 Account Transfer 15 Oct 18 6,000.00 7,139,544.92

15 Oct 18 Account Transfer 15 Oct 18 50,100.00 7,089,444.92

Page 26 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

15 Oct 18 Account Transfer 52046127 15 Oct 18 67,025.00 7,022,419.92

15 Oct 18 Account Transfer 52046128 15 Oct 18 94,695.00 6,927,724.92

17 Oct 18 Online Transfer 52046130 BR0540 17 Oct 18 53,370.00 6,874,354.92

17 Oct 18 Account Transfer 52046134 17 Oct 18 42,070.00 6,832,284.92

17 Oct 18 Account Transfer 52046133 17 Oct 18 9,345.00 6,822,939.92

17 Oct 18 Account Transfer 17 Oct 18 17,580.00 6,805,359.92

19 Oct 18 Account Transfer 19 Oct 18 45,354.00 6,760,005.92

20 Oct 18 Net Profit aftr WHT 20 Oct 18 13,803.50 6,773,809.42

20 Oct 18 Net Profit aftr WHT 20 Oct 18 109,248.50 6,883,057.92

22 Oct 18 Account Transfer 52046142 22 Oct 18 14,821.00 6,868,236.92

22 Oct 18 Account Transfer 52046141 22 Oct 18 5,263.00 6,862,973.92

22 Oct 18 Account Transfer 52046137 22 Oct 18 3,000.00 6,859,973.92

23 Oct 18 Clearing 52046136 23 Oct 18 95,579.00 6,764,394.92

23 Oct 18 Online Transfer 23 Oct 18 16,089.00 6,748,305.92

23 Oct 18 Account Transfer 52046506 23 Oct 18 43,096.00 6,705,209.92

24 Oct 18 Account Transfer 52046143 24 Oct 18 67,860.00 6,637,349.92

24 Oct 18 Outward Cheque Realized 24 Oct 18 25,000,000.00 31,637,349.92

25 Oct 18 Clearing 52046140 25 Oct 18 88,385.00 31,548,964.92

25 Oct 18 Account Transfer 52046147 25 Oct 18 100,000.00 31,448,964.92

25 Oct 18 Account Transfer 52046139 25 Oct 18 78,368.00 31,370,596.92

26 Oct 18 Account Transfer 52046152 26 Oct 18 30,000.00 31,340,596.92

26 Oct 18 Online Charges AC-0010021898270010 26 Oct 18 290.00 31,340,306.92

26 Oct 18 Online Transfer 52046153 26 Oct 18 100,849.00 31,239,457.92

26 Oct 18 Account Transfer 52046145 26 Oct 18 4,900.00 31,234,557.92

26 Oct 18 Account Transfer 52046151 26 Oct 18 31,695.00 31,202,862.92

29 Oct 18 Account Transfer 52046149 29 Oct 18 11,854.00 31,191,008.92

Page 27 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

29 Oct 18 Online Transfer 29 Oct 18 16,766,393.00 47,957,401.92

29 Oct 18 Online Charges AC-0010001924780046 29 Oct 18 2,320.00 47,955,081.92

29 Oct 18 Online Transfer 29 Oct 18 21,885,224.00 26,069,857.92

29 Oct 18 Account Transfer 52046154 29 Oct 18 7,500,000.00 18,569,857.92

29 Oct 18 Account Transfer 52046150 29 Oct 18 15,505.00 18,554,352.92

29 Oct 18 Account Transfer 29 Oct 18 2,711,902.00 15,842,450.92

29 Oct 18 Outward Cheque Realized 29 Oct 18 6,733,497.00 22,575,947.92

29 Oct 18 Outward Cheque Realized 29 Oct 18 1,063,275.00 23,639,222.92

30 Oct 18 Online Transfer 30 Oct 18 1,763,928.00 21,875,294.92

31 Oct 18 Profit 01 Nov 18 75,262.54 21,950,557.46

31 Oct 18 WHT Deduction 01 Nov 18 7,526.00 21,943,031.46

31 Oct 18 Account Transfer 52046158 31 Oct 18 66,745.00 21,876,286.46

31 Oct 18 Account Transfer 52046156 31 Oct 18 98,000.00 21,778,286.46

31 Oct 18 Online Transfer 52046159 31 Oct 18 14,414.00 21,763,872.46

01 Nov 18 Clearing 52046160 01 Nov 18 1,922,950.00 19,840,922.46

01 Nov 18 Account Transfer 52046144 01 Nov 18 31,850.00 19,809,072.46

01 Nov 18 Transfer 01 Nov 18 232,000.00 20,041,072.46

05 Nov 18 Account Transfer 52046165 05 Nov 18 36,770.00 20,004,302.46

05 Nov 18 Account Transfer 52046163 05 Nov 18 30,860.00 19,973,442.46

05 Nov 18 Account Transfer 05 Nov 18 123,945.00 19,849,497.46

05 Nov 18 Account Transfer 05 Nov 18 2,883,874.00 16,965,623.46

05 Nov 18 Instr. Issue Commission AC- 05 Nov 18 116.00 16,965,507.46


0010001924780046
05 Nov 18 Instrument Issued 52046168 05 Nov 18 11,450,000.00 5,515,507.46

05 Nov 18 Clearing 52046161 05 Nov 18 1,896,472.00 3,619,035.46

05 Nov 18 Clearing 52046162 05 Nov 18 3,570,756.00 48,279.46

Page 28 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

06 Nov 18 Account Transfer 52046164 06 Nov 18 30,000.00 18,279.46

08 Nov 18 Encashment of Instrument 12112209 08 Nov 18 11,450,000.00 11,468,279.46

08 Nov 18 Account Transfer 08 Nov 18 351,431.00 11,116,848.46

08 Nov 18 Account Transfer 08 Nov 18 185,771.00 10,931,077.46

09 Nov 18 Account Transfer 52046171 09 Nov 18 19,168.00 10,911,909.46

09 Nov 18 Account Transfer 52046174 09 Nov 18 14,717.00 10,897,192.46

09 Nov 18 Account Transfer 52046175 09 Nov 18 2,466,975.00 8,430,217.46

09 Nov 18 Account Transfer 52046155 09 Nov 18 19,993.00 8,410,224.46

09 Nov 18 Account Transfer 52046180 09 Nov 18 18,499.00 8,391,725.46

09 Nov 18 Account Transfer 52046173 09 Nov 18 24,630.00 8,367,095.46

09 Nov 18 Account Transfer 52046177 09 Nov 18 9,851.00 8,357,244.46

12 Nov 18 Account Transfer 52046179 12 Nov 18 55,100.00 8,302,144.46

13 Nov 18 Account Transfer 52046185 13 Nov 18 10,000.00 8,292,144.46

14 Nov 18 Account Transfer 52046186 14 Nov 18 41,300.00 8,250,844.46

15 Nov 18 Online Transfer 52046181 15 Nov 18 1,760.00 8,249,084.46

15 Nov 18 Account Transfer 52046184 15 Nov 18 6,000.00 8,243,084.46

15 Nov 18 Account Transfer 52046169 15 Nov 18 72,555.00 8,170,529.46

15 Nov 18 Account Transfer 52046188 15 Nov 18 69,120.00 8,101,409.46

15 Nov 18 Account Transfer 52046178 15 Nov 18 48,585.00 8,052,824.46

16 Nov 18 Clearing 52046192 16 Nov 18 180,720.00 7,872,104.46

16 Nov 18 Account Transfer 52046187 16 Nov 18 3,491.00 7,868,613.46

16 Nov 18 Account Transfer 52046190 16 Nov 18 58,150.00 7,810,463.46

16 Nov 18 Online Charges AC-0010021898270010 16 Nov 18 290.00 7,810,173.46

16 Nov 18 Online Transfer 52046189 16 Nov 18 63,889.00 7,746,284.46

16 Nov 18 Account Transfer 52046183 16 Nov 18 28,830.00 7,717,454.46

19 Nov 18 Online Transfer 52046170 BR0195 19 Nov 18 213,516.00 7,503,938.46

Page 29 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

19 Nov 18 Account Transfer 52046193 19 Nov 18 3,635.00 7,500,303.46

19 Nov 18 Outward Cheque Realized 19 Nov 18 2,070,000.00 9,570,303.46

20 Nov 18 Account Transfer 20 Nov 18 13,475.00 9,556,828.46

20 Nov 18 Account Transfer 52046198 20 Nov 18 12,992.00 9,543,836.46

22 Nov 18 Account Transfer 52046196 22 Nov 18 32,140.00 9,511,696.46

22 Nov 18 Account Transfer 52046202 22 Nov 18 195,118.00 9,316,578.46

23 Nov 18 Clearing 52046200 23 Nov 18 3,000,000.00 6,316,578.46

23 Nov 18 Clearing 52046195 23 Nov 18 50,890.00 6,265,688.46

23 Nov 18 Account Transfer 52046201 23 Nov 18 16,026.00 6,249,662.46

26 Nov 18 Account Transfer 52046194 26 Nov 18 13,273.00 6,236,389.46

27 Nov 18 Account Transfer 52046203 27 Nov 18 12,029.00 6,224,360.46

27 Nov 18 Account Transfer 52046207 27 Nov 18 69,840.00 6,154,520.46

27 Nov 18 Account Transfer 52046204 27 Nov 18 32,916.00 6,121,604.46

27 Nov 18 Account Transfer 52046205 27 Nov 18 26,959.00 6,094,645.46

27 Nov 18 Outward Cheque Realized 27 Nov 18 12,000,000.00 18,094,645.46

28 Nov 18 Account Transfer 52046191 28 Nov 18 48,975.00 18,045,670.46

28 Nov 18 Transfer 28 Nov 18 10,944,000.00 28,989,670.46

29 Nov 18 Clearing 52046197 29 Nov 18 377,640.00 28,612,030.46

29 Nov 18 Account Transfer 29 Nov 18 31,720.00 28,580,310.46

29 Nov 18 Account Transfer 52046314 29 Nov 18 30,860.00 28,549,450.46

30 Nov 18 Online Transfer 30 Nov 18 3,606,954.00 24,942,496.46

30 Nov 18 Account Transfer 52046317 30 Nov 18 1,000,000.00 23,942,496.46

30 Nov 18 Account Transfer 52046318 30 Nov 18 1,500,000.00 22,442,496.46

30 Nov 18 Online Transfer 30 Nov 18 592,161.00 21,850,335.46

30 Nov 18 Online Transfer 30 Nov 18 205,289.00 21,645,046.46

30 Nov 18 Profit 01 Dec 18 61,497.29 21,706,543.75

Page 30 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

30 Nov 18 WHT Deduction 01 Dec 18 6,150.00 21,700,393.75

03 Dec 18 Account Transfer 52046321 03 Dec 18 4,000,000.00 17,700,393.75

03 Dec 18 Account Transfer 52046313 03 Dec 18 12,954.00 17,687,439.75

03 Dec 18 Transfer 03 Dec 18 213,133.00 17,900,572.75

04 Dec 18 Account Transfer 52046311 04 Dec 18 43,975.00 17,856,597.75

04 Dec 18 Transfer 04 Dec 18 41,175,000.00 59,031,597.75

04 Dec 18 Account Transfer 52046315 04 Dec 18 86,974.00 58,944,623.75

04 Dec 18 Account Transfer 52046312 04 Dec 18 78,368.00 58,866,255.75

04 Dec 18 Account Transfer 52046323 04 Dec 18 19,334.00 58,846,921.75

04 Dec 18 Outward Cheque Realized 04 Dec 18 20,000,000.00 78,846,921.75

04 Dec 18 Account Transfer 52046329 04 Dec 18 6,500,000.00 72,346,921.75

04 Dec 18 Account Transfer 52046328 04 Dec 18 15,000,000.00 57,346,921.75

05 Dec 18 Account Transfer 52046335 05 Dec 18 98,774.00 57,248,147.75

05 Dec 18 Online Transfer 05 Dec 18 17,780,153.00 39,467,994.75

05 Dec 18 Account Transfer 52046333 05 Dec 18 12,917,042.00 26,550,952.75

05 Dec 18 Online Transfer 05 Dec 18 2,266,507.00 24,284,445.75

05 Dec 18 Account Transfer 52046325 05 Dec 18 30,485.00 24,253,960.75

05 Dec 18 Online Transfer 05 Dec 18 1,478,544.00 22,775,416.75

06 Dec 18 Clearing 52046332 06 Dec 18 13,581,609.00 9,193,807.75

06 Dec 18 Account Transfer 52046322 06 Dec 18 125,280.00 9,068,527.75

06 Dec 18 Account Transfer 52046338 06 Dec 18 91,276.00 8,977,251.75

06 Dec 18 Account Transfer 52046324 06 Dec 18 169,645.00 8,807,606.75

06 Dec 18 Cash Withdrawal 52046334 06 Dec 18 10,260.00 8,797,346.75

07 Dec 18 Account Transfer 52046336 07 Dec 18 23,540.00 8,773,806.75

07 Dec 18 Account Transfer 52046339 07 Dec 18 7,800.00 8,766,006.75

10 Dec 18 FED Deduction 10 Dec 18 4.83 8,766,001.92

Page 31 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

10 Dec 18 Account Statement Charges 10 Dec 18 30.17 8,765,971.75

10 Dec 18 Outward Cheque Realized 10 Dec 18 3,144,000.00 11,909,971.75

11 Dec 18 Clearing 52046342 11 Dec 18 13,045.00 11,896,926.75

11 Dec 18 Online Transfer 11 Dec 18 2,601,441.00 9,295,485.75

11 Dec 18 Online Transfer 11 Dec 18 193,971.00 9,101,514.75

11 Dec 18 Account Transfer 52046348 11 Dec 18 38,232.00 9,063,282.75

11 Dec 18 Account Transfer 52046345 11 Dec 18 20,000.00 9,043,282.75

11 Dec 18 Account Transfer 52046349 11 Dec 18 99,584.00 8,943,698.75

12 Dec 18 Account Transfer 12 Dec 18 11,335.00 8,932,363.75

12 Dec 18 Account Transfer 52046340 12 Dec 18 20,595.00 8,911,768.75

12 Dec 18 Account Transfer 52046352 12 Dec 18 1,200,000.00 7,711,768.75

12 Dec 18 Account Transfer 12 Dec 18 367,675.00 7,344,093.75

13 Dec 18 Online Transfer 13 Dec 18 9,132,428.00 16,476,521.75

13 Dec 18 Online Charges AC-0010001924780046 13 Dec 18 2,320.00 16,474,201.75

13 Dec 18 Account Transfer 13 Dec 18 29,530.00 16,444,671.75

13 Dec 18 Account Transfer 52046351 13 Dec 18 1,027,878.00 15,416,793.75

13 Dec 18 Online Transfer 13 Dec 18 53,100.00 15,363,693.75

13 Dec 18 Account Transfer 13 Dec 18 12,277.00 15,351,416.75

14 Dec 18 Clearing 52046346 14 Dec 18 24,050.00 15,327,366.75

14 Dec 18 Clearing 52046341 14 Dec 18 25,975.00 15,301,391.75

14 Dec 18 Account Transfer 52046362 14 Dec 18 8,000,000.00 7,301,391.75

14 Dec 18 Account Transfer 52046361 14 Dec 18 12,814.00 7,288,577.75

14 Dec 18 Account Transfer 14 Dec 18 6,000.00 7,282,577.75

17 Dec 18 Account Transfer 52046358 17 Dec 18 24,720.00 7,257,857.75

17 Dec 18 Account Transfer 52046357 17 Dec 18 24,285.00 7,233,572.75

17 Dec 18 Account Transfer 52046359 17 Dec 18 24,630.00 7,208,942.75

Page 32 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

18 Dec 18 Account Transfer 52046350 18 Dec 18 41,317.00 7,167,625.75

18 Dec 18 Account Transfer 52046365 18 Dec 18 4,139,132.00 3,028,493.75

19 Dec 18 Account Transfer 52046364 19 Dec 18 36,120.00 2,992,373.75

19 Dec 18 Clearing 52046363 19 Dec 18 15,239.00 2,977,134.75

20 Dec 18 Account Transfer 20 Dec 18 46,000.00 2,931,134.75

20 Dec 18 Account Transfer 20 Dec 18 71,000.00 2,860,134.75

21 Dec 18 Account Transfer 52046368 21 Dec 18 144,000.00 2,716,134.75

21 Dec 18 Outward Cheque Realized 21 Dec 18 6,697,578.00 9,413,712.75

22 Dec 18 Online Transfer 22 Dec 18 84,475.00 9,329,237.75

26 Dec 18 Clearing 52046371 26 Dec 18 2,000,000.00 7,329,237.75

26 Dec 18 Online Transfer 26 Dec 18 119,902.00 7,209,335.75

27 Dec 18 Account Transfer 52046373 27 Dec 18 12,029.00 7,197,306.75

28 Dec 18 Account Transfer 52046374 28 Dec 18 30,860.00 7,166,446.75

28 Dec 18 Account Transfer 28 Dec 18 31,850.00 7,134,596.75

28 Dec 18 Account Transfer 28 Dec 18 29,840.00 7,104,756.75

31 Dec 18 Clearing 52046377 31 Dec 18 1,000,000.00 6,104,756.75

31 Dec 18 Account Transfer 52046383 31 Dec 18 5,919.00 6,098,837.75

31 Dec 18 Outward Cheque Realized 31 Dec 18 12,000,000.00 18,098,837.75

31 Dec 18 Profit 01 Jan 19 81,040.12 18,179,877.87

31 Dec 18 WHT Deduction 01 Jan 19 8,104.00 18,171,773.87

02 Jan 19 Account Transfer 52046386 02 Jan 19 98,774.00 18,072,999.87

02 Jan 19 Account Transfer 52046385 02 Jan 19 28,678.00 18,044,321.87

02 Jan 19 Online Transfer 02 Jan 19 1,776,460.00 16,267,861.87

02 Jan 19 Account Transfer 52046387 02 Jan 19 45,290.00 16,222,571.87

02 Jan 19 Account Transfer 52046384 02 Jan 19 129,600.00 16,092,971.87

02 Jan 19 RTGS Payment Credit 02 Jan 19 6,000,000.00 22,092,971.87

Page 33 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

02 Jan 19 Online Transfer 02 Jan 19 21,311,812.00 781,159.87

03 Jan 19 Account Transfer 03 Jan 19 45,954.00 735,205.87

03 Jan 19 Account Transfer 03 Jan 19 7,800.00 727,405.87

04 Jan 19 Outward Cheque Realized 04 Jan 19 2,046,000.00 2,773,405.87

04 Jan 19 Clearing Charges AC- 04 Jan 19 464.00 2,772,941.87


0010001924780046
07 Jan 19 Account Transfer 52046393 07 Jan 19 16,667.00 2,756,274.87

