You are on page 1of 23

Governor Retrofit Contract:

CFE - Azufres Reference Emerson:


Construction design_R1 Page 1 de 12

CFE - Azufres

Governor retrofit
Installation guide

History Revisions
Rev Date Object Design Check Approve
A 22 June 2020 New document Z.SHAVLOVICH

Confidential : EMERSON PROCESS MANAGEMENT


Governor Retrofit Contract:
CFE - Azufres Reference Emerson:
Construction design_R1 Page 2 de 12

Content
1. INTRODUCTION................................................................................................................. 3
2. SCOPE OF WORK ............................................................................................................. 3

Confidential : EMERSON PROCESS MANAGEMENT


Governor Retrofit Contract:
CFE - Azufres Reference Emerson:
Construction design_R1 Page 3 de 12

1. INTRODUCTION
This document refers to the hydromechanical part of the DEH of the steam turbine at CFE-Azufres. The document
is intended to instruct the Installation company with the main approaches of new equipment installation.
Following documents are attached additionally:
- 2000050 AD Hydraulic actuator
- 2000051 AD Hydraulic servomotor
- 2000052 AD Control unit
Scope below is described for one Unit. Totally project includes 2 Units.
Installation company is responsible for:
- disassembling old servomotor with related equipment
- fit and installation new hydraulic servomotor with control block, including to providing all necessary metal
constructions for these works and welding
- manufacturing parts:
- plate – 1 pc
- bracket – 1 pc
- connection – 1 pc
- flange – 1 pc
- clamp – 2 pcs
- ribbon ring – 1 pc
- disassembling parts of tubes
- assembling new tubes lines, including of providing tubes; fittings; fasteners which are needed for that and welding
Tubes between pressure line/drain line G1 1/2 can be provided via hydraulic hoses in protected metal or via
common metal tubes’ connections.

2. SCOPE OF WORK
2.1 Disassemble steam valve’s arm from the old servomotor

Disassemble arm

Confidential : EMERSON PROCESS MANAGEMENT


Governor Retrofit Contract:
CFE - Azufres Reference Emerson:
Construction design_R1 Page 4 de 12

2.1 Remove following parts:


- old servomotor with distributor and pilot, but keep existing mounting bracket
- old position sensors of servomotor and pilot
- old hydraulic accumulator

2.2 Cut parts of existing tubes, the most of them will be reused (as shown below).

Remove old
servomotor with
distributor, pilot and
position sensors

Keep old flange

Confidential : EMERSON PROCESS MANAGEMENT


Governor Retrofit Contract:
CFE - Azufres Reference Emerson:
Construction design_R1 Page 5 de 12

Remove accumulator

Take out tubes and


ventils; keep ones for
the next woks

Cut pressure tube here

Confidential : EMERSON PROCESS MANAGEMENT


Governor Retrofit Contract:
CFE - Azufres Reference Emerson:
Construction design_R1 Page 6 de 12

Cut drain tube here

Cut protection tube


here

2.3 Move servomotor from store to site.

2.4 Installed servomotor on the existing bracket:


- fit servomotor with existing bracket
- drill orifices “on place”
- install servomotor
- tune the length of servomotor
- assemble arm of steam valve
Confidential : EMERSON PROCESS MANAGEMENT
Governor Retrofit Contract:
CFE - Azufres Reference Emerson:
Construction design_R1 Page 7 de 12

2.5 Installed control unit on the servomotor:


- install sealing plates 3,4 and sealing rings 5 in accordance with the drawing 2000050 AD
- install control unit 2 in accordance with the drawing 2000050 AD
- provide additional mounting bracket under the new servomotor and new control unit “on place”

2.6 Install new hydraulic accumulator assembling:


- fit sketch with new accumulator assembling with existing metal construction
- manufacture items listed in the Item 1 of the current document
- install new accumulator’s assembling

2.7 Assemble tubes “on place” with instruction below.

2.8 Install new linear position sensor in accordance with the drawing 2000051 AD

2.9 Replace old direction valves of stop valves with new

2.10 Clearing and pressure tests of new tubes

2.11 Participation in SAT

Turn nuts to limit stroke


of the servomotor

Assemble level with


steam valve

Fit new servomotor


with old parts

Drill orifices “on place”

Confidential : EMERSON PROCESS MANAGEMENT


Governor Retrofit Contract:
CFE - Azufres Reference Emerson:
Construction design_R1 Page 8 de 12

Provide additional
bracket under new
servomotorr with
control unit from
existing metal
construction

Provide fix and


installation new
accumulator with
existing metal
construction

Confidential : EMERSON PROCESS MANAGEMENT


Governor Retrofit Contract:
CFE - Azufres Reference Emerson:
Construction design_R1 Page 9 de 12

Assemble pressure
pipe. All tubes and
connectors are scope
of Installation company

Manufacture adopter –
from G2 female to
Tube 60

Old tubes and ventil


Out to control unit – (reused)
G 1 1/2

New connector and


new piece of tube

Place of welding

Confidential : EMERSON PROCESS MANAGEMENT


Governor Retrofit Contract:
CFE - Azufres Reference Emerson:
Construction design_R1 Page 10 de 12

Assemble drain pipe.


