CRUSHER PRE START CHECK LIST


Date / Time:
Shift:
Condition
No Equipment Check item Not Remarks
Ready N/A
Ready

1 ROM pad Ore condition, communicate with spv and CRO


ROM pad operator with available Radio
Loader operator with available Radio
2 ROM bin Dumping light (Red / Green)
ROM bin level compare transmitter and actual
3 Appron feeder Track link condition, pan, all sefety guard, pull wire
Sproket no rock and clear condition (head and tail)
Motor condition (visusl check)
ROM bin gate Chain condition at
Local start / stop buttom remote position cros check to control room
4 Jaw Crusher No material inside
Fly wheel guard installed and good condition
All base body bolts complete and thight
Local start / stop buttom remote position cros check to control room
Chute under jaw, no pile up material inside, inspect the chute plate
Jaw gape (communicate with spv or CRO)
Jaw togle spring
Grease level in storage tank
5 Emergency bin and feeder Bin not empty
Belt condition in centre pisition, belt no broken, all roller good
Loader unloading point is clear
6 Feed conveyor All safety guard installed
All drum pulley (Head , bend, take up and tail ) in good condition
Pull wire in healthy, healty
Conveyors cover installed well
Belt drfit switch condition, healthy
Belt Rip condition healthy
Ready status , all healthy (confirm to control room for SCADA)
7 Hoist crane Ready tu use
Stand by at right position
8 Magnet Center position
Pulling chain in safe posisition
9 Feed spout No built up material inside
10 Feed Spout 1 st, 2nd & V scrapper in good condition
11 Go around all walk way and make sure all walk way clear and safe
Note:

Shift / Jr Supervisor Operator

(………………………………………….) (……………………………………………)

M:\PROCESSING\04. Operation\Pre start check list