08 Jan 19 Account Transfer 52046389 08 Jan 19 49,737.00 2,706,537.87

08 Jan 19 Outward Cheque Realized 08 Jan 19 2,474,312.00 5,180,849.87

09 Jan 19 Account Transfer 52046388 09 Jan 19 25,000.00 5,155,849.87

09 Jan 19 Account Transfer 09 Jan 19 381,150.00 4,774,699.87

09 Jan 19 Online Transfer 09 Jan 19 3,005,899.00 1,768,800.87

09 Jan 19 Account Transfer 09 Jan 19 166,481.00 1,602,319.87

09 Jan 19 Account Transfer 52046391 09 Jan 19 55,825.00 1,546,494.87

10 Jan 19 Account Transfer 10 Jan 19 29,988.00 1,516,506.87

10 Jan 19 Account Transfer 10 Jan 19 134,164.00 1,382,342.87

10 Jan 19 Clearing 52046390 10 Jan 19 28,830.00 1,353,512.87

10 Jan 19 Outward Cheque Realized 10 Jan 19 2,000,000.00 3,353,512.87

11 Jan 19 Online Transfer 11 Jan 19 100,000.00 3,453,512.87

11 Jan 19 Online Transfer 11 Jan 19 89,100.00 3,364,412.87

14 Jan 19 Account Transfer 52046405 14 Jan 19 25,260.00 3,339,152.87

14 Jan 19 Account Transfer 14 Jan 19 43,096.00 3,296,056.87

14 Jan 19 Account Transfer 14 Jan 19 73,765.00 3,222,291.87

14 Jan 19 Account Transfer 52046403 14 Jan 19 25,600.00 3,196,691.87

14 Jan 19 Account Transfer 14 Jan 19 41,576.00 3,155,115.87

14 Jan 19 Account Transfer 52046397 14 Jan 19 76,245.00 3,078,870.87

Page 34 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

15 Jan 19 Clearing 52046404 15 Jan 19 73,765.00 3,005,105.87

15 Jan 19 Account Transfer 52046409 15 Jan 19 20,000.00 2,985,105.87

15 Jan 19 Account Transfer 52046407 15 Jan 19 6,000.00 2,979,105.87

16 Jan 19 Outward Cheque Realized 16 Jan 19 8,701,559.00 11,680,664.87

16 Jan 19 Transfer 16 Jan 19 232,000.00 11,912,664.87

18 Jan 19 Account Transfer 56031072 18 Jan 19 37,350.00 11,875,314.87

18 Jan 19 Account Transfer 56031092 18 Jan 19 4,141.00 11,871,173.87

18 Jan 19 Account Transfer 56131096 18 Jan 19 76,140.00 11,795,033.87

18 Jan 19 Online Charges AC-0010001893210029 18 Jan 19 624.97 11,794,408.90

18 Jan 19 Online Transfer 56031073 18 Jan 19 538,972.00 11,255,436.90

21 Jan 19 Clearing 56031085 21 Jan 19 9,060.00 11,246,376.90

21 Jan 19 Online Transfer 56031090 BR0117 21 Jan 19 7,880.00 11,238,496.90

21 Jan 19 Clearing 56031078 21 Jan 19 18,900.00 11,219,596.90

21 Jan 19 Account Transfer 56031094 21 Jan 19 27,567.00 11,192,029.90

23 Jan 19 Clearing 56031091 23 Jan 19 8,500.00 11,183,529.90

23 Jan 19 Clearing 56031088 23 Jan 19 5,220.00 11,178,309.90

23 Jan 19 Clearing 56031077 23 Jan 19 39,310.00 11,138,999.90

24 Jan 19 Account Transfer 56031102 24 Jan 19 86,904.00 11,052,095.90

24 Jan 19 Cash Withdrawal 56031101 24 Jan 19 8,000.00 11,044,095.90

24 Jan 19 Clearing 56031083 24 Jan 19 9,560.00 11,034,535.90

24 Jan 19 Clearing 56031082 24 Jan 19 9,460.00 11,025,075.90

24 Jan 19 Account Transfer 56031099 24 Jan 19 32,240.00 10,992,835.90

25 Jan 19 Account Transfer 56031097 25 Jan 19 11,190.00 10,981,645.90

28 Jan 19 Clearing 56031093 28 Jan 19 206,820.00 10,774,825.90

28 Jan 19 Account Transfer 56031098 28 Jan 19 143,288.00 10,631,537.90

28 Jan 19 Outward Cheque Realized 28 Jan 19 10,245,384.00 20,876,921.90

Page 35 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

28 Jan 19 Outward Cheque Realized 28 Jan 19 5,830,369.00 26,707,290.90

29 Jan 19 Transfer 29 Jan 19 22,151,592.00 48,858,882.90

29 Jan 19 Clearing 56031080 29 Jan 19 14,700.00 48,844,182.90

29 Jan 19 Account Transfer 29 Jan 19 27,098.00 48,817,084.90

30 Jan 19 Account Transfer 56031104 30 Jan 19 18,000,000.00 30,817,084.90

30 Jan 19 Account Transfer 56031105 30 Jan 19 3,000,000.00 27,817,084.90

31 Jan 19 Online Transfer 31 Jan 19 22,053,518.00 5,763,566.90

31 Jan 19 Online Transfer 31 Jan 19 1,757,073.00 4,006,493.90

31 Jan 19 Service Charges IWCLGRTLCY 31 Jan 19 450.00 4,006,043.90

31 Jan 19 Profit 01 Feb 19 67,669.77 4,073,713.67

31 Jan 19 WHT Deduction 01 Feb 19 6,767.00 4,066,946.67

01 Feb 19 Clearing 56031084 01 Feb 19 8,000.00 4,058,946.67

01 Feb 19 Clearing 56031079 01 Feb 19 12,700.00 4,046,246.67

01 Feb 19 Account Transfer 56031095 01 Feb 19 78,368.00 3,967,878.67

04 Feb 19 Clearing 56031110 04 Feb 19 30,000.00 3,937,878.67

04 Feb 19 Account Transfer 56031112 04 Feb 19 96,805.00 3,841,073.67

04 Feb 19 Account Transfer 56031111 04 Feb 19 68,220.00 3,772,853.67

06 Feb 19 Account Transfer 56031114 06 Feb 19 4,037.00 3,768,816.67

07 Feb 19 Account Transfer 56031113 07 Feb 19 12,455.00 3,756,361.67

07 Feb 19 Account Transfer 56031108 07 Feb 19 23,300.00 3,733,061.67

08 Feb 19 Clearing 56031115 08 Feb 19 67,535.00 3,665,526.67

08 Feb 19 Online Transfer 56031089 BR0872 08 Feb 19 5,192.00 3,660,334.67

08 Feb 19 Account Transfer 56031118 08 Feb 19 43,256.00 3,617,078.67

08 Feb 19 Account Transfer 08 Feb 19 12,650.00 3,604,428.67

08 Feb 19 Account Transfer 56031116 08 Feb 19 6,999.00 3,597,429.67

08 Feb 19 Account Transfer 56031125 08 Feb 19 43,900.00 3,553,529.67

Page 36 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

09 Feb 19 Account Transfer 56031109 09 Feb 19 39,500.00 3,514,029.67

11 Feb 19 FED Deduction 11 Feb 19 4.83 3,514,024.84

11 Feb 19 Account Statement Charges 11 Feb 19 30.17 3,513,994.67

11 Feb 19 Account Transfer 56031130 11 Feb 19 36,602.00 3,477,392.67

11 Feb 19 Account Transfer 56031127 11 Feb 19 2,909.00 3,474,483.67

11 Feb 19 Account Transfer 56031126 11 Feb 19 19,940.00 3,454,543.67

11 Feb 19 Account Transfer 56031119 11 Feb 19 44,642.00 3,409,901.67

11 Feb 19 Account Transfer 56031129 11 Feb 19 20,787.00 3,389,114.67

11 Feb 19 Account Transfer 56031133 11 Feb 19 35,211.00 3,353,903.67

11 Feb 19 Online Charges AC-0010009174340010 11 Feb 19 406.00 3,353,497.67

11 Feb 19 Online Transfer 56031131 11 Feb 19 37,911.00 3,315,586.67

12 Feb 19 Clearing 56031123 12 Feb 19 11,300.00 3,304,286.67

12 Feb 19 Account Transfer 56031124 12 Feb 19 18,460.00 3,285,826.67

12 Feb 19 Account Transfer 56031134 12 Feb 19 27,300.00 3,258,526.67

12 Feb 19 Online Transfer 12 Feb 19 2,371,080.00 887,446.67

12 Feb 19 Account Transfer 56031135 12 Feb 19 6,260.00 881,186.67

12 Feb 19 Account Transfer 12 Feb 19 182,720.00 698,466.67

12 Feb 19 Account Transfer 12 Feb 19 380,875.00 317,591.67

12 Feb 19 Outward Cheque Realized 12 Feb 19 2,000,000.00 2,317,591.67

13 Feb 19 Online Transfer 13 Feb 19 19,500.00 2,298,091.67

13 Feb 19 Outward Cheque Realized 13 Feb 19 13,513,954.00 15,812,045.67

14 Feb 19 Account Transfer 56031146 14 Feb 19 4,456,782.00 11,355,263.67

14 Feb 19 Clearing 56031144 14 Feb 19 9,000,000.00 2,355,263.67

14 Feb 19 Account Transfer 56031138 14 Feb 19 18,760.00 2,336,503.67

15 Feb 19 Account Transfer 56031149 15 Feb 19 18,000.00 2,318,503.67

15 Feb 19 Online Charges AC-0010001893210029 15 Feb 19 624.57 2,317,879.10

Page 37 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

15 Feb 19 Online Transfer 56031140 15 Feb 19 538,570.00 1,779,309.10

15 Feb 19 Encashment of Instrument BBB13311378 15 Feb 19 3,234,521.00 5,013,830.10

15 Feb 19 Online Transfer 15 Feb 19 56,900.00 4,956,930.10

16 Feb 19 Account Transfer 16 Feb 19 37,974.00 4,918,956.10

18 Feb 19 Account Transfer 56031139 18 Feb 19 19,530.00 4,899,426.10

18 Feb 19 Account Transfer 18 Feb 19 6,000.00 4,893,426.10

19 Feb 19 Account Transfer 19 Feb 19 18,077.00 4,875,349.10

19 Feb 19 Account Transfer 56031157 19 Feb 19 48,000.00 4,827,349.10

20 Feb 19 Account Transfer 20 Feb 19 117,693.00 4,709,656.10

20 Feb 19 Account Transfer 56031159 20 Feb 19 21,940.00 4,687,716.10

21 Feb 19 Account Transfer 56031152 21 Feb 19 28,151.00 4,659,565.10

21 Feb 19 Account Transfer 56031158 21 Feb 19 36,512.00 4,623,053.10

21 Feb 19 Account Transfer 56031100 21 Feb 19 90,520.00 4,532,533.10

21 Feb 19 Account Transfer 56031153 21 Feb 19 39,365.00 4,493,168.10

22 Feb 19 Outward Cheque Realized 22 Feb 19 16,330,930.00 20,824,098.10

22 Feb 19 Service Charges IWCLGRTLCY 22 Feb 19 450.00 20,823,648.10

26 Feb 19 Clearing 56031156 26 Feb 19 500,490.00 20,323,158.10

26 Feb 19 Account Transfer 56031164 26 Feb 19 96,115.00 20,227,043.10

26 Feb 19 Online Charges AC-0010021898270010 26 Feb 19 406.00 20,226,637.10

26 Feb 19 Online Transfer 56031165 26 Feb 19 56,567.00 20,170,070.10

28 Feb 19 Clearing 56031154 28 Feb 19 144,275.00 20,025,795.10

28 Feb 19 Clearing 56031163 28 Feb 19 1,897,004.00 18,128,791.10

28 Feb 19 Account Transfer 56031160 28 Feb 19 20,230.00 18,108,561.10

28 Feb 19 Profit 01 Mar 19 53,512.97 18,162,074.07

28 Feb 19 WHT Deduction 01 Mar 19 5,351.00 18,156,723.07

01 Mar 19 Account Transfer 56031162 01 Mar 19 35,981.00 18,120,742.07

Page 38 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

01 Mar 19 Account Transfer 56031166 01 Mar 19 93,600.00 18,027,142.07

01 Mar 19 Account Transfer 56031169 01 Mar 19 96,566.00 17,930,576.07

01 Mar 19 Account Transfer 01 Mar 19 18,540.00 17,912,036.07

04 Mar 19 Outward Cheque Realized 04 Mar 19 10,000,000.00 27,912,036.07

04 Mar 19 Online Transfer 56030873 04 Mar 19 16,838.00 27,895,198.07

05 Mar 19 Account Transfer 56030875 05 Mar 19 31,040.00 27,864,158.07

05 Mar 19 Online Transfer 05 Mar 19 21,269,494.00 6,594,664.07

06 Mar 19 Account Transfer 06 Mar 19 48,000.00 6,546,664.07

06 Mar 19 Cash Withdrawal 56030879 06 Mar 19 8,872.00 6,537,792.07

06 Mar 19 Account Transfer 56030872 06 Mar 19 25,795.00 6,511,997.07

06 Mar 19 Account Transfer 56031168 06 Mar 19 34,159.00 6,477,838.07

06 Mar 19 Account Transfer 56030877 06 Mar 19 14,749.00 6,463,089.07

06 Mar 19 Online Transfer 06 Mar 19 166,456.00 6,296,633.07

06 Mar 19 Online Transfer 06 Mar 19 166,456.00 6,463,089.07

06 Mar 19 Online Transfer 06 Mar 19 1,664,565.00 4,798,524.07

07 Mar 19 Account Transfer 56030871 07 Mar 19 119,902.00 4,678,622.07

07 Mar 19 Account Transfer 56030881 07 Mar 19 29,718.00 4,648,904.07

07 Mar 19 Transfer 07 Mar 19 213,440.00 4,862,344.07

07 Mar 19 Account Transfer 56030882 07 Mar 19 3,323.00 4,859,021.07

07 Mar 19 Online Transfer 56030880 07 Mar 19 21,970.00 4,837,051.07

08 Mar 19 Account Transfer 56030887 08 Mar 19 28,794.00 4,808,257.07

08 Mar 19 Account Transfer 56030889 08 Mar 19 11,250.00 4,797,007.07

11 Mar 19 Account Transfer 56030885 11 Mar 19 118,871.00 4,678,136.07

12 Mar 19 Account Transfer 56030884 12 Mar 19 27,175.00 4,650,961.07

12 Mar 19 Account Transfer 56030886 12 Mar 19 32,029.00 4,618,932.07

12 Mar 19 Account Transfer 56030890 12 Mar 19 381,975.00 4,236,957.07

Page 39 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

12 Mar 19 Encashment of Instrument BBB13311439 12 Mar 19 4,280,682.00 8,517,639.07

13 Mar 19 Clearing 56030895 13 Mar 19 4,000,000.00 4,517,639.07

13 Mar 19 Online Transfer 13 Mar 19 2,590,263.00 1,927,376.07

14 Mar 19 Account Transfer 14 Mar 19 170,643.00 1,756,733.07

14 Mar 19 Online Charges AC-0010009174340010 14 Mar 19 406.00 1,756,327.07

14 Mar 19 Online Transfer 56030888 14 Mar 19 30,485.00 1,725,842.07

15 Mar 19 FED Deduction CCY = PKRýAMOUNT = 15 Mar 19 80.00 1,725,762.07


-80
15 Mar 19 Stop Payment Charges CCY = 15 Mar 19 500.00 1,725,262.07
PKRýAMOUNT = -500
15 Mar 19 Account Transfer 56030883 15 Mar 19 41,260.00 1,684,002.07

15 Mar 19 Account Transfer 15 Mar 19 60,900.00 1,623,102.07

15 Mar 19 Account Transfer 15 Mar 19 6,000.00 1,617,102.07

15 Mar 19 Account Transfer 56030891 15 Mar 19 199,646.00 1,417,456.07

18 Mar 19 Account Transfer 56030901 18 Mar 19 72,000.00 1,345,456.07

18 Mar 19 Account Transfer 56030902 18 Mar 19 139,600.00 1,205,856.07

21 Mar 19 Clearing 56030896 21 Mar 19 85,725.00 1,120,131.07

21 Mar 19 Account Transfer 56030905 21 Mar 19 42,535.00 1,077,596.07

21 Mar 19 Account Transfer 56030904 21 Mar 19 15,632.00 1,061,964.07

21 Mar 19 Account Transfer 56030903 21 Mar 19 26,637.00 1,035,327.07

22 Mar 19 Account Transfer 56030899 22 Mar 19 13,040.00 1,022,287.07

22 Mar 19 Online Charges AC-0010001893210029 22 Mar 19 406.00 1,021,881.07

22 Mar 19 Online Transfer 56030900 22 Mar 19 170,953.00 850,928.07

28 Mar 19 Account Transfer 56030906 28 Mar 19 39,025.00 811,903.07

28 Mar 19 Account Transfer 56030909 28 Mar 19 82,671.00 729,232.07

28 Mar 19 Account Transfer 56030908 28 Mar 19 54,393.00 674,839.07

29 Mar 19 Account Transfer 56030907 29 Mar 19 85,725.00 589,114.07

Page 40 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

29 Mar 19 Outward Cheque Realized 29 Mar 19 995,804.00 1,584,918.07

30 Mar 19 Profit 01 Apr 19 33,574.56 1,618,492.63

30 Mar 19 WHT Deduction 01 Apr 19 3,357.00 1,615,135.63

01 Apr 19 Account Transfer 56030911 01 Apr 19 58,860.00 1,556,275.63

02 Apr 19 Online Transfer 02 Apr 19 3,512,527.00 -1,956,251.37

02 Apr 19 Account Transfer 56030915 02 Apr 19 600,000.00 -2,556,251.37

02 Apr 19 Account Transfer 02 Apr 19 1,500,000.00 -4,056,251.37

02 Apr 19 Account Transfer 02 Apr 19 195,614.00 -4,251,865.37

02 Apr 19 Online Transfer 02 Apr 19 16,232.00 -4,268,097.37

02 Apr 19 Account Transfer 56030912 02 Apr 19 30,594.00 -4,298,691.37

02 Apr 19 Account Transfer 56030910 02 Apr 19 19,505.00 -4,318,196.37

02 Apr 19 Account Transfer 56030913 02 Apr 19 16,990.00 -4,335,186.37

02 Apr 19 RTGS Payment Credit 02 Apr 19 5,000,000.00 664,813.63

03 Apr 19 Account Transfer 56030917 03 Apr 19 21,995.00 642,818.63

04 Apr 19 Account Transfer 56030920 04 Apr 19 9,713.00 633,105.63

04 Apr 19 Account Transfer 04 Apr 19 35,095.00 598,010.63

04 Apr 19 Transfer 04 Apr 19 11,210,272.00 11,808,282.63

05 Apr 19 Online Transfer 56030921 05 Apr 19 16,115.00 11,792,167.63

05 Apr 19 Account Transfer 56030923 05 Apr 19 31,893.00 11,760,274.63

05 Apr 19 Account Transfer 05 Apr 19 4,260.00 11,756,014.63

05 Apr 19 Outward Cheque Realized 05 Apr 19 14,000,000.00 25,756,014.63

08 Apr 19 Account Transfer 56030927 08 Apr 19 5,167.00 25,750,847.63

08 Apr 19 Outward Cheque Realized 08 Apr 19 8,962,239.00 34,713,086.63

09 Apr 19 Online Transfer 09 Apr 19 17,767,788.00 16,945,298.63

09 Apr 19 Account Transfer 56030934 09 Apr 19 9,000,000.00 7,945,298.63

09 Apr 19 Online Charges AC-0010021898270010 09 Apr 19 406.00 7,944,892.63

Page 41 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

09 Apr 19 Online Transfer 56030928 09 Apr 19 39,346.00 7,905,546.63

10 Apr 19 Account Transfer 56030930 10 Apr 19 32,916.00 7,872,630.63

10 Apr 19 Online Transfer 10 Apr 19 1,465,836.00 6,406,794.63

10 Apr 19 Account Transfer 56030933 10 Apr 19 95,000.00 6,311,794.63

12 Apr 19 Account Transfer 56030935 12 Apr 19 65,020.00 6,246,774.63

12 Apr 19 Account Transfer 56030922 12 Apr 19 97,579.00 6,149,195.63

13 Apr 19 Account Transfer 56030937 13 Apr 19 32,134.00 6,117,061.63

14 Apr 19 Clearing 56030926 14 Apr 19 11,700.00 6,105,361.63

14 Apr 19 Account Transfer 56030936 14 Apr 19 350,000.00 5,755,361.63

16 Apr 19 Account Transfer 56030943 16 Apr 19 16,000.00 5,739,361.63

16 Apr 19 Account Transfer 16 Apr 19 385,550.00 5,353,811.63

17 Apr 19 Clearing 56030938 17 Apr 19 486,396.00 4,867,415.63

17 Apr 19 Account Transfer 56030942 17 Apr 19 72,931.00 4,794,484.63

18 Apr 19 Account Transfer 56030939 18 Apr 19 18,078.00 4,776,406.63

18 Apr 19 Account Transfer 56030941 18 Apr 19 139,580.00 4,636,826.63

18 Apr 19 Account Transfer 56030940 18 Apr 19 224,031.00 4,412,795.63

19 Apr 19 Account Transfer 56030944 19 Apr 19 16,800.00 4,395,995.63

19 Apr 19 Online Transfer 19 Apr 19 2,579,640.00 1,816,355.63

19 Apr 19 Account Transfer 19 Apr 19 133,522.00 1,682,833.63

19 Apr 19 Account Transfer 56030946 19 Apr 19 174,430.00 1,508,403.63

22 Apr 19 Online Transfer 22 Apr 19 800,400.00 2,308,803.63

22 Apr 19 Transfer 22 Apr 19 213,440.00 2,522,243.63

22 Apr 19 Online Transfer 22 Apr 19 59,100.00 2,463,143.63

23 Apr 19 Outward Cheque Realized 23 Apr 19 1,762,599.00 4,225,742.63

23 Apr 19 Account Transfer 56030948 23 Apr 19 65,515.00 4,160,227.63

24 Apr 19 Clearing 56030949 24 Apr 19 65,515.00 4,094,712.63

Page 42 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

24 Apr 19 Account Transfer 24 Apr 19 38,795.00 4,055,917.63

25 Apr 19 Account Transfer 56030951 25 Apr 19 6,000.00 4,049,917.63

26 Apr 19 Instr. Issue Commission AC- 26 Apr 19 174.00 4,049,743.63


0010001924780046
26 Apr 19 Instrument Issued 56030954 26 Apr 19 3,800,000.00 249,743.63

26 Apr 19 Transfer 26 Apr 19 249,743.00 0.63

30 Apr 19 Encashment of Instrument 12112280 30 Apr 19 3,800,000.00 3,800,000.63

30 Apr 19 Profit 01 May 19 47,225.41 3,847,226.04

30 Apr 19 WHT Deduction 01 May 19 4,723.00 3,842,503.04

03 May 19 Outward Cheque Realized 03 May 19 50,000,000.00 53,842,503.04

03 May 19 Online Charges AC-0010001893210029 03 May 19 534.33 53,841,968.71

03 May 19 Online Transfer 56030955 03 May 19 460,331.00 53,381,637.71

04 May 19 Account Transfer 56030957 04 May 19 114,644.00 53,266,993.71

06 May 19 Account Transfer 56030958 06 May 19 21,113.00 53,245,880.71

08 May 19 Account Transfer 08 May 19 33,610.00 53,212,270.71

08 May 19 Online Transfer 08 May 19 3,445,662.00 49,766,608.71

08 May 19 Online Transfer 08 May 19 17,913,490.00 31,853,118.71

08 May 19 Online Transfer 08 May 19 197,284.00 31,655,834.71

08 May 19 Account Transfer 56030964 08 May 19 16,800.00 31,639,034.71

08 May 19 Account Transfer 56030966 08 May 19 18,000,000.00 13,639,034.71

08 May 19 Encashment of Instrument BBB13311488 08 May 19 11,365,543.00 25,004,577.71

08 May 19 Account Transfer 56030967 08 May 19 7,000,000.00 18,004,577.71

09 May 19 Account Transfer 56030959 09 May 19 12,413.00 17,992,164.71

09 May 19 Online Transfer 09 May 19 1,469,671.00 16,522,493.71

10 May 19 Account Transfer 56030968 10 May 19 4,717.00 16,517,776.71

13 May 19 FED Deduction 13 May 19 4.83 16,517,771.88

Page 43 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

13 May 19 Account Statement Charges 13 May 19 30.17 16,517,741.71

13 May 19 Account Transfer 56030956 13 May 19 995.00 16,516,746.71

14 May 19 Online Transfer 56030953 BR5158 14 May 19 6,509.00 16,510,237.71

15 May 19 Online Transfer 56030969 BR0528 15 May 19 465,720.00 16,044,517.71

15 May 19 Account Transfer 56030973 15 May 19 15,325.00 16,029,192.71

15 May 19 Clearing 56030970 15 May 19 1,000,000.00 15,029,192.71

16 May 19 Account Transfer 56030972 16 May 19 11,183.00 15,018,009.71

17 May 19 Account Transfer 56030976 17 May 19 29,300.00 14,988,709.71

20 May 19 Clearing 56030975 20 May 19 61,808.00 14,926,901.71

20 May 19 Account Transfer 56030971 20 May 19 100,009.00 14,826,892.71

20 May 19 Account Transfer 56030980 20 May 19 2,200,000.00 12,626,892.71

20 May 19 Account Transfer 56030979 20 May 19 1,000,000.00 11,626,892.71

20 May 19 Online Transfer 20 May 19 2,825,531.00 8,801,361.71

21 May 19 Clearing 56030974 21 May 19 41,497.00 8,759,864.71

21 May 19 Account Transfer 56030978 21 May 19 158,533.00 8,601,331.71

21 May 19 Account Transfer 56030986 21 May 19 19,344.00 8,581,987.71

21 May 19 Account Transfer 56030981 21 May 19 58,800.00 8,523,187.71

21 May 19 Online Transfer 21 May 19 75,100.00 8,448,087.71

22 May 19 Account Transfer 56030983 22 May 19 388,300.00 8,059,787.71

23 May 19 Account Transfer 56030982 23 May 19 156,606.00 7,903,181.71

24 May 19 Account Transfer 56030988 24 May 19 413,640.00 7,489,541.71

27 May 19 Transfer 27 May 19 29,760,000.00 37,249,541.71

28 May 19 Online Transfer 28 May 19 525,084.00 37,774,625.71

28 May 19 Online Charges AC-0010001924780046 28 May 19 609.08 37,774,016.63

28 May 19 Account Transfer 56030987 28 May 19 6,000.00 37,768,016.63

28 May 19 Account Transfer 56030991 28 May 19 5,728.00 37,762,288.63

Page 44 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

28 May 19 Online Charges AC-0010021898270010 28 May 19 406.00 37,761,882.63

28 May 19 Online Transfer 56030990 28 May 19 51,496.00 37,710,386.63

28 May 19 Account Transfer 56030989 28 May 19 12,171.00 37,698,215.63

29 May 19 Account Transfer 56030993 29 May 19 19,720.00 37,678,495.63

29 May 19 Account Transfer 56030994 29 May 19 8,237.00 37,670,258.63

29 May 19 Account Transfer 56030996 29 May 19 7,000,000.00 30,670,258.63

29 May 19 Account Transfer 56030997 29 May 19 18,000,000.00 12,670,258.63

29 May 19 Transfer 29 May 19 29,810,000.00 42,480,258.63

29 May 19 Online Charges AC-0010034006680014 29 May 19 406.00 42,479,852.63

29 May 19 Online Transfer 56031004 29 May 19 42,229.00 42,437,623.63

29 May 19 Online Transfer 29 May 19 21,994,724.00 20,442,899.63

29 May 19 Outward Cheque Realized 29 May 19 3,000,000.00 23,442,899.63

29 May 19 Outward Cheque Realized 29 May 19 15,000,000.00 38,442,899.63

30 May 19 Account Transfer 56030992 30 May 19 413,640.00 38,029,259.63

30 May 19 Account Transfer 56031006 30 May 19 37,350.00 37,991,909.63

30 May 19 Account Transfer 56030995 30 May 19 40,238.00 37,951,671.63

30 May 19 Account Transfer 56031010 30 May 19 34,705.00 37,916,966.63

30 May 19 Online Transfer 30 May 19 2,455,109.00 35,461,857.63

30 May 19 Online Transfer 30 May 19 2,705,200.00 32,756,657.63

30 May 19 Account Transfer 56031002 30 May 19 18,042,391.00 14,714,266.63

30 May 19 Account Transfer 56031003 30 May 19 11,156,417.00 3,557,849.63

30 May 19 Account Transfer 56031007 30 May 19 68,760.00 3,489,089.63

31 May 19 Profit 01 Jun 19 145,136.38 3,634,226.01

31 May 19 WHT Deduction 01 Jun 19 14,514.00 3,619,712.01

31 May 19 Account Transfer 56031008 31 May 19 20,530.00 3,599,182.01

31 May 19 Account Transfer 56031012 31 May 19 8,264.00 3,590,918.01

Page 45 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

31 May 19 Account Transfer 56031001 31 May 19 115,755.00 3,475,163.01

03 Jun 19 Account Transfer 56031009 03 Jun 19 29,718.00 3,445,445.01

03 Jun 19 Account Transfer 56031013 03 Jun 19 12,581.00 3,432,864.01

03 Jun 19 Account Transfer 56031019 03 Jun 19 10,546.00 3,422,318.01

03 Jun 19 Account Transfer 56031016 03 Jun 19 96,649.00 3,325,669.01

03 Jun 19 Account Transfer 56031011 03 Jun 19 21,949.00 3,303,720.01

03 Jun 19 Account Transfer 56031021 03 Jun 19 414,700.00 2,889,020.01

10 Jun 19 Clearing 56031014 10 Jun 19 234,546.00 2,654,474.01

10 Jun 19 Transfer 10 Jun 19 106,720.00 2,761,194.01

10 Jun 19 Account Transfer 56030985 10 Jun 19 51,035.00 2,710,159.01

11 Jun 19 Account Transfer 56031018 11 Jun 19 25,490.00 2,684,669.01

11 Jun 19 Online Charges AC-0010023931190012 11 Jun 19 406.00 2,684,263.01

11 Jun 19 Online Transfer 56031020 11 Jun 19 1,972.00 2,682,291.01

11 Jun 19 Online Transfer 56031022 11 Jun 19 18,220.00 2,664,071.01

12 Jun 19 Clearing 56031000 12 Jun 19 38,760.00 2,625,311.01

12 Jun 19 Online Charges AC-0010033812590017 12 Jun 19 406.00 2,624,905.01

12 Jun 19 Online Transfer 56031015 12 Jun 19 50,890.00 2,574,015.01

12 Jun 19 Outward Cheque Realized 12 Jun 19 4,000,000.00 6,574,015.01

12 Jun 19 Outward Cheque Realized 12 Jun 19 6,462,605.00 13,036,620.01

13 Jun 19 Account Transfer 56031023 13 Jun 19 22,902.00 13,013,718.01

13 Jun 19 Online Transfer 56031027 13 Jun 19 15,020.00 12,998,698.01

13 Jun 19 Online Transfer 13 Jun 19 2,935,321.00 10,063,377.01

13 Jun 19 Account Transfer 56031028 13 Jun 19 103,212.00 9,960,165.01

13 Jun 19 Online Transfer 13 Jun 19 180,205.00 9,779,960.01

14 Jun 19 Clearing 56031026 14 Jun 19 895,646.00 8,884,314.01

17 Jun 19 Online Transfer 17 Jun 19 60,900.00 8,823,414.01

Page 46 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

18 Jun 19 Account Transfer 56031031 18 Jun 19 100,000.00 8,723,414.01

19 Jun 19 Account Transfer 56031035 19 Jun 19 52,505.00 8,670,909.01

19 Jun 19 Account Transfer 56031036 19 Jun 19 77,940.00 8,592,969.01

19 Jun 19 Account Transfer 56031033 19 Jun 19 6,000.00 8,586,969.01

20 Jun 19 Clearing 56031034 20 Jun 19 61,808.00 8,525,161.01

20 Jun 19 Account Transfer 56031025 20 Jun 19 145,575.00 8,379,586.01

21 Jun 19 Account Transfer 56031040 21 Jun 19 60,480.00 8,319,106.01

21 Jun 19 Outward Cheque Realized 21 Jun 19 8,093,141.00 16,412,247.01

21 Jun 19 Clearing 56031037 21 Jun 19 494,724.00 15,917,523.01

24 Jun 19 Clearing 56031038 24 Jun 19 190,620.00 15,726,903.01

24 Jun 19 Account Transfer 56031041 24 Jun 19 2,000,000.00 13,726,903.01

25 Jun 19 Clearing 56031024 25 Jun 19 152,433.00 13,574,470.01

26 Jun 19 Transfer 26 Jun 19 11,357,131.00 24,931,601.01

26 Jun 19 Account Transfer 56031043 26 Jun 19 4,800.00 24,926,801.01

27 Jun 19 Instr. Issue Commission AC- 27 Jun 19 174.00 24,926,627.01


0010001924780046
27 Jun 19 Instrument Issued 56031051 27 Jun 19 24,926,000.00 627.01