All tubes and
connectors are scope
of Installation company

Old tubes and ventil

Connect with old fitting

Confidential : EMERSON PROCESS MANAGEMENT


Governor Retrofit Contract:
CFE - Azufres Reference Emerson:
Construction design_R1 Page 11 de 12

Assemble pressure line

G 1 1/2 G 1 1/2

Flexible hose about


5m

Confidential : EMERSON PROCESS MANAGEMENT


Governor Retrofit Contract:
CFE - Azufres Reference Emerson:
Construction design_R1 Page 12 de 12

Assemble drain line

Connector G 1 1/2 Welding flange with


connector G 1 1/2
Flexible hose about
3m

Assemble protection
line

Connector G1/8
Metal tube Welding adopter

Confidential : EMERSON PROCESS MANAGEMENT


4 3 2 1
2000051 AD

A-A ( 1 : 2 ) B-B ( 1 : 2 )
B 12
F(1:2) 27
45
A
52 46
37 M(1:1) 14
36
28 15
11
52
R R 42
20

33 13
21 40
2
33 41
B 27 21

250 maximum stroke


B
22

N(2:1)
M6 eight places

25
1 24
20 M
43 33
21
44 32 23
21 17
22 30
М6

31
53
30
36 F
First application
2000050 AD

25 x 60
7 R-R ( 1 : 1 )
16 M20x2.5 - 6H x 20 - 25
4 four places
6
16

M5
19
Reference Nr.

372,5
8

385

403,75
35 18

397,5
49
10 51
34
29
35 50
24 3
A
23 A
Signature and date

25 x 65
30 9 28
31 5
N 12
Nr. of dupl.

Technical performance
1. Power supply 24VDC.
2. Valve max stroke 250 mm.
3. Rated pressure 12 bar.
Nr. of original Signature and date Replacement

4. Test pressure 25 bar.


5. All orifices must be covered by plug during transportation.
A 6. Equip with 4 eye bolts M20.
65
7. Coverage: blue color (0,4 m2), instead of internal parts.
B
130
2000051 AD
Letter Mass Scale
Rev Sheet Doc. Nr Signature Date Hydraulic servomotor
Designed Cherniavskii Signed 31.08.2020
Assembly drawing 1:2
Checked Makeev Signed 07.09.2020

Sheet 1 Sheets 3
This drawing contains information proprietary to Emerson Process
Management. It is submitted in confidence and is to be used solely
for this project. This drawing and such information is not to be
reproduced, transmitted, disclosed, or used otherwise without written
Approved Shavlovich Signed 09.09.2020 authorization from Emerson Process Management. EMERSON
4 3 2 1 Копировал FormatA1
2 1

L
G(1:2)

H-H ( 1 : 1 )
60 Damping!zone
H

J J

300 Position!Sensor!Measuring!Range
G
11 47

K K
46

n10,2

22,5
45 45
М4
14
15
11 T(1:1)

40
41

2
42
30 - 1 Damping!zone
27
13 45
n19 46 47
2

B
[ 22]
[ 102]

М24х3 L-L ( 1 : 1 )
4 holes 36
42

13
[ 163]
[ 38]

A
Signature and date

K-K ( 2 : 1 ) 35
12
Nr. of dupl.

M8 A

7
Nr. of original Signature and date Replacement

37

1. Processing according to dimensions in square brackets should be done


during installation. Sheet
2000051 AD 2
Rev Sheet Doc.Nr Signature Date
2 1 Копировал Format A1
Item Format Number Name Qnt. Comments

