Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
CONTENTS
4. REFERENCES ........................................................................................................................................... 3
ANNEX 1: EXAMPLE OF FORMATS OF THE EMAIL THAT ACCOMPANYING THE ANNEX 2 .................. 27
1/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
2/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
4. REFERENCES
The Enel Group Code of Ethics;
Zero Corruption Tolerance (ZCT) Plan;
Enel Human Right Policy;
Enel Global Compliance Program (EGCP);
Global Infrastructure and Networks RACI Handbook;
3/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
4/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
Any internal or external event affecting power grid that can impact on the
population, the employees, the Enel Group reputation, the installations, the
environment, stakeholders. Emergency cannot be faced through normal
Emergency Status operations, but it requires a specific operative supports. The emergency can be
caused by accidental, natural, criminal or fraudulent events.
Emergencies can be classified in three levels of severity: Emergency Level 1,
Emergency Level 2 and Crisis Status.
Office or referent appointed by the Country Manager with the following
responsibilities:
providing alerts, from either internal and external sources, on threats which can
lead to potential critical event;
Critical Event
dispatching bulletins and notifications regarding the response operations;
Monitoring Office
supporting telephone call service available 24hours/7 days.
The Country Manager shall inform his relevant C-LCOs about the contacts of the
Critical Event Monitoring Office (e.g. through a Country Critical Event Management
procedure or policy).
The Security Control Room, settled in Rome, Viale Regina Margherita, has the
responsibility of:
Security Control supporting telephone call service available 24hours/7 days;
Room supporting Top Management telephone communication;
collecting and dispatching in a structured and prompt way alerts in case of
a pre-alert or a critical event.
Committee led by the Group CEO and composed by the Heads of the relevant
GBLs/GSFs, the relevant Countries/Regions, Communications, Administration,
Finance and Control, People and Organization, Group CEC, Head of relevant
Group Crisis Country Security, and any other Head of functions/units providing useful support in
Management coping with Crisis (e.g. Health and Safety, Digital Solutions, Services, Legal Affairs,
Committee (GCC) local Public Relations, ...).
It has the responsibility to manage Group Red Code events and restore operation
activities and services.
Group Crisis
Evaluation Committee composed by Holding Security and Holding Real Time Communications
Committee Unit, or by their delegates; it evaluates the impacts of a Critical Event for the Group.
(G-CEC)
5/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
Country Crisis
Management Committee led by the Country Manager and composed by the Country Heads of all
Committee the Line/Staff Units (or, in case of their unavailability, by delegated Country Line
Crisis Officers) and the C-CEC.
(CCC)
Country Crisis
Evaluation Committee established by the delegates of Security (Holding) and Real Time
Committee Communications (Holding); it evaluates the impacts of a Critical Event for the
relevant Country.
(C-CEC)
Global Line Crisis Contact person responsible for critical event management at global level for the
Officer Global Line. For Global I&N is the head of Global Operation and Maintenance. Any
change must be communicate to Holding Security and Holding Real Time
(G-LCO) Communications.
Employee (on call shift, 24h/7d) at territorial level (I&N Country/Company) who is
responsible for:
analyzing and classifying the Critical Event occurred in the corresponding
I&N Territorial territorial area in accordance with I&N Impact Matrix;
Referent activating the units in charge of operational management of the Critical
Event.
The designated I&N Territorial Referents shall be communicated to the relevant
Country Security and Holding Real Time Communications.
I&N Emergency Person in charge to manage the operational activities during the crisis situation. It
Responsible usually corresponds to I&N Territorial Referent.
Person (on call shift, 24h/7d) belonging to a line/staff organizational unit of the
Country, which ensures the flow of information to the Critical Event Monitoring Office
Country Line Crisis and the C-CEC and the coordination of the actions directed by the Country Crisis
Officer Committee.
(C-LCO) He/She may also substitute the Country’s Head of his relevant Line/Staff Unit, in
case of impairment or unavailability, and identify delegates who assure their
presence 24h during incident response.
Territorial Crisis Set-up in order to manage and coordinate the operational activities during the crisis
Unit situation at local level
Territorial Crisis Room equipped with all HW-SW equipment and documents needed to manage an
Room emergency where meets the Territorial Crisis Unit
Head of Local
O&M Network Head of Network Operation within the Local O&M.
Operations Unit
Control Center Territorial Unit (h24/7d) with the task of monitoring and networking functions
6/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
Head of the Chief of Staff responsible for the Control Center of Local O&M Network Operations
Control Center Unit
Operational plan to be drafted and updated by O&M Local Unit on the basis of the
EOP (Emergency
present guidelines and the Policy of Country detailed operation instruction on
Operational Plan)
crisis management at I&N Country/Company Level.
Local Emergency Teams of personnel with specialized training, communications systems, vehicles,
Team and equipment for specific duties,
Teams of personnel with specialized training coming from Territorial/Country Units
Task Force Team
different from those in emergency
Tool supporting the assessment of the impact level of a Critical Event through the
identification of thresholds for each type of event. Each I&N Country/Company
I&N Impact Matrix shall define the Impact Matrix for events that affecting the operations of the
relevant network within the respective geographical perimeter, according to the
criteria of this procedure.
Parameter of I&N Impact Matrix which represent the Minimum Warning Threshold
MWT
below which the emergency plan is not activated
Parameter of I&N Impact Matrix which represent, for each Country/Company, the
RC Restore Capacity power supply within 24 hours. This parameter can be downward
to external factors.
