You are on page 1of 3

Online consultation

1. Design Concept
Baguhin yung second statement – the word contemporary and eco (explain how it would help to
promote a self-sustaining community
2. Design Philosophy
Parang statement lang pinaka philosophy

Substructure- structure below the ground level


Superstrcuture- structure above the ground level
1. Yung basement, may certain percentage. Kung mas mataas structure mo, mas malalim
yung foundation. Nakadepend sa height ng structure yung basement parking.
2. Yung macucut mappunta sa iba at mabebenta
3. Add certain space for parking, - kunin mo lahat ng total requirement mo for each
component tapos yung pinaka dominant space yung number of parking slot sa buong
building, yung makukuha mo na parking slot sa NBC dagdagan mo kasi minimum lang
yon
SITE DEVELOPMENT
1. 1 way for parking \ entry and exit para d macongest
2. Maglagay ng way or landscape before the tower for services, utilities,
3. Water treatment plant for mixed use structure & gray water treatment plant – operations
and
4. Solid waste facilities /material recovery facilities, tapos service road
4 types of clientele
1. Sosyal na ddrop off lang tapos yung car may pagsstayan of pagpaparkan para pag
tapos na sya lalabas lang
2. Walk in lang dadaan lang tapos aalis na
3. Office employee tapos don talaga nakatira
4. Yung talagang tenant na pedeng hindi na lumabas. Which may sariling parking na sa
kanila
For pandemic response: corridor
1. 2-meter-wide corridor for social distancing
2. Provide barrier glass in the center and provide exhaust fan and lalabas sa labas yung virus
para mapatay sa init
3. 1 way lahat, walang magkakasalubong

Provide fire exit from both side


MEP floor for 13 story – tapos itypical floor muna
WTP units – located near to river, or river bank
Staff quarter and office should be near the area, to watch the facility easily

1. Receiving chamber –6.2x3x3


2. Coarse screen – bar screen = 1.2x.7
3. Grit chamber – 5.7 x6x 3
4. Fine screen -3.2x08
5. Skimming tank – 1.5x1x3
6. Primary clarifier – 29.2 dia x 2.5
7. Aeration tank – 54 x 10x 4.5
8. Secondary Clarifier – 37 dia x3.5
9. Sludge Drying Bed- 12.5x 8

1. Bar screen- 1.2x.6 = 2 x 1.25 x 1.0


2. Equalization tanks- 5.7 x 5.8 x 3 = 4.5 x 4.5 x 3
3. Bio Reactor – 7.8 x 7.9 x 3.5 (with diffused aeration) = 5.5 x 5.5 x 3.5
4. Decant tank = 5.5 x 5.5 x 3.5 =
5. Sludge Holding Tank = 2.58 x 2.58x 3= 2 x 2 x 3.5
6. Pressure sand filter = 1.2m -1.85 dia
7. Activated carbon filter = 1.2m – 1.85 dia

8. Pre aeration tank 6.4x 6.5 x 3= 3 x 3x 3.5m


9. Final collection tank = 5.7 x 5.7x 3 4.5x5x3.5

10. BS /coarse screen


11. ET
12. Sludge tank
13. SBR
14. DT
15.
16. PSF
17. ACF
18. FHT = For reuse for flushing, landscaping, carwash and etc
GAREBAGE CHUTE DIA- .8
GARBAGE BIN 1100 ML- 1.2 X1 (10 OR more dwelling)
FREIGHT ELEVATOR- 3.65 X 3.9
MACHINE ROOM 2.5 X 2.8
ENTRANCE 2.70

Twin elevator concept


Twin elevator- 1 shafts and 2 cars
-HIGH RISE
Early tall-building designers, fearing a fire on the 13th floor, or fearing tenants' superstitions about
the rumor, decided to omit having a 13th floor listed on their elevator numbering.

1-4 FFL Retail s


5 PODIUM DECK
6-11 HOTEL ROOMS,

Column rule thumb for high rise building should not less than by .14 m2
-at the corner of the room , staircases