You are on page 1of 158

DATE Code Item Record of operations, signature of Officer-incharge

c 11.1 DIRTY OIL TANK


6-Jul-17
11.2 CAPACITY: 18.4 M3
11.3 QTY RETAINED: 1.2M3
11.4 0.39M3 OIL DRAINED FROM SERVICE TKS, MANUALLY TRANSFERRED
R. NARSIMHAN CHIEF ENGINEER 06 JULY 2017
INTERNAL TRANSFER OF TOTAL 34.0 M3 HFHSD FROM 1DC TO 5C- 23M3
AND 4DC-11M3. QTY RETAINED-5C-30M3, 4DC-28M3
6-Jul-17 I
R. NARSIMHAN CHIEF ENGINEER 06 JULY 2017
10-Jul-17 H 26.1 NHAVA BASE JETTY 1 FROM ONGC TERMINAL
26.2 START:0940 HRS, STOP: 1050 HRS
26.3 HFHSD SULPHUR CONTENT 0.156%, IN TANK 5C
QTY ADDED=14.89M3, NOW CONTAINS=30.2M3
D.G. KADAM CHIEF ENGINEER 10 JULY 2017
13-Jul-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 4.94M3
3.74M3.M3 OF SLUDGE REMOVED FROM DAY SERVICE TANKS (P,P1 & S)
11.4 WHILE CLEANING TRANSFERRED MANUALY
D.G. KADAM CHIEF ENGINEER 13 JULY 2017
13-Jul-17 D 13 1.25 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0800 HRS TO 0920 HRS
15.3 HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-3.85M3
D.G. KADAM CHIEF ENGINEER 10 JULY 2017
INTERNAL TRANS OF 21.0M3 HFHSD FROM 2P & 2S CARGO TKS TO 5C
SHIPS OIL TK
16-Jul I
QTY RETND IN 5C=21.0M3
SIGNATURE D,G. KADAM CHIEF ENGINEER 16 JULY 2017
INTERNAL TRANS OF 20.0M3 HFHSD FROM 2DC CARGO TKS TO 4DC SHIPS
OIL TK
16-Jul I
QTY RETND IN 4DC=20.0M3
SIGNATURE D,G. KADAM CHIEF ENGINEER 16 JULY 2017
INTERNAL TRANS OF 15.0M3 HFHSD FROM 3DC CARGO TKS TO 5C SHIPS
OIL TK
19-Jul I
QTY RETND IN 5C= 16M3
SIGNATURE D,G. KADAM CHIEF ENGINEER 16 JULY 2017
20-Jul-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 5.8M3
0.86M3.M3 OF PURIFIER SLUDGE AND FO DRAIN FROM DAY SERVICE
11.4 TANKS TRANSFERRED
D.G. KADAM CHIEF ENGINEER 20 JULY 2017
INTERNAL TRANS OF 20.0M3 HFHSD FROM 2DC CARGO TKS TO 5C SHIPS
OIL TK
21-Jul I
QTY RETND IN 5C=25 M3
SIGNATURE D,G. KADAM CHIEF ENGINEER 21 JULY 2017
INTERNAL TRANS OF 43.0M3 HFHSD FROM 2DC & 1DC CARGO TKS TO 5C
& 4DC SHIPS OIL TK
26-Jul I
QTY RETND IN 5C=26 M3, 4DC=18M3,
SIGNATURE D,G. KADAM CHIEF ENGINEER 26 JULY 2017
27-Jul-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 6.1M3
0.3M3. OF PURIFIER SLUDGE AND FO DRAIN FROM DAY SERVICE TANKS
11.4 TRANSFERRED
D.G. KADAM CHIEF ENGINEER 27 JULY 2017
27-Jul-17 D 13 0.5 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0815 HRS TO 0845 HRS
15.3 HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-4.35M3
D.G. KADAM CHIEF ENGINEER 27 JULY 2017
29-Jul-17 H 26.1 NHAVA BASE JETTY 5 FROM ONGC BARGE SARASWATI,
26.2 1530 TO 1640 HRS
26.3 15 MT (18.0 M3) HFHSD, S= 0.18% LOADED IN SHIPS F.O TK 5C
INT SDG 5C- 7.7M3, QTY ADDED= 15MT(18M3), FINAL SDG 5C= 21.12MT
(25.27M3)
D.G. KADAM CHIEF ENGINEER 29 JULY 2017
3-Aug-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 7.8M3
1.7M3. OF PURIFIER SLUDGE AND FO DRAIN FROM ALL DAY SERVICE
11.4 TANKS TRANSFERRED
D.G. KADAM CHIEF ENGINEER 03 AUG 2017
INTERNAL TRANS OF 36.0M3 HFHSD FROM 1S, 1DS, 1DP CARGO TKS TO 5C
& 4DC SHIPS OIL TK
3-Aug-17 I
QTY RETND IN 5C=30 M3, 4DC=17M3,
D.G. KADAM CHIEF ENGINEER 03 AUG 2017

4-Aug-17 D 13 0.35 M3 WATER FM ER BILGES TO BILGE HOLDING TK


14 FROM 0815 HRS TO 0840 HRS
15.3 HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-4.7M3
D.G. KADAM CHIEF ENGINEER 04 AUG 2017
D.G. KADAM CHIEF ENGINEER 03 AUG 2017
INTERNAL TRANS OF 28.0M3 HFHSD FROM 3DC CARGO TKS TO 5C SHIPS
OIL TK
8-Aug-17 I
QTY RETND IN 5C=31.0 M3,
D.G. KADAM CHIEF ENGINEER 07 AUG 2017
8-Aug-17 D 13 1.6 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0800 HRS TO 0840 HRS
15.3 HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-6.3M3
D.G. KADAM CHIEF ENGINEER 08 AUG 2017
8-Aug-17 D 13 1.1 M3 WATER FM BILGE HOLDING TK
14 FROM 0925 HRS TO 1125 HRS
15.1 THROUGH 15 PPM EQUIPMENT. START:
HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-5.2M3
D.G. KADAM CHIEF ENGINEER 08 AUG 2017
OWS 15 PPM SENSOR ALARM,THREE WAY SOLENOID OPERATION AND
OWS BILGE PUMP OPERATIONCHECKED. OPERATING AS INTENDED.
8-Aug-17 I
D.G. KADAM CHIEF ENGINEER 08 AUG 2017
10-Aug-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 8.9M3
1.1M3. OF PURIFIER SLUDGE AND FO DRAIN FROM ALL DAY SERVICE
11.4 TANKS AND STEERING TANK OLD OIL TRANSFERRED
D.G. KADAM CHIEF ENGINEER 10 AUG 2017
10-Aug-17 D 13 0.7 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0815 HRS TO 0840 HRS
15.3 HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-5.9M3
D.G. KADAM CHIEF ENGINEER 04 AUG 2017
INTERNAL TRANS OF 18.0M3 HFHSD FROM 1DC TKS TO 4DC SHIPS OIL TK
10-Aug-17 I
QTY RETND IN 4DC=20 M3,
D.G. KADAM CHIEF ENGINEER 10 AUG 2017
INTERNAL TRANS OF 38.0M3 HFHSD FROM 1DC, 2DC,2DP, 3DC AND 1DC
TKS TO 4DC AND5C SHIPS OIL TK
14-Aug-17 I
QTY RETND IN 4DC=15 M3, 5C-28.0M3
D.G. KADAM CHIEF ENGINEER 10 AUG 2017
17-Aug-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 8.9M3
D.G. KADAM CHIEF ENGINEER 17 AUG 2017
17-Aug-17 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0815 HRS TO 0820 HRS
15.3 HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-6.0M3
D.G. KADAM CHIEF ENGINEER 17 AUG 2017
21-Aug-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 9.7 M3
800L OF RESIDUE COLLECTED FROM WHILE RENEWING SUMP OILS OF ALL
11.4 03 DG AND BOTH FI-FI GEAR BOXES TRANSFERRED TO DIRTY OIL TK.

D.G. KADAM CHIEF ENGINEER 21 AUG 2017


24-Aug-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 9.9M3
0.25M3. OF PURIFIER SLUDGE AND FO DRAIN FROM ALL DAY SERVICE
TANKS TRANSFERRED
D.G. KADAM CHIEF ENGINEER 24 AUG 2017
24-Aug-17 D 13 0.55 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0815 HRS TO 0820 HRS
15.3 HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-6.55M3
D.G. KADAM CHIEF ENGINEER 24 AUG 2017
25-Aug-17 H 26.1 NHAVA BASE JETTY 2FROM ONGC BARGE SHARAWATI,
26.2 1130 TO 1305 HRS
26.3 18.48 MT (22.0 M3) HFHSD, S= 0.20% LOADED IN SHIPS F.O TK 5C
INT SDG 5C- 9.32M3, QTY ADDED= 18.48MT(22.0M3), FINAL SDG 5C=
26.3MT (31.32M3)
D.G. KADAM CHIEF ENGINEER 25 AUG 2017
31-Aug-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 9.9M3

D.G. KADAM CHIEF ENGINEER 31 AUG 2017


31-Aug-17 D 13 1.2 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0815 HRS TO 0915 HRS
15.3 HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-7.75M3
D.G. KADAM CHIEF ENGINEER 31 AUG 2017
INTERNAL TRANS OF 10.0M3 HFHSD FROM 1DP TKS TO 5C SHIPS OIL TK
31-Aug-17 I
QTY RETND IN 5C-26.0M3
D.G. KADAM CHIEF ENGINEER 31 AUG 2017
INTERNAL TRANS OF 34.0M3 HFHSD FROM 1DC & 2DC TKS TO 5C SHIPS
OIL TK
4-Sep-17 I
QTY RETND IN 5C-37.0M3
D.G. KADAM CHIEF ENGINEER 04 SEP 2017
OWS 15 PPM SENSOR ALARM,THREE WAY SOLENOID OPERATION AND
OWS BILGE PUMP OPERATIONCHECKED. OPERATING AS INTENDED.
4-Sep-17 I
D.G. KADAM CHIEF ENGINEER 04 SEP 2017
7-Sep-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 9.9M3
D.G. KADAM CHIEF ENGINEER 07 SEP 2017
7-Sep-17 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0800 HRS TO 0805 HRS
15.3 HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-7.85M3
D.G. KADAM CHIEF ENGINEER 07 SEP 2017
11-Sep-17 H 26.1 NHAVA BASE JETTY 3, FROM ONGC BARGE SHARAWATI,
26.2 1300 TO 1440 HRS
26.3 15.8 M3 (13.27 MT) HFHSD, S= 0.20% LOADED IN SHIPS F.O TK 5C
INT SDG 5C- 17.0M3 (14.2MT), QTY ADDED= 13.27MT(15.8M3), FINAL SDG
5C= 26.88MT (32.0M3)
D.G. KADAM CHIEF ENGINEER 11 SEP 2017
14-Sep-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 10.02M3
120 LITERS OF PURIFIER SLUDGE AND DRAIN FROM SER TANKS
11.4 TRANSFERRED
D.G. KADAM CHIEF ENGINEER 14 SEP 2017
14-Sep-17 D 13 0.2 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0800 HRS TO 0810 HRS
15.3 HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-8.05M3
D.G. KADAM CHIEF ENGINEER 14 SEP 2017
INTERNAL TRANS OF 38.0M3 HFHSD FROM 2DP & 3DC TKS TO 5C SHIPS
OIL TK
15-Sep-17 I
QTY RETND IN 5C-42.0.0M3
D.G. KADAM CHIEF ENGINEER 15 SEP 2017
17-Sep-17 D 13 1.0 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 1300 HRS TO 1420 HRS
15.3 HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-9.05M3
D.G. KADAM CHIEF ENGINEER 17 SEP 2017
OWS 15 PPM SENSOR ALARM,THREE WAY SOLENOID OPERATION AND
OWS BILGE PUMP OPERATIONCHECKED. OPERATING AS INTENDED.
17-Sep-17 I
D.G. KADAM CHIEF ENGINEER 17 SEP 2017
INTERNAL TRANS OF 25.0M3 HFHSD FROM 2DC CAGO TK TO 5C SHIPS OIL
TK
19-Sep-17 I
QTY RETND IN 5C-34.0M3
D.G. KADAM CHIEF ENGINEER 19 SEP 2017
21-Sep-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 10.62M3
11.4 0.6M3 OF FO DRAINED FROM SER TKS TRANSFERRED TO DO TK
D.G. KADAM CHIEF ENGINEER 21 SEP 2017
21-Sep-17 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0800 HRS TO 0805 HRS
15.3 HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-9.15M3
D.G. KADAM CHIEF ENGINEER 21 SEP 2017
INTERNAL TRANSFER OF 20.0M3 HFHSD FROM 1DC CAGO TK TO 5C SHIPS
OIL TK
22-Sep-17 I
QTY RETND IN 5C-29.0M3
D.G. KADAM CHIEF ENGINEER 22 SEP 2017
INTERNAL TRANSFER OF 25.0M3 HFHSD FROM 1DC CAGO TK TO 5C SHIPS
OIL TK
26-Sep-17 I
INT SDG-12.15,QTY RETND IN 5C-37.15.0M3
D.G. KADAM CHIEF ENGINEER 22 SEP 2017

27-Sep-17 C 11.1 DIRTY OIL TANK


11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 11.12M3
0.5M3 OF SLUDGE/DIRTY FO DRAINED FROM SER TANKS & TRANSFERRED
11.4 MANUALY
D.G. KADAM CHIEF ENGINEER 27 SEP 2017
27-Sep-17 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0800 HRS TO 0805 HRS
15.3 BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-9.25M3
D.G. KADAM CHIEF ENGINEER 27 SEP 2017
INTERNAL TRANSFER OF 30.0M3 HFHSD FROM CAGO TKS- 3DS & 3DP TO
5C SHIPS OIL TK
29-Sep-17 I
INT SDG-5C-3.19M3,QTY RETND IN 5C-33.19M3
D.G. KADAM CHIEF ENGINEER 29 SEP 2017
INTERNAL TRANSFER OF 20.0M3 HFHSD FROM CAGO TKS- 3DC & 3DP TO
5C SHIPS OIL TK
1-Oct-17 I
INT SDG-5C-15.5M3,QTY RETND IN 5C-35.42M3
D.G. KADAM CHIEF ENGINEER 01 OCT 2017
2-Oct-17 D 13 1.2 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0830 HRS TO 0900 HRS
15.3 BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-10.45M3
D.G. KADAM CHIEF ENGINEER 02 OCT 2017
2-Oct-17 I OWS 15 PPM SENSOR ALARM,THREE WAY SOLENOID OPERATION AND
OWS BILGE PUMP OPERATIONCHECKED. OPERATING AS INTENDED.
D.G. KADAM CHIEF ENGINEER 02 OCT 2017
2-Oct-17 D 13 1.6 M3 WATER FM BILGE HOLDING TK
14 START: 1200 HRS : 18 DEG 50.03' N; 070 DEG 20.76'E
STOP: 1545 HRS: 18 DEG 52.21'N; 070 DEG 22.46'E
15.1 THROUGH 15 PPM EQUIPMENT.
HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-8.85M3
D.G. KADAM CHIEF ENGINEER 02 OCT 2017
INTERNAL TRANSFER OF 09.0M3 HFHSD FROM CAGO TKS-
1DC,2DP,3DP,3DS, 3DC TO 5C SHIPS OIL TK
3-Oct-17 I
INT SDG-5C-16.8M3,QTY RETND IN 5C-24.76M3
D.G. KADAM CHIEF ENGINEER 01 OCT 2017
4-Oct-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 11.32M3
0.2M3 OF SLUDGE/DIRTY FO DRAINED FROM SER TANKS & TRANSFERRED
11.4 MANUALY
D.G. KADAM CHIEF ENGINEER 04 OCT 2017
4-Oct-17 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0800 HRS TO 0805 HRS
15.3 BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-8.95M3
D.G. KADAM CHIEF ENGINEER 27 SEP 2017
INTERNAL TRANSFER OF 20.0M3 HFHSD FROM CAGO TKS-2DC, TO 5C
SHIPS OIL TK
6-Oct-17 I
INT SDG-5C-8.76M3,QTY RETND IN 5C-28.76M3
D.G. KADAM CHIEF ENGINEER 06 OCT 2017
INTERNAL TRANSFER OF 12.0M3 HFHSD FROM CAGO TKS-2DP, TO 5C
SHIPS OIL TK
9-Oct-17 I
INT SDG-5C-3.576M3,QTY RETND IN 5C-15.576M3
D.G. KADAM CHIEF ENGINEER 09 OCT 2017
INTERNAL TRANSFER OF 20.0M3 HFHSD FROM CAGO TKS-2DS, TO 5C
SHIPS OIL TK
10-Oct-17 I
INT SDG-5C-7.46M3,QTY RETND IN 5C-27.46M3
D.G. KADAM CHIEF ENGINEER 10 OCT 2017
11-Oct-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 12.1M3
0.2M3 OF WASTE OIL FROM DG SUMP POST 500 HRLY RTN AND 0.5M3
11.4 SLUDGE/DIRTY FO DRAINED FROM SER TANKS PLUS FO PURIFIER SLUDGE
TRANSFERRED MANUALY

D.G. KADAM CHIEF ENGINEER 11 OCT 2017


11-Oct-17 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0800 HRS TO 0805 HRS
15.3 BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-9.05M3
D.G. KADAM CHIEF ENGINEER 11 OCT 2017
INTERNAL TRANSFER OF 32.0M3 HFHSD FROM CAGO TKS-1DC TO 5C & 4DC
SHIPS OIL TK
15/10/2017 I
INT SDG-5C-8.1M3,QTY RETND IN 5C-24.12M3; 4DC INT SDG-9.12KL,
FINAL- 25.1M3
D.G. KADAM CHIEF ENGINEER 15 OCT 2017
INTERNAL TRANSFER OF 27.0M3 HFHSD FROM CAGO TKS-2DC TO 5C SHIPS
OIL TK
17/10/2017 I
INT SDG-5C-0.082M3,QTY RETND IN 5C-27.082M3;
D.G. KADAM CHIEF ENGINEER 17 OCT 2017

18-Oct-17 C 11.1 DIRTY OIL TANK


11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 12.4M3
0.3M3 OF WASTE OIL FROM DG SUMP POST 500 HRLY RTN AND 0.5M3
11.4 SLUDGE/DIRTY FO DRAINED FROM SER TANKS PLUS FO PURIFIER SLUDGE
TRANSFERRED MANUALY

D.G. KADAM CHIEF ENGINEER 18 OCT 2017


18-Oct-17 D 13 0.2 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0800 HRS TO 0810 HRS
15.3 BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-9.25M3
D.G. KADAM CHIEF ENGINEER 18 OCT 2017
INTERNAL TRANSFER OF 32.0M3 HFHSD FROM CAGO TKS-2DC TO 5C SHIPS
OIL TK
22/10/2017 I
INT SDG-5C-3.2M3,QTY RETND IN 5C-35.2M3;
D.G. KADAM CHIEF ENGINEER 22 OCT 2017
25-Oct-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 12.5M3
0.1M3 OF WASTE OIL FROM FI-FI GB SUMP DRAINED FROM SER TANKS
11.4 PLUS FO PURIFIER SLUDGE TRANSFERRED MANUALY
D.G. KADAM CHIEF ENGINEER 25 OCT 2017
25-Oct-17 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0900 HRS TO 0905 HRS
15.3 BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-9.35M3
D.G. KADAM CHIEF ENGINEER 25 OCT 2017
INTERNAL TRANSFER OF 36.0M3 HFHSD FROM CAGO TKS-1DC TO SHIPS
OIL TK 5C AND 4DC
25/10/2017 I
INT SDG-5C-7.48M3,QTY RETND IN 5C-33.51M3;
INT SDG-4DC-5.25M3,QTY RETND IN 5C-16.25M3;
D.G. KADAM CHIEF ENGINEER 25 OCT 2017
INTERNAL TRANSFER OF 31.0M3 HFHSD FROM CAGO TKS-2DC TO SHIPS
OIL TK 5C AND 4DC
29/10/2017 I
INT SDG-5C-4.2M3,QTY RETND IN 5C-29.2M3;
INT SDG-4DC-9.48M3,QTY RETND IN 4DC-15.48M3;
D.G. KADAM CHIEF ENGINEER 29 OCT 2017
31-Oct-17 D 13 0.9 M3 WATER FM BILGE HOLDING TK
14 START: 0950 HRS : 18 .45 DEG 987' N; 071.16 DEG 680'E
STOP: 1200 HRS: 18 DEG 52.21'N; 070 DEG 22.46'E
15.1 THROUGH 15 PPM EQUIPMENT.
HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-8.45M3
D.G. KADAM CHIEF ENGINEER 31 OCT 2017
I OWS 15 PPM SENSOR ALARM,THREE WAY SOLENOID OPERATION AND
OWS BILGE PUMP OPERATIONCHECKED. OPERATING AS INTENDED.
31-Oct-17
D.G. KADAM CHIEF ENGINEER 31 OCT 2017
1-Nov-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 13.3M3
APPROX 0.8 M3 OF WASTE OIL FROM FOIL OIL SERVICE TANKS DRAINING
11.4 AND PURIFIER SLUDGE TRANSFERRED MANUALLY.
D.G. KADAM CHIEF ENGINEER 01 NOV 2017
1-Nov-17 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0900 HRS TO 0905 HRS
15.3 BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-8.55M3
D.G. KADAM CHIEF ENGINEER 01 NOV 2017
INTERNAL TRANSFER OF 38.0M3 HFHSD FROM CAGO TKS-3DC TO SHIPS
OIL TK 5C
7-Nov-17 I
INT SDG-5C-4.62,QTY RETND IN 5C-42.62M3;
D.G. KADAM CHIEF ENGINEER 07 NOV 2017
8-Nov-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 14.2M3
APPROX 0.9 M3 OF WASTE OIL FROM NO 2 DG SUMP OIL RENEWAL +
11.4 DAILY DRAIN OF SERVICE TANKS AND PURIFIER SLUDGE, ALL 03 DGs TRAYS
+ ME WASTE OIL TRANSFERRED .

D.G. KADAM CHIEF ENGINEER 08 NOV 2017


8-Nov-17 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0830 HRS TO 0840 HRS
15.3 BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-8.65M3
D.G. KADAM CHIEF ENGINEER 08 NOV 2017
INTERNAL TRANSFER OF 25.0M3 HFHSD FROM CAGO TKS-1DP TO SHIPS
OIL TK 5C
12-Nov-17 I
INT SDG-5C-2.71,QTY RETND IN 5C-27.71M3;
D.G. KADAM CHIEF ENGINEER 12 NOV 2017
INTERNAL TRANSFER OF 14.0M3 HFHSD FROM CAGO TKS-3DS TO SHIPS
OIL TK 5C
13-Nov-17 I
INT SDG-5C-7.07,QTY RETND IN 5C-21.24M3;
D.G. KADAM CHIEF ENGINEER 13 NOV 2017
15-Nov-17 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 14.2.4M3
T.P SAJEEV CHIEF ENGINEER 15NOV 2017
17-Nov-17 H 26.1 NHAVA BASE JETTY 3, FROM ONGC BARGE GOMATI,
26.2 1405 TO 1730 HRS
26.3 19.32 MT(23 MT) HFHSD, S= 0.21% LOADED IN SHIPS F.O TK 4DC
25.2MT(30M3) IN TO 5C,HF HSD OF S-0.21%. FINAL SDG. 4DC-
22.8MT(27.2M3)& 5C-26MT(30.96M3)
T.P SAJEEV CHIEF ENGINEER 17NOV 2017
INTERNAL TRANSFER OF 15.04M3 (12.63MT) HFHSD FROM CAGO TKS-2DC
TO SHIPS OIL TK 5C
3-Mar-18 I
INT SDG-5C-2.31M3,QTY RETND IN 5C-17.35M3;
T.P.SAJEEV CHIEF ENGINEER 03 MARCH 2018
3-Mar-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 13.80M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.4 0.05M3 FROM PURIFIER DRAINS + DRAINS FROM TRAYS
T.P.SAJEEV CHIEF ENGINEER 03 MARCH 2018
3-Mar-18 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0900 HRS TO 0905 HRS
15.3 BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-9.05M3
D.G. KADAM CHIEF ENGINEER 03 MAR 2018
INTERNAL TRANSFER OF 15.0M3 (12.6MT) HFHSD FROM CAGO TKS-3DC TO
SHIPS OIL TK 5C
4-Mar-18 I
INT SDG-5C-2.71M3,QTY RETND IN 5C-17.71M3;
D.G.KADAM CHIEF ENGINEER 04 MARCH 2018

10-Mar-18 C 11.1 DIRTY OIL TANK


11.2 CAPACITY- 18.4M3
QTY RETAINED: 13.85M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3

11.4 0.05M3 FROM PURIFIER DRAINS + DRAINS FROM TRAYS


D.G. KADAM CHIEF ENGINEER 10 MAR 2018
10-Mar-18 I BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-9.05M3
D.G. KADAM CHIEF ENGINEER 10 MAR 2018
I OWS 15 PPM SENSOR ALARM,THREE WAY SOLENOID OPERATION AND
OWS BILGE PUMP OPERATIONCHECKED. OPERATING AS INTENDED.
10-Mar-18
D.G. KADAM CHIEF ENGINEER 10 MAR 2018
INTERNAL TRANSFER OF 22M3 (18.6MT) HFHSD FROM CAGO TKS-3DP TO
SHIPS OIL TK 4C
11-Mar-18 I
INT SDG-4C-0.318M3,QTY RETND IN 4C-22.318M3;
D.G.KADAM CHIEF ENGINEER 11 MARCH 2018
INTERNAL TRANSFER OF 05M3 (4.2MT) HFHSD FROM CAGO TKS-3DS TO
SHIPS OIL TK 4C
11-Mar-18 I
INT SDG-4C-22.318M3,QTY RETND IN 4C-27.318M3;
D.G.KADAM CHIEF ENGINEER 11 MARCH 2018
INTERNAL TRANSFER OF 13M3 (10.9MT) HFHSD FROM CAGO TKS-3DS TO
SHIPS OIL TK 5C
11-Mar-18 I
INT SDG-5C-15.52M3,QTY RETND IN 5C-28.52M3;
D.G.KADAM CHIEF ENGINEER 11 MARCH 2018
INTERNAL TRANSFER OF 10M3 (8.4MT) HFHSD FROM CAGO TKS-3DS TO
SHIPS OIL TK 5C
17-Mar-18 I
INT SDG-5C-12.1M3,QTY RETND IN 5C-22.1M3;
D.G.KADAM CHIEF ENGINEER 17 MARCH 2018
17-Mar-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 13.9M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3

11.4 0.05M3 FROM PURIFIER DRAINS + DRAINS FROM TRAYS


D.G. KADAM CHIEF ENGINEER 17 MAR 2018
17-Mar-18 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 1600 HRS TO 1605 HRS
15.3 BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-9.1M3
D.G. KADAM CHIEF ENGINEER 17 MAR 2018
INTERNAL TRANSFER OF 20M3 (16.92MT) HFHSD FROM CAGO TKS-1DP TO
SHIPS OIL TK 5C
21-Mar-18 I
INT SDG-5C-3.75M3,QTY RETND IN 5C-23.75M3;
D.G.KADAM CHIEF ENGINEER 21 MARCH 2018
INTERNAL TRANSFER OF 07M3 (5.92MT) HFHSD FROM CAGO TKS-1DP TO
SHIPS OIL TK 4C
21-Mar-18 I
INT SDG-4C-07M3,QTY RETND IN 4C-14M3;
D.G.KADAM CHIEF ENGINEER 21 MARCH 2018
24-Mar-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 9.1M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.4 0.05M3 FROM PURIFIER DRAINS + DRAINS FROM TRAYS
D.G. KADAM CHIEF ENGINEER 24 MAR 2018
24-Mar-18 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 1600 HRS TO 1605 HRS
15.3 BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-9.2M3
D.G. KADAM CHIEF ENGINEER 24 MAR 2018
INTERNAL TRANSFER OF 08M3 (6.76MT) HFHSD FROM CAGO TKS-1DS TO
SHIPS OIL TK 5C
24-Mar-18 I
INT SDG-5C-2.23M3,QTY RETND IN 5C-10.23M3;
D.G.KADAM CHIEF ENGINEER 24 MARCH 2018
INTERNAL TRANSFER OF 05M3 (4.23MT) HFHSD FROM CAGO TKS-2DP TO
SHIPS OIL TK 5C
24-Mar-18 I
INT SDG-5C-10.23M3,QTY RETND IN 5C-15.23M3;
D.G.KADAM CHIEF ENGINEER 24 MARCH 2018
INTERNAL TRANSFER OF 18M3 (15.2MT) HFHSD FROM CAGO TKS-2DS TO
SHIPS OIL TK 4C
25-Mar-18 I
INT SDG-4C-2.08M3,QTY RETND IN 4C-20.08M3;
D.G.KADAM CHIEF ENGINEER 25 MARCH 2018
INTERNAL TRANSFER OF 18M3 (15.2MT) HFHSD FROM CAGO TKS-1DC TO
SHIPS OIL TK 5C
26-Mar-18 I
INT SDG-5C-12.71M3,QTY RETND IN 5C-30.71M3;
D.G.KADAM CHIEF ENGINEER 26 MARCH 2018
28-Mar-18 D 13 0.5 M3 WATER FM BILGE HOLDING TK
14 START: 1130 HRS : 18DEG 41.50'N; 072DEG 12.15'E
STOP: 1300 HRS : 18DEG 41.50'N; 072DEG 12.15'E
15.1 THROUGH 15 PPM EQUIPMENT. START:
HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-8.7M3
D.G. KADAM CHIEF ENGINEER 28 MAR 2018
28-Mar-18 D 13 0.4 M3 WATER FM BILGE HOLDING TK
14 START: 1534 HRS : 19DEG 39.47'N; 072DEG 18.76'E
STOP: 1300 HRS : 18DEG 41.50'N; 072DEG 12.15'E
15.1 THROUGH 15 PPM EQUIPMENT. START:
HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-8.3M3
D.G. KADAM CHIEF ENGINEER 28 MAR 2018
I OWS 15 PPM SENSOR ALARM,THREE WAY SOLENOID OPERATION AND
OWS BILGE PUMP OPERATIONCHECKED. OPERATING AS INTENDED.
28-Mar-18
D.G. KADAM CHIEF ENGINEER 28 MAR 2018
INTERNAL TRANSFER OF 20M3 (16.9MT) HFHSD FROM CAGO TKS-1DC TO
SHIPS OIL TK 5C
28-Mar-18 I
INT SDG-5C-8.04M3,QTY RETND IN 5C-28.04M3;
D.G.KADAM CHIEF ENGINEER 28 MARCH 2018
31-Mar-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 13.95M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3

11.4 0.05M3 FROM PURIFIER DRAINS + DRAINS FROM TRAYS


D.G. KADAM CHIEF ENGINEER 31 MAR 2018
31-Mar-18 I BILGE WATER HOLDING TK
CAPACITY: 18.4M3; RETAINED: 8.3M3
D.G. KADAM CHIEF ENGINEER 31 MAR 2018
INTERNAL TRANSFER OF 35.52M3 (30.04MT) HFHSD FROM CAGO TKS-2DC
TO SHIPS OIL TK 5C
5-Apr-18 I
INT SDG-5C-2.7M3,QTY RETND IN 5C-37.7M3;
D.G.KADAM CHIEF ENGINEER 05 APRIL 2018
7-Apr-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 14.0M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3

11.4 0.05M3 FROM PURIFIER DRAINS + DRAINS FROM TRAYS


D.G. KADAM CHIEF ENGINEER 07 APR 2018
7-Apr-18 I BILGE WATER HOLDING TK
CAPACITY: 18.4M3; RETAINED: 8.3M3
D.G. KADAM CHIEF ENGINEER 07 APR 2018
INTERNAL TRANSFER OF 35.36M3 (29.91MT) HFHSD FROM CAGO TKS-3DC
TO SHIPS OIL TK 5C
9-Apr-18 I
INT SDG-5C-9.3M3,QTY RETND IN 5C-44.3M3;
D.G.KADAM CHIEF ENGINEER 09 APRIL 2018
10-Apr-18 D 13 0.6 M3 WATER FM BILGE HOLDING TK
14 START: 1020 HRS : 19DEG 21.012'N; 071DEG 15.224'E
STOP: 1220 HRS : 19DEG 19.369'N; 071DEG 10.897'E
15.1 THROUGH 15 PPM EQUIPMENT. START:
HOLDING TK CAPACITY: 18.4 M3, QTY RETAINED- 7.7 M3
D.G.KADAM CHIEF ENGINEER 10 APRIL 2018
I OWS 15 PPM SENSOR ALARM,THREE WAY SOLENOID OPERATION AND
OWS BILGE PUMP OPERATIONCHECKED. OPERATING AS INTENDED.
10-Apr-18
D.G.KADAM CHIEF ENGINEER 10 APRIL 2018
INTERNAL TRANSFER OF 40.53 (33.84MT) HFHSD FROM CARGO TKS 3DC TO
SHIP OIL TK 5C.
13-Apr-18 I
INT SDG-5C-0.96,QTY RETND IN 5C-40.96;
D.G.KADAM CHIEF ENGINEER 13 APRIL 2018
14-Apr-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 14.05M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3

11.4 0.05M3 FROM PURIFIER DRAINS + DRAINS FROM TRAYS


D.G. KADAM CHIEF ENGINEER 14 APR 2018
14-Apr-18 I BILGE WATER HOLDING TK
CAPACITY: 18.4M3; RETAINED: 7.7M3
D.G. KADAM CHIEF ENGINEER 14 APR 2018
INTERNAL TRANSFER OF 42.49 ( 35.53MT) HFHSD FROM CARGO TKS 3DS
TO SHIP OIL TK 5C.
16-Apr-18 I
INT SDG-5C-1.0,QTY RETND IN 5C-43.49M3;
D.G.KADAM CHIEF ENGINEER 16 APRIL 2018
21-Apr-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 14.1M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3

11.4 0.05M3 FROM PURIFIER DRAINS + DRAINS FROM TRAYS


D.G. KADAM CHIEF ENGINEER 21 APR 2018
21-Apr-18 I BILGE WATER HOLDING TK
CAPACITY: 18.4M3; RETAINED: 7.7M3
D.G. KADAM CHIEF ENGINEER 21 APR 2018
INTERNAL TRANSFER OF 30.0 (24.72MT) HFHSD FROM CARGO TKS 2DC TO
SHIP OIL TK 5C.
24-Apr-18 I
INT SDG-5C-5.2M3,QTY RETND IN3C-35.2M3;
D.G.KADAM CHIEF ENGINEER 24 APRIL 2018
INTERNAL TRANSFER OF 32.0 (26.36MT) HFHSD FROM CARGO TKS 3DC TO
SHIP OIL TK 5C.
27-Apr-18 I
INT SDG-5C-6.4M3,QTY RETND IN 5C-38.4M3;
D.G.KADAM CHIEF ENGINEER 27 APRIL 2018
I OWS 15 PPM SENSOR ALARM,THREE WAY SOLENOID OPERATION AND
OWS BILGE PUMP OPERATIONCHECKED. OPERATING AS INTENDED.
28-Apr-18
D.G.KADAM CHIEF ENGINEER 28 APRIL 2018
28-Apr-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 14.15M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3

