MIRFA INDEPENDENT WATER AND POWER PLANT
Technical Specification for 3D CAD MODELING Rev. A
1. 3D MODELING
1.1 PURPOSE
The purpose of 3D Modeling is to review the engineering documents and drawings and prevent
problems which may arise during construction. The 3D models shall be developed to a level of
detail that is consistent with the submitted drawings as deliverables.
1.4.1 3D Model to submit shall be created as one of the following formats.(included 3D model List)
Order S/W File Format Remark
Model & Data
1 PDS SmartPlant Review dri, drv, dgn, prp
(property are required)
Model
2 Microstation 3D dgn
(property are not required)
1.4.2 Graphic Core is Microstaion J or equivalent and please use the following working unit.
*(): alternative unit
Master Unit Sub Unit Positional Unit
Unit Name M (MM) MM (MM) -
Resolution 1 (1) 1000 (1) 80
1.4.3 The location of all 3D model files should be placed at the coordinates shown on Plot Plan.
3D Model should be located in actual position from the origin point.
1.4.4 If 3D model file naming rule is required, the equipment supplier should follow.
1.4.5 Model files of equipment, plumbing, electricity, steel, etc. shall be separated in each file as per the
discipline. Each file size shall be less than 2MB.
1.4.6 The model list shall be submitted with the 3D model files.
1.4.7 For the main equipment, the inside items shall be modeled. (If there is no interference inside
equipment, only the external shape of equipment could be modeled by agreement.)
1.4.8 Model file should show the properties for each element on review program. The minimum property
is as follows.
□ Pipe
- Line numbers
- Design conditions (design temperature, design pressure, operation temperature, operation
pressure, test pressure etc.)
- Etc.
□ Steel structure
- Member size
□ Cable tray
- Cable tray size
□ Panel
- Panel tag no.
- Panel description
- Panel door open space
□ Equipment
- Equipment tag no.
- Equipment Nozzle data
- Equipment description
- Equipment Removal space
1.4.10 If ccontractors do
d not use PDS for 3D C
CAD modeling, 3D CAD model
m shall bbe converted
d properly so
o
tha
at it can be re
endered in th
he 3D modell review prog
gram (SmartP
Plant Review
w). (When the
e 3D modelss
are
e developed not in PDS but using an
nother solutio
on and they are converteed to MICRO
OSTATION J
forrmat, sometim
mes the 3D CAD
C model sshapes are looked only WIRE
W FRAM
ME. Please be
e cautious)
-Exxample of not acceptable 3D
D model-
1.5 3D
D MODEL SUBMITTAL
S L TIME
- when afterr the contractt within 1 mo
onth (in appro
oximate shap
pe)
- when subm
mit related drrawings
- when an ow
wner require
es
- when subm
mit final docu
uments