28 Jun 19 Transfer 28 Jun 19 213,440.00 214,067.01

28 Jun 19 Transfer 28 Jun 19 18,256.00 232,323.01

28 Jun 19 Encashment of Instrument 12112323 28 Jun 19 24,926,000.00 25,158,323.01

28 Jun 19 Account Transfer 56031053 28 Jun 19 136,980.00 25,021,343.01

28 Jun 19 Account Transfer 56031055 28 Jun 19 332,000.00 24,689,343.01

29 Jun 19 Profit 01 Jul 19 65,679.03 24,755,022.04

29 Jun 19 WHT Deduction 01 Jul 19 6,568.00 24,748,454.04

02 Jul 19 Transfer 02 Jul 19 65,515.00 24,813,969.04

02 Jul 19 Clearing 56031042 02 Jul 19 163,779.00 24,650,190.04

Page 47 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

02 Jul 19 Online Charges AC-0010021898270010 02 Jul 19 406.00 24,649,784.04

02 Jul 19 Online Transfer 56031050 02 Jul 19 32,149.00 24,617,635.04

02 Jul 19 Account Transfer 56031060 02 Jul 19 81,415.00 24,536,220.04

02 Jul 19 Account Transfer 56031047 02 Jul 19 49,745.00 24,486,475.04

02 Jul 19 Outward Cheque Realized 02 Jul 19 8,000,000.00 32,486,475.04

03 Jul 19 Online Transfer 03 Jul 19 21,473,292.00 11,013,183.04

03 Jul 19 Clearing 56031054 03 Jul 19 2,000,000.00 9,013,183.04

03 Jul 19 Account Transfer 56031057 03 Jul 19 1,502,679.00 7,510,504.04

03 Jul 19 Account Transfer 56031059 03 Jul 19 14,790.00 7,495,714.04

03 Jul 19 Account Transfer 56031271 03 Jul 19 61,808.00 7,433,906.04

04 Jul 19 Clearing 56031049 04 Jul 19 199,646.00 7,234,260.04

04 Jul 19 Account Transfer 56031046 04 Jul 19 100,000.00 7,134,260.04

04 Jul 19 Cash Withdrawal 56031044 04 Jul 19 9,000.00 7,125,260.04

04 Jul 19 Account Transfer 56031064 04 Jul 19 58,850.00 7,066,410.04

05 Jul 19 Account Transfer 56031061 05 Jul 19 35,290.00 7,031,120.04

05 Jul 19 Account Transfer 56031274 05 Jul 19 206,820.00 6,824,300.04

08 Jul 19 Online Transfer 08 Jul 19 149,432.00 6,674,868.04

08 Jul 19 Account Transfer 56031065 08 Jul 19 29,827.00 6,645,041.04

09 Jul 19 Clearing 56031276 09 Jul 19 149,432.00 6,495,609.04

09 Jul 19 Account Transfer 56031279 09 Jul 19 22,845.00 6,472,764.04

10 Jul 19 Account Transfer 56031063 10 Jul 19 24,150.00 6,448,614.04

10 Jul 19 Account Transfer 56031283 10 Jul 19 13,390.00 6,435,224.04

10 Jul 19 Outward Cheque Realized 10 Jul 19 3,000,000.00 9,435,224.04

11 Jul 19 Account Transfer 56031068 11 Jul 19 105,598.00 9,329,626.04

11 Jul 19 Account Transfer 56031284 11 Jul 19 1,100,000.00 8,229,626.04

11 Jul 19 Account Transfer 56031275 11 Jul 19 178,250.00 8,051,376.04

Page 48 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

11 Jul 19 Account Transfer 56031280 11 Jul 19 8,917.00 8,042,459.04

11 Jul 19 Account Transfer 56031067 11 Jul 19 50,290.00 7,992,169.04

11 Jul 19 Account Transfer 56031282 11 Jul 19 45,000.00 7,947,169.04

11 Jul 19 Account Transfer 56031278 11 Jul 19 58,100.00 7,889,069.04

11 Jul 19 Online Transfer 11 Jul 19 3,038,450.00 4,850,619.04

11 Jul 19 Account Transfer 56031070 11 Jul 19 219,725.00 4,630,894.04

11 Jul 19 Account Transfer 56031286 11 Jul 19 29,100.00 4,601,794.04

11 Jul 19 Account Transfer 56031285 11 Jul 19 3,300,000.00 1,301,794.04

11 Jul 19 Outward Cheque Realized 11 Jul 19 1,034,914.00 2,336,708.04

12 Jul 19 Clearing 56031281 12 Jul 19 43,215.00 2,293,493.04

12 Jul 19 Account Transfer 56031066 12 Jul 19 47,080.00 2,246,413.04

15 Jul 19 Clearing 56031058 15 Jul 19 40,521.00 2,205,892.04

15 Jul 19 Account Transfer 56031288 15 Jul 19 6,000.00 2,199,892.04

15 Jul 19 Account Transfer 56031287 15 Jul 19 68,900.00 2,130,992.04

15 Jul 19 Account Transfer 56031289 15 Jul 19 91,276.00 2,039,716.04

16 Jul 19 FED Deduction 16 Jul 19 4.83 2,039,711.21

16 Jul 19 Account Statement Charges 16 Jul 19 30.17 2,039,681.04

16 Jul 19 Account Transfer 56031294 16 Jul 19 200,000.00 1,839,681.04

16 Jul 19 Account Transfer 56031290 16 Jul 19 31,485.00 1,808,196.04

17 Jul 19 Account Transfer 56031291 17 Jul 19 125,159.00 1,683,037.04

17 Jul 19 Account Transfer 56031293 17 Jul 19 200,000.00 1,483,037.04

18 Jul 19 Account Transfer 56031295 18 Jul 19 16,950.00 1,466,087.04

18 Jul 19 Clearing 56031272 18 Jul 19 45,954.00 1,420,133.04

18 Jul 19 Account Transfer 56031292 18 Jul 19 30,485.00 1,389,648.04

18 Jul 19 Account Transfer 56031297 18 Jul 19 34,618.00 1,355,030.04

19 Jul 19 Account Transfer 56031303 19 Jul 19 19,500.00 1,335,530.04

Page 49 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

22 Jul 19 Account Transfer 56031300 22 Jul 19 60,000.00 1,275,530.04

22 Jul 19 Account Transfer 56031301 22 Jul 19 400,000.00 875,530.04

23 Jul 19 Account Transfer 56031307 23 Jul 19 200,000.00 675,530.04

23 Jul 19 Clearing 56031299 23 Jul 19 41,466.00 634,064.04

24 Jul 19 Clearing 56031306 24 Jul 19 69,245.00 564,819.04

24 Jul 19 Account Transfer 56031062 24 Jul 19 18,250.00 546,569.04

24 Jul 19 Account Transfer 56031048 24 Jul 19 108,695.00 437,874.04

24 Jul 19 Account Transfer 56031305 24 Jul 19 90,960.00 346,914.04

26 Jul 19 Account Transfer 56031308 26 Jul 19 82,060.00 264,854.04

26 Jul 19 Outward Cheque Realized 26 Jul 19 6,000,000.00 6,264,854.04

30 Jul 19 Account Transfer 56031309 30 Jul 19 63,720.00 6,201,134.04

30 Jul 19 Outward Cheque Realized 30 Jul 19 1,392,000.00 7,593,134.04

31 Jul 19 Online Transfer 56031298 BR0366 31 Jul 19 140,932.00 7,452,202.04

31 Jul 19 Profit 01 Aug 19 39,970.19 7,492,172.23

31 Jul 19 WHT Deduction 01 Aug 19 3,997.00 7,488,175.23

02 Aug 19 Account Transfer 56031315 02 Aug 19 124,797.00 7,363,378.23

02 Aug 19 Account Transfer 56031314 02 Aug 19 15,542.00 7,347,836.23

02 Aug 19 Account Transfer 56031321 02 Aug 19 8,762.00 7,339,074.23

05 Aug 19 Transfer 05 Aug 19 23,782,500.00 31,121,574.23

05 Aug 19 Transfer 05 Aug 19 14,242,500.00 45,364,074.23

06 Aug 19 Account Transfer 56031324 06 Aug 19 41,205.00 45,322,869.23

06 Aug 19 Account Transfer 56031311 06 Aug 19 235,080.00 45,087,789.23

06 Aug 19 RTGS Payment Credit 06 Aug 19 8,000,000.00 53,087,789.23

06 Aug 19 Account Transfer 56031316 06 Aug 19 35,395.00 53,052,394.23

06 Aug 19 Account Transfer 56031319 06 Aug 19 12,927.00 53,039,467.23

06 Aug 19 Online Charges AC-0010023931190012 06 Aug 19 406.00 53,039,061.23

Page 50 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

06 Aug 19 Online Transfer 56031312 06 Aug 19 12,160.00 53,026,901.23

06 Aug 19 Account Transfer 56031323 06 Aug 19 1,600,408.00 51,426,493.23

06 Aug 19 Online Transfer 06 Aug 19 3,992,672.00 47,433,821.23

06 Aug 19 Online Transfer 06 Aug 19 18,280,672.00 29,153,149.23

06 Aug 19 Account Transfer 56031326 06 Aug 19 7,000,000.00 22,153,149.23

06 Aug 19 Account Transfer 56031327 06 Aug 19 15,500,000.00 6,653,149.23

06 Aug 19 Online Transfer 06 Aug 19 2,132,047.00 4,521,102.23

07 Aug 19 Online Transfer 56031318 07 Aug 19 18,310.00 4,502,792.23

07 Aug 19 Online Transfer 56031331 07 Aug 19 16,232.00 4,486,560.23

07 Aug 19 FED Deduction 07 Aug 19 4.83 4,486,555.40

07 Aug 19 Account Statement Charges 07 Aug 19 30.17 4,486,525.23

07 Aug 19 Account Transfer 56031330 07 Aug 19 114,644.00 4,371,881.23

07 Aug 19 Account Transfer 56031329 07 Aug 19 7,863.00 4,364,018.23

08 Aug 19 Cash Deposit 08 Aug 19 10,866.00 4,374,884.23

08 Aug 19 Account Transfer 56031336 08 Aug 19 3,000,000.00 1,374,884.23

08 Aug 19 Account Transfer 56031335 08 Aug 19 878,763.00 496,121.23

08 Aug 19 Account Transfer 56031333 08 Aug 19 38,630.00 457,491.23

08 Aug 19 Account Transfer 56031334 08 Aug 19 74,520.00 382,971.23

08 Aug 19 Account Transfer 56031320 08 Aug 19 32,916.00 350,055.23

09 Aug 19 Clearing 56031313 09 Aug 19 224,031.00 126,024.23

09 Aug 19 Account Transfer 56031337 09 Aug 19 31,893.00 94,131.23

17 Aug 19 Account Transfer 56031332 17 Aug 19 19,745.00 74,386.23

21 Aug 19 Outward Cheque Realized 21 Aug 19 629,741.00 704,127.23

21 Aug 19 Outward Cheque Realized 21 Aug 19 1,938,498.00 2,642,625.23

21 Aug 19 Outward Cheque Realized 21 Aug 19 464,643.00 3,107,268.23

22 Aug 19 Account Transfer 56031339 22 Aug 19 222,359.00 2,884,909.23

Page 51 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

23 Aug 19 Account Transfer 56031341 23 Aug 19 105,598.00 2,779,311.23

23 Aug 19 Account Transfer 56031348 23 Aug 19 49,785.00 2,729,526.23

23 Aug 19 Account Transfer 56031346 23 Aug 19 60,369.00 2,669,157.23

23 Aug 19 Account Transfer 56031342 23 Aug 19 62,000.00 2,607,157.23

23 Aug 19 Account Transfer 56031347 23 Aug 19 58,345.00 2,548,812.23

23 Aug 19 Account Transfer 56031338 23 Aug 19 205,478.00 2,343,334.23

23 Aug 19 Account Transfer 56031343 23 Aug 19 1,500,000.00 843,334.23

23 Aug 19 Outward Cheque Realized 23 Aug 19 10,000,000.00 10,843,334.23

24 Aug 19 Account Transfer 56031344 24 Aug 19 2,600,000.00 8,243,334.23

26 Aug 19 Account Transfer 56031345 26 Aug 19 1,193,266.00 7,050,068.23

26 Aug 19 Online Transfer 26 Aug 19 3,350,865.00 3,699,203.23

28 Aug 19 Account Transfer 56031349 28 Aug 19 6,000.00 3,693,203.23

28 Aug 19 Account Transfer 56031350 28 Aug 19 102,583.00 3,590,620.23

29 Aug 19 Account Transfer 56031351 29 Aug 19 15,932.00 3,574,688.23

29 Aug 19 Account Transfer 56031352 29 Aug 19 68,517.00 3,506,171.23

30 Aug 19 Account Transfer 56031353 30 Aug 19 5,370.00 3,500,801.23

30 Aug 19 Account Transfer 56031354 30 Aug 19 27,792.00 3,473,009.23

31 Aug 19 Profit 01 Sep 19 31,625.44 3,504,634.67

31 Aug 19 WHT Deduction 01 Sep 19 3,163.00 3,501,471.67

03 Sep 19 Account Transfer 56031355 03 Sep 19 21,751.00 3,479,720.67

03 Sep 19 Outward Cheque Realized 03 Sep 19 5,000,000.00 8,479,720.67

04 Sep 19 Online Transfer 04 Sep 19 28,506.00 8,451,214.67

04 Sep 19 Online Charges AC-0010021898270010 04 Sep 19 406.00 8,450,808.67

04 Sep 19 Online Transfer 56031358 04 Sep 19 69,380.00 8,381,428.67

04 Sep 19 Outward Cheque Realized 04 Sep 19 3,000,000.00 11,381,428.67

05 Sep 19 Clearing 56031357 05 Sep 19 28,809.00 11,352,619.67

Page 52 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

05 Sep 19 Account Transfer 56031365 05 Sep 19 61,560.00 11,291,059.67

05 Sep 19 Account Transfer 56031361 05 Sep 19 78,368.00 11,212,691.67

06 Sep 19 Account Transfer 56031370 06 Sep 19 207,681.00 11,005,010.67

06 Sep 19 Account Transfer 56031362 06 Sep 19 37,060.00 10,967,950.67

06 Sep 19 Account Transfer 56031367 06 Sep 19 1,200,000.00 9,767,950.67

06 Sep 19 Online Charges AC-0010034006680014 06 Sep 19 406.00 9,767,544.67

06 Sep 19 Online Transfer 56031171 06 Sep 19 44,361.00 9,723,183.67

06 Sep 19 Account Transfer 56031359 06 Sep 19 8,035.00 9,715,148.67

06 Sep 19 Online Transfer 56031360 06 Sep 19 15,020.00 9,700,128.67

06 Sep 19 Account Transfer 56031172 06 Sep 19 533,917.00 9,166,211.67

06 Sep 19 Online Transfer 06 Sep 19 3,606,957.00 5,559,254.67

06 Sep 19 FED Deduction 06 Sep 19 48.00 5,559,206.67

06 Sep 19 Cheque Book Charges 06 Sep 19 300.00 5,558,906.67

06 Sep 19 FED Deduction 06 Sep 19 48.00 5,558,858.67

06 Sep 19 Cheque Book Charges 06 Sep 19 300.00 5,558,558.67

06 Sep 19 FED Deduction 06 Sep 19 48.00 5,558,510.67

06 Sep 19 Cheque Book Charges 06 Sep 19 300.00 5,558,210.67

06 Sep 19 FED Deduction 06 Sep 19 48.00 5,558,162.67

06 Sep 19 Cheque Book Charges 06 Sep 19 300.00 5,557,862.67

06 Sep 19 FED Deduction 06 Sep 19 48.00 5,557,814.67

06 Sep 19 Cheque Book Charges 06 Sep 19 300.00 5,557,514.67

06 Sep 19 FED Deduction 06 Sep 19 48.00 5,557,466.67

06 Sep 19 Cheque Book Charges 06 Sep 19 300.00 5,557,166.67

06 Sep 19 FED Deduction 06 Sep 19 48.00 5,557,118.67

06 Sep 19 Cheque Book Charges 06 Sep 19 300.00 5,556,818.67

06 Sep 19 FED Deduction 06 Sep 19 48.00 5,556,770.67

Page 53 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

06 Sep 19 Cheque Book Charges 06 Sep 19 300.00 5,556,470.67

07 Sep 19 Account Transfer 56031368 07 Sep 19 1,800,000.00 3,756,470.67

11 Sep 19 Account Transfer 56031363 11 Sep 19 27,761.00 3,728,709.67

11 Sep 19 Account Transfer 56031366 11 Sep 19 29,718.00 3,698,991.67

12 Sep 19 Account Transfer 56031173 12 Sep 19 123,127.00 3,575,864.67

12 Sep 19 Transfer 12 Sep 19 112,520.00 3,688,384.67

12 Sep 19 Transfer 12 Sep 19 112,520.00 3,800,904.67

12 Sep 19 Account Transfer 56031176 12 Sep 19 33,936.00 3,766,968.67

12 Sep 19 Outward Cheque Realized 12 Sep 19 16,667,716.00 20,434,684.67

13 Sep 19 Account Transfer 56031177 13 Sep 19 64,080.00 20,370,604.67

13 Sep 19 Account Transfer 56031179 13 Sep 19 4,600.00 20,366,004.67

13 Sep 19 Account Transfer 56031178 13 Sep 19 33,535.00 20,332,469.67

16 Sep 19 Account Transfer 56031182 16 Sep 19 95,693.00 20,236,776.67

17 Sep 19 Account Transfer 56031181 17 Sep 19 200,000.00 20,036,776.67

18 Sep 19 Account Transfer 56031185 18 Sep 19 1,500,000.00 18,536,776.67

19 Sep 19 Online Transfer 19 Sep 19 16,196.00 18,520,580.67

20 Sep 19 Online Charges AC-0010023931190012 20 Sep 19 406.00 18,520,174.67

20 Sep 19 Online Transfer 56031183 20 Sep 19 7,546.00 18,512,628.67

20 Sep 19 Account Transfer 56031187 20 Sep 19 27,465.00 18,485,163.67

20 Sep 19 Account Transfer 56031190 20 Sep 19 80,100.00 18,405,063.67

20 Sep 19 Account Transfer 56031188 20 Sep 19 5,161.00 18,399,902.67

24 Sep 19 Clearing 56031189 24 Sep 19 119,520.00 18,280,382.67

24 Sep 19 Account Transfer 56031191 24 Sep 19 57,523.00 18,222,859.67

24 Sep 19 Account Transfer 56031192 24 Sep 19 95,579.00 18,127,280.67

24 Sep 19 Outward Cheque Realized 24 Sep 19 32,000,000.00 50,127,280.67

26 Sep 19 Account Transfer 56031195 26 Sep 19 16,000,000.00 34,127,280.67

Page 54 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

26 Sep 19 Transfer 26 Sep 19 15,600,000.00 49,727,280.67

26 Sep 19 Account Transfer 56031194 26 Sep 19 5,400,000.00 44,327,280.67

26 Sep 19 Online Transfer 26 Sep 19 18,504,198.00 25,823,082.67

26 Sep 19 Account Transfer 56031180 26 Sep 19 1,402,161.00 24,420,921.67

26 Sep 19 Account Transfer 56031200 26 Sep 19 3,000,000.00 21,420,921.67

26 Sep 19 Account Transfer 56031202 26 Sep 19 10,000,000.00 11,420,921.67

26 Sep 19 Online Transfer 26 Sep 19 2,226,232.00 9,194,689.67

27 Sep 19 Clearing 56031201 27 Sep 19 1,218,820.00 7,975,869.67

27 Sep 19 Clearing 56031199 27 Sep 19 911,898.00 7,063,971.67

27 Sep 19 Account Transfer 56031204 27 Sep 19 37,316.00 7,026,655.67

27 Sep 19 Account Transfer 56031198 27 Sep 19 213,833.00 6,812,822.67

27 Sep 19 Account Transfer 56031203 27 Sep 19 64,500.00 6,748,322.67

30 Sep 19 Instr. Issue Commission AC- 30 Sep 19 174.00 6,748,148.67


0010001924780046
30 Sep 19 Instrument Issued 56031210 30 Sep 19 6,500,000.00 248,148.67

30 Sep 19 Instr. Issue Commission AC- 30 Sep 19 174.00 247,974.67


0010001924780046
30 Sep 19 Instrument Issued 56031216 30 Sep 19 5,000.00 242,974.67

30 Sep 19 Instr. Issue Commission AC- 30 Sep 19 174.00 242,800.67


0010001924780046
30 Sep 19 Instrument Issued 30 Sep 19 50,000.00 192,800.67

30 Sep 19 Profit 01 Oct 19 95,973.00 288,773.67

30 Sep 19 WHT Deduction 01 Oct 19 9,597.00 279,176.67

01 Oct 19 Encashment of Instrument 12112349 01 Oct 19 6,500,000.00 6,779,176.67

01 Oct 19 Account Transfer 56031209 01 Oct 19 579,050.00 6,200,126.67

01 Oct 19 Account Transfer 56031205 01 Oct 19 6,000.00 6,194,126.67

02 Oct 19 Account Transfer 56031211 02 Oct 19 24,615.00 6,169,511.67

02 Oct 19 Account Transfer 56031219 02 Oct 19 42,897.00 6,126,614.67

Page 55 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

02 Oct 19 Outward Cheque Realized 02 Oct 19 10,000,000.00 16,126,614.67

03 Oct 19 Clearing 56031213 03 Oct 19 91,276.00 16,035,338.67

03 Oct 19 Account Transfer 56031229 03 Oct 19 107,684.00 15,927,654.67

03 Oct 19 Account Transfer 56031218 03 Oct 19 183,462.00 15,744,192.67

03 Oct 19 Account Transfer 56031224 03 Oct 19 1,500,000.00 14,244,192.67

03 Oct 19 Account Transfer 56031226 03 Oct 19 1,000,000.00 13,244,192.67

03 Oct 19 Account Transfer 56031225 03 Oct 19 2,700,000.00 10,544,192.67

03 Oct 19 Account Transfer 56031193 03 Oct 19 33,795.00 10,510,397.67

04 Oct 19 Clearing 56031207 04 Oct 19 453,850.00 10,056,547.67

04 Oct 19 Clearing 56031206 04 Oct 19 453,850.00 9,602,697.67

04 Oct 19 Account Transfer 56031222 04 Oct 19 65,700.00 9,536,997.67

04 Oct 19 Account Transfer 56031221 04 Oct 19 9,495.00 9,527,502.67

04 Oct 19 Online Transfer 04 Oct 19 3,179,754.00 6,347,748.67

04 Oct 19 Account Transfer 56031223 04 Oct 19 5,161.00 6,342,587.67

04 Oct 19 Account Transfer 56031214 04 Oct 19 30,886.00 6,311,701.67

07 Oct 19 Clearing 56031230 07 Oct 19 291,792.00 6,019,909.67

07 Oct 19 Account Transfer 56031233 07 Oct 19 14,540.00 6,005,369.67

08 Oct 19 Clearing 56031228 08 Oct 19 216,000.00 5,789,369.67

09 Oct 19 FED Deduction 09 Oct 19 4.83 5,789,364.84

09 Oct 19 Account Statement Charges 09 Oct 19 30.17 5,789,334.67

09 Oct 19 Account Transfer 56031241 09 Oct 19 12,966.00 5,776,368.67

10 Oct 19 Online Transfer 10 Oct 19 637,032.00 6,413,400.67

10 Oct 19 Online Charges AC-0010001924780046 10 Oct 19 739.03 6,412,661.64

10 Oct 19 Clearing 56031234 10 Oct 19 207,720.00 6,204,941.64

10 Oct 19 Account Transfer 56031239 10 Oct 19 35,417.00 6,169,524.64

11 Oct 19 Online Transfer 11 Oct 19 1,045,380.00 7,214,904.64

Page 56 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

11 Oct 19 Online Charges AC-0010001924780046 11 Oct 19 1,212.38 7,213,692.26

11 Oct 19 Account Transfer 56031245 11 Oct 19 22,150.00 7,191,542.26

11 Oct 19 Account Transfer 56031244 11 Oct 19 23,359.00 7,168,183.26

14 Oct 19 Account Transfer 56031240 14 Oct 19 82,671.00 7,085,512.26

14 Oct 19 Outward Cheque Realized 14 Oct 19 7,977,202.00 15,062,714.26

15 Oct 19 Clearing 56031249 15 Oct 19 255,440.00 14,807,274.26

17 Oct 19 Account Transfer 56031258 17 Oct 19 844,513.00 13,962,761.26

18 Oct 19 Account Transfer 56031256 18 Oct 19 9,500,000.00 4,462,761.26

18 Oct 19 Online Transfer 18 Oct 19 1,366,735.00 3,096,026.26

18 Oct 19 Online Transfer 18 Oct 19 1,366,735.00 4,462,761.26

18 Oct 19 Online Charges AC-0010034006680014 18 Oct 19 406.00 4,462,355.26

18 Oct 19 Online Transfer 56031262 18 Oct 19 28,739.00 4,433,616.26

18 Oct 19 Account Transfer 56031251 18 Oct 19 78,368.00 4,355,248.26

18 Oct 19 Account Transfer 56031236 18 Oct 19 35,726.00 4,319,522.26

18 Oct 19 Online Transfer 56031264 18 Oct 19 16,406.00 4,303,116.26

18 Oct 19 Clearing 56031248 18 Oct 19 111,026.00 4,192,090.26

18 Oct 19 Account Transfer 56031250 18 Oct 19 200,775.00 3,991,315.26

18 Oct 19 Account Transfer 56031253 18 Oct 19 117,915.00 3,873,400.26

18 Oct 19 Online Transfer 18 Oct 19 11,964,095.00 -8,090,694.74

18 Oct 19 Online Transfer 18 Oct 19 859,051.00 -8,949,745.74

18 Oct 19 Outward Cheque Realized 18 Oct 19 20,000,000.00 11,050,254.26

18 Oct 19 Account Transfer 56031263 18 Oct 19 21,054.00 11,029,200.26

18 Oct 19 Account Transfer 56031255 18 Oct 19 4,000,000.00 7,029,200.26

21 Oct 19 Net Profit aftr WHT 21 Oct 19 23,991.84 7,053,192.10

21 Oct 19 Net Profit aftr WHT 21 Oct 19 189,883.45 7,243,075.55

21 Oct 19 Account Transfer 56031252 21 Oct 19 16,898.00 7,226,177.55

Page 57 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

21 Oct 19 Account Transfer 56031261 21 Oct 19 1,366,735.00 5,859,442.55

21 Oct 19 Account Transfer 56031227 21 Oct 19 11,422.00 5,848,020.55

21 Oct 19 Online Transfer 56031231 21 Oct 19 13,340.00 5,834,680.55

22 Oct 19 Account Transfer 56031238 22 Oct 19 31,335.00 5,803,345.55

22 Oct 19 Clearing 56031247 22 Oct 19 214,865.00 5,588,480.55

22 Oct 19 Clearing 56031242 22 Oct 19 122,829.00 5,465,651.55

22 Oct 19 Account Transfer 56031265 22 Oct 19 70,920.00 5,394,731.55

23 Oct 19 Account Transfer 56031232 23 Oct 19 32,321.00 5,362,410.55

23 Oct 19 Instr. Issue Commission AC- 23 Oct 19 174.00 5,362,236.55


0010001924780046
23 Oct 19 Instrument Issued 56031266 23 Oct 19 5,000,000.00 362,236.55

