TASK DESCRIPTION
SCOPE OF WORK
This procedure will define the method to be used to ensure that the low voltage switchgear, main distribution
boards, free standing and wall mounted sub main distribution boards and control centre installation on site
assembly, final connection workmanship are acceptable, correct, safe and
REFERENCE DOCUMENTS
Construction Quality PlanDoc ref…………………
Field Materials Control ProcedureDoc ref. ………………
Field & Inspection Plan for Elect.Doc ref. ………………….
Operational Procedure (Acceptance, Storage, Handling and Preservation of
Materials in the Job site.Doc ref. …………………
Operational Procedure (Job Site Operations Management) Doc ref. …………………..
Field Test and Inspection Plan for Electrical Doc ref. …………./SAFETY PLAN
Mark the location of the panel on the wall. Wall mounted panels shall be installed 1800mm A.F.F.L from the
top of the panel.
Install the uni-strut channel support on the wall, make sure that the support is rigidly and secured fixed.
Fix the panel on the support, ensure that the panels are rigidly fixed in its supports and vertically and
horizontally aligned.
Cable dressing and termination of the motor into the panel will commence.
Remove unnecessary foreign material and unused bolts and protect with protective bonding.
After completing all associated work related to the MCC/Panel raise a request for engineer to inspect
installation of MCC/Panel
Test the MCC/Panel in accordance to specification, all testing will be carried out in the presence of the
Engineer, he will certify all test sheet
SITE CONDITION
This task is to be carried out inside the MCC/Panel room. All equipment, material and documentation relevant
section of work shall be checked prior to the installation. Make sure that the plinth is completed and painted
ready for final installation of equipment; make sure that the MCC/Panel room is clear and free of debris and
foreign material. The room should be equipped with fire fighting equipment
All the workers shall be provided with safety equipments to all workers ensure that the same worker using
them in a properly way.
Our staff has the responsibility to check workmen wearing proper PPE at site daily.
If same worker will be found not wearing proper PPE, the supervisor will stop him and provide for those
immediately.
The item issued to the worker must be periodically inspected and changed in case that they are found
damaged or they do not meet the specified conditions.
Items of personal use shall be inspected regularly and maintained in serviceable and sanitary condition and
before reissuing to another person or returned to storage shall be cleaned, disinfected, inspected, and
repaired. Employees shall wear clothing suitable for weather and work conditions.
All wiring and fitting of the relevant installation will be carried out whilst the circuits are dead
Wearing and use of PPE such as ear defender
Good housekeeping procedures, awareness of others on site
QUALITY CONTROL
The site supervisor is to retain accountability for all tasks and processes
Site Supervisor and Engineer to certify all suitably completed stages and processes
Corrective action to be taken to ensure standard works are produced