You are on page 1of 2

Refer. SOP No.

: WL/B/QAD/001

TITLE : PREVENTIVE MAINTENANCE PROCEDURE OF PRODUCTION EQUIPMENTS


SOP No.: WL/B/MNT/023 Approved By:
Version No.: 00 Head-QA
Page 1 of 2

PREVENTIVE MAINTENANCE OF LAMINAR AIR FLOW

Frequency: Equipment ID No:


Location: Date:
S.n
Description Activity Observation Remarks
o
1 Check the any abnormalities in LAF at on
Pre - Maintenance OK/NOT OK/NA
condition.
Isolate The Power & Display the status Board
2 Status Display OK/NOT OK/NA
As Machine “Under Maintenance”
3 Starter Check the starter connections OK/NOTOK/NA
Check the motor connections and lubricate
4 Motor OK/NOT OK/NA
the bearing
Check the Blower condition and lubricate the
5 Blower OK/NOT OK/NA
bearings
6 Alignment Check the alignment of the Motor and blower. OK/NOT OK/NA

7 Pre Filter Clean the Pre filter OK/NOT OK/NA

8 HEPA Check the HEPA Filter condition. OK/NOT OK/NA


Check the Manometer Readings with in the
9 Manometer limit. If readings (or) Not with in the Limit OK/NOT OK/NA
Check the Problem and rectify it.
Check the Check the connections of LAF, If find any
10 OK/NOT OK/NA
connections loose wire tight it.

11 Check the earthing Check the earthing continuity to LAF. OK/NOT OK/NA
Check the voltage between neutral to Earth in
Check the Earth
12 the panel which should be less than 5v and OK/NOT OK/NA
Voltage
record the same
13 Check the voltage Check the incoming line voltage OK/NOT OK/NA

14 Switch on Switch on the LAF OK/NOT OK/NA

15 Current Check the Current of the Each Phase. OK/NOT OK/NA


Remove the status board display as machine
16 Status Display “Under Maintenance” and check for proper OK/NOT OK/NA
functioning of the Machine.
Remarks:

* OK if satisfactory, NOT OK if not satisfactory, NA Not applicable

Format No.: WL/B/MNT/023/F01-00


WEXFORD LABORATORIES PVT. LTD.
Plot No. 163, Vasanthanarasapura Industrial Area, 1st Phase, Nagenahalli, Kora Hobli, Tumkur-572128.
CIN: U24231KA2002PTC030849
Refer. SOP No.: WL/B/QAD/001

TITLE : PREVENTIVE MAINTENANCE PROCEDURE OF PRODUCTION EQUIPMENTS


SOP No.: WL/B/MNT/023 Approved By:
Version No.: 00 Head-QA
Page 2 of 2

Done by: Verified by:


Next Due on
(Technician) (Engineer)

Format No.: WL/B/MNT/023/F01-00


WEXFORD LABORATORIES PVT. LTD.
Plot No. 163, Vasanthanarasapura Industrial Area, 1st Phase, Nagenahalli, Kora Hobli, Tumkur-572128.
CIN: U24231KA2002PTC030849