Professional Documents
Culture Documents
Pá Àäuájaiàä ºé Àgàä: - Pà Àpà Àägà Vá®Æèpàä Zápà Àºà Î Uáæ Àä Àazá Äw Gàauà Áxà Áé Ä © Pà Ï Élözà Á Àðd Pà Gà Éû Pá Àäuáj Cazádä Ànö
Pá Àäuájaiàä ºé Àgàä: - Pà Àpà Àägà Vá®Æèpàä Zápà Àºà Î Uáæ Àä Àazá Äw Gàauà Áxà Áé Ä © Pà Ï Élözà Á Àðd Pà Gà Éû Pá Àäuáj Cazádä Ànö
Construction of unlined surface drains of average cross sectional area 0.40 sqm in
soil to specified lines grades, levels and dimension excavated materials to used in
1
embankment with a lift of up to 3m and lead of 50m (average lead 25m as per
technical specification clause 307 (A) by manual means [p.no:36:I.no: 3.19 (A)
PRED SR 2018-20]
PÁAiÀÄð¥Á®PÀ EAf¤AiÀÄgÀªÀgÀÄ
¥ÀAZÁAiÀÄvï gÁeï EAf¤AiÀÄjAUï «¨sÁUÀ gÁªÀÄ£ÀUÀgÀ
CAzÁdÄ ¥ÀnÖ
PÁªÀÄUÁjAiÀÄ ºÉ¸ÀgÀÄ : - PÀ£ÀPÀ¥ÀÄgÀ
vÁ®ÆèPÀÄ ZÁPÀ£ÀºÀ½î UÁæªÀÄ ¥ÀAZÁ¬Äw
gÀAUÀ£ÁxÀ¸Áé«Ä ©½PÀ¯ï ¨ÉlÖzÀ ¸ÁªÀðd¤PÀ gÀ¸ÉÛ
PÁªÀÄUÁj CAzÁdÄ ¥ÀnÖ