Parameter of I&N Impact Matrix which represent the Crises Limit meaning as the
CL
number of customers equal to the 90% of the double of the Restore Capacity (RC).
OU Organizational Unit of Enel Group
HV/MV network
System in use to the Control Center of Distribution for monitoring and remote
Remote Control
control of the HV and MV network (SCADA)
System
7/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
7. PROCESS DESCRIPTION
GENERAL PRINCIPLES
This document describes the operational strategies and practices that allow the Local Distribution Companies
within the Global Infrastructure & Network to deal with sudden and disruptive events that have an impact on
the electrical service that can significantly affect operations business, reputation, public security or any
stakeholder.
Critical events may occur following of an unpredictable event or as events already been considered as a
potential risk like atmospheric origin, for which the pre-alert state has been declared.
In either case, it requires that decisions be made quickly.
In the Emergency Operational Plan (EOP) of each I&N Country/Company, must be defined the monitoring
system that will be used during an emergency state to produce immediately, from any location, exhaustive
reporting that making available real-time emergency evolution by on-line dashboards, reports, graph of period
and topographic maps where it is visible the power supply network de- energized. It must describe the
modalities and timing of updating the web data by the single Territorial Crisis Unit in order to allow immediate
access to summary data on the on the magnitude of interruption from any operating site.
It must also provide training for crisis personnel and test emergency procedures with effective periodic
simulations.
Impact assessment, crisis team composition, decision-making, operative response and containment,
investigation, communications, media interactions, are part of the issues to be carefully planned and
periodically tested in order to implement an effective critical event management strategy.
8/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
Information provided by the Critical Event Monitoring Office shall be, for example:
bulletins of weather forecasts alerts with any negative impacts on the power supply service;
alerts from institutional bodies about possible events related to public order or to potential civil
emergencies;
collection of information from open sources (press, social, web, etc.) relating to any organized actions
that could jeopardize the continuity of service or business operations or affect the interests of Enel;
information provided by the business lines or the service units related to planned stops or outages.
Each I&N Country must make agreements with the Country to define modalities (eg mail) and
frequency (periodic or on demand) of transmission of the information.
When the Critical Event Monitoring Office detects an issue based on the information collected, the condition is
evaluated considering the potential impacts, also according to the indications of Real Time Communications
Unit regarding possible implications on the media, and then it can trigger a Pre-Alert state.
The Pre-Alert state is notified by Critical Event Monitoring Office through a bulletin that shall be sent to:
Country Manager;
C-CEC;
G-CEC;
I&N Territorial Referents and Country LCO.
In the case of specific network events, the Country LCO could also notify the pre-alert statement specifing the
duration and the Organizational Units that may be involved by the emergency status. In this case, it has to be
notified the Pre-Allert State through e-mail bulletin (Annex 6) to a predefined mailing list where at least should
be included the following recipients:
Global LCO (by email: i&n.gom.crisis@enel.com);
Head I&N Country,
Critical Event Monitoring Office;
Local O&M Network Operations Unit oversees monitoring, through several tools the conditions that could
cause an emergency situation.
Each organizational unit shall promptly perform, within its relevant perimeter, the checks following a specific
check-lists previously defined in order to attest the proper functionally of operational tools and processes. The
organizational units involved are also responsible for reinforcement of necessary on call shifts.
A non-exhaustive example of check-lists are shown in Annex 3, 4 and 5.
National Pre-Alert Status (if predefined):
Phase of analysis, verification and prior notification for any events that affect the entire National territory or a
significant part of it.
The forecast of widespread and critical weather events, affecting the entire Country or a large part of it shall
determine the declaration of the National Pre-Alert Status. This event causes the activation of the Pre-Alert
Status all over the national territory and for all the organizational units into the relevant perimeter.
The National Pre-Allert Status provides the same information flow and authorization described in the previous
paragraph.
9/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
N° of
Country I&N Territorial Referent
Units
Argentina 1 Head of O&M Argentina
Brazil 4 Head of Area Brazil (Rio, Cearà, Goias, Sao Paulo)
Chile 1 Head of O&M Chile
Colombia 1 Head of O&M Colombia
Iberia 7 Head of Division
Italy 6 Head of Area
Romania 3 Head of Region (Banat, Muntenia, Dobrogea)
Perù 1 Head of O&M Perù
Beyond the normal office hours, the I&N Territorial Referent must be substituted by qualified employee skilled
to manage any operative emergencies.
Each I&N Country will provide, at intervals determined by Country (eg. Monthly), the list of names "on call shift,
24h / 7d" (see glossary)
10/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
CL
RC
0 1 24 48
estimated hours of interruption
Operation events
Limit for the evaluation of the number of disconnected
Emergency Status Level 1 (Possible Green Code)
customers, net of the repositioning maneuvers of the AT
and MV power outages Emergency Status Level 2 (Possible Yellow Code)
Crisis Status (Possible Red Code)
The Minimum Warning Threshold (MWT) represents the maximum limit of unsupplied customers at the same
time beyond which it’s considered an Emergency Status. This limit is taken into consideration only in the
assessments made at the beginning of the emergency.
