A07-STR-7105
A 07-STR-7105 / 7205 / 7305
TA BL E OF CONTENTS
I. SCAFF
SCAFFOLD
OLD PLAN
PLAN COMP
COMPLET
LETEN
ENES
ESS
S CHEC
CHECKLIS
KLIST
T
II.
II. BRIEF
BRIEF DESCR
DESCRIP
IPTI
TION
ON OF
OF WORK
WORK TO BE PERF
PERFOR
ORME
MED
D & DURATIO
DURATION
N
III.
III. SCAF
SCAFFO
FOLD
LD DRAWI
DRAWING
NGS
S
IV. STRUC
STRUCTU
TURAL
RAL DESIG
DESIGN
N CALCULATIO
CALCULATIONS
NS
V. SUPPO
SUPPORT
RT INFOR
INFORMATI
MATION
ON / TECH
TECHNI
NICAL
CAL DATA
I.
SUSPENDED SCAFFOLD AT A07‐STR‐7105 / 7205 & 7305, SRU, IGCC, SA Form # 9613
PKG 2, JAZAN, SAUDI ARABIA (DRAWING NO. NSH2017 CVL 019)
Scaffold Location / Description: ______________________________________________________________________
‐ ‐ ‐
SECTION A: FOR SCAFFOLD OVER 12.2 m (40 ft ) TALL , CHECK TO INDICATE IF IN SCAFFOLD PLAN:
Scope of Work
1a √ Brief description of work to be performed from scaffold
1b √ Duration of work
1c √ Exact Location where the scaffold will be erected
Scaffold Drawing s
2a √ Height of scaffold shown
2b √ Length and width of scaffold at base shown
2c √ Type of scaffold (tube & coupler, fabricated tubular, system. Etc.) noted
2d √ Light-duty, Medium-duty, or Special-duty load rating noted and used for design of scaffold
2e √ Maximum intended load (personnel, equipment, tools, and materials) per working level noted
2f √ Total number of planked / platformed levels noted
2g √ Maximum number of working level noted
2h √ Tubing size (diameter, wall thickness) and materials specification (including yield stress) noted
2i √ Platform unit type, size, and materials specified
2j √ Drawings adequately show complete construction information and details for the scaffold:
2k √ - Posts, bearers, runners, horizontal (plan) and vertical bracing, etc.
2l √ - Attachments or ties to buildings or other structures
2m √ - Ladders or other access to all working levels
2n √ - Guardrail system locations, dimensions, and top rail, midrail, and toeboard sizes
2o √ - Base support details, including base plates and sills
2p √ Drawn to scale on at least "C" size paper and scale noted on drawings
2q √ Scaffold fully and properly dimensioned
2r √ Plan views shown complete layout of all horizontal members (bearers, runners, horiz. Bracing, etc.)
2s √ Elevation views show complete layout of all vertical members (post, brace, etc.)
2t √ All potential obstructions and references (pipi ng, cable trays, platforms, etc.) shown and cleared
2u √ All areas to remain free of scaff old obstructions shown (roads, corridors, etc.)
2v √ If stair are used, adequate handrails are provided and detail
2w √ Note or signature on drawings to shown they have been checked for accuracy
Other Information
3a √ Manufacturer's specifications and technical data for materials, planks, fittings, etc., included
3b √ Names and contact phone numbers for the proponent organization and scaffolding contractor
SECTION B: FOR SPECIAL SCAFFOLDS - including over 38 m (125 ft) tall - CHECK IF IN SCAFFOLD PLAN:
Structural Calculations
4a √ Design loads, including uniformly distributed and concentrated loads and locations
4b √ Complete design calculations provided verifying "safety factor of 4" for scaffold and all components
4c Calculations verifying foundation and / or existing support structure capacity
4d √ If required, wind load analysis for all critical wind directions as per SAES-A-112
4e Calculation prepared as per SAES-A-204 (including plots if computer program printouts submitted)
4f √ Calculation legible and in English
4g √ Calculation checked and approved by qualified and degreed structural engineer
The needed information, shown above, has been verified as being contained within this scaffold plan package by:
Scaffolding Contractor Proponent Loss Prevention
Signature
Print Name Engr. Edmar Obligado
Organization SGB
Date 11/3/2017
Phone Number 543433824
Is this scaffold plan complete (Y/N) Y
II.