26 Oct 19 Encashment of Instrument 12112364 26 Oct 19 5,000,000.00 5,362,236.55

28 Oct 19 Account Transfer 60304466 28 Oct 19 21,144.00 5,341,092.55

29 Oct 19 Account Transfer 56031270 29 Oct 19 1,366,723.00 3,974,369.55

29 Oct 19 Account Transfer 60304472 29 Oct 19 22,777.00 3,951,592.55

29 Oct 19 Online Charges AC-0010034006680014 29 Oct 19 406.00 3,951,186.55

29 Oct 19 Online Transfer 60304467 29 Oct 19 28,739.00 3,922,447.55

29 Oct 19 RTGS Payment Credit 29 Oct 19 30,000,000.00 33,922,447.55

29 Oct 19 Online Transfer 29 Oct 19 11,963,984.00 21,958,463.55

29 Oct 19 Account Transfer 60304469 29 Oct 19 4,000,000.00 17,958,463.55

29 Oct 19 Account Transfer 60304468 29 Oct 19 9,000,000.00 8,958,463.55

30 Oct 19 Account Transfer 60304473 30 Oct 19 105,825.00 8,852,638.55

30 Oct 19 Account Transfer 60304471 30 Oct 19 177,678.00 8,674,960.55

30 Oct 19 Online Transfer 30 Oct 19 3,467,718.00 5,207,242.55

30 Oct 19 Account Transfer 56031268 30 Oct 19 859,044.00 4,348,198.55

31 Oct 19 Inward Telex Payment IFTT 31 Oct 19 13,934,839.57 18,283,038.12

Page 58 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

31 Oct 19 Profit 01 Nov 19 72,958.70 18,355,996.82

31 Oct 19 WHT Deduction 01 Nov 19 7,296.00 18,348,700.82

01 Nov 19 Account Transfer 56031246 01 Nov 19 767,220.00 17,581,480.82

01 Nov 19 Clearing 56031235 01 Nov 19 301,692.00 17,279,788.82

01 Nov 19 Account Transfer 60304474 01 Nov 19 68,500.00 17,211,288.82

04 Nov 19 Account Transfer 60304476 04 Nov 19 861,713.00 16,349,575.82

04 Nov 19 Account Transfer 60304475 04 Nov 19 6,000.00 16,343,575.82

05 Nov 19 Online Transfer 05 Nov 19 4,882,559.00 11,461,016.82

05 Nov 19 Account Transfer 60304483 05 Nov 19 2,500,000.00 8,961,016.82

05 Nov 19 Account Transfer 60304482 05 Nov 19 1,000,000.00 7,961,016.82

05 Nov 19 Account Transfer 60304477 05 Nov 19 26,100.00 7,934,916.82

05 Nov 19 Account Transfer 60304481 05 Nov 19 298,581.00 7,636,335.82

05 Nov 19 Account Transfer 60304478 05 Nov 19 38,418.00 7,597,917.82

06 Nov 19 Account Transfer 60304485 06 Nov 19 8,601.00 7,589,316.82

06 Nov 19 Online Transfer 60304441 06 Nov 19 15,770.00 7,573,546.82

07 Nov 19 Account Transfer 60304486 07 Nov 19 13,594.00 7,559,952.82

07 Nov 19 Account Transfer 60304490 07 Nov 19 38,973.00 7,520,979.82

07 Nov 19 Account Transfer 60304443 07 Nov 19 33,505.00 7,487,474.82

08 Nov 19 Account Transfer 60304445 08 Nov 19 71,640.00 7,415,834.82

08 Nov 19 Online Transfer 60304442 08 Nov 19 18,183.00 7,397,651.82

08 Nov 19 Account Transfer 60304489 08 Nov 19 34,554.00 7,363,097.82

11 Nov 19 Clearing 60304484 11 Nov 19 41,260.00 7,321,837.82

11 Nov 19 Account Transfer 60304448 11 Nov 19 806,677.00 6,515,160.82

12 Nov 19 Clearing 60304488 12 Nov 19 454,050.00 6,061,110.82

12 Nov 19 Account Transfer 60304487 12 Nov 19 80,507.00 5,980,603.82

14 Nov 19 Clearing 60304446 14 Nov 19 496,991.00 5,483,612.82

Page 59 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

14 Nov 19 Outward Cheque Realized 14 Nov 19 5,176,804.00 10,660,416.82

18 Nov 19 Clearing 60304449 18 Nov 19 59,315.00 10,601,101.82

18 Nov 19 Clearing 60304450 18 Nov 19 32,140.00 10,568,961.82

18 Nov 19 Encashment of Instrument BBB13311850 18 Nov 19 10,203,921.00 20,772,882.82

19 Nov 19 Account Transfer 60304451 19 Nov 19 28,830.00 20,744,052.82

19 Nov 19 Encashment of Instrument BBB13311852 19 Nov 19 11,609,931.00 32,353,983.82

19 Nov 19 Account Transfer 60304453 19 Nov 19 6,000,000.00 26,353,983.82

19 Nov 19 Account Transfer 60304454 19 Nov 19 16,000,000.00 10,353,983.82

19 Nov 19 Outward Cheque Realized 19 Nov 19 16,688,550.00 27,042,533.82

19 Nov 19 Online Transfer 19 Nov 19 19,350,286.00 7,692,247.82

19 Nov 19 Account Transfer 60304447 19 Nov 19 1,130,798.00 6,561,449.82

20 Nov 19 Account Transfer 60304455 20 Nov 19 40,000.00 6,521,449.82

20 Nov 19 Inward Telex Payment IW REM 20 Nov 19 16,866,049.50 23,387,499.32


US108638
20 Nov 19 Utility Bills 20 Nov 19 505,332.00 22,882,167.32

20 Nov 19 Account Transfer 60304459 20 Nov 19 11,405,683.00 11,476,484.32

20 Nov 19 Transfer 20 Nov 19 112,520.00 11,589,004.32

20 Nov 19 Transfer 20 Nov 19 112,520.00 11,701,524.32

21 Nov 19 Clearing 60304460 21 Nov 19 300,000.00 11,401,524.32

21 Nov 19 Utility Bills 21 Nov 19 5,257,638.00 6,143,886.32

21 Nov 19 Account Transfer 60304463 21 Nov 19 6,000.00 6,137,886.32

21 Nov 19 Account Transfer 60304462 21 Nov 19 87,500.00 6,050,386.32

21 Nov 19 Account Transfer 60304456 21 Nov 19 101,066.00 5,949,320.32

22 Nov 19 Transfer 22 Nov 19 300,000.00 6,249,320.32

25 Nov 19 Outward Cheque Realized 25 Nov 19 8,132,090.00 14,381,410.32

25 Nov 19 Account Transfer 60304394 25 Nov 19 1,100,000.00 13,281,410.32

Page 60 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

25 Nov 19 Account Transfer 60304392 25 Nov 19 149,029.00 13,132,381.32

25 Nov 19 Account Transfer 60304395 25 Nov 19 2,500,000.00 10,632,381.32

25 Nov 19 Online Transfer 25 Nov 19 3,166,366.00 7,466,015.32

26 Nov 19 Account Transfer 60304397 26 Nov 19 105,825.00 7,360,190.32

26 Nov 19 Account Transfer 60304399 26 Nov 19 895,000.00 6,465,190.32

26 Nov 19 Account Transfer 60304396 26 Nov 19 27,504.00 6,437,686.32

27 Nov 19 Online Transfer 27 Nov 19 247,169.00 6,190,517.32

27 Nov 19 Online Transfer 27 Nov 19 68,446.00 6,122,071.32

28 Nov 19 Clearing 60304398 28 Nov 19 1,189,642.00 4,932,429.32

28 Nov 19 Account Transfer 60304401 28 Nov 19 60,810.00 4,871,619.32

28 Nov 19 Account Transfer 60304404 28 Nov 19 35,984.00 4,835,635.32

29 Nov 19 Online Transfer 60304405 29 Nov 19 94,663.00 4,740,972.32

29 Nov 19 Account Transfer 60304403 29 Nov 19 15,255.00 4,725,717.32

29 Nov 19 Outward Cheque Realized 29 Nov 19 800,000.00 5,525,717.32

30 Nov 19 Profit 01 Dec 19 84,231.87 5,609,949.19

30 Nov 19 WHT Deduction 01 Dec 19 8,423.00 5,601,526.19

30 Nov 19 Account Transfer 60304465 30 Nov 19 204,067.00 5,397,459.19

02 Dec 19 Clearing 60304402 02 Dec 19 195,841.00 5,201,618.19

02 Dec 19 Account Transfer 60304400 02 Dec 19 161,039.00 5,040,579.19

02 Dec 19 Online Transfer 02 Dec 19 4,782,221.00 258,358.19

02 Dec 19 Outward Cheque Realized 02 Dec 19 11,000,000.00 11,258,358.19

02 Dec 19 Account Transfer 60304414 02 Dec 19 1,000,000.00 10,258,358.19

02 Dec 19 Account Transfer 60304413 02 Dec 19 2,500,000.00 7,758,358.19

03 Dec 19 Account Transfer 60304412 03 Dec 19 73,800.00 7,684,558.19

03 Dec 19 Account Transfer 60304411 03 Dec 19 350,497.00 7,334,061.19

03 Dec 19 Account Transfer 60304415 03 Dec 19 16,233.00 7,317,828.19

Page 61 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

04 Dec 19 Clearing 60304409 04 Dec 19 51,974.00 7,265,854.19

04 Dec 19 Account Transfer 60304368 04 Dec 19 155,575.00 7,110,279.19

05 Dec 19 Account Transfer 60304369 05 Dec 19 13,246.00 7,097,033.19

05 Dec 19 Online Charges AC-0010021898270010 05 Dec 19 406.00 7,096,627.19

05 Dec 19 Online Transfer 60304479 05 Dec 19 31,082.00 7,065,545.19

05 Dec 19 Account Transfer 60304370 05 Dec 19 12,550.00 7,052,995.19

05 Dec 19 Account Transfer 60304372 05 Dec 19 37,054.00 7,015,941.19

05 Dec 19 Online Transfer 60304373 05 Dec 19 187,379.00 6,828,562.19

05 Dec 19 Online Transfer 60304374 05 Dec 19 15,770.00 6,812,792.19

06 Dec 19 Clearing 60304410 06 Dec 19 78,368.00 6,734,424.19

06 Dec 19 Clearing 60304371 06 Dec 19 1,000,000.00 5,734,424.19

06 Dec 19 Account Transfer 60304375 06 Dec 19 33,440.00 5,700,984.19

09 Dec 19 Account Transfer 60304379 09 Dec 19 49,403.00 5,651,581.19

09 Dec 19 Account Transfer 60304378 09 Dec 19 32,420.00 5,619,161.19

09 Dec 19 Online Transfer 60304376 09 Dec 19 16,034.00 5,603,127.19

09 Dec 19 Online Transfer 60304366 09 Dec 19 18,557.00 5,584,570.19

10 Dec 19 Account Transfer 60304380 10 Dec 19 71,460.00 5,513,110.19

10 Dec 19 Account Transfer 60304367 10 Dec 19 88,715.00 5,424,395.19

12 Dec 19 Clearing 60304382 12 Dec 19 78,368.00 5,346,027.19

12 Dec 19 Account Transfer 60304388 12 Dec 19 116,250.00 5,229,777.19

13 Dec 19 Account Transfer 60304381 13 Dec 19 69,223.00 5,160,554.19

13 Dec 19 Account Transfer 60304386 13 Dec 19 27,778.00 5,132,776.19

13 Dec 19 Account Transfer 60304387 13 Dec 19 500,000.00 4,632,776.19

16 Dec 19 Clearing 60304385 16 Dec 19 54,945.00 4,577,831.19

18 Dec 19 Clearing 60304377 18 Dec 19 1,500,000.00 3,077,831.19

18 Dec 19 Outward Cheque Realized 18 Dec 19 4,915,820.00 7,993,651.19

Page 62 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

19 Dec 19 Transfer 19 Dec 19 259,646.00 8,253,297.19

19 Dec 19 Account Transfer 60304343 19 Dec 19 259,646.00 7,993,651.19

20 Dec 19 Account Transfer 60304347 20 Dec 19 329,756.00 7,663,895.19

20 Dec 19 Account Transfer 60304344 20 Dec 19 78,300.00 7,585,595.19

20 Dec 19 Account Transfer 60304350 20 Dec 19 38,000.00 7,547,595.19

20 Dec 19 Account Transfer 60304345 20 Dec 19 25,052.00 7,522,543.19

20 Dec 19 Account Transfer 60304348 20 Dec 19 278,000.00 7,244,543.19

23 Dec 19 Clearing 60304346 23 Dec 19 1,000,000.00 6,244,543.19

23 Dec 19 Clearing 60304390 23 Dec 19 187,614.00 6,056,929.19

23 Dec 19 Account Transfer 60304351 23 Dec 19 200,000.00 5,856,929.19

23 Dec 19 Encashment of Instrument BBB13311904 23 Dec 19 1,185,536.00 7,042,465.19

24 Dec 19 Clearing 60304341 24 Dec 19 312,282.00 6,730,183.19

24 Dec 19 RTGS Payment Credit 24 Dec 19 45,000,000.00 51,730,183.19

24 Dec 19 Online Transfer 24 Dec 19 19,404,837.00 32,325,346.19

24 Dec 19 Account Transfer 60304355 24 Dec 19 6,000,000.00 26,325,346.19

24 Dec 19 Account Transfer 60304384 24 Dec 19 1,133,213.00 25,192,133.19

24 Dec 19 Account Transfer 60304352 24 Dec 19 250,000.00 24,942,133.19

24 Dec 19 Account Transfer 60304362 24 Dec 19 11,000,000.00 13,942,133.19

24 Dec 19 Online Transfer 60304363 24 Dec 19 43,096.00 13,899,037.19

24 Dec 19 Online Transfer 24 Dec 19 20,810.00 13,878,227.19

24 Dec 19 Online Transfer 24 Dec 19 21,940.00 13,856,287.19

26 Dec 19 Online Transfer 26 Dec 19 11,335,948.00 25,192,235.19

26 Dec 19 Online Charges AC-0010001924780046 26 Dec 19 2,320.00 25,189,915.19

26 Dec 19 Account Transfer 60304354 26 Dec 19 16,000,000.00 9,189,915.19

26 Dec 19 Clearing 60304353 26 Dec 19 169,977.00 9,019,938.19

26 Dec 19 FED Deduction 26 Dec 19 48.00 9,019,890.19

Page 63 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

26 Dec 19 Cheque Book Charges 26 Dec 19 300.00 9,019,590.19

27 Dec 19 Account Transfer 60304316 27 Dec 19 70,500.00 8,949,090.19

27 Dec 19 Account Transfer 60304317 27 Dec 19 6,000.00 8,943,090.19

27 Dec 19 Clearing 60304364 27 Dec 19 2,419,625.00 6,523,465.19

27 Dec 19 Clearing 60304357 27 Dec 19 1,000,000.00 5,523,465.19

27 Dec 19 Clearing 60304342 27 Dec 19 200,095.00 5,323,370.19

27 Dec 19 Online Transfer 60304361 BR0531 27 Dec 19 357,913.00 4,965,457.19

30 Dec 19 Account Transfer 60304365 30 Dec 19 35,000.00 4,930,457.19

30 Dec 19 Account Transfer 60304358 30 Dec 19 39,305.00 4,891,152.19

31 Dec 19 Online Charges AC-0010030031270011 31 Dec 19 406.00 4,890,746.19

31 Dec 19 Online Transfer 60304318 31 Dec 19 1,650.00 4,889,096.19

31 Dec 19 Profit 01 Jan 20 62,380.17 4,951,476.36

31 Dec 19 WHT Deduction 01 Jan 20 6,238.00 4,945,238.36

02 Jan 20 Account Transfer 60304319 02 Jan 20 413,640.00 4,531,598.36

02 Jan 20 Account Transfer 60304320 02 Jan 20 23,285.00 4,508,313.36

02 Jan 20 RTGS Payment Credit 02 Jan 20 12,000,000.00 16,508,313.36

02 Jan 20 Account Transfer 60304327 02 Jan 20 3,500,000.00 13,008,313.36

02 Jan 20 Account Transfer 60304322 02 Jan 20 162,560.00 12,845,753.36

02 Jan 20 Online Transfer 02 Jan 20 3,416,869.00 9,428,884.36

03 Jan 20 Account Transfer 60304326 03 Jan 20 1,100,000.00 8,328,884.36

03 Jan 20 Account Transfer 60304328 03 Jan 20 106,230.00 8,222,654.36

06 Jan 20 Online Transfer 60304324 06 Jan 20 148,284.00 8,074,370.36

07 Jan 20 Account Transfer 60304334 07 Jan 20 2,000,000.00 6,074,370.36

07 Jan 20 Account Transfer 60304325 07 Jan 20 35,626.00 6,038,744.36

08 Jan 20 Account Transfer 60304333 08 Jan 20 74,520.00 5,964,224.36

08 Jan 20 FED Deduction 08 Jan 20 48.00 5,964,176.36

Page 64 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

08 Jan 20 Cheque Book Charges 08 Jan 20 300.00 5,963,876.36

08 Jan 20 FED Deduction 08 Jan 20 48.00 5,963,828.36

08 Jan 20 Cheque Book Charges 08 Jan 20 300.00 5,963,528.36

08 Jan 20 FED Deduction 08 Jan 20 48.00 5,963,480.36

08 Jan 20 Cheque Book Charges 08 Jan 20 300.00 5,963,180.36

08 Jan 20 FED Deduction 08 Jan 20 4.83 5,963,175.53

08 Jan 20 Account Statement Charges 08 Jan 20 30.17 5,963,145.36

08 Jan 20 FED Deduction 08 Jan 20 48.00 5,963,097.36

08 Jan 20 Cheque Book Charges 08 Jan 20 300.00 5,962,797.36

08 Jan 20 FED Deduction 08 Jan 20 48.00 5,962,749.36

08 Jan 20 Cheque Book Charges 08 Jan 20 300.00 5,962,449.36

09 Jan 20 Clearing 60304330 09 Jan 20 723,233.00 5,239,216.36

09 Jan 20 RTGS Payment Credit 09 Jan 20 10,000,000.00 15,239,216.36

09 Jan 20 Account Transfer 60304332 09 Jan 20 16,378.00 15,222,838.36

09 Jan 20 Account Transfer 60304295 09 Jan 20 2,500,000.00 12,722,838.36

09 Jan 20 Account Transfer 60304338 09 Jan 20 437,678.00 12,285,160.36

09 Jan 20 Account Transfer 60304294 09 Jan 20 1,000,000.00 11,285,160.36

09 Jan 20 Inward Telex Payment IW REM US 09 Jan 20 29,651,661.60 40,936,821.96


191796
09 Jan 20 Online Transfer 09 Jan 20 4,694,720.00 36,242,101.96

09 Jan 20 Account Transfer 60304297 09 Jan 20 11,000,000.00 25,242,101.96

10 Jan 20 Online Transfer PK0010667 10 Jan 20 23,465,540.00 48,707,641.96

10 Jan 20 Account Transfer 60304335 10 Jan 20 37,735.00 48,669,906.96

10 Jan 20 Account Transfer 60304340 10 Jan 20 11,000,000.00 37,669,906.96

10 Jan 20 Account Transfer 60304339 10 Jan 20 20,000,000.00 17,669,906.96

10 Jan 20 Online Transfer 60304292 10 Jan 20 18,950.00 17,650,956.96

Page 65 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

10 Jan 20 Account Transfer 60304291 10 Jan 20 34,559.00 17,616,397.96

13 Jan 20 Account Transfer 60304336 13 Jan 20 12,443.00 17,603,954.96

13 Jan 20 Transfer 13 Jan 20 2,763,792.00 20,367,746.96

13 Jan 20 Clearing 60304296 13 Jan 20 6,667,738.00 13,700,008.96

14 Jan 20 FED Deduction 14 Jan 20 48.00 13,699,960.96

14 Jan 20 Cheque Book Charges 14 Jan 20 300.00 13,699,660.96

14 Jan 20 Clearing 60304298 14 Jan 20 1,828,994.00 11,870,666.96

14 Jan 20 Online Transfer 14 Jan 20 178,126.00 11,692,540.96

15 Jan 20 Clearing 60304299 15 Jan 20 180,000.00 11,512,540.96

15 Jan 20 Account Transfer 60304300 15 Jan 20 33,505.00 11,479,035.96

15 Jan 20 RTGS Payment Credit 15 Jan 20 39,000,000.00 50,479,035.96

15 Jan 20 Online Transfer 15 Jan 20 19,423,560.00 31,055,475.96

15 Jan 20 Account Transfer 60304308 15 Jan 20 6,000,000.00 25,055,475.96

15 Jan 20 Account Transfer 60304307 15 Jan 20 16,000,000.00 9,055,475.96

16 Jan 20 Online Charges AC-0010021898270010 16 Jan 20 406.00 9,055,069.96

16 Jan 20 Online Transfer 60304331 16 Jan 20 28,904.00 9,026,165.96

16 Jan 20 Clearing 60304323 16 Jan 20 88,715.00 8,937,450.96

16 Jan 20 Clearing 60304309 16 Jan 20 53,400.00 8,884,050.96

16 Jan 20 RTGS Payment Credit 16 Jan 20 10,000,000.00 18,884,050.96

16 Jan 20 Online Transfer 16 Jan 20 922,044.00 19,806,094.96

16 Jan 20 Account Transfer 60304311 16 Jan 20 10,000,000.00 9,806,094.96

17 Jan 20 Account Transfer 60304313 17 Jan 20 83,520.00 9,722,574.96

17 Jan 20 Inward Telex Payment 17 Jan 20 43,932,405.56 53,654,980.52


IWREMUS284683.81
17 Jan 20 Account Transfer 60304305 17 Jan 20 1,130,747.00 52,524,233.52