11.4 0.05M3 FROM PURIFIER DRAINS + DRAINS FROM TRAYS


D.G.KADAM CHIEF ENGINEER 28 APRIL 2018
28-Apr-18 D 13 0.2 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 1630 HRS TO 1640 HRS
15.3 BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-7.9M3
D.G. KADAM CHIEF ENGINEER 28 MAR 2018
INTERNAL TRANSFER OF 30.0 (24.72MT) HFHSD FROM CARGO TKS 2DC TO
SHIP OIL TK 5C.
30-Apr-18 I
INT SDG-5C-4.2M3,QTY RETND IN3C-34.2M3;
D.G.KADAM CHIEF ENGINEER 30 APRIL 2018
INTERNAL TRANSFER OF 30.0 (24.72MT) HFHSD FROM CARGO TKS 3DC TO
SHIP OIL TK 5C.
4-May-18 I
INT SDG-5C-6.1M3,QTY RETND 5C-36.13;
D.G.KADAM CHIEF ENGINEER 04 MAY 2018
5-May-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 14.52M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK

200L OF WASTE OIL FROM GEN SUMPS + 100L FI FI G/B & 70 L FROM AIR
11.4 COMP SUMP SUMP AND PURIFIER SLUDGE.
D.G.KADAM CHIEF ENGINEER 05 MAY 2018
5-May-18 D 13 0.5 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 0825 HRS TO 0840 HRS
15.3 BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-8.3M3
D.G.KADAM CHIEF ENGINEER 05 MAY 2018
12-May-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 14.52M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3
T.P CHIEF ENGINEER 12 MAY 2018
INTERNAL TRANSFER OF 30.0M3 (25.2MT) HFHSD FROM CARGO TKS 2DC
TO SHIP OIL TK4C& 5C.
17-May-18 I
INT SDG-4C-0.60M3(0.5MT)&5C 10M3 (8.4MT),QTY RETND 4C-8.4MT& 5C
(30M3)25.2MT;
T.P SAJEEV CHIEF ENGINEER 17 MAY 2018
INTERNAL TRANSFER OF 20.0M3 (16.8MT) HFHSD FROM CARGO TKS
2DP&2DS TO SHIP OIL TK 5C.
19-May-18 I
INT SDG-5C-9.8M3(8.2MT),QTY RETND 5C- (29.8M3)25.MT;
T.P SAJEEV CHIEF ENGINEER 19 MAY 2018
19-May-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 14.57M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3

11.4 0.05M3 FROM PURIFIER DRAINS + DRAINS FROM TRAYS


T.P CHIEF ENGINEER 19 MAY 2018
INTERNAL TRANSFER OF 20.0M3 (16.8MT) HFHSD FROM CARGO TKS
2DP&2DS TO SHIP OIL TK 5C.
22-May-18 I
INT SDG-5C-NIL,QTY RETND 5C- 16.8MT( 20M3)
T.P SAJEEV CHIEF ENGINEER 22 MAY 2018
22-May-18 D 13 0.2 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 1030 HRS TO 1040 HRS
15.3 BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-8.5M3
T.P CHIEF ENGINEER 22 MAY 2018
INTERNAL TRANSFER OF 20.0M3 (16.8MT) HFHSD FROM CARGO TK 3DS TO
SHIPS OIL FUEL TK 5C.
24-May-18 I
INT SDG-5C-7 MT,QTY RETND 5C- 23.9MT( 28.5M3)
T.P SAJEEV CHIEF ENGINEER 24 MAY 2018
26-May-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 14.57M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3
T.P CHIEF ENGINEER 26MAY 2018
INTERNAL TRANSFER OF 20.0M3 (16.8MT) HFHSD FROM CARGO TK 3DP TO
SHIPS OIL FUEL TK 5C.
27-May-18 I
INT SDG-5C-8.4 MT,QTY RETND 5C- 25.2MT( 30M3)
T.P SAJEEV CHIEF ENGINEER 27 MAY 2018
1-Jun-18 C 12.2 3.2 M3 WATER DRAINED FROM SLUDGE TANK
QTY.RETND IN SLUDGE TANK 11.37
TO BILGE HOLDING TANK,QTY. RETND-11.7M3
T.P CHIEF ENGINEER 01 JUNE 2018
2-Jun-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 11.75M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3

11.4 0.05M3 FROM PURIFIER DRAINS + DRAINS FROM TRAYS


T.P SAJEEV CHIEF ENGINEER 02 JUNE 2018
INTERNAL TRANSFER OF 41M3 (34.4MT) HFHSD FROM CARGO TK 3DC TO
SHIPS OIL FUEL TK 4C&5C.
2-Jun-18 I
INT SDG-4C-8.4 MT,QTY RETND 4C- 18.4MT,INT SDG-5C-3.2MT,QTY RETND
5C- 28.4MT
T.P SAJEEV CHIEF ENGINEER 02JUNE 2018
5-Jun-18 D 13 0.7 M3 WATER FM BILGE HOLDING TK
14 START: 12; 18.56 HRS : 21DEG 17.8'N; 068 DEG 55.60'E(GMT)
STOP: 13;37.44HRS : 21DEG 24.58'N; 068DEG 44..99'E
15.1 THROUGH 15 PPM EQUIPMENT.
HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-11M3
T.P SAJEEV CHIEF ENGINEER 05JUNE 2018
INTERNAL TRANSFER OF 20M3 (16.8MT) HFHSD FROM CARGO TK 2DS TO
SHIPS OIL FUEL TK 5C.
7-Jun-18 I
INT SDG-5C-2.1 MT,QTY RETND 5C- 18.9MT
T.P SAJEEV CHIEF ENGINEER 07JUNE 2018
9-Jun-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 11.75M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3
T.P SAJEEV CHIEF ENGINEER 09JUNE 2018
INTERNAL TRANSFER OF 15M3 (12.6MT) HFHSD FROM CARGO TK
2DP&3DP TO SHIPS OIL FUEL TK 5C.
15-Jun-18 I
INT SDG-5C-4.2(5M3) MT,QTY RETND 5C- 16.8MT(20M3)
T.P SAJEEV CHIEF ENGINEER 15JUNE 2018
16-Jun-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 11.80M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3

11.4 0.05M3 FROM PURIFIER DRAINS


T.P SAJEEV CHIEF ENGINEER 16JUNE 2018
22-Jun-18 H 26.1 AT SEA (PORBANDAR) FROM M.V GREAT SHIP ANJALI,
26.2 1230 TO 1330 HRS
26.3 25.2 MT(30M3) HFHSD, S= 0.06% LOADED IN SHIPS F.O TK 5DC
FINAL SOUNDING 5C-27.72MT(33M3)
T.P SAJEEV CHIEF ENGINEER 22 JUNE 2018
23-Jun-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 11.80M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3
T.P SAJEEV CHIEF ENGINEER 23JUNE 2018
30-Jun-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 11.85M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3

11.4 0.05M3 FROM PURIFIER DRAINS


T.P SAJEEV CHIEF ENGINEER 30JUNE 2018
7-Jul-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 11.85M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3
T.P SAJEEV CHIEF ENGINEER 07JULY 2018
14-Jul-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 11.90M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3

11.4 0.05M3 FROM PURIFIER DRAINS


T.P SAJEEV CHIEF ENGINEER 14JULY 2018
17-Jul-18 D 13 0.3 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 FROM 1130 HRS TO 1150 HRS
15.3 BILGE HOLDING TK CAPACITY: 18.4M3, QTY RETAINED-12M3
T.P CHIEF ENGINEER 17 JULY 2018
21-Jul-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 11.90M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3
T.P SAJEEV CHIEF ENGINEER 07JULY 2018
27-Jul-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 11.95M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3

11.4 0.05M3 FROM PURIFIER DRAINS


T.P SAJEEV CHIEF ENGINEER 27JULY 2018
27-Jul-18 H 26.1 NHAVA BASE JETTY 2, FROM ONGC BARGE M.T BAY VII,
26.2 0250 TO 0515 HRS
40.32 MT(48 M3) HFHSD, S= 0.041% LOADED IN SHIPS F.O TK 4DC&5C
26.3
15.12MT(18M3) IN TO 4C,HF HSD OF S-0.041%. FINAL SDG. 4DC-
18.48MT(22M3)& 5C-25.2MT(30.M3) FINAL SDG-26.04MT(31M3)
T.P SAJEEV CHIEF ENGINEER 27JULY2018
INTERNAL TRANSFER OF 18.48MT(22 M3)HFHSD FROM CARGO TKS
1DP&1DC TO SHIPS OIL FUEL TK 5C.
31-Jul-18 I
INT SDG-5C-NIL,QTY RETND 5C- 18.48MT(22M3)
T.P SAJEEV CHIEF ENGINEER 31JULY 2018
3-Aug-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
QTY RETAINED: 11.95M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.3
T.P SAJEEV CHIEF ENGINEER 03AUG 2018
INTERNAL TRANSFER OF 16.8MT(20 M3)HFHSD FROM CARGO TKS
2DP&2DS TO SHIPS OIL FUEL TK 5C.
6-Aug-18 I
INT SDG-5C-NIL,QTY RETND 5C- 16.8MT(20M3)
T.P SAJEEV CHIEF ENGINEER 06AUG 2018
10-Aug-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 12 M3 IN SLUDGE TANK + 0.8M3 IN DRUMS ON DECK
11.4 0.05M3 FROM PURIFIER DRAINS
T.P SAJEEV CHIEF ENGINEER 10AUG 2018
INTERNAL TRANSFER OF 27.72MT(33 M3)HFHSD FROM CARGO TK 3DC TO
SHIPS OIL FUEL TK 5C.
11-Aug-18 I
INT SDG-5C-NIL,QTY RETND 5C- 27.72MT(33M3)
T.P SAJEEV CHIEF ENGINEER 11AUG 2018
INTERNAL TRANSFER OF 26.8MT(32 M3)HFHSD FROM CARGO TK 1DC TO
SHIPS OIL FUEL TK 5C.
16-Aug-18 I
INT SDG-5C-NIL,QTY RETND 5C- 26.8MT(32M3)
T.P SAJEEV CHIEF ENGINEER 16AUG 2018
17-Aug-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 12.05 M3 IN SLUDGE TANK + 0.8M3 IN DRUMS
11.4 0.05M3 FROM PURIFIER DRAINS
T.P SAJEEV CHIEF ENGINEER 17AUG 2018
20-Aug-18 I 11.1 BILGE WATER HOLDING TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 12. M3
T.P SAJEEV CHIEF ENGINEER 20AUG 2018
20-Aug-18 D 13 0.5M3 FROM BILGE HOLDING TANK
START-12:46:32(GMT),19˚09.5M NORTH STOP-13:46:29(GMT)071˚ 05.4 M
14 EAST
THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY
15.1 RETND-11.5M3
T.P SAJEEV CHIEF ENGINEER 20 AUG 2018
INTERNAL TRANSFER OF25.2MT (30 M3)HFHSD FROM CARGO TK 1DC TO
SHIPS OIL FUEL TK 5C.
23-Aug-18 I
INT SDG-5C-3.0M3,QTY RETND 5C- 33M3
D.G. KADAM CHIEF ENGINEER 23AUG 2018
24-Aug-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 12.55 M3 IN SLUDGE TANK + 0.8M3 IN DRUMS
11.4 0.5M3 FROM PURIFIER + MISC DRAINS
D.G. KADAM CHIEF ENGINEER 24AUG 2018
24-Aug-18 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 1300 TO 1305 HRS
15.3 QTY RETAINED: 11.6 M3
D.G. KADAM CHIEF ENGINEER 24AUG 2018
0.2M3 WASTE OIL FROM AE3 SUMP + PORT FI FI SUMP TRANSFERRED TO
12.2 DIRTY OIL TK. DIRTY OIL TK RENTION- 12.75M3
25-Aug-18 C
D.G. KADAM CHIEF ENGINEER 25AUG 2018
INTERNAL TRANSFER OF 25.2 MT(30 M3)HFHSD FROM CARGO TK 2DC TO
SHIPS OIL FUEL TK 5C.
26-Aug-18 I
INT SDG-5C-5.09,QTY RETND 5C- 35.09M3)
D.G. KADAM CHIEF ENGINEER 26AUG 2018
27-Aug-18 D 13 0.7M3 FROM BILGE HOLDING TANK
START-09:57:05(GMT),18DEG 55.1N; 072.20.8'EAST STOP-10:59:55(GMT)
14 18DEG 54.9'N; 072 205'E
THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY
15.1 RETND-10.9M3
D.G. KADAM CHIEF ENGINEER 27AUG 2018
29-Aug-18 D 13 0.5M3 FROM BILGE HOLDING TANK
14 START-11:40,19˚09.5M NORTH STOP-1215 HRS;071˚ 05.4 M EAST
THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY
15.1 RETND-10.4M3
D.G. KADAM CHIEF ENGINEER 29AUG 2018
1.2M3 SLUDGE GENERATED FROM WASHING OWS FILTER MEDIA
12.2 TRANSFERRED TO SLUDGE TANK. DIRTY OIL TK RENTION- 13.95M3
29-Aug-18 C
D.G. KADAM CHIEF ENGINEER 25AUG 2018
31-Aug-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 14.25 M3
0.1M3 FROM PURIFIER + 0.2M3 DRAINED SLUDGE FROM PORT AND STBD
11.4 FOSERVICE TANKS
D.G. KADAM CHIEF ENGINEER 24AUG 2018
31-Aug-18 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 0800 TO 0805 HRS
15.3 QTY RETAINED: 10.5 M3
D.G. KADAM CHIEF ENGINEER 24AUG 2018
INTERNAL TRANSFER OF 25.2 MT(30 M3)HFHSD FROM CARGO TK 2DC TO
SHIPS OIL FUEL TK 5C.
31-Aug-18 I
INT SDG-5C-5.09,QTY RETND 5C- 35.09M3)
D.G. KADAM CHIEF ENGINEER 31AUG 2018
INTERNAL TRANSFER OF 25.2 MT(30 M3)HFHSD FROM CARGO TK 2DC TO
SHIPS OIL FUEL TK 5C.
4-Sep-18 I
INT SDG-5C-2.2,QTY RETND 5C- 32.2M3)
D.G. KADAM CHIEF ENGINEER 04 SEP 2018

7-Sep-18 C 11.1 DIRTY OIL TANK


11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 14.35 M3
0.1M3 FROM PURIFIER + DRAINED SLUDGE FROM PORT AND STBD
11.4 FOSERVICE TANKS
D.G. KADAM CHIEF ENGINEER 07 SEP 2018
7-Sep-18 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 0900 TO 0905 HRS
15.3 QTY RETAINED: 10.6 M3
D.G. KADAM CHIEF ENGINEER 07 SEP 2018
9-Sep-18 H 26.1 NHAVA BASE JETTY 2, FROM ONGC BARGE M.T BAY VII,
26.2 1640 TO 1800 HRS
37.85 MT(45.5 M3) HFHSD, S= 0.015% LOADED IN SHIPS F.O TK 4DC&5C
26.3
4.16MT(5M3) IN TO 4DC,HF HSD OF S-0.015%. FINAL SDG. 4DC-
16.64MT(20M3)& 5C-4.57MT(5.5.M3) FINAL SDG-29.53MT(35.5M3)
D.G. KADAM CHIEF ENGINEER 09 SEP 2018
14-Sep-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 14.65 M3
0.1M3 FROM PURIFIER + 0.2 DRAINED SLUDGE FROM PORT AND STBD FO
11.4 SERVICE TANKS
D.G. KADAM CHIEF ENGINEER 14 SEP 2018
14-Sep-18 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 0900 TO 0905 HRS
15.3 QTY RETAINED: 10.7 M3
D.G. KADAM CHIEF ENGINEER 14 SEP 2018
INTERNAL TRANSFER OF 31.27 MT(38 M3)HFHSD FROM CARGO TK 2DC TO
SHIPS OIL FUEL TK 5C.
15-Sep-18 I
INT SDG-5C-1.0,QTY RETND 5C- 39.0M3)
D.G. KADAM CHIEF ENGINEER 15 SEP 2018
0.3M3 WASTE OIL FROM BOTH SUMPS POST OIL RENEWAL AND FLUSH
THROUGH + .06M3 BOTH SHAFTS ALL 06 BEARINGS OIL RENEWAL AND
12.2 FLUSH THROUGH , TOTAL 0.36M3 WASTE OIL TRANSFERRED TO DIRTY OIL
TK. DIRTY OIL TK RENTION- 15.01M3
17-Sep-18 C
D.G. KADAM CHIEF ENGINEER 25AUG 2018
INTERNAL TRANSFER OF 20.57 MT(25 M3)HFHSD FROM CARGO TK 2DC TO
SHIPS OIL FUEL TK 5C.
19-Sep-18 I
INT SDG-5C-8.5,QTY RETND 5C- 33.5M3)
D.G. KADAM CHIEF ENGINEER 19 SEP 2018
21-Sep-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 15.31 M3
0.1M3 FROM PURIFIER + 0.2 DRAINED SLUDGE FROM PORT AND STBD FO
11.4 SERVICE TANKS
D.G. KADAM CHIEF ENGINEER 21 SEP 2018
21-Sep-18 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 0900 TO 0905 HRS
15.3 QTY RETAINED: 10.8 M3
D.G. KADAM CHIEF ENGINEER 21 SEP 2018
INTERNAL TRANSFER OF 16.46 MT(20 M3)HFHSD FROM CARGO TK 1DC TO
SHIPS OIL FUEL TK 5C.
22-Sep-18 I
INT SDG-5C-9.0,QTY RETND 5C- 29M3)
D.G. KADAM CHIEF ENGINEER 22 SEP 2018
INTERNAL TRANSFER OF 16.8 MT(20 M3)HFHSD, S-0.015%; FROM CARGO
TK 3DS & 3DC TO SHIPS OIL FUEL TK 5C.
26-Sep-18 I
INT SDG-5C-4.0M3,QTY RETND 5C- 24.0M3)
D.G. KADAM CHIEF ENGINEER 26 SEP 2018

27-Sep-18 C 11.1 DIRTY OIL TANK


11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 15.34 M3
11.4 0..03M3 FROM PURIFIER
D.G. KADAM CHIEF ENGINEER 27 SEP 2018
27-Sep-18 D 13 0.1 M3 WATER FM ER BILGES TO BILGE HOLDING TK
14 0800 TO 0805 HRS
15.3 QTY RETAINED: 10.9 M3
D.G. KADAM CHIEF ENGINEER 27 SEP 2018
INTERNAL TRANSFER OF 25.82 MT(30 M3)HFHSD, S-0.015%; FROM CARGO
TK 1DC TO SHIPS OIL FUEL TK 5C.
30-Sep-18 I
INT SDG-5C-4.0M3,QTY RETND 5C- 24.0M3)
D.G. KADAM CHIEF ENGINEER 30 SEP 2018
4-Oct-18 D 13 0.5M3 FROM BILGE HOLDING TANK
START-1500 HRS,19˚09.5M NORTH; 071DEG 11.08'E; STOP-1600 HRS- 19
14 DEG 11.500'N; 071 DEG 03.500'EAST
THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY
15.1 RETND-10.4M3
D.G. KADAM CHIEF ENGINEER 04 OCT 2018
4-Oct-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 15.74 M3
0.4M3 FROM PURIFIER + SUMPS RENEWAL WASTE OIL FROM DG2 & DG1
11.4
D.G. KADAM CHIEF ENGINEER 04 OCT 2018
NHAVA BASE JETTY 2, FROM ONGC SHORE TERMINAL, ONGC SUPPLY.
26.1
7-Oct-18 H
26.2 2205 HRS TO 2250 HRS
26.3 21.72 MT(26.0 M3) HFHSD, S= 0.064% LOADED IN SHIPS F.O TK 5C
INTSDG5C- 4.0 ME, QTYADDED- 26.0M3, QTY RTND- 30.0 M3
D.G. KADAM CHIEF ENGINEER 07 OCT 2018
0.3ME WATER TRANSFERRED TO BILGE HOLDING TANK FROM ER BILGES
13
11-Oct-18 D
14 0800 TO 0805 HRS
15.3 CAP: 18.4M3; QTY RETAINED- 10.7 M3
D.G. KADAM CHIEF ENGINEER 11 OCT 2018
11-Oct-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 15.94 M3
11.4 0.2M3 FROM PURIFIER + WASTE OIL FROM DRAINS OF FO SER TANKS
D.G. KADAM CHIEF ENGINEER 11 OCT 2018
INTERNAL TRANSFER OF 31.0 M3(25.88 MT)HFHSD, S-0.064%; FROM
CARGO TK 1DC TO SHIPS OIL FUEL TK 5C.
13-Oct-18 I
INT SDG-5C-3.5M3,QTY RETND 5C- 34.5M3)
D.G. KADAM CHIEF ENGINEER 13 OCT 2018
0.1ME WATER TRANSFERRED TO BILGE HOLDING TANK FROM ER BILGES
13
18-Oct-18 D
14 0900 TO 0905 HRS
15.3 CAP: 18.4M3; QTY RETAINED- 10.8 M3
D.G. KADAM CHIEF ENGINEER 18 OCT 2018
18-Oct-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 16.24 M3
0.3M3 FROM PURIFIER + WASTE OIL FROM DRAINS OF FO SER TANKS
11.4
D.G. KADAM CHIEF ENGINEER 18 OCT 2018
INTERNAL TRANSFER OF 30.0 M3(25.2 MT)HFHSD, S-0.064%; FROM CARGO
TK 3DC TO SHIPS OIL FUEL TK 5C.
18-Oct-18 I
INT SDG-5C-6.3M3,QTY RETND 5C- 36.3M3)
D.G. KADAM CHIEF ENGINEER 18 OCT 2018
INTERNAL TRANSFER OF 25.0 M3(21.0 MT)HFHSD, S-0.064%; FROM CARGO
TK 1DS TO SHIPS OIL FUEL TK 5C.
22-Oct-18 I
INT SDG-5C-4.0M3,QTY RETND 5C- 29.0M3)
D.G. KADAM CHIEF ENGINEER 22 OCT 2018
0.1ME WATER TRANSFERRED TO BILGE HOLDING TANK FROM ER BILGES
13
25-Oct-18 D
14 0730 TO 0735 HRS
15.3 CAP: 18.4M3; QTY RETAINED- 10.9 M3
D.G. KADAM CHIEF ENGINEER 25 OCT 2018
25-Oct-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 16.3 M3
11.4 0.06M3 FROM PURIFIER + SER TKS DRAINS
INTERNAL TRANSFER OF 40.0 M3(33.6 MT)HFHSD, S-0.064%; FROM CARGO
TK 2DS & 2DP TO SHIPS OIL FUEL TK 5C.
31-Oct-18 I
INT SDG-5C-0.08M3,QTY RETND 5C- 40.08M3)
D.G. KADAM CHIEF ENGINEER 31 OCT 2018
1-Nov-18 D 13 0.1M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
14 0730 TO 0735 HRS
15.3 CAP: 18.4M3; QTY RETAINED- 11.0 M3
D.G. KADAM CHIEF ENGINEER 01 NOV 2018
1-Nov-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 16.33 M3
11.4 0.03M3 FROM PURIFIER + SER TKS DRAINS
D.G. KADAM CHIEF ENGINEER 01 NOV 2018
INTERNAL TRANSFER OF 43.7 MT(52 M3)HFHSD, S-0.064%; FROM CARGO
TKS 3DS,3DP,3DC AND 1DC TO SHIPS OIL FUEL TK 4DC& 5C.
4-Nov-18 I
INT SDG-4C- 0.6MT(0.7M3),QTY RETND 4DC- 14MT(16.7M3).INT SDG-5C-
1.02MT(1.2M3),QTY RETND 5C- 31.2MT(37.2)M3
T.P SAJEEV CHIEF ENGINEER 04 NOV 2018
8-Nov-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 16.33M3
T.P SAJEEV CHIEF ENGINEER 08 NOV 2018
INTERNAL TRANSFER OF 26.04 MT(31M3)HFHSD, S-0.064%; FROM CARGO
TKS 1DP&2DC TO SHIPS OIL FUEL TK 5C.
8-Nov-18 I
INT SDG-5C- 2.0MT(2.4M3),QTY RETND 5C- 28MT(33.4M3).
T.P SAJEEV CHIEF ENGINEER 08 NOV 2018
INTERNAL TRANSFER OF 25.4 MT(30M3)HFHSD, S-0.064%; FROM CARGO
TK 3DC TO SHIPS OIL FUEL TK 5C.
11-Nov-18 I
INT SDG-5C- 3.5MT(4.2M3),QTY RETND 5C- 28.7MT(34.2M3).
T.P SAJEEV CHIEF ENGINEER 11 NOV 2018
14.6MT(16.33M3)OF SLUDE FROM SLUDGE/DIRTY OIL TK(FR NO.48-55)
12
13-Nov-18 C
TO RECEPTION FACILITY AT NHAVA, THROUGH M/S SAGAR
1 SERVICES,ORCHID 31 BLDG, NAVI MUMBAI
QUANTITY RETAINED- 0.36 MT(O.4M3).
T.P SAJEEV CHIEF ENGINEER 13 NOV 2018
15-Nov-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 0.43 M3
11.4 0.03M3 FROM PURIFIER + SER TKS DRAINS
INTERNAL TRANSFER OF 22.6 MT(27M3)HFHSD, S-0.018%; FROM CARGO
TKS 1DC TO SHIPS OIL FUEL TK 5C.
18-Nov-18 I
INT SDG-5C- 3.5MT(2.4M3),QTY RETND 5C- 26.2MT(31.2M3).
T.P SAJEEV CHIEF ENGINEER 15NOV 2018
19-Nov-18 D 13 0.5M3 FROM BILGE HOLDING TANK
START-1500 HRS,19˚32.01M NORTH; 071DEG 35.09'E; STOP-1530 HRS- 19
14 DEG 33.90'N; 071 DEG 46.18'EAST
THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY
15.1 RETND-10.5M3
20-Nov-18 D 13 0.1M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
14 0845 TO 0850 HRS
15.3 CAP: 18.4M3; QTY RETAINED- 10.6 M3
T.P SAJEEV CHIEF ENGINEER 20NOV 2018
20-Nov-18 D 13 1.5M3 FROM BILGE HOLDING TANK
START-1600 HRS,19˚04.6' NORTH; 072˚09.9'EAST; STOP-1730 HRS-
14 18˚51.8'NORTH ; 072˚ 12.6'EAST
THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY
15.1 RETND-9.1M3
T.P SAJEEV CHIEF ENGINEER 20NOV 2018
23-Nov-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 0.83 M3
11.4 0.4M3 USED OIL DRAINED FROM M/ES SUMP
T.P SAJEEV CHIEF ENGINEER 23NOV 2018
INTERNAL TRANSFER OF 36.96MT(44M3)HFHSD, S-0.018%; FROM CARGO
TKS 3DC&2DC TO SHIPS OIL FUEL TKS 4DC& 5C.
25-Nov-18 I
INT SDG-4DC- 0.6MT(0.7M3),QTY RETND 4DC- 14.2MT(16.7M3).INT SDG-
5C- 5.3MT(6.4M3),QTY RETND 5C- 28.8MT(34.4M3)
T.P SAJEEV CHIEF ENGINEER 25NOV 2018
30-Nov-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 0.86 M3
11.4 0.03M3 FROM PURIFIER + SER TKS DRAINS
T.P SAJEEV CHIEF ENGINEER 30NOV 2018
INTERNAL TRANSFER OF 14.28MT(17M3)HFHSD, S-0.018%; FROM CARGO
TKS 2DC TO SHIPS OIL FUEL TKS 5C.
4-Dec-18 I
INT SDG-5DC- 4.2MT(5.1M3),QTY RETND 5DC- 18.6MT(22.1M3).
T.P SAJEEV CHIEF ENGINEER 04DEC 2018
7-Dec-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 0.89 M3
11.4 0.03M3 FROM PURIFIER DRAINS
T.P SAJEEV CHIEF ENGINEER 07 DEC 2018
INTERNAL TRANSFER OF 19.32MT(23M3)HFHSD, S-0.018%; FROM CARGO
TKS 3DP TO SHIPS OIL FUEL TK 5C.
7-Dec-18 I
INT SDG-5C- 5.3MT(6.4M3),QTY RETND 5C- 24.6MT(29.4M3)
T.P SAJEEV CHIEF ENGINEER 07 DEC 2018
INTERNAL TRANSFER OF 25.2MT(30M3)HFHSD, S-0.018%; FROM CARGO
TKS 2DP& 2DS TO SHIPS OIL FUEL TK 5C.
11-Dec-18 I
INT SDG-5C- 6.9MT(8.3M3),QTY RETND 5C- 32.1MT(38.3M3)
T.P SAJEEV CHIEF ENGINEER 11 DEC 2018
14-Dec-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 0.92 M3
11.4 0.03M3 FROM PURIFIER DRAINS
T.P SAJEEV CHIEF ENGINEER 1`4 DEC 2018
INTERNAL TRANSFER OF 28.5MT(33.5M3)HFHSD, S-0.018%; FROM CARGO
TKS 2DP, 2DS&3DS TO SHIPS OIL FUEL TK 5C.
15-Dec-18 I
INT SDG-5C- 1MT(1.2M3),QTY RETND 5C- 29.1MT(34.7M3)
T.P SAJEEV CHIEF ENGINEER 15 DEC 2018
21-Dec-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 0.95 M3
11.4 0.03M3 FROM PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 21 DEC 2018
INTERNAL TRANSFER OF 22.68MT(27M3)HFHSD, S-0.018%; FROM CARGO
TKS 1DP TO SHIPS OIL FUEL TK 5C.
21-Dec-18 I
INT SDG-5C- 0.3MT(0.4M3),QTY RETND 5C- 23MT(27.4M3)
T.P SAJEEV CHIEF ENGINEER 21 DEC 2018
22-Dec-18 D 13 1.0M3 FROM BILGE HOLDING TANK
START-0815 HRS,19˚42.61' NORTH; 072˚17.88'EAST; STOP-0920 HRS-
14 19˚50.24'NORTH ; 072˚ 12.56'EAST
THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY
15.1 RETND-8.1M3
28-Dec-18 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 0.98 M3
11.4 0.03M3 FROM PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 28 DEC 2018
INTERNAL TRANSFER OF 25.2MT(30M3)HFHSD, S-0.18%; FROM CARGO TKS
1DC TO SHIPS OIL FUEL TK 5C.
28-Dec-18 I
INT SDG-5C- 1.9MT(2.3M3),QTY RETND 5C- 27.1MT(32.30M3)
T.P SAJEEV CHIEF ENGINEER 28 DEC 2018
INTERNAL TRANSFER OF 26.8MT(32M3)HFHSD, S-0.18%; FROM CARGO TKS
1DC,1DP,1DS TO SHIPS OIL FUEL TK 5C.
1-Jan-19 I
INT SDG-5C- 1.7MT(2.0M3),QTY RETND 5C- 27.1MT(32.30M3)
T.P SAJEEV CHIEF ENGINEER 01 JAN 2019
4-Jan-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 1.03M3
11.4 0.05M3 FROM PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 04 JAN 2019
INTERNAL TRANSFER OF 25.2MT(30M3)HFHSD, S-0.18%; FROM CARGO TKS
2DC TO SHIPS OIL FUEL TK 5C.
8-Jan-19 I
INT SDG-5C- 4.2MT(5M3),QTY RETND 5C- 29.4MT(35M3)
T.P SAJEEV CHIEF ENGINEER 08 JAN 2019
11-Jan-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 1.09M3
11.4 0.06M3 FROM PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 011JAN 2019
INTERNAL TRANSFER OF 25.2MT(30M3)HFHSD, S-0.18%; FROM CARGO TKS
3DC &3DP TO SHIPS OIL FUEL TK 5C.
12-Jan-19 I
INT SDG-5C- 2.52MT(3M3),QTY RETND 5C- 27.72MT(33M3)
T.P SAJEEV CHIEF ENGINEER 12 JAN 2019
INTERNAL TRANSFER OF 20.16MT(24M3)HFHSD, S-0.18%; FROM CARGO
TKS 3DS TO SHIPS OIL FUEL TK 5C & 4C.
14-Jan-19 I
INT SDG-5C- 13.4MT(16M3),QTY RETND 5C- 22.3.MT(26.6M3),INT SDG-4C-
1.09MT(1.3M3),QTY RETND 4C- 14.5.MT(17.3M3)
T.P SAJEEV CHIEF ENGINEER 14 JAN 2019
18-Jan-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 1.14M3
11.4 0.05M3 FROM PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 18JAN 2019
INTERNAL TRANSFER OF 20.16MT(24M3)HFHSD, S-0.19%; FROM CARGO
TKS 1DS & 1DP TO SHIPS OIL FUEL TK 5C .
20-Jan-19 I
INT SDG-5C- 5.04MT(6M3),QTY RETND 5C- 25.2.MT(30M3)
T.P SAJEEV CHIEF ENGINEER 20 JAN 2019
23-Jan-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 1.34M3
11.4 0.2M3 USED OIL DRAINED FROM A/E NO1 & 3
T.P SAJEEV CHIEF ENGINEER 23 JAN 2019
INTERNAL TRANSFER OF 12.6MT(15M3)HFHSD, S-0.19%; FROM CARGO TKS
1DP TO SHIPS OIL FUEL TK 5C .
24-Jan-19 I
INT SDG-5C- 5.04MT(6M3),QTY RETND 5C- 17.64MT(21M3)
T.P SAJEEV CHIEF ENGINEER 24 JAN 2019
INTERNAL TRANSFER OF 17.6MT(21M3)HFHSD, S-0.19%; FROM CARGO TKS
1Ds& 1dc TO SHIPS OIL FUEL TK 5C .
25-Jan-19 I
INT SDG-5C- 6.72MT(8M3),QTY RETND 5C- 24.36MT(29M3)
T.P SAJEEV CHIEF ENGINEER 25 JAN 2019
INTERNAL TRANSFER OF 27.72MT(30M3)HFHSD, S-0.19%; FROM CARGO
TKS 1DC TO SHIPS OIL FUEL TK 5C .
29-Jan-19 I
INT SDG-5C- 4.2MT(5M3),QTY RETND 5C- 29.4MT(35M3)
T.P SAJEEV CHIEF ENGINEER 29 JAN 2019
30-Jan-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 1.39M3
11.4 0.05M3 FROM PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 30 JAN 2019
INTERNAL TRANSFER OF 23.52MT(28M3)HFHSD, S-0.19%; FROM CARGO
TKS 2DP& 2DS TO SHIPS OIL FUEL TK 5C .
2-Feb-19 I
INT SDG-5C- 5.8MT(7M3),QTY RETND 5C- 29.4MT(35M3)
T.P SAJEEV CHIEF ENGINEER 02 FEB 2019
INTERNAL TRANSFER OF 10.92MT(13M3)HFHSD, S-0.19%; FROM CARGO
TKS 2DP& 2DS TO SHIPS OIL FUEL TK 5C .
5-Feb-19 I
INT SDG-5C- 5.8MT(7M3),QTY RETND 5C- 16.8MT(20M3)
T.P SAJEEV CHIEF ENGINEER 05 FEB 2019
7-Feb-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 1.54M3
11.4 0.15M3 FROM PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 07 FEB 2019
INTERNAL TRANSFER OF 26.04MT(31M3)HFHSD, S-0.19%; FROM CARGO
TKS 2DC TO SHIPS OIL FUEL TK 5C .
7-Feb-19 I
INT SDG-5C- 3.36MT(4M3),QTY RETND 5C- 28.56MT(34M3)
T.P SAJEEV CHIEF ENGINEER 07 FEB 2019
8-Feb-19 D 13 0.5M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
14 1500HRS TO 1530 HRS
15.3 CAP: 18.4M3; QTY RETAINED- 8.6 M3
T.P SAJEEV CHIEF ENGINEER 08 FEB 2019
9-Feb-19 D 13 1.0M3 FROM BILGE HOLDING TANK
START-0830 HRS,19˚31.4' NORTH; 070˚56.8'EAST; STOP-0930 HRS-
14 19˚22.2'NORTH ; 070˚ 57.1'EAST(3.21HRS-4.21HRS 15PPM MONITOR
TIME)

THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY


15.1 RETND-7.6M3
T.P SAJEEV CHIEF ENGINEER 09 FEB 2019
INTERNAL TRANSFER OF 25.2MT(30M3)HFHSD, S-0.19%; FROM CARGO
TKS 3DP& 3DS TO SHIPS OIL FUEL TK 5C .
11-Feb-19 I
INT SDG-5C- 4.2MT(5M3),QTY RETND 5C- 29.4MT(35M3)
T.P SAJEEV CHIEF ENGINEER 11 FEB 2019
INTERNAL TRANSFER OF 6.72MT(8M3)HFHSD, S-0.19%; FROM CARGO TKS
3DP TO SHIPS OIL FUEL TK 5C .
12-Feb-19 I
INT SDG-5C- 9.24MT(11M3),QTY RETND 5C- 15.96MT(19M3)
T.P SAJEEV CHIEF ENGINEER 12 FEB 2019
14-Feb-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 1.59M3
11.4 0.05M3 FROM PURIFIER DRAINS+DRAINS FROM TRAYS
RANJEET SINGH CHIEF ENGINEER 14 FEB 2019
INTERNAL TRANSFER OF 25.2MT(30M3)HFHSD, S-0.15%; FROM CARGO
TKS 2DP & 2DS TO SHIPS OIL FUEL TK 5C .
17-Feb-19 I
INT SDG-5C- 3.36MT(4M3),QTY RETND 5C- 28.56MT(34M3)
RANJEET SINGH CHIEF ENGINEER 17 FEB 2019
INTERNAL TRANSFER OF 16.6MT(20M3)HFHSD, S-0.15%; FROM CARGO
TKS 2DP, 2DS & 2DC TO SHIPS OIL FUEL TK 5C .
21-Feb-19 I
INT SDG-5C- 5.0MT(6M3),QTY RETND 5C- 21.67MT(26M3)
RANJEET SINGH CHIEF ENGINEER 21 FEB 2019
21-Feb-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 1.64M3
11.4 0.05M3 FROM PURIFIER DRAINS+DRAINS FROM TRAYS
RANJEET SINGH CHIEF ENGINEER 21 FEB 2019
INTERNAL TRANSFER OF 28.34MT(34M3)HFHSD, S-0.15%; FROM CARGO
TKS 3DC TO SHIPS OIL FUEL TK 5C .
23-Feb-19 I
INT SDG-5C- 3.3MT(4M3),QTY RETND 5C- 31.67MT(38M3)
RANJEET SINGH CHIEF ENGINEER 23 FEB 2019
28-Feb-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 1.70M3
11.4 0.06M3 FROM PURIFIER DRAINS+DRAINS FROM TRAYS
RANJEET SINGH CHIEF ENGINEER 28 FEB 2019
INTERNAL TRANSFER OF 25MT(30M3)HFHSD, S-0.15%; FROM CARGO TKS
3DP & 3DS TO SHIPS OIL FUEL TK 5C .
28-Feb-19 I
INT SDG-5C- 5MT(6M3),QTY RETND 5C- 30MT(36M3)
RANJEET SINGH CHIEF ENGINEER 28 FEB 2019
INTERNAL TRANSFER OF 20.8MT(25M3)HFHSD, S-0.15%; FROM CARGO
TKS 3DS & 1DC TO SHIPS OIL FUEL TK 5C .
4-Mar-19 I
INT SDG-5C- 6.7MT(8M3),QTY RETND 5C- 27.5MT(33M3)
RANJEET SINGH CHIEF ENGINEER 04 MAR 2019
7-Mar-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 1.74M3
11.4 0.04M3 FROM PURIFIER DRAINS+DRAINS FROM TRAYS
RANJEET SINGH CHIEF ENGINEER 07 MAR 2019
INTERNAL TRANSFER OF 7.5MT(9M3)HFHSD, S-0.15%; FROM CARGO TKS
1DC TO SHIPS OIL FUEL TK 5C .
7-Mar-19 I
INT SDG-5C- 20.84MT(25M3),QTY RETND 5C- 28.34MT(34M3)
RANJEET SINGH CHIEF ENGINEER 07 MAR 2019
INTERNAL TRANSFER OF 13.38MT(16M3)HFHSD, S-0.15%; FROM CARGO
TKS 1DC TO SHIPS OIL FUEL TK 5C .
11-Mar-19 I
INT SDG-5C- 4.1MT(5M3),QTY RETND 5C- 17.5MT(21M3)
RANJEET SINGH CHIEF ENGINEER 11 MAR 2019
INTERNAL TRANSFER OF 12.53MT(15M3)HFHSD, S-0.15%; FROM CARGO
TKS 2DC TO SHIPS OIL FUEL TK 4DC .
13-Mar-19 I
INT SDG-4DC- 0.58MT(0.7M3),QTY RETND 4DC- 13.12MT(15.7M3)
RANJEET SINGH CHIEF ENGINEER 13 MAR 2019
14-Mar-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 1.79M3
11.4 0.05M3 FROM PURIFIER DRAINS+DRAINS FROM TRAYS
RANJEET SINGH CHIEF ENGINEER 14 MAR 2019
INTERNAL TRANSFER OF 12.53MT(15M3)HFHSD, S-0.15%; FROM CARGO
TKS 2DC TO SHIPS OIL FUEL TK 4DC .
14-Mar-19 I
INT SDG-4DC- 2.5MT(3M3),QTY RETND 4DC-15MT(18M3)
RANJEET SINGH CHIEF ENGINEER 14 MAR 2019
INTERNAL TRANSFER OF 16.7MT(20M3)HFHSD, S-0.15%; FROM CARGO TKS
2DP TO SHIPS OIL FUEL TK 5C .
16-Mar-19 I
INT SDG-5C- 6.7MT(8M3),QTY RETND 5C-23.4MT(28M3)
RANJEET SINGH CHIEF ENGINEER 16 MAR 2019
INTERNAL TRANSFER OF 22.6MT(27M3)HFHSD, S-0.15%; FROM CARGO TKS
3DC TO SHIPS OIL FUEL TK 5C .
19-Mar-19 I
INT SDG-5C- 4.2MT(5M3),QTY RETND 5C-26.7MT(32M3)
RANJEET SINGH CHIEF ENGINEER 19 MAR 2019
INTERNAL TRANSFER OF 10.9MT(13M3)HFHSD, S-0.15%; FROM CARGO TKS
3DC TO SHIPS OIL FUEL TK 5C .
21-Mar-19 I
INT SDG-5C- 8.4MT(10M3),QTY RETND 5C-19.2MT(23M3)
RANJEET SINGH CHIEF ENGINEER 21 MAR 2019
21-Mar-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 1.92M3
0.13M3 FROM OIL DRAINED FROM A/E NO.2+ PURIFIER DRAINS+DRAINS
11.4 FROM TRAYS
RANJEET SINGH CHIEF ENGINEER 21 MAR 2019
INTERNAL TRANSFER OF 25.9MT(31M3)HFHSD, S-0.15%; FROM CARGO TKS
3DP & 3DS TO SHIPS OIL FUEL TK 5C .
23-Mar-19 I
INT SDG-5C- 5MT(6M3),QTY RETND 5C-30.9MT(37M3)
RANJEET SINGH CHIEF ENGINEER 23 MAR 2019
25-Mar-19 D 13 1.5M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
14 1145HRS TO 1230 HRS
15.3 CAP: 18.4M3; QTY RETAINED- 9.1 M3
RANJEET SINGH CHIEF ENGINEER 25 MAR 2019
26-Mar-19 D 13 1.0M3 FROM BILGE HOLDING TANK
START-0130 HRS,19˚12.5' NORTH; 071˚13.09'EAST; STOP-0230 HRS-
14 19˚11.58'NORTH ; 071˚ 07.62'EAST(20.21HRS-21.21HRS 15PPM MONITOR
TIME)

THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY


15.1 RETND-8.1M3
RANJEET SINGH CHIEF ENGINEER 26 MAR 2019
INTERNAL TRANSFER OF 14.2MT(17M3)HFHSD, S-0.15%; FROM CARGO TKS
3DP TO SHIPS OIL FUEL TK 5C .
27-Mar-19 I
INT SDG-5C- 3.3MT(4M3),QTY RETND 5C-17.6MT(21M3)
RANJEET SINGH CHIEF ENGINEER 27 MAR 2019
28-Mar-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 1.94M3
11.4 0.02M3 PURIFIER DRAINS+DRAINS FROM TRAYS
RANJEET SINGH CHIEF ENGINEER 28 MAR 2019
INTERNAL TRANSFER OF 23.5MT(28M3)HFHSD, S-0.0018%; FROM CARGO
TKS 1DP TO SHIPS OIL FUEL TK 5C .
31-Mar-19 I
INT SDG-5C- 4.2MT(5M3),QTY RETND 5C-27.7MT(33M3)
RANJEET SINGH CHIEF ENGINEER 31 MAR 2019
INTERNAL TRANSFER OF 13.4MT(16M3)HFHSD, S-0.0018%; FROM CARGO
TKS 1DS TO SHIPS OIL FUEL TK 5C .
2-Apr-19 I
INT SDG-5C- 5MT(6M3),QTY RETND 5C-18.45MT(22M3)
RANJEET SINGH CHIEF ENGINEER 02 APRIL 2019
INTERNAL TRANSFER OF 16.77MT(20M3)HFHSD, S-0.0018%; FROM CARGO
TKS 2DS TO SHIPS OIL FUEL TK 5C .
4-Apr-19 I
INT SDG-5C- 3.3MT(4M3),QTY RETND 5C-20.1MT(24M3)
RANJEET SINGH CHIEF ENGINEER 04 APRIL 2019
4-Apr-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 1.98M3
11.4 0.04M3 PURIFIER DRAINS+DRAINS FROM TRAYS
RANJEET SINGH CHIEF ENGINEER 04 APRIL 2019
INTERNAL TRANSFER OF 16.77MT(20M3)HFHSD, S-0.0018%; FROM CARGO
TKS 2DP TO SHIPS OIL FUEL TK 5C .
6-Apr-19 I
INT SDG-5C- 3.3MT(4M3),QTY RETND 5C-20.1MT(24M3)
RANJEET SINGH CHIEF ENGINEER 06 APRIL 2019
INTERNAL TRANSFER OF 25.2MT(30M3)HFHSD, S-0.0018%; FROM CARGO
TKS 2DC TO SHIPS OIL FUEL TK 5C .
9-Apr-19 I
INT SDG-5C- 4.2MT(5M3),QTY RETND 5C-29.34MT(35M3)
RANJEET SINGH CHIEF ENGINEER 09 APRIL 2019
11-Apr-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2M3
11.4 0.02M3 PURIFIER DRAINS+DRAINS FROM TRAYS
RANJEET SINGH CHIEF ENGINEER 11 APRIL 2019
INTERNAL TRANSFER OF 20.96MT(25M3)HFHSD, S-0.0018%; FROM CARGO
TKS 3DP TO SHIPS OIL FUEL TK 5C .
13-Apr-19 I
INT SDG-5C- 5.9MT(7M3),QTY RETND 5C-26.8MT(32M3)
RANJEET SINGH CHIEF ENGINEER 13 APRIL 2019
INTERNAL TRANSFER OF 20.96MT(25M3)HFHSD, S-0.0018%; FROM CARGO
TKS 3DS TO SHIPS OIL FUEL TK 5C .
17-Apr-19 I
INT SDG-5C- 3.3MT(4M3),QTY RETND 5C-24.3MT(29M3)
RANJEET SINGH CHIEF ENGINEER 17 APRIL 2019
18-Apr-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.03M3
11.4 0.03M3 PURIFIER DRAINS+DRAINS FROM TRAYS
RANJEET SINGH CHIEF ENGINEER 18 APRIL 2019
INTERNAL TRANSFER OF 22.64MT(27M3)HFHSD, S-0.0018%; FROM CARGO
TKS 3DC TO SHIPS OIL FUEL TK 5C .
19-Apr-19 I
INT SDG-5C- 5.8MT(7M3),QTY RETND 5C-28.5MT(34M3)
RANJEET SINGH CHIEF ENGINEER 19 APRIL 2019
25-Apr-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.05M3
11.4 0.02M3 PURIFIER DRAINS+DRAINS FROM TRAYS
RANJEET SINGH CHIEF ENGINEER 25 APRIL 2019
INTERNAL TRANSFER OF 33MT(27.72M3)HFHSD, S-0.0018%; FROM CARGO
TKS 1DC TO SHIPS OIL FUEL TK 5C .
27-Apr-19 I
INT SDG-5C- 2.52MT(3M3),QTY RETND 5C-31.08MT(37M3)
RANJEET SINGH CHIEF ENGINEER 27 APRIL 2019
INTERNAL TRANSFER OF 20.1MT(24M3)HFHSD, S-0.0018%; FROM CARGO
TKS 1DP&2DP TO SHIPS OIL FUEL TK 5C .
30-Apr-19 I
INT SDG-5C- 4.2MT(5M3),QTY RETND 5C-24.3MT(29M3)
RANJEET SINGH CHIEF ENGINEER 30 APRIL 2019
INTERNAL TRANSFER OF 14.2MT(17M3)HFHSD, S-0.0018%; FROM CARGO
TKS 2DS TO SHIPS OIL FUEL TK 5C .
3-May-19 I
INT SDG-5C- 7.5MT(9M3),QTY RETND 5C-21.8MT(26M3)
RANJEET SINGH CHIEF ENGINEER 03 MAY2019
INTERNAL TRANSFER OF 20.16MT(24M3)HFHSD, S-0.12%; FROM CARGO
TKS 2DC TO SHIPS OIL FUEL TK 5C .
6-May-19 I
INT SDG-5C- 7.5MT(9M3),QTY RETND 5C-27.7MT(33M3)
RANJEET SINGH CHIEF ENGINEER 06 MAY 2019
10-May-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.09M3
11.4 0.04M3 PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 10 MAY 2019

INTERNAL TRANSFER OF 25.2MT(30M3)HFHSD, S-0.12%; FROM CARGO TKS


2DP&2DS TO SHIPS OIL FUEL TK 5C .
13-May-19 I
INT SDG-5C- 4.2MT(5M3),QTY RETND 5C-29.4MT(35M3)
T.P SAJEEV CHIEF ENGINEER 13 MAY 2019
17-May-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.12M3
11.4 0.03M3 PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 17 MAY 2019
NHAVA BASE JETTY 4, FROM ONGC SHORE TERMINAL, ONGC SUPPLY.
26.1
19-May-19 H
26.2 2305 HRS TO 2356 HRS
26.3 28.56 MT(34 M3) HFHSD, S= 0.1% LOADED IN SHIPS F.O TKS 4DC& 5C
INTSDG 4DC- 1.1MT(1.3M3) , QTYADDED- 15.12MT(18M3), QTY RTND-
16.2MT(19.30 M3),INTSDG 5DC- 11.34MT(13.5M3), QTYADDED-
13.4MT(16M3), QTY RTND- 24.78MT(29.50 M3)

T.P SAJEEV CHIEF ENGINEER 19 MAY 2019


INTERNAL TRANSFER OF 22.68MT(27M3)HFHSD, S-0.1%; FROM CARGO TKS
2DC TO SHIPS OIL FUEL TK 5C .
23-May-19 I
INT SDG-5C- NIL,QTY RETND 5C-23.19MT(27.61M3)
T.P SAJEEV CHIEF ENGINEER 23 MAY 2019
24-May-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.15M3
11.4 0.03M3 PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 24 MAY 2019
24-May-19 D 13 1.0M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
14 0830HRS TO 0910HRS
15.3 CAP: 18.4M3; QTY RETAINED- 9.1 M3
T.P SAJEEV CHIEF ENGINEER 24 MAY 2019
24-May-19 D 13 1.0M3 FROM BILGE HOLDING TANK
START-1048 HRS,19˚00.48' NORTH; 072˚03.63'EAST; STOP-1149 HRS-
14 19˚09.024'NORTH ; 072˚ 06.203'EAST(5.48HRS-6.49HRS 15PPM MONITOR
TIME)

THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY


15.1 RETND-8.1M3
T.P SAJEEV CHIEF ENGINEER 24 MAY 2019
INTERNAL TRANSFER OF 25.2MT(30M3)HFHSD, S-0.1%; FROM CARGO TKS
3DC TO SHIPS OIL FUEL TK 5C .
27-May-19 I
INT SDG-5C- 1.76 MT(2.1M3),QTY RETND 5C-26.9MT(32.1M3)
T.P SAJEEV CHIEF ENGINEER 27 MAY 2019
31-May-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.18M3
11.4 0.03M3 PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 31MAY 2019
INTERNAL TRANSFER OF 15.12MT(18M3)HFHSD, S-0.17%; FROM CARGO
TKS 1P TO SHIPS OIL FUEL TK 4DC& 5C .
31-May-19 I
INT SDG-5C- 19.32 MT(23M3),QTY RETND 5C-26.04MT(31M3),INT SDG-
4DC- 0.65MT(0.78M3),QTY RETND 4DC-8.9MT(10.7M3),
T.P SAJEEV CHIEF ENGINEER 31 MAY 2019
7-Jun-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.21M3
11.4 0.03M3 PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 07 JUNE 2019
INTERNAL TRANSFER OF 22.34MT(26.6M3)HFHSD, S-0.1%; FROM CARGO
TKS 2DC&3DS TO SHIPS OIL FUEL TK 5C .
7-Jun-19 I
INT SDG-5C- 4.03 MT(4.8M3),QTY RETND 5C-26.2MT(31.2M3)
T.P SAJEEV CHIEF ENGINEER 07 JUNE 2019
INTERNAL TRANSFER OF 21MT(25M3)HFHSD, S-0.1%; FROM CARGO TKS
3DC TO SHIPS OIL FUEL TK 5C .
13-Jun-19 I
INT SDG-5C- NIL,QTY RETND 5C-21MT(25M3)
T.P SAJEEV CHIEF ENGINEER 13 JUNE 2019
14-Jun-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.24M3
11.4 0.03M3 PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 14 JUNE 2019
INTERNAL TRANSFER OF 8.4MT(10M3)HFHSD, S-0.1%; FROM CARGO TKS
3DC TO SHIPS OIL FUEL TK 5C .
16-Jun-19 I
INT SDG-5C- NIL,QTY RETND 5C-8.4MT(10M3)
T.P SAJEEV CHIEF ENGINEER 16 JUNE 2019
INTERNAL TRANSFER OF 8.4MT(10M3)HFHSD, S-0.1%; FROM CARGO TKS
3DC TO SHIPS OIL FUEL TK 5C .
18-Jun-19 I
INT SDG-5C- NIL,QTY RETND 5C-8.4MT(10M3)
T.P SAJEEV CHIEF ENGINEER 18 JUNE 2019
NHAVA BASE JETTY 1, FROM ONGC SHORE TERMINAL, ONGC SUPPLY.
26.1
20-Jun-19 H
26.2 1845 HRS TO 2025HRS
26.3 16.8 MT(20M3) HFHSD, S= 0.13% LOADED IN SHIPS F.O TK 5C
INTSDG 5DC- 6.72MT(8M3) , QTYADDED- 16.8MT(20M3), QTY RTND-
23.52MT(28 M3)
T.P SAJEEV CHIEF ENGINEER 20 JUNE 2019
21-Jun-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.27M3
11.4 0.03M3 PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 21 JUNE 2019
INTERNAL TRANSFER OF 25.2MT(30M3)HFHSD, S-0.13%; FROM CARGO TKS
1DC TO SHIPS OIL FUEL TK 5C .
23-Jun-19 I
INT SDG-5C- NIL,QTY RETND 5C-25.2MT(30M3)
T.P SAJEEV CHIEF ENGINEER 23 JUNE 2019
INTERNAL TRANSFER OF 16.8MT(20M3)HFHSD, S-0.13%; FROM CARGO TKS
1DP TO SHIPS OIL FUEL TK 5C .
27-Jun-19 I
INT SDG-5C- 4M3(3.36MT),QTY RETND 5C-20.16MT(24M3)
T.P SAJEEV CHIEF ENGINEER 27 JUNE 2019
28-Jun-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.30M3
11.4 0.03M3 PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 28 JUNE 2019
INTERNAL TRANSFER OF 21.84MT(26M3)HFHSD, S-0.13%; FROM CARGO
TKS 1DC & 2DC TO SHIPS OIL FUEL TK 5C .
1-Jul-19 I
INT SDG-5C- 4M3(3.36MT),QTY RETND 5C-25.2MT(30M3)
T.P SAJEEV CHIEF ENGINEER 01 JULY 2019
5-Jul-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.33M3
11.4 0.03M3 PURIFIER DRAINS+DRAINS FROM TRAYS
T.P SAJEEV CHIEF ENGINEER 05 JULY 2019
INTERNAL TRANSFER OF 21.84MT(26M3)HFHSD, S-0.13%; FROM CARGO
TKS 1DS & 3DS TO SHIPS OIL FUEL TK 5C .
5-Jul-19 I
INT SDG-5C- 4M3(3.36MT),QTY RETND 5C-25.2MT(30M3)
T.P SAJEEV CHIEF ENGINEER 05 JULY 2019
INTERNAL TRANSFER OF 16.8MT(20M3)HFHSD, S-0.13%; FROM CARGO TKS
3DC TO SHIPS OIL FUEL TK 5C .
9-Jul-19 I
INT SDG-5C- 4M3(3.36MT),QTY RETND 5C-20.16MT(24M3)
T.P SAJEEV CHIEF ENGINEER 09 JULY 2019
INTERNAL TRANSFER OF 12.6MT(15M3)HFHSD, S-0.13%; FROM CARGO TKS
3DC TO SHIPS OIL FUEL TK 5C .
11-Jul-19 I
INT SDG-5C- 5M3(4.2MT),QTY RETND 5C-16.8MT(20M3)
T.P SAJEEV CHIEF ENGINEER 11 JULY 2019
12-Jul-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.36M3
11.4 0.03M3 PURIFIER DRAINS+DRAINS FROM TRAYS
NHAVA BASE JETTY 1, FROM ONGC SHORE TERMINAL, ONGC SUPPLY.
26.1
15-Jul-19 H
26.2 1145 HRS TO 1410 HRS
26.3 8.4 MT(10M3) HFHSD, S= 0.132% LOADED IN SHIPS F.O TK 5C
INTSDG 5DC- NIL , QTYADDED- 8.4MT(10M3), QTY RTND- 8.4MT(10 M3)

T.P SAJEEV CHIEF ENGINEER 15JULY 2019


T.P SAJEEV CHIEF ENGINEER 12 JULY 2019
INTERNAL TRANSFER OF 20.16MT(24M3)HFHSD, S-0.132%; FROM CARGO
TKS 1DP & 1DS TO SHIPS OIL FUEL TK 5C .
15-Jul-19 I
INT SDG-5C- 5M3(4.2MT),QTY RETND 5C-24.36MT(29M3)
T.P SAJEEV CHIEF ENGINEER 15 JULY 2019
18-Jul-19 D 13 0.5 M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
14 1130HRS TO 1150 HRS
15.3 CAP: 18.4M3; QTY RETAINED- 8.6 M3
T.P SAJEEV CHIEF ENGINEER 18 JULY 2019
18-Jul-19 D 13 1.0M3 FROM BILGE HOLDING TANK
START-1600 HRS,18˚47.19' NORTH; 071˚54.50'EAST; STOP-1700 HRS-
14 18˚47.84'NORTH ; 071˚ 47.77 EAST(10 51HRS-1151 HRS 15PPM MONITOR
TIME)

THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY


15.1 RETND-7.6M3
T.P SAJEEV CHIEF ENGINEER 18 JULY 2019
INTERNAL TRANSFER OF 17.64MT(21M3)HFHSD, S-0.132%; FROM CARGO
TKS 1DS,2DS,1DC&2DC TO SHIPS OIL FUEL TK 5C .
18-Jul-19 I
INT SDG-5C- 8M3(7.56MT),QTY RETND 5C-24.36MT(29M3)
T.P SAJEEV CHIEF ENGINEER 18 JULY 2019
19-Jul-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.49M3
11.4 0.03M3 PURIFIER DRAINS+0.1M3 USED OIL FROM A/E 2
T.P SAJEEV CHIEF ENGINEER 19 JULY 2019
INTERNAL TRANSFER OF 17.64MT(21M3)HFHSD, S-0.132%; FROM CARGO
TK 2DC TO SHIPS OIL FUEL TK 5C .
21-Jul-19 I
INT SDG-5C-3M3(2.52MT),QTY RETND 5C-20.16MT(24M3)
T.P SAJEEV CHIEF ENGINEER 21 JULY 2019
26-Jul-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.52M3
11.4 0.03M3 PURIFIER DRAINS AND TRAYS
T.P SAJEEV CHIEF ENGINEER 26 JULY 2019
INTERNAL TRANSFER OF 25.2MT(30M3)HFHSD, S-0.132%; FROM CARGO TK
3DP, 3DS TO SHIPS OIL FUEL TK 5C .
28-Jul-19 I
INT SDG-5C-2.52MT(3M3),QTY RETND 5C-27.72MT(33M3)
T.P SAJEEV CHIEF ENGINEER 28 JULY 2019
INTERNAL TRANSFER OF 8.4MT(10M3)HFHSD, S-0.132%; FROM CARGO TK
3DP TO SHIPS OIL FUEL TK 5C .
29-Jul-19 I
INT SDG-5C-19.32MT(23M3),QTY RETND 5C-27.72MT(33M3)
T.P SAJEEV CHIEF ENGINEER 29 JULY 2019
2-Aug-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.55M3
11.4 0.03M3 PURIFIER DRAINS AND TRAYS
T.P SAJEEV CHIEF ENGINEER 02 AUG 2019
INTERNAL TRANSFER OF 25.2MT(30M3)HFHSD, S-0.132%; FROM CARGO TK
1DC TO SHIPS OIL FUEL TK 5C .
5-Aug-19 I
INT SDG-5C-4.2MT(5M3),QTY RETND 5C-29.4MT(35M3)
T.P SAJEEV CHIEF ENGINEER 05 AUG 2019
9-Aug-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.58M3
11.4 0.03M3 PURIFIER DRAINS AND TRAYS
T.P SAJEEV CHIEF ENGINEER 09 AUG 2019
INTERNAL TRANSFER OF 18.48MT(22M3)HFHSD, S-0.132%; FROM CARGO
TK 1DC,2DC.3DC&3DS TO SHIPS OIL FUEL TK 5C .
9-Aug-19 I
INT SDG-5C-4.2MT(5M3),QTY RETND 5C-22.68MT(27M3)
T.P SAJEEV CHIEF ENGINEER 09 AUG 2019
INTERNAL TRANSFER OF 14.11MT(17M3)HFHSD, S-0.121%; FROM CARGO
TK 1P TO SHIPS OIL FUEL TK 5C .
12-Aug-19 I
INT SDG-5C-8.3MT(10M3),QTY RETND 5C-22.4MT(27M3)
RANJEET SINGH CHIEF ENGINEER 12 AUG 2019
INTERNAL TRANSFER OF 20.75MT(25M3)HFHSD, S-0.121%; FROM CARGO
TK 1DC,2DC,3DC&2DS TO SHIPS OIL FUEL TK 5C .
15-Aug-19 I
INT SDG-5C-2.49MT(3M3),QTY RETND 5C-23.24MT(28M3)
RANJEET SINGH CHIEF ENGINEER 15 AUG 2019
16-Aug-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.62M3
11.4 0.04M3 PURIFIER DRAINS AND TRAYS
RANJEET SINGH CHIEF ENGINEER 16 AUG 2019
INTERNAL TRANSFER OF 19MT(23M3)HFHSD, S-0.121%; FROM CARGO TK
3DS TO SHIPS OIL FUEL TK 5C .
18-Aug-19 I
INT SDG-5C-6.6MT(8M3),QTY RETND 5C-25.7MT(31M3)
RANJEET SINGH CHIEF ENGINEER 18 AUG 2019
23-Aug-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.64M3
11.4 0.02M3 PURIFIER DRAINS AND TRAYS
RANJEET SINGH CHIEF ENGINEER 23 AUG 2019
INTERNAL TRANSFER OF 18.26MT(22M3)HFHSD, S-0.121%; FROM CARGO
TK 3DP TO SHIPS OIL FUEL TK 5C .
24-Aug-19 I
INT SDG-5C-2.49MT(3M3),QTY RETND 5C-20.75MT(25M3)
RANJEET SINGH CHIEF ENGINEER 24 AUG 2019
26-Aug-19 D 13 0.5 M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
14 1000HRS TO 1020 HRS
15.3 CAP: 18.4M3; QTY RETAINED- 8.1 M3
RANJEET SINGH CHIEF ENGINEER 26 AUG 2019
INTERNAL TRANSFER OF 24.9MT(30M3)HFHSD, S-0.143%; FROM CARGO TK
1DC TO SHIPS OIL FUEL TK 5C .
30-Aug-19 I
INT SDG-5C-1.7MT(2M3),QTY RETND 5C-26.6MT(32M3)
RANJEET SINGH CHIEF ENGINEER 30 AUG 2019
30-Aug-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.67M3
11.4 0.03M3 PURIFIER DRAINS AND TRAYS
RANJEET SINGH CHIEF ENGINEER 30 AUG 2019
INTERNAL TRANSFER OF 17.43MT(21M3)HFHSD, S-0.143%; FROM CARGO
TK 2DS TO SHIPS OIL FUEL TK 5C .
1-Sep-19 I
INT SDG-5C-8.3MT(10M3),QTY RETND 5C-25.73MT(31M3)
RANJEET SINGH CHIEF ENGINEER 01 SEPT 2019
INTERNAL TRANSFER OF 19.9MT(24M3)HFHSD, S-0.143%; FROM CARGO TK
1DC, 2DC, 3DC, 1DP, 1DS TO SHIPS OIL FUEL TK 5C .
4-Sep-19 I
INT SDG-5C-4.98MT(6M3),QTY RETND 5C-24.9MT(30M3)
RANJEET SINGH CHIEF ENGINEER 04 SEPT 2019
6-Sep-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.69M3
11.4 0.02M3 PURIFIER DRAINS AND TRAYS
RANJEET SINGH CHIEF ENGINEER 06 SEPT 2019
INTERNAL TRANSFER OF 8.3MT(10M3)HFHSD, S-0.143%; FROM CARGO TK
2DP TO SHIPS OIL FUEL TK 5C .
10-Sep-19 I
INT SDG-5C-1.7MT(2M3),QTY RETND 5C-9.96MT(12M3)
RANJEET SINGH CHIEF ENGINEER 10 SEPT 2019
INTERNAL TRANSFER OF 18.26MT(22M3)HFHSD, S-0.143%; FROM CARGO
TK 3DS TO SHIPS OIL FUEL TK 5C .
12-Sep-19 I
INT SDG-5C-3.3MT(4M3),QTY RETND 5C-21.5MT(26M3)
RANJEET SINGH CHIEF ENGINEER 12 SEPT 2019
13-Sep-19 D 13 1.0 M3 FROM BILGE HOLDING TANK
START-1400 HRS,18˚39.622' NORTH; 071˚37.20'EAST; STOP-1504 HRS-
14 18˚38.540'NORTH ; 071˚ 29.970' EAST(0851HRS-0955HRS 15PPM
MONITOR TIME)

THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY


15.1 RETND-7.1M3
RANJEET SINGH CHIEF ENGINEER 13 SEPTEMBER 2019
13-Sep-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.76M3
11.4 0.07M3 OWS, PURIFIER DRAINS AND TRAYS
RANJEET SINGH CHIEF ENGINEER 13 SEPT 2019
INTERNAL TRANSFER OF 16.6MT(20M3)HFHSD, S-0.143%; FROM CARGO TK
2DS TO SHIPS OIL FUEL TK 5C .
15-Sep-19 I
INT SDG-5C- 3.3MT(4M3),QTY RETND 5C-19.92MT(24M3)
RANJEET SINGH CHIEF ENGINEER 15 SEPT 2019
INTERNAL TRANSFER OF 16.6MT(20M3)HFHSD, S-0.143%; FROM CARGO TK
2DP TO SHIPS OIL FUEL TK 5C .
17-Sep-19 I
INT SDG-5C- 4.98MT(6M3),QTY RETND 5C-21.58MT(26M3)
RANJEET SINGH CHIEF ENGINEER 17 SEPT 2019
INTERNAL TRANSFER OF 16.6MT(20M3)HFHSD, S-0.143%; FROM CARGO TK
3DC TO SHIPS OIL FUEL TK 5C .
19-Sep-19 I
INT SDG-5C- 1.66MT(2M3),QTY RETND 5C-18.26MT(22M3)
RANJEET SINGH CHIEF ENGINEER 19 SEPT 2019
20-Sep-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.81M3
11.4 0.05M3 PURIFIER DRAINS AND TRAYS
RANJEET SINGH CHIEF ENGINEER 20 SEPT 2019
INTERNAL TRANSFER OF 17.43MT(21M3)HFHSD, S-0.143%; FROM CARGO
TK 3DC TO SHIPS OIL FUEL TK 5C .
21-Sep-19 I
INT SDG-5C- 9.13MT(11M3),QTY RETND 5C-26.6MT(32M3)
RANJEET SINGH CHIEF ENGINEER 21 SEPT 2019
INTERNAL TRANSFER OF 23.2MT(28M3)HFHSD, S-0.143%; FROM CARGO TK
1S & 1DS TO SHIPS OIL FUEL TK 5C .
26-Sep-19 I
INT SDG-5C- 5MT(6M3),QTY RETND 5C-28.2MT(34M3)
RANJEET SINGH CHIEF ENGINEER 26 SEPT 2019
27-Sep-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.84M3
11.4 0.03M3 PURIFIER DRAINS AND TRAYS
RANJEET SINGH CHIEF ENGINEER 27 SEPT 2019
INTERNAL TRANSFER OF 26.6MT(32M3)HFHSD, S-0.143%; FROM CARGO TK
1P & 1DC TO SHIPS OIL FUEL TK 5C .
1-Oct-19 I
INT SDG-5C- 1.7MT(2M3),QTY RETND 5C-28.2MT(34M3)
RANJEET SINGH CHIEF ENGINEER 01 OCT 2019
2-Oct-19 D 13 0.7 M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
14 1400HRS TO 1440 HRS
15.3 CAP: 18.4M3; QTY RETAINED- 7.8 M3
RANJEET SINGH CHIEF ENGINEER 02 OCT 2019
4-Oct-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 2.98M3
11.4 0.14M3 DG3 ROUTINE,PURIFIER DRAINS AND TRAYS
RANJEET SINGH CHIEF ENGINEER 04 OCT 2019
INTERNAL TRANSFER OF 23.2MT(28M3)HFHSD, S-0.143%; FROM CARGO TK
1DC TO SHIPS OIL FUEL TK 5C .
5-Oct-19 I
INT SDG-5C- 2.5MT(3M3),QTY RETND 5C-25.7MT(31M3)
RANJEET SINGH CHIEF ENGINEER 05 OCT 2019
INTERNAL TRANSFER OF 28.22MT(34M3)HFHSD, S-0.143%; FROM CARGO
TK 2DS, 2DP TO SHIPS OIL FUEL TK 5C .
9-Oct-19 I
INT SDG-5C- 1.7MT(2M3),QTY RETND 5C-29.8MT(36M3)
RANJEET SINGH CHIEF ENGINEER 09 OCT 2019
11-Oct-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED: 3.02M3
11.4 0.04M3 PURIFIER DRAINS AND TRAYS
RANJEET SINGH CHIEF ENGINEER 11 OCT 2019
INTERNAL TRANSFER OF 23.2MT(28M3)HFHSD, S-0.143%; FROM CARGO TK
2DC TO SHIPS OIL FUEL TK 5C .
13-Oct-19 I
INT SDG-5C- 2.5MT(3M3),QTY RETND 5C-25.7MT(31M3)
RANJEET SINGH CHIEF ENGINEER 13 OCT 2019
18-Oct-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-3.05M3
11.4 0.03M3 PURIFIER DRAINS AND TRAYS
RANJEET SINGH CHIEF ENGINEER 18 OCT 2019
INTERNAL TRANSFER OF 23.77MT(28.65M3) HFHSD,S-0.136%,FROM
CARGO TK 1DC,2DC,3DC,2DP&2DS TO SHIP OIL FUEL TK 5C
20-0CT-19 I
INITIAL SDG 5C- 7M3(5.81MT), QTY RETND 5C- 35.65M3(29.58MT)
RANJEET SINGH CHIEF ENGINEER 20-OCT-2019
INTERNAL TRANSFER OF 24.48MT(29.5M3) HFHSD,S-0.136%,FROM CARGO
TK 3DP & 3DS TO SHIP OIL FUEL TK 5C.
24-Oct-19 I
INITIAL SDG 5C -5.5M3(4.56MT), QTY RETND 5C-35M3(29.05MT)
RANJEET SINGH CHIEF ENGINEER 24-OCT-19
27-Oct-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-3.15M3
11.4 0.1M3 USED OIL FROM DG1 ROUTINE.
RANJEET SINGH CHIEF ENGINEER 27-OCT-19
1-Nov-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-5.75M3
11.4 2.6M3 USED OIL FROM PME
RANJEET SINGH CHIEF ENGINEER 01-NOV-19
0.7M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
13
01-N0V-19 D
14 1350HRS TO 1420 HRS
15.3 CAPACITY-18.4M3,QTY RETAINED=8.5M3
RANJEET SINGH CHIEF ENGINEER 01-N0V-19
INTERNAL TRANSFER OF 13.2 M3 (10.95MT)HFHSD, S-0.136%,FROMCARGO
TK 1DC TO SHIP FUEL OIL TK 5C
3-Nov-19 I
INITIAL SDG 5C-5.3M3(4.39MT),QTY RETAINED-18.5M3(15.35MT)
RANJEET SINGH CHIEF ENGINEER 03-NOV-19
6-Nov-19 H 26.1 NHAVA BASE JETTY1, FROM ONGC SHORE TERMINAL ONGC SUPPLY
26.2 0910 HRS TO 1050 HRS
26.3 24.9MT(30M3) HFHSD, S- 0.0008% LOADED IN SHIP F.O TANK 5C
INITIAL SDGS 5DC-0.08M3(0.06MT)
QTY ADDED- 30M3(24.9MT)
QTY RETAINED -30.08M3(24.96MT)
T.P SAJEEV CHIEF ENGINEER 06-NOV-19
INTERNAL TRANSFER OF 22M3(18.26MT), HFHSD, S-0.0008%,FROM CARGO
TK 1DP & 1DS TO SHIP FUEL OIL TK 4DC
8-Nov-19 I
INITIAL SDGS 4DC-0.70M3(0.58MT),QTY RETAINED-22.7M3(18.84MT)
T.P SAJEEV CHIEF ENGINEER 08-NOV-19
8-Nov-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-5.78M3
11.4 0.03M3 FROM PURIFIER DRAINS
T.P SAJEEV CHIEF ENGINEER 08-NOV-19
INTERNAL TRANSFER OF 20M3(16.6MT),HFHSD, S-0.0008%, FROM CARGO
TK 1DP & 1 DS TO SHIP FUEL OIL TK 4DC.
10-Nov-19 I
INITIAL SDGS 4DC-5.05M3(4.19MT), QTY RETAINED -25.05M3(20.79MT)

T.P SAJEEV CHIEF ENGINEER 10-NOV-19


INTERNAL TRANSFER OF 24M3 (19.92MT) , HFHSD, S-0.0008%, FROM
CARGO TK 2DP&2DS TO SHIP FUEL OIL TK 5C.
11/13/2019 I
INITIAL SDGS 5C-5.7M3(4.73MT), QTY RETAINED -29.7M3(24.65MT)
T.P SAJEEV CHIEF ENGINEER 13-NOV-19
15-Nov-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-5.81M3
11.4 0.03M3 FROM PURIFIER DRAINS
T.P SAJEEV CHIEF ENGINEER 15-NOV-19
INTERNAL TRANSFER OF 21.26M3(17.64MT),HFHSD,S-0.0008%,FROM
CARGO TK 1DP,1DS,2DP & 2DS TO SHIP FUEL OIL TK 5C.
16-Nov-19 I
INITIAL SDGS 5C-7.82M3(6.49MT),QTY RETAINED-29.08M3(24.13MT)
T.P SAJEEV CHIEF ENGINEER 16-NOV-19
17-Nov-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-5.9M3
11.4 0.09M3 DG2 ROUTINE.
T.P SAJEEV CHIEF ENGINEER 17-NOV-19
INTERNAL TRANSFER OF 25M3(20.95MT),HFHSD,S-0.0008%,FROM CARGO
TK 2DC TO SHIP FUEL OIL TK 5C.
19-Nov-19 I
INITIAL SDGS 5C-4.08M3(3.41MT),QTY RETAINED-29.08M3(24.36MT)
T.P SAJEEV CHIEF ENGINEER 19-NOV-19
INTERNAL TRANSFER OF 10.54M3(8.83MT),HFHSD,S-0.0008%,FROM
CARGO TK 2DC TO SHIP FUEL OIL TK 5C.
21-Nov-19 I
INITIAL SDGS 5C-14.7M3(12.3MT),QTY RETAINED-25.24M3(21.51MT)
T.P SAJEEV CHIEF ENGINEER 21-NOV-19
25-Nov-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-5.93M3
11.4 0.03M3 FROM PURIFIER DRAINS
T.P SAJEEV CHIEF ENGINEER 25-NOV-19
INTERNAL TRANSFER OF 26M3(21.78MT),HFHSD,S-0.0008%,FROM CARGO
TK 1DP& 1DS TO SHIP FUEL OIL TK 5C.
25-Nov-19 I
INITIAL SDGS 5C-4.23M3(3.54MT),QTY RETAINED-30.23M3(25.33MT)
T.P SAJEEV CHIEF ENGINEER 25-NOV-19
INTERNAL TRANSFER OF 24.2M3(20.27MT),HFHSD,S-0.0008%,FROM
CARGO TK 1DP& 1DS TO SHIP FUEL OIL TK 5C.
29-Nov-19 I
INITIAL SDGS 5C-4.87M3(4.08MT),QTY RETAINED-29.07M3(24.36MT)
T.P SAJEEV CHIEF ENGINEER 29-NOV-19
1-Dec-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-5.96M3
11.4 0.03M3 FROM PURIFIER DRAINS
T.P SAJEEV CHIEF ENGINEER 01-DEC-19
3-Dec-19 D 13 0.6M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
14 1310 HRS TO 1325 HRS
15.3 CAPACITY-18.4M3,QTY RETAINED=9.1M3
T.P SAJEEV CHIEF ENGINEER 03-DEC-19
INTERNAL TRANSFER OF 28.1M3(23.54MT),HFHSD,S-0.0008%,FROM
CARGO TK 2DP& 2DS TO SHIP FUEL OIL TK 5C.
3-Dec-19 I
INITIAL SDGS 5C-3.41M3(2.85MT),QTY RETAINED-31.51M3(26.4MT)
T.P SAJEEV CHIEF ENGINEER 03-DEC-19
INTERNAL TRANSFER OF 26.7M3(22.37MT),HFHSD,S-0.0008%,FROM
CARGO TK 2DC& 3DS TO SHIP FUEL OIL TK 5C.
8-Dec-19 I
INITIAL SDGS 5C-1.75M3(1.46MT),QTY RETAINED-28.45M3(23.84MT)
T.P SAJEEV CHIEF ENGINEER 08-DEC-19
8-Dec-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-5.99M3
11.4 0.03M3 FROM PURIFIER DRAINS
T.P SAJEEV CHIEF ENGINEER 08-DEC-19
13-Dec-19 D 13 1 M3 FROM BILGE HOLDING TANK
START-1825 HRS,18˚59.50' NORTH; 072˚07.35'EAST; STOP-1930 HRS-
14 18˚55.03'NORTH ; 072˚ 18.09' EAST(1317HRS-1422HRS 15PPM MONITOR
TIME)

THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY


15.1 RETND-8.1M3
T.P SAJEEV CHIEF ENGINEER 13-DEC-19
INTERNAL TRANSFER OF 31M3(25.7MT),HFHSD,S-0.0008%,FROM CARGO
TK 1DP& 1DS TO SHIP FUEL OIL TK 5C.
14-Dec-19 I
INITIAL SDGS 5C-1.4M3(1.2MT),QTY RETAINED-32.4M3(26.9MT)
T.P SAJEEV CHIEF ENGINEER 14-DEC-19
15-Dec-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-6.02M3
11.4 0.03M3 FROM PURIFIER DRAINS
T.P SAJEEV CHIEF ENGINEER 15-DEC-19
INTERNAL TRANSFER OF 27.2M3(22.6MT),HFHSD,S-0.0008%,FROM CARGO
TK 1DC& 1DS TO SHIP FUEL OIL TK 5C.
17-Dec-19 I
INITIAL SDGS 5C-6M3(4.98MT),QTY RETAINED-33.2M3(27.5MT)
T.P SAJEEV CHIEF ENGINEER 17-DEC-19
19-Dec-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-8.52M3
11.4 2.5 M3 USED OIL FROM STBD. M/E SUMP
T.P SAJEEV CHIEF ENGINEER 19-DEC-19
INTERNAL TRANSFER OF 31.1M3(25.81MT),HFHSD,S-0.0008%,FROM
CARGO TK 1P& 1S TO SHIP FUEL OIL TK 5C.
20-Dec-19 I
INITIAL SDGS 5C-0.18M3(0.15MT),QTY RETAINED-31.28M3(25.96MT)
T.P SAJEEV CHIEF ENGINEER 20-DEC-19
26-Dec-19 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-8.54M3
11.4 0.02M3 FROM PURIFIER DRAINS
T.P SAJEEV CHIEF ENGINEER 26-DEC-19
INTERNAL TRANSFER OF 34.08M3(28.29MT),HFHSD,S-0.0008%,FROM
CARGO TK 2DP& 2DS TO SHIP FUEL OIL TK 5C.
26-Dec-19 I
INITIAL SDGS 5C-0.67M3(0.56MT),QTY RETAINED-34.75M3(28.84MT)
T.P SAJEEV CHIEF ENGINEER 26-DEC-19
INTERNAL TRANSFER OF 25.63M3(21.02MT),HFHSD,S-0.0005%,FROM
CARGO TK 1DC,1DP& 2DP TO SHIP FUEL OIL TK 5C.
1-Jan-20 I
INITIAL SDGS 5C-2.77M3(2.27MT),QTY RETAINED-28.4M3(23.28MT)
T.P SAJEEV CHIEF ENGINEER 01-JAN-20
2-Jan-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-8.57M3
11.4 0.03M3 FROM PURIFIER DRAINS
T.P SAJEEV CHIEF ENGINEER 02-JAN-20
INTERNAL TRANSFER OF 28.45M3(23.3MT),HFHSD,S-0.0005%,FROM
CARGO TK 1DS & 2DC TO SHIP FUEL OIL TK 5C.
4-Jan-20 I
INITIAL SDGS 5C-4.2M3(3.44MT),QTY RETAINED-32.65M3(26.77MT)
T.P SAJEEV CHIEF ENGINEER 04-JAN-20
9-Jan-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-8.6M3
11.4 0.03M3 FROM PURIFIER DRAINS
T.P SAJEEV CHIEF ENGINEER 09-JAN-20
INTERNAL TRANSFER OF 31.14M3(25.53MT),HFHSD,S-0.0005%,FROM
CARGO TK 3DS & 3DP TO SHIP FUEL OIL TK 5C.
9-Jan-20 I
INITIAL SDGS 5C-3.36M3(2.75MT),QTY RETAINED-34.5M3(28.29MT)
T.P SAJEEV CHIEF ENGINEER 09-JAN-20
11-Jan-20 D 13 0.5M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
14 1130 HRS TO 1145 HRS
15.3 CAPACITY-18.4M3,QTY RETAINED=8.6M3
T.P SAJEEV CHIEF ENGINEER 11-JAN-20
INTERNAL TRANSFER OF 30.4M3(24.9MT),HFHSD,S-0.0005%,FROM CARGO
TK 3DS , 3DP & 2DC TO SHIP FUEL OIL TK 5C.
13-Jan-20 I
INITIAL SDGS 5C-3.2M3(2.62MT),QTY RETAINED-33.6M3(27.55MT)
T.P SAJEEV CHIEF ENGINEER 13-JAN-20
16-Jan-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-8.63M3
11.4 0.03M3 FROM PURIFIER DRAINS
T.P SAJEEV CHIEF ENGINEER 16-JAN-20
16-Jan-20 D 13 0.8M3 FROM BILGE HOLDING TANK
START-1555 HRS,19˚19.40' NORTH; 072˚20.008'EAST; STOP-1657 HRS-
14 19˚15.76'NORTH ; 072˚ 12.40' EAST(10:48HRS-11:50HRS 15PPM MONITOR
TIME)

THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY


15.1 RETND-7.8M3
SALMAN FARCY 3RD ENGINEER 16-JAN-2020
INTERNAL TRANSFER OF 36.24M3(30.07MT),HFHSD,S-0.0008%,FROM
CARGO TK 1P & 1S TO SHIP FUEL OIL TK 5C.
19-Jan-20 I
INITIAL SDGS 5C-0.7M3(0.58MT),QTY RETAINED-36.94M3(30.66MT)
PANKAJ BHATT 2ND ENGINEER 19-JAN-20
INTERNAL TRANSFER OF 18.38M3(15.25MT),HFHSD,S-0.0008%,FROM
CARGO TK 2DP & 2DS TO SHIP FUEL OIL TK 5C.
22-Jan-20 I
INITIAL SDGS 5C-4.27M3(3.54MT),QTY RETAINED-22.65M3(18.79MT)
PANKAJ BHATT 2ND ENGINEER 22-JAN-20
23-Jan-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-8.66M3
11.4 0.03M3 FROM PURIFIER DRAINS
T.P SAJEEV CHIEF ENGINEER 23-JAN-20
INTERNAL TRANSFER OF 28.63M3(23.76MT),HFHSD,S-0.0008%,FROM
CARGO TK 2DP, 2DS & 2DC TO SHIP FUEL OIL TK 5C.
25-Jan-20 I
INITIAL SDGS 5C-2.77M3(2.29MT),QTY RETAINED-31.4M3(26.06MT)
SALMAN FARCY 3RD ENGINEER 25-JAN-2020
30-Jan-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-8.69M3
11.4 0.03M3 FROM PURIFIER DRAINS
SALMAN FARCY 3RD ENGINEER 30-JAN-20
INTERNAL TRANSFER OF 25.89M3(21.49MT),HFHSD,S-0.0008%,FROM
CARGO TK 2DC TO SHIP FUEL OIL TK 5C.
30-Jan-20 I
INITIAL SDGS 5C- 3.9M3(3.23MT),QTY RETAINED-29.79M3(24.72MT)
SALMAN FARCY 3RD ENGINEER 30-JAN-2020
INTERNAL TRANSFER OF 33.49M3(27.79MT),HFHSD,S-0.0008%,FROM
CARGO TK 3DC TO SHIP FUEL OIL TK 5C.
2-Feb-20 I
INITIAL SDGS 5C- 1.9M3(1.57MT),QTY RETAINED-35.39M3(29.37MT)
PANKAJ BHATT 2ND ENGINEER 02-FEB-2020
6-Feb-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-8.73M3
11.4 0.04M3 FROM PURIFIER DRAIN AND TRAYS
SALMAN FARCY 3RD ENGINEER 06-FEB-20
INTERNAL TRANSFER OF 29.85M3(24.77MT),HFHSD,S-0.0008%,FROM
CARGO TK 1DP, 1DS & 3DC TO SHIP FUEL OIL TK 5C.
6-Feb-20 I
INITIAL SDGS 5C-2.64M3(2.19MT),QTY RETAINED-32.49M3(26.96MT)
SALMAN FARCY 3RD ENGINEER 06-FEB-2020
7-Feb-20 D 13 0.5M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
14 1015 HRS TO 1035 HRS
15.3 CAPACITY-18.4M3,QTY RETAINED=8.3M3
PANKAJ BHATT 2ND ENGINEER 07-FEB-20
INTERNAL TRANSFER OF 22.86M3(18.97MT),HFHSD,S-0.0008%,FROM
CARGO TK 1DS, 1DP TO SHIP FUEL OIL TK 5C.
11-Feb-20 I
INITIAL SDGS 5C-0.8M3(0.66MT),QTY RETAINED-23.66M3(19.63MT)
SALMAN FARCY 3RD ENGINEER 11-FEB-2020
13-Feb-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-8.76M3
11.4 0.03M3 FROM PURIFIER DRAIN AND TRAYS
PANKAJ BHATT 2ND ENGINEER 13-FEB-20
INTERNAL TRANSFER OF 19.18M3(15.91MT),HFHSD,S-0.0008%,FROM
CARGO TK 1DC TO SHIP FUEL OIL TK 5C.
13-Feb-20 I
INITIAL SDGS 5C-3.14M3(2.60MT),QTY RETAINED-22.32M3(18.52MT)
PANKAJ BHATT 2ND ENGINEER 13-FEB-2020
14-Feb-20 H 26.1 NHAVA BASE JETTY1, FROM ONGC SHORE TERMINAL ONGC SUPPLY
26.2 1555 HRS TO 1722 HRS
26.3 16.6MT(20M3) HFHSD, S- 0.0008% LOADED IN SHIP F.O TANK 5C
INITIAL SDGS 5C-8.5M3(7.05MT)
QTY ADDED- 20M3(16.6MT)
QTY RETAINED -28.5M3(23.65MT)
RANJEET SINGH CHIEF ENGINEER 14-FEB-20
INTERNAL TRANSFER OF 30.69M3(25.47MT),HFHSD,S-0.0008%,FROM
CARGO TK 1DP & 1DS TO SHIP FUEL OIL TK 5C.
17-Feb-20 I
INITIAL SDGS 5C-1.88M3(1.56MT),QTY RETAINED-32.57M3(27.03MT)
SALMAN FARCY 3RD ENGINEER 17-FEB-20
20-Feb-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-8.79M3
11.4 0.03M3 FROM PURIFIER DRAIN AND TRAYS
RANJEET SINGH CHIEF ENGINEER 20-FEB-20
INTERNAL TRANSFER OF 22.72M3(18.85MT),HFHSD,S-0.0008%,FROM
CARGO TK 1DP & 1DS TO SHIP FUEL OIL TK 5C.
21-Feb-20 I
INITIAL SDGS 5C-7.4M3(6.14MT),QTY RETAINED-30.12M3(24.99MT)
PANKAJ BHATT 2ND ENGINEER 21-FEB-20
INTERNAL TRANSFER OF 27.4M3(22.74MT),HFHSD,S-0.0008%,FROM
CARGO TK 1DC TO SHIP FUEL OIL TK 5C.
23-Feb-20 I
INITIAL SDGS 5C-3.6M3(2.98MT),QTY RETAINED-31M3(25.73MT)
SALMAN FARCY 3RD ENGINEER 23-FEB-20
25-Feb-20 D 13 0.9M3 FROM BILGE HOLDING TANK
START-1402 HRS,19˚40.3' NORTH; 070˚52.6'EAST; STOP-1505 HRS,
14 19˚32.5'NORTH ; 070˚ 53.5' EAST(08:53HRS-09:56HRS 15PPM MONITOR
TIME)

THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY


15.1 RETND-7.4M3
RANJEET SINGH CHIEF ENGINEER 25-FEB-20
27-Feb-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-8.82M3
11.4 0.03M3 FROM PURIFIER DRAIN AND TRAYS
RANJEET SINGH CHIEF ENGINEER 27-FEB-20
INTERNAL TRANSFER OF 32.34M3(26.84MT),HFHSD,S-0.0008%,FROM
CARGO TK 1DC & 2DC TO SHIP FUEL OIL TK 5C.
27-Feb-20 I
INITIAL SDGS 5C-1.84M3(1.52MT),QTY RETAINED-34.18M3(28.36MT)
SALMAN FARCY 3RD ENGINEER 27-FEB-20
INTERNAL TRANSFER OF 31.39M3(26.05MT),HFHSD,S-0.0008%,FROM
CARGO TK 2DP & 2DS TO SHIP FUEL OIL TK 5C.
3-Mar-20 I
INITIAL SDGS 5C-2.04M3(1.69MT),QTY RETAINED-33.43M3(27.74MT)
PANKAJ BHATT 2ND ENGINEER 03-MARCH-20
5-Mar-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-8.86M3
11.4 0.04M3 FROM PURIFIER DRAIN AND TRAYS
RANJEET SINGH CHIEF ENGINEER 05-MARCH-20
INTERNAL TRANSFER OF 31.22M3(25.91MT),HFHSD,S-0.0008%,FROM
CARGO TK 2DP, 2DC & 3DS TO SHIP FUEL OIL TK 5C.
7-Mar-20 I
INITIAL SDGS 5C-2.38M3(1.97MT),QTY RETAINED-33.6M3(27.88MT)
SALMAN FARCY 3RD ENGINEER 07-MARCH-20
9-Mar-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-8.9M3
11.4 0.04M3 DRAIN FROM DG-1 SUMP
RANJEET SINGH CHIEF ENGINEER 09-MARCH-20
10-Mar-20 D 13 0.7M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
14 0840 HRS TO 0905 HRS
15.3 CAPACITY-18.4M3,QTY RETAINED=8.1M3
PANKAJ BHATT 2ND ENGINEER 10-MARCH-20
INTERNAL TRANSFER OF 31.18M3(25.87MT),HFHSD,S-0.0008%,FROM
CARGO TK 3DP & 3DS TO SHIP FUEL OIL TK 5C.
10-Mar-20 I
INITIAL SDGS 5C-0.84M3(0.69MT),QTY RETAINED-32.02M3(26.57MT)
SALMAN FARCY 3RD ENGINEER 10-MARCH-20
INTERNAL TRANSFER OF 19.85M3(16.47MT),HFHSD,S-0.0008%,FROM
CARGO TK 3DC TO SHIP FUEL OIL TK 5C.
15-Mar-20 I
INITIAL SDGS 5C-3.68M3(3.05MT),QTY RETAINED-23.53M3(19.52MT)
PANKAJ BHATT 2ND ENGINEER 15-MARCH-20
16-Mar-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-8.93M3
11.4 0.03M3 FROM PURIFIER DRAIN AND TRAYS
RANJEET SINGH CHIEF ENGINEER 16-MARCH-20
INTERNAL TRANSFER OF 20.77M3(17.23MT),HFHSD,S-0.0008%,FROM
CARGO TK 3DC TO SHIP FUEL OIL TK 5C.
17-Mar-20 I
INITIAL SDGS 5C-5.34M3(4.43MT),QTY RETAINED-26.11M3(21.67MT)
SALMAN FARCY 3RD ENGINEER 17-MARCH-20
INTERNAL TRANSFER OF 28.74M3(23.85MT),HFHSD,S-0.0005%,FROM
CARGO TK 1P & 1S TO SHIP FUEL OIL TK 5C.
20-Mar-20 I
INITIAL SDGS 5C-3.81M3(3.16MT),QTY RETAINED-32.55M3(27.01MT)
SALMAN FARCY 3RD ENGINEER 20-MARCH-20
23-Mar-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-8.96M3
11.4 0.03M3 FROM PURIFIER DRAIN AND TRAYS
RANJEET SINGH CHIEF ENGINEER 23-MARCH-20
INTERNAL TRANSFER OF 29.76M3(24.7MT),HFHSD,S-0.0005%,FROM
CARGO TK 1P & 1DC TO SHIP FUEL OIL TK 5C.
24-Mar-20 I
INITIAL SDGS 5C-2.71M3(2.24MT),QTY RETAINED-32.47M3(26.95MT)
JAISANKAR 2ND ENGINEER 24-MARCH-20
26-Mar-20 D 13 0.4M3 FROM BILGE HOLDING TANK
START-1410 HRS,19˚19.10' NORTH; 071˚36.17'EAST; STOP-1445 HRS,
14 19˚17.6'NORTH ; 071˚ 41.5' EAST(09:01HRS-09:36HRS 15PPM MONITOR
TIME)

THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY


15.1 RETND-7.7M3
RANJEET SINGH CHIEF ENGINEER 26-MARCH-20
INTERNAL TRANSFER OF 25.95M3(21.53MT),HFHSD,S-0.0005%,FROM
CARGO TK 1DS & 1DC TO SHIP FUEL OIL TK 5C.
28-Mar-20 I
INITIAL SDGS 5C-3.08M3(2.55MT),QTY RETAINED-29.03M3(24.09MT)
SALMAN FARCY 3RD ENGINEER 28-MARCH-20
30-Mar-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-9 M3
11.4 0.04M3 FROM PURIFIER DRAIN AND TRAYS
RANJEET SINGH CHIEF ENGINEER 23-MARCH-20
INTERNAL TRANSFER OF 32.4M3(26.89MT),HFHSD,S-0.0005%,FROM
CARGO TK 2DC TO SHIP FUEL OIL TK 5C.
1-Apr-20 I
INITIAL SDGS 5C-0.94M3(0.78MT),QTY RETAINED-33.34M3(27.67MT)
JAISANKAR 2ND ENGINEER 01-APRIL-20
INTERNAL TRANSFER OF 26.7M3(22.16MT),HFHSD,S-0.0005%,FROM
CARGO TK 2DP & 2DS TO SHIP FUEL OIL TK 5C.
4-Apr-20 I
INITIAL SDGS 5C-2.33M3(1.93MT),QTY RETAINED-29.03M3(24.09MT)
SALMAN FARCY 3RD ENGINEER 04-APRIL-20
6-Apr-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-9.03M3
11.4 0.03M3 FROM PURIFIER DRAIN AND TRAYS
RANJEET SINGH CHIEF ENGINEER 06-APRIL-20
6-Apr-20 D 13 0.5M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
14 1130 HRS TO 1150 HRS
15.3 CAPACITY-18.4M3,QTY RETAINED=8.2M3
RANJEET SINGH CHIEF ENGINEER 06-APRIL-20
INTERNAL TRANSFER OF 29.62M3(24.58MT),HFHSD,S-0.0005%,FROM
CARGO TK 2DP, 2DS & 3DC TO SHIP FUEL OIL TK 5C.
9-Apr-20 I
INITIAL SDGS 5C-4.1M3(3.4MT),QTY RETAINED-33.72M3(27.98MT)
SALMAN FARCY 3RD ENGINEER 09-APRIL-20
13-Apr-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-9.06M3
11.4 0.03M3 FROM PURIFIER DRAIN AND TRAYS
RANJEET SINGH CHIEF ENGINEER 13-APRIL-20
INTERNAL TRANSFER OF 28.06M3(23.28MT),HFHSD,S-0.0005%,FROM
CARGO TK 3DC TO SHIP FUEL OIL TK 5C.
13-Apr-20 I
INITIAL SDGS 5C-1.68M3(MT),QTY RETAINED-29.74M3(24.68MT)
JAISANKAR 2ND ENGINEER 13-APRIL-20
INTERNAL TRANSFER OF 24.24M3(20.1MT),HFHSD,S-0.0005%,FROM
CARGO TK 3DS TO SHIP FUEL OIL TK 5C.
16-Apr-20 I
INITIAL SDGS 5C-6.8M3(5.54MT),QTY RETAINED-31.04M3(25.76MT)
SALMAN FARCY 3RD ENGINEER 16-APRIL-20
19-Apr-20 D 13 0.4M3 FROM BILGE HOLDING TANK
START-1544 HRS,19˚18.7' NORTH; 071˚30.7'EAST; STOP-1615 HRS,
14 19˚22.35'NORTH ; 071˚ 26.75' EAST(10:35HRS-11:06HRS 15PPM MONITOR
TIME)

THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY


15.1 RETND-7.8M3
RANJEET SINGH CHIEF ENGINEER 19-APRIL-20
INTERNAL TRANSFER OF 24M3(19.92MT),HFHSD,S-0.0005%,FROM CARGO
TK 3DP TO SHIP FUEL OIL TK 5C.
20-Apr-20 I
INITIAL SDGS 5C-4.48M3(3.71MT),QTY RETAINED-28.48M3(23.63MT)
JAISANKAR 2ND ENGINEER 20-APRIL-20
INTERNAL TRANSFER OF 26.2M3(21.74MT),HFHSD,S-0.0006%,FROM
CARGO TK 2DC TO SHIP FUEL OIL TK 5C.
22-Apr-20 I
INITIAL SDGS 5C-5.3M3(4.39MT),QTY RETAINED-31.5M3(26.14MT)
SALMAN FARCY 3RD ENGINEER 22-APRIL-20
22-Apr-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-9.1M3
11.4 0.04M3 FROM PURIFIER DRAIN AND TRAYS
RANJEET SINGH CHIEF ENGINEER 22-APRIL-20
INTERNAL TRANSFER OF 30.59M3(25.38MT),HFHSD,S-0.0006%,FROM
CARGO TK 1DC TO SHIP FUEL OIL TK 5C.
26-Apr-20 I
INITIAL SDGS 5C-2.43M3(2.01MT),QTY RETAINED-33.02M3(27.4MT)
SALMAN FARCY 3RD ENGINEER 26-APRIL-20
29-Apr-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-9.13M3
11.4 0.03M3 FROM PURIFIER DRAIN AND TRAYS
RANJEET SINGH CHIEF ENGINEER 29-APRIL-20
INTERNAL TRANSFER OF 29.81M3(24.74MT),HFHSD,S-0.0006%,FROM
CARGO TK 2DP & 2DS TO SHIP FUEL OIL TK 5C.
29-Apr-20 I
INITIAL SDGS 5C-1.6M3(1.33MT),QTY RETAINED-31.41M3(26.07MT)
SALMAN FARCY 3RD ENGINEER 29-APRIL-20
INTERNAL TRANSFER OF 25.58M3(21.23MT),HFHSD,S-0.0006%,FROM
CARGO TK 1DC & 2DC TO SHIP FUEL OIL TK 5C.
4-May-20 I
INITIAL SDGS 5C-2.85M3(2.36MT),QTY RETAINED-28.43M3(23.59MT)
SALMAN FARCY 3RD ENGINEER 04-MAY-20
5-May-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-9.24M3
11.4 0.11M3 FROM DG-1 SUMP & PURIFIER DRAIN AND TRAYS
RANJEET SINGH CHIEF ENGINEER 05-MAY-20
8-May-20 D 13 0.7M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
14 1345 HRS TO 1415 HRS
15.3 CAPACITY-18.4M3,QTY RETAINED=8.5M3
RANJEET SINGH CHIEF ENGINEER 08-MAY-20
INTERNAL TRANSFER OF 32.65M3(27.09MT),HFHSD,S-0.0006%,FROM
CARGO TK 2DC & 3DC TO SHIP FUEL OIL TK 5C.
9-May-20 I
INITIAL SDGS 5C-1.2M3(0.99MT),QTY RETAINED-33.85M3(28.09MT)
JAISANKAR 2ND ENGINEER 09-MAY-20
12-May-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-9.26M3
11.4 0.02M3 FROM PURIFIER DRAIN AND TRAYS
RANJEET SINGH CHIEF ENGINEER 12-MAY-20
INTERNAL TRANSFER OF 16.54M3(13.72MT),HFHSD,S-0.0006%,FROM
CARGO TK 3DC TO SHIP FUEL OIL TK 5C.
14-May-20 I
INITIAL SDGS 5C-1.6M3(1.32MT),QTY RETAINED-18.14M3(15.05MT)
JAISANKAR 2ND ENGINEER 14-MAY-20
INTERNAL TRANSFER OF 32.47M3(26.95MT),HFHSD,S-0.0006%,FROM
CARGO TK 1DP, 1DS & 1DC TO SHIP FUEL OIL TK 5C.
18-May-20 I
INITIAL SDGS 5C-1.33M3(1.10MT),QTY RETAINED-33.8M3(28.05MT)
SALMAN FARCY 3RD ENGINEER 18-MAY-20
19-May-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-9.29M3
11.4 0.03M3 FROM PURIFIER DRAIN AND TRAYS
RANJEET SINGH CHIEF ENGINEER 19-MAY-20
INTERNAL TRANSFER OF 26.39M3(21.90MT),HFHSD,S-0.0006%,FROM
CARGO TK 1DC TO SHIP FUEL OIL TK 5C.
21-May-20 I
INITIAL SDGS 5C-3.41M3(2.83MT),QTY RETAINED-29.8M3(24.73MT)
SALMAN FARCY 3RD ENGINEER 21-MAY-20
26-May-20 D 13 0.9M3 FROM BILGE HOLDING TANK
START-1621 HRS,19˚18.6' NORTH; 071˚13.7'EAST; STOP-1723 HRS,
14 19˚14.9'NORTH ; 071˚ 05.9' EAST(11:16HRS-12:18HRS 15PPM MONITOR
TIME)
THROUGH 15 PPM EQUIPMENT, TANK HOLDING CAPACITY-18.4M3, QTY
15.1 RETND-7.6M3
RANJEET SINGH CHIEF ENGINEER 26-MAY-20
26-May-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-9.32M3
11.4 0.03M3 FROM OWS, PURIFIER DRAIN AND TRAYS
RANJEET SINGH CHIEF ENGINEER 26-MAY-20
INTERNAL TRANSFER OF 25.97M3(21.55MT),HFHSD,S-0.0006%,FROM
CARGO TK 1DC & 2DP TO SHIP FUEL OIL TK 5C.
26-May-20 I
INITIAL SDGS 5C-4.64M3(3.85MT),QTY RETAINED-30.61M3(25.4MT)
SALMAN FARCY 3RD ENGINEER 26-MAY-20
INTERNAL TRANSFER OF 19.82M3(16.45MT),HFHSD,S-0.0006%,FROM
CARGO TK 2DS TO SHIP FUEL OIL TK 5C.
30-May-20 I
INITIAL SDGS 5C-5.3M3(4.39MT),QTY RETAINED-25.12M3(20.84MT)
JAISANKAR 2ND ENGINEER 30-MAY-20
2-Jun-20 C 11.1 DIRTY OIL TANK
11.2 CAPACITY- 18.4M3
11.3 QTY RETAINED-9.34M3
11.4 0.02M3 FROM PURIFIER DRAIN AND TRAYS
RANJEET SINGH CHIEF ENGINEER 02-JUNE-20
INTERNAL TRANSFER OF 16.32M3(13.54MT),HFHSD,S-0.0006%,FROM
CARGO TK 3DC TO SHIP FUEL OIL TK 5C.
2-Jun-20 I
INITIAL SDGS 5C-2.4M3(1.99MT),QTY RETAINED-18.72M3(15.53MT)
JAISANKAR 2ND ENGINEER 02-JUNE-20
INTERNAL TRANSFER OF 22.64M3(18.79MT),HFHSD,S-0.0006%,FROM
CARGO TK 3DS TO SHIP FUEL OIL TK 5C.
4-Jun-20 I
INITIAL SDGS 5C-5M3(4.15MT),QTY RETAINED-27.64M3(22.94MT)
SALMAN FARCY 3RD ENGINEER 04-JUNE-20
5-Jun-20 D 13 0.5M3 ER BILGE WATER TRANSFERRED TO BILGE HOLDING TANK
14 0900 HRS TO 0920 HRS
15.3 CAPACITY-18.4M3,QTY RETAINED=8.1M3
RANJEET SINGH CHIEF ENGINEER 05-JUNE-20
BILGE 3.877M3
dirty, 24/08- 72cms=10.03m3
bilge, 24/8-46cms= 6.55m3
24-Sep
26-Sep

26-Sep

26-Sep

26-Sep
5-Nov

5-Nov
14.15

0.37
ACTUAL
SULDGE 103CM 13.8M3 AFTER TR OFWATER FROM SLUDGE TO BILGE ON 26 AUG

ACTUAL
BILGE 55CM 7.7M3 AFTER TR OFWATER FROM SLUDGE TO BILGE ON 26 AUG

ACTUAL
BILGE 55CM 7.7M3 AFTER TR OFWATER FROM SLUDGE TO BILGE ON 26 AUG
120CM 16M3
62 CMS 8.5

113 15.5

88 12.1
120 16

84 11.7

122 16.6

77 10.7

122 16.6
77 10.7

110 15.1

77 10.7

115 15.7

77 10.7
DATE Code Item
3-Jul-17 B 4.1
4.2
5

6-Jul-17 B 4.1
4.2
5

10-Jul-17 A 1

16-Jul-17 B 4.1
4.2
5

16-Jul-17 B 4.1
4.2
5

B 4.1
4.2
5

21-Jul-17 B 4.1
4.2
5

26-Jul-17 B 4.1
4.2
5
29-Jul-17 A 1
2

1-Aug-17 C 6
7

3-Aug-17 B 4.1
4.2
5

8-Aug-17 B 4.1
4.2
5

10-Aug-17 B 4.1
4.2
5

14-Aug-17 B 4.1
4.2
5

25-Aug-17 A 1
2

3
31-Aug-17 B 4.1
4.2
5

4-Sep-17 B 4.1
4.2
5

11-Sep-17 A 1

15-Sep-17 B 4.1
4.2
5

19-Sep-17 B 4.1
4.2
5

22-Sep-17 B 4.1
4.2
5

26-Sep-17 B 4.1
4.2
5

29-Sep-17 B 4.1
4.2
5

1-Oct-17 B 4.1
4.2

3-Oct-17 B 4.1
4.2
5

6-Oct-17 A 1

2
3

6-Oct-17 B 4.1
4.2
5

9-Oct-17 B 4.1
4.2
5

10-Oct-17 B 4.1
4.2
5

15/10/2017 B 4.1
4.2
5

17/10/2017 B 4.1
4.2
5
19-Oct-17 A 1

2
3

22/10/2017 B 4.1
4.2

25/10/2017 B 4.1
4.2
5

29/10/2017 B 4.1
4.2
5

7-Nov-17 B 4.1
4.2
5

12-Nov-17 B 4.1
4.2
5

13-Nov-17 B 4.1
4.2
5

17-Nov-17 A 1

2
3
18-Nov-17 C 6
7

19-Nov-17 C 6
7
8

20-Nov-17 C 6
7
8

24-Nov-17 B 4.1
4.2
5

3-Mar-18 B 4.1
4.2
5

4-Mar-18 B 4.1
4.2
5

6-Mar-18 A 1

2
3
6-Mar-18 C 6
7
8

7-Mar-18 C 6
7
8

8-Mar-18 C 6
7
8

10-Mar-18 C 6
7
8

11-Mar-18 B 4.1
4.2
5

11-Mar-18 B 4.1
4.2
5

11-Mar-18 B 4.1
4.2
5

12-Mar-18 A 1

2
3

14-Mar-18 C 6
7
8

17-Mar-18 B 4.1
4.2
5

18-Mar-18 A 1

2
3

21-Mar-18 B 4.1
4.2
5

21-Mar-18 B 4.1
4.2
5

24-Mar-18 B 4.1
4.2
5

24-Mar-18 B 4.1
4.2
5

25-Mar-18 B 4.1
4.2
5

26-Mar-18 B 4.1
4.2
5

28-Mar-18 B 4.1
4.2
5

2-Apr-18 C 6
7
8

5-Apr-18 B 4.1
4.2
5

9-Apr-18 B 4.1
4.2
5

12-Apr-18 A 1

2
3

13-Apr-18 B 4.1
4.2
5

16-Apr-18 B 4.1
4.2
5

20-Apr-18 A 1

2
3

24-Apr-18 B 4.1
4.2
5

27-Apr-18 B 4.1
4.2
5

27-Apr-18 A 1
2
3

30-Apr-18 B 4.1
4.2
5

4-May-18 B 4.1
4.2
5

12-May-18 A 1

2
3

13-May-18 B 4.1
4.2
5

17-May-18 B 4.1
4.2
5

19-May-18 B 4.1
4.2

22-May-18 B 4.1
4.2
5

24-May-18 B 4.1
4.2
5

27-May-18 B 4.1
4.2
5

2-Jun-18 B 4.1
4.2
5

6-Jun-18 C 6
7
8

7-Jun-18 B 4.1
4.2
5

8-Jun-18 C 6
7
8

8-Jun-18 B 4.1
4.2
5

15-Jun-18 B 4.1
4.2

22-Jun-18 A 1
2
3

24-Jun-18 B 4.1
4.2
5
25-Jun-18 A 1

2
3

29-Jun-18 B 4.1
4.2
5

7-Jul-18 B 4.1
4.2

10-Jul-18 B 4.1
4.2
5

16-Jul-18 B 4.1
4.2
5

27-Jul-18 A 1

2
3

28-Jul-18 C 6
7
8

28-Jul-18 C 6
7
8

29-Jul-18 C 6
7
8

31-Jul-18 B 4.1
4.2

3-Aug-18 B 4.1
4.2

3-Aug-18 A 1

2
3

6-Aug-18 B 4.1
4.2

11-Aug-18 B 4.1
4.2
5

16-Aug-18 B 4.1
4.2
5

22-Aug-18 A 1

2
3

23-Aug-18 B 4.1
4.2
5

24-Aug-18 C 6
7
8

24-Aug-18 C 6
7
8

24-Aug-18 C 6
7
8

26-Aug-18 B 4.1
4.2
5

31-Aug-18 B 4.1
4.2
5

4-Sep-18 A 1
2
3

4-Sep-18 B 4.1
4.2
5

8-Sep-18 C 6
7
8

9-Sep-18 A 1

2
3

10-Sep-18 C 6
7
8

11-Sep-18 C 6
7
8

15-Sep-18 B 4.1
4.2
5

19-Sep-18 B 4.1
4.2
5

22-Sep-18 B 4.1
4.2
5

23-Sep-18 C 6
7
8

26-Sep-18 B 4.1
4.2
5

27-Sep-18 A 1
2
3

30-Sep-18 B 4.1
4.2
5

6-Oct-18

7-Oct-18 A 1

2
3

13-Oct-18 B 4.1
4.2
5

18-Oct-18 B 4.1
4.2
5

22-Oct-18 B 4.1
4.2
5

31-Oct-18 B 4.1
4.2
5
4-Nov-18 B 4.1
4.2

6-Nov-18 A 1

2
3

8-Nov-18 B 4.1
4.2

11-Nov-18 B 4.1
4.2
5

12-Nov-18 A 1

2
3

15-Nov-18 C 6

7
8

18-Nov-18 B 4.1
4.2
5

4-Dec-18 B 4.1
4.2
5

7-Dec-18 B 4.1
4.2

11-Dec-18 B 4.1
4.2

15-Dec-18 B 4.1
4.2

21-Dec-18 B 4.1
4.2

21-Dec-18 C 6

7
8

25-Dec-18 A 1

2
3
28-Dec-18 B 4.1
4.2

1-Jan-19 B 4.1
4.2

8-Jan-19 B 4.1
4.2
5

12-Jan-19 B 4.1
4.2

14-Jan-19 B 4.1
4.2
5

16-Jan-19 A 1

2
3

20-Jan-19 B 4.1
4.2

24-Jan-19 B 4.1
4.2
5

25-Jan-19 B 4.1
4.2

29-Jan-19 B 4.1
4.2
5

2-Feb-19 B 4.1
4.2

5-Feb-19 B 4.1
4.2

7-Feb-19 B 4.1
4.2
5

11-Feb-19 B 4.1
4.2

11-Feb-19 C 6

7
8

12-Feb-19 B 4.1
4.2

13-Feb-19 A 1

2
3

15-Feb-19 C 6

7
8

16-Feb-19 C 6

7
8

17-Feb-19 B 4.1
4.2

21-Feb-19 B 4.1
4.2

23-Feb-19 B 4.1
4.2
5

28-Feb-19 B 4.1
4.2

1-Mar-19 A 1

2
3

4-Mar-19 B 4.1
4.2

7-Mar-19 B 4.1
4.2

7-Mar-19 A 1

2
3

11-Mar-19 B 4.1
4.2

12-Mar-19 C 6

7
8
13-Mar-19 B 4.1
4.2
5

14-Mar-19 B 4.1
4.2
5

16-Mar-19 B 4.1
4.2

19-Mar-19 B 4.1
4.2

21-Mar-19 B 4.1
4.2

23-Mar-19 B 4.1
4.2

27-Mar-19 B 4.1
4.2

29-Mar-19 A 1

2
3
31-Mar-19 B 4.1
4.2

1-Apr-19 C 6

7
8

2-Apr-19 B 4.1
4.2

4-Apr-19 B 4.1
4.2
5

6-Apr-19 B 4.1
4.2

9-Apr-19 B 4.1
4.2
5

13-Apr-19 B 4.1
4.2

17-Apr-19 B 4.1
4.2

18-Apr-19 C 6

7
8

19-Apr-19 B 4.1
4.2
5

20-Apr-19 A 1

2
3

22-Apr-19 C 6

7
8

26-Apr-19 C 6

7
8

27-Apr-19 B

30-Apr-19 B

3-May-19 B

4-May-19 A 1

2
3

6-May-19 B 4.1
4.2

7-May-19 C 6

7
8

8-May-19 C 6

7
8

9-May-19 A 1

2
3

10-May-19 C 6

13-May-19 B 4.1
4.2
5

19-May-19 A 1

2
3

19-May-19 A 1

2
3

20-May-19 C 6

23-May-19 C 6

23-May-19 B 4.1
4.2

5
24-May-19 A 1

2
3

27-May-19 B 4.1
4.2

30-May-19 A 1

2
3

31-May-19 B 4.1
4.2

2-Jun-19 C 6

7
8

2-Jun-19 C 6

7
8

7-Jun-19 B 4.1
4.2

13-Jun-19 B 4.1
4.2

16-Jun-19 B 4.1
4.2

18-Jun-19 B 4.1
4.2
5

20-Jun-19 A 1

2
3

22-Jun-19 C 6
7

23-Jun-19 B 4.1
4.2

27-Jun-19 B 4.1
4.2

1-Jul-19 B 4.1
4.2

5-Jul-19 B 4.1
4.2

9-Jul-19 B 4.1
4.2

11-Jul-19 B 4.1
4.2

15-Jul-19 A 1

2
3
16-Jul-19 B 4.1
4.2

17-Jul-19 C 6

18-Jul-19 B 4.1
4.2

21-Jul-19 B 4.1
4.2
5

28-Jul-19 B 4.1
4.2

29-Jul-19 B 4.1
4.2

1-Aug-19 A 1
2
3

5-Aug-19 B 4.1
4.2

6-Aug-19 C 6

7
8

9-Aug-19 B 4.1
4.2

11-Aug-19 A 1

2
3

12-Aug-19 B 4.1
4.2
5

13-Aug-19 C 6

14-Aug-19 C 6

15-Aug-19 B 4.1
4.2

18-Aug-19 B 4.1
4.2

24-Aug-19 B 4.1
4.2

26-Aug-19 A 1

2
3
30-Aug-19 B 4.1
4.2

30-Aug-19 A 1

2
3

31-Aug-19 C 6

7
8

1-Sep-19 C 6

1-Sep-19 B 4.1
4.2

4-Sep-19 B 4.1
4.2
5

10-Sep-19 B 4.1
4.2

12-Sep-19 B 4.1
4.2

13-Sep-19 A 1

2
3

15-Sep-19 B 4.1
4.2

17-Sep-19 B 4.1
4.2

19-Sep-19 B 4.1
4.2

21-Sep-19 B 4.1
4.2

5
22-Sep-19 A 1

2
3

23-Sep-19 C 6

7
8

26-Sep-19 B 4.1
4.2

1-Oct-19 B 4.1
4.2

5-Oct-19 B 4.1
4.2

9-Oct-19 B 4.1
4.2

12-Oct-19 C 6

7
8
13-Oct-19 B 4.1
4.2

16-Oct-19 A 1
2
3

20-Oct-19 C 6

20-Oct-19 B 4.1
4.2

24-0CT-19 B 4.1
4.2

3-Nov-19 B 4.1
4.2
5

6-Nov-19 A 1
2
3

08-N0V-19 B 4.1
4.2

10-Nov-19 B 4.1
4.2

13-Nov-19 B 4.1
4.2

16-Nov-19 B 4.1
4.2
5
19-Nov-19 B 4.1
4.2

21-Nov-19 B 4.1
4.2

23-N0V-19 A 1
2
3

25-Nov-19 B 4.1
4.2

29-Nov-19 B 4.1
4.2
5

3-Dec-19 B 4.1
4.2

4-Dec-19 C 6

7
8

7-Dec-19 C 6
7
8

8-Dec-19 B 4.1
4.2
5

11-Dec-19 A 1
2
3

11-Dec-19 C 6

7
8

14-Dec-19 B 4.1
4.2
5

17-Dec-19 B 4.1
4.2
5

20-Dec-19 B 4.1
4.2
5

26-Dec-19 B 4.1
4.2
5

29-Dec-19 A 1
2
3

30-Dec-19 C 6

7
8

1-Jan-20 B 4.1
4.2
5

4-Jan-20 B 4.1
4.2
5

9-Jan-20 B 4.1
4.2
5

13-Jan-20 B 4.1
4.2
5

13-Jan-20 A 1
2
3
19-Jan-20 B 4.1
4.2
5

22-Jan-20 B 4.1
4.2
5

25-Jan-20 B 4.1
4.2
5

30-Jan-20 B 4.1
4.2
5

2-Feb-20 B 4.1
4.2
5

6-Feb-20 B 4.1
4.2
5

10-Feb-20 C 6
7

11-Feb-20 C 6
7

8
11-Feb-20 B 4.1
4.2
5

12-Feb-20 C 6
7

13-Feb-20 B 4.1
4.2
5

14-Feb-20 A 1
2
3

17-Feb-20 B 4.1
4.2
5

21-Feb-20 B 4.1
4.2
5

23-Feb-20 B 4.1
4.2
5

27-Feb-20 B 4.1
4.2
5

3-Mar-20 B 4.1
4.2
5

7-Mar-20 B 4.1
4.2
5

10-Mar-20 B 4.1
4.2
5

15-Mar-20 B 4.1
4.2
5

17-Mar-20 B 4.1
4.2
5

17-Mar-20 A 1
2
3

20-Mar-20 B 4.1
4.2
5

24-Mar-20 B 4.1
4.2
5

24-Mar-20 C 6
7

28-Mar-20 B 4.1
4.2
5

1-Apr-20 B 4.1
4.2
5

4-Apr-20 B 4.1
4.2
5

9-Apr-20 B 4.1
4.2
5

13-Apr-20 B 4.1
4.2
5

16-Apr-20 B 4.1
4.2
5

18-Apr-20 A 1

2
3
20-Apr-20 B 4.1
4.2
5

22-Apr-20 B 4.1
4.2
5

22-Apr-20 A 1

2
3

26-Apr-20 B 4.1
4.2
5

29-Apr-20 B 4.1
4.2
5

4-May-20 B 4.1
4.2
5

9-May-20 B 4.1
4.2
5

14-May-20 B 4.1
4.2
5
15-May-20 A 1
2
3

18-May-20 C 6
7

18-May-20 C 6
7

18-May-20 B 4.1
4.2
5

21-May-20 B 4.1
4.2
5

26-May-20 B 4.1
4.2
5

30-May-20 B 4.1
4.2
5

31-May-20 C 6
7

1-Jun-20 C 6
7

2-Jun-20 B 4.1
4.2
5

4-Jun-20 B 4.1
4.2
5
Record of operations, signature of Officer-incharge
FO HFHSD FROM 2DC
TRANSFERRED 22.0M3 & 11.0M3 TO 4DC
QTY RETAINED IN 2DC-2.202M3
R. NARSIMHAN CHIEF ENGINEER 03 JULY 2017
FO HFHSD FROM 1DC
TRANSFERRED 23.0M3 TO 5C& 11.0M3 TO 4DC
QTY RETAINED IN 1DC-9.124M3
R. NARSIMHAN CHIEF ENGINEER 03 JULY 2017
NHAVA BASE. ONGC TERMINAL BUNKER POINT ON JETTY:1

HFFHSD, SULPHUR=0.156% LOADED IN 1P,1S,1DS,1DC,2P,2DP,


2DC, 3DS,3DC
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1P 15.256 15.256
1S 16.138 16.138
1DS 22.58 22.58
1DC 29.466 38.7
2P 10.42 10.42
2DP 5.31 5.31
2DC 25.5 27.9
3DS 21.1 21.6
3DC 39.68 39.68
D,G. KADAM CHIEF ENGINEER 10 JULY 2017
FO HFHSD FM TKS 2P & 2S
TRANSFERRED 21.0M3 TO 5C SHIPS TK
QTY RTND IN 2P=NIL, 2S=NIL
SIGNATURE D,G. KADAM CHIEF ENGINEER 16 JULY 2017
FO HFHSD FM TKS 3DC
TRANSFERRED 20.0M3 TO 4DC SHIPS TK
QTY RTND IN 3DC=20.0 M3
SIGNATURE D,G. KADAM CHIEF ENGINEER 16 JULY 2017
FO HFHSD FM TKS 3DC
TRANSFERRED 15.0M3 TO 5C SHIPS TK
QTY RTND IN 3DC=5.32 M3
SIGNATURE D,G. KADAM CHIEF ENGINEER 19 JULY 2017
FO HFHSD FM TKS 2DC
TRANSFERRED 20.0M3 TO 5C SHIPS TK
QTY RTND IN2DC=10.0 M3
SIGNATURE D,G. KADAM CHIEF ENGINEER 21 JULY 2017
FO HFHSD FM TKS 2DC & 1DC (1DC=33.0+2DC=7.0)
TRANSFERRED 43.0M3 TO 5C & 4DC SHIPS TK
QTY RTND IN2DC=2.7 M3 & 1DC= 3.3M3
SIGNATURE D,G. KADAM CHIEF ENGINEER 26 JULY 2017
NHAVA BASE. BARGE SARASWARI. ONGC SUPPLY AT POINT ON JETTY:5
102 M3,HFFHSD, SULPHUR=0.18% LOADED IN 1DC,2DC,3DC,

TOTAL QTY LOADED AS UNDER


TANK QTY ADDED-M3 TOTAL CONTENT-M3
1P 0 15.256
1S 0 16.138
1DS 0 22.58
1DC 39.1 39.1
2P 0 9.39
2DP 0 5.31
2DC 28.99 28.9
3DS 0 21.6
3DC 33.92 33.92
D,G. KADAM CHIEF ENGINEER 29 JULY 2017
OKHA OFF RIG GREAT SHIP CHAAYA , FM TKS
94 M3 FM TKS, 1DC,2DC,3DC,1DS,2DP

QTY RETAINED: 1DC=21M3,2DC-8M3, 3DC-13M3, 1DS-3.0M3, 2DP-6M3


D,G. KADAM CHIEF ENGINEER 01 AUG 2017

FO HFHSD FM TKS 1S,1DS,1DP (1S-12M3,1DS-3M3,1DP-21M3)


TRANSFERRED 36.0M3 TO 5C & 4DC SHIPS TK
QTY RTND IN 1DS=NIL M3 & 1DP-= 3.0M3, 1S-4.0 M3M3
D,G. KADAM CHIEF ENGINEER 03 AUG 2017
28.0M3 FO HFHSD FM TKS 3DC
TRANSFERRED TO 5C SHIPS FO TK
QTY RTND IN 3DC= 7.0 M3
D,G. KADAM CHIEF ENGINEER 07 AUG 2017
18.0M3 FO HFHSD FM TKS 1DC
TRANSFERRED TO 4DC SHIPS FO TK
QTY RTND IN 1DC= 14.0 M3
D,G. KADAM CHIEF ENGINEER1 10 AUG 2017
38.0M3 FO HFHSD FM TKS 1DC,2DP,2DC,3DC
TRANSFERRED TO 4DC & 5C SHIPS FO TK
QTY RTND IN 1DC= 1.0 M3, 2DP, 2DC & 3DC-NIL
D,G. KADAM CHIEF ENGINEER1 14 AUG 2017

NHAVA BASE. BARGE SARAWATI. ONGC SUPPLY AT POINT ON JETTY:2


148 M3,HFFHSD, SULPHUR=0.20% LOADED IN 1DC,2DC,3DC,
1DP & 3DP
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 39.0 42.01
2DC 31 33.1
3DC 38.0 40.51
3DP 20.00 22.25
1DP 10.00 36.00
D,G. KADAM CHIEF ENGINEER1 31 AUG 2017
10.0M3 FO HFHSD FM TKS FM 1DP
TRANSFERRED TO 5C SHIPS FO TK
QTY RTND IN 1DP= NIL
D,G. KADAM CHIEF ENGINEER1 31 AUG 2017
34.0M3 FO HFHSD FM TKS 1DC & 2DC
TRANSFERRED TO 5C SHIPS FO TK
QTY RTND IN 1DP= 6.4 M3, 2DC-11.0 M3
D,G. KADAM CHIEF ENGINEER1 04 sep 2017

NHAVA BASE. BARGE SHARAWATI. ONGC SUPPLY AT POINT ON JETTY:3

134.2 M3,HFFHSD, SULPHUR=0.20% LOADED IN 1DC,2DC,3DC,


1DP,& 3DS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 35.7 41.76
2DC 30.3 34.51
3DC 21.0 40.0
1DP 25.6 25.6
3DS 22.1 22.48
D,G. KADAM CHIEF ENGINEER1 11 SEP 2017

38.0M3 FO HFHSD FM TKS 2DP & 3DC( 09KL+29KL RESPECTIVELY)


TRANSFERRED TO 5C SHIPS FO TK
QTY RTND IN 2DP= 00 M3, 3DC-11.0 M3
D,G. KADAM CHIEF ENGINEER1 15 sep 2017
25.0M3 FO HFHSD FM TKS 1DC( )
TRANSFERRED TO 5C SHIPS FO TK
QTY RTND IN 1DC= 23.8 M3,
D,G. KADAM CHIEF ENGINEER1 15 sep 2017
20.0M3 FO HFHSD FM TKS 1DC( )
TRANSFERRED TO 5C SHIPS FO TK
QTY RTND IN 1DC= 3.8 M3,
D,G. KADAM CHIEF ENGINEER 22 sep 2017
25.0M3 FO HFHSD FM TKS 1DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDG-26.93M3,QTY RTND IN 1DP= 1.93 M3
D,G. KADAM CHIEF ENGINEER1 26 sep 2017
30.0M3 FO HFHSD FM CARGO TKS 3DS & 3DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDG, 3DS-19.75, 3DS-20.447,QTY RTND IN 3DS= 0.97 M3, 3DP-9.447M3
D,G. KADAM CHIEF ENGINEER1 29 sep 2017
20.0M3 FO HFHSD FM CARGO TKS 3DC & 3DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDG, 3DC-11.34, 3DP-9.35,QTY RTND IN 3DC= 9.35 M3, 3DP-0.358M3


D,G. KADAM CHIEF ENGINEER1 01 OCT 2017
09.0M3 FO HFHSD FM CARGO TKS 1DC,2DP,3DP,3DS,3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG, 1DC-1.124,2DP-2.3,3DP-1.436,3DS-1.436,3DC-3.913
FIN SDG-1DC-0.51,2DP-.506,3DP-0.22,3DS-0.22,3DC-0.769
D,G. KADAM CHIEF ENGINEER1 03 OCT 2017
FROM M.V. ABS ANOKHI. AT MUMBAI HIGH, NORTH.
150.0 M3(125.4 MT),HFFHSD, SULPHUR=0.10% LOADED IN 3DC, 1DC, 2DC,2DP,
2DS & 1DS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
3DC 37.0 37.769
1DC 38.0 39.124
2DC 15.0 30.95
2DP 20.0 20.506
2DS 20.0 20.506
1DS 20.0 20.657
D,G. KADAM CHIEF ENGINEER1 06 OCT 2017
20.0M3 FO HFHSD FM CARGO TKS 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG, 2DC-31.06, RTND IN 2DC= 11.06 M3,
D,G. KADAM CHIEF ENGINEER1 06 OCT 2017
12.0M3 FO HFHSD FM CARGO TKS 2DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDG, 2DP-12.72, RTND IN 2DP= 0.72 M3,
D,G. KADAM CHIEF ENGINEER1 06 OCT 2017
20.0M3 FO HFHSD FM CARGO TKS 2DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDG, 2DS-20.39, RTND IN 2DS= 0.39 M3,
D,G. KADAM CHIEF ENGINEER 10 OCT 2017
32.0M3 FO HFHSD FM CARGO TKS 1dc
TRANSFERRED TO 5C & 4DC SHIPS FO TK
INT SDG, 1DC-38.8, RTND IN 1DC= 6.8 M3,
D,G. KADAM CHIEF ENGINEER 15 OCT 2017
27.0M3 FO HFHSD FM CARGO TKS 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG, 2DC-27.995, RTND IN 2DC= 0.995 M3,
D,G. KADAM CHIEF ENGINEER 17 OCT 2017
FROM M.V. CELESTIAL. AT MUMBAI HIGH, NORTH.

