Professional Documents
Culture Documents
Breve Introdução Das Atividades em E&P No Brasil: Brazilian Proved Reserves (SPE)
Breve Introdução Das Atividades em E&P No Brasil: Brazilian Proved Reserves (SPE)
Details
Barracuda/Caratinga Espadarte/Marimbá Roncador
• Module 1 went into production in 2000
• P-36 (SS) and P-47 (FPSO) utilized
• P-36 sunk March 2001 ( 11 died )
• After P-36, Module 1 becomes Mod. 1A
• FPSO Brasil replaced P-36
• P-52 (SS) soon to be in service
• New FPSO P-54 will be employed
• In 2011, P-55 (SS) deployed in Mod. 3
• 488,000 bpd production in 2014
Discovered: 1989/1994 Discovered: 1988 Number of Production Wells: 40
Number of Production Wells: 33 Number of Production Wells: 15 Average Production(06): 84,000 bpd
Average Production(06): 331,101 bpd Average Production(06): 24,000 bpd Peek Production(14): 488,000 bpd
Peek Production(12/11): 349,430 bpd Water Depth: 700-1500 meters Water Depth: 1500-1900 meters
Water Depth: 800-1350 meters Number of Production Units: 3 Number of Production Units: 4
FPSO P-54
Espírito Basin
Details
Marlim Sul Jubarte/Cachalote
• Production started in 1994
• Oil stored in FPSO P-38
• Gas sent to nearby Namorado field
• New SS P-51 planned to start in 2008
• Module 3,4 currently being explored
• 430,186 bpd projected in 2011
• New SS P-56 planned for Module 3
Tupi Details
• Discovered in 2007
• Reservoir 7 km from sea surface
• Salt Barrier 2 km thick
• Could be largest reservoir in the world
• Located 300 km from coast
• Primary test shows 28 API oil
• Offers many technical challenges