20 Jan 20 Account Transfer 60304314 20 Jan 20 17,000,000.00 35,524,233.52

Page 66 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

21 Jan 20 Account Transfer 60304416 21 Jan 20 65,515.00 35,458,718.52

21 Jan 20 Account Transfer 60304424 21 Jan 20 41,260.00 35,417,458.52

21 Jan 20 Account Transfer 60304426 21 Jan 20 21,564.00 35,395,894.52

21 Jan 20 Online Transfer 21 Jan 20 22,222.00 35,373,672.52

21 Jan 20 Clearing 60304418 21 Jan 20 15,000,000.00 20,373,672.52

22 Jan 20 Account Transfer 60304422 22 Jan 20 48,000.00 20,325,672.52

22 Jan 20 Account Transfer 60304423 22 Jan 20 38,473.00 20,287,199.52

22 Jan 20 Clearing 60304310 22 Jan 20 614,736.00 19,672,463.52

22 Jan 20 Online Charges AC-0010023929490019 22 Jan 20 406.00 19,672,057.52

22 Jan 20 Online Transfer 60304417 22 Jan 20 36,531.00 19,635,526.52

22 Jan 20 Account Transfer 60304312 22 Jan 20 206,820.00 19,428,706.52

22 Jan 20 Account Transfer 60304430 22 Jan 20 2,500,000.00 16,928,706.52

22 Jan 20 Account Transfer 60304428 22 Jan 20 6,000.00 16,922,706.52

23 Jan 20 Clearing 60304302 23 Jan 20 255,879.00 16,666,827.52

23 Jan 20 Clearing 60304421 23 Jan 20 629,307.00 16,037,520.52

23 Jan 20 Account Transfer 60304429 23 Jan 20 1,000,000.00 15,037,520.52

23 Jan 20 Account Transfer 60304434 23 Jan 20 3,200,000.00 11,837,520.52

24 Jan 20 Clearing 60304420 24 Jan 20 604,471.00 11,233,049.52

24 Jan 20 Clearing 60304432 24 Jan 20 1,400,000.00 9,833,049.52

24 Jan 20 Clearing 60304431 24 Jan 20 1,300,000.00 8,533,049.52

24 Jan 20 Account Transfer 60304435 24 Jan 20 91,800.00 8,441,249.52

24 Jan 20 Account Transfer 60304436 24 Jan 20 77,580.00 8,363,669.52

27 Jan 20 Clearing 60304419 27 Jan 20 995,667.00 7,368,002.52

27 Jan 20 FED Deduction 27 Jan 20 48.00 7,367,954.52

27 Jan 20 Cheque Book Charges 27 Jan 20 300.00 7,367,654.52

28 Jan 20 Online Transfer 28 Jan 20 17,272,171.00 24,639,825.52

Page 67 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

28 Jan 20 Online Transfer 28 Jan 20 1,303,020.00 25,942,845.52

28 Jan 20 Online Charges AC-0010001924780046 28 Jan 20 1,511.02 25,941,334.50

29 Jan 20 Clearing 60304301 29 Jan 20 248,713.00 25,692,621.50

29 Jan 20 Clearing 60304425 29 Jan 20 30,485.00 25,662,136.50

30 Jan 20 Clearing 60304439 30 Jan 20 3,000,000.00 22,662,136.50

30 Jan 20 Clearing 60304303 30 Jan 20 256,790.00 22,405,346.50

30 Jan 20 Account Transfer 60304433 30 Jan 20 24,559.00 22,380,787.50

30 Jan 20 Online Transfer 30 Jan 20 294,840.00 22,085,947.50

31 Jan 20 Clearing 60304437 31 Jan 20 1,007,330.00 21,078,617.50

31 Jan 20 Clearing 60304438 31 Jan 20 3,000,000.00 18,078,617.50

31 Jan 20 Clearing 60304440 31 Jan 20 3,000,000.00 15,078,617.50

31 Jan 20 Account Transfer 62288999 31 Jan 20 106,128.00 14,972,489.50

31 Jan 20 Account Transfer 62289001 31 Jan 20 75,363.00 14,897,126.50

31 Jan 20 Account Transfer 62288996 31 Jan 20 2,500,000.00 12,397,126.50

31 Jan 20 Account Transfer 62288995 31 Jan 20 1,100,000.00 11,297,126.50

31 Jan 20 Online Transfer 31 Jan 20 3,515,298.00 7,781,828.50

31 Jan 20 Online Transfer 31 Jan 20 3,515,298.00 11,297,126.50

31 Jan 20 Profit 01 Feb 20 166,333.74 11,463,460.24

31 Jan 20 WHT Deduction 01 Feb 20 16,633.00 11,446,827.24

03 Feb 20 Online Transfer 03 Feb 20 3,515,298.00 7,931,529.24

04 Feb 20 Online Charges AC-0010030031270011 04 Feb 20 406.00 7,931,123.24

04 Feb 20 Online Transfer 62289003 04 Feb 20 12,160.00 7,918,963.24

04 Feb 20 Account Transfer 62289004 04 Feb 20 75,420.00 7,843,543.24

04 Feb 20 Outward Cheque Realized 04 Feb 20 2,885,851.00 10,729,394.24

04 Feb 20 Online Transfer 04 Feb 20 195,000.00 10,534,394.24

04 Feb 20 Clearing 62288997 04 Feb 20 149,432.00 10,384,962.24

Page 68 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

06 Feb 20 Outward Cheque Realized 06 Feb 20 5,000,000.00 15,384,962.24

07 Feb 20 Account Transfer 62289006 07 Feb 20 22,591.00 15,362,371.24

07 Feb 20 Account Transfer 62289008 07 Feb 20 1,000,000.00 14,362,371.24

07 Feb 20 Clearing Charges AC- 07 Feb 20 522.00 14,361,849.24


0010001924780046
07 Feb 20 Account Transfer 62289014 07 Feb 20 37,332.00 14,324,517.24

07 Feb 20 Account Transfer 62289013 07 Feb 20 1,000,000.00 13,324,517.24

07 Feb 20 Account Transfer 62289009 07 Feb 20 2,500,000.00 10,824,517.24

07 Feb 20 Online Transfer 07 Feb 20 4,113,696.00 6,710,821.24

07 Feb 20 Transfer 07 Feb 20 112,520.00 6,823,341.24

08 Feb 20 Account Transfer 62289005 08 Feb 20 16,342.00 6,806,999.24

10 Feb 20 Account Transfer 62289010 10 Feb 20 357,785.00 6,449,214.24

10 Feb 20 Online Transfer 62263681 10 Feb 20 17,678.00 6,431,536.24

11 Feb 20 Account Transfer 62263682 11 Feb 20 512,602.00 5,918,934.24

11 Feb 20 Online Transfer 11 Feb 20 93,700.00 5,825,234.24

11 Feb 20 Outward Cheque Realized 11 Feb 20 6,878,444.00 12,703,678.24

11 Feb 20 Account Transfer 62289011 11 Feb 20 33,505.00 12,670,173.24

12 Feb 20 Account Transfer 62263688 12 Feb 20 259,646.00 12,410,527.24

12 Feb 20 Account Transfer 62263689 12 Feb 20 65,515.00 12,345,012.24

12 Feb 20 Account Transfer 62263686 12 Feb 20 34,559.00 12,310,453.24

12 Feb 20 Online Charges AC-0010023931190012 12 Feb 20 406.00 12,310,047.24

12 Feb 20 Online Transfer 62263687 12 Feb 20 17,491.00 12,292,556.24

14 Feb 20 Clearing 60304306 14 Feb 20 255,576.00 12,036,980.24

14 Feb 20 Account Transfer 62263694 14 Feb 20 1,000,000.00 11,036,980.24

14 Feb 20 Account Transfer 62263691 14 Feb 20 19,790.00 11,017,190.24

14 Feb 20 Outward Cheque Realized 14 Feb 20 2,000,000.00 13,017,190.24

Page 69 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

17 Feb 20 Account Transfer 62263698 17 Feb 20 5,000,000.00 8,017,190.24

18 Feb 20 Account Transfer 62263699 18 Feb 20 61,808.00 7,955,382.24

19 Feb 20 Account Transfer 62263690 19 Feb 20 30,155.00 7,925,227.24

19 Feb 20 Account Transfer 62263693 19 Feb 20 20,200.00 7,905,027.24

19 Feb 20 Clearing Charges AC- 19 Feb 20 522.00 7,904,505.24


0010001924780046
19 Feb 20 Clearing 62263685 19 Feb 20 377,772.00 7,526,733.24

19 Feb 20 Clearing 62289002 19 Feb 20 59,315.00 7,467,418.24

20 Feb 20 Account Transfer 62263702 20 Feb 20 23,285.00 7,444,133.24

21 Feb 20 Clearing 62263697 21 Feb 20 225,000.00 7,219,133.24

21 Feb 20 Clearing 62263696 21 Feb 20 527,691.00 6,691,442.24

21 Feb 20 Clearing 62263683 21 Feb 20 372,281.00 6,319,161.24

21 Feb 20 Account Transfer 62263703 21 Feb 20 50,000.00 6,269,161.24

21 Feb 20 Clearing Charges AC- 21 Feb 20 522.00 6,268,639.24


0010001924780046
21 Feb 20 Outward Cheque Realized 21 Feb 20 2,575,350.00 8,843,989.24

21 Feb 20 Outward Cheque Realized 21 Feb 20 386,183.00 9,230,172.24

24 Feb 20 Clearing 62263700 24 Feb 20 1,300,000.00 7,930,172.24

24 Feb 20 Clearing 62289012 24 Feb 20 15,070.00 7,915,102.24

24 Feb 20 Clearing 62263695 24 Feb 20 302,000.00 7,613,102.24

24 Feb 20 Account Transfer 62263704 24 Feb 20 500,000.00 7,113,102.24

26 Feb 20 Outward Cheque Realized 26 Feb 20 1,261,000.00 8,374,102.24

28 Feb 20 Account Transfer 62547315 28 Feb 20 476,352.00 7,897,750.24

29 Feb 20 Profit 01 Mar 20 84,682.49 7,982,432.73

29 Feb 20 WHT Deduction 01 Mar 20 8,468.00 7,973,964.73

02 Mar 20 Account Transfer 62547311 02 Mar 20 6,000,000.00 1,973,964.73

02 Mar 20 RTGS Payment Credit 02 Mar 20 41,000,000.00 42,973,964.73

Page 70 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

02 Mar 20 Online Transfer 02 Mar 20 6,430,329.00 49,404,293.73

02 Mar 20 Online Charges AC-0010001924780046 02 Mar 20 2,320.00 49,401,973.73

02 Mar 20 Account Transfer 62547312 02 Mar 20 16,000,000.00 33,401,973.73

02 Mar 20 Online Transfer 02 Mar 20 19,458,370.00 13,943,603.73

02 Mar 20 Account Transfer 62547317 02 Mar 20 56,005.00 13,887,598.73

03 Mar 20 Clearing 62288992 03 Mar 20 185,729.00 13,701,869.73

03 Mar 20 Account Transfer 62547318 03 Mar 20 86,974.00 13,614,895.73

03 Mar 20 Account Transfer 62263705 03 Mar 20 41,670.00 13,573,225.73

03 Mar 20 Account Transfer 62547316 03 Mar 20 70,560.00 13,502,665.73

03 Mar 20 Account Transfer 62547314 03 Mar 20 1,713,882.00 11,788,783.73

04 Mar 20 Clearing 62547320 04 Mar 20 5,000,000.00 6,788,783.73

04 Mar 20 Account Transfer 62547321 04 Mar 20 490,128.00 6,298,655.73

04 Mar 20 Account Transfer 62547328 04 Mar 20 8,100,000.00 -1,801,344.27

04 Mar 20 Outward Cheque Realized 04 Mar 20 14,438,621.00 12,637,276.73

05 Mar 20 Online Transfer 05 Mar 20 82,300.00 12,554,976.73

06 Mar 20 Clearing 62547326 06 Mar 20 2,319,524.00 10,235,452.73

06 Mar 20 Account Transfer 62547324 06 Mar 20 6,000.00 10,229,452.73

06 Mar 20 FED Deduction 06 Mar 20 4.83 10,229,447.90

06 Mar 20 Account Statement Charges 06 Mar 20 30.17 10,229,417.73

06 Mar 20 Account Transfer 62547334 06 Mar 20 21,940.00 10,207,477.73

09 Mar 20 Clearing 62547331 09 Mar 20 1,000,000.00 9,207,477.73

09 Mar 20 Online Transfer 62547332 09 Mar 20 493,513.00 8,713,964.73

09 Mar 20 Account Transfer 62547325 09 Mar 20 250,000.00 8,463,964.73

09 Mar 20 Outward Cheque Realized 09 Mar 20 7,415.00 8,471,379.73

09 Mar 20 Outward Cheque Realized 09 Mar 20 3,188.00 8,474,567.73

10 Mar 20 Inward Telex Payment IW REM US 10 Mar 20 34,826,406.25 43,300,973.98

Page 71 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

222889

10 Mar 20 Account Transfer 62379353 10 Mar 20 19,500.00 43,281,473.98

10 Mar 20 Account Transfer 62379356 10 Mar 20 3,000,000.00 40,281,473.98

11 Mar 20 Account Transfer 62547335 11 Mar 20 17,390.00 40,264,083.98

11 Mar 20 Account Transfer 62379361 11 Mar 20 1,100,000.00 39,164,083.98

11 Mar 20 Outward Cheque Realized 11 Mar 20 5,000,000.00 44,164,083.98

11 Mar 20 Outward Cheque Realized 11 Mar 20 2,000,000.00 46,164,083.98

12 Mar 20 Online Transfer 62379354 12 Mar 20 14,996.00 46,149,087.98

12 Mar 20 Account Transfer 62379352 12 Mar 20 33,528.00 46,115,559.98

12 Mar 20 Account Transfer 62547329 12 Mar 20 10,862.00 46,104,697.98

12 Mar 20 Online Transfer 12 Mar 20 3,947,204.00 42,157,493.98

12 Mar 20 Clearing 62379357 12 Mar 20 204,067.00 41,953,426.98

12 Mar 20 Account Transfer 62379358 12 Mar 20 295,071.00 41,658,355.98

12 Mar 20 Account Transfer 62379359 12 Mar 20 1,000,000.00 40,658,355.98

13 Mar 20 Clearing 62379363 13 Mar 20 15,000,000.00 25,658,355.98

13 Mar 20 Clearing 62379364 13 Mar 20 6,000,000.00 19,658,355.98

13 Mar 20 Account Transfer 62379362 13 Mar 20 31,335.00 19,627,020.98

13 Mar 20 Online Transfer 13 Mar 20 3,528,445.00 16,098,575.98

13 Mar 20 Account Transfer 62379369 13 Mar 20 1,100,000.00 14,998,575.98

13 Mar 20 Account Transfer 62379371 13 Mar 20 107,185.00 14,891,390.98

13 Mar 20 Account Transfer 62379367 13 Mar 20 158,799.00 14,732,591.98

13 Mar 20 Account Transfer 62379370 13 Mar 20 2,500,000.00 12,232,591.98

16 Mar 20 Transfer 16 Mar 20 30,000.00 12,262,591.98

16 Mar 20 Online Charges AC-0010024652070016 16 Mar 20 406.00 12,262,185.98

16 Mar 20 Online Transfer 62379368 16 Mar 20 88,038.00 12,174,147.98

16 Mar 20 Account Transfer 62379351 16 Mar 20 32,321.00 12,141,826.98

Page 72 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

17 Mar 20 Clearing 62379360 17 Mar 20 3,000,000.00 9,141,826.98

17 Mar 20 Transfer 17 Mar 20 225,040.00 9,366,866.98

18 Mar 20 Clearing 62379372 18 Mar 20 834,549.00 8,532,317.98

18 Mar 20 FED Deduction 18 Mar 20 4.83 8,532,313.15

18 Mar 20 Account Statement Charges 18 Mar 20 30.17 8,532,282.98

18 Mar 20 Account Transfer 62379375 18 Mar 20 1,000,000.00 7,532,282.98

18 Mar 20 Outward Cheque Realized 18 Mar 20 1,462,443.00 8,994,725.98

19 Mar 20 FED Deduction 19 Mar 20 48.00 8,994,677.98

19 Mar 20 Cheque Book Charges 19 Mar 20 300.00 8,994,377.98

19 Mar 20 Account Transfer 62263706 19 Mar 20 206,820.00 8,787,557.98

19 Mar 20 FED Deduction 19 Mar 20 48.00 8,787,509.98

19 Mar 20 Cheque Book Charges 19 Mar 20 300.00 8,787,209.98

19 Mar 20 FED Deduction 19 Mar 20 48.00 8,787,161.98

19 Mar 20 Cheque Book Charges 19 Mar 20 300.00 8,786,861.98

19 Mar 20 Clearing 62547333 19 Mar 20 117,202.00 8,669,659.98

20 Mar 20 Outward Cheque Realized 20 Mar 20 2,442,697.00 11,112,356.98

20 Mar 20 Account Transfer 62263707 20 Mar 20 1,000,000.00 10,112,356.98

20 Mar 20 Account Transfer 62379374 20 Mar 20 1,443,768.00 8,668,588.98

20 Mar 20 Account Transfer 62263708 20 Mar 20 186,855.00 8,481,733.98

24 Mar 20 Clearing 62379373 24 Mar 20 288,694.00 8,193,039.98

24 Mar 20 Transfer 24 Mar 20 47,340,000.00 55,533,039.98

24 Mar 20 Online Transfer 24 Mar 20 19,906,417.00 35,626,622.98

24 Mar 20 RTGS Payment Debit 24 Mar 20 7,000,000.00 28,626,622.98

24 Mar 20 Account Transfer 62263712 24 Mar 20 16,000,000.00 12,626,622.98

24 Mar 20 Account Transfer 62263713 24 Mar 20 6,000,000.00 6,626,622.98

24 Mar 20 Account Transfer 62263711 24 Mar 20 1,458,887.00 5,167,735.98

Page 73 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

24 Mar 20 Account Transfer 62263711 24 Mar 20 1,458,887.00 6,626,622.98

24 Mar 20 Online Transfer 24 Mar 20 1,458,887.00 5,167,735.98

25 Mar 20 Account Transfer 62263715 25 Mar 20 1,000,000.00 4,167,735.98

30 Mar 20 Outward Cheque Realized 30 Mar 20 653,516.00 4,821,251.98

30 Mar 20 Outward Cheque Realized 30 Mar 20 871,355.00 5,692,606.98

30 Mar 20 Outward Cheque Realized 30 Mar 20 435,677.00 6,128,283.98

30 Mar 20 Outward Cheque Realized 30 Mar 20 871,355.00 6,999,638.98

31 Mar 20 Profit 01 Apr 20 110,170.85 7,109,809.83

31 Mar 20 WHT Deduction 01 Apr 20 11,017.00 7,098,792.83

02 Apr 20 Clearing 62263684 02 Apr 20 486,221.00 6,612,571.83

03 Apr 20 Outward Cheque Realized 03 Apr 20 9,483,210.00 16,095,781.83

06 Apr 20 Account Transfer 62263721 06 Apr 20 1,000,000.00 15,095,781.83

06 Apr 20 FED Deduction 06 Apr 20 48.00 15,095,733.83

06 Apr 20 Cheque Book Charges 06 Apr 20 300.00 15,095,433.83

06 Apr 20 FED Deduction 06 Apr 20 48.00 15,095,385.83

06 Apr 20 Cheque Book Charges 06 Apr 20 300.00 15,095,085.83

06 Apr 20 Online Transfer 06 Apr 20 3,980,815.00 11,114,270.83

06 Apr 20 Account Transfer 62263717 06 Apr 20 2,500,000.00 8,614,270.83

06 Apr 20 Account Transfer 62263720 06 Apr 20 41,038.00 8,573,232.83

07 Apr 20 Account Transfer 62263716 07 Apr 20 1,000,000.00 7,573,232.83

07 Apr 20 Account Transfer 62263719 07 Apr 20 357,670.00 7,215,562.83

07 Apr 20 Outward Cheque Realized 07 Apr 20 4,000,000.00 11,215,562.83

08 Apr 20 Online Transfer 62263724 08 Apr 20 15,770.00 11,199,792.83

08 Apr 20 Account Transfer 62263723 08 Apr 20 2,500,000.00 8,699,792.83

09 Apr 20 Online Transfer 09 Apr 20 3,372,508.00 5,327,284.83

09 Apr 20 Online Transfer 09 Apr 20 3,372,508.00 8,699,792.83

Page 74 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

09 Apr 20 Online Transfer 09 Apr 20 158,799.00 8,540,993.83

09 Apr 20 Account Transfer 62263727 09 Apr 20 107,185.00 8,433,808.83

09 Apr 20 Online Transfer 09 Apr 20 3,372,508.00 5,061,300.83

09 Apr 20 Account Transfer 62263722 09 Apr 20 1,100,000.00 3,961,300.83

13 Apr 20 Account Transfer 62263729 13 Apr 20 6,000.00 3,955,300.83

14 Apr 20 Outward Cheque Realized 14 Apr 20 4,015,962.00 7,971,262.83

14 Apr 20 Outward Cheque Realized 14 Apr 20 1,487,652.00 9,458,914.83

14 Apr 20 Account Transfer 62263728 14 Apr 20 76,700.00 9,382,214.83

14 Apr 20 Account Transfer 62263730 14 Apr 20 74,160.00 9,308,054.83

17 Apr 20 Online Transfer 17 Apr 20 165,700.00 9,473,754.83

20 Apr 20 Clearing Charges AC- 20 Apr 20 522.00 9,473,232.83


0010001924780046
20 Apr 20 Clearing Charges AC- 20 Apr 20 522.00 9,472,710.83
0010001924780046
20 Apr 20 Clearing Charges AC- 20 Apr 20 522.00 9,472,188.83
0010001924780046
20 Apr 20 Clearing Charges AC- 20 Apr 20 522.00 9,471,666.83
0010001924780046
21 Apr 20 Account Transfer 62042982 21 Apr 20 24,000.00 9,447,666.83

21 Apr 20 Inward Telex Payment 21 Apr 20 30,611,967.05 40,059,633.88


IWREMUS189900.54
21 Apr 20 Account Transfer 62042981 21 Apr 20 126,455.00 39,933,178.88

21 Apr 20 Repayment of Principal 21 Apr 20 3,237,000.00 43,170,178.88

21 Apr 20 Net Profit aftr WHT 21 Apr 20 138,530.92 43,308,709.80

23 Apr 20 Outward Cheque Realized 23 Apr 20 2,864,671.00 46,173,380.80

23 Apr 20 Outward Cheque Realized 23 Apr 20 829,720.00 47,003,100.80

23 Apr 20 Outward Cheque Realized 23 Apr 20 304,000.00 47,307,100.80

23 Apr 20 FED Deduction 23 Apr 20 4.83 47,307,095.97

23 Apr 20 Account Statement Charges 23 Apr 20 30.17 47,307,065.80

Page 75 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

23 Apr 20 Repayment of Principal 23 Apr 20 409,000.00 47,716,065.80

23 Apr 20 Net Profit aftr WHT 23 Apr 20 17,694.68 47,733,760.48

29 Apr 20 Online Transfer 29 Apr 20 31,335.00 47,702,425.48

29 Apr 20 Instr. Issue Commission AC- 29 Apr 20 174.00 47,702,251.48


0010001924780046
29 Apr 20 Instrument Issued 62042988 29 Apr 20 4,264,000.00 43,438,251.48

29 Apr 20 Account Transfer 62042984 29 Apr 20 32,029.00 43,406,222.48

29 Apr 20 Outward Cheque Realized 29 Apr 20 2,150,945.00 45,557,167.48

30 Apr 20 Clearing 62042986 30 Apr 20 413,640.00 45,143,527.48

30 Apr 20 Profit 01 May 20 147,149.11 45,290,676.59

30 Apr 20 WHT Deduction 01 May 20 14,715.00 45,275,961.59

04 May 20 Account Transfer 62042985 04 May 20 1,575,187.00 43,700,774.59

04 May 20 Account Transfer 62042989 04 May 20 16,000,000.00 27,700,774.59

05 May 20 Account Transfer 62042983 05 May 20 19,494,903.00 8,205,871.59

06 May 20 Account Transfer 62042990 06 May 20 6,000,000.00 2,205,871.59

11 May 20 Outward Cheque Realized 11 May 20 2,000,000.00 4,205,871.59

12 May 20 Online Transfer 12 May 20 65,500.00 4,140,371.59

12 May 20 Inward Telex Payment IW REM 12 May 20 31,687,371.00 35,827,742.59


US198356
12 May 20 Inward Telex Payment IW REMUS52874. 12 May 20 8,446,712.56 44,274,455.15
57
13 May 20 Clearing 62042995 13 May 20 8,000,000.00 36,274,455.15

13 May 20 RTGS Payment Debit 13 May 20 10,000,000.00 26,274,455.15

14 May 20 Account Transfer 62043005 14 May 20 2,500,000.00 23,774,455.15

14 May 20 Account Transfer 62043001 14 May 20 4,020,612.00 19,753,843.15

14 May 20 Account Transfer 62043003 14 May 20 367,490.00 19,386,353.15

14 May 20 Account Transfer 62042999 14 May 20 6,000.00 19,380,353.15

14 May 20 Account Transfer 62043000 14 May 20 122,532.00 19,257,821.15

Page 76 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

14 May 20 Account Transfer 62263756 14 May 20 39,450.00 19,218,371.15

14 May 20 Account Transfer 62043004 14 May 20 1,000,000.00 18,218,371.15

14 May 20 Clearing Charges AC- 14 May 20 522.00 18,217,849.15


0010001924780046
15 May 20 Account Transfer 62263760 15 May 20 10,300,000.00 7,917,849.15

18 May 20 Clearing 62263761 18 May 20 1,000,000.00 6,917,849.15

18 May 20 Account Transfer 62042993 18 May 20 13,246.00 6,904,603.15

19 May 20 Clearing 62263757 19 May 20 2,550,456.00 4,354,147.15

19 May 20 Account Transfer 62263766 19 May 20 103,788.00 4,250,359.15

19 May 20 Online Transfer 19 May 20 76,860.00 4,173,499.15

19 May 20 Account Transfer 62263762 19 May 20 2,662,608.00 1,510,891.15

19 May 20 Account Transfer 62042996 19 May 20 32,420.00 1,478,471.15

19 May 20 Outward Cheque Realized 19 May 20 7,000,000.00 8,478,471.15

19 May 20 Outward Cheque Realized 19 May 20 1,277,996.00 9,756,467.15

20 May 20 Clearing Charges AC- 20 May 20 638.00 9,755,829.15


0010001924780046
20 May 20 Account Transfer 62263769 20 May 20 2,400,000.00 7,355,829.15

