CHANGE OVER AND RUN TEST SCHEDULE OF JANUARY 2021

SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY


⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday)
1 ⃝ Drain water inside TRB main oil tk(everday)
2 ⃝ Run Sump pit pump Condenser (1w)

⃝ Run test Fuel oil pump to storage tk (1w) ⃝ Drain water inside TRB main oil tk(everday)
⃝ Changeover HPF Fan (1m) ⃝ Change over to Fly Ash Silo 2 (2w)

⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday)
3 ⃝ Drain water inside TRB main oil tk(everday)
4 ⃝ Drain water inside TRB main oil tk(everday)
5 ⃝ Drain water inside TRB main oil tk(everday)
6 ⃝ Drain water inside TRB main oil tk(everday)
7 ⃝ Drain water inside TRB main oil tk(everday)
8 ⃝ Drain water inside TRB main oil tk(everday)
9 ⃝ Run Sump pit pump Condenser (1w)

⃝ Change Over EH oil Pump (2w) ⃝ Run Ball Cleaning (1w) ⃝ Changeover Gland Seal Stm Fan (1w) ⃝ Run test Supply Fuel oil pump (1w) ⃝ Run test Fuel oil pump to storage tk (1w) ⃝ Drain water inside TRB main oil tk(everday)
⃝ Run EDG (warming-up) (1w) ⃝ Run Test Limestone feeding line (1w) ⃝ Changeover CCCW pump (2w) ⃝ Run LP drain pump (flexible)

⃝ Run Test Sand Feeding line (1w) ⃝ Changeover Vacuum pump (3w)
⃝ Changeover Condensate pump (2w)

⃝ Run test Sump pit pump Boiler (1w)

⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday)
10 ⃝ Drain water inside TRB main oil tk(everday) 11 ⃝ Drain water inside TRB main oil tk(everday) 12 ⃝ Run Sump pit pump Condenser 13 ⃝ Drain water inside TRB main oil tk(everday) 14 ⃝ Drain water inside TRB main oil tk(everday) 15 ⃝ Drain water inside TRB main oil tk(everday) 16 ⃝ Run Sump pit pump Condenser (1w)
⃝ Run EDG (warming-up) (1w) ⃝ Drain water inside TRB main oil tk(everday) ⃝ Changeover Gland Seal Stm Fan (1w) ⃝ Run test Supply Fuel oil pump (1w) ⃝ Run test Fuel oil pump to storage tk (1w) ⃝ Drain water inside TRB main oil tk(everday)

⃝ Run AC & DC Oil pump (2w) ⃝ Run Ball Cleaning (1w) ⃝ Run test Sump pit pump Boiler (1w) ⃝ Run LP drain pump (flexible) ⃝ Change over to Fly Ash Silo 2 (2w)

⃝ Change Over Oil Extractor Fan (2w) ⃝ Run Test Limestone feeding line (1w)

⃝ Run Test Sand Feeding line (1w)

⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday)
17 ⃝ Drain water inside TRB main oil tk(everday) 18 ⃝ Drain water inside TRB main oil tk(everday) 19 ⃝ Drain water inside TRB main oil tk(everday) 20 ⃝ Drain water inside TRB main oil tk(everday) 21 ⃝ Drain water inside TRB main oil tk(everday) 22 ⃝ Drain water inside TRB main oil tk(everday) 23 ⃝ Run Sump pit pump Condenser (1w)
⃝ Run EDG (warming-up) (1w) ⃝ Run Ball Cleaning (1w) ⃝ Changeover Gland Seal Stm Fan (1w) ⃝ Changeover oil pump Bypass v/v ⃝ Run test Fuel oil pump to storage tk (1w) ⃝ Drain water inside TRB main oil tk(everday)

⃝ Change Over EH oil Pump (2w) ⃝ Run Test Limestone feeding line (1w) ⃝ Changeover CCCW pump (2w) ⃝ Run test Supply Fuel oil pump (1w)

⃝ Run Test Sand Feeding line (1w) ⃝ Changeover Condensate pump (2w) ⃝ Run LP drain pump (flexible)

⃝ Run test Sump pit pump Boiler (1w)

⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday) ⃝ Run TRB L.O Purifier (everyday)
24 ⃝ Drain water inside TRB main oil tk(everday) 25 ⃝ Drain water inside TRB main oil tk(everday) 26 ⃝ Drain water inside TRB main oil tk(everday) 27 ⃝ Drain water inside TRB main oil tk(everday) 28 ⃝ Drain water inside TRB main oil tk(everday) 29 ⃝ Drain water inside TRB main oil tk(everday) 30 ⃝ Run Sump pit pump Condenser (1w)
⃝ Run EDG (warming-up) (1w) ⃝ Run Ball Cleaning (1w) ⃝ Changeover Gland Seal Stm Fan (1w) ⃝ Run test Supply Fuel oil pump (1w) ⃝ Run test Fuel oil pump to storage tk (1w) ⃝ Drain water inside TRB main oil tk(everday)
⃝ Run AC & DC Oil pump (2w) ⃝ Run Test Limestone feeding line (1w) ⃝ Run test Sump pit pump Boiler (1w) ⃝ Run LP drain pump (flexible) ⃝ Change over to Fly Ash Silo 2 (2w)

⃝ Change Over Oil Extractor Fan (2w) ⃝ Changeover Vacuum pump (3w)
⃝ Run Test Sand Feeding line (1w)

⃝ Run TRB L.O Purifier (everyday)


31 ⃝ Drain water inside TRB main oil tk(everday)

REMARKS:
1 All equipments that will be changed over and Run test has to do on Morning shift
2 EDG warming-up duration is 30 minutes Deputy Dept. Head Operation Dept. Head,
3 Run Test Limestone feeding line until SO2 indication decrease

Marudut Silalahi Ikhlas Ramlan