1. SCOPE OF WORK
1.1. This scope of work is applicable to all Erection and Dismantling of Scaffolding which
being carried out by SGB
1.1.1. The design scaffold plan is for erecting and dismantling scaffolds at Saudi
Aramco Jazan. This scaffolding Design is to be Used as a safe working Platform
(access) to facilitate insulation works & piping erection at A07-STR-7105 / 7205
& 7305 Structure in Jazan IGCC Project Package-2
1.1.2. This Proposed scaffoldings structure grid sizes was supported by the
manufacturer’s specification and data publication. Access stair are shown on the
drawings.
2. RESPONSIBILITIES
2.1. It is the responsibility of the “Saudi Aramco Certified Scaffolding Supervisor” to:
2.1.1. Ensure that all Scaffolding Materials are approved for use and in accordance with
GI 8.001 requirements
2.1.2. Ensure that all Scaffold Erector are qualified, prior to carrying out any Scaffolding
Services
2.1.3. Ensure that on Erection and Dismantling of Scaffolds are in compliance with the
client requirements, plans and Saudi Aramco Construction Safety Manual.
2.1.4. Ensure that daily erected and dismantled scaffold report is correctly completed.
2.1.5. To organize and supervise all scaffold workers, as appropriate.
2.1.6. In-case of discrepancies from drawing and site location, report to the designer or
project in-charge for proper modification.
2.2. It is the responsibility of the “Saudi Aramco Certified Scaffolding Inspector” to:
2.2.1. Carry out the final inspection
2.2.2. Records all faulty installed scaffolds and arrange with the supervisor for
rectification.
2.2.3. Reclassify and sign all erected scaffolds as per the category of usage.
3. REFERENCE DOCUMENTS
3.1. Approved and Issued for Construction drawings on site.
3.2. General Instruction Manual (GI 8.001)
3.3. Saudi Aramco Construction Safety Manual (SACSM)
3.4. Saudi Aramco Scaffold Safety Handbook (SASSH)
4. DURATION
4.1. Estimated duration to complete the erection required work is Twenty Two (22) days
4.2. Estimated duration to complete dismantling required work is Twenty (20) days
SCAFFOLD DRAWINGS
IV.
DATE :
TABLE OF CONTENT
SECTION
I. OBJECTIVES
II. PURPOSED
V. DESIGNED ASSUMPTIONS:
I. OBJECTIVE
To provide design analysis and calculation for the designed of Typical Suspended Tube & Coupler
Dancing Platform along the structures for inspection and access used only.
II. PURPOSE
The Purpose of this designed calculation is to check and verified the safety of the structural adequacy
of scaffold elements like tubes, fittings couplers and others scaffolding components as specified in
"Saudi Aramco Scaffold Safety Handbook" (SASSH), "Saudi Aramco Construction Safety Manual"
(SACSM) and "G.I. 8.001 issued by Saudi Aramco / and Saipem.
V. DESIGNED ASSUMPTIONS:
A. SCAFFOLD TUBES shall be 48.3 mm Outer Diameter, 3.2mm Wall Thickness, conforming to
EN 10219 shall be used for all framing members of "Suspended Tube and Coupler Scaffold".
The Minimum Yield Strength of the Scaffold Tubes shall be 320 MPa with Modulus of Elasticity
of 210,000 MPa.