20 May 20 Account Transfer 62263773 20 May 20 30,000.00 7,325,829.15

20 May 20 Account Transfer 62263767 20 May 20 1,100,000.00 6,225,829.15

20 May 20 Outward Cheque Realized 20 May 20 3,798,812.00 10,024,641.15

20 May 20 Account Transfer 62263763 20 May 20 198,708.00 9,825,933.15

20 May 20 Account Transfer 62263764 20 May 20 191,141.00 9,634,792.15

21 May 20 Online Transfer 21 May 20 76,140.00 9,558,652.15

21 May 20 Account Transfer 62263774 21 May 20 33,440.00 9,525,212.15

21 May 20 Account Transfer 62263772 21 May 20 500,000.00 9,025,212.15

21 May 20 Account Transfer 62042997 21 May 20 104,085.00 8,921,127.15

21 May 20 Account Transfer 62263777 21 May 20 55,203.00 8,865,924.15

Page 77 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

21 May 20 Online Transfer 21 May 20 1,970,386.00 10,836,310.15

21 May 20 Online Charges AC-0010001924780046 21 May 20 2,285.39 10,834,024.76

21 May 20 Outward Cheque Realized 21 May 20 18,043,378.00 28,877,402.76

28 May 20 Clearing 62263758 28 May 20 421,942.00 28,455,460.76

28 May 20 Clearing 62263771 28 May 20 1,000,000.00 27,455,460.76

28 May 20 Account Transfer 63456477 28 May 20 8,600,000.00 18,855,460.76

28 May 20 Online Transfer 28 May 20 10,188,877.00 8,666,583.76

29 May 20 Account Transfer 62263779 29 May 20 641,862.00 8,024,721.76

29 May 20 Account Transfer 62042991 29 May 20 16,737.00 8,007,984.76

29 May 20 Account Transfer 63456476 29 May 20 3,500,000.00 4,507,984.76

29 May 20 Profit 01 Jun 20 104,409.50 4,612,394.26

29 May 20 WHT Deduction 01 Jun 20 10,441.00 4,601,953.26

03 Jun 20 Account Transfer 63456482 03 Jun 20 40,415.00 4,561,538.26

03 Jun 20 Outward Cheque Realized 03 Jun 20 20,000,000.00 24,561,538.26

03 Jun 20 Account Transfer 63456484 03 Jun 20 3,000,000.00 21,561,538.26

04 Jun 20 Account Transfer 63456483 04 Jun 20 6,100,000.00 15,461,538.26

04 Jun 20 Account Transfer 63456480 04 Jun 20 1,166,218.00 14,295,320.26

04 Jun 20 Account Transfer 63456489 04 Jun 20 122,532.00 14,172,788.26

04 Jun 20 Online Transfer 04 Jun 20 9,661,830.00 4,510,958.26

04 Jun 20 Outward Cheque Realized 04 Jun 20 1,469,063.00 5,980,021.26

04 Jun 20 Outward Cheque Realized 04 Jun 20 864,580.00 6,844,601.26

04 Jun 20 Outward Cheque Realized 04 Jun 20 250,587.00 7,095,188.26

05 Jun 20 Account Transfer 62263780 05 Jun 20 255,576.00 6,839,612.26

08 Jun 20 Outward Cheque Realized 08 Jun 20 7,090,554.00 13,930,166.26

08 Jun 20 Transfer 08 Jun 20 1,130,712.00 15,060,878.26

08 Jun 20 Outward Cheque Realized 08 Jun 20 974,799.00 16,035,677.26

Page 78 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

08 Jun 20 Courier Charges 08 Jun 20 100.00 16,035,577.26

08 Jun 20 LC Courier Charges 08 Jun 20 250.00 16,035,327.26

08 Jun 20 FED Deduction 08 Jun 20 179,009.00 15,856,318.26

08 Jun 20 LG Commission Recovered 08 Jun 20 1,118,807.00 14,737,511.26

08 Jun 20 Outward Cheque Realized 08 Jun 20 4,881,293.00 19,618,804.26

08 Jun 20 Account Transfer 63456492 08 Jun 20 6,000,000.00 13,618,804.26

09 Jun 20 Clearing 63456481 09 Jun 20 109,352.00 13,509,452.26

09 Jun 20 Account Transfer 63456490 09 Jun 20 69,120.00 13,440,332.26

11 Jun 20 Clearing 63456487 11 Jun 20 90,960.00 13,349,372.26

11 Jun 20 RTGS Payment Credit 11 Jun 20 2,436,667.00 15,786,039.26

12 Jun 20 Account Transfer 63456493 12 Jun 20 3,500,000.00 12,286,039.26

15 Jun 20 Outward Cheque Realized 15 Jun 20 9,737,306.00 22,023,345.26

17 Jun 20 Clearing Charges AC- 17 Jun 20 522.00 22,022,823.26


0010001924780046
17 Jun 20 Clearing Charges AC- 17 Jun 20 522.00 22,022,301.26
0010001924780046
17 Jun 20 Clearing Charges AC- 17 Jun 20 522.00 22,021,779.26
0010001924780046
17 Jun 20 Online Charges AC-0010023929500010 17 Jun 20 406.00 22,021,373.26

17 Jun 20 Online Transfer 63456494 17 Jun 20 28,695.00 21,992,678.26

18 Jun 20 Clearing Charges AC- 18 Jun 20 522.00 21,992,156.26


0010001924780046
18 Jun 20 Online Transfer 18 Jun 20 14,277,539.40 36,269,695.66

18 Jun 20 Clearing Charges AC- 18 Jun 20 522.00 36,269,173.66


0010001924780046
19 Jun 20 Clearing 63456498 19 Jun 20 2,000,000.00 34,269,173.66

19 Jun 20 Online Transfer 19 Jun 20 84,700.00 34,184,473.66

19 Jun 20 Clearing 63456500 19 Jun 20 2,000,000.00 32,184,473.66

22 Jun 20 Clearing 63456497 22 Jun 20 4,000,000.00 28,184,473.66

Page 79 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

22 Jun 20 Clearing 63456496 22 Jun 20 8,000,000.00 20,184,473.66

22 Jun 20 Clearing 63456499 22 Jun 20 1,000,000.00 19,184,473.66

22 Jun 20 Outward Cheque Realized 22 Jun 20 549,114.00 19,733,587.66

22 Jun 20 Outward Cheque Realized 22 Jun 20 2,010,015.00 21,743,602.66

22 Jun 20 Outward Cheque Realized 22 Jun 20 759,375.00 22,502,977.66

22 Jun 20 Account Transfer 63456460 22 Jun 20 2,500,000.00 20,002,977.66

22 Jun 20 Account Transfer 63456454 22 Jun 20 349,018.00 19,653,959.66

22 Jun 20 Account Transfer 63456451 22 Jun 20 3,859,528.00 15,794,431.66

22 Jun 20 Clearing Charges AC- 22 Jun 20 522.00 15,793,909.66


0010001924780046
22 Jun 20 Clearing Charges AC- 22 Jun 20 522.00 15,793,387.66
0010001924780046
22 Jun 20 Clearing Charges AC- 22 Jun 20 522.00 15,792,865.66
0010001924780046
22 Jun 20 Clearing Charges AC- 22 Jun 20 522.00 15,792,343.66
0010001924780046
22 Jun 20 Clearing Charges AC- 22 Jun 20 522.00 15,791,821.66
0010001924780046
22 Jun 20 Online Transfer 22 Jun 20 2,110,510.00 17,902,331.66

22 Jun 20 Online Charges AC-0010001924780046 22 Jun 20 2,320.00 17,900,011.66

22 Jun 20 Account Transfer 63456453 22 Jun 20 80,820.00 17,819,191.66

22 Jun 20 Online Transfer 63456458 22 Jun 20 19,626.00 17,799,565.66

22 Jun 20 Account Transfer 63456461 22 Jun 20 1,000,000.00 16,799,565.66

23 Jun 20 Clearing Charges AC- 23 Jun 20 522.00 16,799,043.66


0010001924780046
23 Jun 20 Clearing Charges AC- 23 Jun 20 522.00 16,798,521.66
0010001924780046
23 Jun 20 Clearing Charges AC- 23 Jun 20 522.00 16,797,999.66
0010001924780046
23 Jun 20 Clearing Charges AC- 23 Jun 20 522.00 16,797,477.66
0010001924780046
23 Jun 20 Clearing Charges AC- 23 Jun 20 522.00 16,796,955.66
0010001924780046
Page 80 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

23 Jun 20 Clearing Charges AC- 23 Jun 20 522.00 16,796,433.66


0010001924780046
23 Jun 20 Clearing Charges AC- 23 Jun 20 522.00 16,795,911.66
0010001924780046
23 Jun 20 Outward Cheque Realized 23 Jun 20 2,115,660.00 18,911,571.66

23 Jun 20 Account Transfer 63456459 23 Jun 20 37,054.00 18,874,517.66

23 Jun 20 Clearing Charges AC- 23 Jun 20 2,320.00 18,872,197.66


0010001924780046
23 Jun 20 Clearing Charges AC- 23 Jun 20 522.00 18,871,675.66
0010001924780046
23 Jun 20 Clearing Charges AC- 23 Jun 20 522.00 18,871,153.66
0010001924780046
24 Jun 20 Clearing 63456463 24 Jun 20 3,845,779.00 15,025,374.66

24 Jun 20 Outward Cheque Realized 24 Jun 20 947,846.00 15,973,220.66

24 Jun 20 Outward Cheque Realized 24 Jun 20 795,701.00 16,768,921.66

24 Jun 20 Outward Cheque Realized 24 Jun 20 642,313.00 17,411,234.66

24 Jun 20 Account Transfer 63456457 24 Jun 20 30,250.00 17,380,984.66

24 Jun 20 Account Transfer 63456467 24 Jun 20 99,085.00 17,281,899.66

24 Jun 20 Clearing Charges AC- 24 Jun 20 522.00 17,281,377.66


0010001924780046
24 Jun 20 Clearing Charges AC- 24 Jun 20 522.00 17,280,855.66
0010001924780046
24 Jun 20 Account Transfer 63456456 24 Jun 20 31,202.00 17,249,653.66

24 Jun 20 Outward Cheque Realized 24 Jun 20 3,206,609.00 20,456,262.66

25 Jun 20 Account Transfer 63456462 25 Jun 20 2,785,953.00 17,670,309.66

25 Jun 20 Account Transfer 63456471 25 Jun 20 156,509.00 17,513,800.66

25 Jun 20 Outward Cheque Realized 25 Jun 20 3,326,752.00 20,840,552.66

25 Jun 20 Clearing 63456469 25 Jun 20 1,500,000.00 19,340,552.66

25 Jun 20 Clearing 63456468 25 Jun 20 5,000,000.00 14,340,552.66

25 Jun 20 Clearing Charges AC- 25 Jun 20 522.00 14,340,030.66


0010001924780046

Page 81 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

25 Jun 20 Clearing Charges AC- 25 Jun 20 522.00 14,339,508.66


0010001924780046
25 Jun 20 Outward Cheque Realized 25 Jun 20 10,208.00 14,349,716.66

25 Jun 20 Outward Cheque Realized 25 Jun 20 4,630.00 14,354,346.66

25 Jun 20 Outward Cheque Realized 25 Jun 20 3,305.00 14,357,651.66

25 Jun 20 Outward Cheque Realized 25 Jun 20 64,759.00 14,422,410.66

25 Jun 20 Outward Cheque Realized 25 Jun 20 13,183.00 14,435,593.66

25 Jun 20 Outward Cheque Realized 25 Jun 20 5,578.00 14,441,171.66

25 Jun 20 Outward Cheque Realized 25 Jun 20 7,014.00 14,448,185.66

25 Jun 20 Outward Cheque Realized 25 Jun 20 1,494,178.00 15,942,363.66

26 Jun 20 Outward Cheque Realized 26 Jun 20 2,500,000.00 18,442,363.66

26 Jun 20 Outward Cheque Realized 26 Jun 20 966,835.00 19,409,198.66

26 Jun 20 Outward Cheque Realized 26 Jun 20 861,140.00 20,270,338.66

26 Jun 20 Outward Cheque Realized 26 Jun 20 613,700.00 20,884,038.66

26 Jun 20 Outward Cheque Realized 26 Jun 20 5,363,492.00 26,247,530.66

26 Jun 20 Outward Cheque Realized 26 Jun 20 3,000,000.00 29,247,530.66

26 Jun 20 Outward Cheque Realized 26 Jun 20 981,518.00 30,229,048.66

26 Jun 20 Outward Cheque Realized 26 Jun 20 674,846.00 30,903,894.66

26 Jun 20 Outward Cheque Realized 26 Jun 20 1,040,850.00 31,944,744.66

26 Jun 20 Outward Cheque Realized 26 Jun 20 161,500.00 32,106,244.66

26 Jun 20 Transfer 26 Jun 20 225,040.00 32,331,284.66

29 Jun 20 Clearing 63456488 29 Jun 20 178,250.00 32,153,034.66

29 Jun 20 Clearing 63456465 29 Jun 20 163,779.00 31,989,255.66

29 Jun 20 Online Transfer 29 Jun 20 78,368.00 31,910,887.66

29 Jun 20 Online Transfer 63456472 29 Jun 20 15,134.00 31,895,753.66

29 Jun 20 Outward Cheque Realized 29 Jun 20 40,000,000.00 71,895,753.66

Page 82 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

29 Jun 20 FED Deduction 29 Jun 20 48.00 71,895,705.66

29 Jun 20 Cheque Book Charges 29 Jun 20 300.00 71,895,405.66

29 Jun 20 Account Transfer 63456466 29 Jun 20 19,206.00 71,876,199.66

29 Jun 20 RTGS Payment Debit 29 Jun 20 20,000,000.00 51,876,199.66

29 Jun 20 Account Transfer 63456455 29 Jun 20 9,598.00 51,866,601.66

29 Jun 20 Account Transfer 62263737 29 Jun 20 15,000,000.00 36,866,601.66

29 Jun 20 Outward Cheque Realized 29 Jun 20 99,496,623.00 136,363,224.66

29 Jun 20 Outward Cheque Realized 29 Jun 20 1,243,720.00 137,606,944.66

29 Jun 20 Outward Cheque Realized 29 Jun 20 788,580.00 138,395,524.66

30 Jun 20 Outward Cheque Realized 30 Jun 20 845,099.00 139,240,623.66

30 Jun 20 Outward Cheque Realized 30 Jun 20 3,745,641.00 142,986,264.66

30 Jun 20 Outward Cheque Realized 30 Jun 20 1,040,147.00 144,026,411.66

30 Jun 20 Outward Cheque Realized 30 Jun 20 515,743.00 144,542,154.66

30 Jun 20 Outward Cheque Realized 30 Jun 20 91,447.00 144,633,601.66

30 Jun 20 Outward Cheque Realized 30 Jun 20 894,494.00 145,528,095.66

30 Jun 20 Account Transfer 62263733 30 Jun 20 122,532.00 145,405,563.66

30 Jun 20 Account Transfer 63456474 30 Jun 20 9,790,965.00 135,614,598.66

30 Jun 20 Account Transfer 62263736 30 Jun 20 6,500,000.00 129,114,598.66

30 Jun 20 Online Transfer 30 Jun 20 1,274,064.00 130,388,662.66

30 Jun 20 Online Charges AC-0010001924780046 30 Jun 20 1,478.06 130,387,184.60

30 Jun 20 Online Charges AC-0010049189280016 30 Jun 20 406.00 130,386,778.60

30 Jun 20 Online Transfer 62263739 30 Jun 20 71,680.00 130,315,098.60

30 Jun 20 Instr. Issue Commission AC- 30 Jun 20 174.00 130,314,924.60


0010001924780046
30 Jun 20 Instrument Issued 62263740 30 Jun 20 123,000,000.00 7,314,924.60

30 Jun 20 Account Transfer 62263731 30 Jun 20 1,066,760.00 6,248,164.60

Page 83 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

30 Jun 20 Account Transfer 62263732 30 Jun 20 530,970.00 5,717,194.60

30 Jun 20 Account Transfer 63456475 30 Jun 20 9,403,302.00 -3,686,107.40

30 Jun 20 Outward Cheque Realized 30 Jun 20 4,162,080.00 475,972.60

30 Jun 20 Profit 01 Jul 20 112,441.98 588,414.58

30 Jun 20 WHT Deduction 01 Jul 20 11,244.00 577,170.58

02 Jul 20 Encashment of Instrument 12840456 02 Jul 20 123,000,000.00 123,577,170.58

02 Jul 20 Clearing Charges AC- 02 Jul 20 1,465.70 123,575,704.88


0010001924780046
02 Jul 20 Outward Cheque Realized 02 Jul 20 206,448.00 123,782,152.88

02 Jul 20 Account Transfer 62263738 02 Jul 20 37,000,000.00 86,782,152.88

03 Jul 20 Clearing 62263735 03 Jul 20 2,157,350.00 84,624,802.88

03 Jul 20 Account Transfer 62263745 03 Jul 20 37,000,000.00 47,624,802.88

03 Jul 20 Online Charges AC-0010008721930019 03 Jul 20 490.64 47,624,312.24

03 Jul 20 Online Transfer 63456473 03 Jul 20 422,637.00 47,201,675.24

03 Jul 20 Outward Cheque Realized 03 Jul 20 1,263,698.00 48,465,373.24

06 Jul 20 Account Transfer 62263746 06 Jul 20 93,002.00 48,372,371.24

06 Jul 20 Account Transfer 62263747 06 Jul 20 4,900,000.00 43,472,371.24

06 Jul 20 Account Transfer 62263748 06 Jul 20 2,100,000.00 41,372,371.24

07 Jul 20 Clearing 62263741 07 Jul 20 3,000,000.00 38,372,371.24

07 Jul 20 Account Transfer 62263751 07 Jul 20 351,257.00 38,021,114.24

07 Jul 20 Account Transfer 62263743 07 Jul 20 2,141,992.00 35,879,122.24

07 Jul 20 Account Transfer 62263744 07 Jul 20 212,992.00 35,666,130.24

07 Jul 20 Account Transfer 62263749 07 Jul 20 3,893,534.00 31,772,596.24

08 Jul 20 Account Transfer 62263755 08 Jul 20 48,813.00 31,723,783.24

08 Jul 20 Clearing 62263742 08 Jul 20 3,000,000.00 28,723,783.24

09 Jul 20 Account Transfer 62263754 09 Jul 20 1,869,386.00 26,854,397.24

Page 84 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

09 Jul 20 Clearing 62263752 09 Jul 20 4,000,000.00 22,854,397.24

09 Jul 20 Account Transfer 63603296 09 Jul 20 23,540.00 22,830,857.24

10 Jul 20 Inward Telex Payment IWREM US63501. 10 Jul 20 10,534,855.72 33,365,712.96


24
13 Jul 20 Outward Cheque Realized 13 Jul 20 37,540.00 33,403,252.96

13 Jul 20 Outward Cheque Realized 13 Jul 20 136,606.00 33,539,858.96

13 Jul 20 Outward Cheque Realized 13 Jul 20 43,534.00 33,583,392.96

13 Jul 20 Outward Cheque Realized 13 Jul 20 8,386.00 33,591,778.96

13 Jul 20 Outward Cheque Realized 13 Jul 20 1,843.00 33,593,621.96

13 Jul 20 Outward Cheque Realized 13 Jul 20 605,258.00 34,198,879.96

13 Jul 20 Outward Cheque Realized 13 Jul 20 88,437.00 34,287,316.96

13 Jul 20 Outward Cheque Realized 13 Jul 20 22,097.00 34,309,413.96

13 Jul 20 Outward Cheque Realized 13 Jul 20 209,479.00 34,518,892.96

13 Jul 20 Account Transfer 62263753 13 Jul 20 82,200.00 34,436,692.96

13 Jul 20 RTGS Payment Credit 13 Jul 20 1,947,394.00 36,384,086.96

13 Jul 20 Account Transfer 63603298 13 Jul 20 2,000,000.00 34,384,086.96

13 Jul 20 Account Transfer 63603297 13 Jul 20 3,000,000.00 31,384,086.96

13 Jul 20 Account Transfer 63603301 13 Jul 20 2,200,000.00 29,184,086.96

13 Jul 20 Account Transfer 63603302 13 Jul 20 800,000.00 28,384,086.96

14 Jul 20 Account Transfer 63603300 14 Jul 20 386,180.00 27,997,906.96

14 Jul 20 Account Transfer 63603299 14 Jul 20 5,702,189.00 22,295,717.96

14 Jul 20 Account Transfer 63603303 14 Jul 20 48,690.00 22,247,027.96

14 Jul 20 Account Transfer 63603304 14 Jul 20 85,955.00 22,161,072.96

16 Jul 20 Outward Cheque Realized 16 Jul 20 2,000,000.00 24,161,072.96

16 Jul 20 Account Transfer 63603306 16 Jul 20 95,579.00 24,065,493.96

16 Jul 20 Account Transfer 63603309 16 Jul 20 3,200,000.00 20,865,493.96

Page 85 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

16 Jul 20 Account Transfer 63603310 16 Jul 20 7,100,000.00 13,765,493.96

17 Jul 20 Account Transfer 63603308 17 Jul 20 590,706.00 13,174,787.96

17 Jul 20 Account Transfer 63603307 17 Jul 20 6,341,921.00 6,832,866.96

21 Jul 20 Account Transfer 63603312 21 Jul 20 16,000.00 6,816,866.96

22 Jul 20 Account Transfer 63603313 22 Jul 20 141,300.00 6,675,566.96

22 Jul 20 FED Deduction 22 Jul 20 4.83 6,675,562.13

22 Jul 20 FED Deduction 22 Jul 20 4.83 6,675,557.30

22 Jul 20 Account Statement Charges 22 Jul 20 30.17 6,675,527.13

22 Jul 20 Account Statement Charges 22 Jul 20 30.17 6,675,496.96

22 Jul 20 FED Deduction 22 Jul 20 120.00 6,675,376.96

22 Jul 20 Charges 22 Jul 20 750.00 6,674,626.96

22 Jul 20 Online Transfer 22 Jul 20 11,642.00 6,662,984.96

22 Jul 20 Account Transfer 63603314 22 Jul 20 91,276.00 6,571,708.96

23 Jul 20 Account Transfer 63603320 23 Jul 20 17,580.00 6,554,128.96

23 Jul 20 RTGS Payment Credit 3 23 Jul 20 335,317.00 6,889,445.96

23 Jul 20 FED Deduction 23 Jul 20 60.00 6,889,385.96

23 Jul 20 Cheque Book Charges 23 Jul 20 375.00 6,889,010.96

23 Jul 20 Account Transfer 63603311 23 Jul 20 90,000.00 6,799,010.96

23 Jul 20 Transfer 23 Jul 20 112,520.00 6,911,530.96

23 Jul 20 Transfer 23 Jul 20 112,520.00 7,024,050.96

24 Jul 20 Outward Cheque Realized 24 Jul 20 40,109,593.00 47,133,643.96

24 Jul 20 FED Deduction 24 Jul 20 60.00 47,133,583.96

24 Jul 20 Cheque Book Charges 24 Jul 20 375.00 47,133,208.96

24 Jul 20 FED Deduction 24 Jul 20 60.00 47,133,148.96

24 Jul 20 Cheque Book Charges 24 Jul 20 375.00 47,132,773.96

24 Jul 20 FED Deduction 24 Jul 20 60.00 47,132,713.96

Page 86 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

24 Jul 20 Cheque Book Charges 24 Jul 20 375.00 47,132,338.96

24 Jul 20 FED Deduction 24 Jul 20 60.00 47,132,278.96

24 Jul 20 Cheque Book Charges 24 Jul 20 375.00 47,131,903.96

24 Jul 20 FED Deduction 24 Jul 20 60.00 47,131,843.96

24 Jul 20 Cheque Book Charges 24 Jul 20 375.00 47,131,468.96

24 Jul 20 FED Deduction 24 Jul 20 60.00 47,131,408.96

24 Jul 20 Cheque Book Charges 24 Jul 20 375.00 47,131,033.96

27 Jul 20 Clearing 63603317 27 Jul 20 91,276.00 47,039,757.96

27 Jul 20 Clearing 63603272 27 Jul 20 2,000,000.00 45,039,757.96

27 Jul 20 Clearing 63603273 27 Jul 20 3,000,000.00 42,039,757.96

27 Jul 20 Clearing 63603274 27 Jul 20 12,000,000.00 30,039,757.96

27 Jul 20 Clearing 63603319 27 Jul 20 1,200,000.00 28,839,757.96

27 Jul 20 Clearing Charges AC- 27 Jul 20 1,425.28 28,838,332.68


0010001924780046
27 Jul 20 Account Transfer 63603277 27 Jul 20 1,900,000.00 26,938,332.68

27 Jul 20 Account Transfer 63603281 27 Jul 20 76,667.00 26,861,665.68

27 Jul 20 Account Transfer 63603280 27 Jul 20 3,800,000.00 23,061,665.68

27 Jul 20 Online Transfer 27 Jul 20 1,868,941.00 24,930,606.68

27 Jul 20 Online Charges AC-0010001924780046 27 Jul 20 2,167.94 24,928,438.74

28 Jul 20 Account Transfer 63603318 28 Jul 20 124,432.00 24,804,006.74

28 Jul 20 Account Transfer 63603271 28 Jul 20 6,590,283.00 18,213,723.74

28 Jul 20 Account Transfer 63603275 28 Jul 20 582,020.00 17,631,703.74

28 Jul 20 Clearing 63603276 28 Jul 20 5,000,000.00 12,631,703.74

28 Jul 20 Inward Telex Payment 28 Jul 20 25,383,308.98 38,015,012.72


IWREMUS152819.44
28 Jul 20 Account Transfer 63603286 28 Jul 20 16,109.00 37,998,903.72

