This document shows a drawing of pipe supports and traffic barriers being installed at a municipal building gate. A 2" diameter galvanized iron pipe will be used as the main support structure, with a 1" pipe frame and steel rebar welded to an existing steel fence. Steel frame boards and traffic barriers will also be installed. The drawing is part of a repair and improvement project of the municipal building gate in Catubig, Northern Samar.
This document shows a drawing of pipe supports and traffic barriers being installed at a municipal building gate. A 2" diameter galvanized iron pipe will be used as the main support structure, with a 1" pipe frame and steel rebar welded to an existing steel fence. Steel frame boards and traffic barriers will also be installed. The drawing is part of a repair and improvement project of the municipal building gate in Catubig, Northern Samar.
This document shows a drawing of pipe supports and traffic barriers being installed at a municipal building gate. A 2" diameter galvanized iron pipe will be used as the main support structure, with a 1" pipe frame and steel rebar welded to an existing steel fence. Steel frame boards and traffic barriers will also be installed. The drawing is part of a repair and improvement project of the municipal building gate in Catubig, Northern Samar.
1"Ø G.I. PIPE FRAME 2"Ø G.I. PIPE 3"Ø G.I. PIPE (PAINTED WITH (PAINTED WITH BLACK/YELLOW BLACK/YELLOW STRIPES) STRIPES) WITH HOOP REBAR WELDED INTO THE EXISTING STEEL FENCE STEEL FRAME FOR SIGN BOARD (4 NOS) STEEL TRAFFIC BARRIER (4 NOS) PREPARED BY: CHECKED BY: APPROVED BY: PROJECT TITLE / LOCATION: SHEET CONTENTS: DRAWING NO. Republic of the Philippines PROVINCE OF NORTHERN SAMAR REPAIR/IMPROVEMENT OF MUNICIPAL MUNICIPALITY OF CATUBIG MAURICIO R. PUJANTE Engineering Assistant RAYMUNDO J. GIRAY, JR. CE, M.ASCE Municipal Engineer HON. GALAHAD O. VICENCIO Municipal Mayor BUILDING GATE Catubig, Northern Samar S1