Professional Documents
Culture Documents
Outline
Education Introduction
Work experience y Taiwan railway
Experience learned
1
6/9/2013
(1) Education
National Taiwan University
y Department of Civil Engineering,
Geotechnical Engineering Division
y Master of Science 2002
y Bachelor of Science in Engineering 2000
2
6/9/2013
Deputy Secretary-general,
02/2012 – Present
Taiwan Society of Construction Law
underground
elevated
Hualien
Tainan
electrification
underground
Kaohsiung
underground
6
3
6/9/2013
Zuoying Station 10
1
Neiwei Station Start Pt.
17
Kaohsiung City
Cheng Ching
Art Gallery Station Lake
1
Kaohsiung
Gushan Station Station
Fengshan
Sankuaicuo Mintsu Station
Station Station Tashun
Station End Pt.
Lover River
4
6/9/2013
Love River
SM
CL-ML
SM Eternal tunnel
CL-ML
Bed rock
Construction Stages
Stage I :use old railway bridge, remove 1 track
Stage II :build new railway bridge , move to temporary track
remove the old bridge
Stage III :build eternal tunnel
10
5
6/9/2013
11
N-1 N-2
P1
P2 P3 P4 P5 P6
A tomatic monitoring
Automatic Meas re b
Measure by man
6
6/9/2013
sp.
ang
dis
A B C D
P1 P2 P3 P4 P5 P6
time distance
A:install of temporary bridge C:hosting of steel girder
B:construction of pile and beam D:removal of foundation of temporary bridge
( H beam ) 13
14
7
6/9/2013
water-proof
Eternal railway tunnel slab
15
16
8
6/9/2013
Photo
Water-Proof V ○ ○
Construction
X X ○
Need cofferdam Need cofferdam Use temporary bridge
Time ∆ ∆ V
18
9
6/9/2013
Experience learned
Railway engineering shows great complexity
y Switch of temporary track & electricity system
y Strict security request
20
10
6/9/2013
備片
11
6/9/2013
12
6/9/2013
[ 愛河臨時鐵路橋型式 \ 25
臨時鐵路橋淨空及河道落墩檢討
落二墩案 落一墩案 落0墩案
2 piers 1 pier 0 pier
「高雄計畫」西段工程細部設計技術服務(DL01標)
CO1, 2004
CO2, 2005
13
6/9/2013
本會之任務如下:
一、以法律為主軸整合與工程有關之土木、建築、機電、財務、會計、管理、保險
等相關專業及科技。
二、從事工程法學之研究實踐及工程法制之改革。
14