28 Jul 20 Account Transfer 63603282 28 Jul 20 14,400,000.00 23,598,903.72

Page 87 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

28 Jul 20 Outward Cheque Realized 28 Jul 20 1,228,280.00 24,827,183.72

28 Jul 20 Account Transfer 63603284 28 Jul 20 51,480.00 24,775,703.72

29 Jul 20 Clearing 63603289 29 Jul 20 10,000,000.00 14,775,703.72

29 Jul 20 Online Charges AC-0010023929490019 29 Jul 20 406.00 14,775,297.72

29 Jul 20 Online Transfer 63603294 29 Jul 20 25,580.00 14,749,717.72

29 Jul 20 Account Transfer 63603293 29 Jul 20 206,820.00 14,542,897.72

29 Jul 20 Online Transfer 29 Jul 20 37,555.00 14,505,342.72

29 Jul 20 Account Transfer 63603288 29 Jul 20 4,072,844.00 10,432,498.72

29 Jul 20 Account Transfer 63603292 29 Jul 20 369,220.00 10,063,278.72

29 Jul 20 Account Transfer 63603295 29 Jul 20 23,700.00 10,039,578.72

29 Jul 20 Clearing 63603290 29 Jul 20 1,500,000.00 8,539,578.72

29 Jul 20 Clearing 63603291 29 Jul 20 1,500,000.00 7,039,578.72

30 Jul 20 Account Transfer 51233783 30 Jul 20 48,000.00 6,991,578.72

30 Jul 20 Account Transfer 51233784 30 Jul 20 38,382.00 6,953,196.72

30 Jul 20 Profit 01 Aug 20 118,330.17 7,071,526.89

30 Jul 20 WHT Deduction 01 Aug 20 17,750.00 7,053,776.89

30 Jul 20 Account Transfer 51233781 30 Jul 20 2,600,000.00 4,453,776.89

30 Jul 20 Account Transfer 51233782 30 Jul 20 1,100,000.00 3,353,776.89

04 Aug 20 Online Transfer 04 Aug 20 2,606,040.00 5,959,816.89

04 Aug 20 Online Charges AC-0010001924780046 04 Aug 20 2,320.00 5,957,496.89

05 Aug 20 Account Transfer 63603283 05 Aug 20 24,775.00 5,932,721.89

05 Aug 20 Account Transfer 51233788 05 Aug 20 34,559.00 5,898,162.89

05 Aug 20 Online Charges AC-0010005407660018 05 Aug 20 12.00 5,898,150.89

05 Aug 20 Online Transfer 51233789 05 Aug 20 18,950.00 5,879,200.89

05 Aug 20 Clearing Charges AC- 05 Aug 20 522.00 5,878,678.89


0010001924780046

Page 88 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

05 Aug 20 Account Transfer 51233787 05 Aug 20 11,000.00 5,867,678.89

06 Aug 20 Account Transfer 51233798 06 Aug 20 32,735.00 5,834,943.89

06 Aug 20 Online Transfer 06 Aug 20 103,400.00 5,731,543.89

06 Aug 20 Online Charges AC-0010024652070016 06 Aug 20 406.00 5,731,137.89

06 Aug 20 Online Transfer 51233792 06 Aug 20 35,390.00 5,695,747.89

07 Aug 20 Account Transfer 51233801 07 Aug 20 14,505.00 5,681,242.89

07 Aug 20 Clearing 51233785 07 Aug 20 215,719.00 5,465,523.89

07 Aug 20 Account Transfer 63603316 07 Aug 20 28,141.00 5,437,382.89

10 Aug 20 Account Transfer 51233797 10 Aug 20 42,186.00 5,395,196.89

10 Aug 20 Online Transfer 10 Aug 20 24,025.00 5,371,171.89

11 Aug 20 Clearing Charges AC- 11 Aug 20 638.00 5,370,533.89


0010001924780046
11 Aug 20 Account Transfer 51233803 11 Aug 20 71,640.00 5,298,893.89

11 Aug 20 Outward Cheque Realized 11 Aug 20 503,880.00 5,802,773.89

11 Aug 20 Outward Cheque Realized 11 Aug 20 39,900,215.00 45,702,988.89

12 Aug 20 Clearing 64889271 12 Aug 20 1,000,000.00 44,702,988.89

12 Aug 20 Clearing 64889273 12 Aug 20 1,500,000.00 43,202,988.89

12 Aug 20 Clearing 64889272 12 Aug 20 12,000,000.00 31,202,988.89

12 Aug 20 Clearing 64889274 12 Aug 20 5,000,000.00 26,202,988.89

12 Aug 20 Clearing 64889270 12 Aug 20 3,000,000.00 23,202,988.89

12 Aug 20 Clearing 64889269 12 Aug 20 3,000,000.00 20,202,988.89

12 Aug 20 Transfer 12 Aug 20 250,000.00 20,452,988.89

12 Aug 20 Transfer 12 Aug 20 250,000.00 20,702,988.89

13 Aug 20 Account Transfer 64889286 13 Aug 20 2,400,000.00 18,302,988.89

13 Aug 20 Account Transfer 64889279 13 Aug 20 316,667.00 17,986,321.89

13 Aug 20 Account Transfer 64889287 13 Aug 20 1,100,000.00 16,886,321.89

Page 89 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

13 Aug 20 Account Transfer 64889283 13 Aug 20 104,025.00 16,782,296.89

13 Aug 20 Account Transfer 64889284 13 Aug 20 48,000.00 16,734,296.89

13 Aug 20 Account Transfer 64889289 13 Aug 20 51,950.00 16,682,346.89

13 Aug 20 Account Transfer 64889281 13 Aug 20 31,335.00 16,651,011.89

13 Aug 20 Clearing 64889276 13 Aug 20 274,943.00 16,376,068.89

13 Aug 20 Clearing 64889266 13 Aug 20 2,000,000.00 14,376,068.89

13 Aug 20 Clearing 51233805 13 Aug 20 967,166.00 13,408,902.89

13 Aug 20 Clearing 51233794 13 Aug 20 150,000.00 13,258,902.89

13 Aug 20 Clearing 51233799 13 Aug 20 93,916.00 13,164,986.89

13 Aug 20 Account Transfer 64889267 13 Aug 20 2,107,621.00 11,057,365.89

13 Aug 20 Account Transfer 64889282 13 Aug 20 91,868.00 10,965,497.89

13 Aug 20 Account Transfer 64889268 13 Aug 20 189,602.00 10,775,895.89

17 Aug 20 Account Transfer 64889288 17 Aug 20 19,600.00 10,756,295.89

17 Aug 20 Clearing 51233791 17 Aug 20 130,417.00 10,625,878.89

17 Aug 20 Clearing 64889280 17 Aug 20 1,200,000.00 9,425,878.89

17 Aug 20 Clearing 64889277 17 Aug 20 316,667.00 9,109,211.89

17 Aug 20 Outward Cheque Realized 17 Aug 20 4,660.00 9,113,871.89

18 Aug 20 Clearing 51233790 18 Aug 20 328,425.00 8,785,446.89

18 Aug 20 Clearing 51233804 18 Aug 20 203,470.00 8,581,976.89

18 Aug 20 Account Transfer 64889290 18 Aug 20 72,720.00 8,509,256.89

18 Aug 20 Online Transfer 18 Aug 20 64,199.00 8,573,455.89

18 Aug 20 Online Charges AC-0010001924780046 18 Aug 20 12.00 8,573,443.89

18 Aug 20 Online Transfer 18 Aug 20 374,439.00 8,947,882.89

18 Aug 20 Account Transfer 64872127 18 Aug 20 42,491.00 8,905,391.89

18 Aug 20 Account Transfer 64872126 18 Aug 20 30,555.00 8,874,836.89

19 Aug 20 Utility Bills 19 Aug 20 1,563,482.00 7,311,354.89

Page 90 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

19 Aug 20 Online Charges AC-0010033540730013 19 Aug 20 12.00 7,311,342.89

19 Aug 20 Online Transfer 64872130 19 Aug 20 19,626.00 7,291,716.89

20 Aug 20 Clearing 64872129 20 Aug 20 41,966.00 7,249,750.89

20 Aug 20 Outward Cheque Realized 20 Aug 20 333.00 7,250,083.89

20 Aug 20 Outward Cheque Realized 20 Aug 20 780.00 7,250,863.89

20 Aug 20 Account Transfer 64872134 20 Aug 20 119,902.00 7,130,961.89

21 Aug 20 Account Transfer 64872136 21 Aug 20 41,440.00 7,089,521.89

21 Aug 20 Cash Withdrawal 64872138 21 Aug 20 5,400.00 7,084,121.89

21 Aug 20 Account Transfer 64872128 21 Aug 20 19,862.00 7,064,259.89

21 Aug 20 Account Transfer 64872137 21 Aug 20 1,000,000.00 6,064,259.89

21 Aug 20 Account Transfer 64872133 21 Aug 20 28,143.00 6,036,116.89

25 Aug 20 Clearing 64872135 25 Aug 20 334,250.00 5,701,866.89

25 Aug 20 Online Transfer 25 Aug 20 41,440.00 5,660,426.89

25 Aug 20 Outward Cheque Realized 25 Aug 20 8,828,325.00 14,488,751.89

26 Aug 20 Account Transfer 64872142 26 Aug 20 206,820.00 14,281,931.89

27 Aug 20 Clearing 51233795 27 Aug 20 51,852.00 14,230,079.89

27 Aug 20 Account Transfer 64872144 27 Aug 20 700,000.00 13,530,079.89

27 Aug 20 Account Transfer 64872143 27 Aug 20 2,100,000.00 11,430,079.89

28 Aug 20 Account Transfer 64872145 28 Aug 20 33,860.00 11,396,219.89

28 Aug 20 Account Transfer 64872147 28 Aug 20 25,000.00 11,371,219.89

28 Aug 20 Clearing 64872132 28 Aug 20 131,878.00 11,239,341.89

28 Aug 20 Account Transfer 64872146 28 Aug 20 48,000.00 11,191,341.89

28 Aug 20 Account Transfer 64872140 28 Aug 20 5,983,382.00 5,207,959.89

28 Aug 20 Account Transfer 64872141 28 Aug 20 426,758.00 4,781,201.89

31 Aug 20 Account Transfer 64872148 31 Aug 20 1,000,000.00 3,781,201.89

31 Aug 20 Outward Cheque Realized 31 Aug 20 6,274,992.00 10,056,193.89

Page 91 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

31 Aug 20 Clearing Charges AC- 31 Aug 20 522.00 10,055,671.89


0010001924780046
31 Aug 20 Clearing Charges AC- 31 Aug 20 522.00 10,055,149.89
0010001924780046
31 Aug 20 Clearing Charges AC- 31 Aug 20 522.00 10,054,627.89
0010001924780046
31 Aug 20 Profit 01 Sep 20 41,591.78 10,096,219.67

31 Aug 20 WHT Deduction 01 Sep 20 6,239.00 10,089,980.67

01 Sep 20 Account Transfer 64872149 01 Sep 20 54,359.00 10,035,621.67

01 Sep 20 Account Transfer 64889242 01 Sep 20 500,000.00 9,535,621.67

01 Sep 20 Account Transfer 64872150 01 Sep 20 63,360.00 9,472,261.67

01 Sep 20 Transfer SBP FUND 01 Sep 20 3,743,750.00 13,216,011.67

01 Sep 20 Transfer 01 Sep 20 569,835.00 13,785,846.67

01 Sep 20 Transfer 01 Sep 20 1,781,788.00 15,567,634.67

01 Sep 20 Transfer 01 Sep 20 514,895.00 16,082,529.67

02 Sep 20 Account Transfer 64889243 02 Sep 20 112,000.00 15,970,529.67

03 Sep 20 Outward Cheque Realized 03 Sep 20 827,703.00 16,798,232.67

03 Sep 20 Outward Cheque Realized 03 Sep 20 636,204.00 17,434,436.67

03 Sep 20 Outward Cheque Realized 03 Sep 20 2,813,000.00 20,247,436.67

04 Sep 20 Account Transfer 64889247 04 Sep 20 537,153.00 19,710,283.67

04 Sep 20 Online Transfer 04 Sep 20 6,396,689.00 13,313,594.67

04 Sep 20 Account Transfer 64889249 04 Sep 20 2,200,000.00 11,113,594.67

04 Sep 20 Account Transfer 64889248 04 Sep 20 7,600,000.00 3,513,594.67

04 Sep 20 RTGS Payment Credit 04 Sep 20 1,371,655.00 4,885,249.67

04 Sep 20 Outward Cheque Realized 04 Sep 20 10,000,000.00 14,885,249.67

04 Sep 20 Outward Cheque Realized 04 Sep 20 17,000,000.00 31,885,249.67

08 Sep 20 Transfer 08 Sep 20 112,520.00 31,997,769.67

09 Sep 20 Account Transfer 64889256 09 Sep 20 3,900,000.00 28,097,769.67

Page 92 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

09 Sep 20 Account Transfer 64889255 09 Sep 20 2,000,000.00 26,097,769.67

09 Sep 20 Account Transfer 64889253 09 Sep 20 6,578,123.00 19,519,646.67

10 Sep 20 Account Transfer 64889254 10 Sep 20 593,882.00 18,925,764.67

10 Sep 20 Clearing 64889252 10 Sep 20 588,579.00 18,337,185.67

10 Sep 20 Clearing 64889241 10 Sep 20 3,000,000.00 15,337,185.67

10 Sep 20 Online Transfer 10 Sep 20 733,035.00 16,070,220.67

10 Sep 20 Account Transfer 64889258 10 Sep 20 124,432.00 15,945,788.67

10 Sep 20 Account Transfer 64889262 10 Sep 20 7,000.00 15,938,788.67

11 Sep 20 Online Transfer 11 Sep 20 79,200.00 15,859,588.67

11 Sep 20 Clearing 64889250 11 Sep 20 114,644.00 15,744,944.67

14 Sep 20 Clearing 64889244 14 Sep 20 57,805.00 15,687,139.67

14 Sep 20 Account Transfer 64889216 14 Sep 20 25,720.00 15,661,419.67

14 Sep 20 Online Transfer 64889218 BR0528 14 Sep 20 448,955.00 15,212,464.67

14 Sep 20 Online Transfer 64889260 BR0609 14 Sep 20 19,862.00 15,192,602.67

14 Sep 20 Account Transfer 64889230 14 Sep 20 3,000,000.00 12,192,602.67

14 Sep 20 Account Transfer 64889231 14 Sep 20 1,300,000.00 10,892,602.67

14 Sep 20 Account Transfer 64889229 14 Sep 20 1,400,000.00 9,492,602.67

14 Sep 20 Outward Cheque Realized 14 Sep 20 51,253,412.00 60,746,014.67

15 Sep 20 Clearing 64889223 15 Sep 20 2,000,000.00 58,746,014.67

15 Sep 20 Clearing 64889225 15 Sep 20 3,500,000.00 55,246,014.67

15 Sep 20 Clearing 64889224 15 Sep 20 2,500,000.00 52,746,014.67

15 Sep 20 Clearing 64889222 15 Sep 20 1,500,000.00 51,246,014.67

15 Sep 20 Account Transfer 64889227 15 Sep 20 5,918,143.00 45,327,871.67

15 Sep 20 Account Transfer 64889228 15 Sep 20 426,042.00 44,901,829.67

15 Sep 20 Account Transfer 64889257 15 Sep 20 3,993,293.00 40,908,536.67

15 Sep 20 Account Transfer 64889263 15 Sep 20 365,191.00 40,543,345.67

Page 93 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

15 Sep 20 Clearing 64889219 15 Sep 20 6,000,000.00 34,543,345.67

15 Sep 20 Clearing 64889226 15 Sep 20 25,000,000.00 9,543,345.67

15 Sep 20 Account Transfer 64889265 15 Sep 20 37,512.00 9,505,833.67

15 Sep 20 Account Transfer 64889235 15 Sep 20 20,000.00 9,485,833.67

15 Sep 20 FED Deduction 15 Sep 20 60.00 9,485,773.67

15 Sep 20 Cheque Book Charges 15 Sep 20 375.00 9,485,398.67

15 Sep 20 FED Deduction 15 Sep 20 60.00 9,485,338.67

15 Sep 20 Cheque Book Charges 15 Sep 20 375.00 9,484,963.67

15 Sep 20 FED Deduction 15 Sep 20 60.00 9,484,903.67

15 Sep 20 Cheque Book Charges 15 Sep 20 375.00 9,484,528.67

15 Sep 20 FED Deduction 15 Sep 20 60.00 9,484,468.67

15 Sep 20 Cheque Book Charges 15 Sep 20 375.00 9,484,093.67

15 Sep 20 FED Deduction 15 Sep 20 60.00 9,484,033.67

15 Sep 20 Cheque Book Charges 15 Sep 20 375.00 9,483,658.67

16 Sep 20 Account Transfer 64889233 16 Sep 20 77,220.00 9,406,438.67

16 Sep 20 Online Charges AC-0010005407660018 16 Sep 20 12.00 9,406,426.67

16 Sep 20 Online Transfer 64889264 16 Sep 20 16,406.00 9,390,020.67

16 Sep 20 Online Transfer 16 Sep 20 1,904,183.00 11,294,203.67

16 Sep 20 Online Charges AC-0010001924780046 16 Sep 20 2,209.18 11,291,994.49

17 Sep 20 Clearing 64889232 17 Sep 20 91,134.00 11,200,860.49

17 Sep 20 Utility Bills 17 Sep 20 1,382,370.00 9,818,490.49

18 Sep 20 Account Transfer 64889238 18 Sep 20 7,533.00 9,810,957.49

21 Sep 20 Clearing 64889236 21 Sep 20 385,047.00 9,425,910.49

21 Sep 20 Online Transfer 64889251 BR0195 21 Sep 20 234,546.00 9,191,364.49

21 Sep 20 Account Transfer 64889240 21 Sep 20 230,968.00 8,960,396.49

22 Sep 20 Clearing 64889237 22 Sep 20 426,312.00 8,534,084.49

Page 94 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

22 Sep 20 Account Transfer 64889239 22 Sep 20 16,830.00 8,517,254.49

22 Sep 20 Account Transfer 64889191 22 Sep 20 80,000.00 8,437,254.49

23 Sep 20 Clearing 64889193 23 Sep 20 1,500,000.00 6,937,254.49

23 Sep 20 Clearing 64889194 23 Sep 20 1,000,000.00 5,937,254.49

23 Sep 20 Clearing 64889245 23 Sep 20 46,326.00 5,890,928.49

23 Sep 20 Clearing 64889192 23 Sep 20 2,500,000.00 3,390,928.49

23 Sep 20 Account Transfer 64889203 23 Sep 20 100,503.00 3,290,425.49

23 Sep 20 Account Transfer 64889200 23 Sep 20 1,200,000.00 2,090,425.49

23 Sep 20 Outward Cheque Realized 23 Sep 20 32,542,486.00 34,632,911.49

23 Sep 20 Outward Cheque Realized 23 Sep 20 19,874,180.00 54,507,091.49

23 Sep 20 Outward Cheque Realized 23 Sep 20 2,395,680.00 56,902,771.49

23 Sep 20 Account Transfer 64889199 23 Sep 20 2,400,000.00 54,502,771.49

24 Sep 20 Account Transfer 64889196 24 Sep 20 150,199.00 54,352,572.49

24 Sep 20 Account Transfer 64889195 24 Sep 20 2,832,617.00 51,519,955.49

25 Sep 20 Clearing 64889204 25 Sep 20 782,982.00 50,736,973.49

25 Sep 20 Clearing 64889201 25 Sep 20 22,000,000.00 28,736,973.49

28 Sep 20 Clearing 64889208 28 Sep 20 1,000,000.00 27,736,973.49

28 Sep 20 Clearing Charges AC- 28 Sep 20 522.00 27,736,451.49


0010001924780046
28 Sep 20 Clearing Charges AC- 28 Sep 20 522.00 27,735,929.49
0010001924780046
28 Sep 20 Account Transfer 64889202 28 Sep 20 25,000.00 27,710,929.49

29 Sep 20 Clearing 64889207 29 Sep 20 6,000,000.00 21,710,929.49

29 Sep 20 Account Transfer 64889210 29 Sep 20 6,794,436.00 14,916,493.49

29 Sep 20 Account Transfer 64889209 29 Sep 20 533,668.00 14,382,825.49

29 Sep 20 Account Transfer 64889211 29 Sep 20 7,800,000.00 6,582,825.49

29 Sep 20 Account Transfer 64889212 29 Sep 20 2,900,000.00 3,682,825.49

Page 95 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

30 Sep 20 Clearing 64889206 30 Sep 20 425,090.00 3,257,735.49

30 Sep 20 Outward Cheque Realized 30 Sep 20 2,149,014.00 5,406,749.49

30 Sep 20 Outward Cheque Realized 30 Sep 20 637,813.00 6,044,562.49

30 Sep 20 Profit 01 Oct 20 98,415.20 6,142,977.69

30 Sep 20 WHT Deduction 01 Oct 20 14,762.00 6,128,215.69

01 Oct 20 Online Transfer 01 Oct 20 322,000.00 6,450,215.69

01 Oct 20 Online Charges AC-0010001924780046 01 Oct 20 406.00 6,449,809.69

02 Oct 20 Account Transfer 64889213 02 Oct 20 75,600.00 6,374,209.69

02 Oct 20 Account Transfer 64889167 02 Oct 20 15,025.00 6,359,184.69

05 Oct 20 Outward Cheque Realized 05 Oct 20 800,000.00 7,159,184.69

05 Oct 20 Clearing Charges AC- 05 Oct 20 522.00 7,158,662.69


0010001924780046
05 Oct 20 Clearing Charges AC- 05 Oct 20 522.00 7,158,140.69
0010001924780046
05 Oct 20 Clearing Charges AC- 05 Oct 20 522.00 7,157,618.69
0010001924780046
05 Oct 20 Account Transfer 64889172 05 Oct 20 127,323.00 7,030,295.69