This limit must be carefully defined taking into account the average number of customers without service under
normal operating conditions (different from the the emergency/crisis status), considerating an observation
period of at least 12 months previous to the drafting of the local document of this Policy. However, the
interruptions below this threshold must be carefully assessed with regard to the duration of the individual
interruptions which must not exceed the standard expected to manage an event under normal conditions (on
average 8 hours). In situations where, despite having a total number of customers simultaneously unsupplied
11/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
below the "Minimum Warning Threshold", high or unpredictable recovery times are expected, it must be given
the possibility of declaring at least the Emergency Level 1.
If, during the emergency, the number of customers falls below this threshold, it does not automatically mean
that the emergency is ended because another parameter must be evaluated such as the duration of the single
interruptions.
Each I&N Country/Company shall identify the “Minimum Warning Threshold” (MWT) and the “Restore
Capacity” (RC) in order to classify the correct Emergency Status Level. These thresholds should be agreed
with the Global O&M function.
When needed, the Country LCO can defined the I&N Impact Matrix for single Area/Region according to the
above criteria.
I&N Impact Matrix shall be defined in a detail of Emergency Operational Plan (EOP) for the critical
event/emergency management, to be issued in each I&N Country. The I&N Impact Matrix must be sent to their
respective Country for publication in the Country Policy.
Any changes to the parameters of Country I&N Impact Matrix shall be promptly communicated to the Global
O&M function and the respective Country.
12/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
Furthermore, the Country LCO inform formally by email about the Country code classification:
Head of I&N Country (green, yellow and red code)
Global LCO (green, yellow and red code) - by email: i&n.gom.crisis@enel.com
Head of Global I&N (yellow and red code)
In case of the escalation of an existing pre-alert or an ongoing Critical Event, the Critical Event Monitoring
Office is responsible to collect all the information in order to allow the involved actors to evaluate the situation.
In this case, the Country LCO has to inform the Critical Event Monitoring Office within 90 minutes since the
new classification according to the Line Impact matrices.
The Critical Event Monitoring Office immediately forwards by email all the information available activating the
Country CEC.
In case of Fatal or Severe Accidents, the Group CEO, the Segreteria AD office (segreteriad@enel.com) and
the Health & Safety Holding Unit (safety.enel@enel.com) have to be also informed according to the principles
of the Policy 237 “Classification, communication, analysis and reporting of incidents”.
The Country CEC (C-CEC) evaluates the Country Impact classification in accordance with:
Affected Country LCOs;
Country Institutional Affairs;
Country Communications.
The Country CEC, taking into consideration the Line Impact evaluation as well as possible impacts at Country
level (e.g. on external stakeholders), proposes to the Country Manager a Country Impact evaluation (which is
independent from the technical one), according to the following classifications: Country Green Code, Country
Yellow Code, Country Red Code.
The Country CEC has to propose the Country classification to the Country Manager within 45 minutes since
the communication from the Country LCO.
Depending on the proposed classification status code, the Country Manager:
in case of a Country Green Code can approve or modify the Critical Event classification informing
the Country CEC. Anyway, the Emergency Status declared by the Business Line remains valid
regardless of the critical event classification.
in case of a Country Yellow Code, after consulting the Head of Global I&N and the Affected Region
Manager (if applicable), can approve or modify the critical event classification informing the Country
CEC and the Group CEC. In turn, the Country LCO, must inform the Head of Global I&N. Anyway, the
Emergency Status declared by the Business Line remains valid regardless of the critical event
classification.
in case of a Country Red Code, after consulting the Head of Global I&N and the Affected Region
Manager (if applicable), can approve or modify the critical event classification informing the Country
CEC the Group CEC and the CEO. In turn, the Country LCO, must inform the Head of Global I&N.
Anyway, the Emergency Status declared by the Business Line remains valid regardless of the critical
event classification.
13/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
In any case, the Country Code must be activated by the Country Manager within 3 hours since the
occurrence of the Critical Event.
In case the Country Manager is temporarily unavailable, the Country classification can be approved by the
Country CEC; the classification must be confirmed by the Country Manager as soon as possible.
The Critical Event Monitoring Office, according to the indications provided by the Country CEC, decides the
frequency of the bulletins and informs the Country LCOs.
In case of the activation of a Country Yellow or Red Code the Group CEC also evaluates possible impacts of
the Critical Event at a Group level and in this case proposes to the Group CEO the activation of a Group Red
Code.
The Group CEO can:
approve the activation of the Group Red Code, convening the Group’s Crisis Management Committee.
In case the Group CEO is temporarily unavailable, the Group’s Crisis Committee will be called by the
Group CEC;
reject the activation of the Group Red Code, returning to the Country management of the Critical Event.
14/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
Definition of the process for the collection of photos and videos on the field attesting the causes of
the emergency/crisis status and the work of the task forces to restore the service. These photos and
videos, as well as highlighting the entity of the damage, must also be used for insurance purposes
and must therefore be georeferenced. Since these are photos and videos meant for external use;
they should be taken directly from the people on the field through smartphones when available,
checked by H&S of I&N Country and uploaded on a repository by the I&N Territorial Referents).
H&S of I&N Country, the colleagues responsible for the management of the digital channels (e.g.
Facebook and Twitter) for the I&N Country/Company and the C-CEC have to be able to access to
the repository.
The O&M Country units shall be responsible for updating this Emergency Operational Plan (EOP) on the crisis
management and a hard copy of it shall be kept in the Territorial Crisis Room.