B. Scaffold Board shall be as per Project Specification in accordance with BS 2482 : 1981, shall be
at least 225 mm wide and 38 mm thick, and as per BS 5973 table 13 (a)
C. All COUPLERS connecting the members of the scaffold shall be in conformance to BS 1139 or
EN 74
D. LADDER BEAM 300mm Height, 48.3mm outer diameter, 3.2mm wall thickness conforming to
BS EN 10219, Minimum Yield Stress of 320 MPa
Design By: Project: A07-STR-7105 / 7205 / 7305 Sheet
4 of 18
Engr. Glenn Aguilar IGCC PROJECT PACKAGE-2
Designer Engineer Location: JAZAN ECONOMIC CITY Dwg. No.
Checked & Verified By: JAZAN , KSA NSH2017-CVL-019
Engr. Edmar Obligado Load Rating: LIGHT DUTY Calc. Rev. No
A
Designer Engineer 1.2 kN/m²
BENDING MOMENT
Therefore, the proposed hyPLANK used for scaffold 0.28 < 0.47
working platform is structurally sound Safe!!! Actual Allowable
IN NO CASE THE SPAN OF LVL SCAFFOLD PLANKS ARE MORE THAN 1.8m
Dead Load:
PLANKS = wp * B Dp = 0.343 kN/m
TUBES = wt * 1 no's Dt = 0.043 kN/m
Total Dead Load WD = 0.386 kN/m
Live Load:
LIGHT DUTY = LL * B LL = 1.680 kN/m
Check:
Mu Mf Therefore, the proposed scaffold tubes for
2.00 kN-m < 2.09 kN-m Inter-Transom are Safe for Flexural
Check:
Max. Deflection D+4L Deflection Allowable Therefore, the proposed scaffold tubes for
19.25 mm < 25.000 mm Inter-Transom are Safe for Deflection
OR
Live Load:
L LIGHT DUTY = LL * B WLL = 0.540 kN/m
2
Max. Bending Moment = Wu * L / 8 Mu = 1.59 kN-m
Check:
M D+4L Mf Therefore, the proposed scaffold tubes for
1.59 kN-m < 2.09 kN-m Inter-Transom are Safe for Flexural
4
Max. Deflection = 5 WL / 384 EI = 37.6 mm
Check:
Max. Deflection D+4L Deflection Allowable Therefore, the proposed scaffold tubes for
37.63 mm < 39.133 mm Inter-Transom are Safe for Deflection
2
Uniform Load Capacity due to Flexure Wa = 6.918 kN / m =8Mf /L
Check:
Load REQUIRED SWL (Manufacturer) Therefore, the proposed Ladder Beam
22.84
kN < 41.511 kN 6.0 m span length are Safe!!!
Design By: Project: A07-STR-7105 / 7205 / 7305 Sheet
9 of 18
Engr. Glenn Aguilar IGCC PROJECT PACKAGE-2
Designer Engineer Location: JAZAN ECONOMIC CITY Dwg. No.
Checked & Verified By: JAZAN , KSA NSH2017-CVL-019
Engr. Edmar Obligado Load Rating: LIGHT DUTY Calc. Rev. No
A
Designer Engineer 1.2 kN/m²
Check:
Therefore, the proposed connection
Max. Load SWL IN-SLIP using 4 double coupler on Ladder Beam to
13.77
kN < 15.040 kN Hanger Tubes is Safe!!!
(unfactored Load) (FOS = 4)
Design By: Project: A07-STR-7105 / 7205 / 7305 Sheet
10 of 18
Engr. Glenn Aguilar IGCC PROJECT PACKAGE-2
Designer Engineer Location: JAZAN ECONOMIC CITY Dwg. No.
Checked & Verified By: JAZAN , KSA NSH2017-CVL-019
Engr. Edmar Obligado Load Rating: LIGHT DUTY Calc. Rev. No
A
Designer Engineer 1.2 kN/m²
Dead Load:
W HANGER TUBES (2) 2.50 m * wt = 0.21 kN
W BEARER (1) 6.00 m * wt = 0.26 kN
W PLAN BRACING 4.00 m * wt = 0.17 kN
Live Load:
Light Duty Rating = LL * L * B L = 10.80 kN
Check:
1 Hanger Tube 1 Hanger Tube Therefore, the Hanger Tubes are
Max. Load P ALLOW Safe!!!