06 Oct 20 Account Transfer 64889176 06 Oct 20 23,285.00 7,007,010.69

06 Oct 20 Outward Cheque Realized 06 Oct 20 8,000,000.00 15,007,010.69

07 Oct 20 Clearing 64889166 07 Oct 20 111,207.00 14,895,803.69

07 Oct 20 Account Transfer 64889173 07 Oct 20 51,800.00 14,844,003.69

07 Oct 20 Account Transfer 64889170 07 Oct 20 18,100.00 14,825,903.69

07 Oct 20 Transfer 07 Oct 20 112,520.00 14,938,423.69

07 Oct 20 Account Transfer 51233800 07 Oct 20 59,671.00 14,878,752.69

07 Oct 20 Outward Cheque Realized 07 Oct 20 1,744,017.00 16,622,769.69

07 Oct 20 Outward Cheque Realized 07 Oct 20 167,035.00 16,789,804.69

07 Oct 20 Outward Cheque Realized 07 Oct 20 257,873.00 17,047,677.69

07 Oct 20 Outward Cheque Realized 07 Oct 20 200,270.00 17,247,947.69

Page 96 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

08 Oct 20 Transfer 08 Oct 20 1,845,416.00 19,093,363.69

08 Oct 20 Clearing 64889205 08 Oct 20 1,002,381.00 18,090,982.69

09 Oct 20 1LINK Inter-Bank FT 463761 09 Oct 20 881,707.76 18,972,690.45

09 Oct 20 Account Transfer 64889181 09 Oct 20 4,100,000.00 14,872,690.45

09 Oct 20 Account Transfer 64889178 09 Oct 20 25,515.00 14,847,175.45

09 Oct 20 Account Transfer 64889182 09 Oct 20 2,000,000.00 12,847,175.45

09 Oct 20 Account Transfer 64889175 09 Oct 20 635,665.00 12,211,510.45

09 Oct 20 Account Transfer 64889183 09 Oct 20 124,432.00 12,087,078.45

09 Oct 20 Account Transfer 64889174 09 Oct 20 7,129,205.00 4,957,873.45

09 Oct 20 Account Transfer 64889171 09 Oct 20 112,574.00 4,845,299.45

12 Oct 20 Clearing Charges AC- 12 Oct 20 522.00 4,844,777.45


0010001924780046
13 Oct 20 Clearing 64889177 13 Oct 20 26,185.00 4,818,592.45

13 Oct 20 Clearing 64889180 13 Oct 20 40,000.00 4,778,592.45

13 Oct 20 Account Transfer 64889185 13 Oct 20 11,000.00 4,767,592.45

13 Oct 20 Account Transfer 64889184 13 Oct 20 84,200.00 4,683,392.45

13 Oct 20 Account Transfer 64889187 13 Oct 20 50,000.00 4,633,392.45

14 Oct 20 Account Transfer 64889186 14 Oct 20 19,700.00 4,613,692.45

15 Oct 20 Clearing Charges AC- 15 Oct 20 1,975.28 4,611,717.17


0010001924780046
15 Oct 20 Clearing 64889198 15 Oct 20 312,538.00 4,299,179.17

15 Oct 20 Outward Cheque Realized 15 Oct 20 10,000,000.00 14,299,179.17

15 Oct 20 Outward Cheque Realized 15 Oct 20 24,300,156.00 38,599,335.17

15 Oct 20 Outward Cheque Realized 15 Oct 20 7,000,000.00 45,599,335.17

15 Oct 20 Account Transfer 64889151 15 Oct 20 3,827,754.00 41,771,581.17

15 Oct 20 Account Transfer 64889149 15 Oct 20 4,000,000.00 37,771,581.17

15 Oct 20 Online Charges AC-0010005407660018 15 Oct 20 12.00 37,771,569.17

Page 97 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

15 Oct 20 Online Transfer 64889147 15 Oct 20 16,406.00 37,755,163.17

15 Oct 20 Account Transfer 64889142 15 Oct 20 41,364.00 37,713,799.17

15 Oct 20 Account Transfer 64889150 15 Oct 20 1,500,000.00 36,213,799.17

15 Oct 20 Outward Cheque Realized 15 Oct 20 1,228,282.00 37,442,081.17

16 Oct 20 Account Transfer 64889146 16 Oct 20 34,398.00 37,407,683.17

16 Oct 20 Account Transfer 64889143 16 Oct 20 588,522.00 36,819,161.17

16 Oct 20 Account Transfer 64889190 16 Oct 20 5,862,908.00 30,956,253.17

16 Oct 20 Account Transfer 64889141 16 Oct 20 368,184.00 30,588,069.17

16 Oct 20 Account Transfer 64889188 16 Oct 20 4,017,842.00 26,570,227.17

16 Oct 20 Account Transfer 64889179 16 Oct 20 19,813.00 26,550,414.17

16 Oct 20 Online Charges AC-0010033540730013 16 Oct 20 12.00 26,550,402.17

16 Oct 20 Online Transfer 64889148 16 Oct 20 18,728.00 26,531,674.17

16 Oct 20 Account Transfer 64889153 16 Oct 20 15,000,000.00 11,531,674.17

16 Oct 20 Account Transfer 64889145 16 Oct 20 32,420.00 11,499,254.17

16 Oct 20 Outward Cheque Realized 16 Oct 20 1,594,909.00 13,094,163.17

16 Oct 20 Account Transfer 64889144 16 Oct 20 33,440.00 13,060,723.17

16 Oct 20 Outward Cheque Realized 16 Oct 20 637,813.00 13,698,536.17

19 Oct 20 Clearing 64889152 19 Oct 20 3,000,000.00 10,698,536.17

20 Oct 20 Transfer 20 Oct 20 2,968,048.00 13,666,584.17

20 Oct 20 Transfer 20 Oct 20 855,646.00 14,522,230.17

20 Oct 20 Transfer 20 Oct 20 148,510.00 14,670,740.17

20 Oct 20 Transfer 20 Oct 20 310,175.00 14,980,915.17

21 Oct 20 Account Transfer 64889214 21 Oct 20 82,671.00 14,898,244.17

21 Oct 20 Account Transfer 64889157 21 Oct 20 500,000.00 14,398,244.17

23 Oct 20 Clearing 64889169 23 Oct 20 275,000.00 14,123,244.17

23 Oct 20 Account Transfer 64889159 23 Oct 20 186,855.00 13,936,389.17

Page 98 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

23 Oct 20 Account Transfer 64889160 23 Oct 20 88,248.00 13,848,141.17

23 Oct 20 Transfer 23 Oct 20 711,371.00 14,559,512.17

26 Oct 20 Clearing 64889156 26 Oct 20 35,848.00 14,523,664.17

27 Oct 20 FED Deduction AC-PL52058 27 Oct 20 80.00 14,523,584.17

27 Oct 20 Service Charges IWCLGRTLCY 27 Oct 20 500.00 14,523,084.17

27 Oct 20 Clearing Charges AC- 27 Oct 20 522.00 14,522,562.17


0010001924780046
27 Oct 20 Instr. Issue Commission AC- 27 Oct 20 174.00 14,522,388.17
0010001924780046
27 Oct 20 Instrument Issued 64889164 27 Oct 20 1,937,500.00 12,584,888.17

28 Oct 20 Clearing 64889161 28 Oct 20 3,176.00 12,581,712.17

28 Oct 20 Clearing 64889163 28 Oct 20 208,709.00 12,373,003.17

28 Oct 20 Clearing 64889158 28 Oct 20 107,431.00 12,265,572.17

28 Oct 20 Clearing 64889155 28 Oct 20 206,820.00 12,058,752.17

29 Oct 20 Account Transfer 64889165 29 Oct 20 102,066.00 11,956,686.17

29 Oct 20 Online Transfer 29 Oct 20 1,746,061.00 13,702,747.17

29 Oct 20 Account Transfer 65593193 29 Oct 20 1,100,000.00 12,602,747.17

29 Oct 20 Account Transfer 65593194 29 Oct 20 2,400,000.00 10,202,747.17

29 Oct 20 Online Transfer 29 Oct 20 3,239,745.00 6,963,002.17

29 Oct 20 Account Transfer 65593192 29 Oct 20 168,695.00 6,794,307.17

29 Oct 20 Outward Cheque Realized 29 Oct 20 1,063,838.00 7,858,145.17

29 Oct 20 Transfer 29 Oct 20 2,024,256.00 9,882,401.17

31 Oct 20 Profit 01 Nov 20 53,048.44 9,935,449.61

31 Oct 20 WHT Deduction 01 Nov 20 7,957.00 9,927,492.61

03 Nov 20 Online Charges AC-0010023929500010 03 Nov 20 406.00 9,927,086.61

03 Nov 20 Online Transfer 65593195 03 Nov 20 70,005.00 9,857,081.61

06 Nov 20 Account Transfer 65593198 06 Nov 20 22,845.00 9,834,236.61

Page 99 of 107
*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

06 Nov 20 Account Transfer 65593203 06 Nov 20 54,529.00 9,779,707.61

06 Nov 20 Outward Cheque Realized 06 Nov 20 5,000,000.00 14,779,707.61

06 Nov 20 Outward Cheque Realized 06 Nov 20 5,000,000.00 19,779,707.61

06 Nov 20 Outward Cheque Realized 06 Nov 20 5,000,000.00 24,779,707.61

09 Nov 20 Account Transfer 65593204 09 Nov 20 2,900,000.00 21,879,707.61

09 Nov 20 Account Transfer 09 Nov 20 3,187,355.00 18,692,352.61

09 Nov 20 Account Transfer 09 Nov 20 290,816.00 18,401,536.61

09 Nov 20 Account Transfer 09 Nov 20 215,442.00 18,186,094.61

09 Nov 20 Account Transfer 65593205 09 Nov 20 7,900,000.00 10,286,094.61

10 Nov 20 Account Transfer 10 Nov 20 4,076,664.00 6,209,430.61

11 Nov 20 RTGS Payment Credit 11 Nov 20 1,288,491.00 7,497,921.61

12 Nov 20 Clearing 65593206 12 Nov 20 430,400.00 7,067,521.61

12 Nov 20 Account Transfer 65593207 12 Nov 20 17,600.00 7,049,921.61

13 Nov 20 1LINK Inter-Bank FT 862495 13 Nov 20 333,960.92 7,383,882.53

13 Nov 20 Account Transfer 65593211 13 Nov 20 20,689.00 7,363,193.53

16 Nov 20 Account Transfer 65593209 16 Nov 20 77,400.00 7,285,793.53

16 Nov 20 Account Transfer 65593201 16 Nov 20 154,795.00 7,130,998.53

16 Nov 20 Outward Cheque Realized 16 Nov 20 2,125,054.00 9,256,052.53

17 Nov 20 Account Transfer 17 Nov 20 11,000.00 9,245,052.53

17 Nov 20 Online Transfer 17 Nov 20 92,200.00 9,152,852.53

18 Nov 20 Account Transfer 18 Nov 20 156,500.00 8,996,352.53

18 Nov 20 FED Deduction 18 Nov 20 60.00 8,996,292.53

18 Nov 20 Cheque Book Charges 18 Nov 20 375.00 8,995,917.53

18 Nov 20 FED Deduction 18 Nov 20 60.00 8,995,857.53

18 Nov 20 Cheque Book Charges 18 Nov 20 375.00 8,995,482.53

18 Nov 20 FED Deduction 18 Nov 20 60.00 8,995,422.53

Page 100 of 107


*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

18 Nov 20 Cheque Book Charges 18 Nov 20 375.00 8,995,047.53

18 Nov 20 FED Deduction 18 Nov 20 60.00 8,994,987.53

18 Nov 20 Cheque Book Charges 18 Nov 20 375.00 8,994,612.53

18 Nov 20 FED Deduction 18 Nov 20 60.00 8,994,552.53

18 Nov 20 Cheque Book Charges 18 Nov 20 375.00 8,994,177.53

18 Nov 20 Inward Telex Payment IWREM us27977. 18 Nov 20 4,430,229.21 13,424,406.74


45
18 Nov 20 FED Deduction 18 Nov 20 60.00 13,424,346.74

18 Nov 20 Cheque Book Charges 18 Nov 20 375.00 13,423,971.74

19 Nov 20 Account Transfer 65593223 19 Nov 20 4,200,000.00 9,223,971.74

19 Nov 20 Account Transfer 65593224 19 Nov 20 2,000,000.00 7,223,971.74

19 Nov 20 Account Transfer 19 Nov 20 500,790.00 6,723,181.74

19 Nov 20 Account Transfer 19 Nov 20 1,726,607.00 4,996,574.74

19 Nov 20 Account Transfer 65593218 19 Nov 20 177,182.00 4,819,392.74

19 Nov 20 Outward Cheque Realized 19 Nov 20 12,000,000.00 16,819,392.74

20 Nov 20 Account Transfer 20 Nov 20 5,489,613.00 11,329,779.74

20 Nov 20 Transfer 20 Nov 20 112,520.00 11,442,299.74

23 Nov 20 Account Transfer 65593214 23 Nov 20 62,250.00 11,380,049.74

24 Nov 20 Account Transfer 65593226 24 Nov 20 124,432.00 11,255,617.74

24 Nov 20 Account Transfer 65593227 24 Nov 20 72,125.00 11,183,492.74

24 Nov 20 Clearing 65593221 24 Nov 20 98,852.00 11,084,640.74

24 Nov 20 Clearing 65593219 24 Nov 20 73,294.00 11,011,346.74

25 Nov 20 Outward Cheque Realized 25 Nov 20 10,000,000.00 21,011,346.74

25 Nov 20 Account Transfer 65593228 25 Nov 20 48,000.00 20,963,346.74

25 Nov 20 Account Transfer 65593229 25 Nov 20 51,671.00 20,911,675.74

26 Nov 20 Account Transfer 65593208 26 Nov 20 42,438.00 20,869,237.74

Page 101 of 107


*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

26 Nov 20 Outward Cheque Realized 26 Nov 20 2,650,810.00 23,520,047.74

27 Nov 20 Clearing 65593220 27 Nov 20 42,969.00 23,477,078.74

27 Nov 20 Clearing 65593240 27 Nov 20 425,000.00 23,052,078.74

27 Nov 20 Online Transfer 27 Nov 20 1,528,100.00 24,580,178.74

27 Nov 20 Online Charges AC-0010001924780046 27 Nov 20 1,772.10 24,578,406.64

27 Nov 20 Cash Withdrawal 65593245 27 Nov 20 15,000.00 24,563,406.64

27 Nov 20 Account Transfer 65593236 27 Nov 20 33,070.00 24,530,336.64

27 Nov 20 Online Charges AC-0010005407660018 27 Nov 20 12.00 24,530,324.64

27 Nov 20 Online Transfer 65593235 27 Nov 20 17,042.00 24,513,282.64

27 Nov 20 Account Transfer 65593244 27 Nov 20 42,215.00 24,471,067.64

27 Nov 20 Account Transfer 65593243 27 Nov 20 16,000.00 24,455,067.64

27 Nov 20 Account Transfer 65593237 27 Nov 20 425,086.00 24,029,981.64

27 Nov 20 Account Transfer 65593241 27 Nov 20 1,500,000.00 22,529,981.64

27 Nov 20 Account Transfer 27 Nov 20 354,628.00 22,175,353.64

27 Nov 20 Outward Cheque Realized 27 Nov 20 4,162,364.00 26,337,717.64

30 Nov 20 Account Transfer 65593232 30 Nov 20 33,505.00 26,304,212.64

30 Nov 20 Online Transfer 30 Nov 20 4,056,181.00 22,248,031.64

30 Nov 20 Account Transfer 65593242 30 Nov 20 4,000,000.00 18,248,031.64

30 Nov 20 Online Transfer 30 Nov 20 6,095,297.00 12,152,734.64

30 Nov 20 Account Transfer 65593234 30 Nov 20 34,559.00 12,118,175.64

30 Nov 20 Outward Cheque Realized 30 Nov 20 12,468,804.00 24,586,979.64

30 Nov 20 Profit 01 Dec 20 63,933.75 24,650,913.39

30 Nov 20 WHT Deduction 01 Dec 20 9,590.00 24,641,323.39

01 Dec 20 Online Charges AC-0010061202700011 01 Dec 20 12.00 24,641,311.39

01 Dec 20 Online Transfer 01 Dec 20 16,000.00 24,625,311.39

01 Dec 20 Online Charges AC-0010033540730013 01 Dec 20 12.00 24,625,299.39

Page 102 of 107


*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

01 Dec 20 Online Transfer 65593233 01 Dec 20 17,830.00 24,607,469.39

02 Dec 20 Account Transfer 65593254 02 Dec 20 2,400,000.00 22,207,469.39

02 Dec 20 Account Transfer 02 Dec 20 254,014.00 21,953,455.39

02 Dec 20 Account Transfer 02 Dec 20 102,066.00 21,851,389.39

02 Dec 20 Account Transfer 65593253 02 Dec 20 1,100,000.00 20,751,389.39

02 Dec 20 Account Transfer 02 Dec 20 2,000,000.00 18,751,389.39

02 Dec 20 Transfer 02 Dec 20 258,675.00 19,010,064.39

03 Dec 20 Account Transfer 03 Dec 20 3,229,325.00 15,780,739.39

03 Dec 20 Clearing 65593255 03 Dec 20 5,000,000.00 10,780,739.39

04 Dec 20 Account Transfer 65593259 04 Dec 20 79,020.00 10,701,719.39

04 Dec 20 Clearing Charges AC- 04 Dec 20 1,361.70 10,700,357.69


0010001924780046
04 Dec 20 Account Transfer 65593251 04 Dec 20 53,195.00 10,647,162.69

04 Dec 20 Outward Cheque Realized 04 Dec 20 2,194,140.00 12,841,302.69

07 Dec 20 Clearing 65593210 07 Dec 20 441,760.00 12,399,542.69

07 Dec 20 Account Transfer 65593257 07 Dec 20 74,200.00 12,325,342.69

07 Dec 20 Account Transfer 65593252 07 Dec 20 86,974.00 12,238,368.69

08 Dec 20 Clearing 65593258 08 Dec 20 264,075.00 11,974,293.69

08 Dec 20 Outward Cheque Realized 08 Dec 20 1,173,700.00 13,147,993.69

08 Dec 20 Outward Cheque Realized 08 Dec 20 14,370,738.00 27,518,731.69

11 Dec 20 Clearing 65593264 11 Dec 20 114,644.00 27,404,087.69

11 Dec 20 Account Transfer 65593265 11 Dec 20 20,585.00 27,383,502.69

14 Dec 20 Clearing 65593262 14 Dec 20 55,500.00 27,328,002.69

14 Dec 20 Account Transfer 65593143 14 Dec 20 37,350.00 27,290,652.69

14 Dec 20 Account Transfer 65593144 14 Dec 20 171,828.00 27,118,824.69

14 Dec 20 Account Transfer 65593142 14 Dec 20 7,900,000.00 19,218,824.69

Page 103 of 107


*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

14 Dec 20 Account Transfer 65593141 14 Dec 20 2,900,000.00 16,318,824.69

15 Dec 20 Online Transfer 15 Dec 20 1,303,020.00 17,621,844.69

15 Dec 20 Online Charges AC-0010001924780046 15 Dec 20 1,511.02 17,620,333.67

15 Dec 20 Account Transfer 15 Dec 20 559,241.00 17,061,092.67

15 Dec 20 Account Transfer 65593260 15 Dec 20 7,286,763.00 9,774,329.67

16 Dec 20 Inward Telex Payment IWREMUS28478. 16 Dec 20 4,556,534.40 14,330,864.07


34
16 Dec 20 Account Transfer 65593145 16 Dec 20 121,899.00 14,208,965.07

17 Dec 20 Account Transfer 65593149 17 Dec 20 25,000.00 14,183,965.07

17 Dec 20 Account Transfer 65593151 17 Dec 20 24,500.00 14,159,465.07

17 Dec 20 Account Transfer 65593148 17 Dec 20 157,500.00 14,001,965.07

18 Dec 20 Account Transfer 65593146 18 Dec 20 75,000.00 13,926,965.07

18 Dec 20 Account Transfer 65593147 18 Dec 20 77,760.00 13,849,205.07

18 Dec 20 Account Transfer 65593158 18 Dec 20 86,889.00 13,762,316.07

18 Dec 20 Account Transfer 65593155 18 Dec 20 1,000,000.00 12,762,316.07

21 Dec 20 Clearing 65593152 21 Dec 20 245,767.00 12,516,549.07

21 Dec 20 Transfer 21 Dec 20 112,520.00 12,629,069.07

21 Dec 20 Account Transfer 21 Dec 20 7,000.00 12,622,069.07

21 Dec 20 Account Transfer 21 Dec 20 84,200.00 12,537,869.07

23 Dec 20 Clearing 65593154 23 Dec 20 379,784.00 12,158,085.07

24 Dec 20 Account Transfer 65593165 24 Dec 20 19,025.00 12,139,060.07

24 Dec 20 Cash Withdrawal 65593164 24 Dec 20 14,900.00 12,124,160.07

24 Dec 20 Cash Withdrawal 65593162 24 Dec 20 14,000.00 12,110,160.07

24 Dec 20 Account Transfer 24 Dec 20 142,000.00 11,968,160.07

24 Dec 20 Account Transfer 65593163 24 Dec 20 21,000.00 11,947,160.07

24 Dec 20 Clearing 65593159 24 Dec 20 5,000,000.00 6,947,160.07

Page 104 of 107


*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

28 Dec 20 Clearing 65593160 28 Dec 20 73,350.00 6,873,810.07

29 Dec 20 Clearing 65593153 29 Dec 20 337,622.00 6,536,188.07

29 Dec 20 Clearing 65593166 29 Dec 20 123,760.00 6,412,428.07

29 Dec 20 Online Transfer 29 Dec 20 2,819,570.00 9,231,998.07

29 Dec 20 Online Charges AC-0010001924780046 29 Dec 20 2,320.00 9,229,678.07

30 Dec 20 Online Charges AC-0010061202700011 30 Dec 20 12.00 9,229,666.07

30 Dec 20 Online Transfer 65593167 30 Dec 20 15,300.00 9,214,366.07

31 Dec 20 Utility Bills 31 Dec 20 39,939.00 9,174,427.07

31 Dec 20 Profit 01 Jan 21 68,639.60 9,243,066.67

31 Dec 20 WHT Deduction 01 Jan 21 10,296.00 9,232,770.67

02 Jan 21 Online Transfer 02 Jan 21 32,400.00 9,200,370.67

04 Jan 21 Account Transfer 65593175 04 Jan 21 76,140.00 9,124,230.67

04 Jan 21 Outward Cheque Realized 04 Jan 21 2,029,486.00 11,153,716.67

05 Jan 21 Clearing 65593172 05 Jan 21 25,000.00 11,128,716.67

05 Jan 21 Account Transfer 65593177 05 Jan 21 1,132,572.00 9,996,144.67

05 Jan 21 Account Transfer 65593174 05 Jan 21 6,710,880.00 3,285,264.67

05 Jan 21 Outward Cheque Realized 05 Jan 21 11,000,000.00 14,285,264.67

05 Jan 21 Outward Cheque Realized 05 Jan 21 1,625,334.00 15,910,598.67

05 Jan 21 Outward Cheque Realized 05 Jan 21 1,625,334.00 17,535,932.67

05 Jan 21 Account Transfer 65593181 05 Jan 21 4,200,000.00 13,335,932.67

06 Jan 21 Account Transfer 65593179 06 Jan 21 2,000,000.00 11,335,932.67

06 Jan 21 Clearing 65593168 06 Jan 21 3,986.00 11,331,946.67

06 Jan 21 Clearing 65593169 06 Jan 21 167,717.00 11,164,229.67

06 Jan 21 Account Transfer 65593178 06 Jan 21 17,600.00 11,146,629.67

06 Jan 21 Outward Cheque Realized 06 Jan 21 1,173,700.00 12,320,329.67

06 Jan 21 Transfer 06 Jan 21 5,000,000.00 17,320,329.67

Page 105 of 107


*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

07 Jan 21 Account Transfer 65593182 07 Jan 21 80,000.00 17,240,329.67

07 Jan 21 Account Transfer 07 Jan 21 424,487.00 16,815,842.67

07 Jan 21 Account Transfer 65593190 07 Jan 21 4,000,000.00 12,815,842.67

07 Jan 21 Account Transfer 07 Jan 21 352,393.00 12,463,449.67

07 Jan 21 Account Transfer 66464096 07 Jan 21 1,500,000.00 10,963,449.67

07 Jan 21 Outward Cheque Realized 07 Jan 21 6,000,000.00 16,963,449.67

08 Jan 21 Account Transfer 08 Jan 21 111,249.00 16,852,200.67

08 Jan 21 Online Charges AC-0010005407660018 08 Jan 21 23.00 16,852,177.67

08 Jan 21 Online Transfer 66464100 08 Jan 21 15,770.00 16,836,407.67

08 Jan 21 Account Transfer 65593188 08 Jan 21 33,440.00 16,802,967.67

08 Jan 21 Account Transfer 08 Jan 21 78,840.00 16,724,127.67

08 Jan 21 Account Transfer 08 Jan 21 4,070,313.00 12,653,814.67

08 Jan 21 Account Transfer 65593183 08 Jan 21 6,033,206.00 6,620,608.67

08 Jan 21 Account Transfer 08 Jan 21 39,710.00 6,580,898.67

08 Jan 21 Account Transfer 66464098 08 Jan 21 2,000,000.00 4,580,898.67

08 Jan 21 Account Transfer 08 Jan 21 32,420.00 4,548,478.67

11 Jan 21 Account Transfer 11 Jan 21 29,903.00 4,518,575.67

11 Jan 21 Outward Cheque Realized 11 Jan 21 5,906,247.00 10,424,822.67

11 Jan 21 Outward Cheque Realized 11 Jan 21 1,024,353.00 11,449,175.67

11 Jan 21 Transfer 11 Jan 21 1,241,542.00 12,690,717.67

12 Jan 21 Cash Withdrawal 66464106 12 Jan 21 7,500.00 12,683,217.67

12 Jan 21 Account Transfer 66464099 12 Jan 21 1,000,000.00 11,683,217.67

12 Jan 21 Outward Cheque Realized 12 Jan 21 3,145,505.00 14,828,722.67

13 Jan 21 Transfer 13 Jan 21 112,520.00 14,941,242.67

14 Jan 21 Account Transfer 66464110 14 Jan 21 3,250,466.00 11,690,776.67

14 Jan 21 Account Transfer 66464111 14 Jan 21 102,066.00 11,588,710.67

Page 106 of 107


*REVE- Reversal Entry
This is a computer-generated statement, issued without any alteration, and does not require any signature.
Balance at Period Start 22,306,284.79

NESPAK(PVT)LTD Branch Name: FAISAL TOWN LAHORE

NESPAK HOUSE 1 C BLOCK N Statement Period 16 Jan 18 to 15 Jan 21

MODEL TOWN EXT LAHORE Account Number 0010001924780046


Account Status 1-Regular
LAHORE
Currency Pakistan Rupee
PUNJAB PAKISTAN Account Type Allied Profit Plus Special

DATE PARTICULARS VALUE DATE DEBIT CREDIT BALANCE

14 Jan 21 Account Transfer 66464120 14 Jan 21 2,000,000.00 9,588,710.67

14 Jan 21 Account Transfer 66464107 14 Jan 21 205,091.00 9,383,619.67

14 Jan 21 Account Transfer 66464116 14 Jan 21 88,575.00 9,295,044.67

14 Jan 21 Account Transfer 14 Jan 21 89,271.00 9,205,773.67

14 Jan 21 Account Transfer 14 Jan 21 1,161,694.00 8,044,079.67

14 Jan 21 Account Transfer 66464115 14 Jan 21 2,400,000.00 5,644,079.67

14 Jan 21 Account Transfer 66464114 14 Jan 21 1,600,000.00 4,044,079.67

14 Jan 21 Outward Cheque Realized 14 Jan 21 3,000,000.00 7,044,079.67

14 Jan 21 Online Transfer 14 Jan 21 4,339,061.00 11,383,140.67

14 Jan 21 Online Transfer 14 Jan 21 15,126,790.00 26,509,930.67

15 Jan 21 Online Transfer 15 Jan 21 29,899,898.00 56,409,828.67

15 Jan 21 Online Transfer 15 Jan 21 4,254,639.00 60,664,467.67

15 Jan 21 Account Transfer 66464221 15 Jan 21 20,585.00 60,643,882.67

15 Jan 21 Account Transfer 66464117 15 Jan 21 119,908.00 60,523,974.67

TOTAL DEBIT/CREDITS 2,829,795,591.02,868,013,280.95


7
CLOSING BALANCE 60,523,974.67

TOTAL WITHHOLDING TAX 334,202.00

Page 107 of 107


*REVE- Reversal Entry