You are on page 1of 4

PT.

PATRA BADAK ARUN


SOLUSI
Graha PBAS, Jl. Prof. Dr.
Soepomo, S.H. No. 55 Jakarta
12810 Indonesia
T. +62 21 8379 8585 (Hunting)
F. +62 21 8379 8591
www.pbasolusi.com

LIQUID PENETRANT EXAMINATION REPORT A Subsidiary Of Pertamina

Location : TBBM KERTAPATI

Project Name : Pembangunan Tangki Air 5000 kl

Page 1 of 1 Costumer : PT.PERTAMINA (PERERO)

Job/Contract No. : Report No : 29/PT/PBAS/VIII/2018

Description : WELDER TEST (WPQT) Date : 28-08-2018

Surface Condition : Welded Ground Flush Other ( )

Stage of Exam. : After Welding After Hydrostatic Other ( )

Welding Process : GTAW SMAW Other ( )

Scope of Base Metal Back Chipping Weld Part

Examination Edge Prep. Repair Weld Other ( )


Water Was. Post Emulsifier Solvent Removable

Penetrant SKL-SP1 Other ( ) Dwell Time : 5 Minute

Application By Brushing Spraying Other ( )

Type of Developer SKD-S2 Dry Developer Aqueous Dev. Non Aqueous Dev.

Developing Time : 10 Minute Interpretation Time : 10 Minute

Type of Cleaner SKC-C Other ( ) Applicable Code : ASME Section V

Type of Penetrant Visible Fluorescent ( )

Welding Thickness / Schedule Judgement Type of Material Remark

Identification (mm) Accepted Rejected Discontinuity

Pressure Deferensial

W.07 9 mm ACC − ASTM A 36

SKETCH (Identify Discontinuity Listed Above)

PBAS W 07

Involveme PT. PBAS PT. PBAS PT.PERTAMINA (PERSERO)


nt Party

Signature

Name Septiman Rudi Darmanto Fahmi A. Husain


Date
PT. PATRA BADAK ARUN
SOLUSI
Graha PBAS, Jl. Prof. Dr.
Soepomo, S.H. No. 55 Jakarta
12810 Indonesia
T. +62 21 8379 8585 (Hunting)
F. +62 21 8379 8591
www.pbasolusi.com

LIQUID PENETRANT EXAMINATION REPORT A Subsidiary Of Pertamina

Location : TBBM KERTAPATI

Project Name : Pembangunan Tangki Air 5000 kl

Page 1 of 1 Costumer : PT.PERTAMINA (PERERO)

Job/Contract No. : Report No : 28/PT/PBAS/VIII/2018

Description : WELDER TEST (WPQT) Date : 09-08-2018

Surface Condition : Welded Ground Flush Other ( )

Stage of Exam. : After Welding After Hydrostatic Other ( )

Welding Process : GTAW SMAW Other ( )

Scope of Base Metal Back Chipping Weld Part

Examination Edge Prep. Repair Weld Other ( )


Water Was. Post Emulsifier Solvent Removable

Penetrant SKL-SP1 Other ( ) Dwell Time : 5 Minute

Application By Brushing Spraying Other ( )

Type of Developer SKD-S2 Dry Developer Aqueous Dev. Non Aqueous Dev.

Developing Time : 10 Minute Interpretation Time : 10 Minute

Type of Cleaner SKC-C Other ( ) Applicable Code : ASME Section V

Type of Penetrant Visible Fluorescent ( )

Welding Thickness / Schedule Judgement Type of Material Remark

Identification (mm) Accepted Rejected Discontinuity

Pressure Deferensial

W.03 9 mm ACC − ASTM A 36

W.04 9 mm ACC − ASTM A 36

W.05 9 mm ACC − ASTM A 36

W.06 9 mm ACC − ASTM A 36

SKETCH (Identify Discontinuity Listed Above)