15/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
send to a specific mailing list to be defined and updated into the I&N Country Emergency Operational
Plan (EOP) where in address they will have to be:
o Head of I&N Country
o Global LCO (by email: i&n.gom.crisis@enel.com)
send periodically (at least every 2 hours) a structured report to the Head of I&N Country and the
Global LCO (by email: i&n.gom.crisis@enel.com); the same email could be sent to other internal
stakeholders defined in local operating instructions.
The Territorial Crisis Unit, supported by Local O&M Network Operations unit, perform the following activities
to manage the Emergency Status Level 1:
Monitoring the service interruptions and evaluating the recovery time;
Monitoring the activities of the Control Center (i.e. compliance with operational priority list based on
the number and typology of unsupplied customers, to monitor lines not considered into the fault
selection phase), monitoring the activities of the Alert Fault Service and of the operational units;
Monitoring the internal and third-parties activities (i.e. Emergency Status Statement issuing,
activation of a Task Force Team of the local teams, emergency power supply devices management,
coordination of vehicles aim to detection of cable fault).
supporting the internal communications colleting the information (i.g. the number of customers
without energy supply, the expected service recovery time, the number of internal and third parties
resources involved into the emergency activities ) into reports to be transmitted to the I&N Emergency
Responsible.
Functional and operating interface with the Local Institutions (i.e. Municipalities, Local Institutions,
Civil Protection).
A specific Task Force Team, set with employees of other operational units and/or from Third-parties, shall be
activated in case of internal resources of an operational unit is not enough to face the recovery of all grid faults
occurred. The members of Task Force Team shall be defined in advance in order assure the prompt activation
of Task Force Team itself.
The Network Development unit shall promptly provide:
list of Third-parties suppliers working on the relevant perimeter of the I&N Country including the name
of their Representatives and the related contacts (i.e. e-mail and mobile number).
list of the vehicles, the equipment and the emergency power supplier devices owned by
abovementioned Third-parties suppliers;
list of emergency power supplier devices and emergency light towers rental companies;
list of the local Third-parties companies that can provide services in case of specific emergency
needs (e.g. helicopter rental).
Additional Local Emergency Teams dedicated to the emergency activities could be provided into the
Emergency Operational Plan (EOP) depending on the I&N Country organization structure.
The I&N Emergency Responsible is in charge for requiring the Local Emergency Teams set-up.
The communication process on emergency evolution will be managed in accordance with Policy n. 24 “Critical
Event Management” - and other procedures issued at Country level for relevant matters.
16/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
17/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
The communication process on emergency evolution will be managed in accordance with Policy n. 24 “Critical
Event Management” - and other procedures issued at Country level for relevant matters.
18/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
send to a specific mailing list to be defined and updated into the I&N Country Emergency Operational
Plan (EOP) where in address they will have to be:
o Head of I&N Country
o Global LCO (by email: i&n.gom.crisis@enel.com)
o Head of Global I&N
Send periodically (at least evenry 2 hours) a structured report to the Head of I&N Country and the
Global LCO (by email: i&n.gom.crisis@enel.com); the same email could be sent to other internal
stakeholders defined in local operating instructions;
As for Emergency Level 1 e 2, the Task Force Teams and the Local Emergency Teams shall be defined into
the Emergency Operational Plan (EOP).
The communication process on emergency evolution will be managed in accordance with Policy n. 24 “Critical
Event Management” - and other procedures issued at Country level for relevant matters.
The Crisis Status can be declared independent of the I&N Impact Matrix when one of the following conditions
occur:
A serious event that can affect the ENEL Group image and requires the definition of on-purpose
strategies both at local and global level.
Catastrophic events with severe damages to the main installations, sabotages, terroristic attacks,
earthquakes, tsunamis, etc.
The HV and MV network schemes, uploaded and periodically updated into an identify local Personal Computer,
into a backup support (e.g. USB key or hard drive), shall be available for consultation in case of Crisis Status.
Furthermore, the following list shall be available for consultation:
list of premises and relevant sites;
list of customers with priorities (i.e. Hospitals, Government buildings, etc.);
list of telecommunication sites managing data transmission or critical telecommunication nodes (i.e.
BTs, TLC nodes, shelters)
For premises and relevant sites proper emergency solutions must be defined identifying the relevant systems
to be recovered: HV/MV substations, MV/LV substations and any LV lines.
It will be defined the frequency and the area responsible of the relevant information actualization to manage
the crisis status, including the HV an MV network schemes, list of premises and relevant sites, list of customers
with priorities, and list of telecommunication sites managing data transmission or critical telecommunication
nodes.
In order to recover HV grid faults, a priority communication network with the HV Transmission System Operator
must be always available in the Control Center.
A specific procedure aimed to prioritize the recovery operations on the HV/MV substations shall be defined
and available in case the emergency operations through HV/MV network Remote Control System are not
possible, and a re-activation plans shall be available if any.
Furthermore, a list of employees dedicated to recovery operations on the HV/MV substations must be defined
and available.
19/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
TASK FORCE
Each Company (or its sub-territorial group) must prepare the Task Force plan from which it’s possible to identify
the resources and the available means to be used if it is necessary to activate operational reinforcements.
In exceptional cases, after the statement of the Pre-Alert state, in relation to the type and intensity of the
planned expected, it is possible to evaluate in advance the possibility of activating the use of the Task Force
resources (personnel, vehicles, electricity generators, etc.), assigning them to the territories, which should be
affected by weather events.
