You are on page 1of 42

Take Off Sheet

PROJECT :
Location: BULE HORA

Contractor:
Consultant: Take Off No: 01
T D S Unit Description T D S Unit Description

A. SUBSTRUCTURE
1.0. Excavation & Earth Work
1.1 Site clearing to remove top organic soil

m2
Item
Description

A. SUB STRUCTURE
1.0. Excavation & Earth Work
Unit Qty Rate Amount
BAR SCHEDULE
PROJECT :
Location:
Employer:
Contractor: Bar Schedule No: 01
Consultant:
Length of Reinforcement Bar
S/N Location Diameter Length No of bars No of member Total no of bar
6mm 8mm 10mm 12mm 14mm 16mm
A. SUBSTRUCTURE

Total Length (m) 0.00 0.00 0.00 0.00 0.00 0.00


Bar schedule(kg/m) 0.22 0.395 0.617 0.89 1.21 1.58
Total Weight (kg)this page 0.00 0.00 0.00 0.00 0.00 0.00

B. SUPERSTRUCTURE

Total Length (m) 0.00 0.00 0.00 0.00 0.00 0.00


Bar schedule(kg/m) 0.22 0.395 0.617 0.89 1.21 1.58
Total Weight (kg)this page 0.00 0.00 0.00 0.00 0.00 0.00