M4.

1
Availability of information

Information of the materials that are applied in the building is This is a concept
Stimulating the development of buildings with a high level of
available for relevant involved parties and stakeholders in such credit
This is aproposal
conceptas
reassembly possibilities, for the purpose of easy reassembling part ofproposal
credit the project:
a way, the information can be kept up to date after building
the building and the products and materials in the building, for A Framework
as part of the for
completion and during the use phase regarding maintenance,
future use in new or other functions. Circular Project
project: Buildings
mutations, replacements, etc. by the building owner and/or A Framework for
manager and/or the parties assigned for construction works by one Circular Buildings
of these parties in the building, or are otherwise responsible for
No. of Exemplary
keeping building material information up to date. credits Performance
available
Assessment criteria
3 Yes/No
This issue is split into three parts:

M.4.1.1 1 point A building material passport is made and updated (material streams are mapped during
the life cycle of the building).

M.4.1.2 1 point The material passport is available for everybody that is/will be authorised.

M.4.1.3 1 point A demolition specification is / disassembly guidelines are present and provided upon
completion of the building

The following is required to demonstrate compliance:


M4.1.1 – One credit – Material passport
1. If currently existing constructional or architectural elements are present at the location which is to be developed in the
current situation (including renovation/refurbishment), the current situation need to inventoried, specified, quantified and
qualified, for the purpose of establishing which elements and components are present at the current situation and which
of these elements and components will be preserved, reused or disposed. The conditions that apply for the inventory are
described in the section “additions to the criteria”, part of “requirements inventory existing real estate”.
2. In addition to the previous point, all elements and components that are supplied and applied on location are specified,
quantified and qualified. All elements and components with corresponding specifications, qualifications and amounts as
described here, together with the information from the previous point, form the foundation of the material passport of the
new building. The material passport needs to contain all elements and components (“as built”) upon building completion
that belong to the delivered situation, including both existing and newly developed elements. The material passport needs
to comply with the conditions as described under “additions to the criteria”, part of “requirements material passport”.

M4.1.2 - One credit – Availability of the material passport


1.
3. The material passport and related products (see M.4.1.1.) need to be delivered upon completion of the building in digital a
form, preferably linked to a BIM model. The passport needs to be set-up, completed and adjusted during the development
process. The material passport is developed and delivered in a digital form, both understandable and user-friendly for the
building owner and/or manager. The required software for opening, controlling, modifying and maintaining the passport
and related products is provided. The developing party is obliged to instruct the building owner and/or manager regarding
the passport and the correct use of it by written and verbal explanation. In addition, the developing party needs to be
available for further explanation and/or answering of questions during two years after completion of the building.