100.0 M3(83.4 MT),HFFHSD, SULPHUR=0.10% LOADED IN 1DC, 2DC,3DP, 3DS


TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 40.0 41.12
2DC 30 30.9
3DP 15.0 15.22
3DS 15.0 15.22
D,G. KADAM CHIEF ENGINEER 19 OCT 2017
32.0M3 FO HFHSD FM CARGO TKS 3DS & 3DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDG, 3DS-20.4, INT SDG- 3DP- 12.9 RTND IN 3DS-0.4, 3DP-0.9M3,
D,G. KADAM CHIEF ENGINEER 22 OCT 2017
36.0M3 FO HFHSD FM CARGO TKS 1DC TO 4DC TO 5C
TRANSFERRED TO 5C & 4DC SHIPS FO TK
INT SDG 1DC-36.87M3, QTY RTND- 0.87M3
D,G. KADAM CHIEF ENGINEER 25 OCT 2017
31.0M3 FO HFHSD FM CARGO TKS 2DC TO 4DC TO 5C
TRANSFERRED TO 5C & 4DC SHIPS FO TK
INT SDG 2DC-31.06M3, QTY RTND- 0.06M3
D,G. KADAM CHIEF ENGINEER 29 OCT 2017
38.0M3 FO HFHSD FM CARGO TKS 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DC-38.81M3, QTY RTND- 0.81M3
D,G. KADAM CHIEF ENGINEER 07 NOV 2017
25.0M3 FO HFHSD FM CARGO TKS 1DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 1DP-25.14M3, QTY RTND- 0.14M3
D,G. KADAM CHIEF ENGINEER 12 NOV 2017
14.0M3 FO HFHSD FM CARGO TKS 3DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DS-14.17M3, QTY RTND- 0.17M3
D,G. KADAM CHIEF ENGINEER 13 NOV 2017
FROM BARGE GOMATI. ONGC SUPPLY BASE AT NHAVA
247.0 M3(207.4 MT),HFFHSD, SULPHUR=0.21% LOADED IN1DP,1DP,1DS 1DC,
2DP,2DS,2DC,3DP, 3DSAND 3C
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DP 25 25.66
1DS 25 25.66
1DC 41 41.12
2DP 19 19.51
2DS 22 22.51
2DC 33 33.89
3DP 18 18.2
3DS 23 26.46
3DC 41 41.7
T.P SAJEEV CHIEF ENGINEER 17 NOV 2017
M.V TAG 19 , FM TKS
75 M3 FM TKS, 2DS,2DP,3DS,3DP,1DS.1DP

QTY RETAINED: 2DS-12.51,2DP-4,51,3DS-11.46,3DP-3.2,1DS-16.66,1DP-15.66


T.P SAJEEV CHIEF ENGINEER 18 NOV 2017
RIG DYNAMIC VISION , FM TKS
40 M3 FM TKS, 1DC& 2DC
QTY RETAINED: 1DC-16.12M3 & 2DC-18.89M3
T.P SAJEEV CHIEF ENGINEER 19 NOV 2017
M.V HALUL-26, FM TKS
50 M3 FM TKS, 1DC, 2DC&3DC
QTY RETAINED: 1DC-4.88M3 , 2DC-6,89M3&3DC-14.94M3
T.P SAJEEV CHIEF ENGINEER 20 NOV 2017
11.0M3 FO HFHSD FM CARGO TKS 1DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 1DP-11.99M3, QTY RTND- 2.2M3
T.P SAJEEV CHIEF ENGINEER 24 NOV 2017
15.04M3(12.63 MT) FO HFHSD FM CARGO TKS 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 2DC-15.04M3, QTY RTND- 0.04M3
T.P SAJEEV CHIEF ENGINEER 03 FMAR 2018
15.0M3(12.6 MT) FO HFHSD FM CARGO TKS 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DC-43.71M3, QTY RTND- 28.71M3
D.G. KADAM CHIEF ENGINEER 04 MAR 2018

FROM BARGE GOMATI. ONGC SUPPLY BASE AT NHAVA, BERTH 3

199.0 M3(167.16 MT),HFFHSD, SULPHUR=0.19% LOADED IN FOLLOWING TKS


TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DP 26 26.65
1DS 22 24.29
1DC 38 41.75
2DP 15 20.11
2DS 18 19.75
2DC 30 33.00
3DP 20 21.07
3DS 20 21.44
3DC 10 40.91
D.G. KADAM CHIEF ENGINEER 06 MAR 2018
OCEAN, CREWZER 2, FROM CRGO TK 1DP
08 M3 FM CARGO TK 1DP
QTY RETAINED: 1DP-18.65M3
D.G. KADAM CHIEF ENGINEER 06 MAR 2018
VIVEKANAND1 RIG, FROM CRGO TK 1DC,2DC,3DC
100 M3 FM CARGO TK 1DC,2DC,3DC
QTY RETAINED: 1DC-6.76M3,2DC-4.51,3DC-7.58
D.G. KADAM CHIEF ENGINEER 07 MAR 2018
M.V ASL BAGULA , FROM CRGO TK 1DP,1DS,2DP
50 M3 FM CARGO TK 1DP,1DS,2DP
QTY RETAINED: 1DP-4.65M3,1DS-04,2DP-10
D.G. KADAM CHIEF ENGINEER 08 MAR 2018
OCEAN, CREWZER 2, FROM CRGO TK 1DC, 2DP
08 M3 FM CARGO TK 1DP
QTY RETAINED: 1DC-1.1M3, 2DC-7.8
D.G. KADAM CHIEF ENGINEER 10 MAR 2018
22M3(18.6 MT) FO HFHSD FM CARGO TKS 3DP
TRANSFERRED TO 4C SHIPS FO TK
INT SDG 3DP-22.02M3, QTY RTND- 0.22M3
D.G. KADAM CHIEF ENGINEER 11 MAR 2018
05M3(4.2 MT) FO HFHSD FM CARGO TKS 3DS
TRANSFERRED TO 4C SHIPS FO TK
INT SDG 3DS-27.34M3, QTY RTND- 22.34M3
D.G. KADAM CHIEF ENGINEER 11 MAR 2018
13M3(10.9MT) FO HFHSD FM CARGO TKS 3DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DS-22.34M3, QTY RTND- 9.34M3
D.G. KADAM CHIEF ENGINEER 11 MAR 2018

FROM BARGE SHARAVATI. ONGC SUPPLY BASE AT NHAVA, BERTH 1

100M3(84.6MT),HFFHSD, SULPHUR=0.19% LOADED IN FOLLOWING TKS


TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 38 42.48
2DC 25 33
3DC 32 34.58
1DP 05 8.26
D.G. KADAM CHIEF ENGINEER 12 MAR 2018
NEELAM FIELD, TO SEAMC 1,
100 M3 FM CARGO TKS 1DC, 2DC, 3DC
QTY RETAINED: 1DC-2.5M3, 2DC-2.1, 3DC- 3.4M3
D.G. KADAM CHIEF ENGINEER 14 MAR 2018
10M3(84.0MT) FO HFHSD FM CARGO TKS 3DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DS-10.0M3, QTY RTND- NILM3
D.G. KADAM CHIEF ENGINEER 17 MAR 2018
FROM OIL TERMINAL SUPPLY BASE AT NHAVA, BERTH 2

150M3(126.9MT),HFFHSD, SULPHUR=0.19% LOADED IN FOLLOWING TKS


TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 38 39.24
2DC 30 31.09
3DC 38 39.71
1DP 24 25.21
1DS 10 18.21
2DP 10 10.87
D.G. KADAM CHIEF ENGINEER 18 MARCH 2018
20M3(16.92MT) FO HFHSD FM CARGO TKS 1DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 1DP-27.70M3, QTY RTND- 07.70M3
D.G. KADAM CHIEF ENGINEER 21 MAR 2018
07M3(5.92MT) FO HFHSD FM CARGO TKS 1DP
TRANSFERRED TO 4C SHIPS FO TK
INT SDG 1DP-7.70M3, QTY RTND- 0.70M3
D.G. KADAM CHIEF ENGINEER 21 MAR 2018
08M3(6.7MT) FO HFHSD FM CARGO TKS 1DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 1DS-8.50M3, QTY RTND- 0.50M3
D.G. KADAM CHIEF ENGINEER 24 MAR 2018
05M3(4.2MT) FO HFHSD FM CARGO TKS 2DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 2DP-5.72M3, QTY RTND- 0.72M3
D.G. KADAM CHIEF ENGINEER 24 MAR 2018
18M3(15.2MT) FO HFHSD FM CARGO TKS 2DS
TRANSFERRED TO 4C SHIPS FO TK
INT SDG 2DS-18.06M3, QTY RTND- 0.06M3
D.G. KADAM CHIEF ENGINEER 25 MAR 2018
18M3(15.2MT) FO HFHSD FM CARGO TKS 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 1DC-38.75M3, QTY RTND- 20.75M3
D.G. KADAM CHIEF ENGINEER 26 MAR 2018
20M3(16.9MT) FO HFHSD FM CARGO TKS 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 1DC-20.75M3, QTY RTND- 0.75M3
D.G. KADAM CHIEF ENGINEER 28 MAR 2018
MUMBAI HIGH, TO PRINCE 1,
04 M3 FM CARGO TKS 2DC
QTY RETAINED:2DC-11.36
D.G. KADAM CHIEF ENGINEER 02 APR 2018
35.52M3(30.0MT) FO HFHSD FM CARGO TKS 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 2DC-35.52M3, QTY RTND- 0.52M3
D.G. KADAM CHIEF ENGINEER 05 APR 2018
35.36M3(29.9MT) FO HFHSD FM CARGO TKS 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DC-35.36M3, QTY RTND- 0.36M3
D.G. KADAM CHIEF ENGINEER 09 APR 2018
FROM M.V.OSL GLORY AT DELTA-I FIELD

80M3(66.56MT),HFFHSD, SULPHUR=0.026% LOADED IN FOLLOWING TKS


TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
3DP 20 20.43
3DS 20 20.06
3DC 40 40.53
D.G. KADAM CHIEF ENGINEER 12 APRIL 2018
40.53M3(33.84MT) FO HFHSD FM CARGO TKS 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DC-40.53M3, QTY RTND- 0.0M3
D.G. KADAM CHIEF ENGINEER 13 APR 2018
42.49M3(35.53MT) FO HFHSD FM CARGO TKS 3DS
TRANSFERRED TO 5C SHIPS FO TK
0
D.G. KADAM CHIEF ENGINEER 16 APR 2018
FROM M.V.CREST MERCURY ONE AT TAPTI FIELD

50M3(41.6MT),HFFHSD, SULPHUR=0.026% LOADED IN FOLLOWING TKS


TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
3DC 25 38.98
2DC 25 27.70
D.G. KADAM CHIEF ENGINEER 20 APRIL 2018
30.0M3(24.72MT) FO HFHSD FM CARGO TKS 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 2DC-30.0M3, QTY RTND- 0.0M3
D.G. KADAM CHIEF ENGINEER 24 APR 2018
32.0M3(26.36MT) FO HFHSD FM CARGO TKS 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DC-34.0M3, QTY RTND-2.0M3
D.G. KADAM CHIEF ENGINEER 27 APR 2018
FROM M.V.OSL TRIUMPH ONE AT BOMBAY HIGH
75M3(61.8MT),HFFHSD, SULPHUR=0.13% LOADED IN FOLLOWING TKS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
3DC 39 42.91
2DC 21 21.90
1DC 16 17.12
D.G. KADAM CHIEF ENGINEER 27 APRIL 2018
30.0M3(25.2MT) FO HFHSD FM CARGO TKS 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 2DC-31.0M3, QTY RTND-1.0M3
D.G. KADAM CHIEF ENGINEER 30 APR 2018
30.0M3(26.36MT) FO HFHSD FM CARGO TKS 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DC-39.0M3, QTY RTND-9.0M3
D.G. KADAM CHIEF ENGINEER 04 MAY 2018
FROM OIL TERMINAL SUPPLY BASE AT NHAVA, BERTH 5

200M3(168MT),HFFHSD, SULPHUR=0.13% LOADED IN FOLLOWING TKS


TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 40 40.72
2DC 30 30.21
3DC 42 50.30
2DP 22 22.14
2DS 22 22.12
3DS 22 22.8
3DP 22 24.25
T.P. SAJEEVCHIEF ENGINEER 12 MAY 2018
32.0M3(26.88MT) FO HFHSD FM CARGO TKS 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 1DC-33.6M3, QTY RTND-1.60M3
T.P SAJEEV CHIEF ENGINEER 13 MAY 2018
30.0M3(25.2MT) FO HFHSD FM CARGO TKS 2DC
TRANSFERRED TO 4C& 5C SHIPS FO TK
INT SDG 2DC-30.21M3, QTY RTND-0.21M3
T.P SAJEEV CHIEF ENGINEER 17 MAY 2018
20.0M3(16.8MT) FO HFHSD FM CARGO TKS 2DP&2DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDG 2DP-19.98M3, 2DS 19.30.QTY RTND- 2DP 9.8M3 &2DS 9.3M3
T.P SAJEEV CHIEF ENGINEER 19 MAY 2018
20.0M3(16.8MT) FO HFHSD FM CARGO TKS 2DP&2DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 2DP-9.8M3, 2DS 9.3M3 QTY RTND- 2DP -NIL &2DS -NIL
T.P SAJEEV CHIEF ENGINEER 22 MAY 2018
20.0M3(16.8MT) FO HFHSD FM CARGO TKS 3DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DS-20.8M3, QTY RTND- 3DS -0.8M3
T.P SAJEEV CHIEF ENGINEER 24 MAY 2018
20.0M3(16.8MT) FO HFHSD FM CARGO TKS 3DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DP-22M3, QTY RTND- 3DP -2 M3
T.P SAJEEV CHIEF ENGINEER 27 MAY 2018
41 M3(34.44 MT) FO HFHSD FM CARGO TKS 3DC
TRANSFERRED TO 4C&5C SHIPS FO TK
INT SDG 3DC-49.7M3, QTY RETAINED-8.7M3
T.P SAJEEV CHIEF ENGINEER 02 JUNE 2018
GSS041NA#C PORBANDAR TO GREAT DRILL CHETNA
45 M3 FM CARGO TK 1DC&3DC
QTY RETAINED: 1DC-4.8M3, 3DC-30.16M3
T.P SAJEEV CHIEF ENGINEER 06 JUNE 2018
20 M3(16.8MT) FO HFHSD FM CARGO TKS 2DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DC-49.7M3, QTY RETAINED-8.7M3
T.P SAJEEV CHIEF ENGINEER 02 JUNE 2018
AT SEA ( PORBANDAR) TO JINDAL SUPREME
75 M3 FM CARGO TK 2DC,3DC&2DP
QTY RETAINED: 2DC-2.7M3, 3DC-3.0M3& 2DP-0.50M3
T.P SAJEEV CHIEF ENGINEER 08JUNE 2018
10 M3(8.4MT) FO HFHSD FM CARGO TKS 2DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 2DP-14.7M3, QTY RETAINED-4.7M3
T.P SAJEEV CHIEF ENGINEER 08 JUNE 2018
15 M3(12.6MT) FO HFHSD FM CARGO TKS 2DP&3DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 2DP-4.7M3, QTY RETAINED-NIL,INT SDG 3DP-10.3M3, QTY RETAINED-
NIL
T.P SAJEEV CHIEF ENGINEER 15 JUNE 2018
FROM M.V.GREAT SHIP ANJALI AT SEA (PORBANDAR)
20M3(16.8MT),HFFHSD, SULPHUR=0.06% LOADED IN 5C
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
3DC 20 23
T.P SAJEEV CHIEF ENGINEER 22 JUNE 2018
20 M3(16.8MT) FO HFHSD FM CARGO TKS 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DC-23M3, QTY RETAINED-3M3
T.P SAJEEV CHIEF ENGINEER 24 JUNE 2018
FROM OIL TERMINAL SUPPLY BASE AT NHAVA.

100M3(84MT),HFFHSD, SULPHUR=0.13% LOADED IN FOLLOWING TKS


TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 40 43.7
2DC 20 21.3
3DC 40 42.2
T.P SAJEEV CHIEF ENGINEER 25 JUNE 2018
24M3(20.16MT) FO HFHSD FM CARGO TKS 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 1DC-43.7M3, QTY RETAINED-19.7M3
T.P SAJEEV CHIEF ENGINEER 29 JUNE 2018
16M3(13.44MT) FO HFHSD FM CARGO TKS 1DC& 2DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDG 1DC-11.33M3& 2DC- 10.1M3, QTY RETAINED-1DC -3.3M3 &2DC 2.1M3
T.P SAJEEV CHIEF ENGINEER 07 JULY 2018
20M3(16.84MT) FO HFHSD FM CARGO TKS 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DC-42.2M3, QTY RETAINED-3DC -22.2M3
T.P SAJEEV CHIEF ENGINEER 10 JULY 2018
20M3(16.84MT) FO HFHSD FM CARGO TKS 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DC-22.2M3, QTY RETAINED-3DC -2.2M3
T.P SAJEEV CHIEF ENGINEER 16 JULY 2018

FROM OIL TERMINAL SUPPLY BASE AT NHAVA, BERTH -2 FROM M.T BAY VII

252M3(211.7MT),HFFHSD, SULPHUR=0.041% LOADED IN FOLLOWING TKS


TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 42 45
2DC 32 34.10
3DC 42 45.20
2DP 20 20.50
2DS 20 20.50
3DP 22 23
3DS 20 24
1DP 27 27.65
1DS 27 27.66
T.P SAJEEV CHIEF ENGINEER 27 JULY 2018
RIG VICTORY DRILLER, FROM CRGO TK 1DC,,3DC
75 M3 FM CARGO TK 1DC&3DC
QTY RETAINED: 1DC-12 M3 3DC-3.0
T.P SAJEEV CHIEF ENGINEER 28 JULY 2018
RIG ACTINIA, FROM CRGO TK 2DC,,1DP&1DS
75 M3 FM CARGO TKS 2DC ,1DP&1DS
QTY RETAINED: 2DC-2.5 M3,1DP-11.7M3&1DS-4.6M3
T.P SAJEEV CHIEF ENGINEER 28JULY 2018
RIG ABAN ICE, FROM CRGO TKS 3DS,3DP&2DP
49 M3 FM CARGO TKS 3DS,3DP&2DP
QTY RETAINED: 3DS-1.66 M3,3DP-0.66M3&2DP-18.50
T.P SAJEEV CHIEF ENGINEER 29JULY 2018
22M3(18.48MT) FO HFHSD FM CARGO TKS 1DC&1DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 1DC-12M3, QTY RETAINED-1DC -1.0M3&INTIAL SDG 1DP-11.7M3, QTY
RTND-0.7M3
T.P SAJEEV CHIEF ENGINEER 31 JULY 2018
20M3(16.8MT) FO HFHSD FM CARGO TKS 2DS&2DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 2DS-20.5M3, QTY RETAINED-2DS -10.50M3&INTIAL SDG 2DP-20.5M3,
QTY RTND-10.5M3
T.P SAJEEV CHIEF ENGINEER 03 AUG2018
AT SEA FROM M.V GREATSHIP ROOPA

75M3(65MT),HFFHSD, SULPHUR=0.041% LOADED IN FOLLOWING TKS


TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 10 11
2DC 30 32.5
3DC 35 38
T.P SAJEEV CHIEF ENGINEER 03 AUG2018
20M3(16.8MT) FO HFHSD FM CARGO TKS 2DS&2DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 2DS-10.5M3, QTY RETAINED-2DS -0.50M3&INTIAL SDG 2DP-10.5M3,
QTY RTND-0.5M3
T.P SAJEEV CHIEF ENGINEER 06 AUG2018
33M3(27.72MT) FO HFHSD FM CARGO TK 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DC-38M3, QTY RETAINED-3DC -5M3
T.P SAJEEV CHIEF ENGINEER 11 AUG2018
32M3(26.8MT) FO HFHSD FM CARGO TK 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 1DC-35M3, QTY RETAINED-1DC -3M3
T.P SAJEEV CHIEF ENGINEER 16 AUG2018
FROM OIL TERMINAL SUPPLY BASE AT NHAVA- JETT NO 2

200M3(164.86MT),HFFHSD, SULPHUR=0.059% LOADED IN FOLLOWING TKS


TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 42 43.5
2DC 32 34.4
3DC 42 45.28
1DP 22 22.65
1DS 22 23.50
2DP 20 20.50
2DS 20 21
D.G. KADAM CHIEF ENGINEER 22 AUG2018
30M3(25.2MT) FO HFHSD FM CARGO TKS 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 1DC-43.5M3, QTY RETAINED-1DC-13.5M3
D.G. KADAM CHIEF ENGINEER 23 AUG2018
RIG SEAMEC II, FROM CRGO TKS ,1DP&1DS
30 M3 FM CARGO TKS 1DP&1DS
QTY RETAINED: 1DP-2.65M3&1DS-13.5M3
D.G. KADAM CHIEF ENGINEER 24 AUG2018
RIG GREAT DRILL CHARU, FROM CRGO TKS ,2DP&1DS
30 M3 FM CARGO TKS 2DP&1DS
QTY RETAINED: 2DP-0.5M3&1DS-3.5M3
D.G. KADAM CHIEF ENGINEER 24 AUG2018
RIG JINDAL STAR, FROM CRGO TKS ,2DS&1DC
30 M3 FM CARGO TKS 2DS&1DC
QTY RETAINED: 2DS-1.0M3&1DC-3.5M3
D.G. KADAM CHIEF ENGINEER 24 AUG2018
30M3(25.2MT) FO HFHSD FM CARGO TK 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 2DC-34.4M3, QTY RETAINED-2DC -4.4M3
D.G. KADAM CHIEF ENGINEER 26 AUG2018
30M3(25.2MT) FO HFHSD FM CARGO TK 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 2DC-34.4M3, QTY RETAINED-2DC -4.4M3
D.G. KADAM CHIEF ENGINEER 31 AUG2018
FROM M.V.GREAT SHIP ROHINI AT SEA (PORBANDAR)
30M3(25.2MT),HFFHSD, SULPHUR=0.06% LOADED IN 5C
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
3DC 30 30.28
D.G. KADAM CHIEF ENGINEER 04 SEP 2018
30M3(25.2MT) FO HFHSD FM CARGO TK 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DC-30.28M3, QTY RETAINED-3DC -0.28M3
D.G. KADAM CHIEF ENGINEER 05 SEP 2018
M.V TAG 5
10 M3 FM CARGO TKS 2DC&1DC
QTY RETAINED: 2DC-0.9M3&1DC-3.3M3
D.G. KADAM CHIEF ENGINEER 08 SEP 2018
FROM OIL BARGE MT BAY VII AT NHAVA

200M3(164.86MT),HFFHSD, SULPHUR=0.015% LOADED IN FOLLOWING TKS


TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 42 45.3
2DC 37 37.9
3DC 42 43.1
3DS 24 25.0
3DP 10 10.95
D.G. KADAM CHIEF ENGINEER 09 SEP 2018
RIG GREAT DRILL CHARU, FROM CRGO TK- 1DC
07 M3 FM CARGO TKS 1DC
QTY RETAINED: 1DC-38.3M3
D.G. KADAM CHIEF ENGINEER 10 SEP 2018
RIG DRILL JINDAL STAR, FROM CRGO TK- 1DC & 3DS
50 M3 FM CARGO TKS 1DC + 3DS
QTY RETAINED: 1DC-3.3M3, 3DS-10M3
D.G. KADAM CHIEF ENGINEER 11 SEP 2018
38M3(31.27MT) FO HFHSD FM CARGO TK 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 2DC-37.9M3, QTY RETAINED-2DC -2.9M3
D.G. KADAM CHIEF ENGINEER 15 SEP 2018
25M3(20.57MT) FO HFHSD FM CARGO TK 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 1DC-34.5M3, QTY RETAINED-1DC -9.5M3
D.G. KADAM CHIEF ENGINEER 19 SEP 2018
20M3(16.46MT) FO HFHSD FM CARGO TK 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 1DC-23.8M3, QTY RETAINED-1DC -3.8M3
D.G. KADAM CHIEF ENGINEER 22 SEP 2018
cruise boat …..., FROM CRGO TK- ……
08 M3 FM CARGO TKS …….
QTY RETAINED: 1DC-3.3M3, 3DS-10M3
D.G. KADAM CHIEF ENGINEER 25 SEP 2018
20M3(16.8MT) FO HFHSD FM CARGO TKS FROM 3DS & 3DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DP-10.95M3, QTY RETAINED-3DP-0.95M3;
INT SDG 3DS-10.0M3, QTY RETAINED-3DS-0.68M3;
D.G. KADAM CHIEF ENGINEER 26 SEP 2018
FROM ALBATROS 5
150M3(126MT),HFFHSD, SULPHUR=0.015% LOADED IN FOLLOWING TKS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 42.7 46.3
2DC 31 33.9
3DC 43 43.1
3DS 13 13.68
3DP 20 20.95
D.G. KADAM CHIEF ENGINEER 27 SEP 2018
30M3(25.82MT) FO HFHSD FM CARGO TKS FROM 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 1DC-46.3M3, QTY RETAINED-1DC-16.3M3;
D.G. KADAM CHIEF ENGINEER 30 SEP 2018
OCEAN CREWZER 2
8M3 FM FROM CARGO TKS 1DC
QTY RETAINED: 1DC-8.3M3
D.G. KADAM CHIEF ENGINEER 06 OCT 2018
AT NHAVQ, JETTY 2; ONGC TERMINAL.
74M3(61.75MT),HFFHSD, SULPHUR=0.064% LOADED IN FOLLOWING TKS.
START: 2205 HRS; STOP- 2250 HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DS 25 26.92
1DP 09 10.59
2DS 20 20.68
2DP 20 20.68
D.G. KADAM CHIEF ENGINEER 07 OCT 2018
31M3(25.88MT) FO HFHSD FM CARGO TKS FROM 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 2DC-33.9M3, QTY RETAINED-1DC-2.9M3;
D.G. KADAM CHIEF ENGINEER 13 OCT 2018
30M3(25.2MT) FO HFHSD FM CARGO TKS FROM 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 3DC-43.1M3, QTY RETAINED-3DC-13.1M3;
D.G. KADAM CHIEF ENGINEER 13 OCT 2018
25M3(21.0MT) FO HFHSD FM CARGO TKS FROM 1DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 1DS-26.92M3, QTY RETAINED-1DS-1.92M3;
D.G. KADAM CHIEF ENGINEER 22 OCT 2018
40M3(33.6MT) FO HFHSD FM CARGO TKS FROM 2DP & 2DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDG 2DP-20.68M3, QTY RETAINED-2DP-0.68M3;
INT SDG 2DS-20.68M3, QTY RETAINED-2DS-0.68M3;
D.G. KADAM CHIEF ENGINEER 31 OCT 2018
52M3(43.7MT) FO HFHSD FM CARGO TKS FROM 3DP,3DS,3DC&1DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DS-13.68M3,3DP-20.96M3,3DC-13.1M3& 1DC-8.3M3. QTY RETND-


3DS-0.68M3,3DP-0.68M3, 3DC-2.1M3 &1DC-1.2M3
T.P SAJEEV CHIEF ENGINEER 04 NOV 2018
AT CLUSTER 7 FROM OCEAN AMETHYST
100M3(84MT),HFFHSD, SULPHUR=0.018% LOADED IN FOLLOWING TKS. START:
0555 HRS; STOP- 0730 HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 40 41.12M3
2DC 40 42.00M3
3DC 20 22.40M3
T.P SAJEEV CHIEF ENGINEER 06 NOV 2018
31M3(26.04MT) FO HFHSD FM CARGO TKS FROM 1DP&2DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DP-10.59M3,2DC-22.9M3.QTY. RETND.-1DP-0.65M3&2DC-1.9M3


T.P SAJEEV CHIEF ENGINEER 08 NOV 2018
30M3(5.9MT) FO HFHSD FM CARGO TK 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 3DC-32.1M3, FINAL SDG-2.1M3
T.P SAJEEV CHIEF ENGINEER 11 NOV 2018
AT NHAVA JETTY NO.1 ONGC TERMINAL
200M3(168MT),HFFHSD, SULPHUR=0.018% LOADED IN FOLLOWING TKS.
START: 2220HRS; STOP- 2328HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
3DC 35 37.1M3
2DC 27 28.9M3
3DS 23 23.68M3
3DP 23 23.68M3
2DS 20 20.68M3
2DP 20 20.64M3
1DS 25 26.9M3
1DP 27 27.65M3
T.P SAJEEV CHIEF ENGINEER 12 NOV 2018
DELIVERED TO OCEAN CREWZER III

7M3(5.9MT) FO HFHSD FM CARGO TKS 1DC,INTIAL QTY-(41.12M3)


QTY . RETAINED 1DC-34.2M3(28.7MT)
T.P SAJEEV CHIEF ENGINEER 15 NOV 2018
27M3(22.68MT) FO HFHSD FM CARGO TK 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 1DC-34.12M3(28.6mt), FINAL SDG-7.12M3(6MT)
T.P SAJEEV CHIEF ENGINEER 18 NOV 2018
17M3(14.28MT) FO HFHSD FM CARGO TK 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 2DC-18.9M3(15.8mt), FINAL SDG-1.9M3(1.6MT)
T.P SAJEEV CHIEF ENGINEER 04 DEC 2018
23M3(19.32MT) FO HFHSD FM CARGO TK 3DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DP-23.68M3(19.9mt), FINAL SDG-0.68M3(0.5MT)


T.P SAJEEV CHIEF ENGINEER 07 DEC 2018
30M3(25.2MT) FO HFHSD FM CARGO TKS 2DP & 2DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 2DP-20.64M3(17.3 MT), FINAL SDG-5.64M3(4.7MT),INT SDGS - 2DS-


20.68M3(17.4 MT), FINAL SDG-5.68M3(4.8MT)
T.P SAJEEV CHIEF ENGINEER 11 DEC 2018
33.5M3(28.5MT) FO HFHSD FM CARGO TKS 2DP ,2DS & 3DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 2DP-5.64M3(4.7MT), FINAL SDG-0.5M3(0.42MT),INT SDGS - 2DS-


5.68M3(4.8 MT), FINAL SDG-0.5M3(0.42MT),INT SDG-3DS 23.68(19.9MT),FINAL
3DS-0.34M3(0.3MT)
T.P SAJEEV CHIEF ENGINEER 15 DEC 2018
27M3(22.68MT) FO HFHSD FM CARGO TK 1DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DP-27.65M3(23.2MT), FINAL SDG-0.65M3(0.54MT)


T.P SAJEEV CHIEF ENGINEER 21 DEC 2018
DELIVERED TO GREATDRILL CHARU
30M3(25.2MT) FO HFHSD FM CARGO TKS 1DC&1DSINTIAL QTY-1DC-
7.12M3(5.9MT), 1DS-26.92M3(22.6MT)
QTY . RETAINED 1DC-3.12M3(2.6MT),1DS-0.65M3(0.54MT)
T.P SAJEEV CHIEF ENGINEER 21 DEC 2018
AT NHAVA JETTY NO.2 ONGC TERMINAL
250M3(210MT),HFFHSD, SULPHUR=0.18% LOADED IN FOLLOWING TKS. START:
1655HRS; STOP- 1815HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 40 42.98M3
3DC 40 42.23M3
2DC 34 35.80M3
1DP 25 25.65M3
1DS 25 25.65M3
2DP 20 20.50M3
2DS 20 20.50M3
3DP 23 23.58M3
3DS 23 23.46M3
T.P SAJEEV CHIEF ENGINEER 25 DEC 2018
30M3(25.2MT) FO HFHSD FM CARGO TK 1DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DC-42.98M3(36.1MT), FINAL SDG-12.98M3(10.9MT)


T.P SAJEEV CHIEF ENGINEER 28 DEC 2018
32M3(26.8MT) FO HFHSD FM CARGO TKS 1DP,1DS&1DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DP-11.65(9.7MT),1DS-13.65M3(11.5MT),1DC-13.5M3(11.34MT)


FINAL SDG 1DP- 0.65M3(0.5MT), 1DS-0.65M3(0.5MT),1DC-4.5M3(3.78MT)
T.P SAJEEV CHIEF ENGINEER 01 JAN 2019
30M3(25.2MT) FO HFHSD FM CARGO TK 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 2DC-33M3(27.72MT),FINAL SDNG 3M3(2.52MT)
T.P SAJEEV CHIEF ENGINEER 08 JAN 2019
30M3(25.2MT) FO HFHSD FM CARGO TKs 3DC& 3DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 3DC-6M3(5.04MT),FINAL SDNG NIL.INT SDGS - 3DP-
24.85M3(20.87MT),FINAL SDNG NIL.
T.P SAJEEV CHIEF ENGINEER 12 JAN 2019
24M3(20.16MT) FO HFHSD FM CARGO TKs 3DS
TRANSFERRED TO 5C & 4C SHIPS FO TK
INT SDGS - 3DS-24M3(20.16MT),FINAL SDNG NIL.
T.P SAJEEV CHIEF ENGINEER 14 JAN 2019
AT NHAVA JETTY NO.1 ONGC TERMINAL
250M3(210MT),HFFHSD, SULPHUR=0.19% LOADED IN FOLLOWING TKS. START:
0830HRS; STOP- 0955HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 42 44.25M3
3DC 41 43.02M3
2DC 32 33.50M3
1DP 27 27.65M3
1DS 22 23.82M3
2DP 20 20.36M3
2DS 20 20.36M3
3DP 23 23.32M3
3DS 23 23.22M3
T.P SAJEEV CHIEF ENGINEER 16JAN 2019
24M3(20.16MT) FO HFHSD FM CARGO TKs 1DS& 1DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DS-22.7M3(19MT),FINAL SDNG 10.6M3(8.9MT).INT SDGS - 1DP-


27M3(22.6MT),FINAL SDNG 15 M3(12.6MT).
T.P SAJEEV CHIEF ENGINEER 20 JAN 2019
15M3(12.6MT) FO HFHSD FM CARGO TKs 1DP
TRANSFERRED TO 5C SHIPS FO TK
.INT SDGS - 1DP-15M3(12.6MT),FINAL SDNG NIL).
T.P SAJEEV CHIEF ENGINEER 24 JAN 2019
21M3(17.6MT) FO HFHSD FM CARGO TKs 1DS& 1DC
TRANSFERRED TO 5C SHIPS FO TK
.INT SDGS - 1DS-11M3(9.24MT),FINAL SDNG NIL)..INT SDGS - 1DC-
43M3(36.12MT),FINAL SDNG 33.11M3(27.8MT).
T.P SAJEEV CHIEF ENGINEER 25 JAN 2019
30M3(25.2MT) FO HFHSD FM CARGO TKs 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 1DC-33.3M3(27.9MT),FINAL SDNG 3.3M3(2MT).
T.P SAJEEV CHIEF ENGINEER 29 JAN 2019
28M3(23.52MT) FO HFHSD FM CARGO TKs 2DP&2DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 2DP-21.4M3(17.9MT),FINAL SDNG 7.4M3(6.2MT).INT SDGS - 2DS-


21M3(17.6MT),FINAL SDNG 7M3(5.8MT)
T.P SAJEEV CHIEF ENGINEER 02 FEB 2019
13M3(10.92MT) FO HFHSD FM CARGO TKs 2DP&2DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 2DP-6.4M3(5.3MT),FINAL SDNG NIL.INT SDGS - 2DS-
6.3M3(5.2MT),FINAL SDNG NIL
T.P SAJEEV CHIEF ENGINEER 05 FEB 2019
31M3(26.04MT) FO HFHSD FM CARGO TKs 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 2DC-34M3(28.56MT),FINAL SDNG 3M3(2.52MT)
T.P SAJEEV CHIEF ENGINEER 07 FEB 2019
30M3(25.2MT) FO HFHSD FM CARGO TKs 3DP& 3DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DP-23.32M3(19.6MT),FINAL SDNG 8.32M3(7MT),INT SDGS - 3DS-


23.22M3(19.5MT),FINAL SDNG 8.22M3(6.9MT),
T.P SAJEEV CHIEF ENGINEER 11 FEB 2019
DELIVERED TO ASL BAGULA
50M3(42MT) FO HFHSD FM CARGO TKS 3DC &3DS,INTIAL QTY-3DC-
44M3(36.96MT)& 3DS -9M3(7.56MT)
QTY . RETAINED 3DC-3.2M3(2.6MT)&3DS-NIL
T.P SAJEEV CHIEF ENGINEER 11 FEB 2019
8M3(6.72MT) FO HFHSD FM CARGO TKs 3DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DP-8.58M3(7.2MT),FINAL SDNG 0.58M3(0.48MT)


T.P SAJEEV CHIEF ENGINEER 12 FEB 2019
AT NHAVA JETTY NO.1 ONGC TERMINAL
250M3(208.45MT),HFFHSD, SULPHUR=0.15% LOADED IN FOLLOWING TKS.
START: 2130HRS; STOP- 2300HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 40 43.38M3
3DC 40 43.2M3
2DC 31 34M3
1DP 28 28.65M3
1DS 27 27.89M3
2DP 22 22.68M3
2DS 22 22.5M3
3DP 20 20.5M3
3DS 20 20.8M3
RANJEET SINGH CHIEF ENGINEER 13 FEB 2019
DELIVERED TO M.V. CANARA PRIDE
25M3(20.8MT) FO HFHSD FM CARGO TKS 2DC, INTIAL QTY-2DC-
34M3(28.34MT)
QTY . RETAINED 2DC-9M3(7.5MT)
RANJEET SINGH CHIEF ENGINEER 15 FEB 2019
DELIVERED TO RIG- SAGAR UDAY

50M3(41.68MT) FO HFHSD FM CARGO TKS 1DP & 1DS,INTIAL QTY-1DP-


28.65M3(23.88MT)& 1DS -27.89M3(23.24MT)
QTY . RETAINED 1DP-3.65M3(3.04MT)& 1DS- 2.89M3(2.4)
RANJEET SINGH CHIEF ENGINEER 16 FEB 2019
30M3(25.2MT) FO HFHSD FM CARGO TKs 2DP & 2DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 2DP-22.68M3(18.9MT),FINAL SDNG 7.68M3(6.4MT), INT SDGS - 2DS-


22.5M3(18.7MT),FINAL SDNG 7.5M3(6.25MT)
RANJEET SINGH CHIEF ENGINEER 17 FEB 2019
20M3(16.6MT) FO HFHSD FM CARGO TKs 2DP, 2DS & 2DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 2DP-7.68M3(6.4MT),FINAL SDNG 0.68M3(0.56MT), INT SDGS - 2DS-