Moreover, in case of Pre-Alert with an expectation of a serious consequence or when the number of resources
involved in the repair of the HV/MV/LV faults after statements of Emergency 2nd level or Crisis Status is not
enough to deal with all the faults, it’s possible to activate a special Task Force’s resources at different levels
depending on the severity of the events:
- displacement within the same company in case of Emergency 2° level and Crisis Status declared.
Coordination by the I&N Territorial Referent;
- displacement between different companies within the same Country: in case of Emergency 2° level
and Crisis Status declared. Coordination by the Country LCO;
- displacement between different Countries in case of Crisis Status and Red Code declared by the
Country. Coordination by the Global LCO.
The activation of the inter-State Task Force can be implemented in according to local policies and law
regulation. En non-exhaustive list of the activation conditions of the Inter-state Task Force is shown in Annex
11.
The activation of the inter-State Task Force must be requested to the Global O&M function by the Country
LCO of the Country concerned, prior to authorization by the Head of I&N Country. The Global O&M function
will validate the request and also coordinate the mobilization between countries.
20/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
21/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
Moreover, each I&N Country shall perform, minimum every year (or different frequency according with local
laws and regulations), one emergency simulation in order to check the Emergency Operational Plan (EOP).
The simulation of each year should be a different case of emergency level of the previous year.
In emergency simulations, the country must necessarily be involved; therefore it requires a strong coordination
in the planning and execution of this activity. For this purpose, the Emergency Plan of each I&N Country, must
transpose the procedures provided by the respective country.
Participation in other simulations could be requested by third parties such as the Civil Protection or other bodies
dedicated to the safety of the population.
The Local I&N O&M function shall analyse the criticalities resulted during the checks, in order to detect the
causes and define the corrective actions to be formalized in the report on simulated emergency, which must
include minimum the content of the Annex 10. The dates of the emergency simulation must be communicated
by the Local I&N O&M function to the Global O&M Function
An hardcopy of the report shall be stored by Local I&N O&M function and the improvement actions shall be
implemented reviewing the Emergency Operational Plan (EOP). Moreover a copy of the report shell be send
to the Global O&M Function.
EMPLOYEE TRAINING
In case of relevant changes to the Emergency Operational Plan (EOP), each I&N Country shall organize a
specific operational and technical training sessions for the employees dedicated to the crisis management
process. The frequency and the areas/staff involved in the incident and crisis management must be defined.
In any case, it should be provided regular operational and technical training to raise awareness of employees
about the topics of emergency management.
The certification or list of attendance to the training sessions shall be drafted and stored into training records.
PRELIMINARY ACTIVITIES
22/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
Maintain the efficiency of remote control devices of Primary Substations and those installed
on the MV network;
Maintain efficiency in the auxiliary power sources of the Control Center and Zone/Poli
Outside also providing of switching for test from main to auxiliary power supply;
Prepare lists with all the useful phone numbers in case of emergency. The list should be
shared on the server and on paper in the Territorial Crisis Room. A person responsible for
this type of activity must be appointed;
Define the criteria with which the installation priorities of the generators are established
(number of customers, telephone repeaters, special customers, etc.);
Organize a repository in which to deposit all the documentation of an emergency. The
documentation must be categorized neatly for a quick search;
Organize a repository in order to upload photos and videos on the field attesting the causes
of the emergency/crisis status and the work of the task forces to restore the service. H&S
of I&N Country, the colleagues responsible for the management of the digital channels (e.g.
Facebook and Twitter) for the I&N Country company and the C-CEC have to be able to
access to the repository;
Provide tools for monitoring critical situations (lightning detection, low temperature, etc.)
PRE-ALERT
Check through check list, the equipment and the means, the Zone and the Control Center;
Reinforce adequately in terms of available resources, the Zone and the Control Center;
Pre-define who will be the person responsible for the emergency;
Prepare blank formats that will be used in periodic communications in the event of an
emergency declaration;
Set up mailing lists to which communications will be sent;
Recover, as much as possible, remotes unavailable on the MV network and Primary
Substations;
Suspend the work planned on the AT lines, Primary Substations and main branches of
MV line.
EMERGENCY/CRISIS:
Activation of the Emergency Plan declaring the emergence or crisis status envisaged
according to the I&N Impact Matrix and;
Send the declaration of Emergency/Crisis Status (Annex 1 and 2 - Annex 7 or 8 or 9);
Opening the Territorial Crisis Room providing in advance the turn over of people who will
preside, each for its own competence.
Depending on the severity of the emergency, opening of other Crisis Rooms to diferents
levels in the country with central and peripheral organization
23/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
Appointment of the I&N Emergency Responsible if not already communicated in the pre-
alert state
Declaration code colored by the Country Manager (green, yellow or red)
Information to the hierarchical business line about the code colored defined by the Country
Activate within the Territorial Crisis Room, a telephone station to receive communications
from the Authorities and write down the contacts in a special register.
Activation of the necessary resources. Regarding the teams in the field empirically at least
one team is expected for each faulty power MT line. Plan in advance the turn over of people
on the ground;
Reinforcement of the staff at the Control Center;
Need assessment for activation of task forces from other non-emergency territories
(including other States)
Request for special vehicles from external bodies with previously agreed methods
(helicopters, snow-plow, etc.)
