PT DWINAD NUSA SEJAHTERA - TEMBANG GOLD PROJECT

THICKENER AND TAILING PRE START CHECK LIST


Date / Time:
Shift:
Condition
No Equipment Check item Not Remarks
Ready N/A
Ready

1 Safety shower The condition, eye wash and shower


2 Under flow Pump Motor condition and status confirm to CRO
Gland wayter flow
Suction valve
2 Flocculant Mixing system healthy
Dosing Pump
Hopper powder level
Storage level adequate
3 Thickener Rake gear box oil level (see sigh glass not below low)
Check local panel cross check to the CRO beetwen panel and SCADA
Thickener level in over flow level
4 Tail Check both of tail pump condition, healthy status
Gland water flow, confirm to CRO there is no alarm
Confirm to CRO transmitter and actual level

5
11 Go around all walk way and make sure all walk way clear and safe
Note:

Shift / Jr Supervisor Operator

(………………………………………….) (……………………………………………)

M:\PROCESSING\04. Operation\Pre start check list