7.5M3(6.3MT),FINAL SDNG 0.5M3(0.42MT), INT SDGS - 2DC-9M3(7.5MT),FINAL
SDNG 3M3(2.5MT)
RANJEET SINGH CHIEF ENGINEER 21 FEB 2019
34M3(28.34MT) FO HFHSD FM CARGO TKs 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 3DC-44.4M3(37MT),FINAL SDNG 10.4M3(8.67MT)
RANJEET SINGH CHIEF ENGINEER 23 FEB 2019
30M3(25MT) FO HFHSD FM CARGO TKs 3DP& 3DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 3DP-20.5M3(17MT),FINAL SDNG 0.5M3(0.41MT), INT SDGS - 3DS-
20.8M3(17.3MT),FINAL SDNG 10.8M3(9MT)
RANJEET SINGH CHIEF ENGINEER 28 FEB 2019
AT NEELAM FIELD FROM M.VOCEAN SAPPHIRE
30M3(25MT),HFFHSD, SULPHUR=0.15% LOADED IN 3DC. START: 1130 HRS;
STOP- 1200 HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
3DC 30 40.4M3
RANJEEET SINGH CHIEF ENGINEER 01 MARCH 2019
25M3(20.84MT) FO HFHSD FM CARGO TKs 1DC & 3DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DC-43.38M3(36.2MT),FINAL SDNG 28.38M3(23.6MT), INT SDGS -


3DS-10.8M3(9MT),FINAL SDNG 0.8M3(0.66MT)
RANJEET SINGH CHIEF ENGINEER 04 MARCH 2019
9M3(7.5MT) FO HFHSD FM CARGO TKs 1DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DC-28.38M3(23.65MT),FINAL SDNG-19.38M3(16.15MT)


RANJEET SINGH CHIEF ENGINEER 07 MARCH 2019
AT MUMBAI HIGH FROM M.V. LACHUNG
100M3(83.58MT),HFFHSD, SULPHUR=0.15% LOADED IN FOLLOWING TKS.
START: 1800 HRS; STOP- 1845 HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
2DC 32 35M3
3DP 24 24.5M3
3DS 24 24.8M3
2DP 20 20.68M3
RANJEET SINGH CHIEF ENGINEER 07 MARCH 2019
16M3(13.38MT) FO HFHSD FM CARGO TKs 1DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DC-19.38M3(16.15MT),FINAL SDNG-3.38M3(2.8MT)


RANJEET SINGH CHIEF ENGINEER 11 MARCH 2019
DELIVERED TO RIG- VIVEKANAND-1

3M3(2.6MT) FO HFHSD FM CARGO TKS 2DC,INTIAL QTY-2DC-35M3(30.4MT)


QTY . RETAINED 2DC-32M3(27.7MT)
RANJEET SINGH CHIEF ENGINEER 12 MARCH 2019
15M3(12.53MT) FO HFHSD FM CARGO TKs 2DC
TRANSFERRED TO 4DC SHIPS FO TK
INT SDGS - 2DC-32M3(26.7MT),FINAL SDNG-17M3(14.2MT)
RANJEET SINGH CHIEF ENGINEER 13 MARCH 2019
15M3(12.53MT) FO HFHSD FM CARGO TKs 2DC
TRANSFERRED TO 4DC SHIPS FO TK
INT SDGS - 2DC-17M3(14.2MT),FINAL SDNG-2M3(1.6MT)
RANJEET SINGH CHIEF ENGINEER 14 MARCH 2019
20M3(16.7MT) FO HFHSD FM CARGO TKs 2DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 2DP-20.68M3(17.28MT),FINAL SDNG-0.68M3(0.57MT)


RANJEET SINGH CHIEF ENGINEER 16 MARCH 2019
27M3(22.6MT) FO HFHSD FM CARGO TKs 3DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DC-40.4M3(33.8MT),FINAL SDNG-13.4M3(11.19MT)


RANJEET SINGH CHIEF ENGINEER 19 MARCH 2019
13M3(10.9MT) FO HFHSD FM CARGO TKs 3DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DC-13.4M3(11.19MT),FINAL SDNG-0.4M3(0.33MT)


RANJEET SINGH CHIEF ENGINEER 21 MARCH 2019
31M3(25.9MT) FO HFHSD FM CARGO TKs 3DP & 3DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DP-24.5M3(20.5MT),FINAL SDNG-17.5M3(14.6MT), INT SDGS - 3DS-


24.8M3(20.7MT),FINAL SDNG-0.8M3(0.66MT)
RANJEET SINGH CHIEF ENGINEER 23 MARCH 2019
17M3(14.2MT) FO HFHSD FM CARGO TKs 3DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DP-17.5M3(14.6MT),FINAL SDNG-0.5M3(0.42MT)


RANJEET SINGH CHIEF ENGINEER 27 MARCH 2019
AT NHAVA JETTY NO.1 ONGC TERMINAL
250M3(208.45MT),HFFHSD, SULPHUR=0.0018% LOADED IN FOLLOWING TKS.
START- 1930HRS; STOP- 2130HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 40 43.38 M3
3DC 40 40.4 M3
2DC 30 32 M3
1DP 25 28.65 M3
1DS 25 27.89 M3
2DP 20 20.68 M3
2DS 20 20.5 M3
3DP 25 25.5 M3
3DS 25 25.8 M3
RANJEET SINGH CHIEF ENGINEER 29 MAR 2019
28M3(23.5MT) FO HFHSD FM CARGO TKs 1DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DP-28.65M3(24MT),FINAL SDNG-0.65M3(0.54MT)


RANJEET SINGH CHIEF ENGINEER 31 MARCH 2019
DELIVERED TO RIG- VIVEKANAND-1
50M3(41.9MT) FO HFHSD FM CARGO TKS 1DC & 1DS,INTIAL QTY-1DC-
43.38M3(36.7MT) & 1DS-27.89M3(23.4)
QTY . RETAINED 1DC-3.4M3(2.8MT) & 1DS-17.89M3(15MT)
RANJEET SINGH CHIEF ENGINEER 01 APRIL 2019
16M3(13.4MT) FO HFHSD FM CARGO TKs 1DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DS-17.89M3(15MT),FINAL SDNG-1.89M3(1.5MT)


RANJEET SINGH CHIEF ENGINEER 02 APRIL 2019
20M3(16.77MT) FO HFHSD FM CARGO TKs 2DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 2DS-20.5M3(17.2MT),FINAL SDNG-0.5M3(0.4MT)
RANJEET SINGH CHIEF ENGINEER 04 APRIL 2019
20M3(16.77MT) FO HFHSD FM CARGO TKs 2DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 2DP-20.68M3(17.34MT),FINAL SDNG-0.68M3(0.57MT)


RANJEET SINGH CHIEF ENGINEER 06 APRIL 2019
30M3(25.2MT) FO HFHSD FM CARGO TKs 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 2DC-32M3(26.8MT),FINAL SDNG-2M3(1.7MT)
RANJEET SINGH CHIEF ENGINEER 09 APRIL 2019
25M3(20.96MT) FO HFHSD FM CARGO TKs 3DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DP-25.5M3(21.4MT),FINAL SDNG-0.5M3(0.41MT)


RANJEET SINGH CHIEF ENGINEER 13 APRIL 2019
25M3(20.96MT) FO HFHSD FM CARGO TKs 3DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DS-25.8M3(21.6MT),FINAL SDNG-0.8M3(0.67MT)


RANJEET SINGH CHIEF ENGINEER 17 APRIL 2019
DELIVERED TO OCEAN CREWZER III

7M3(5.9MT) FO HFHSD FM CARGO TKS 3DC, INTIAL QTY-3DC-40.4M3(33.9MT)


QTY . RETAINED 3DC-33.4M3(28MT)
RANJEET SINGH CHIEF ENGINEER 18 APRIL 2019
27M3(22.64MT) FO HFHSD FM CARGO TKs 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 3DC-33.4M3(28MT),FINAL SDNG-6.4M3(5.4MT)
RANJEET SINGH CHIEF ENGINEER 19 APRIL 2019

AT NHAVA JETTY NO.5 ONGC TERMINAL


200M3(168MT),HFFHSD, SULPHUR=0.0018% LOADED IN FOLLOWING TKS.
START- 1015HRS; STOP- 1215HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 40 43.64 M3
3DC 35 42.2 M3
2DC 33 34.91 M3
1DP 27 28.28 M3
1DS 27 28.47 M3
2DP 21 21.87 M3
2DS 17 17.91 M3
RANJEET SINGH CHIEF ENGINEER 20 APR 2019
DELIVERED TO VESSEL HALUL 27
50M3(42MT) FO HFHSD FM CARGO TKS 1DP & 1DS,INTIAL QTY-1DP-
28.28M3(23.75MT)& 1DS -28.47M3(23.91MT)
QTY . RETAINED 1DP-3.74M3(3.14MT)& 1DS- 1.14M3(0.95)
RANJEET SINGH CHIEF ENGINEER 22 APR 2019
DELIVERED TO CREW BOAT KPS
5M3(4.2MT) FO HFHSD FM CARGO TKS 1DC,INTIAL QTY-1DC-
43.64M3(36.65MT)
QTY . RETAINED 1DP-38M3(31.92MT)
RANJEET SINGH CHIEF ENGINEER 26 APR 2019
INTERNAL TRANSFER OF 33MT(27.72M3)HFHSD, S-0.0018%; FROM CARGO TKS
1DC TO SHIPS OIL FUEL TK 5C .
INT SDG-5C- 2.52MT(3M3),QTY RETND 5C-31.08MT(37M3)
RANJEET SINGH CHIEF ENGINEER 27 APRIL 2019
INTERNAL TRANSFER OF 20.1MT(24M3)HFHSD, S-0.0018%; FROM CARGO TKS
1DP&2DP TO SHIPS OIL FUEL TK 5C .
INT SDG-5C- 4.2MT(5M3),QTY RETND 5C-24.3MT(29M3)
RANJEET SINGH CHIEF ENGINEER 30 APRIL 2019
INTERNAL TRANSFER OF 14.2MT(17M3)HFHSD, S-0.0018%; FROM CARGO TKS
2DS TO SHIPS OIL FUEL TK 5C .
INT SDG-5C- 7.5MT(9M3),QTY RETND 5C-21.8MT(26M3)
RANJEET SINGH CHIEF ENGINEER 03 MAY2019
AT FIELD FROM OSV EMRALD
50M3(42MT),HFFHSD, SULPHUR=0.0018% LOADED IN FOLLOWING TKS. START-
0700HRS; STOP- 0750HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
3DP 25 26.69 M3
3DS 25 27.35 M3
RANJEET SINGH CHIEF ENGINEER 04 MAY 2019
24M3(20.16MT) FO HFHSD FM CARGO TKs 2DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 2DC-33.41M3(28.06MT),FINAL SDNG-9.02M3(7.57MT)


RANJEET SINGH CHIEF ENGINEER 06 MAY 2019
DELIVERED TO RIG JINDAL SUPREME
25M3(21MT) FO HFHSD FM CARGO TKS 3DC,INTIAL QTY-3DC-
42.58M3(35.76MT).
QTY . RETAINED 3DC-17.58M3(14.76MT)
RANJEET SINGH CHIEF ENGINEER 07 MAY 2019
DELIVERED TO RIG J T ANGEL

50M3(42MT) FO HFHSD FM CARGO TKS 3DP AND 3DS,INTIAL QTY-3DP-


26.69M3(22.41) & 3DS-27.35M3(22.97MT).
QTY . RETAINED 3DP-1.69M3(1.41MT) & 3DS-2.35M3(1.97MT)
RANJEET SINGH CHIEF ENGINEER 08 MAY 2019
AT NHAVA JETTY NO.1 ONGC TERMINAL
200M3(168MT),HFFHSD, SULPHUR=0.12% LOADED IN FOLLOWING TKS. START-
1917HRS; STOP- 2044HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 44 45.80 M3
3DC 40 41.39M3
2DC 32 34.02 M3
1DP 4 4.89 M3
2DP 20 20.50 M3
2DS 20 20.50 M3
3DP 20 23.84M3
3DS 20 21.31M3
T.P SAJEEV CHIEF ENGINEER 09 MAY 2019
DELIVERED TO M.V LADY SANTRA

75M3(63MT) FO HFHSD FM CARGO TKS1DC, 3DP AND 3DS,INTIAL QTY-1 DC-


46.6(39.1MT) ,3DP-23.95M3(20.1) & 3DS-21.8M3(18.3MT).

QTY . RETAINED 1DC -15.6(13.1) 3DP-0.95M3(0.8MT) & 3DS-0.8M3(0.6MT)


T.P SAJEEV CHIEF ENGINEER 10 MAY 2019
30M3(25.2MT) FO HFHSD FM CARGO TKs 2DP & 2DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 2DP-20.59M3(17.29MT),2DS-21.4(17.98MT)FINAL SDNG- 2DP-
0.50M3 (0.42MT)& 2DS -0.5M3(0.42MT)
T.P SAJEEV CHIEF ENGINEER 10 MAY 2019
AT NHAVA JETTY NO.4 ONGC TERMINAL
`100M3(84MT),HFFHSD, SULPHUR=0.1% LOADED IN FOLLOWING TKS. START-
2033HRS; STOP- 2120HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 20 43.64M3
1DP 25 28.09M3
1DS 25 27.70 M3
2DP 20 21.20 M3
2DS 10 10.50M3
T.P SAJEEV CHIEF ENGINEER 19 MAY 2019
AT NHAVA JETTY NO.4 ONGC TERMINAL
66M3(55.44MT),HFFHSD, SULPHUR=0.1% LOADED IN FOLLOWING TKS. START-
2305HRS; STOP- 2356HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
2DS 10 20.50 M3
3DP 20 21.43M3
3DS 20 21.43 M3
1S 16 16.37M3
T.P SAJEEV CHIEF ENGINEER 19 MAY 2019
DELIVERED TO M.S.V SEAMEC -II

150M3(126MT) FO HFHSD FM CARGO TKS1DC, 1DP ,1DS,2DP.2DSAND


1S,INTIAL QTY-1 DC-43.64(36.65MT) ,1DP-28.09M3(23.59MT,)1DS-
27.70M3(23.26MT),2DP-21.20M3(17.8MT),2DS-20.50M3(17.22MT) &1S-
16.37M3(13.75MT).

QTY . RETAINED 1 DC-0.64M3(0.53MT) ,1DP-2.09M3(1.75MT,)1DS-


2.70M3(2.26MT),2DP-1.20M3(1.08MT),2DS-0.50M3(0.42MT),1S
-0.37M3(0.31MT)
T.P SAJEEV CHIEF ENGINEER 20 MAY 2019
DELIVERED TO RIG VIVEKANAND 1

50M3(42MT) FO HFHSD FM CARGO TKS1DC, 3DP AND 3DS,INTIAL QTY-1 DC-


6.01(5.04MT) ,3DP-24.49M3(20.57MT) & 3DS-25.22M3(21.18MT).
QTY . RETAINED 1DC -4.01M3(3.36MT) 3DP-0.49M3(0.41MT) & 3DS-
1.22M3(1.02MT)
T.P SAJEEV CHIEF ENGINEER 10 MAY 2019
27M3(22.68MT) FO HFHSD FM CARGO TK 2DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 2DC-27.61M3(23.19MT),FINAL SDNG- 2DC-0.61M3 (0.51MT)


T.P SAJEEV CHIEF ENGINEER 23 MAY 2019
AT BASSIN FIELD FROM M.V PRIYA-23
50M3(42MT),HFFHSD, SULPHUR=0.01% LOADED IN 1DC &2DC. START: 2007
HRS; STOP- 2050 HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 42 45M3
1DC 08 9.80M3
T.P SAJEEV CHIEF ENGINEER 24 MAY 2019
30M3(25.2MT) FO HFHSD FM CARGO TK 3DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DC-42M3(35.28MT),FINAL SDNG- 3DC-12M3 (10.08MT)


T.P SAJEEV CHIEF ENGINEER 27MAY 2019
AT NHAVA JETTY NO.1 ONGC TERMINAL
250M3(210MT),HFFHSD, SULPHUR=0.174% LOADED IN FOLLOWING TKS.
START- 1516HRS; STOP- 1645RS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
3DC 40 40.09 M3
2DC 30 46.55M3
1DP 27 27.89 M3
1DS 27 27.89 M3
2DP 20 21.05 M3
2DS 20 23.90 M3

3DS 25 26.07M3
1P 18 18.51
1S 18 18.37M3
T.P SAJEEV CHIEF ENGINEER 30 MAY 2019
18M3(15.12MT) FO HFHSD FM CARGO TK 1P
TRANSFERRED TO 4DC &5C SHIPS FO TK

INT SDGS - 1P-18M3(15.12MT),FINAL SDNG- 1P-0.7M3 (0.6MT)


T.P SAJEEV CHIEF ENGINEER 31MAY 2019
DELIVERED TO ABAN ICE

150M3(126MT) FO HFHSD FM CARGO TKS 1DP ,1DS,2DP.2DS,3DP,3DSAND


1S,INTIAL QTY-1 DP-25.89m3(21.74MT) ,1DS-25.89M3(21.74MT,)2DP-
21.05M3(17.6MT),2DS-23.90M3(20MT),3DP-25.95M3(21.7MT),3DS-
26.07m3(21.8MT) &1S-17.26M3(14.4MT).
QTY . RETAINED 1DP-0.89M3(0.74MT,)1DS- 0.89M3(0.74MT),2DP-
1.05M3(0.88MT),2DS-2.90M3(2.4MT)3DP-0.95M3(0.79MT),3DS-
6.07M3(5.09MT),1S -2.26M3(1.89MT)
T.P SAJEEV CHIEF ENGINEER 02 JUNE 2019
DELIVERED TO RIG SAGAR SHAKTI
50M3(42MT) FO HFHSD FM CARGO TKS1DC &2DC,INTIAL QTY-1 DC-
45.15(37.9MT) ,2DC-33.41M3(28.06)
QTY . RETAINED 1DC -5.15(4.32MT) &2DC-23.41M3(19.6MT)
T.P SAJEEV CHIEF ENGINEER 02 JUNE 2019
26M3(21.84MT) FO HFHSD FM CARGO TK 2DC&3DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 2DC-21M3(17.64MT), 3DS-5.6M3(4.7MT)FINAL SDNG- 2DC-NIL,3DS-
NIL
T.P SAJEEV CHIEF ENGINEER 07JUNE 2019
25M3(21.0MT) FO HFHSD FM CARGO TK 3DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DC- 45M3(37.8MT), FINAL SDNG- 3DC-20M3(16.8MT)


T.P SAJEEV CHIEF ENGINEER 13JUNE 2019
10M3(8.4MT) FO HFHSD FM CARGO TK 3DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DC- 20M3(16.8 MT), FINAL SDNG- 3DC-10M3(8.4MT)


T.P SAJEEV CHIEF ENGINEER 16JUNE 2019
10M3(8.4MT) FO HFHSD FM CARGO TK 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 3DC- 10M3(8.4MT), FINAL SDNG- 3DC-0M3(0 MT)
T.P SAJEEV CHIEF ENGINEER 18JUNE 2019
AT NHAVA JETTY NO.1 ONGC TERMINAL
180M3(151.2MT),HFFHSD, SULPHUR=0.13% LOADED IN FOLLOWING TKS.
START- 1845HRS; STOP- 2025RS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
3DC 35 35 M3
2DC 20 20.97M3
1DC 45 46.50 M3
1DP 20 21.59
1DS 20 20.89 M3
3DP 20 21.07 M3
3DS 20 20.62 M3
T.P SAJEEV CHIEF ENGINEER 20 JUNE 2019
DELIVERED TO RIG VIVEKANAND 1
50M3(42MT) FO HFHSD FM CARGO TKS1DC ,3DP &3DS INTIAL QTY-1 DC-
46.28(38.8MT) ,3DP-21.98M3(18.4MT)&3DS-21.62M3(18.1MT)

QTY . RETAINED 1DC -34(28.5MT) ,3DP-1.98(1.6MT)&3DS-3M3(2.52MT)


T.P SAJEEV CHIEF ENGINEER 22 JUNE 2019
30M3(25.2MT) FO HFHSD FM CARGO TK 1DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DC-34M3(28.5MT), FINAL SDNG- 1DC-4M3(3.36MT)


T.P SAJEEV CHIEF ENGINEER 23JUNE 2019
20M3(16.8MT) FO HFHSD FM CARGO TK 1DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DP- 21.59M3(18.1MT), FINAL SDNG- 1DP-1.59 M3(1.3MT)


T.P SAJEEV CHIEF ENGINEER 27JUNE 2019
26M3(21.84MT) FO HFHSD FM CARGO TK 1DC &2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 1DC- 5M3(4.2MT), FINAL SDNG- 1DC-NIL,INT SDGS - 2DC-
21M3(17.64MT), FINAL SDNG- 2DC-NIL,
T.P SAJEEV CHIEF ENGINEER 01 JULY 2019
26M3(21.84MT) FO HFHSD FM CARGO TK 1DS&3DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 1DS- 23M3(19.32MT), FINAL SDNG- 1DC-NIL,INT SDGS - 3DS-
3M3(2.52MT), FINAL SDNG- 3DS-NIL,
T.P SAJEEV CHIEF ENGINEER 05 JULY 2019
20M3(16.8MT) FO HFHSD FM CARGO TK 3DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DC- 35M3(29.4MT), FINAL SDNG- 3DC-15M3(12.6MT)


T.P SAJEEV CHIEF ENGINEER 09 JULY 2019
15M3(12.6MT) FO HFHSD FM CARGO TK 3DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DC- 15M3(12.6MT), FINAL SDNG- 3DC-0M3(0MT)


T.P SAJEEV CHIEF ENGINEER 011 JULY 2019
AT NHAVA JETTY NO.1 ONGC TERMINAL
240M3(201.6MT),HFFHSD, SULPHUR=0.132% LOADED IN FOLLOWING TKS.
START- 1145HRS; STOP- 1410HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 40 41.50 M3
3DC 40 40.76M3
2DC 30 30.89M3
1DP 25 25.65
1DS 25 25.65 M3
2DP 20 21.24 M3
2DS 20 21.97 M3
3DP 20 21.76 M3
3DS 20 20.95M3
T.P SAJEEV CHIEF ENGINEER 15 JULY 2019
24M3(20.16MT) FO HFHSD FM CARGO TKS 1DP& 1DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DP- 25.65M3(21.5MT), FINAL SDNG- 1DP-13.65M3(11.4MT),INT


SDGS - 1DS- 25.65M3(21.5MT), FINAL SDNG- 1DS-13.65M3(11.4MT)
T.P SAJEEV CHIEF ENGINEER 16 JULY 2019
DELIVERED TO MSV SEAMEC III

100M3(84MT) FO HFHSD FM CARGO TKS1DC ,1DP, 1DS,2DP,2DS INTIAL QTY-1


DC-46.40(38.9MT) ,1DP-13.34M3(11.2MT),1DS-14.97M3(12.5MT),2DP-
21.72M3(18.2MT),2DS-22.49M3(18.8MT)

QTY . RETAINED -1 DC-6.40M3(5.3MT) ,1DP-1.34M3(1.1MT),1DS-


2.97M3(2.4MT),2DP-1.72M3(1.4MT),2DS-6.49M3(5.4MT)
T.P SAJEEV CHIEF ENGINEER 17 JULY 2019

21M3(17.64MT) FO HFHSD FM CARGO TKS 1DS,2DS,1DC&2DC


TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DS- 2.97M3(2.49MT), INT SDGS - 2DS- 6.49M3(5.45MT),INT SDGS -


1DC- 6.4M3(5.3MT),INT SDGS - 2DC- 30.89M3(25.9MT), FINAL SDNGS - 1DS-
0M3(0MT), 2DS-0M3,1DC- 4.8M3(4MT), 2DC- 21M3(17.64MT).
T.P SAJEEV CHIEF ENGINEER 18 JULY 2019
21M3(17.64MT) FO HFHSD FM CARGO TK 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 2DC- 21M3(17.64MT), FINAL SDNGS - 2DC- NIL.
T.P SAJEEV CHIEF ENGINEER 21 JULY 2019
30M3(25.2MT) FO HFHSD FM CARGO TK 3DP & 3DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 3DP- 21.76M3(18.27MT), 3DS- 20.95M3(17.59), FINAL SDNGS -
3DP- 11.76M3(9.87), 3DS- NIL.
T.P SAJEEV CHIEF ENGINEER 28 JULY 2019
10M3(8.4MT) FO HFHSD FM CARGO TK 3DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DP- 11.76M3(9.87MT), FINAL SDNGS - 3DP- 1.76M3(1.4MT).


T.P SAJEEV CHIEF ENGINEER 29 JULY 2019
AT NHAVA JETTY NO.4 FROM M.V SAGAR PRIDE
80M3(67.2MT),HFFHSD, SULPHUR=0.01% LOADED IN FOLLOWING TKS. START-
2305HRS; STOP- 2400HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 40 43.76 M3
3DP 20 23M3
3DS 20 20.46 M3
T.P SAJEEV CHIEF ENGINEER 01 AUG 2019
30M3(25.2MT) FO HFHSD FM CARGO TK 1DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DC- 43.76M3(36.75MT), FINAL SDNGS - 1DC- 13.76M3(11.6MT).


T.P SAJEEV CHIEF ENGINEER 05 AUGUST 2019
DELIVERED TO RIG VIVEKANAND 1
40M3(33.6MT) FO HFHSD FM CARGO TKS3DC &1DC INTIAL QTY-3 DC-
40.76(34.23MT) &1DC-13.76M3(11.5MT)
QTY . RETAINED 3DC -6.76M3(5.6MT) ,1DC-7.76M3(6.5MT).
T.P SAJEEV CHIEF ENGINEER 06 AUGUST 2019

22M3(18.48MT) FO HFHSD FM CARGO TK 1DC,2DC.3DC&3DS


TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DC- 7.76M3(6.5MT),2DC-6.92M3(5.8MT),3DC-6.76M3(5.6MT)


&3DS-19.26M3(16.17MT) FINAL SDNGS - 1DC- 3.76M3(3.15MT),2DC-
3.92M3(3.29MT),3DC-3.76M3(3.15MT)&3DS-6.26M3(5.25MT)
T.P SAJEEV CHIEF ENGINEER 09 AUGUST 2019
AT NHAVA JETTY NO.1 ONGC TERMINAL
250M3(207.5MT),HFFHSD, SULPHUR=0.121% LOADED IN FOLLOWING TKS.
START- 2205HRS; STOP- 2330HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 40 43.76 M3
3DC 35 38.76M3
2DC 30 33.92M3
1DP 27 28.34M3
1DS 27 27M3
2DP 20 21.72M3
2DS 20 20M3
3DS 17 23.26M3
1P 17 17.7M3
1S 17 19.26M3
RANJEET SINGH CHIEF ENGINEER 11 AUG 2019
17M3(14.11MT) FO HFHSD FM CARGO TK 1P
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 1P- 17.7M3(14.7MT), FINAL SDNGS - 1P- 0.7M3(0.58MT).
RANJEET SINGH CHIEF ENGINEER 12 AUGUST 2019
DELIVERED TO MODU SAGAR VIJAY

100M3(83MT) FO HFHSD FM CARGO TKS 1S, 1DC, 2DC & 3DC INTIAL QTY- 1S-
19.26M3(16MT), 1DC-43.76M3(36.3MT) & 2DC-33.92M3(28.2MT), 3DC-
38.76M3(32.2MT)
QTY . RETAINED 1S-3.26M3(2.7MT), 1DC -8.76M3(7.3MT) , 2DC-7.92M3(6.6MT),
3DC-15.76M3(13.1MT)
RANJEET SINGH CHIEF ENGINEER 13 AUGUST 2019
DELIVERED TO RIG SAGAR KIRAN

96M3(79.68MT) FO HFHSD FM CARGO TKS 2DC, 3DC, 1DP, 1DS, 2DP & 2DS
INTIAL QTY- 1DC-8.76M3(7.3MT), 2DC-7.92M3(6.57MT), 3DC-15.76M3(13MT),
1DP-28.34M3(23.5MT), 1DS- 27M3(22.4MT), 2DP-21.72M3(18MT), 2DS-
20M3(16.6MT).

QTY . RETAINED- 1DC-6.76M3(5.6MT), 2DC-3.92M3(3.25MT), 3DC-


6.76M3(5.6MT), 1DP-1.34M3(1.1MT), 1DS- 2M3(1.7MT), 2DP-0.72M3(0.59MT),
2DS- 12M3(9.96MT)
RANJEET SINGH CHIEF ENGINEER 14 AUGUST 2019

25M3(20.75MT) FO HFHSD FM CARGO TK 1DC,2DC,3DC&2DS


TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DC- 6.76M3(5.6MT),2DC-3.92M3(3.3MT),3DC-6.76M3(5.6MT)


&2DS-12M3(9.9MT) FINAL SDNGS - 1DC- 1.76M3(1.5MT),2DC-
0.92M3(0.76MT),3DC-0.76M3(0.63MT)&2DS-1M3(0.83MT)
RANJEET SINGH CHIEF ENGINEER 15 AUGUST 2019
23M3(19MT) FO HFHSD FM CARGO TK 3DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DS-23.26M3(19.3MT) FINAL SDNGS - 3DS-0.26M3(0.21MT)


RANJEET SINGH CHIEF ENGINEER 18 AUGUST 2019
22M3(18.26MT) FO HFHSD FM CARGO TK 3DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DP-23M3(19.09MT) FINAL SDNGS - 3DP-1M3(0.83MT)


RANJEET SINGH CHIEF ENGINEER 24 AUGUST 2019
AT HEERA FIELD FROM M.V.SAGAR FORTUNE
30M3(24.9MT),HFFHSD, SULPHUR=0.143% LOADED IN 1DC. START: 1410 HRS;
STOP- 1450 HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 30 31.76 M3
RANJEET SINGH CHIEF ENGINEER 26 AUGUST 2019
30M3(24.9MT) FO HFHSD FM CARGO TK 1DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DC-31.76M3(26.36MT) FINAL SDNGS - 1DC-1.76M3(1.5MT)


RANJEET SINGH CHIEF ENGINEER 30 AUGUST 2019
AT NHAVA JETTY NO.1 ONGC TERMINAL
250M3(207.5MT),HFFHSD, SULPHUR=0.143% LOADED IN FOLLOWING TKS.
START- 1640HRS; STOP- 1815HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 40 41.76M3
1DP 27 28.34M3
1DS 27 29M3
2DC 32 32.92M3
2DP 20 20.72M3
2DS 20 21M3
3DC 40 40.76M3
3DP 22 23M3
3DS 22 22.26M3
RANJEET SINGH CHIEF ENGINEER 30 AUG 2019
DELIVERED TO RIG-ABAN 3
50M3(41.5MT) FO HFHSD FM CARGO TKS 1DC, 2DC. INTIAL QTY- 1DC-
41.76M3(34.7MT) & 2DC-32.92M3(27.32MT).
QTY . RETAINED 1DC -8.76M3(7.3MT) , 2DC-15.92M3(13.2MT).
RANJEET SINGH CHIEF ENGINEER 31 AUGUST 2019
DELIVERED TO M.V.SEAMEC 3

100M3(83MT) FO HFHSD FM CARGO TKS 2DC, 3DC, 1DP, 1DS, 2DP. INTIAL QTY-
2DC-15.92M3(13.2MT) & 3DC-40.76M3(33.8MT), 1DP- 28.34M3(23.5MT), 1DS-
29M3(24.1MT), 2DP- 20.72M3(17.2MT).

QTY . RETAINED 2DC -7.92M3(6.6MT) , 3DC-7.76M3(6.4MT), 1DP-


4.34M3(3.6MT), 1DS- 4M3(3.32MT), 2DP- 10.72M3(8.9MT).
RANJEET SINGH CHIEF ENGINEER 01 SEPTEMBER 2019
21M3(17.43MT) FO HFHSD FM CARGO TK 2DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 2DS- 21M3(17.43MT) FINAL SDNGS - 2DS-0M3(0MT)


RANJEET SINGH CHIEF ENGINEER 01 SEPTEMBER 2019

24M3(19.92MT) FO HFHSD FM CARGO TK 1DC, 2DC, 3DC, 1DP & 1DS


TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 1DC- 8.76M3(7.3MT),2DC-7.92M3(6.6MT),3DC-7.76M3(6.4MT),
1DP-4.34M3(3.6MT) &1DS-4M3(3.32MT) FINAL SDNGS - 1DC-
2.76M3(2.3MT),2DC-2.92M3(2.4MT),3DC-1.76M3(1.4MT), 1DP-
0.34M3(0.28MT) &1DS-1M3(0.83MT)
RANJEET SINGH CHIEF ENGINEER 04 SEPTEMBER 2019
10M3(8.3MT) FO HFHSD FM CARGO TK 2DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 2DP- 10.72M3(8.9MT) FINAL SDNGS - 2DP-0.72M3(0.6MT)


RANJEET SINGH CHIEF ENGINEER 10 SEPTEMBER 2019
22M3(18.26MT) FO HFHSD FM CARGO TK 3DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DS- 22.26M3(18.4MT) FINAL SDNGS - 3DS-0.26M3(0.21MT)


RANJEET SINGH CHIEF ENGINEER 12 SEPTEMBER 2019
AT NEELAM FIELD FROM M.V.OSL TRIUMPH
100M3(83MT),HFFHSD, SULPHUR=0.143% LOADED IN 3DS, 3DC, 2DP & 2DS.
START: 0625 HRS; STOP- 0740 HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
2DP 20 20.72M3
2DS 20 20M3
3DS 20 20.26M3
3DC 40 41.76M3
RANJEET SINGH CHIEF ENGINEER 13 SEPT 2019
20M3(16.6MT) FO HFHSD FM CARGO TK 2DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 2DS- 20M3(16.6MT) FINAL SDNGS - 2DS-0M3(0MT)


RANJEET SINGH CHIEF ENGINEER 15 SEPTEMBER 2019
20M3(16.6MT) FO HFHSD FM CARGO TK 2DP
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 2DP- 20.72M3(17.2MT) FINAL SDNGS - 2DP-0.72M3(0.6MT)


RANJEET SINGH CHIEF ENGINEER 17 SEPTEMBER 2019
20M3(16.6MT) FO HFHSD FM CARGO TK 3DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DC- 41.76M3(34.7MT) FINAL SDNGS - 3DC-21.76M3(18MT)


RANJEET SINGH CHIEF ENGINEER 19 SEPTEMBER 2019
21M3(17.43MT) FO HFHSD FM CARGO TK 3DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 3DC- 21.76M3(18MT) FINAL SDNGS - 3DC-0.76M3(0.6MT)


RANJEET SINGH CHIEF ENGINEER 21 SEPTEMBER 2019
AT NHAVA JETTY NO.1 ONGC TERMINAL
250M3(207.5MT),HFFHSD, SULPHUR=0.143% LOADED IN FOLLOWING TKS.
START- 0110HRS; STOP- 0310HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 42 44.76M3
1P 18 18.7M3
1S 18 21.26M3
1DP 28 28.34M3
1DS 28 29M3
2DC 32 34.92M3
2DP 21 21.72M3
2DS 21 21M3
3DC 42 42.76M3
RANJEET SINGH CHIEF ENGINEER 22 SEPT 2019
DELIVERED TO RIG-GREAT DRILL CHITRA
50M3(41.5MT) FO HFHSD FM CARGO TKS 1DP, 1DS. INTIAL QTY- 1DP-
28.34M3(23.5MT), 1DS- 29M3(24.1MT).
QTY . RETAINED 1DP- 0.34M3(0.28MT), 1DS- 7M3(5.8MT).
RANJEET SINGH CHIEF ENGINEER 23 SEPTEMBER 2019
28M3(23.2MT) FO HFHSD FM CARGO TK 1S, 1DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 1S-21.26M3(17.6MT), 1DS-7M3(5.8MT) FINAL SDNGS - 1S-
0.26M3(0.21MT), 1DS-0M3(0MT)
RANJEET SINGH CHIEF ENGINEER 26 SEPTEMBER 2019
32M3(26.6MT) FO HFHSD FM CARGO TK 1P, 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 1P-18.7M3(15.5MT), 1DC-44.76M3(37.1MT) FINAL SDNGS - 1P-
0.7M3(0.58MT), 1DC-30.76M3(25.5MT)
RANJEET SINGH CHIEF ENGINEER 01 OCTOBER 2019
28M3(23.2MT) FO HFHSD FM CARGO TK 1DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 1DC-30.76M3(25.5MT) FINAL SDNGS - 1DC-2.76M3(2.3MT)


RANJEET SINGH CHIEF ENGINEER 05 OCTOBER 2019
34M3(28.22MT) FO HFHSD FM CARGO TK 2DS, 2DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS - 2DS-21M3(17.4MT), 2DP-21.72M3(18MT) FINAL SDNGS - 2DS-
0.5M3(0.4MT), 2DP-8.22M3(6.8MT)
RANJEET SINGH CHIEF ENGINEER 09 OCTOBER 2019
DELIVERED TO OCEAN CREWZER-1
06M3(4.98MT) FO HFHSD FM CARGO TKS 2DC. INTIAL QTY- 2DC-
34.92M3(28.98MT).
QTY . RETAINED 2DC- 28.92M3(24MT).
RANJEET SINGH CHIEF ENGINEER 12 OCTOBER 2019
28M3(23.2MT) FO HFHSD FM CARGO TK 2DC
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS - 2DC-28.92M3(24MT), FINAL SDNGS - 2DC-0.92M3(0.76MT).


