Professional Documents
Culture Documents
SPEAKER:
Jimmy Barrón García
jbarron@cemsa.com.pe
jbarron@cemsa.com.pe
OVERVIEW
Pitágoras
jbarron@cemsa.com.pe
1. CONTENT OF A PROJECT (DISCIPLINES)
1. CONTENT OF A PROJECT (DISCIPLINES)
jbarron@cemsa.com.pe
CIVIL STRUCTURE
GEOTECHNICS ARCHITECTURE
SECURITY MECHANICS
ELECTRICITY PIPING
1. CONTENT OF A PROJECT (DISCIPLINES)
jbarron@cemsa.com.pe
1.1. GEOTECHNICS AND GEOLOGY
OBJECTIVES:
• Obtaining soil properties.
• 3D surface generation.
• Flattening of surfaces
• Determination of volume of soil to move.
1. CONTENT OF A PROJECT (DISCIPLINES)
jbarron@cemsa.com.pe
1.2. CIVIL
• Reinforced concrete is one of
the main components in the
design and construction of
industrial plants and facilities.
• It allows us to make
foundations, pedestals, floors,
gutters, and many more parts
that will support the plant's
structures and equipment.
OBJECTIVES:
• Structural calculations of reinforced concrete.
• 3D models of civil works.
• Detail plans (2D) of civil works.
• Costs and budgets of civil works.
1. CONTENT OF A PROJECT (DISCIPLINES)
jbarron@cemsa.com.pe
1.3. STRUCTURE
OBJECTIVES:
• Steel structures calculations.
• 3D Models of Steel Structures.
• Planes in detail (2D) of steel structures.
• Costs and budgets of steel structures.
1. CONTENT OF A PROJECT (DISCIPLINES)
jbarron@cemsa.com.pe
1.4. ARCHITECTURE
OBJECTIVES:
• 3D models of architecture.
• Detail plans (2D) of architecture.
• Costs and budgets of architecture.
1. CONTENT OF A PROJECT (DISCIPLINES)
jbarron@cemsa.com.pe
1.5. MECHANICS
• Equipment is a very important
part of plant design, and is
what actually determines the
final size of the plants.
jbarron@cemsa.com.pe
1.6. PIPING
• The discipline of piping is one of the
most important in the design of
industrial plants. This discipline has
priority over other disciplines.
jbarron@cemsa.com.pe
1.7. ELECTRICITY AND INSTRUMENTATION
• For the 3D design, the
electrical and electronic
design, only the trays and
pipes used for the installation
of cables are physically
denoted, the protection
(grounding), power, control
and service systems are
evaluated. Also electrical
calculations and single-line
designs.
OBJECTIVES:
• Electric calculations.
• Single-line connection plans, Bill of materials
• Costs and budgets, electrical.
1. CONTENT OF A PROJECT (DISCIPLINES)
jbarron@cemsa.com.pe
1.8. SECURITY AND SIGNALING
• This discipline is not
considered as such, since it
was always included in others.
OBJECTIVES:
• 3D models of the components.
• Bill of materials
• Component data sheet.
• Costs and budgets.
jbarron@cemsa.com.pe
2.LAYOUT PLANT
2.LAYOUT PLANT
jbarron@cemsa.com.pe
2.1. GENERAL DISTRIBUTION
100-RX STORAGE
200-FLOATING 01 (Zn)
300-MILLING
400-FILTER
500-PF STORAGE
2.LAYOUT PLANT
jbarron@cemsa.com.pe
2.2. DESCRIPTION AREA
This distribution is
made according to the
needs of the clients
jbarron@cemsa.com.pe
3.FOLDER CREATION AND MANAGEMENT
3.FOLDER CREATION AND MANAGEMENT
jbarron@cemsa.com.pe
3.1. SINGLE USER
CIA Folder DIV Folder Clients Folder
PC-01 HD CEMSA GG
GP 0100-ISM
BACKUP
GA 0101-BACKUS
…
0102-GLORIA
…
3.FOLDER CREATION AND MANAGEMENT
jbarron@cemsa.com.pe
3.2. MULTI-USER
CIA Folder DIV Folder Clients Folder
SERVER HD CEMSA GG
We will do another
webinar, showing
the use and
GP 0100-ISM application of
NET collaborative work.
BACKUP
GA 0101-BACKUS
…
jbarron@cemsa.com.pe
3.3. CLIENT FOLDER CONTENT
Client Folde Client PJs Project Folder
• Basic and conceptual engineering documents.
• PFDs and P&IDs, preliminary.
• Plant layout.
0100-ISM 001A 01-INFORMATION • Preliminary list of materials, equipment, etc.
• P&ID plans.
• Isometric Plans.
• Orthogonal plans, all disciplines.
04-PLANS • Other plans of the project.
