Conclusion
From machine shop, we knew the operation of lathe machine and
milling machine.
We have known how to make the required spur gear.
Photos
Photos
3 of 4in x 2in mild steel sheets, mild steel sheet electrode (3.2 mm)
Required Tools
Electric cable or holder, thick gloves, face shield, earth cable or clamp,
chipping hammer
Required machines
DC generator machine
Procedure
The two metals are aligned to make sure the edges line up well.
They should be smooth and clean.
The electrode is conducted and let the metal arc started by tapping
or striking method.
High temperature is generated about 5000 ° F from the power
source made the molten pool and the end of the electrode melt into
the pool forming the joint.
The two metal sheets are connected at two edges by spotting
method not to move during welding.
Then they are welded to make the T-Joint. Butt joint is also used by
the above Steps.
After welding, the slags over the metal sheets are removed by using
the chipping hammer.
Precaution
We should wear protective clothes and thick gloves to protect heat,
flame and spark.
We need to have eyes and face protection because the light and the
gases produced during welding are harmful.
Conclusion
The required butt joint and lap joint are obtained.
7
Photos
Photos