7.18 kN < 21.76 kN
Design By: Project: A07-STR-7105 / 7205 / 7305 Sheet
11 of 18
Engr. Glenn Aguilar IGCC PROJECT PACKAGE-2
Designer Engineer Location: JAZAN ECONOMIC CITY Dwg. No.
Checked & Verified By: JAZAN , KSA NSH2017-CVL-019
Engr. Edmar Obligado Load Rating: LIGHT DUTY Calc. Rev. No
A
Designer Engineer 1.2 kN/m²
Check:
M D+4L Mf Therefore, the proposed scaffold tubes for
2.05 kN-m < 2.09 kN-m Horizontal Tubes are Safe for Flexural!!!
Check:
Max. Load SWL GIRDER COUPLER Therefore, the proposed connection
7.18 kN < 12.000 kN of Horizontal Tube to Steel Beam using
(unfactored Load) (FOS = 40%) PAIR of Girder / Beam Coupler are Safe!!!
Design By: Project: A07-STR-7105 / 7205 / 7305 Sheet
12 of 18
Engr. Glenn Aguilar IGCC PROJECT PACKAGE-2
Designer Engineer Location: JAZAN ECONOMIC CITY Dwg. No.
Checked & Verified By: JAZAN , KSA NSH2017-CVL-019
Engr. Edmar Obligado Load Rating: LIGHT DUTY Calc. Rev. No
A
Designer Engineer 1.2 kN/m²
Mu = 29.21
kN - m < Mf = 31.13 kN - m SAFE
Sin ɸ = 0.819
I. DESIGNED ASSUMPTION
A. The worst case for Wind Analysis is assume to be when the direction of wind incident normal
to the maximum projection area of the scaffold with no wind shielding is considered.
B. The designed of Plan Bracing shall be purely for Wind Load Only
C. Wind Coefficient of 1.20 is considered for Scaffold Tubes and 2.0 is considered for Toe Boards
normal to the Wind Direction.
2
q = 0.613 * K 1 * K 2 * K 3 * V^ * I (N/m )
2 2
q = Wind Velocity Pressure (kN/m ) = 1.03 kN/m
G = Gust Effect Factor = 0.85 As per ASCE 7-05, Section 6.5.8.1
Af TUBE = Projected Area Normal to Wind = 0.0483 m
Af TOE BOARD = Projected Area Normal to Wind = 0.225 m
Cf TUBE = Wind Force Coefficient = 1.20 As per recommendation of SSH
Cf TOE BOARD = Wind Force Coefficient = 2.00 As per recommendation of SSH
KL/r = 128.24
4
Where: E = Modulus of Elasticity = 210,000 N/mm
Fy = Minimum Yield Strength = 320
SIF = Strength Increase Factor = 1.00
Design By: Project: A07-STR-7105 / 7205 / 7305 Sheet
18 of 18
Engr. Glenn Aguilar IGCC PROJECT PACKAGE-2
Designer Engineer Location: JAZAN ECONOMIC CITY Dwg. No.
Checked & Verified By: JAZAN , KSA NSH2017-CVL-019
Engr. Edmar Obligado Load Rating: LIGHT DUTY Calc. Rev. No
A
Designer Engineer 1.2 kN/m²
CC = 113.815
For
KL/r = 128.24 > CC
2 2
Fa = ∏ E / (kL/r) = 126.02 MPa
Pf = A * Fa
2
Where: A = Cross Sectional Area = 453.4 mm
2
Fa = Axial Compressive Stress = 126.02 N/mm
Pf = 57.14 kN
Check:
P(WL) Pf Therefore, the Plan Bracing are Safe
3.17 kN < 57.139 kN on Wind Load
Check:
P(WL) SWL Therefore, the Plan Bracing connection
3.2 kN < 5.9 kN with double coupler with FOS of 1.6 is safe
V.