3.FOLDER CREATION AND MANAGEMENT
jbarron@cemsa.com.pe
3.4. FOLDER “02-MODEL” CONTENT
Project Folder Model Folder
02-MODEL Mq-0100GP001A
CREATE
User Soft
3.FOLDER CREATION AND MANAGEMENT
jbarron@cemsa.com.pe
3.5. FOLDER “Mq-0100GP001A” CONTENT.
3.FOLDER CREATION AND MANAGEMENT
jbarron@cemsa.com.pe
3.6. FOLDER “Plant 3D Models” CONTENT.
100-RX STORAGE
200-FLOATING 01 (Zn)
300-MILLING
Plant 3D Models
(Plant 3D Drawings)
400-FILTER
500-PF STORAGE
3.FOLDER CREATION AND MANAGEMENT
jbarron@cemsa.com.pe
3.6. FOLDER “Plant 3D Models” CONTENT (Cont.)
3.FOLDER CREATION AND MANAGEMENT
jbarron@cemsa.com.pe
3.7. DISTRIBUTION OF FOLDERS BY PLANT AREAS
01A-EXISTING TOPOGRAPHY 05A-EXISTING EQUIPMENTS
01-GEOTECHNICS 05-MECHANICS
02-CIVIL 06-PIPING
07B-NEW ELECTRICAL
03B-NEW STRUCTURE 200-FLOATING 01 (Zn)
03-STRUCTURE 07-ELECTRICITY
04A-EXISTING ARCHITECTURE 08A-EXISTING SECURITY
04-ARCHITECTURE 08-SECURITY
3.FOLDER CREATION AND MANAGEMENT
jbarron@cemsa.com.pe
3.7. DISTRIBUTION OF FOLDERS BY PLANT AREAS (Cont.)
3.FOLDER CREATION AND MANAGEMENT
jbarron@cemsa.com.pe
3.8. COMPLEMENTARY FOLDERS
MODEL (MAQUETA):
In this folder, we store the Drawings, where
the main model of the entire plant and the
models of the plant areas will be individually.
000-MODEL
jbarron@cemsa.com.pe
3.8. COMPLEMENTARY FOLDERS (Cont.)
jbarron@cemsa.com.pe
4. CREATION, EDITING AND MANAGEMENT
OF DRAWINGS
4. CREATION, EDITING AND MANAGEMENT OF DRAWINGS
jbarron@cemsa.com.pe
4.1. FILES CREATED IN COMPLEMENTARY FOLDER
Main
Model
Models of
Mq-0100GP001A individual areas
000-MODEL
ETE
001-ETE
4. CREATION, EDITING AND MANAGEMENT OF DRAWINGS
jbarron@cemsa.com.pe
4.2. CAD NAME ASSIGNMENT
jbarron@cemsa.com.pe
4.2. CAD NAME ASSIGNMENT (Cont.)
4. CREATION, EDITING AND MANAGEMENT OF DRAWINGS
jbarron@cemsa.com.pe
4.3. EQUIPMENT TAG
200-TK-01
200-T-01A
05B-NEW 200-T-01B
EQUIPMENTS
200-ML-02
4. CREATION, EDITING AND MANAGEMENT OF DRAWINGS
jbarron@cemsa.com.pe
4.3. EQUIPMENT TAG (Cont.)
4. CREATION, EDITING AND MANAGEMENT OF DRAWINGS
jbarron@cemsa.com.pe
4.4. PIPING LINE NAME ASSIGNMENT
200-WP-8-CS-3201 200-WT-6-CS-3411
200-WP-14-CS-3202 200-WT-8-CS-3412
200-WP-12-CS-3203 200-WT-6-CS-3413
3200
200-WP-2-CS-3204 200-WT-4-CS-3414
200-WT-2-CS-3415
200-WT-1/2-CS-3416
06B-NEW 3300
PIPING 200-RE-12-HDPE-3421
3410 200-RE-12-HDPE-3422
200-RE-8-HDPE-3423
3400 200-RE-6-HDPE-3424
3420 200-RE-4-HDPE-3425
4. CREATION, EDITING AND MANAGEMENT OF DRAWINGS
jbarron@cemsa.com.pe
4.4. PIPING LINE NAME ASSIGNMENT (Cont.)
jbarron@cemsa.com.pe
jbarron@cemsa.com.pe
EL P&ID ES EL DOCUMENTO MAS IMPORTANTE EN EL DISEÑO DE
INSTALACIONES Y PLANTAS INDUSTRIALES Y DEBE ESTAR
APROBADO ANTES DE DAR INICIO EL MODELADO 3D
jbarron@cemsa.com.pe
5. INTEROPERATIVITY OF AUTOCAD PLANT 3D
AND NAVISWORK
5.INTEROPERATIVITY OF AUTOCAD PLANT 3D AND NAVISWORK
jbarron@cemsa.com.pe
5.1. MODEL MANAGEMENT (XREF APPLICATION)
5.INTEROPERATIVITY OF AUTOCAD PLANT 3D AND NAVISWORK
jbarron@cemsa.com.pe
5.2. LAYERS MANAGEMENT IN PT3D
Platinas anclaje
200-03-3001-Estructura metalica
Pernos de anclaje
Columnas
Vigas
Arriostres
Correas
Templadores
5.INTEROPERATIVITY OF AUTOCAD PLANT 3D AND NAVISWORK
jbarron@cemsa.com.pe
5.3. VIEW PROPERTIES IN NAVISWORK
jbarron@cemsa.com.pe
6.QUESTIONS
THANKS
Jimmy Barrón García Specialist in design of facilities and industrial plants
jbarron@cemsa.com.pe BIM consultant for industrial plants
+51 939741220 Design and simulation engineer in unit operations