According to the internal organization, activate a number of suitable locations for the outage
management, with its own staff or with through call centers
Operate in the MT network according to the Policy 69 minimizing the impact to the SAIDI or
TIEPI.
Maneuvers in remote control and with personnel on the ground taking into account the
priority: AT lines, Primary Substations, number of customers out of service by MV line,
sensitive customers, dangerous situations, etc.
BT faults, as far as possible, must be managed in parallel with MV faults with a sufficient
number of resources. If this is not possible, the resources that are gradually available must
be used for the management of BT failures.
Monitoring of failure report received to detect fault location and danger situations in
advance.
Estimate of the recovery times for each HV, MV and LV localized fault for possible
installation of the generators and for included these times in the outage management
systems that allow it to provide an adequate response to customers who request it.
Sending maximum every 2 hours the periodic reports with the data of emergency to to the
already prepared mailing list of recipients Annex 1 and Annex 2 (part 1 and 2).
Check of the time of restoration of the electricity service every two hours and evaluation of
the possible new emergency status to be declared based on the I&N Impact Matrix. If to be
raised, communication to the hierarchical line as above
Provide the necessary information to the External Relations Office for communications to
the media and Institutions
An ENEL delegate must be present at the Institutions if a crisis room is opened
Analyze potential safety risk behaviors and promptly report them to the Safety unit
Collection of photos and videos on the field georeferenced attesting the causes of the
emergency/crisis status and the work of the task forces to restore the service (these photos
and videos are meant for external use; they should be taken directly from the people on the
24/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
field through smartphones - when available - and uploaded on the repository by the I&N
Territorial Referents)
Check with H&S of I&N Country of the photos and videos with the task forces at work on
the repository.
Upload of photos and videos on the dedicated repository so that they can be used externally
(on social media and/or sent to the media) to show the effort of I&N to restore the service.
The material checked by H&S of I&N Country has to be clearly identified on the repository
so that it can be used externally.
Set up the insurance process that includes, among other things, the prompt notification of
the accident, the contact with the insurance experts for visiting damaged installation as soon
as possible, external consultancy for complex damages. In addition, an accounting account
must be opened in SAP where must be allocated all the costs incurred in emergency
management.
AFTER EMERGENCY/CRISIS
Evaluation of the impact of the emergency on the indicators in terms of SAIDI and SAIFI
and evaluation of the possible spin off due to exceptional events
Draw up the final report of the emergency according to the Policy 34 effectively documenting
also the actions taken all accompanied by extensive photographic documentation. In the
document will be also detailed the management committee with the names of the
participants, the decisions and actions taken
To effectively document the damage to own electrical installations caused by the
emergency to open practices to insurance policies.
Closure of the insurance practice and definition of the economic amount.
25/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
ANNEXES
ANNEX 1: EXEMPLE OF FORMATS OF THE EMAIL THAT ACCOMPANYING ANNEX 2
ANNEX 2: SUMMARY REPORT ON THE CRISIS EVENT FOR INTERNAL PERIODICAL UPDATE
26/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
As announced by the weather reports of recent days, from this night, a wave of bad weather is affecting the
network of ......................, especially the northern and central regions…………...
Atmospheric phenomena are causing numerous system failures due to ....................
By now, the number of unsupplied LV customers is ......................
ANNEX:
- ANNEX 2 (part 1 and 2)
27/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
Bad weather conditions continue and affecting in particular the regions ................ Atmospheric phenomena
(storms, storms and strong winds) entail a dynamic and constantly evolving situation in the network. The
weather situation is worsening (improvement, stable, etc.).
Actually, the number of unsupplied LV customers is ......................
- Region/Area: The persistence of bad weather causes the onset of new failures that make the
situation dynamic.
- Region/Area: City of ...... approximately 7.000 disrupted customers including a hospital. Are
underway the necessary repairs and installations of power generators. It is expected to restore the
service today in the late afternoon.
- Region/Area: in the provinces of .......... inspections of the High Voltage overhead lines are
underway to verify the damage also with the aid of helicopters..
- Region/Area: in the Provinces of ………. There are areas for next evacuation by flooding. Fault
selection maneuvers and start of necessary repairs are being carried out and power generators are
being installed.
Possible actions to decrease the impacts and recovery forecasts of service: With the reinforcement of
n° ………resources in the field and the installation of n ° ……... generators, it is planned to restore the service
no later than the hours …………. of tomorrow .......
The restoration of the AT line is also envisaged, which will allow the restoration of the AT power supply of the
Primary Substation of ..........
