نموذج لتصميم محطة ضخ
نموذج لتصميم محطة ضخ
stage -2 (2060)
QMDWF 16675 m3/d
0.193 m3/sec
assume D 0.6 m
assume d/D (3/4)
Qfull 0.214 m3/sec manning
S 0.0010
check of velocity
vact 1.13vfull
0.776 m/sec (0.6-1.5)
check at 2030
from manning
d/D 0.53 CURIVE
from manning
Vact/Vfull 1.03 CURIVE
vact 0.7 m/sec (0.6-1.5)
𝑷𝒐𝒑
• 𝑫𝒆𝒏𝒊𝒔𝒊𝒕𝒚 =
𝑨𝒓𝒆𝒂
• Qave= 𝟎.8*W C*Pop
• Qave= 𝟎.8*W
C*Pop
• Qrain=(C*I*0.2*Area)/
360
• P F= 𝟏/𝑷𝟎.𝟏𝟔𝟕
• 𝑸𝒅 = 𝑸𝒎𝒅𝒘𝒇 = 𝟏. 𝟐𝟓 ∗ 𝑸𝒂𝒗𝒆 ∗ 𝑷 𝑭 + 𝑸𝒊𝒏𝒇
1
stage -2 (2060)
stage -1 (2030)
2
Atotal 28.26 m2 At=3.14*D2/4
du 0.9 m du=Vu/Aw
Desin of force main (2060)
Q=A*V
Q pumps 230 L/sec
Assume v 1.5 m/sec <2m/sec
A 0.15 m2
D 0.44 m
select (D) 0.4 m
2
Aact 0.126 m
Vact 1.8 m/sec <2m/sec
3
Manometric head
stage -2 -(2060)
Ht=Hfriction+Hstatic+H minor+H resedual
Level of off Level -1.5 m
max hight of force main 12.45 m
1-Hstatic 13.95 m
2-Hfriction from Hazenwillim
equation Q=0.279*C*D2.63*(hf/L)0.54
Length(L) 1500 m
C (130-140) 130 H D P E
Q pumps 230 L/sec
0.23 m3/sec
D 0.4 m
Hfriction 11.1 m
H minor (0.1-0.15)Hfriction
1.7 m
H resedual (2-3) m
2 m
Htotal 28.7 m
working range
Hmax 1.1*Htotal
31.5 m
Hmin 0.8*Htotal
22.9 m
stage -1 (2030)
1-Hstatic 13.95 m
2-Hfriction from Hazenwillim equation
Q=0.279*C*D2.63*(hf/L)0.54
Length(L) 1500 m
C (130-140) 140
Q pumps 140 L/sec
0.14 m3/sec
D 0.4 m
Hfriction 3.8 m
H minor (0.1-0.15)Hfriction
0.58 m
4
H resedual (2-3) m
2 m
Htotal 20.4 m
working range
Hmax 1.1*Htotal
22.4 m
Hmin 0.8*Htotal
16.3 m
stage -
2-
(2060)
Length(L) 1500 m
C (130-
140) 130
Q pumps 230 L/sec
0.23 m3/sec
D 0.4 m
Q Hf
50 0.66
150 5.08
230 11.22
300 18.35
400 31.26
2060
50.00
40.00
30.00
H (m)
20.00
10.00
0.00
500 400 300 200 100 0
Q (L/sec)
5
stage -
1-
(2030)
Length(L) 1500 m
C (130-
140) 140
Q pumps 140 L/sec
0.14 m3/sec
D 0.4 m
Q Hf
50 0.58
100 2.09
140 3.90
200 7.55
250 11.41
2030
30.00
25.00
20.00
H (m)
15.00
10.00
5.00
0.00
300 250 200 150 100 50 0
Q (L/sec)
6
تصميم البيارة بعد اضافة التوابع
𝑷𝒐𝒑
• 𝑫𝒆𝒏𝒊𝒔𝒊𝒕𝒚 = 𝑨𝒓𝒆𝒂
• P F= 𝟏/𝑷𝟎.𝟏𝟔𝟕
• 𝑸𝒅 = 𝑸𝒎𝒅𝒘𝒇 = 𝟏. 𝟐𝟓 ∗ 𝑸𝒂𝒗𝒆 ∗ 𝑷 𝑭 + 𝑸𝒊𝒏𝒇
stage -2 (2060)
7
stage -1 (2030)
8
تصميم خط الطرد بعد اضافة التوابع
Q=A*V
Q pumps 350 L/sec
Assume v 1.5 m/sec <2m/sec
A 0.23 m2
D 0.55 m
select (D) 0.5 m
2
Aact 0.196 m
Vact 1.8 m/sec <2m/sec
Manometric head
stage -2 -(2060)
Ht=Hfriction+Hstatic+H minor+H resedual
Level of off Level -1.5 m
max hight of force main 12.45 m
1-Hstatic 13.95 m
2.63
2-Hfriction from Hazenwillim equation Q=0.279*C*D *(hf/L)0.54
Length(L) 1500 m
C (130-140) 130 H D P E
Q pumps 350 L/sec
0.35 m3/sec
D 0.4 m
Hfriction 24.1 m
H minor (0.1-0.15)Hfriction
3.6 m
9
H resedual (2-3) m
2 m
Htotal 43.7 m
working range
Hmax 1.1*Htotal
48.0 m
Hmin 0.8*Htotal
34.9 m
stage -1 (2030)
1-Hstatic 13.95 m
2-Hfriction from Hazenwillim equation
Q=0.279*C*D2.63*(hf/L)0.54
Length(L) 1500 m
C (130-140) 140
Q pumps 220 L/sec
0.22 m3/sec
D 0.4 m
Hfriction 8.9 m
H minor (0.1-0.15)Hfriction
1.33 m
H resedual (2-3) m
2 m
Htotal 26.2 m
working range
Hmax 1.1*Htotal
28.8 m
Hmin 0.8*Htotal
20.9 m
11
stage -
2-
(2060)
Length(L) 1500 m
C (130-
140) 130
Q pumps 230 L/sec
0.23 m3/sec
D 0.5 m
Q Hf
150 1.71
250 4.42
350 8.23
450 13.11
550 19.02
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
600 500 400 300 200 100 0
11
stage -
1-
(2030)
Length(L) 1500 m
C (130-
140) 140
Q pumps 140 L/sec
0.14 m3/sec
D 0.5 m
Q Hf
50 0.20
100 0.71
220 3.04
300 5.40
400 9.19
25.00
20.00
15.00
10.00
5.00
12 0.00
500 400 300 200 100 0
13