Documentation

Hydraulic servomotor Assembly drawing 1

Sets

1 A3 2000055 Arm. Assembly 1 Mezon

Assembling units

2 A4 BALLUFF BTL7-E570-M0300-B-S32 Micropulse Transducer 1 BALLUFF

Details

3 A2 3000072 Piston 1 Mezon


4 A3 3000073 Inner cylinder 1 Mezon
5 A2 3000074 Bottom cover 1 Mezon
6 A3 3000075 Outside cylinder 1 Mezon
7 A3 3000076 Top cover 1 Mezon
8 A3 3000077 Axis 1 Mezon
9 VSTI33X2ORCF VSTI M-OR EO-Blanking plug for ports 1 PARKER
10 A3 3000078 Damper 1 Mezon
11 A3 3000079 Bracket 1 Mezon
12 A3 3000080 Kernel 2 Mezon
13 A3 3000081 Sensor bracket 1 Mezon
14 BALLUFF BTL-P-1013-4R Magnet 1 BALLUFF
15 BTL-P spaiser Spacer 1 BALLUFF
16 A3 3000082 Mounting bracket 1 Mezon
17 A3 3000083 Pin М20х80 4 Mezon
18 A3 3000084 Pin М24х55 4 Mezon
19 A3 3000085 Pin M24x460 6 Mezon
20 KASTAS-K06-140X152_2X7_3X12 Single acting wiper 1 KASTAS
21 KASTAS-K22-140X160X14 Single acting rod seal 2 KASTAS
22 KASTAS Seals-K68-140X145X15_2 Guide ring 1 KASTAS
23 KASTAS-K69-180X174X19_2 Guide ring 1 KASTAS
24 KASTAS-K17-159X180X8_1 Two piece double acting piston seal 1 KASTAS
25 A3 3000086 Sleeve 2 Mezon
26 A3 3000088 Arrow 1 Mezon
27 A3 3000087 Scale 1 Mezon
28 A3 3000089 Scale bracket 1 Mezon

Standard equipment

29 DIN 3771 - 122 x 3,55 - N - NBR 1


70(1)
30 DIN 3771 - 170 x 3,55 - N - NBR 2
70(3)
31 Кольцо 200-205-36-3 2
ГОСТ 9833-73
32 DIN 128 - A24 6
33 DIN 934 - M24 10
Signature and date

34 DIN 915 - M6 x 16 2
35 DIN 915 - M6 x 12 4
36 DIN 128 - A6 10
37 DIN 914 - M6 x 20 2
38 DIN 128 - A8 2
39 DIN 912 - M8 x 20 2
40 DIN 128 - A4 2
Nr. of dupl.

41 DIN 934 - M4 2
42 DIN 439 - M18 x 1,5 1
43 DIN 128 - A20 4
44 DIN 934 - M20 4
45 DIN 912 - M4 x 35 2
Nr. of original Signature and date Replacement

46 DIN 912 - M6 x 30 8
47 DIN 128 - A3 2
48 DIN 912 - M3 x 8 2
49 DIN 912 - M5 x 25 2
50 DIN 128 - A5 2
51 DIN 934 - M5 2
52 DIN 439 - M24 2
53 DIN 912 - M6 x 12 2

Sheet
2000051 AD 3
Rev Sheet Doc.Nr Signature Date
Копировал Формат A3
2 1
Перв. примен. Clamp

R115 - 2
Справ. №

230

270 14
40

A
300 A
Подп. и дата
Инв. № дубл.
Взам. инв. №
Подп. и дата

Clamp
Лит. Масса Масштаб
Изм. Лист № докум. Подп. Дата
Разраб. zshavlovich 28.09.2020
Пров.
Инв. № подл.

Т. контр. Лист Листов 1


Нач.отд.
Н. контр.
Утв.
2 1 Копировал Формат А3
2 1
Connection

100
Перв. примен.

+2
60

G 1 1/2-11 - x 50 - 70
Справ. №

100

100
A
A
Подп. и дата

G 1/4-19 - x 26,31
Инв. № дубл.
Взам. инв. №

+2
60
Подп. и дата

Connection
Лит. Масса Масштаб
Изм. Лист № докум. Подп. Дата
Разраб. zshavlovich 28.09.2020
Пров.
Инв. № подл.

Т. контр. Лист Листов 1


Нач.отд.
Н. контр.
Утв.
2 1 Копировал Формат А3
2 1
Перв. примен. Flange

150
Справ. №

G 1 1/2-11 - x 95,61

A
A
Подп. и дата

40
Инв. № дубл.
Взам. инв. №
Подп. и дата

Flange
Лит. Масса Масштаб
Изм. Лист № докум. Подп. Дата
Разраб. zshavlovich 29.09.2020
Пров.
Инв. № подл.

Т. контр. Лист Листов 1


Нач.отд.
Н. контр.
Утв.
2 1 Копировал Формат А3
2 1
Перв. примен.
Plate

162

12
650
600
500
400
Справ. №

4orif.M12; 20
300
+1
3oriif63
30 30

150
700

A 30 30

625
620

600
580

A
Подп. и дата

250

230
210

95
25

210
Инв. № дубл.

300
Взам. инв. №
Подп. и дата

Plate
Лит. Масса Масштаб
Изм. Лист № докум. Подп. Дата
Разраб. zshavlovich 28.09.2020
Пров.
Инв. № подл.

Т. контр. Лист Листов 1


Нач.отд.
Н. контр.
Утв.
2 1 Копировал Формат А3
2 1
Перв. примен.
Справ. № Ribbon ring

220
0
20

A
A
Подп. и дата
Инв. № дубл.
Взам. инв. №

10
Подп. и дата

Ribbon ring
Лит. Масса Масштаб
Изм. Лист № докум. Подп. Дата
Разраб. zshavlovich 28.09.2020
Пров.
Инв. № подл.

Т. контр. Лист Листов 1


Нач.отд.
Н. контр.
Утв.
2 1 Копировал Формат А3

You might also like