ANNEX:
- ANNEX 2 (part 1 and 2)
28/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
ANNEX 2: SUMMARY REPORT ON THE EMERGENCY/CRISIS EVENT FOR INTERNAL PERIODICAL UPDATE
(PART 1 AND 2)
ANNEX 2
Company logo SUMMARY REPORT ON THE EMERGENCY/CRISIS EVENT FOR INTERNAL PERIODICAL UPDATE - PART 1
(TO BE UPDATED EVERY 2 HOURS)
Company name/ Network Operation/Country or Region unit/Network Operation and Maintenance Unit/Control Center
29/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
ANNEX 2: SUMMARY REPORT ON THE EMERGENCY/CRISIS EVENT FOR INTERNAL PERIODICAL UPDATE - PART 2
Company logo
(TO BE UPDATED EVERY 2 HOURS)
Company name/ Network Operation/Country or Region unit/ Network Operation and Maintenance Unit/ Control Center
Name HV Line Name HV/MV Substation State Name HV Line Name HV/MV Substation State
Faulted HV lines by Transmission
HV Line… HV/MV Substation ...... radial supply/disconnected Faulted HV lines owned by ENEL with HV Line… HV/MV Substation ....... radial supply/disconnected
Operator (not Enel) with indication of
indication of the HV/MV substations with
the HV/MV substations with a radial HV Line… HV/MV Substation ...... radial supply/disconnected a radial supply or disconnected: HV Line… HV/MV Substation ....... radial supply/disconnected
supply or disconnected
COMMUNICATION SYSTEMS
Eventual fault of the Remote Control
Eventual unpower supply in the Control
System of Control Center (STM, SAC
Center of ……………
etc)
Name substation From Name substation Recovery time
Widespread permanent faults of the
Substation 1 date/time Disrupting of phone/intranet Phone …. date/time
HV/MV network Remote Control
communication systems with expected
System in the HV/MV substations with Substation 2 date/time Intranet …. date/time
recovery timing:
duration above 60 minutes:
ADDITIONAL INFORMATION
Logistical difficulties situation: Traffic, floods, streets not available, etc. Other significant information:
30/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
ANNEX 3
Company logo
CHECK LIST DOCUMENTATION HANDBOOK
Date of Check Control Center Auditor Name Signature
Presence /
Availability Description Notes
YES/NO
List of on call shift employees from the support units (not belong to
I&N) in charge of the operational coordination and technical support
List of on call shift employees of telephone companies that
manage remote control carriers
31/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
If planned (periodically): every six months, usually in occasion of Summer or Winter plan by a
employees appointed by the Responsible of the relevant Operational Unit.
ANNEX 4
Company logo
CHECK LIST OPERATIONAL UNIT
Presence /
Check Functions/Control
Availability Description Notes
Time YES/NO
YES/NO
32/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
ANNEX 5
Company logo
CHECK LIST CONTROL CENTER
With the support of the Operational Units and/or with the Network Development unit,
5 check of the HV and MV works status, in order to evaluate the recovery timing of the
lines (or a part of those) in case of emergency
With the support of the Operational Units and/or with the Network Development unit,
6 check of the planned HV and MV works in order to erase them from the Emergency
Work Plan
Check of the proper status of VOIP phones, mobile and satellite phones and the
status of telecommunication lines dedicated for the communication with the
7
authorities (to be executed calls aim to check all the available devices in the Control
Center)
Verification of the functionality and the efficiency of the HV/MV network Remote
8
Control System (lack of signals/alarms for system protocol)
Printed copy of an updated list of on call shift employees after the definition of a Task
9 Force team on the related software system (i.e. Operational Unit, HV/MV network
Remote Control System unit) or drafting of a specific summary table
Downloaded and saved copy of the grid schemes on at least one Personal Computer
10
of the Control Center from the SCADA system (or other equivalent system)
Download of the grid schemes on at least one Personal Computer of the local
11
operational support team from the SCADA system (or other equivalent system)
Check the status of the streets to the Control Center in case of lack of power and
12
other criticalities
33/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
……………………………………………
THE FOLLOWING ON CALL PERSON SHALL
BE INFORMED ABOUT THE PRE-ALERT ……………………………………………
STATUS THROUGH PHONE/MAIL:
……………………………………………
34/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
……………………………………………
THE FOLLOWING ON CALL PERSON SHALL BE
INFORMED ABOUT THE EMERGENCY STATUS ……………………………………………
THROUGH PHONE/MAIL:
……………………………………………
CLOSING NOTIFICATION OF EMERGENCY STATUS LEVEL 1
35/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
…………………………………………………
Operational reinforcement of the following
Country/Region offices that have been …………………………………………………
activated:
…………………………………………………
Brief description of the critical events below:
………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………
……………………………………………
THE FOLLOWING ON CALL PERSON SHALL BE
INFORMED ABOUT THE EMERGENCY STATUS ……………………………………………
THROUGH PHONE/MAIL:
……………………………………………
CLOSING NOTIFICATION OF EMERGENCY STATUS LEVEL 2
36/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
CRISIS STATEMENT
Since the current conditions have been evaluated and the authorization of the I&N Territorial Referent:
…………………………………………………………………………………………………………………………
…………………………………………………
Operational reinforcement of the following Country
departments that have been activated: …………………………………………………
…………………………………………………
The territorial team(s) has/have been established in the ........................... Control Center (if not previously established
during the Level 1 or 2 Emergency States).
Brief description of the critical events below:
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
……………………………………………
THE FOLLOWING ON CALL PERSONNEL HAS BEEN
INFORMED ABOUT THE CRISIS STATE BY PHONE: ……………………………………………
……………………………………………
CLOSING NOTIFICATION OF CRISIS STATUS
37/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
Report Title It must indicate if it is an emergency or crisis. Eg: Crisis Management Report occurred
dd/mm/yyyy or Emergency Management Report occurred dd/mm/yyyy
1. DOCUMENT AIMS The objective could be: "To inform about the management of the emergency/crisis
AND APPLICATION that occurred in ED XXXXX on dd/mm/yyyy. Likewise, to present the actions carried
AREA out by the areas involved, the resources used, the lessons learned and corrective
actions, in compliance with the Policy 34 - Incident and Crisis Management Global
Infrastructure and Networks Guidelines.
