Professional Documents
Culture Documents
Record-keeping
and photographs
Important
+ System description
+ Shipment details
+ Solar panel installation
+ Array and cabling installation
+ Functionality test
+ Staff training
+ Documentation and photographs
+ Conclusion and sign-off
Checklist Complete the checklist in full, ensuring your writing is clear and legible.
Complete the checks in the order shown in the document.
System description
Clearly fill in the serial number information on first page of the document.
The three serial numbers can be found on the Refrigerator (A), on the Solar modules (B)
and the RTMD - Remote Temperature Monitoring Device (C).
A B C
Checklist Complete the checklist in full, ensuring your writing is clear and legible.
Complete the checks in the order shown in the document.
Shipment details
Inspect the crate(s) and contents during the installation phase.
If any equipment has been damaged, it must be recorded on this document.
Checklist Complete the checklist in full, ensuring your writing is clear and legible.
Complete the checks in the order shown in the document.
Functionality test
The installer must carry out the functionality test in
accordance with the instructions supplied, and sign
the report provided.
Staff training
User training must be carried out at the Health
Facility, with a minimum of 2 staff where available.
Storing files
Keeping clear records in a safe place is imperative,
and using this method is good practise.
Photograph evidence
The installer is required to take clear photographs as
evidence of a safe, successful installation.