The following sample(s) was/ were submitted and identified on behalf of the client as:
Joyce Li
Authorized signatory
TEST REPORT
No. : SHIN161003663CCM
Date : Nov. 04, 2016
Page: 2 of 6
Sample information:
Sample Nominal dimension Actual dimension(mm)
Test item
No. (Length × Width × Height) (Length × Width × Height)
Deflection at 25psf
1 5950mm× 225mm×38mm 5950mm×226mm×39.8mm
(Light duty)
Deflection at 50psf
2 3950mm× 225mm×38mm 3950mm×226mm×39.6mm
(Medium-duty)
Deflection at 75psf
3 2500mm× 225mm×38mm 2500mm×225mm×39.3mm
(Heavy-duty)
Deflection at
4 one person-250pounds 3000mm ×225mm×38mm 3000mm×226mm×39.9mm
total
Deflection at
5 two person-500 pounds 2000mm× 225mm×38mm 2000mm×225mm×40.1mm
total
Deflection at
6 three person-750 3950mm× 225mm×38mm 3950mm×225mm×39.5mm
pounds total
******** To be continued********
TEST REPORT
No. : SHIN161003663CCM
Date : Nov. 04, 2016
Page: 3 of 6
Test results:
Requirement of
Test item Span(m) Test result Conclusion
OSHA
Deflection at 25psf Note 1
3.05 23.42mm ≤50.83mm Pass
(Light duty)
Deflection at 50psf Note 1
2.44 21.33mm ≤40.67mm Pass
(Medium-duty)
Deflection at 75psf Note 1
1.83 11.03mm ≤30.50mm Pass
(Heavy-duty)
Deflection at Note 1
2.44 33.21mm ≤40.67mm Pass
one person-250pounds total
Deflection at
1.83 17.36mm ≤30.50mm
Note Pass
two person-500 pounds total
Deflection at
1.50 13.20mm ≤25.00mm
Note Pass
three person-750 pounds total
Note 1: OSHA Regulations (Standard-29 CFR)-1926.451(f) (16):
Platforms shall not deflect more than 1 / 60 of the span when loaded.
Statement: Unless otherwise stated the results shown in this test report refer only to the sample(s) tested.
******** To be continued********
TEST REPORT
No. : SHIN161003663CCM
Date : Nov. 04, 2016
Page: 4 of 6
Test photos:
Sample 1:
Sample 2:
Sample 3:
Sample 4:
Sample 5:
Sample 6:
O. Applied gravity loads (unfactored) shall be less than 40% of the rated SWL
shown in Table 2.1 to ensure a safety factor of four. See Section 2.5.1. For
wind loads in braces, the rated SWL shown in Table 2.1 may be used.
Right-angle coupler, also known
as double or load-bearing Slip along a tube B 9.4 kN (2,100 lb)
coupler (See Figure 2.4)
Adjustable coupler, also known A 5.3 kN (1,190 lb)
as swivel coupler (See Figure Slip along a tube
2.5) B 9.4 kN (2,100 lb)
* Note: The rated SWL shown is based on a slipping safety factor of only 1.6.
A. Scaffold platform units shall be solid sawn wood planks, laminated veneer
lumber (LVL) planks, fabricated planks or fabricated platforms. See Figure
2.9. All recommendations by the platform unit manufacturer or the lumber
grading association or inspection agency shall be followed.
B. Solid sawn wood planks shall be of solid sawn timber and shall be 2 x 10
inches (nominal), 2 x 9 inches (rough), 38 mm x 225 mm (basic) or 50 mm
x 225 mm (basic).
C. Solid sawn wood scaffold planks shall be a “scaffold plank” grade and
shall be certified by and bear the grade stamp of the West Coast Lumber
Inspection Bureau (WCLIB), Southern Pine Inspection Bureau (SPIB) or
other lumber-grading agency approved by the American Lumber Standards
Committee (see Certified Agencies and Typical Grade Stamps, published
by the American Lumber Standards Committee).
5 SCAFFOLD TUBE TEST REPORTS
6 OTHER INFORMATIONS : KWIKSTAGE
SYSTEM SCAFFOLD
7 LADDER BEAM