2. DOCUMENT VERSION A table with three columns where it is reported: Version / Date / Description of the
MANAGEMENT changes. Eg:
Version Date Main changes description
3. UNITS IN CHARGE OF It must indicate the area responsible for the preparation of the document, the
THE DOCUMENT responsible for the document approbation, and the responsible for the distribution of
the document (the area in charge of disseminating the report to the other I&N areas)
4. EVENT A table is presented that contains the event generalities, like this:
GENERALITIES
Division:
Territorial Organizational Unit:
Date and Time: Start: dd/mm/yyyy hh:mm End: dd/mm/yyyy hh:mm
Event Origen:
Regions/Municipalities:
Province:
5. Executive Summary Describe on a sheet, how the emergency was managed from the Prealerta (if any),
including the different statements, the actors, all reports sent and the event principal
details until its closed.
6. Event Description Make a detailed description of the cause/background and origin.
6.1. I&N Emergency Indicate the name of the person that is identified as the I&N Emergency Responsible.
Responsible
38/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
6.2. Emergency States Indicate the date and time of the emergency/crisis states declared in accordance with
Declared the evaluation made on the I&N Impact Matrix. The I&N Impact Matrix must be showed
indicating CL, RC, MWT and attach the emails sent.
6.3. Geographical and Inform with details the geographical and electrical area conditions where the event
electrical happened.
characteristics
6.4. Preventive actions Describe the actions taken by the different areas to prevent the event, also after the
Prealerta (if any).
6.5. Impact on It must be informed:
Electricity Supply - maximum number of customers without supply, including the graph with the
interrupted customers trend and the graph with the trend of the energy recovery during
the critical event.
- Fault reporting service: performance data
- Installations impacted by the event: indicate the main occurrences (most affected)
with the affected facilities and times affectation.
- own resources used: ENEL employees, operational vehicles and special media,
generators used.
- external resources used: employees of third parties, operative and specific means,
generator sets used.
- other extraordinary measures for the restoration of the service
- field safety
- impact on quality of service indicators
6.6. Meetings with It should describe how the communication with the authorities was managed and
Institutions and include the reports or the meetings minutes held with the institutions.
Authorities
6.7. Communications To inform in detail how the communication with the customers was managed (call
and channels of center logistics, used media). Also include the collection of press releases published
attention during the emergency.
6.8. Economic Costs Estimate all the economic costs associated with the event.
7. Conclusions and Write the conclusions and lessons learned from the emergency / crisis.
Lessons Learned
8. Corrective actions Describe each corrective action and improvement project emerged, putting the person
and improvement in charge and the date of completion of each one.
projects
9. Photographic Include photographs of terrain, materials and crisis room.
Record
39/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
40/41
INTERNAL USE
Policy No. 34
Version no. 6 dated 21/11/2019
Subject: Incident and Crisis Management Global Infrastructure and Networks
Guidelines
Application Areas
Perimeter: Global
Staff Function: Security
Service Function: -
Business Line: Infrastructure & Networks
Activities to be carried out in an international support service for major emergencies in the MV/LV
network
Personnel from others Enel Group companies sent to support a crisis in another country, must carry out the
following activities:
Inspection of the MV/LV network to identify faults or damage that are producing or may cause power
failures. The result of these inspections must be communicated to the personnel of the country in crisis,
in the form previously agreed.
Execution of maneuvers in the suitables devices for the MV/LV distribution network, such as: reclosers,
disconnectors and fuses.
Application of the 5 golden rules for voltage-free jobs: visible sectioning, locking against reclosures,
verification of the voltage absence, grounding and delimitation of the intervention area.
Elimination, repair and assembly of damaged networks, so that they return to normal operating
conditions as soon as possible. It implies, among other things, the removal, repair and assembly of:
poles, conductors, transformers, protection devices, connections, joints, etc, in the MV and LV
network.
Pruning, removal of vegetation and objects on or near Enel's electrical installations, connections and
joints of customers.
These activities must be able to be performed day and night, always considering the respect of the highest
safety standards in interventions and must be carried out together with the personnel responsible for the
installations of the country in crisis.
Personnel should be provided with their own personal protection items in their country of origin (helmets,
shoes, clothes) and can be easily transported, but if it does not happen, the host country will provide all
working tools.
Likewise, the host country will provide the vehicle for traveling, bulky tools, the food, the place of rest and
transfers. Possibly insurance must be also provided to deal with the possibility of an accident at work.
Operational strategy
By way of example, some strategies to be implemented in field are illustrated:
Define a local supervisor to interact with the teams from other countries
Organize mixed teams with a team leader that always must belong to the host country
The host country must have "emergency kits" to be provided to teams from other countries containing
basic work tools such as:
- maneuvering rods, earthing devices, devices to signal the work area etc.
- Verification of hotel logistics, insurance, food, laundry, etc.
- simulation by sending a crew to participate in a scheduled activity
In order to verify the efficiency of the Local and Global organization to manage the Interstate task force, a
simulation is recommended, which involves the intervention of a team to carry out a work scheduled in
another country
Contractual conditions for mobilization of contractor resources
In the existing service contracts with third parties, Global Procurement must insert a clause providing the
possibility to request resources when critical events occur in another country among of the Enel Group
perimeter