PBAS W 03 PBAS W 04

PBAS W 05 PBAS W 06

Involve
ment PT. PBAS PT. PBAS PT.PERTAMINA (PERSERO)
Party
Signatu
re

Name Septiman Rudi Darmanto Yulanda Charly


Date
PT. PATRA BADAK ARUN
SOLUSI
Graha PBAS, Jl. Prof. Dr.
Soepomo, S.H. No. 55 Jakarta
12810 Indonesia
T. +62 21 8379 8585 (Hunting)
F. +62 21 8379 8591
www.pbasolusi.com

LIQUID PENETRANT EXAMINATION REPORT A Subsidiary Of Pertamina

Location : TBBM KERTAPATI

Project Name : Pembangunan Tangki Air 5000 kl

Page 1 of 1 Costumer : PT.PERTAMINA (PERERO)

Job/Contract No. : Report No : 02/PT/PBAS/III/2018

Description : WELDER TEST (WPQT) Date : 07-03-2018

Surface Condition : Welded Ground Flush Other ( )

Stage of Exam. : After Welding After Hydrostatic Other ( )

Welding Process : GTAW SMAW Other ( )

Scope of Base Metal Back Chipping Weld Part

Examination Edge Prep. Repair Weld Other ( )


Water Was. Post Emulsifier Solvent Removable

Penetrant SKL-SP1 Other ( ) Dwell Time : 5 Minute

Application By Brushing Spraying Other ( )

Type of Developer SKD-S2 Dry Developer Aqueous Dev. Non Aqueous Dev.

Developing Time : 10 Minute Interpretation Time : 10 Minute

Type of Cleaner SKC-C Other ( ) Applicable Code : ASME Section V

Type of Penetrant Visible Fluorescent ( )

Welding Thickness / Schedule Judgement Type of Material Remark

Identification (mm) Accepted Rejected Discontinuity

Pressure Deferensial

W.01 9 mm ACC − ASTM A 36

W.02 9 mm ACC − ASTM A 36

SKETCH (Identify Discontinuity Listed Above)

PBAS W 01 PBAS W 02

Involve
ment PT. PBAS PT. PBAS PT.PERTAMINA (PERSERO)
Party
Signatu
re

Name Septiman Rudi Pujianto Hasbi F


Date
PT. PATRA BADAK ARUN
SOLUSI
Graha PBAS, Jl. Prof. Dr.
Soepomo, S.H. No. 55 Jakarta
12810 Indonesia
T. +62 21 8379 8585 (Hunting)
F. +62 21 8379 8591
www.pbasolusi.com

LIQUID PENETRANT EXAMINATION REPORT A Subsidiary Of Pertamina

Location : TBBM KERTAPATI

Project Name : Pembangunan Tangki Air 5000 kl

Page 1 of 1 Costumer : PT.PERTAMINA (PERERO)

Job/Contract No. : Report No : 01/PT/PBAS/III/2018

Description : WELDER TEST (WPQT) Date : 07-03-2018

Surface Condition : Welded Ground Flush Other ( )

Stage of Exam. : After Welding After Hydrostatic Other ( )

Welding Process : GTAW SMAW Other ( )


Scope of Base Metal Back Chipping Weld Part

Examination Edge Prep. Repair Weld Other ( )

Water Was. Post Emulsifier Solvent Removable

Penetrant SKL-SP1 Other ( ) Dwell Time : 5 Minute

Application By Brushing Spraying Other ( )

Type of Developer SKD-S2 Dry Developer Aqueous Dev. Non Aqueous Dev.

Developing Time : 10 Minute Interpretation Time : 10 Minute

Type of Cleaner SKC-C Other ( ) Applicable Code : ASME Section V

Type of Penetrant Visible Fluorescent ( )

Welding Thickness / Schedule Judgement Type of Material Remark

Identification (mm) Accepted Rejected Discontinuity

Pressure Deferensial

W.01 8.18 mm ACC − ASTM A53 Gr.C

W.02 8.18 mm ACC − ASTM A53 Gr.C

SKETCH (Identify Discontinuity Listed Above)

PBAS W 01

PBAS W 02

Involve
ment PT. PBAS PT. PBAS PT.PERTAMINA (PERSERO)
Party
Signatu
re

Name Septiman Rudi Pujianto Hasbi F


Date