RANJEET SINGH CHIEF ENGINEER 13 OCTOBER 2019

AT NHAVA JETTY NO 2 ONGC TERMINAL


150 M3 (124.421 MT), HFFHSD, SULPHER-0.136%
LOADED IN FOLLOWING TANKS, START-2246 HRS,STOP-2340 HRS
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 22 23.12
2DP 20 20.50
2DS 20 20.50
2DC 31 31.89
3DS 24.5 24.70
3DC 32.5 36.00
RANJEET SINGH CHIEF ENGINEER 16-OCT-2019
DELIVERED TO RIG VIVEKANAND- 1

100 M3 (83MT) FO HFHSD FM CARGO TKS 1DC,2DC,3DC,2DS & 2DP INITIAL


QTY- 1DC-23.12 M3(19.18MT),2DC-30.89M3(25.63MT),3DC-40.10
M3(33.28MT),2DS-20.80M3(17.26MT),2DP-20.50M3(17.01MT)
QTY. RETAINED 1DC-5.12M3(4.24MT),2DC-7.89M3(6.54MT),3DC-
3.10M3(2.57MT),2DS-1.80M3(1.49MT),2DP-17.50M3(14.52MT)
RANJEET SINGH CHIEF ENGINEER 20-OCT-2019

28.65M3(23.77MT),FO HFHSD FM CARGO TK 1DC,2DC,3DC,2DP&2DS


TRANSFERRED TO 5C SHIPS FO TK

INT SDGS- 1DC-5.12M3(4.24MT),FINAL SDGS 1DC-2.25M3(1.86MT), INT SDGD-


2DC-7.89M3(6.54MT),FINAL SDGS 2DC-3.00M3(2.49MT), INT SDGS-3DC-
3.1M3(2.57MT), FINAL SDGS 3DC-0.51M3(0.42MT), INT SDGS-2DP-
17.5M3(14.52MT),FINAL SDGS 2DP-0.50M3(0.41MT), INT SDGS-2DS-
1.8M3(1.4MT),FINAL SDGS 2DS-0.5M3(0.41MT).
RANJEET SINGH CHIEF ENGINEER 20-OCT-2019
29.5M3 (24.48MT) FO HFHSD FM CARGO TKS 3DP& 3DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS-3DP-24.73M3(20.52MT),FINAL SDGS 3DP-3.73M3(3.09MT) INT SDGS


-3DS24.13M3(20.02MT),FINAL SDGS 3DS-15.63M3(12.9MT)
RANJEET SINGH CHIEF ENGINEER 24-OCT-19
13.2 M3(10.95MT),FO HFHSD FM CARGO TK 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS -1DC-16.9M3(14.02MT),FINAL SDGS 1DC- 3.7M3(3.07MT)
RANJEET SINGH CHIEF ENGINEER 03-NOV-19
AT NHAVA JETTY NO1, ONGC SUPPLY BASE
220M3(184.8MT) HFHSD OF SULPHER-0.0008%
LOADED IN FOLLOWING TANKS, START-0910 HRS,STOP-1050 HRS
TANK QTY ADDED-M3 TOTAL CONTENT-M3
3DC 40 40.51
2DC 30 33
1DP 25 25.8
1DS 25 25.8
2DP 18 18.5
2DS 18 18.5
3DP 18 18.5
3DS 15 15.5
1P 15 15.9
1S 16 16.56
T.P SAJEEV CHIEF ENGINEER 06-NOV-19
22M3(18.26MT), FO HFHSD FM CARGO TK 1DP & 1DS
TRANSFERRED TO 4DC SHIPS FO TK

INT SDGS 1DP-27.31M3(22.66MT),FINAL SDGS 1DP-15.31M3(12.7MT)

INT SDGS 1DS-25.8M3(21.41MT), FINAL SDGS 1DS-15.8M3(13.11MT)


T.P SAJEEV CHIEF ENGINEER 08-NOV-19
20M3(16.6MT), FO HFHSD FM CARGO TK 1DP & 1DS
TRANSFERRED TO 4DC SHIPS FO TK

INT SDGS 1DP-13.61M3(11.29MT),FINAL SDGS 1DP- 2.61M3(2.16MT)


INT SDGS 1DS-16.6M3(13.77MT),FINAL SDGS 1DS-7.6M3(6.3MT)
T.P SAJEEV CHIEF ENGINEER 10-NOV-19
24M3(19.92MT) , FO HFHSD FM CARGO TK 2DP& 2DS
TRANSFERRED TO 5C SHIPS FO TK

INT SDGS 2DP- 18.92M3(15.7MT), FINAL SDGS 2DP-6.92M3(5.74MT)

INT SDGS 2DS-19.37M3(16.07MT),FINAL SDGS 2DS-7.37M3(6.11MT)


T.P SAJEEV CHIEF ENGINEER 13-NOV-19
21.26M3(17.64MT), FO HFHSD FM CARGO TK 1DP ,1DS,2DP& 2DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DP-3.7M3(3.07MT),FINAL SDGS 1DP- 0.89M3(0.73MT)
INT SDGS 1DS-8.2M3(6.80MT),FINAL SDGS 1DS-0.89M3(0.73MT)
INT SDGS 2DP-6.5M3(5.39MT),FINAL SDGS 2DP-0.91M3(0.75MT)
INT SDGS 2DS-6.3M3(5.22MT),FINAL SDGS 2DS-0.75M3(0.62MT)
T.P SAJEEV CHIEF ENGINEER 16-NOV-19
25M3(20.95MT),FO HFHSD FM CARGO TK 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 2DC-38.53M3(32.28MT),FINAL SDGS 2DC-13.24M3(11.09MT)

T.P SAJEEV CHIEF ENGINEER 19-NOV-19


10.54M3(8.83MT),FO HFHSD FM CARGO TK 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 2DC-13.24M3(11.09MT),FINAL SDGS 2DC-2.7M3(2.26MT)

T.P SAJEEV CHIEF ENGINEER 21-NOV-19


AT NHAVA JETTY NO5, ONGC SUPPLY BASE
150M3(124.5MT) HFHSD OF SULPHER-0.0008%
LOADED IN FOLLOWING TANKS, START-1445 HRS,STOP-1610HRS
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DP 25 25.89
1DS 25 25.89
2DP 15 15.91
2DS 15 15.75
1DC 40 41.87
2DC 30 32.70
T.P SAJEEV CHIEF ENGINEER 23-NOV-19
26M3(21.78MT),FO HFHSD FM CARGO TK 1DP,1DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS1DP-25.89M3(21.69MT),FINAL SDGS 1DP-12.89M3(10.8MT)

INT SGS 1DS-25.78M3(21.6MT),FINAL SDGS 1DS-12.68M3(10.62MT)

T.P SAJEEV CHIEF ENGINEER 25-NOV-19


24.2M3(20.27MT),FO HFHSD FM CARGO TK 1DP,1DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS1DP-11.46M3(9.6MT),FINAL SDGS 1DP-0.48M3(0.40MT)
INT SGS 1DS-13.62M3(11.41MT),FINAL SDGS 1DS-0.4M3(0.33MT)
T.P SAJEEV CHIEF ENGINEER 29-NOV-19
28.1M3(23.54MT),FO HFHSD FM CARGO TK 2DP,2DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS2DP-15.58M3(13.05MT),FINAL SDGS 2DP-1.08M3(0.90MT)

INT SGS 2DS-15.8M3(13.24MT),FINAL SDGS 2DS-2.2M3(1.84MT)


T.P SAJEEV CHIEF ENGINEER 03-DEC-19
DELIVERED TO OCEAN CREWZER-2
08M3(6.70MT) FO HFHSD FM CARGO TKS 2DC. INTIAL QTY- 2DC-
31M3(25.97MT).
QTY . RETAINED 2DC- 23M3(19.27MT).
T.P SAJEEV CHIEF ENGINEER 04-DEC-19
DELIVERED TO OCEAN CREWZER-2
08M3(6.70MT) FO HFHSD FM CARGO TKS 2DC. INTIAL QTY- 2DC-
21.07M3(17.65MT).
QTY . RETAINED 2DC- 13.07M3(10.95MT).
T.P SAJEEV CHIEF ENGINEER 07-DEC-19
26.7M3(22.37MT),FO HFHSD FM CARGO TK 2DC,3DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS2DC-13.24M3(11.09MT),FINAL SDGS 2DC-0.8M3(0.67MT)
INT SGS 3DS-15.68M3(13.13MT),FINAL SDGS 3DS-1.42M3(1.18MT)
T.P SAJEEV CHIEF ENGINEER 08-DEC-19
AT NHAVA JETTY NO5, ONGC SUPPLY BASE
100M3(83MT) HFHSD OF SULPHER-0.0007%
LOADED IN FOLLOWING TANKS, START-1035 HRS,STOP-1110HRS
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DP 17 17.48
1DS 20 20.4
2DP 20 21.08
2DS 20 22.2
3DS 23 24.42
T.P SAJEEV CHIEF ENGINEER 11-DEC-19
DELIVERED TO S.B. ORCA
01M3(0.84MT) FO HFHSD FM CARGO TKS 2DP. INTIAL QTY- 2DP-
21.08M3(17.5MT).
QTY . RETAINED 2DP- 20.08M3(16.7MT).
T.P SAJEEV CHIEF ENGINEER 11-DEC-19
31M3(25.7MT),FO HFHSD FM CARGO TK 1DP,1DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS1DP-17.48M3(14.5MT),FINAL SDGS 1DP-0.65M3(0.53MT)
INT SGS 1DS-20.4M3(16.9MT),FINAL SDGS 1DS-6.23M3(5.2MT)
T.P SAJEEV CHIEF ENGINEER 14-DEC-19
27.2M3(22.6MT),FO HFHSD FM CARGO TK 1DC,1DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS1DC-41.87M3(34.75MT),FINAL SDGS 1DC-20.25M3(16.8MT)
INT SGS 1DS-6.23M3(5.2MT),FINAL SDGS 1DS-0.65M3(0.53MT)
T.P SAJEEV CHIEF ENGINEER 17-DEC-19
31.1M3(25.81MT),FO HFHSD FM CARGO TK 1P,1S
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1P-15.9M3(13.2MT),FINAL SDGS 1P-0.6M3(0.49MT)
INT SGS 1S-16.56M3(13.74MT),FINAL SDGS 1S-0.76M3(0.63MT)
T.P SAJEEV CHIEF ENGINEER 20-DEC-19
34.08M3(28.29MT),FO HFHSD FM CARGO TK 2DP, 2DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 2DP-20.08M3(16.7MT),FINAL SDGS 2DP-7.7M3(6.4MT)
INT SGS 2DS-22.2M3(18.4MT),FINAL SDGS 2DS-0.5M3(0.41MT)
T.P SAJEEV CHIEF ENGINEER 26-DEC-19
AT NHAVA JETTY NO5, ONGC SUPPLY BASE
100M3(82MT) HFHSD OF SULPHER-0.0005%
LOADED IN FOLLOWING TANKS, START-0058 HRS,STOP-0135HRS
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DP 28 28.65
1DS 20 20.65
1DC 19 42.3
2DC 33 33.89
T.P SAJEEV CHIEF ENGINEER 29-DEC-19
DELIVERED TO RIG-G.D.CHETNA
50M3(41MT) FO HFHSD FM CARGO TKS 1DC,1DP. INTIAL QTY- 1DC-
42.3M3(35.1MT), 1DP- 28.65M3(23.49MT).
QTY . RETAINED 1DC-6.8M3(5.64MT),1DP- 14.15M3(11.74MT).
T.P SAJEEV CHIEF ENGINEER 30-DEC-19
25.63M3(21.02MT),FO HFHSD FM CARGO TK 1DC, 1DP,2DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DC-6.8M3(5.64MT),FINAL SDGS 1DC-1.87M3(1.53MT)
INT SGS 1DP-14.15M3(11.74MT),FINAL SDGS 1DP-0.65M3(0.53MT)
INT SDGS 2DP-7.7M3(6.4MT),FINAL SDGS 2DP-0.5M3(0.41MT)
T.P SAJEEV CHIEF ENGINEER 01-JAN-20
28.45M3(23.3MT),FO HFHSD FM CARGO TK 1DS, 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DS-20.65M3(16.93MT),FINAL SDGS 1DS-0.89M3(0.72MT)
INT SDGS 2DC-33.89M3(27.78MT),FINAL SDGS 2DC-25.2M3(20.7MT)
T.P SAJEEV CHIEF ENGINEER 04-JAN-20
31.14M3(25.53MT),FO HFHSD FM CARGO TK 3DS, 3DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 3DS-24.42M3(20.02MT),FINAL SDGS 3DS-8.4M3(6.9MT)
INT SDGS 3DP-18.5M3(15.17MT),FINAL SDGS 3DP-3.38M3(2.77MT)
T.P SAJEEV CHIEF ENGINEER 09-JAN-20
30.4M3(24.9MT),FO HFHSD FM CARGO TK 3DS, 3DP & 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 3DS-8.4M3(6.9MT),FINAL SDGS 3DS-0.82M3(0.67MT)
INT SDGS 3DP-3.38M3(2.77MT),FINAL SDGS 3DP-0.96M3(0.78MT)
INT SDGS 2DC-25.2M3(20.7MT),FINAL SDGS 2DC-4.8M3(3.93MT)
T.P SAJEEV CHIEF ENGINEER 13-JAN-20
AT NHAVA JETTY NO 4, ONGC SUPPLY BASE
250M3(207.5MT) HFHSD OF SULPHER-0.0008%
LOADED IN FOLLOWING TANKS, START- 1807HRS,STOP-1943HRS
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 40 41.87
2DC 30 34.8
1DP 28 28.65
1DS 28 28.89
2DP 20 20.5
2DS 20 20.5
3DP 24 24.96
3DS 24 24.82
1P 18 18.6
1S 18 18.76
T.P SAJEEV CHIEF ENGINEER 13-JAN-20
36.24M3(30.07MT),FO HFHSD FM CARGO TK 1P & 1S
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1P-18.6M3(15.44MT),FINAL SDGS 1P-0.47M3(0.39MT)
INT SDGS 1S-18.76M3(15.57MT),FINAL SDGS 1S-0.65M3(0.53MT)
PANKAJ BHATT 2ND ENGINEER 19-JAN-20
18.38M3(15.25MT),FO HFHSD FM CARGO TK 2DP & 2DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 2DP-20.5M3(17.01MT),FINAL SDGS 2DP-10.55M3(8.75MT)
INT SDGS 2DS-20.5M3(17.01MT),FINAL SDGS 2DS-12.07M3(10.01MT)
PANKAJ BHATT 2ND ENGINEER 22-JAN-20
28.63M3(23.76MT),FO HFHSD FM CARGO TK 2DP, 2DS & 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 2DP-10.55M3(8.75MT),FINAL SDGS 2DP-0.6M3(0.49MT)
INT SDGS 2DS-12.07M3(10.01MT),FINAL SDGS 2DS-0.5M3(0.41MT)
INT SDGS 2DC-34.8M3(28.88MT),FINAL SDGS 2DC-27.69M3(22.98MT)
SALMAN FARCY 3RD ENGINEER 25-JAN-2020
25.89M3(21.49MT),FO HFHSD FM CARGO TK 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 2DC-27.69M3(22.98MT),FINAL SDGS 2DC-1.8M3(1.49MT)
SALMAN FARCY 3RD ENGINEER 30-JAN-2020
33.49M3(27.79MT),FO HFHSD FM CARGO TK 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 3DC-40.51M3(33.62MT),FINAL SDGS 3DC-7.02M3(5.82MT)
PANKAJ BHATT 2ND ENGINEER 02-FEB-2020
29.85M3(24.77MT),FO HFHSD FM CARGO TK 1DP, 1DS & 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DP-28.65M3(23.77MT),FINAL SDGS 1DP-16.6M3(13.77MT)
INT SDGS 1DS-28.89M3(23.97MT),FINAL SDGS 1DS-17.98M3(14.92MT)
INT SDGS 3DC-7.02M3(5.82MT),FINAL SDGS 3DC-0.13M3(0.1MT)
SALMAN FARCY 3RD ENGINEER 06-FEB-20
DELIVERED TO M.V. SAROJA BLESSING
50M3(41.5MT) FO HFHSD FM CARGO TKS 3DP, 3DS & 1DS. INTIAL QTY- 3DP-
24.96M3(20.71MT),3DS- 24.82M3(20.60MT) & 1DS- 17.98M3(14.92MT)
QTY . RETAINED 3DP- 1.09M3(0.90MT),3DS- 0.46M3(0.38MT) & 1DS-
16.21M3(13.45MT).
SALMAN FARCY 3RD ENGINEER 10-FEB-2020
DELIVERED TO OCEAN CREWZER-3
08M3(6.64MT) FO HFHSD FM CARGO TKS 1DP. INTIAL QTY- 1DP- 16.6M3
(13.77MT).
QTY . RETAINED 1DP- 8.6M3(7.13MT).
PANKAJ BHATT 2ND ENGINEER 11-FEB-2020
22.86M3(18.97MT),FO HFHSD FM CARGO TK 1DS, 1DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DS-16.21M3(13.45MT),FINAL SDGS 1DS-0.65M3(0.54MT)
INT SDGS 1DP-8.6M3(7.13MT),FINAL SDGS 1DP-1.3M3(1.08MT)
SALMAN FARCY 3RD ENGINEER 11-FEB-2020
DELIVERED TO JACKET B179A
02M3(1.66MT) FO HFHSD FM CARGO TKS 1DC. INTIAL QTY- 1DC- 41.87M3
(34.75MT).
QTY . RETAINED 1DC- 39.87M3(33.09MT).
PANKAJ BHATT 2ND ENGINEER 12-FEB-2020
19.18M3(15.91MT),FO HFHSD FM CARGO TK 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DC-39.87M3(33.09MT),FINAL SDGS 1DC-20.69M3(17.17MT)
PANKAJ BHATT 2ND ENGINEER 13-FEB-2020
AT NHAVA JETTY NO 1, ONGC SUPPLY BASE
230M3(190.9MT) HFHSD OF SULPHER-0.0008%
LOADED IN FOLLOWING TANKS, START- 1555HRS,STOP-1722HRS
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 21 41.69
2DC 30 31.8
3DC 41 41.13
1DP 26 27.3
1DS 27 27.65
2DP 20 20.6
2DS 20 20.5
3DP 22 23.09
3DS 23 23.46
RANJEET SINGH CHIEF ENGINEER 14-FEB-20
30.69M3(25.47MT),FO HFHSD FM CARGO TK 1DP & 1DS.
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DP-27.3M3(22.65MT),FINAL SDGS 1DP-11.73M3(9.73MT)
INT SDGS 1DS-27.65M3(22.94MT),FINAL SDGS 1DS-12.53M3(10.39MT)
SALMAN FARCY 3RD ENGINEER 17-FEB-20
22.72M3(18.85MT),FO HFHSD FM CARGO TK 1DP & 1DS.
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DP-11.73M3(9.73MT),FINAL SDGS 1DP-0.65M3(0.53MT)
INT SDGS 1DS-12.53M3(10.39MT),FINAL SDGS 1DS-0.89M3(0.73MT)
PANKAJ BHATT 2ND ENGINEER 21-FEB-20
27.4M3(22.74MT),FO HFHSD FM CARGO TK 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DC-41.69M3(34.6MT),FINAL SDGS 1DC-14.29M3(11.86MT)
SALMAN FARCY 3RD ENGINEER 23-FEB-20
32.34M3(26.84MT),FO HFHSD FM CARGO TK 1DC & 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DC-14.29M3(11.86MT),FINAL SDGS 1DC-2.62M3(2.17MT)
INT SDGS 2DC-31.8M3(26.39MT),FINAL SDGS 2DC-11.13M3(9.24MT)
SALMAN FARCY 3RD ENGINEER 27-FEB-20
31.39M3(26.05MT),FO HFHSD FM CARGO TK 2DP & 2DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 2DP-20.6M3(17.09MT),FINAL SDGS 2DP-8.84M3(7.33MT)
INT SDGS 2DS-20.5M3(17.01MT),FINAL SDGS 2DS-0.87M3(0.72MT)
PANKAJ BHATT 2ND ENGINEER 03-MARCH-20
31.22M3(25.91MT),FO HFHSD FM CARGO TK 2DP, 2DC & 3DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 2DP-8.84M3(7.33MT),FINAL SDGS 2DP-0.68M3(0.56MT)
INT SDGS 2DC-11.13M3(9.24MT),FINAL SDGS 2DC-2.4M3(1.99MT)
INT SDGS 3DS-23.46M3(19.47MT),FINAL SDGS 3DS-9.13M3(7.57MT)
SALMAN FARCY 3RD ENGINEER 07-MARCH-20
31.18M3(25.87MT),FO HFHSD FM CARGO TK 3DP & 3DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 3DP-23.09M3(19.16MT),FINAL SDGS 3DP-0.58M3(0.48MT)
INT SDGS 3DS-9.13M3(7.57MT),FINAL SDGS 3DS-0.46M3(0.38MT)
SALMAN FARCY 3RD ENGINEER 10-MARCH-20
19.85M3(16.47MT),FO HFHSD FM CARGO TK 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 3DC-41.13M3(34.13MT),FINAL SDGS 3DC-21.28M3(17.66MT)
PANKAJ BHATT 2ND ENGINEER 15-MARCH-20
20.77M3(17.23MT),FO HFHSD FM CARGO TK 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 3DC-21.28M3(17.66MT),FINAL SDGS 3DC-0.51M3(0.42MT)
SALMAN FARCY 3RD ENGINEER 17-MARCH-20
AT NHAVA JETTY NO 5, ONGC SUPPLY BASE
300M3(249MT) HFHSD OF SULPHER-0.0005%
LOADED IN FOLLOWING TANKS, START- 1505HRS,STOP-1722HRS
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 42 44.62
2DC 33 35.4
3DC 43 43.51
1DP 28 28.65
1DS 28 28.89
2DP 21 21.68
2DS 21 21.87
3DP 24 24.58
3DS 24 24.46
1P 18 18.47
1S 18 18.65
RANJEET SINGH CHIEF ENGINEER 17-MARCH-20
28.74M3(23.85MT),FO HFHSD FM CARGO TK 1P & 1S
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1P-18.47M3(15.33MT),FINAL SDGS 1P-7.67M3(6.36MT)
INT SDGS 1S-18.65M3(15.47MT),FINAL SDGS 1S-0.71M3(0.58MT)
SALMAN FARCY 3RD ENGINEER 20-MARCH-20
29.76M3(24.7MT),FO HFHSD FM CARGO TK 1P & 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1P-7.67M3(6.36MT),FINAL SDGS 1P-0.71M3(0.58MT)
INT SDGS 1DC-44.62M3(37.03MT),FINAL SDGS 1DC-21.82M3(18.11MT)
JAISANKAR 2ND ENGINEER 24-MARCH-20
DELIVERED TO M.V. GREAT SHIP ASMI
50M3(41.5MT) FO HFHSD FM CARGO TKS 1DP & 1DS. INTIAL QTY- 1DP-
28.65M3(23.77MT), 1DS-28.89M3(23.97MT)
QTY . RETAINED 1DP- 0.65M3(0.53MT), 1DS- 6.89M3(5.71MT)
RANJEET SINGH CHIEF ENGINEER 24-MARCH-2020
25.95M3(21.53MT),FO HFHSD FM CARGO TK 1DS & 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DS-6.89M3(5.71MT),FINAL SDGS 1DS-0.89M3(0.73MT)
INT SDGS 1DC-21.82M3(18.11MT),FINAL SDGS 1DC-1.87M3(1.55MT)
SALMAN FARCY 3RD ENGINEER 28-MARCH-20
32.4M3(26.89MT),FO HFHSD FM CARGO TK 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 2DC-35.4M3(29.38MT),FINAL SDGS 2DC-3M3(2.49MT)
JAISANKAR 2ND ENGINEER 01-APRIL-20
26.7M3(22.16MT),FO HFHSD FM CARGO TK 2DP & 2DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 2DP- 21.68M3(17.99MT),FINAL SDGS 2DP-9.27M3(7.69MT)
INT SDGS 2DS- 21.87M3(18.15MT),FINAL SDGS 2DS-7.58M3(6.29MT)
SALMAN FARCY 3RD ENGINEER 04-APRIL-20
29.62M3(24.58MT),FO HFHSD FM CARGO TK 2DP, 2DS & 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 2DP- 9.27M3(7.69MT),FINAL SDGS 2DP-0.68M3(0.56MT)
INT SDGS 2DS- 7.58M3(6.29MT),FINAL SDGS 2DS-0.50M3(0.41MT)
INT SDGS 3DC- 43.51M3(36.11MT),FINAL SDGS 3DC-29.56M3(24.53MT)
SALMAN FARCY 3RD ENGINEER 09-APRIL-20
28.06M3(23.28MT),FO HFHSD FM CARGO TK 3DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 3DC- 29.56M3(24.53MT),FINAL SDGS 3DC-1.5M3(1.24MT)
JAISANKAR 2ND ENGINEER 13-APRIL-20
24.24M3(20.1MT),FO HFHSD FM CARGO TK 3DS
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 3DS- 24.46M3(20.3MT),FINAL SDGS 3DS-0.22M3(0.18MT)
SALMAN FARCY 3RD ENGINEER 16-APRIL-20
AT RATNA FIELD FROM M.V.OSL GLORY
60M3(49.8MT),HFFHSD, SULPHUR=0.0006% LOADED IN 2DC & 3DC. START:
1610 HRS; STOP- 1640 HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
2DC 25 28 M3
3DC 35 36.5 M3
RANJEET SINGH CHIEF ENGINEER 18-APRIL-20
24M3(19.92MT),FO HFHSD FM CARGO TK 3DP
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 3DP- 24.58M3(20.4MT),FINAL SDGS 3DP-0.58M3(0.48MT)
JAISANKAR 2ND ENGINEER 20-APRIL-20
26.2M3(21.74MT),FO HFHSD FM CARGO TK 2DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 2DC- 28M3(23.24MT),FINAL SDGS 2DC-1.8M3(1.49MT)
SALMAN FARCY 3RD ENGINEER 22-APRIL-20
AT HEERA FIELD FROM M.V.EMERALD
100M3(83MT),HFFHSD, SULPHUR=0.0006% LOADED IN 1DC, 2DC, 2DP & 2DS.
START: 1830 HRS; STOP- 2000 HRS
TOTAL QTY LOADED AS UNDER
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 40 41.87M3
2DC 30 31.8M3
2DP 15 15.68M3
2DS 15 15.5M3
RANJEET SINGH CHIEF ENGINEER 22-APRIL-20
30.59M3(25.38MT),FO HFHSD FM CARGO TK 1DC
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DC- 41.87M3(34.75MT),FINAL SDGS 1DC-11.28M3(9.36MT)
SALMAN FARCY 3RD ENGINEER 26-APRIL-20
29.81M3(24.74MT),FO HFHSD FM CARGO TK 2DP & 2DS.
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 2DP- 15.68M3(13.01MT),FINAL SDGS 2DP-0.87M3(0.72MT)
INT SDGS 2DS- 15.5M3(12.86MT),FINAL SDGS 2DS-0.5M3(0.42MT)
SALMAN FARCY 3RD ENGINEER 29-APRIL-20
25.58M3(21.23MT),FO HFHSD FM CARGO TK 1DC & 2DC.
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DC- 11.28M3(9.36MT),FINAL SDGS 1DC-3.7M3(3.07MT)
INT SDGS 2DC- 31.8M3(26.39MT),FINAL SDGS 2DC-13.8M3(11.45MT)
SALMAN FARCY 3RD ENGINEER 04-MAY-20
32.65M3(27.09MT),FO HFHSD FM CARGO TK 2DC & 3DC.
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 2DC- 13.8M3(11.45MT),FINAL SDGS 2DC-0.89M3(0.74MT)
INT SDGS 3DC- 36.5M3(30.29MT),FINAL SDGS 3DC-16.76M3(13.91MT)
JAISANKAR 2ND ENGINEER 09-MAY-20
16.54M3(13.72MT), FO HFHSD FM CARGO TK 3DC.
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 3DC- 16.76M3(13.91MT),FINAL SDGS 3DC-0.22M3(0.18MT)
JAISANKAR 2ND ENGINEER 14-MAY-20
AT NHAVA JETTY NO 5, ONGC SUPPLY BASE
250M3(207.5MT) HFHSD OF SULPHER-0.0006%
LOADED IN FOLLOWING TANKS, START- 1530HRS,STOP-1658HRS
TANK QTY ADDED-M3 TOTAL CONTENT-M3
1DC 40 43.7
2DC 30 30.89
3DC 40 40.22
1DP 27 27.65
1DS 27 27.89
2DP 20 20.87
2DS 20 20.5
3DP 23 23.58
3DS 23 23.22
RANJEET SINGH CHIEF ENGINEER 15-MAY-20
DELIVERED TO PLATFORM R10 A
10M3(8.3MT) FO HFHSD FM CARGO TKS 1DS. INTIAL QTY- 1DS- 27.89M3
(23.14MT).
QTY . RETAINED 1DS- 17.89M3(14.84MT).
RANJEET SINGH CHIEF ENGINEER 18-MAY-2020
DELIVERED TO PLATFORM R12
20M3(16.6MT) FO HFHSD FM CARGO TKS 1DP. INTIAL QTY- 1DP- 27.65M3
(22.94MT).
QTY . RETAINED 1DP- 7.65M3(6.34MT).
RANJEET SINGH CHIEF ENGINEER 18-MAY-2020
32.47M3(26.95MT),FO HFHSD FM CARGO TK 1DP, 1DS & 1DC.
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DP- 7.65M3(6.34MT),FINAL SDGS 1DP-0.89M3(0.73MT)
INT SDGS 1DS- 17.89M3(14.84MT),FINAL SDGS 1DS-0.89M3(0.73MT)
INT SDGS 1DC- 43.7M3(36.27MT),FINAL SDGS 1DC-34.99M3(29.04MT)
SALMAN FARCY 3RD ENGINEER 18-MAY-20
26.39M3(21.90MT),FO HFHSD FM CARGO TK 1DC.
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DC- 34.99M3(29.04MT),FINAL SDGS 1DC-8.6M3(7.13MT)
SALMAN FARCY 3RD ENGINEER 21-MAY-20
25.97M3(21.55MT),FO HFHSD FM CARGO TK 1DC & 2DP.
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 1DC- 8.6M3(7.13MT),FINAL SDGS 1DC-3M3(2.49MT)
INT SDGS 2DP- 20.87M3(17.32MT),FINAL SDGS 2DP-0.5M3(0.41MT)
SALMAN FARCY 3RD ENGINEER 26-MAY-20
19.82M3(16.45MT),FO HFHSD FM CARGO TK 2DS.
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 2DS- 20.5M3(17.01MT),FINAL SDGS 2DS-0.68M3(0.56MT)
JAISANKAR 2ND ENGINEER 30-MAY-20
DELIVERED TO M.V PFS SUPPLIER
30M3(24.9MT) FO HFHSD FM CARGO TKS 2DC & 3DC. INTIAL QTY- 2DC-
30.89M3 (25.63MT), 3DC- 40.22M3 (33.38MT)
QTY . RETAINED 2DC- 3.89M3(3.23MT), 3DC- 37.22M3(30.89MT).
RANJEET SINGH CHIEF ENGINEER 31-MAY-2020
DELIVERED TO M.V SAGAR PRIDE
20M3(16.6MT) FO HFHSD FM CARGO TKS 3DC. INTIAL QTY- 3DC-
37.22M3(30.89MT).
QTY . RETAINED 3DC- 17.22M3(14.29MT).
RANJEET SINGH CHIEF ENGINEER 01-JUNE-2020
16.32M3(13.54MT),FO HFHSD FM CARGO TK 3DC.
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 3DC- 17.22M3(14.29MT),FINAL SDGS 3DC-0.9M3(0.74MT)
JAISANKAR 2ND ENGINEER 02-JUNE-20
22.64M3(18.79MT),FO HFHSD FM CARGO TK 3DS.
TRANSFERRED TO 5C SHIPS FO TK
INT SDGS 3DS -23.22M3(19.27MT),FINAL SDGS 3DS-0.58M3(0.48MT)
SALMAN FARCY 3RD ENGINEER 04-JUNE-20
1 DAILY BILGE P/P CAPACITY- 2M3/HR

2 OWS P/P CAPACITY- 1.2M3/HR

3 SLUDGE P/P CAPACITY- 5M3/HR